Bulletin  629,  September-October  1970  Page 

Factors  involved  in  upgrading  present  main  tracks  to  support  very  high 
speeds: 

Part  1 — Basic  mechanical  considerations    1 

Part  2 — Special  report  on  high-speed  rail  transportation 9 

Economics  of  ACI  systems   73 

Railroads  in  Europe — an  American's  views 79 

Location  and  operation  of  metropolitan  transit  systems  as  related  to  cur- 
rent railway  operations    95 

Ground  Rules  for  Discussion  Section   72 

Bulletin  630,  November-December  1970  (Part  1) 

Manual  Recommendations   107-161 

Bulletin  630,  November-December  1970  (Part  2 — Reports  of  Committees) 

16 — Economics  of  Railway  Location  and  Operation 165 

20— Contract   Forms    167 

9— Highways     169 

22 — Economics  of  Railway  Construction  and  Maintenance  183 

13 — Environmental    Engineering    203 

14 — Yards  and  Terminals   227 

11 — Engineering  Records  and  Property  Accounting   239 

27 — Maintenance  of  Way  Work  Equipment  249 

Bulletin  631,  January-February  1971  (Reports  of  Committees) 

1 — Roadway  and  Ballast  255 

3 — Ties  and  Wood  Preservation 291 

4— RaU  305 

5— Track    401 

31— Continuous  Welded  Rail   415 

6— Buildings    419 

7 — Timber  Structures   421 

8 — Concrete  Structures  and  Foundations   425 

15— Steel    Structures    429 

30 — Impact  and  Bridge  Stresses 431 

32 — Systems   Engineering    435 

28— Clearances    439 

25 — Waterways  and  Harbors   441 

24 — Engineering    Education    449 

Address  by  J.  H.  Spicer  at  Toronto  Regional  Meeting 454 

Address  by  Dr.  R.  S.  Thoman  at  Toronto  Regional  Meeting   458 

Ground  Rules  for  Discussion  Section   254 


Bulletin  633,  June-July  1971  (Convention  Report)  Page 

Opening  Session  Features   471 

Annual  Luncheon  Address    485 

Special  Features    491 

Remarks  by  Chairmen  of  Technical  Committees   609 

Memoir— H.  S.  Loeffler  635 

Memoir— E.  G.  Gehrke   637 

Report  of  Executive    Manager    639 

Report  of  Treasurer   653 

Constitution    659 


ADVANCE  COMMITTEE  REPORT 

Tie  Renewals  and  Costs  (Committee  3 — Ties  and  Wood  Preservation)     677 


American  Railway 

Engineering  Association  ~  Bulletin 


Bulletin  629  September-October  1970 

Proceedings  Vol.  72* 


CONTENTS 

Factors    involved    in    upgrading    present    main    tracks   to 
support  very  high  speeds: 

Part   1 — Basic  mechanical  considerations 1 

Part  2 — Special    report    on    high-speed    rail    trans- 
portation         9 

Economics  of  ACI  systems 73 

Railroads  in  Europe — an  American's  views 79 

Location  and  operation  of  metropolitan  transit  systems  as 

related  to  current  railway  operations 95 

Ground  Rules  for  Discussion  Section 72 


•  The  contents  of  this  Bulletin  and  subsequent  Bulletins  of  the  Association  to  and 
including  Bulletin  635,  June-July  1971  (except  the  blue-covered  Directory  Issue,  Bulle- 
tin 634,  April-May  1971),  will  constitute  the  Annual  Proceedings  of  the  Association, 
Vol.  72.  Accordingly,  this  issue  of  the  Bulletin  should  be  carefully  preserved  for  inclu- 
sion in  the  Proceedings  book-type  binder  which  will  be  made  available  on  request 
from    Association    Headquarters,    following   publication   of    the  June-July   issue. 


Copyright  1970,  by  American   Railway  Engineering   Association 


BOARD  OF  DIRECTION 

1970-1971 

President 
E.  Q.  Johnson,  Chief  Engineer,  Norfolk  &  Western  Railway,  Roanoke,  Va.  24011 

Vice  Presidents 

A.  L.  Sams,  Vice  President  and  Chief  Engineer,  Illinois  Central  Railroad,  Chicago,  111. 

6060S 
R.  M.  Brown,  Chief  Engineer,  Union  Pacific  Railroad,  Omaha,  Neb.  68102 

Past  Presidents 

H.  E.  Wilson,  Assistant  Chief  Engineer  System,  Atchison,  Topeka  &  Santa  Fe  Railway, 

Chicago,  111.  60604 
H.  M.  Williamson,  Chief  Engineer,  System,  Southern  Pacific  Transportation  Company, 

San  Francisco,  Calif.  94105 

Directors 

D.  V.  Sartore,  Chief  Engineer — Design,  Burlington  Northern,  Inc.,  St.  Paul,  Minn.  55 101 
S.  A.  Cooper,  Chief  Engineer,  Gulf,  Mobile  &  Ohio  Railroad,  Mobile,  Ala.  36601 

J.  F.  Piper,  Chief  Engineer,  Pennsylvania-Reading  Seashore  Lines,  Camden,  N.  J.  08103 

C.  T.  PoPMA,  Chief  Engineering  Officer,  Penn  Central  Transportation  Company,  Phila- 
delphia, Pa.  19104 

C.  W.  Wagner,  Industrial  Engineering  Officer,  Canadian  National  Railways,  Montreal, 
101,  Que.,  Can. 

R.  F.  Bush,  Chief  Engineer,  Erie  Lackawanna  Railway,  Cleveland,  Ohio  441  IS 

A.  W.  Carlson,  Chief  Engineer,  Western  Pacific  Railroad,  San  Francisco,  Calif.  94105 

E.  T.  Franzen,  Chief  Engineer,  Missouri  Pacific  Railroad,  St.  Louis,  Mo.  63103 

J,  T.  Ward,  Senior  Assistant  Chief  Engineer,  Seaboard  Coast  Line  Railroad,  Jackson- 
ville, Fla.  32202 

E.  M.  Hastings,  Jr.,  Utility  Engineer,  Chesapeake  &  Ohio  Railway-Baltimore  &  Ohio 
Railroad,  Huntington,  W.  Va.  25718 

B.  J.  WoRLEY,  Vice  President-Chief  Engineer,  Chicago,  Milwaukee,  St.  Paul  &  Pacific 

Railroad,  Chicago,  111.  60606 
W.  J.  Jones,  Engineer  Maintenance  of  Way  and  Structures,  System,  Southern  Pacific 
Transportation  Company,  San  Francisco,  Calif.  94105 

Treasurer 
A.  B.  HnxMAN,  Jr.,  Chief  Engineer,  Belt  Railway  of  Chicago,  Chicago,  111.  60638 

Executive  Manager 
Eam.  W.  Hodgkins,  59  East  Van  Buren  Street,  Chicago,  111,  60605 

Administrative  Secretary 
E.  L.  Abbott,  59  East  Van  Buren  Street,  Chicago,  111.  60605 

Technical  Secretary 
N.  V,  Engman,  59  East  Van  Buren  Street,  Chicago,  111.  60605 

Published  by   the   American   Railway   Engineering  Association,   Bi-Monthly,   January-February,   April- 
May,    June-July,    September-October    and   November-December,    at 
59  East  Van  Buren  Street,  Chicago,  III.  6060S 

Second  class  postage  at  Chicago,  111.,  and  at  additional  mailing  offices. 
Subscription  $15  per  annum. 


Advance   report  of  Committee    16 — Economics  of   Railway 
Location  and  Operation 

Report  on   Assignment  9 

Determine  factors,  including  costs,  involved  in  rehabilitation, 

operation  and  maintenance  that  may  be  incurred  in 

upgrading  present  main  tracks  to  support 

very  high  speeds  above  80  mph 

72-629-7 t 

H.  J.  Kay  (chairman,  subcommittee),  M.  B.  Miller  {vice  chairm,an,  subcommittee), 
R.  H.  Dunn,  R.  C.  Gilbert,  G.  E.  Hartsoe,  W.  Henschell,  G.  R.  Janosko, 
R.  J.  Lane,  C.  J.  Meyer,  R.  McCann,  D.  McCorquodale,  W.  B.  O'Sullivan, 
W.  L.  Paul,  G.  Rugge,  L.  K.  Sillcox,  H.  Wanaselja,  F.  Wasco. 

This  is  the  final  report  on  Assignment  9  and  is  presented  in  two  parts,  both 
as  information.  Part  1,  immediately  following,  discusses  Basic  Mechanical  Considera- 
tions. Part  2,  beginning  on  page  9,  is  a  Special  Report  on  High  Speed  Rail 
Transportation  written  by  W.  B.  O'Sullivan,  a  former  member  of  AREA  Committee 
16  (now  a  member  of  AREA  Committee  5 — Track),  who  assumes  sole  responsi- 
bility for  the  complete  text  of  his  report. 


Part   1 
Basic  mechanical  considerations 

Locomotive   Horsepower   Requirements 

A  locomotive  hauling  a  train  develops  a  certain  amount  of  horizontal  pull, 
known  as  draw-bar  pull.  It  is  the  tractive  force  at  tlie  rail  minus  the  effort  which  is 
needed  to  move  the  locomotive.  It  is  equal  to  the  resistances  encountered  by  the 
train  in  motion. 

Resistance  at  any  specified  speed  is  usually  measured  in  pounds  per  ton  and 
is  equal  to  the  amount  of  horizontal  force  required  to  sustain  the  movement  of  one 
ton  (2,000  lb)  of  train  at  that  speed.  If  at  any  speed  the  locomotive  has  excess 
capacity  to  develop  a  greater  tractive  force,  it  is  capable  of  accelerating  the  train 
to  a  higher  speed.  The  maximum  speed  attainable  is  reached  when  the  maximum 
tractive  force  that  the  locomotive  can  exert  at  any  given  speed  is  equal  to  the  total 
resistances  to  be  overcome  by  the  train  and  locomotives  at  that  speed.  At  high  sus- 
tained speeds  the  relationship  between  resistance  and  available  tractive  force  is  of 
increasing  signifiance  in  evaluating  the  overall  economic  considerations. 

Gross  resistance  to  the  movement  of  the  train  is  comprised  of  the  following 
elements,  all  of  which  may  be  expressed  in  pounds  per  ton: 

1.  Resistance  on  straight  and  level  track  at  uniform  speed  in  still  air  (internal 
resistance ) . 

2.  Resistance  due  to  grade. 

3.  Resistance  due  to  curves. 

4.  Resistance  to  acceleration. 


t  Discussion  open  until   December    15,   1970. 

1 
Hill.   WM 


High    Speed    Rail    Transportation 


Resistance    on    Straight   Level    Track 

Assuming  average  operating  conditions,  i.e.,  mild  weather,  good  track  and  road- 
bed and  rolling  stock  of  standard  types,  the  \ariablcs  relating  to  internal  resistance 
on  straight  and  level  track  are  those  representing  the  physical  contact  between  wheel 
and  rail,  the  speed  of  the  train  and  weights  of  the  equipment.  The  elements  of  inter- 
nal resistance  may  be  divided  into  the  four  following  classes  based  upon  their  rela- 
tionship to  speed: 

1.  Elements  which  are  constant  with  respect  to  speed  and  weight  per  axle 
but  vary  with  respect  to  surface  condition  and  horizontal  contour  of  rail- 
head as  well  as  contour  and  condition  of  wheel  tread. 

2.  Elements  which  are  constant  witli  respect  to  speed  but  vary  with  respect 
to  weight  per  axle,  such  as  journal  bearing  friction. 

3.  Elements  which  are  proportional  to  the  first  power  of  speed,  including 
wheel  flange  friction  and  friction  due  to  concussion,  swaying  and  oscilla- 
tion resulting  from  lateral  motion. 

4.  Elements  which  are  proportional  to  the  square  of  the  speed,  consisting 
of  air  resistances. 

The  total  resistance  in  pounds  per  ton  exclusive  of  the  effect  on  grades  and 
curves  is  the  sum  of  the  above  four  components  which  may  be  referred  to  as  rolling 
friction,  journal  bearing  friction,  train  dynamic  losses,  and  air  resistance.  These  four 
components  of  resistance  on  straight  and  level  track  may  be  combined  into  a  single 
formula.  One  of  the  most  commonly  known  fonnulas  is  the  Davis  Formula  which 
is  included  in  Chapter  16  of  the  Manual.  Modifications  of  this  formula  are  used  by 
some  roads  and  one  modification  is  also  included  in  the  Manual.  The  formulas  are 
shown  in  Appendix  C.  Basic  computer  programs  for  train  performance  calculations 
which  take  into  account  all  of  the  resistance  parameters  and  tractive  force  have  been 
developed. 

Limitations   of   Existing    Formulas 

Application  of  these  programs  or  the  Davis  Formula  to  determine  train  per- 
formance at  sustained  high  speed  may  involve  certain  limitations  or  additional  con- 
siderations as  they  relate  to  the  four  classes  of  internal  resistance.  Such  limitations 
and  considerations  for  each  of  the  four  classes  appear  to  be: 

1.  Rolling  friction — This  can  be  considered  constant  for  a  given  quahty  of 
track  and  assuming  that  railhead  contour  and  condition  would  be  better 
in  high  sustained  speed  territories,  it  is  recommended  that  tlie  value  of  0.6 
included  in   the  modified  Davis  Formula   be  used. 

2.  Journal  bearing  friction — There  is  no  appreciable  diff^erence  between  solid 
bearings  and  roller  bearings  above  35  mph,  but  other  mechanical  con- 
siderations heavily  favor  the  use  of  all  roller  bearings. 

3.  Train  dynamic  losses — Present  available  information  indicates  that  properly 
designed  six-axle  locomotives  can  operate  at  speeds  up  to  120  mph  with- 
out developing  truck  hunting  action  (swaying  due  to  concussion,  vibra- 
tion, flange  friction  and  other  miscellaneous  frictions).  The  threshold 
speed  for  hunting  with  four-axle  locomotives  is  somewhat  lower.  Test  runs 
by  the  AAR  Research  Department  on  a  94-ft-long  high-cube  car  indicated 


Basic    Mechanical    Considerations 


that  the  four-wheel  trucks  operated  satisfactorily  at  90  mph.  Investigation 
of  truck  design  for  high  speed  operation  is  now  under  study. 
4.  Air  resistance — The  first  diesel  locomotives  developed  for  road  freight 
service  were  of  the  semi-streamlined  car  body  design,  and  this  design  pre- 
vailed until  the  manufacturers  developed  the  so-called  general  purpose 
locomotive  commonly  referred  to  as  a  road  switcher.  The  general  concept 
of  the  road  switcher  design  has  usually  prevailed  up  to  the  present  time, 
and  this  design  is  less  streamlined  than  the  former  car  body  type  but  some 
semi-streamlined  units  are  now  coming  back  into  use. 
Streamlining  becomes  increasingly  important  in  reducing  frontal  pressure 
at  speeds  in  excess  of  50  mph,  and  the  effect  of  this  parameter  upon  horse- 
power requirements  should  be  analyzed  in  train  performance  calculations 
involving  sustained  high-speed  operation. 

Present  freight  train  consists  have  a  wider  variety  of  equipment  than  was 
formerly  the  case  and  now  include  TOFC,  high-cube,  and  high  capacity 
cars  intermingled  \\'ith  older  equipment.  In  addition,  the  use  of  cushion- 
type  draft  gear  has  increased  the  distance  between  adjacent  car  bodies 
which  reduces  the  streamlining  of  the  train  as  a  whole.  The  effects  of 
these  features  upon  the  co-efficients  previously  recommended  for  use  in 
the  resistance  formula  are  not  definitely  known. 

Economic  Considerations 

The  ultimate  objective  of  sustained  high-speed  rail  operation  is  to  provide  a 
more  attractive  and  dependable  service  vis-a-vis  competing  modes  of  transportation, 
which  in  turn  would  not  only  prevent  further  erosion  of  rail  traffic  but  would  also 
generate  additional  revenues.  The  additional  revenues  generated  provide  one  im- 
portant criteria  for  determining  the  monies  available  for  capital  expenditures  to 
improve  existing  roadway  and  equipment  which  would  be  required  to  permit  sus- 
tained high-speed  operation.  Initially,  the  additional  revenues  expected  to  accrue 
are  in  large  measure  dependent  upon  judgment  estimates  by  Traffic  Department 
officers  or  a  marketing  study,  both  of  which  are  subject  to  certain  infirmities. 

Two  basic  requirements  for  sustained  high-speed  operation  are  adequate  road- 
way and  suitable  equipment,  each  of  which  cannot  be  considered  separately.  Pres- 
sently  in  North  America  there  are  not  many  territories  where  sustained  high  speeds 
can  be  attained  over  long  districts  because  of  restrictions  due  to  curvature,  grades 
or  track  conditions.  Restrictions  due  to  curvature  and  grades  are  generally  more 
acute  in  mountain  territory,  and  although  greater  roadway  capital  expenditures 
would  be  required  to  reduce  or  eliminate  these  restrictions,  the  resulting  savings  in 
operating  costs  and  motive  power  requirements  along  with  additional  revenues  might 
justify  the  estimated  expenditures. 

Present  authorized  maximum  freight  train  speed  for  many  roads  is  60  mph, 
and  a  few  roads  have  increased  maximum  authorized  freight  train  speed  to  70  mph. 

One  road  has  a  maximum  speed  of  75  mph  for  a  particular  train  operating 
with  standard  equipment,  and  the  highest  maximum  authorized  freight  train  speed  is 
90  mph  in  a  certain  territory  on  one  road  for  one  specific  train  which  is  operated 
with  a  limited  number  of  all  TOFC  cars  equipped  with  roller  bearings. 

One  of  the  factors  involved  in  the  economic  considerations  for  sustained  high- 
speed operation   is  the  saving  in   time  which  would  occur  as  speeds  are  increased. 


High    Speed    Rail    Transportation 


Theoretically,  doubhng  the  maximum  authorized  speed  would  reduce  the  over-the- 
road  time  by  50  percent  providing,  of  course,  that  this  increase  could  be  accom- 
pUshed  over  the  entire  segment  of  road  under  consideration.  However,  increasing 
the  maximum  authorized  speed  from  90  to  100  mph  results  in  a  gain  of  only  6  min 
and  40  sec  for  each  100-mile  segment,  or  slightly  over  3  hours  for  a  transcontinen- 
tal nm  from  coast  to  coast.  Appendix  A  of  tliis  report  shows  the  saving  in  time  per 
100  miles  for  increases  in  speeds  in  10-mph  increments  from  60  to  120  mph. 

Selection  of  the  type  of  motive  power  affects  the  overall  economic  analysis, 
and  the  available  alternatives  include  electric,  diesel-electric  and  gas-turbine  elec- 
tric. The  speed-tractive  effort  curves  for  diesel-electric  and  electric  locomotives 
included  in  Chapter  16  of  the  Manual  are  typical  of  similar  curves  for  units  in  serv- 
ice today,  and  curves  for  gas-turbine  electric  locomotives  are  similar  to  those  for 
diesel  locomotives. 

Diesel  units  in  freight  service  are  equipped  with  either  four-  or  six-wheel  trucks 
and  have  various  ratings  of  from  1500  to  5000  hp.  Tractive-effort  curves  are  avail- 
able from  the  manufacturer,  but  in  the  absence  of  such  data,  the  available  tractive 
effort  may  be  calculated  from  the  following  fonnula: 

TE=  308  X  HP 


V 
where:   TE  =  tractive  effort  in  pounds 

HP  =  rated  horsepower  of  the  diesel  engine 
V  =  track  speed  in  miles  per  hour 

The  characteristics  of  the  speed-tractive  effort  curves  produced  by  this  formula 
for  units  of  different  horsepower  are  similar  to  the  curve  shown  in  Appendix  D 
taken  from  the  Manual  for  a  2,000  horsepower  unit;  and  for  any  given  speed,  the 
available  tractive  effort  is  proportional  to  the  rated  horsepower  of  the  unit. 

At  high  sustained  speeds  the  excess  tractive  effort  available  for  acceleration 
becomes  an  important  element  in  any  economic  consideration  because  the  available 
horsepower  decreases  and  the  total  resistance  increases  as  the  speed  increases. 
Therefore,  additional  power  units  may  be  required  merely  to  accelerate  the  train  in 
the  high-speed  range  at  rates  within  realistic  limits.  Since  the  rate  of  acceleration 
desired  is  flexible  within  certain  limits,  the  related  additional  investment  and  operat- 
ing costs  should  be  weighed  against  the  benefits  gained. 

The  effect  of  high  sustained  speed  upon  the  hauhng  capacity  of  a  locomotive 
is  graphically  illustrated  in  Appendix  B — Locomotive-Car  Capacity  at  Various 
Speeds.  This  graph  also  provides  an  approximate  basis  for  estimating  the  economics 
of  increased  speeds  as  they  relate  to  power  requirements.  Based  upon  the  data 
shown,  the  hauling  capacity  of  a  diesel  locomotive  at  100  mph  is  about  25  percent 
of  its  capacity  at  60  mph,  33  percent  of  its  capacity  at  70  mph  and  50  percent  of 
its  capacity  at  80  mph.  Stated  another  way,  a  given  train  requires  four  times  as 
many  units  at  100  mph  as  it  does  at  60  mph  and  twice  as  many  units  as  at  80  mph. 

The  selection  of  individual  units  within  a  particular  type  of  motive  power  for 
sustained  high-speed  operation  affects  the  economic  results.  Generally  speaking,  the 
selection  of  units  having  high  rated  horsepower  results  in  lower  costs  per  horse- 
power for  initial  investment,  operating  costs  and  depreciation.  However,  increases 
in  speed  above  60  mph  up  to  ICO  mph  does  not  necessarily  require  replacement  of 
existing  power  units  with  new  power.   Most  of  the  units  presently  used  in  through 


Basic    Mechanical    Considerations 


freight  sersdce  have  gear  ratios  which  permit  a  maximum  speed  of  at  least  55  mph, 
and  by  changing  the  gear  ratio,  the  maximum  speed  can  be  increased  up  to  about 
105  mph,  providing  other  mechanical  considerations  do  not  impose  a  lesser 
restriction. 

The  selection  of  individual  units  also  affects  the  train  service  labor  costs.  Under 
present  labor  contracts  the  compensation  of  enginemen  is  based  in  part  upon  tlie 
weight  of  the  locomotive  operated,  and  the  basic  daily  and  mileage  rates  increase 
for  each  50,000  lb  over  200,000  lb.  A  1,500-hp  unit  with  six-wheel  trucks  weighs 
approximately  363,000  lb  compared  to  a  total  weight  of  approximately  417,000  lb 
for  a  5,000-hp  unit.  Since  three  and  one-third  units  weighing  approximately 
1,200,000  lb  would  be  required  to  replace  a  single  5,000-hp  unit,  enginemen's  com- 
pensation would  be  greater  for  the  units  of  lower  horsepower.  At  the  wage  levels  of 
January  1,  1969  the  increased  cost  would  be  in  excess  of  3  cents  per  train  mile, 
exclusive  of  fringe  benefits,  assuming  operation  without  a  fireman. 

Freight   Cars 

At  the  end  of  1968  there  were  approximately  1,800,000  freight-carrying  cars  in 
service  in  the  United  States.  The  individual  units  comprising  the  total  vary  widely 
in  design,  age,  length,  carrying  capacity  and  type  of  construction. 

The  present  trend  when  purchasing  new  equipment  is  to  acquire  cars  best 
suited  to  the  requirements  of  the  shippers.  As  a  result  of  this  pohcy,  some  of  the 
newer  cars  have  special  equipment  or  are  of  special  construction  designed  to  meet 
the  needs  of  a  particular  group  of  shippers  or  to  haul  a  specific  commodity.  Many 
of  the  newer  cars  have  high  carrying  capacity.  The  present  freight-rate  structure 
is  in  part  related  to  high-capacity  cars,  and  any  diminution  in  carrying  capacity 
which  might  be  necessary  to  achieve  high  sustained  speeds  could  alter  the  existing 
intermodal  competitive  relationship  unless  the  rate  structure  were  adjusted 
accordingly. 

The  present  freight  car  truck  system,  though  currently  under  extensive  study 
relating  to  operation  and  maintenance,  is  capable  of  performing  safely  at  speeds  over 
80  mph,  which  was  one  of  the  criteria  in  its  development. 

As  indicated  previously,  a  94-ft-long  high-cube  car  has  been  operated  at  speeds 
of  90  mph  on  main-line  track  in  a  test  run  conducted  by  the  AAR  Research  Depart- 
ment, and  one  road  is  regularly  operating  TOFC  equipment  at  this  speed.  In  the 
event  the  results  of  the  studies  by  the  AAR  Mechanical  Division  indicate  that  it  is 
not  practicable  to  opeiate  present  equipment  at  speeds  higher  tlian  90  mph,  this 
would  appear  to  be  the  upper  limit  until  such  time  as  the  equipment  could  either 
be  replaced  or  modified  for  higher  speeds.  The  capital  requirements  necessary  to 
replace  even  half  of  the  present  fleet  are  of  such  magnitude  as  to  preclude  econom- 
ical replacement  over  a  short  period  of  time. 

Summary 

The  operation  of  freight  trains  at  high  sustained  speeds  requires  investigation 
and  analysis  of  many  elements.  Some  of  the  individual  elements  involve  complex 
combinations  of  interrelated  engineering,  mechanical  and  operating  fields  of  inciuiry 
which  cannot  be  fully  evaluated  unless  considered  together.  Therefore,  if  investiga- 
tion of  this  subject  is  to  produce  meaningful  results  at  the  earliest  possible  date,  joint 
participation   of  the  various  departments  involved  is  recommended. 


6 


High    Speed    Rail    Transportation 


Acknowledgements 

C.  A.  Love,  chief  mechanical  officer  of  the  Louisville  &  Nashville  Railroad,  fur- 
nished certain  material  which  is  incorporated  in  the  above,  and  his  contribution  is 
acknowledged  with  appreciation.  The  Steam  Locomotive,  Second  Edition,  by  R.  P. 
Johason;  Modern  Railroads;  Railway  Age;  and  AAR  Yearbook  of  Railroad  Facts, 
1969  Edition,  were  also  used. 


APPENDIX   A 

Saving  in  Minutes  for  Each  100  Miles  as  Speed  Is  Increased 
FROM  60  TO  120  MPH  IN  Increments  of  10  MPH 


MPH 

To 

70 

80 

90 

100 

110 

120 

Saving  in  Minutes 

From: 

60  MPH        

14.3 

25.0 
10.7 

33.4 

19.1 

8.3 

40.0 

25.7 

15.0 

6.7 

45.5 
31.2 
20.5 
12.1 
5.5 

50.0 

70  MPH              

35.8 

80  MPH              

25.0 

90  MPH 

16.7 

100  MPH 

10.0 

110  MPH 

4.6 

I.Ol 


M'lMNnlX   B 


AH  (  APAriTV  AT  VAHIOI'S  SPKKDS 


200 


5  150 
o 


100 


I    50 

Z 


i'hki'ah|-|)  nv  n.  m.  magkk.  assistant  vick  prhsidknt- 
hi:si:aiuii,  aah  (now  rftirkd),  and  provided  by 

V .  A.   l.OVK,  CIIIKF  MRrriANICAL  OKFICER- 

KQl'IPMFNT,  LOUISVILLE  «.  NASHVILLE 

RAILROAD.  AND  FORMER  C'llAlRMAM 

oi'  Mi:riiANirAi,  di\  isioN,  aar 


LOCOMOTIVE  -  3600  HP    DIESEL 
CARS   -  100   TON 
TRACK -LEVEL 


lL_a 


n 


XI 


l~l 


10   20   30   40   50   60   70 
TRAIN   SPEED  -  MPH 


80   90   100 


Basic    Mechanical    Considerations 


APPENDIX   C 
Davis  Formula 

29  CAV- 


R  z=  resistance  in  pounds  per  ton. 

W  =  average  weight  in  tons  per  axle  of  locomotive  or  car. 
N  =  number  of  axles. 
b  =  coefficient  of  flange  friction — effects. 
V  =  velocity  of  train  in  miles  per  hour. 
C  =  drag  coefficient  of  air   (0.0017  for  streamlined  locomotives;   0.0025  for 

other    locomotives,    0.0005    for    freight    cars    and    0.0OO34    for    traihng 

passenger  cars ) . 
A  =:  cross-sectional   area    in   square   feet   of   locomotives   and   cars    ( 120   for 

locomotives  and  90  for  cars). 

Modified  Davis  Formula 
R  =  0.6  + -^  +  O.OIV + 


W     '      ■  '     WN 


where 


B  =  resistance  in  pound  per  ton. 
W  =  weight  per  axle  in  tons. 
N  =  number  of  axles  per  car. 
V  =:  speed  in  miles  per  hour. 
K  =  air  resistance  coefficient: 

0.07  for  conventional  equipment, 

0.16  for  piggyback, 

0.0935  for  containers. 


High    S  peed    R  ail    Tr  ansportation 


APPENDIX   D 


90 


80 


70 

Q 

Z 
3 
O 

°-60 
o 
o 
o 


q:50 
o 


^40 

< 


30 


20 


1 

\ 

6; 

40" 

?:15  GEAF 
DIAMETE 

R  RATIO 
R    WHEEL 

S 

\ 

\ 

\ 

\ 

\ 

0                 l( 

D               2 

0               3 

0               4 

0                5 

0               6 

0               70 

SPEED -MILES   PER   HOUR 


Locomotive    rating     (continuous    horsepower    for    traction)     2,000 

4  Traction  motors. 
Weight: 

Locomotive,    fully    loaded    244,800    lb. 

On    drivers,    fully    loaded 244,800    lb. 

Modifications: 

Ballast — Maximum    weight,    fully    loaded 278,000   lb. 


Part  2 


Special   report  on   high-speed   rail   transportation 

By   W.    B.    O'SULUVAN 

Staff   Engineer,    Federal    Railroad   Administration 

U.    S.    Department   of   Transportation 


FOREWORD 

The  first  progress  report  on  Assignment  9  of  Committee  16  appeared  in  Bulletin 
616,  November  1968.  This  report  discussed  the  dilemma  confronting  your  committee 
in  carrying  out  its  assignment  in  the  face  of  a  marked  paucity  of  fact.  At  that  time 
it  appeared  that  a  useful  service  could  be  rendered  the  Association  by  summarizing 
current  and  recent  past  investigative  work  bearing  on  the  subject  even  though  the 
bulk  of  this  material  contained  precious  little  reference  to  associated  costs.  Addi- 
tionally, it  was  felt  then  that  the  creation  of  a  topical  bibliography  would  be  helpful. 

The  passage  of  a  few  brief  years,  while  not  discrediting  the  value  of  this  early 
intention,  did  indeed  reveal  the  domplexity  of  such  an  endeavor  and  the  inap- 
propriateness  of  attack  by  a  group  so  structured  as  your  committee.  Moreover  it  now 
appears  that  a  reasonably  comprehensive  bibliography  would  occupy  many  pages 
of  the  Bulletin,  a  space  requirement  disproportionate  to  the  general  interest  of  a 
large  portion  of  the  readership.  Partial  dispatch  of  this  obligation  is  offered  in  Refer- 
ence 31  under  which  are  shown  titles  and  sources  of  three  published  bibliographies 
containing  a  total  of  150  pages  of  listings  pertaining  to  high-speed  ground  transport. 

This  same  time  span,  however,  has  not  been  wholly  uncharitable  in  its  treat- 
ment of  committee  aspirations  in  this  area.  There  now  exists  in  this  country  a  viable 
high-speed  train  service  which  has  given  birth  to  a  small  but  growing  body  of  expe- 
rience. Further,  the  work  of  a  group  within  the  Federal  Government  to  produce  a 
comprehensive  quantitative  analysis  of  some  of  the  long-range  transportation  prob- 
lems of  a  major  region  of  tlie  Nation  has  recently  been  made  accessible.  Part  of  this 
study  supplies  projected  in-the-order-of  costs  for  the  conversion  of  an  existing  rail 
line  to  support  passenger  train  speeds  of  vip  to  150  mph. 

A  very  real  uncertainty  preceded  the  decision  as  to  how  to  structure  treatment 
of  the  subject.  One  can  readily  succumb  to  the  lure  of  the  many  fascinating  tech- 
nical aspects  attending  high-speed  train  operation  and  dwell  overlong  on  a  singular 
facet,  to  the  ultimate  distraction  of  many  readers.  On  the  other  hand,  an  in-depth 
review  of  the  entire  field  is  equally  unsuitable.  Firmly  guiding  final  resolution  of 
the  problem  is  the  impression  that  a  large  part  of  the  potential  readership,  a  Ijody 
of  diligently  applied  and  pragmatic  railroad  engineers,  would  find  most  helpful  a 
siunmary  type  presentation;  an  identification  of  the  unique  components  of  contem- 
porary experience,  problems  isolable  and  anticipated,  and  the  pro])al)le  economic 
burden  associated  with  overcoming  these  pro])lems.  A  strong  eflort  will  be  made 
toward  categorizing  salient  issues  while,  at  the  same  time,  resisting  the  urge  toward 
extended  expository  involvement. 


10 High    Speed    Rail    Transportation 

In  the  development  of  tliis  report  it  is  proposed  to  first,  characterize  the  forces 
that  prompt  the  consideration  of  high  speed  ground  transportation  as  a  means  of 
affording  rehef  of  certain  well  defined  societal  dilemmas,  to  then  look  at  contem- 
porary experience,  here  and  ahroad,  in  order  to  determine  if  present  trends  portend 
the  likelihood  of  eventual  relief  and  finally,  to  look  at  the  projected  cost-benefit  rela- 
tionships for  various  levels  of  improvement  in  the  forms  of  modification  of  existing 
rights  of  way  and  new  construction. 

From  the  fortuitous  occurrence  of  events  it  is  now  possible  to  take  a  small  but 
significant  step  toward  the  discharge  of  this  assignment;  a  step,  in  fact,  which  may 
be  happily  substituted  for  the  originally  contemplated  course  of  action.  It  is  felt 
that  where  the  outstanding  aspects  of  high  speed  rail  achievement,  present  and  near- 
term  future  possibilities,  are  discussed  in  this  report,  further  consideration  of  the 
topic,  within  this  reportorial  context  may  be  suspended  for  some  years  attending  the 
identification   of  new  information. 

The  author  of  this  report  wishes  to  acknowledge  the  assistance  of  Neil  Moyer, 
of  FRA's  Office  of  High  Speed  Ground  Transportation,  in  locating  certain  references 
and  in  the  translation  of  occasional  particularly  intractable  material.  Additionally, 
an  expression  of  appreciation  is  owed  Steven  Ditmeyer,  of  the  same  unit,  for  his 
guidance  through  the  mazes  of  stochastic  analysis. 

The  author  of  this  report  assumes  sole  responsibility  for  the  complete  text.  In  no 
way  should  the  contents  of  this  discussion  l^e  considered  as  representing  an  official 
stance  of  the  U.S.  Department  of  Transportation's  Federal  Railroad  Administration 
with  regard  to  events,  concepts,  or  personalities  dwelt  upon  in  the  text. 

BACKGROUND 

Even  the  most  sanguine  proponent  of  high-speed  rail  transportation  would  have 
to  admit  that  in  the  United  States  we  are,  at  best,  poised  on  the  threshold  of  entry 
into  this  domain.  For  the  fastest  service  now  available  in  this  country  the  average 
speed  is  somewhat  over  89  mph  for  an  entire  non-stop  trip.  Since  this  discussion 
intends  to  consider  speed  ranges  much  greater  than  this  and  because  the  whole 
concept  of  high-speed  ground  transportation  is  not  one  on  which  everyone  con- 
cerned has  evolved  a  unanimity  of  opinion,  an  examination  of  the  forces  urging  us 
in  this  direction  would  not  be  misdirected. 

Train  speeds  of  the  order  of  150  to  300  mph  must  presuppose  the  movement 
of  people  rather  than  commodities.  At  this  point  there  appears  scant  economic 
justification  for  the  enormous  investment  that  would  be  required  to  move  the  bulk 
of  the  nation's  freight  at  these  speeds.  Conceivably,  certain  containerized  merchan- 
dise transported  on  vehicles  of  specific  design  might  move  at  premium  rates  in  such 
a  service.  But,  as  a  percentage,  this  would  be  a  small  fraction  of  the  overall  national 
freight  transfer.  The  prospect  of  rail-bound  movement  of  the  country's  goods  at 
speeds  in  excess  of  100  mph  seems  dim  indeed  in  the  forseeable  future.  We  are, 
then,  scrutinizing  the  value  of  high-speed  groimd  transportation  of  people;  is  it 
necessary  and  is   it  feasible? 

In  an  examination  of  the  first  qualification  the  effect  of  certain  well  identified 
sociological    phenomena   must  be   considered. 

Through  the  compulsion  of  personal  desire  to  enjoy  the  sometimes  questionable 
fruits  of  urban  living  and  following  the  mechanisation  of  traditional  rural  employ- 
ment opportunities,  cities  and  towns  have  attracted  large  numbers  of  people.  Cur- 
rently  about   two-thirds   of   the  population  of  the   United   States   resides    in  urban 


Special    Report 


11 


The  North«ast  Corridor  Transportation  Project  Region 
Figure   1 . 


places.  By  1985,  this  proportion  will  rise  to  80  percent  with  much  of  the  increase 
being  concentrated  in  a  few  regions.  Such  a  concentration  of  people  into  densely 
populated  socio-industrial-commercial  matrices  is  a  manifestation  not  indigenous  to 
this  country.  Rather,  it  is  one  evident  on  a  world-wide  scale  particularly  associated 
with  highly  developed  countries.  The  Tokyo-Osaka  axis  is  an  excellent  example. 
Other  similar  non-domestic  alignments  arc  the  Paris-Dijon-Lyon  and  Milan-Verona- 
Venice  agglomerations.  In  this  country  there  are  no  less  than  21  such  regions  iden- 
tifiable and  differing  chiefly  in  their  level  of  maturity.  Specific  examples  would  be 
the  Pittsburgh-Detroit,  Chicago-St.  Louis,  Los  Angeles-San  Francisco,  and  Van- 
couver-Portland axes.  Perhaps  the  most  clearly  distinctive  region  illustrative  of  the 
undisputed  advantages  and,  simultaneously,  the  equally  unchallenged  social  handi- 
caps of  this  growth  pattern  lies  contiguous  to  the  Atlantic  coast  bet%veen  the  metro- 
politan areas  of  Boston  and  Washington.  To  this  section  of  the  country  has  been 
assigned  the  appellation,  "Northeast  Corridor";  its  boundaries  are  oudined  in  Figure 
1.    Frequent  reference  to   this  specimen  of  the   genus  will  appear  in   the  following 


12  High    Speed    Rail    Transportation 


TABLE  1 


PASSENGER  TRAVEL  IN  THE  UNITED  STATES 

PASSENGER  MILES-BILLIONS       NUMBER  OF  PASSENGERS-MILLIONS 
YEAR      AUTO    AIR    BUS     RAIL      AIR     BUS    RAIL 


1950 

433.3 

9.3 

22.7 

32.5 

17.5 

338.5 

209.1 

1951 

498.1 

12.0 

23.6 

35,3 

22.7 

336.1 

214.3 

1952 

539.2 

13.3 

24.7 

34.7 

25.2 

311.3 

209.0 

1953 

575.8 

16.2 

24.4 

32.3 

28.9 

292.6 

200.9 

1954 

597.1 

18.2 

22.0 

29.5 

32.5 

256.6 

189.5 

1955 

637.4 

21  .7 

21  .9 

28.7 

38.2 

237.8 

183.6 

1956 

669.7 

23.9 

21.7 

28.6 

41.9 

224.4 

181.5 

1957 

670.5 

26.3 

21  .5 

26.3 

45.2 

212.4 

162.0 

1958 

684.9 

26.4 

20.8 

23.6 

44.7 

188.0 

139.8 

1959 

687.4 

30.5 

20.4 

22.4 

51.0 

191.2 

129.8 

1960 

706.1 

31.7 

19.9 

21.6 

52.4 

187.7 

122.7 

1961 

713.6 

32.3 

19.7 

20.5 

52.7 

187.5 

118.1 

1962 

735.9 

34.8 

21  .3 

20.2 

56.0 

186.1 

117.2 

1963 

765.9 

39.4 

22.5 

1 8 .6 

63.9 

185.1 

114.5 

1964 

801.8 

45.5 

23.3 

18.4 

73.0 

185.8 

114.8 

1965 

817.7 

53.7 

23.8 

17.6 

84.5 

193.4 

106.3 

1966 

856.4 

63.7 

24.6 

17.3 

97.7 

203.2 

105.3 

1967 

889.8 

80.2 

24.9 

15.3 

118.7 

207.3 

98.1 

1968^^) 

931  .0 

93.0 

24.5 

13.2 

134.5 

199.0 

92.6 

( 1 )   Pre! i mi  nary 

Source:   Transportation  Facts  and  Trends,  Transportation 
Association  of  America,  April  1969. 


text.  Simply,  it  has  been  most  intensely  studied  and  from  this  work  a  large  body  of 
data  is  now  available. 

Growth  of  urban  areas,  consequent  to  population  migration  and  a  burgeoning 
birth  rate,  has  given  rise  to  a  host  of  well  documented  social  and  economic  dilemmas 
not  the  least  of  which  is  a  congestion  of  transportation  facilities.  Demand  for  trans- 
portation in  urbanized  areas  of  this  country  will  more  than  double  in  the  next  20 
years.  There  is  reason  for  c-oncern  if  this  increased  requirement  follows  the  rather 
singular  modal  use  trends  displayed  during  the  last  two  decades.  These  trends  are 
clearly  outlined  in  Table  1. 


Special    Report  13 


From  these  data  one  may  readily  isolate  modal  popularity  with  participation 
guided  chiefly  by  freedom  of  choice.  Also  evident  is  the  paradox  of  modal  imbalance 
wherein  the  means  of  most  economically  transporting  large  numbers  of  people  is  in 
a  state  of  precipitate  decline,  and  isurging  ascendancy  is  patent  for  those  means  most 
voracious  in  appetite  for  tlie  dedication  of  land  constantly  increasing  in  value.  The 
following  observations,  relying  largely  on  Reference  1  for  statistical  values,  are  illus- 
trative of  the  economic  implications  of  this  distortion. 

Estimates  by  the  Bureau  of  Public  Roads  indicate  that  highway  travel  on  inter- 
city routes  in  the  Northeast  Corridor  will  almost  double  between  1965  and  1985  and 
that  approximately  $2.5  billion  will  be  needed  just  on  the  intercity  portion  of  the 
Corridor  highway  system.  The  total  cost  by  federal,  state,  and  local  authorities  of  all 
street  and  highway  construction  in  the  Northeast  Corridor  for  the  same  20  year 
period  is  estimated  at  more  than   $33  billion. 

These  new  facilities  will  have  to  be  accommodated  into  what  is  already  the 
most  heavily  developed  region  in  the  country — 14  percent  of  the  Nation's  total  road 
mileage  is  concentrated  on  less  than  2  percent  of  the  land  area.  The  freeway  net- 
work alone  in  the  Corridor  now  occupies  an  area  equivalent  to  one-quarter  of  the 
State  of  Rhode  Island;  the  entire  road  and  street  network  covers  an  area  equal  to  all 
of  Connecticut,  Rhode  Island,  and  the  District  of  Columbia. 

The  significance  of  such  demands  for  space  should  be  considered  within  the 
context  of  land  values  in  the  Nortlieast  Corridor,  which  have  a  mid-range  of  approxi- 
mately $4,000  per  acre  in  rural  areas  of  one  person  per  acre  to  $/2  million  for  urban 
land  at  a  density  of  100  persons  per  acre. 

More  efficient  use  of  the  highway  system  would  result  from  greater  use  of  bus 
transportation  as  a  substitute  for  travel  by  private  auto.  However,  tliere  is  little  evi- 
dence in  the  figures  presented  above  that  such  a  sliift  is  likely.  Intercity  passenger- 
miles  by  bus  have  risen  only  slightly  over  the  past  25  years.  Although  increases  in 
population,  improved  vehicles,  and  further  development  of  limited-access  highways 
will  probably  result  in  a  continued  growth  in  bus  volumes,  the  degree  of  relief  to 
highway  congestion  which  this  would  represent  would  be  slight. 

In  view  of  tlie  fourfold  increase  in  air  traffic  that  will,  within  die  next  20  to 
30  years,  be  superimposed  on  what  is  now  a  virtually  saturated  airspace  in  this  same 
Corridor,   certain  solutions   have  been    advanced. 

Solutions  which  have  been  proposed  include  the  construction  of  larger  jet  air- 
craft and  the  separation  of  common  carrier  airports  from  general  aviation  airports. 
Both  of  these  responses  will  create  severe  problems  of  land  use  in  heavily  populated 
areas,  noise  pollution,  air  pollution,  and  access  to  and  from  new  airports.  The  cur- 
rent minimum  standards  for  an  average  jet  port  require  10,000  acres  of  land  which 
must  often  be  taken  from  other  productive  uses.  In  addition,  airport  construction 
is  a  relatively  expensive  activity.  For  example,  estimates  of  federal  and  local  expendi- 
ture for  1967  amounted  to  $515  million  on  new  airport  facilities,  with  an  additional 
$120  million  being  provided  from  airline  funds  for  improving  existing  facilities. 

Growth  of  this  pattern  of  air  congestion,  as  it  is  apparent  now  in  the  Northeast, 
is  indicated  in  Table  2.  Some  idea  of  the  magnitude  of  the  anticipated  costs  in 
attempting  to  cope  with  expected  future,  but  near-term,  ground  transportation 
requirements  of  a  single  large  metropolitan  region  is  shown  in  Table  3. 

From  this  picture  begins  to  emerge  rather  clearly  the  implications  of  economic 
and  social  cost  inherent  in  the  established  pattern  of  modal  use  imbalance.  Presum- 


14 


High    Speed    Rail    Transportation 


TABLE  2 


Air  traffic  delay* 

Airport 

Aircral't  delay, 
aircraft-hours 
per  year    ^^0^ 

Passenger  delay, 
passenger-hours . 
per  year   x  1  0-' 

Typical  peak-hour 
aircraft  delay, 
minutes 

1966 

1 9Y0*« 

1966 

1970^ 

1966 

1970** 

JFK 

2U 

95 

1170 

6290 

35 

110 

La  Guard! a 

h 

16 

110 

550 

10 

28 

Newark 

6 

22 

170 

830 

16 

U3 

National*"^ 

8 

10 

2U2 

357 

16 
. . 

19 

Delays  are  recorded  only  for  aircraft  more  than  15  minutes  over  schedule. 

Estimated  by  FAA,  based  on  existing  facilities. 

Projected  1970  delays  at  Washington  National  Airport  reflect  the  re- 
strictions on  the  number  of  operations  per  hour  imposed  by  FAA. 


Source:  Federal  Aviation  Administration,  Alternative  Approaches  for  Re- 
ducing belays  in  Terminal  Areas,  Clearinghouse  for  Federal  Scientific 
and  Technical  Information,  Niunber  AD  663  089,  November  1967- 


TABLE  3 

PLANNED  EXPENDITURES  FOR  TRANSPORTATION  FACILITIES 
IN  THE  GREATER  NEW  YORK  REGION  THROUGH  THE  19  70 's 


State 


Interstate  Highways 

Other  Highways 

Public  Transit  and 
Commuter  Lines 

TOTAL 


N.Y. 

$    900 
1,100 

1,516 
$  3,516 


N.J. 


Conn.*    Total 


($  millions) 

1,300 
1,177 

325 


2,802 


80 
500 


59 
639 


2,280 
2,777 

1,890 
6,947 


*  Estimated  for  the  Greater  New  York  Region  rrom  state  total 
Source:-  State  Transportation  and  Highway  Department  plana. 


SpecialReport  15 


ably,  it  is  fail-  to  submit  the  experience  of  one  region  having  the  characteristics  of 
the  genre  as  representative  of  levels  to  which  other  less  developed,  but  typical,  areas 
may  one  day  arrive. 

An  ironic  aspect  of  the  cited  experience  is  revealed  when  the  increasing  con- 
gestion of  air  and  highway  facilities  is  contrasted  with  under-utilized  regional  rail 
capacity  of  a  fixed  plant  containing  12%  of  the  nation's  total  trackage. " 

Up  to  now,  the  discussion  has  pursued  an  examination  of  the  transportation 
status  quo  in  the  Northeast  Corridor  as  a  pre-eminent  display  of  like  problems  exist- 
ing at  various  states  of  evolution  in  all  similar  dispositions  of  populations  and  com- 
merce. Outstandingly,  the  chief  characteristic  distinguishing  the  result  of  free  choice 
of  mode  for  personal  transport  is  congestion.  In  answer  to  the  first  part  of  the  ques- 
tion earlier  posed,  high  speed  ground  transportation  of  people  is  an  evident  neces- 
sity if  relief  is  to  be  obtained  from  the  inhibiting  influence  of  this  congestion  with- 
out the  requirement  to  commit  large  financial  resources  perhaps  better  allocated  in 
more  socially  beneficial  ways. 

At  this  point,  a  working  definition  of  "high  speed,"  as  applied  to  conventional 
rail  operation,  would  serve  a  useful  end.  First  though,  one  must  clearly  regard  train 
speed,  whatever  its  maximum  value,  not  as  a  goal  of  itself,  but  as  a  major  com- 
ponent of  trip  time.  Railroad  service,  expressed  as  passenger  miles  or  ton  miles, 
hopefully  is  a  saleable  commodity.  Railroad  passenger  service  currently — but  with 
a  few  notable  exceptions — is  an  increasingly  unrewarding  market.  Chiefly,  but  by  no 
means  exclusively,  this  is  due  to  non-competitive  trip  times.  As  a  consequence,  any 
realistic  definition  of  "high  speed"  in  this  context  would  fall  out  of  a  requirement 
that,  for  a  rail  passenger  service  to  be  attractive  enough  to  interest  a  potential  user 
and  lure  him  away  in  large  enough  numbers  to  aff^ord  palpable  relief  to  other,  for- 
hire  mode  congestion,  the  total  time  it  takes  to  accomplish  a  journey  must  approx- 
imate that  to  which  he  has  become  accustomed. 

Consider,  as  an  example  of  the  speed  level  being  dictated  by  a  trip-time  goal, 
the  following.  Until  recently,  Penn  Central  operated  a  non-stop  Metroliner  service 
between  New  York  and  Washington  having  an  elapsed  trip  time,  station  to  station, 
of  2.5  hours.  About  equally  balanced,  for  either  direction  of  this  trip,  there  was, 
until  April,  1970,  approximately  142  miles  of  track  posted  for  115-120  mph  maxi- 
mum speed  for  tliis  type  of  equipment.  If  it  had  been  possible  to  operate  through 
these  non-contiguous  portions  of  line  at  150  mph,  the  total  time  saving  would  have 
been  14.2  minutes,  virtually  one-quarter  hour.  This  would  have  produced  a  trip  time 
of  2.25  hours.  Taxi  transportation  within  the  central  business  districts  at  each  end 
of  the  journey  may  be  expected  to  total  40  minutes. 

Estimated  flight  time  of  a  DC-9,  New  York  to  Washington,  is  about  35  minutes. 
However,  at  peak  hours,  which  happen  to  coincide  with  commuter  rush  periods, 
it  takes  about  54  minutes  to  travel  from  nn'd-Manhattan  to  LaCuardia  by  cab  and 
20  minutes  to  get  from  W^ashington-National  to  the  center  of  the  District.  Allowing 
10  minutes  to  move  through  the  flight  check-in  queue,  the  cumulative  total  elapsed 
time  would  be  2  hours.  From  the  data  displayed  in  Table  2,  it  is  seen  that  typical 
aircraft  delays  of  28  minutes  and  19  minutes  may  lie  anticipated  at  peak  hours  at 
LaCuardia  and  National,  respectively.  This  hypothetical  analog  now  presents  a  neat 
comparison  of  almost  identical  trip  times,  rail  vs.  air,  for  the  same  journey.  A  sig- 
nificant but  non-(iuantifiable  factor  of  rail  reliability,  both  as  to  time  and  weather 
dependent  performance,  might  well  now  influence  the  user's  choice  of  mode. 


16 High    Speed    Rail    Transportation 

One  hastens  to  acknowledge  the  rudimentary  nature  of  this  representation. 
Even  so,  it  is  descriptive  of  tlie  process  whereby  a  level  of  train  speed  may  be 
rationalized.  It  does  not,  at  this  point,  consider  the  cost  per  minute  saved  of  rail 
route  modification.  Moreover,  it  does  not  consider  the  influence  of  factors  other  than 
trip  time  in  guiding  the  potential  users  choice  of  mode.  But,  from  this  discussion 
and  in  the  realization  that  most  genuine  high  speed  services  overseas  are  constructed 
on  a  cruising  speed  level  of  at  least  125  mph,  this  figure  may  be  regarded  as  a 
minimum  for  definitive  purposes. 

An  extensive  review  of  the  elements  that  form  the  motivation  operative  in  the 
choice  of  mode  by  the  travelling  public  is  outside  the  scope  of  this  discussion.  But 
if,  as  has  been  indicated,  transportation  congestion  does  exist  and  the  possibility  of 
relief  via  what,  seemingly,  must  be  a  high  speed  rail  operation  is  available,  there 
is  an  obligation  to  address  the  very  real  question  of  ultimate  success  of  such  a  rail 
venture,  once  brought  to  reality  in  the  United  States.  Success,  in  this  sense,  is  con- 
tingent on  substantial  market  response.  Any  attempt  to  entertain  speculation  on  so 
volatile  a  subject  as  the  dynamics  of  prospective  mode  choice  decisions  is  an  enter- 
prise surrounded  by  some  degree  of  uncertainty.  Nevertheless,  there  has  been  some 
reasonably  supported  work  done  in  the  field  and  some  interesting  results  reported. 

Current  market  attitudes,  which  may  be  expected  to  continue  into  the  future, 
have  been  revealed  in  one  such  study. ^ 

1.  Business  travel  emphasizes  trip  time  and  minimizes  trip  cost. 

2.  Non-business  travellers,  paying  their  own  way,  place  heavy  reliance  on  the 
private  auto. 

3.  The  greatest  source  of  open  complaint  of  business  travellers  concerns  access 
to  terminals,  especially  airports. 

4.  Schedule  reliability  is  an  important  issue,  but,  since  no  one  mode  has  any 
great  superiority,  it  does  not  now  function  as  a  choice  determinant. 

a.  Airline   schedule    unreliability   is    deplored   without    resentment    (ascribed 
to  factors  beyond  carrier's  control). 

b.  Railroad   unreliability  arouses  heated  complaint. 

5.  Modal  status  and  prestige,  as  viewed  by  the  traveller — particularly  the  busi- 
ness traveller,  is  a  variable.  Most  commonly,  a  favorable  image  of  air  travel  is  held. 
To  the  same  extent,  rail  travel  is  regarded  negatively. 

6.  There  is  a  curious  but  not  uncharacteristic  ambivalence  about  tlie  opinions 
held  by  travellers  with  regard  to  risk  of  hazard.  Fear  of  air  travel  is  not  uncom- 
mon. It  is  an  emotional  feeling  that  can  persist  despite  accurate  knowledge  of  low 
risk.  Conversely,  few  people  feel  afraid  of  automobile  travel  although  they  know 
of  its  risk.  That  rail  ti-avel  is  by  far  the  safest  of  the  three  modes  (passenger  fatal- 
ities in  1969  per  100  million  passenger-miles:  rail,  0.10;  air,  0.13;  busses,  0.22;  auto 
and  taxis,  2.30)  seems  to  have  little  influence  on  choice  of  mode. 

7.  Another  relative  non-constant  attitude  concerns  the  so-called  amenities  of 
travel:  cleanliness,  availability  of  food  and  drink,  courtesy  and  personal  enjoyment. 
None  of  these  categories  elicits  a  positive  image  in  the  traveller's  mind  when  asso- 
ciated with  rail  travel  except,  notably,  in  the  cases  of  the  Metroliner  and  Turbo 
equipment  and  a  few  "name"  conventional  passenger  trains. 

In  tlie  advancement  of  the  foregoing  it  is  realized  that  some  of  the  points  may 
be  part  of  current  intuitive  understanding.  In  this  case,  though,  the  element  of 
intuition  is  signally  absent  in  that  the  statements  flow  out  of  a  study  based  on  very 


Special    Report 17 


carefully  structured  interview  techniques  imposed  on  a  sample  population  of  856 
subjects  selected  with  equal  care.  A  very  salient  feature  of  this  work  is  an  evident 
element  of  uncertainty  likely  to  be  attached  to  any  attempt  to  quantify  future 
demands.  As  such,  this  is  important  as  a  constraint  to  be  recognized  by  those  con- 
templating involvement  in  such  activity. 

As  a  corollary  investigation  in  this  area,  a  close  scrutiny  of  traveller  response 
to  the  advent  of  the  high-speed  Metroliner  service  is  an  on-going  task.  A  portion 
of  this  work  has  been  summarized  for  1969  and,  in  a  sense,  provides  the  statistical 
quantification  indicative  of  how  a  market  prompted  by  many  individual  needs  and 
desires  responds  to  the  availability  of  the  most  rapid  intercity  train  service  afforded 
up  to  now.^ 

Table  4  illustrates  a  marked  increase  in  the  volume  of  patronage  due  to  the 
gradual  phasing  into  service,  in  1969,  of  the  newly  arriving  Metroliner  train  sets. 
The  demand  increase  noted  in  1968,  as  compared  with  1967  was  about  2%  and, 
doubtless,  was  influenced  in  part  by  the  attention  focused  by  public  press  accounts 
of  the  then  Pennsylvania  Railroad's  strenuous  anticipatory  efforts  to  upgrade  the 
proposed  Metro  route  trackage.  In  1969,  however,  the  increase  over  the  previous 
year  was  1%.  The  brief  data  on  the  Turbo  operation  between  New  York  and  Boston 
is  presented  as  information  only  and  does  not  contribute  to  the  instant  discussion 
because  of  the  effect  on  passenger  count  imposed  by  the  discontinuance  of  conven- 
tionally equipped  trains  within  the  considered  study  period. 

From  Table  5  it  may  be  seen  that  if  a  correlation  is  established  between  air- 
craft passengers  and  Metroliner  passengers  on  the  bases  of  Family  Income,  Age, 
and  State  of  Residence,  a  close  correspondence  is  apparent.  From  this  one  may 
justifiably  conclude  that  there  is  a  very  similar  appeal,  within  these  parameters,  of 
the  attractiveness  of  the  Metro  service  compared  with  that  of  the  airlines.  The 
rather  dissimilar  relationship  noticed  on  the  basis  of  sex  is  heavily  weighted  by  the 
business  traveller  continuing  his  reliance  on  air  transport  to  a  large  degree. 

This  correspondence  of  response,  air  vs.  rail,  is  again  apparent  in  Table  6 
wherein  the  next-future-choice  of  mode  is  explored.  Both  high-speed  train  and 
plane  passengers  tend  to  expect  to  re-employ  their  present  choice  to  about  the  same 
degree.  A  surprising  relationship  is  noted  in  the  apparent  decrease  in  the  expected 
dependence  on  the  private  auto  as  a  means  of  transportation.  This  must  be  viewed 
as  a  possible  reduction  of  city-pair  trips  compared  with  all  destinations  to  which 
auto  transportation  may  be  directed.  As  such,  the  establishment  of  a  seemingly 
favorable  trend  would  appear  to  be  evident.  Whether  this  actually  portends  a  sig- 
nificant reduction  in  the  now  highly  disproportionate  utilization  of  the  private  auto 
will  be  considered  in  a  later  portion  of  this  discussion  dealing,  in  part,  with  the 
likelihood  of  success  of  various  high-speed  modal  combinations  in  attacking  the 
problem   of  congestion. 

There  are  several  other  interesting  facets  of  modal  use  distribution  in  these 
data,  the  pursuit  of  which  may  not,  for  the  sake  of  conserving  space,  be  conducted 
here.  For  this  reason,  a  close  analysis  of  the  data  is  suggested.  A  description  of  the 
survey  technique  employed  in  gathering  the  data  in  Reference  4  is  included  in 
Appendix  I  (see  page  6.5). 

Up  to  this  point  have  been  discussed  some  attitudes  and  social  factors  expected 
to  operate  on  the  choice  of  an  available  mode  of  high-speed  transportation  and 
which  may,  by  extrapolation,  be  considered  as  applicable  to  similar  situations  else- 


18 


Hi  g  h    Speed    Rail    Transportation 


^ 

■-J 

c 

0    <n 

•  -<    c  --^ 

'O 

S3 

r. 

D 

iJ   ..<  O 

^ 

o 

li    ...    (-J 

^ 

m 

CN 

O 

coo 

^ 

CO  a) 

a 

c    -x  o 

c^ 

1— « 

:* 

y    V-  o 

a    u  c 

>    H  '-- 

n 

P1|>o 

>   H  ^ 

r~^ 

,-1 

CN 

c 

0 

6 

u 

o 

nj 

re 

c 

a 

O     in 

o    w 

■Z) 

-J     C   '-^ 

ID 

•o 

oc 

•rJ        C      -^ 

r-* 

a^ 

o 

4-»     -^     O 

VO 

vO 

W     .J    O 

o 

r^ 

CD 

CT^ 

C      CO   o 

LA 

^ 

o 

CJ^ 

C     ra  O 

o 

CS 

(DUO 

•■J    u  o 

>    E-  --^ 

cn 

n 

o 

>  H  ^ 

,-H 

,_! 

CN 

c 

r: 

o 

o 

u 

OO 

00 

^    vO 

+     (TV 

^    >-< 

4-1 

^    ^ 

4-> 

M    ^^ 

c    a). 

U    ■'-^ 

c:   0) 

«        1 

a)    tj 

&3 

6S 

IV      1 

a)    M 

bs 

feS 

>    ^ 

a    c 

oD  r^ 

>    ^ 

o    c 

vn 

00    ^ 

o 

U     CT3 

+ 

+    + 

o 

U     CO 

CO 

IJ 

a)  j= 

1-. 

a)  j= 

1     1 

a\    (u 

0.   o 

<J>     0) 

o<  o 

'O     Tl 

>o  -v 

a-,    c 

Ov    c 

r-<        D 

-■     3 

^  ^ 

o 

ro 

CO 

ffl    o 

(^ 

CO 

re  o 

CNI 

CN 

d- 

4-J     O 

r^ 

r^ 

d- 

u  o 

00 

CO 

vO 

o  o 

o  o 

r^ 

H  ^ 

CO 

r^ 

H  -^ 

•i. 

^ 

^ 

-H     \ 

tfl 

re  J3| 

c 

c 

O      01 

O    m 

a> 

.-1     c    ^ 

r-i 

r^ 

00 

CT- 

■  ^    c  ^ 

>o 

*J  .-1   o 

r^ 

O 

f^ 

"^ 

JJ   -1  o 

o 

o 

o 

CT> 

c    «  o 

d- 

^ 

oo 

Ov 

c    re  o 

in 

o 

■DUO 

ai    u  o 

r^ 

>   H   --^ 

n 

CO 

\o 

>  H  ^ 

c 

o 

5 

o 

u 

u 

<D 

^^ 

C     M 

re| 

-J     c   ^ 

^1    -^   o 

o 

\0  m 

il   o 

0    (u  o 

00 

^  o 

o  o 

CN 

cnIj- 

V'    u  o 

fO    vO 

J3    O 

CO 

colo 

u    h-  -^ 

u,  ^ 

^ 

r 

o 

IJ    o 

o 

iO-i 

t:  uj 

C    IM 

O  u-i 

j=    re 

-■J    (0 

m    ij 

n    u 

S.  '-' 

0  H 

3 

x: 

"J  -"• 

M 

,-t 

c 

c    n; 

1     u 

r> 

■^    re 

Ji    o 

D 

3    4J 

M    Q 

c 

C     J-l 

U    13 

o 

o   o 

U   TD 

3 

3     0 

0   -J 

XI 

J3   H 

O   -J 

0 

O    H 

><    u 

.c 

x: 

>     Li 

XI 

.n 

■tJ 

iJ 

U 

4J 

4J 

3    O 

-; 

u 

i    o 

-U    O 

0 

o 

J  o 

re 

aj 

z 

CO 

2 

u 

3 

a) 

a) 

w; 

3 

c 

*J 

a) 

a) 

Ul 

XJ 

n1 

a) 

O. 

c 

■D  x: 
3    re 


Special    Report 


19 


Table  $ 

SOCIO-ECONOMIC   CHARACTERISTICS   OF  NBJ  YORK-WASHINGTON  AIRPLANE  AND  METROLINER  PASSENGERS 
July    7,    1969   -    February   4,    1970 


Airplane 

Metroliner 

Passengers 

Passengers 

Time  Peri 

ods* 

Time  Periods* 

Socio-Economic  Characteristics 

1 

II 

III 

I 

II      III 

Family  Income 

Under  $5,000 

6% 

4% 

5% 

4% 

4%      4% 

$5,000  -  $7,499 

6 

4 

4 

7 

5       5 

$7,500  -  $9,999 

7 

6 

6 

9 

8       9 

$10,000  -  $14,999 

16 

14 

15 

20 

19      20 

$15,000  -  $24,999 

29 

30 

27 

30 

29      29 

$25,000  and  Over 

36 
100% 

42 
100% 

43 
100% 

30 
100% 

35      33 
100%    100% 

Age 

20  and  under 

10% 

6% 

8% 

8% 

5%      7% 

21-35 

37 

34 

34 

37 

38      38 

36-50 

34 

39 

38 

32 

33      30 

51-65 

16 

19 

18 

19 

20      20 

66  and  Over 

3 
100% 

2 

100% 

2 
100% 

4 
100% 

4       5 
100%    100% 

Sex 

Male 

72% 

77% 

77% 

59% 

63%     62% 

Female 

28 
100% 

23 
100% 

23 

100% 

41 

"ioo% 

37      38 
100%    100% 

State  of  Residence 

In  Corridor  State 

80% 

80% 

83% 

83% 

87%     90% 

Out  of  Corridor  State 

20 

20 

17 

17 

13      10 

100% 

100% 

100% 

100% 

100%    100% 

Sources:      On  Train   Survey    (Metrollner  passengeis  between  New  Vork/Newaik  and 

Baltiitiore/WouhiriKton   tenninals)    and  Special  On  Plane  Survey    (Amsrican, 
Eastern   and   Allegheny    Alrlinf-s   passengers  between  LaGuardl  a/New  jrk 
and  Friendship/National  Airports). 


*  Time  Pi-riod   I,    July    7-Octnber   4,    1969 

Time  Period   II,   October  S-Deccmber  4,    1969 
Time  Period  III,   December  5,    1969- February 


20 


High    Speed    Rail    Transportation 


u 

<! 

< 

f>< 

1^ 

:::> 

b-l 

^  t: 


-3  H    >> 

H  "^  if 


•U    M 

O    M 

1/) 

■r-( 

Q) 

U 

r: 

« 

ai 

M) 

P-,M 

CA  "H  *-^ 


O  --H  ^ 


-J  ■-(  vO 


-J-  .-)  vO 


V*  r-l  VD 


-"•    H 

6^ 

S-5 

'O    M 

O 

r- 

-a- 

<N 

•K    C 

O   n 

rH 

CM 

CM 

*     O 

U     (,-1 

■H 

rH 

(U     P 

U 

C     CJ 

01 

•H      01. 

fL. 

S-! 

S< 

1-1   ti 

M 

m 

o 

O 

-a- 

O 

rH    O 

O     OJ 

<l>    M 

CM 

CM 

n 

CM 

O 

i-i    m 

e 

rH 

"     Oi 

1-1 

<L'     It) 

H 

^ 

^s 

S  =^ 

»o 

v£> 

r^ 

\D 

<t 

r-i    O 

CM 

iH 

CM 

CM. 

O 

^! 

»< 

m 

O    M 

vD 

rj 

r-^ 

CM 

n 

c;    P 

•H    M 

r^ 

.-1 

R     OJ 

U 

n)    M 

0) 

rl     c 

Oi       • 

6~S 

'  p.  a; 

M 

-3- 

(N 

o 

fH 

CM 

fH   O 

tt)    M 

00 

t--( 

O 

■r*   m 

B 

<   ra 

■r-t 

A. 

H 

t>! 

£  * 

M 

m 

CM 

o 
t^ 

CM 

.H 

■HlO 
O 

!  •§ 

H 

-0 

a) 

1' 

^ 

O 

-4 

0) 

o 

-§ 

^ 

0)    J 

c 

•H 

c 

(U 

H 
O 
H 

:3  ' 

J 

1^ 

01 

a; 

> 

VU 

'-' 

n 

3 

•H 

x: 

(U 

c 

P 

l-.i- 

...  '-■„ 

_Jtti~> 

— 

..Jil-. 

.  n  .   ..J 

00  Ci 


c 

<11 

E 

o 

(U 

4-1 

l> 

m 

o 

QJ 

ro     . 

n 

W  ^ 

C7- 

CD 

rH 

«  iJ 

^< 

C    1-1 

• 

4) 

CO     O 

<r 

Ul 

(.1     D. 

C 

•ri     M 

CT.     ^ 

4) 

0)    < 

tn 

CT<     « 

^.. 

.-(    3 

n) 

I-I 

n. 

^^    « 

o 

".O 

c 

vn 

-*     lU 

v> 

>,  o 

C7N 

u< 

<u 

<U    -H 

-H 

■h     I 

c 

(U  cy\ 

•r-l 

.^ 

^  o 

r~\ 

3  2; 

vT 

R  a^ 

O 

00  --^ 

IJ 

D. 

(4 

o 

iJ 

(U    -H 

t) 

01       • 

m 

C   4= 

12 

o  in 

n>    ui 

o 

1 

\_- 

r-;  -a 

tJ 

u-i    Vj 

0:    c 

CI 

CI 

V 

01 

o 

u  .a 

C) 

c^.-d 

1 

01    B 

lA 

^     4) 

u 

\^ 

3 

i-i 

u    u 

ro 

n  -o 

o  o 

•H    c 

y 

O 

C 

tj     CO 

►-; 

•r-( 

OJ 

«  r-l 

ra 

D.  M 

« 

hJ    M 

u 

1/3     >J 

M 

r-t  1-1 

SpecialReport  21 


where.  Now  it  is  appropriate  to  review  the  influence  of  these  elements  on  utihzation 
of  the  existing  service  as  revealed  in  actual  passenger  counts.  The  load  factor  of  tlie 
Metroliner  service  since  its  inception  on  Jan.  16,  1969,  until  April  7,  1970,  was  69.6 
percent.  During  the  week  of  April  1  to  April  7,  1970,  it  was  88.9  percent.  Total 
passengers  carried  approached  1,200,000,  each  averaging  a  trip  length  of  150  miles. 
So  it  would  seem  that,  despite  certain  negative  and  seemingly  contradictory  com- 
ponents evident  in  the  market's  view  of  rail  passenger  accommodations  generally, 
the  service  as  offered  has  stimulated  a  rewarding  response. 

Once  again,  though,  a  note  of  caution  is  interjected  in  the  consideration  of 
these  data.  An  unknown,  but  probably  smaller  rather  tlian  larger,  proportion  of  the 
million-plus  passengers  would  haxe  travelled  by  train  anyway,  even  if  the  Metro- 
liner  service  had  not  been  at  hand.  Further,  pleasing  as  utilization  has  been,  it  still 
represents  the  satisfaction  of  a  very  small  percentage  of  overall  travel  demand  within 
the  Corridor,  and  at  its  present  level  of  development  has  contributed  minimally  to 
a  reduction  of  transportation  congestion.  An  extremely  valid  question  would  inquire 
into  the  effect  of  expanding  and  improving  upon  contemporary  experience;  would 
such  an  effort  yield  material  relief  from  the  problem?  And  what  would  the  requisite 
level  of  future  investment  be  to  deliver  a  variety  of  incremental  improvements?  Just 
such  an  inquiry  has  indeed  been  undertaken  and  reported  on.  Discussion  of  the 
implications  of  this  rigorous  research  is  deferred  in  this  text  to  that  later  segment 
treating  the  Northeast  Corridor  Transportation  Project. 


CONTEMPORARY   EXPERIENCE 

Within  the  context  of  lirst,  examining  the  scope  of  the  problem  of  domestic 
transport  congestion  and,  then,  the  potential  for  amelioration  through  the  provision 
of  attractive  high-speed  rail  service,  it  would  be  of  use  to  look  at  the  fruits  of  present 
experience  and  some  of  the  imique  aspects  of  the  more  advanced  efforts  outside  of 
this  country. 

As  has  been  suggested  earlier  the  phenomenon  of  urbanization  is  widespread 
and  the  associated  transportation  problems  are  being  addressed  in  many  places. 
There  is  a  general  overall  similarity  in  the  various  approaches  being  pursued.  Never- 
theless, it  is  possible  to  isolate  particular  features  that  may  be  of  interest  to  railroad 
engineers  here. 

One  thing  that  should  be  e\ident,  if  only  through  the  device  of  subsequent 
textual  section  headings,  is  that  all  of  the  foreign  work  described  is  being  sponsored 
by  administrations  that  are  responsible  for  the  management  of  nationalized  systems. 
From  this  it  would  be  expected  that,  to  a  varying  extent,  the  activities  of  these 
groups  reflect  the  implementation  of  portions  of  national  transportation  policy. 

United   States 

If  a  review  of  recent  high-speed  operational  history  in  this  country  is  to  pro- 
ceed it  must  be  confined,  perforce,  to  what  is  known  in  the  public  domain  about  tlie 
performance  of  the  Turbo  and  Metroliner  equipment,  as  this  service  forms  the  only 
true  capability  for  high-speed  train  operation. 

So  far,  this  discussion  has  not  dwelt  at  length  on  the  Turbo  service  betAveen 
New  York  and  Boston  for  the  reason  that  it  is  not  considered  a  genuinely  high- 
speed service.  The  Turbos  make  the  229  mile  run  in  3  hours  and  39  minutes  which 
represents  an  average  speed  of  63  mph  for  the  trip,  including  four  stops.  There  is 


22 High    Speed    Rail    Transportation 

scant  eligibility  in  this  to  support  the  designation  of  high  speed  despite  some  route 
segment  operation  at  110  mph.  One  should  realize,  however,  that  this  relatively 
leisurely  service  is  the  result  of  the  restrictive  nature  of  much  of  the  track  align- 
ment indigenous  to  the  route  o\er  which  the  two  train  sets  run.  In  no  sense  is  this 
pace  attributable  to  an  innate  lack  of  capability  on  the  part  of  the  equipment. 
Indeed,  one  of  these  three-car  train  sets  has  attained  the  highest  speed  ever  re- 
corded in  the  United  States  by  unmodified,  commercially  oriented  equipment:  170.6 
mph,  achieved  during  acceptance  trials  on    December  18-19,   1967. 

Some  very  practical  intelligence  has  come  out  of  the  nearly  IM  years  of  Metro- 
liner  operation. 

J.  W.  Diffenderfer,  in  an  address  to  the  American  Railway  Engineering  Asso- 
ciation assembled  in  convention  at  Chicago  on  March  25,  1970,  and  reported  in 
the  trade  press  subsequent  thereto,  stated:  ".  .  .  Our  problem  is  that  the  high- 
speed operation  requires  far  greater  detail  of  surface  and  alignment  than  required 
for  conventional  passenger  trains  and  freight  trains.  Thus,  the  damage  inflicted  by 
the  heavier  tonnage  movements  becomes  more  pronounced  in  terms  of  an  uncom- 
fortable ride  at  higher  speeds  .  .  ."" 

Clearly,  the  translation  of  track  induced  vibrational  energy  through  the  sus- 
pension system  of  what  may  be  regarded  as  still  new  equipment  to  the  point  of 
causing  discomfort  to  the  passenger  implies  a  harsh  environment  in  that  region  of 
the  equipment  configuration  where  many  vulnerable  components  must  function. 
Component  dependability,  not  firmly  established  by  a  development  program,  is 
further  jeopardized  by  subjection  to  high  levels  of  vibrational  excitation  generated 
by  the  degradation  of  track  profile  and  alignment  to  levels  that,  while  manifestly 
not  unsafe,  are  decidedly  undesirable  for  a  high  speed  passenger  service. 

It  has  been  determined  that  the  parameter  of  track  geometry  to  which  the 
ride  quality  of  the  'Metroliners  is  most  sensitive  at  high  speed  is  cross  level,  particu- 
larly cross  level  variations  in  curved  track."  Following  closely  in  effect  on  ride  quality 
are  variations  in  alignment.  Variations  in  gage,  within  a  range  normally  encountered 
in  well  maintained  track,  appear  to  have  little  influence  on  ride  quality.  Deviations 
in  profile  of  the  type  commonly  associated  with  jointed  track  do  not  induce  pas- 
senger discomfort  at  high  speed.  Rather,  they  are  a  source  of  annoyance  in  the 
creation  of  a  disturbing  car  interior  noise.  Interestingly  enough,  short  wave  length 
corrugations  give  rise  to  resonant  vibration  of  car  interior  paneling  which  can  be 
distracting.  Approximately  35%  of  the  PC  main  trackage  over  which  the  Metroliner 
operates  contains  bolted  rail. 

The  rugged  environment  beneath  the  cars  is  not  composed  solely  of  vibra- 
tional input.  Since  the  only  attempt  at  streamlining  the  equipment  is  seen  in  the 
slight  fairing  noted  at  the  train  set  ends,  there  is,  at  high  speed,  considerable  aero- 
dynamic activity  around  the  cars.  This  effect  has  caused  high  velocity  impingement 
of  ballast  particles  on  car  components  beneath  the  floor  and  a  consequent  mortality 
to  function.  Intrusion  of  fine  material  into  inadequately  sealed  enclosures  has  also 
been  a  source  of  trouble. 

These,  then,  are  the  points  of  interest  visible  to  those  of  tlie  engineering  persua- 
sion from  a  scrutiny  of  domestic  high-speed  experience: 

1.  Rather  severe  penalties,  applied  through  the  compromise  of  equipment 
dependability,  are  incurred  in  the  absence  of  a  precedent  and  thorough 
R&D  program. 


SpecialReport  23 


2.  Initially  high  standards  of  guideway  geometry  must  prevail  and  continue. 
Without  resort,  at  this  point,  to  quantitative  standards  definition,  suffice 
it  to  say  that  the  image  of  the  best  track  that  can  be  visualized  by  a 
practical  maintenance  engineer  probal^ly  lies  in  the  lower  half  of  the 
spectrum  of  acceptability. 

3.  The  indiscriminate  intermixing  of  high-speed  trains,  the  maintenance  of 
which  is  perhaps  within  the  control  of  a  single  administration,  and  revenue 
freight  consists,  composed  of  vehicles  representative  of  a  wide  span  of 
design  characteristics  and  upkeep  practices,  creates  a  track  maintenance 
burden,  the  extent  of  which  is  not  clear  at  the  moment. 

4.  Interlockings,  not  surprisingly,  can  be  isolated  as  the  greatest  offenders 
in  the  introduction  of  adverse  vibration  to  high-speed  vehicles.  That  this 
should  be  recognized  domestically  is  no  technological  breakthrough;  wit- 
ness the  mo\'able  nose  frog  developmental  work  now  in  progress  in  Great 
Britain  and  Japan. 

In  connection  with  Item  3,  above,  should  be  mentioned  the  not  always  sepa- 
rated categories  that  must  be  considered  when  contemplating  the  economic  burden 
introduced  in  attempting  to  maintain  railroad  track  for  use  by  both  high-speed 
passenger  and  conventional  freight  trains.  Summarily,  there  are  the  elements  of 
accelerated  curve  wear  (low  rail)  associated  with  the  negative  unbalance  felt  by 
slower  freight  equipment  and  the  prompt  deterioration  from  the  requisite  level  of 
profile  and  alignment  once  the  movement  of  substantial  freight  tonnage  is  intro- 
duced. It  is  hoped  that  e\'entua]ly  firm  cost  data  reporting  on  each  of  these  will  be 
available,  but  presently  there  is  nothing  on  which  to  base  supported  conclusions 
l:)eyond  the  statement  of  an  earlier  reference:  ".  .  .  The  heaxy  freight  trains  and 
high-speed  locomotives  of  conventional  passenger  trains  inflict  far  more  damage 
upon  the  track  and  the  roadbed  than  do  the  Metroliners  .  .  .  and  is  therefore 
translated  into  higher  maintenance  costs.  .  .  ."''  Graphical  confirmation  of  this  last 
statement  is  included  as  Appendix  II  (see  page  67)  and  is  the  result  of  study 
progressed  jointly  by  Penn  Central  and  the  Federal  Railroad  Administration  late 
in  1969. 

What  this  really  devolves  to  is:  can  conventional  railroad  track,  as  the  term  is 
applied  in  the  United  States,  be  economically  maintained  even  as  a  high-speed 
routeway  uncontaminated  by  freight  usage.  The  question  is  open — under  active 
investigation  here^  and  answered  in  the  negative  by  engineers  of  many  foreign 
systems. 

French    National    Railways    (SNCF) 

At  the  present  moment  SNCF  is  operating  trains  over  specific  route  segments 
at  125  mph.  Between  Les  Aubrais  and  Vierzon  on  the  route,  Paris  to  Toulouse, 
trains  of  the  prestige  Le  Capitole  service  run  at  this  speed  for  47.5  miles.  It  is  the 
intention  of  SNCF  to  expand  the  number  of  route  segments  of  this  line  and  others 
over  which  speeds  in  this  order  will  be  permitted.  As  is  the  case  with  most  fixed 
plants  constructed  in  the  last  century,  SNCF  is  constrained  by  route  alignment  in 
its  attempts  to  increase  speed  by  a  large  increment  over  substantial  route  mileage. 
This  is  one  of  the  reasons  why  active  consideration  of  new-line  construction  is 
lieing  given  for  a  successor  route,  Paris  to  Lyon. 

Tliis  new  line,  if  built,  will  be  235  miles  long  between  its  junction  points 
with  present  routes.  Rail  will  be  132  ll)/yd  on  concrete  tics,  the  spacing  of  which 


24 High    Speed    Rail    Transportation 

is  not  clear.  Planned  depth  of  stone  ballast  beneath  the  ties  is  13.7  inches,  and 
particular  attention  is  directed  to  the  provision  of  an  enlarged  ballast  .section  profile 
at  the  tie  ends  to  augment  resistance  to  transverse  forces  applied  to  the  rail.  Hori- 
zontal alignment  will  include  curves  having  a  minimal  radius  of  1.3,000  ft.  Vertical 
curves  will  have  minimum  radii  of  39,000  ft.  It  is  interesting  to  note  that  the  high 
power  requirement  envisioned  for  rapid  train  acceleration  is  considered  adequate  to 
overcome,  at  full  speed,  grades  of  3.5%  (length  not  specified).  Unfortunately,  the 
envisioned  level  of  requisite  track  geometry  is  quantified  only  in  terms  of  the  oscillo- 
gram output  of  the  SNCF  track  measuring  car  fleet  and,  as  such,  is  not  amenable 
to  tabular  listing  in  the  usual  mid-ordinate  value  form.  Contemplated  train  speed  for 
this  line  is  188  mph.'" 

Train  velocities  in  this  range  are  e.xceedingly  close  to  the  20%  below  critical 
speed  of  198  mph  postulated  by  Matsudaira  in  1966  for  trains  drawing  power  from 
a  catenary  system.  However,  in  the  case  of  the  planned  French  service  which  will 
be  powered  by  gas-turbine  locomotives,  this  limitation  does  not  apply  and  may  be, 
for  the  moment,  replaced  by  one  representative  value  at  wliich  the  adhesion  of 
powered  wheels  is  balanced  by  train  resistance.  For  New  Tokaido  line  equipment 
this  has  been  extrapolated  to  approximately  230  mph.  In  a  practical  sense,  this  limit 
must  be  something  less  and  becomes  a  measure  dependent  on  the  refinement  of 
track  geometry  coupled  with  the  suspension  characteristics  of  the  vehicle.  In  the 
case  of  the  equipment  operated  on  the  New  Tokaido  Line,  these  trains  could  run, 
hypothetically,  at  217  mph  over  a  track  having  a  maximum  vertical  error  of  0.078 
inches  in  32.8  ft.^*^  The  ruling  parameter,  then,  is  seen  to  be  economically  achievable 
track  quality  as  a  function  of  a  given  gage  width.  To  soften  a  suspension  in  order 
to  accommodate  larger  track  geometry  error  introduces  vehicle  instability  that  is 
compensated  for  only  by  extending  the  distance  between  the  points  of  support,  the 
wheels  in   this   case.   Otherwise,   roll  response  sooner  or  later  becomes   critical. 

Except  for  a  higher  planned  speed  than  has  been  suggested  anywhere  else 
overseas,  there  is  nothing  singular  in  this  anticipatory  planning  for,  as  will  be  seen, 
similar  projections  are  underway  in  several  other  places  and,  in  the  case  of  Japan, 
the  New  Tokaido  Line  exists  as  a  palpable  fact.  What  is  noteworthy  is  the  opinion 
of  qualified  French  engineers  that  cross-tied  track  will  be  adequate  to  sustain, 
comfortably,  trains  operating  in  this  speed  range.*"'  This  position  has  been  estab- 
lished as  a  result  of  careful  preliminary  investigation  over  a  period  of  several  years. 
A  most  interesting  aspect  of  this  work  to  American  railroad  engineers  lies  in  the 
reliance  of  the  developmental  approach  on  the  cross  correlation  of  vehicle-track 
parameters  and  in  the  use  of  continuous,  real  track  deviation  measurements,  as  an 
essential  input  to  the  design  of  suspension  for  a  proposed  vehicle  type. 

One  notes  early  in  the  technical  literature  covering  the  SNCF,  the  British  Rail 
work  to  be  discussed  below  and,  indeed,  much  contemporary  activity  dealing  with 
vibration  response  to  random  excitation,  a  dependency  on  the  technique  of  spectral 
analysis  in  order  to  identify  the  nature  and  influence  of  functions  of  interest.  This 
analytic  method,  refined  in  reaent  years,  is  one  in  general  use  now  in  any  area 
involving  the  study  of  bodies  moving  on  a  continuous,  randomly  varying  support, 
and  is  one,  reference  to  which  the  native  railroad  engineering  community  will  en- 
counter with  increasing  frequency.  Realization  may  occur  to  alert  individuals  that 
a  familiarity  with  this  technique  and  its  implications  will  become  a  necessary  part 
of  the  background  of  the  well-informed  railroad  maintenance  engineer  in  compre- 
hending the  origin  of  some  of  die  factors  that  can  affect  the  nature  of  his  daily 


Special    Report  25 


work.  This  is  anticipated  as  not  being  an  analytic  method  to  which  an  engineer 
may  turn  in  seeking  a  description  of  discrete  track  faults  but,  rather,  one  which 
will  enable  the  comparison  of  a  given  section  of  track  with  itself  as  a  means  of 
estabhshing  rate  of  change  with  time.  More  important  though,  is  the  ability  of  the 
procedure  to  isolate  alignment,  profile,  and  cross  level  variations  having  a  potential 
energy  input    of  interest  or   concern   to   vehicle  suspension   designers. 

(It  is  a  matter  of  more  than  casual  curiosity  that  people  in  the  Canadian  Na- 
tional Railway  Research  Centre  are  now  trying  by  means  of  spectral  density  analysis, 
to  estabhsh  the  unique  "signature"  of  various  track  conditions,  the  symptomatic 
evidence  of  which  has  been  recorded  by  their  track  geometry  measuring  car. ) 

The  utility  of  successfully  correlating  cause  with  effect  in  an  objective  way  is 
plain  but  success  will  not  come  easily  nor  completely,  it  is  feared. 

In  the  specific  case  of  SNCF,  Mauzin  type  track  measuring  cars  have  been 
employed  to  record  on  magnetic  tape  continuous  signals  analogous  to  the  loaded 
profile,  horizontal  and  vertical,  of  the  track  over  which  the  measuring  equipment  is 
operated.  In  the  subsequent  processing  of  the  data,  it  has  been  possible  to  identify, 
to  a  great  extent,  the  spatial  frequency  and  wave  length  of  variations  in  the 
parameters  examined.  It  is  not  made  too  clear  in  the  literature  what  the  relative 
state  of  the  track  was  when  the  measurements  were  made.  However,  as  some  of 
these  measurements  were  made  on  the  125-mph  Les  Aubrais-Vierzon  sector,  one 
infers  a  high  initial  condition  of  repair.  This  is  a  concrete  application  of  the  tech- 
nique in  providing  to  the  vehicle  design  phase  a  measure  of  the  actual  vibration 
environment  in  which  the  equipment   is  expected  to   operate. 

From  an  extended  series  of  investigations  French  engineers  have  estabhshed 
to  their  satisfaction  the  levels  of  stress  that  cross-tied  track  will  economically  and 
safely  resist.  From  the  measurement  of  track  quality,  the  production  burden  of 
which  is  considered  economically  supportable,  they  have  further  determined  that 
reasonable  extrapolation  of  this  degree  of  vibrational  excitation  may  be  safely  and 
comfortably  negotiated  by  high-speed  vehicles,  the  description  of  which  lies  within 
present  design  capability.  Hence,  the  conviction  that  contemporary  track  design 
concepts  will  suffice  for  a  future  commercial  service  cruising  at  a  speed  of  188  mph. 

Original  construction  costs  of  this  new  Paris-Lyon  line  were  estimated  in 
January  1969  as  being,  in  total,  either  $212.8  million  or  $217.26  million,  depending 
on  the  route  location  options  exercised.  This  has  been  reported  as  $870,000  and 
$900,000  per  route  mile,  respectively.'^" 

In  the  context  of  maintenance,  the  cost  expected  to  attend  the  requisite  level 
of  alignment  and  profile  is  estimated  at  5600  FR  per  mile."''  Literally,  this  sum 
is  equivalent  to  $1000  per  track  mile.  In  adjusting  for  the  cost  differential  for  serv- 
ices performed  in  the  United  States  similar  to  their  French  counterparts,  a  fre- 
quently used  multiplier  of  2.5  produces  a  domestic  equivalent  cost  of  $2500  per 
mile  for  surfacing  and  lining,  solely  and  apart  from  other  maintenance  of  way  costs. 
It  is  not  clear  whether  this  figure  represents  a  repetitious  operation  or,  which  is 
dubious,  the  assignment  of  large  numbers  of  men  to  the  work.  In  any  case,  consider- 
ing the  usual  crew  size  applied  to  this  type  of  work  in  the  American  railroad  in- 
dustry and  that  completion  of  a  mile  per  day  of  surfacing  and  lining  is  a  conserxative 
reflection  of  the  state  of  the  art,  the  SNCF  requirement  seems  rather  excessive. 
Conceivably,  the  work  equipment  amortization  cost  is  included.  If  this  is  so,  com- 
bining for  these  purposes  an  arbitrary  5-year  amortization  period  for  equipment 
having  an  aggregate  first  cost  of  $250,000,  a  160-day  annual  work  season  and  a  1- 


26 H  igh    Speed    Rail    Transportation 


mile  daily  accomplishment  yields  an  equipment  depreciation  cost  per  mile  of  $312.00, 
a  minor  fraction  of  the  total  cost  per  mile. 

While  SNCF  is  quite  firm  in  the  belief  that  con\entional  track  desijjns  will  be 
botli  technically  and  economically  sufficient  for  the  proposed  Paris-Lyon  high-speed 
route,  it  has  been  shown  tliat  similar  faith  is  difficult  to  sustain  in  the  United  States, 
particularly  from  an  economy  viewpoint.  The  ride  quality  problems  of  the  Metro- 
liner  grant  rudimentary  insight  into  the  necessity  for  a  highly  refined  level  of 
profile  and  alignment,  and  SNCF's  own  analysis  of  expected  future  maintenance 
costs  associated  with  this  degree  of  track  geometry  perfection  would  scarcely  survive 
the  ocean  voyage  if  they  were,  of  necessity,  to  be  applied  here  to  a  purely  private 
venture. 

SNCF  has  just  as  firmly  rejected  the  concept  of  rail  support  by  concrete  slabs 
or  beams  on  the  grounds  of  no  technical  requirement  and  a  construction  cost  of 
2-3  times  that  of  conventional  track.  Quite  unlike  many  other  administrations, 
foreign  and  domestic,  SNCF  appears  to  have  no  internal  field  trials  directed  toward 
slab  or  beam  track  although  they  are  participating  in  the  joint  ORE-British  Rail 
venture  at  Radcliffe-on-Trent  in  England. 

Treatment  of  the  SNCF  outlook  has  been  somewhat  specific  in  an  illustrative 
way.  For  greater  understanding  of  maintenance  costs  associated  with  high-speed 
Continental  rail  operations.  Reference  27  presents  the  viewpoint  of  the  West  Ger- 
man Federal  Railways  (DB)  in  some  detail.  This  material  is  explicit  in  its  treatment 
of  construction  and  maintenance  costs  as  a  function  of  train  speeds  to  125  mph, 
and  consideration  of  it  is  recommended. 

Japanese   National    Railways    (JNR) 

In  a  perusal  of  the  JNR  high-speed  eftorts  one  is  confronted  with  a  near  em- 
barrassment of  riches  in  source  material  descriptive  of  the  physical  detail  of  the 
operative  New  Tokaido  Line  (NTL)  and  the  under-construction  extension,  the 
New  San  Yo  Line  (NSL).  In  a  most  admirable  fashion,  the  engineers  of  JNR  and 
its  affihates  have  reported  over  the  years  on  their  intentions  and  the  fine  research 
supporting  tliese  purposes. 

By  common  understanding,  JNR  is  in  the  van  of  the  advance  into  the  era  of 
high-speed  commercial  rail  transportation.  In  that  the  literature  descriptive  of  these 
accomplishments  has  had  widespread  distribution  in  tlie  United  States,  it  is  felt 
that  a  close  scrutiny  of  specific  details  of  either  the  NTL  or  NSL  would  be 
redundant.  It  would  be  more  useful  if  a  short  summary  of  physical  characteristics 
of  each  line  and  die  essential  differences  leads  into  a  consideration  of  guideway 
performance  and  associated  costs. 

This  is  a  more  difficult  course  to  follow  because  of  the  scarcity  of  critical  analysis 
of  performance  in  the  prolific  literature  uttered  by  those  closest  to  the  scene. 

For  example,  consider  the  pad  between  the  rail  and  concrete  tie  as  a  signifi- 
cant contributor  to  satisfactory  track  structural  system  performance.  The  pad  used 
in  the  NTL  is  a  rather  stiff  one  having  a  spring  constant  of  slighdy  in  excess  of 
500,000  lb/in  (90  MT/cm).'"  Reportedly,  JNR  has  backed  away  from  this  value 
for  the  NSL,  but  the  reasons  for  this  change  are  not  made  clear. 

A  further  illustration  is  provided  by  the  same  commentator  in  connection  with 
the  embankment  criteria  developed  for  the  NSL."  In  order  to  avoid  the  severe  em- 
bankment settlement  problem  that  plagued  the  NTL  during  the  first  year  and  a 


SpecialReport  27 


half  of  operation,  a  different  soils  engineering  approach  has  been  employed.  Letting 
the  reporter's  statement  convey  the  thrust  of  this  re-aligned  approach:  "Regarding 
settlement,  we  are  restricting  the  settling  speed  within  5  mm  (0.2  inch)  per  month 
in  the  incipient  stage  of  commercial  operation  and  to  limit  the  total  settlement  from 
completion  of  the  embankment  to  the  completion  of  the  settlement  to  300  mm 
(11.8  inches)." 

This  is  truly  an  astonishing  ultimate  value.  The  implication  is  of  a  grim  em- 
bankment foundation  condition  in  the  areas  where  this  amount  of  subsidence  is 
expected  to  occur.  Japanese  engineers  are,  without  a  doubt,  aware  of  the  benefits 
of  surcharging.  Why  has  this  technique  not  been  adopted  and  how  is  the  predicted 
rate  of  early  settlement  to  be  controlled?  Answers  to  these  questions  would  be  most 
useful  to  know. 

One  can  only  hope  for  the  guidance  of  greater  future  professional  candor  from 
those  who  have  acquired  experience  to  others  about  to  assume  the  charge.  Mean- 
while, abetting  what  is  available  by  means  of  inference  and  non-JNR  sources,  some 
body  of  understanding  may  be  accumulated. 

At  the  end  of  this  JNR  section  there  appears  a  tabular  summary  of  the  essential 
physical  differences  between  the  NTL  and  its  successor,  the  NSL.  That  there  is  con- 
templated no  outstanding  change  in  the  original  NTL  track  design,  other  than  an 
increase  in  the  size  of  rail,  implies  satisfaction  with  the  present  reliance  on  concrete 
ties  and  double  elastic  rail  fixation.  This  is  important,  for  if  NTL  is  a  prototype 
and  NSL  the  first  production  model,  so  to  speak,  it  means  that  JNR  have  not  yet 
resolved  their  opinion  on  the  matter  of  conventional  track  designs  as  opposed  to 
slab  or  beam  support  for  use  in  the  national  network  plan  in  that  further  experi- 
mental rigid  track  support  is  to  be  installed  in  NSL.  This  planned  high-speed 
(156  mph)  trunk  network  is  envisaged  as  including  2500  miles  of  new  double- 
track  route  at  a  cost  of  $2.08  billion.^-  Doubtless  before  so  large  an  undertaking 
proceeds  much  further,  a  firmer  position  on  the  tie-slab  controversy  will  be  adopted. 

In  the  matter  of  maintaining  this  type  of  concrete-tie  track  that  its  progenitors 
have,  so  far,  found  satisfactory,  information  bearing  on  its  current  maintenance 
costs  has  been  elusive.  One  commentator  has  said  that  the  annual  maintenance  of 
way  force  on  the  NTL  in  1965  was  1.80  men  per  mile  (2240  hrs/km/yr).  In 
1966  this  reduced  to  1.44  men  per  mile."  In  1966  the  earlier  high  subsidence  rate 
of  subgrade  levelled  off  to  relative  stability,  so  this  trend  of  diminishing  manpower 
could  be  expected  to  have  been  arrested  if  not  reversed  by  the  aging  of  the  track 
under  service. 

Another  source,  still  reporting  on  experience  in  1966,  states  that  tlie  322  route 
miles  of  double  track  required  that  personnel  accomplish  2560  miles  of  surfacing 
and  spot  tamping,  680  miles  of  lining,  and  481  miles  of  vertical  rail  hold-down 
bolt  tightening." 

Clarity  is  lacking  in  a  definition  of  causes  to  which  to  attribute  this  mainte- 
nance burden.  Is  it  the  demands  of  a  rigorous  track  geometry  error  tolerance  level? 
Do  the  equipment  suspension  characteristics  require  an  overly  refined  level  of  track 
geometry  in  order  not  to  exceed,  at  speed,  the  ride  quality  criteria  established  by 
JNR   for  car  interiors?  One  cannot  say. 

One  thing  is  plain,  though,  and  that  is  that  JNR  has  given  the  closest  scrutiny, 
analytically  and  experimentally,  to  the  concept  of  l)allastless  track.  The  original  trial 
installations  (3)  of  stub  wood  ties  on  concrete  slabs  in  the  NTL  have  proven  un- 
satisfactory.   More  elaborate  designs  were  develojied  and  installed  in   two  locations. 


28 


High    Speed    Rail    Transportation 


Experience  with  these  has  been  satisfactory  and  furtlicr  trial  installations  are  planned 
for  the  NSL.^"  The  higher  first  cost  of  rigid  track  support  systems  as  compared  with 
the  construction  costs  of  new  conventional  track  breeds  a  lack  of  complete  en- 
thusiasm in  railroad  engineers  around  the  world.  Nevertheless,  there  is  much  investi- 
gative work  pointed  in  this  direction.  In  addition  to  the  JNR  installations,  like 
studies  are  currently  underway  in  Britain,  Germany,  Czechoslovakia  and  the  USSR. 


Summary  of  Certain  Variables 
New  Tokaido  Line  Compared  With  New  San  Yo  Line 


NTL 

NSL 

Speed,  max. 

132  mph 

132  mph  (constructed  to  an  ulti- 
mate 156  mph) 

Curvature 
(alignment) 

0°-42' 
(2500  m  min.) 

0°-26'           ( occasional  3500  m 
( 4000  m  min )  where  unavoidable ) 

Gradient 

1.5% 
than 
miles 

to    1.8%  for  no   more 
1.5  miles.  2%  for  0.625 
or  less. 

max.  equal  to  1.5% 
6.25  mile  average  limited  to  1.2% 

Vertical 
curves 

32,800  ft 

49,000  ft 

Weight 

of 
Rail 

110  lb/yd 

132  lb/yd 

Route 
length 

322  mi 

101  mi 

Cost 

$1,045  million 

$472  million  (estimated) 

Soviet   Union    Railways    (SZD) 

While  regretting  the  tantalizing  shortcomings  of  an  area  of  railroad  reporting 
practice,  it  is  appropriate  to  address  a  similar  problem  associated  with  activities  in 
the  USSR.  From  what  can  be  learned,  operation  of  trains  in  the  Soviet  Union  at 
speeds  in  excess  of  100  mph  is  liighly  uncommon  although  higher  speeds  are  under 
study.  This  being  the  case,  consideration  might  appear  to  be  out  of  context.  There 
is  this  about  rail  operation  in  the  Soviet  Union  that  suggests  the  reward  inherent  in 
acquiring  an  understanding  of  activities,  recent  past  and  present,  in  that  country: 
the  average  gross  load  intensity  is  about  5  times  that  in  the  United  States  and  7 
times  that  in  Europe.'"  A  specific  example  of  this  is  displayed  in  the  100,000,000  mgt 
handled  annually  over  the  line,  Moscow  to  Leningrad.  On  a  system-wide  basis,  SZD 
transports  80%  of  all  internal  traffic  in  terms  of  ton-miles.  This  is  a  traffic-intensive 
operation  over  an  aggregate  route  length  of  82,780  miles. 

Total  rail  ton-milas  transported  in  1967  throughout  the  world  are  reported  as 
having  l^een  3,006,000  X  10".  Of  this  aggregate,  SZD  accumulated  1,429,700  X  10" 
and  the  U.S.,  having  close  to  220,000  miles  of  main  track,  accounted  for  719,460  X 
10"."  Not  commonly  realized  is  the  fact  that  well  over  half  of  the  82,780  miles  of 
track  in  the  Soviet  Union  incorporates  5-ft  gage.  Even  less  popularly  appreciated 
is   the   additional   fact  that   18,000   route  miles   are  electrified." 


___^ Special    Report 29 

Equally  intensive  is  the  training  of  technical  personnel  for  service  with  SZD 
and  the  measure  of  and  value  to  the  organization  of  rail  research.  There  are  now 
12  institutions  of  higher  learning  devoted  to  the  professional  training  of  future  em- 
ployees of  the  system.  Of  this  number,  tliere  are  currently  over  9000  engineers-in- 
training.  Railway  technicians  are  now  being  trained  at  more  than  70  technical 
colleges. 

Research  is  directed  by  the  Scientific  Research  Institute  for  Railway  Transport 
of  the  USSR.  The  reported  scope  of  investigation  supported  by  this  organization 
appears  to  embrace  nearly  every  problem  area  familiar  to  western  railroad  opera- 
tion. Illustrative  are  train  braking  in  extreme  cold  ( — 76°F),  assessment  of  residual 
service  life  in  rail  and  fittings  anticipatory  of  failure,  and  the  creation  of  two 
closed-loop  test  tracks,  one  outside  Moscow  and  the  other  in  the  Caucasus.  The 
first  of  these  two  installations  carries  out  daily  service  loading  tests  of  conventional 
track  and  fittings  and  includes  an  "obstacle"  with  which  full-scale  cars  are  collided 
at  speeds  up  to  16  mph.  The  second  is  dedicated  to  research  on  vehicles  and  tracks 
for  high-speed  trains.  The  U.S.  Department  of  Transportation  intends  to  start  con- 
struction on  a  single  facility,  combining  the  general  attributes  of  both  of  these 
installations,  this  year  in  Colorado. 

Truly,  in  contemplating  the  apparent  totality  of  SZD  research,  one  is  reminded 
of  that  most  common  of  World  War  II  graffiti,  latinized  herein,  in  view  of  the 
solemnity  of  these  proceedings,  to:  "Kilroyus  erat  in  hoc  loco."  One  should  remem- 
ber to  substitute  a  suitable  Slavic  cognomen  in  place  of  the  named,  mythical  Gaelic 
activist. 

A  listing  of  many  of  the  current  projects  of  SZD  research  is  disclosed  in  Refer- 
ence 19. 

It  seems  almost  axiomatic  that  such  an  energetic  enterprise  would  have  evolved 
information  of  use  to  the  domestic  railroad  engineering  fraternity.  And  this  is  in- 
deed the  case;  many  of  the  experimental  ventures  contemplated  here,  particularly  in 
connection  with  research  directed  towards  improving  guideway  stability  for  high- 
speed trains,  have  already  been  accomplished  in  the  USSR.  There  now  exists  in  the 
Moscow-Leningrad  main  line  a  test  specimen  including  direct  fixation  of  rails  to 
concrete  slabs  and  parallel  beams  both  in  tangent  and  curved  track.  This  is  a  pre- 
cursor to  the  AT&SF-FRA  Kansas  test  track  for  which  the  first  contract  was  let 
in  June  of  this  year. 

The  difficulty  lies  in  trying  to  gain  an  intimate  knowledge  of  what  actually  was 
done.  There  are  two  causes  for  this: 

First,  even  though  there  is  a  surprising  amount  of  material  readily  available 
through  commercial  outlets  specializing  in  the  distriljution  of  Russian  literature,  it 
exists  as  original  text  and,  as  such,  is  not  as  commonly  translated  as  are  some  other, 
more  familiar  languages  for  which  technical  translation  skills  are  more  conveniently 
accessible.  A  corollary  to  this  is  that  the  demand  for  translation  is  less  pressing. 

Second,  while  the  amount  of  material  at  hand  is  gratifying,  at  least  quanti- 
tatively, it  is  so  in  a  relative  sense  only.  The  quantity  is  by  no  means  comparable 
to  what  is  available  from  Western  Europe  and  Japan.  Basically,  this  is  brought 
about  by  the  importance,  to  the  management  of  that  nation's  affairs,  of  the  USSR 
rail  network  as  an  essential  component  in  strategic  security  planning.  From  tliis 
point  of  view  and  in  the  light  of  other  political  factors  not  germane  to  this  text, 
the  prospects  for  unlimited  flow  of  information  are  bleak. 


30 High    Speed    Rail    Transportation 

Thi.s  awkward  form  and  slender  measure  of  technieal  discussion  emanating 
from  the  Soviet  Union  is  distressing,  for  it  represents  denial  to  American  railroad 
engineers  of  the  experience  of  an  enterprise  that  by  its  sheer  magnitude  in  both 
operation  and  research  almost  inevitably  must  have  developed  a  level  of  perception, 
an  awareness  of  whicli  would  be  useful  here.  There  is  concern  in  the  Federal  Rail- 
road Administration  with  tliis  situation.  Preliminary  work  is  underway  within  that 
organization  which,  if  completed  as  planned,  will  constitute  an  early  phase  of  what 
may  be  regarded  as  a  reasonable  first  stage  resolution  of  the  problem.  Progress 
is  less  tlian  meteoric  though,  due  to  Inidgetary  and  personnel  limitations.  As  a 
matter  of  interest,  it  should  be  noted  that  this  work  is  just  one  segment  of  the 
larger  matter  of  establishing  a  central  source  of  information  and  data  bearing  on 
the  total  area  of  transportation  of  which  the  rail  mode  is  simply  one  division.  The 
need  for  such  a  facility  is  patent  and,  once  again,  progress  toward  fulfillment  is 
dependent  on  funding  and  tlie  availability  of  personnel  for  assignment  to  the  task. 

British    Railways    (BR) 

In  the  United  Kingdom,  as  in  the  USSR,  there  are  presently  no  commercial 
operations  requiring  125  mph  train  speeds.  Just  as  SZD  has  plans  for  eventual 
operation  at  or  in  excess  of  this  level  so,  similarly,  does  BR.  More  is  known  about 
the  thinking  that  counsels  the  BR  effort  and  there  is  much  about  this  direction  that 
is  noteworthy. 

Of  particular  interest  to  American  railroad  engineers  is  the  distinctly  singular 
BR  position  that,  beyond  a  certain  rather  refined  upper  threshold  of  track  geometry 
deviation  tolerance,  high-speed  equipment  must  include  a  guidance  and  suspension 
system  capable  of  accommodating  itself  to  errors  of  profile  and  alignment.  This 
concept  has  a  rational  basis  in  the  difficulty  and  consequent  cost  of  producing  track 
quality  beyond  a  point  that  BR  has  identified  as  necessary  for  the  adequate  support 
of  passenger  trains  running  at  125  mph. 

Equipment  has  now  been  designed  for  running  at  150  mph  and  has  been 
designated  as  the  Advanced  Passenger  Train  (APT).  "The  suspension  is  designed 
specifically  to  handle  British  Track  and  to  run  without  flange  contact  on  all  curves 
on  the  main  lines  of  British  Railways."-" 

This  equipment  is  expected  to  utilize  power-operated  active  roll  control  as  an 
alternate  to  the  older  concept  of  passive,  gravity  actuated,  pendulous  suspension 
employed  in  the  Turbo  units,  to  negotiate  at  speed  relatively  unmodified  or  exist- 
ing superelevated  curves  without  the  build-up  of  passenger  distress  due  to  high 
levels  of  unbalance.  Passing  mention  should  be  made  that  SNCF  is,  likewise,  pro- 
posing active  roll  control  for  the  turbine-driven,  articulated  equipment  intended  for 
service  on  the  new  Paris-Lyon  line.  Basically,  it  is  felt  that  gravity  reactive  roll 
compensation  has  too  sluggish  a  response  time  and  that  passengers  will  be  sub- 
jected to  uncomfortable  lateral  forces  at  points  of  cros.slevel-alignment  transitions 
marking  the  ends  of  easement  curves.  The  responsiveness  of  powered  roll  control, 
having  itself  a  system  impedance,  may  approach  the  ideal  if  track  status  evaluation 
is  performed  ahead  of  a  unit  for  which  adjustment  is  to  be  initiated.  This  course 
is  under  investigation  by  SNCF.^^°  Naturally,  one  wonders  about  the  source  of  ad- 
vance information  to  be  applied  for  the  lead  vehicle.  Gas-turbine-powered  trains 
on  the  SNCF  will  have  a  unit  at  each  end  of  a  train  entirely  devoted  to  containing 
the  train's  motive  power.  Present  opinion  holds  that  these  cars,  not  being  occupied 


Special    Report  31 


by  revenue  passengers,  may  be  allowed  to  experience  the  larger  lateral  forces  that 
will  develop  in  unbanked  vehicles.  However,  in  the  case  of  the  lead  unit,  the  en- 
gineman's  seat,  in  a  way  not  clear,  will  be  tilted."^'' 

A  person's  work  in  this  whole  field  can  provide  great  intellectual  enjoyment 
but  it's  not  often  that  an  element  of  humor  intrudes.  Consider,  though,  the  hypo- 
thetical plight  of  an  engineman  ensconced  on  such  a  chair  in  the  event  that  an 
errant  logic  module  in  the  circuitry  controlling  the  chair's  glide  path,  so  to  speak, 
reads  up  for  down  or,  as  is  more  likely,  this  remarkable  seat  is  gimbaled  and,  by 
chance,  finds  its  natural  frequency  synchronous  with  a  transient  but  prolonged 
oscillatory  motion  of  the  vehicle. 

For  the  APT,  rapid  acceleration  and  reasonable  power  plant  size,  despite  the 
large  horsepower  requirement  per  ton  dictated  by  150  mph  speeds,  is  achieved 
through  light  metal,  stressed  skin  vehicle  construction.  Weight  is  consequently  kept 
to  the  minimum  necessary  to  confer  stability  in  cross-winds  when  running  and  still 
retaining  standard  gage. 

The  unique  concept  of  avoiding  all  flange  contact  is  a  wholly  British  Railways 
Research  Division  contribution  to  the  state  of  the  art  and,  if  brought  to  fruition — 
as  experimental  evidence  would  seem  to  guarantee — represents  a  pronounced  step 
forward  in  arriving  at  control  of  hunting,  provision  of  added  passenger  comfort 
during  high-speed  running,  reduction  of  wear  rates  of  rail,  wheel  and  vehicle  com- 
ponents and  diminished  power  requirements.  Essentially,  guidance  is  achieved  by 
the  creep  forces  acting  on  the  wheel  treads,  tlie  configuration  of  which  has  been 
very  carefully  determined.  The  suspension  must  control  the  tread  forces  which 
guide  the  vehicle  along  the  track.  Fundamentally,  this  is  a  feed-back  control  problem 
in  the  stabilization  of  lateral  motion,  the  perfection  of  which  forms  an  important 
part  of  the  BR  research  work  in  this  area. 

From  this  elegantly  conceived  and  executed  developmental  effort,  which  has 
been  periodically  reported  in  the  trade  press,"  BR  will  in  all  probability  realize  a 
handsome  success,  both  in  satisfaction  of  domestic  requirement  and  in  the  creation 
of  a  commercially  viable  venture  in  overseas  trade.  The  approach  to  the  progress 
of  the  overall  investigation,  considering  as  it  has  the  symbiotic  interaction  of  track 
and  vehicle  characteristias,  recommends  itself  to  studious  review  by  similarly  applied 
personnel  in  this  country,  not  only  in  connection  with  future  high-speed  endeavors 
l)ut  also  for  present-day  application.  The  statistical  analysis  of  randomly  distributed 
BR  track  profile  errors,  as  reported  by  Gilchrist,"''  constitutes  an  in-put  to  the  AFT 
suspension  design  phase.  Similar  track  data  covering  a  wide  range  of  domestic  main- 
line track  condition,  is  available  through  the  U.S.  Department  of  Transportation. 
To  date,  demand  for  access  to  this  information  has  been  negligible. 

What  BR  considers  as  adequate  track  geometry  for  conventional  passenger 
trains  operating  at  125  mph  and  to  which  APT  must  conform  when  running  at 
150  mph  (and  above  in  the  so-called  "stretch  design")  is  presented  in  Table  7, 
which  also  displays,  for  comparative  purposes  (where  possible),  the  geometric 
standards  initially  formulated  for  the  Japanese  National  Railroad's  New  Tokaido 
Line  (NTL)  and  follow-on  New  San  Yo  Line  (NSL).  Additionally,  as  a  matter  of 
potential  interest  are  included  the  tolerances  that  were  established  for  the  so-called 
Test  Track  active  on  the  Pennsylvania  and  subsequent  Penn  Central  Transportation 
Company's  Main  Line  3  between  County  and  Milham  interlockings  (21.2  miles)  in 
New  Jersey  in  1967-68  and  for  the  proposed  FRA  linear  induction  motor  vehicle 
test  track  to  be  constructed  in  Pueblo,  Colo.,  this  year. 


32 


High    Speed    Rail    Transportation 


:iM 


rH     top    O, 
C     (0 

•  H    C 

as        (« 


O  T^   TJ      - 

Id  o<  u 

O  «)            4) 

H  O.X!    (O 

i  >->   •r^    Bi 

Z  •         (0 


o 

, 

<l-l 

CJ 

(1) 

>. 

in 

<4-) 

c 

nl 

in 

o 

CJ 

x 

3 

y 

+j 

« 

w 

I-) 

r-i 

o 

■r< 

9) 

« 

M 

4J 

<s 

u. 

>. 

U 

<U 

VI 

r) 

rt 

U 

< 

3 

^ 

w 

(U 

nl 

r-t 

j-> 

■  •^ 

N 

c 

« 

c 

•M 

.Vi 

rt 

() 

o 

(11 

in 

rl 

•r< 

•r^ 

0) 

fl 

>. 

•P 

C 

XI 

fi 

H 

.t! 

fli 

■<! 

o 

ij 

>> 

n 

a) 

<u 

0) 

+j 

n) 

H 

1^ 

in 

(/) 

•H 

(rt 

U 

o 

rt 

a) 

•  P. 

■  » 

HI 

H 

cri 

C 

dtTJ 

f-j 

> 

•  •^ 

Q-Z 

z 

» 

5". 

rt 

<i) 

M 

CQ 

1-) 

z 

^A 

Special    Report 33 


In  a  consideration  of  the  data  displayed  in  Table  7,  specifically  the  "Warp" 
column,  it  will  be  seen  that  the  target  levels  for  BR  and  the  NSL  differ  markedly 
even  though  minima  are  equal.  Assuming  that  experience  and  analysis  have  led 
these  two  organizations  to  establish  realistic  guidelines,  one  may  then  infer  tliat  the 
suspension  of  the  higher  speed  APT  will  be  so  designed  that  less  stringent  require- 
ment will  be  demanded  in  the  provision  of  field  geometry  applicable  to  this  impor- 
tant parameter. 

Track  designs  expected  to  provide  an  adequate  measure  of  track  geometry  will 
be  based  on  the  use  of  continuous  welded  rail  (113.5  lb/yd),  prestressed  concrete 
ties,  the  elimination  of  virtually  all  joints  (turnouts  and  insulated  joint  locations 
included),  the  use  of  jointless  (overlay)  signal  circuits,  and  if  current  tests  are 
satisfactory,  the  movable  or  swing  nose  frog.^**  The  benefits  from  this  last  are  dual 
in  that  the  vertical  impact  of  the  frog  flangeway  gap  is  eliminated  and  the  often 
substantial  lateral  shock  imparted  to  wheels  by  a  frog  guard  rail  is  avoided. 

During  the  summer  of  1969,  BR  was  afflicted  by  a  rash  of  incidents  (and 
accidents)  involving  the  lateral  displacement  of  track  due  to  compression  stress 
build-up  in  continuous  welded  rail.  Administrative  concern  over  the  issue  was  in- 
tense, and  corrective  measures  involved  not  only  the  restoration,  where  slack,  of  the 
ballast  section,  but  the  subsequent  out-of-face  mechanical  compaction  of  the  new 
(and  older)  material.  For  this  work  BR  ordered  20  new  track-mounted  machines.^ 

In  the  United  States  there  is  little  attention  paid  to  this  facet  of  track  mainte- 
nance. A  consequence  of  this  disinterest  is  revealed  in  the  derailment  statistics,  par- 
ticularly in  association  with  displacements  occurring  after  general  track  raises. 
Railway  Track  and  Structures  in  October  1968  reported  on  the  experimental  use 
by  the,  then.  New  York  Central  Railroad  of  an  in-house-developed  machine  that 
provided  some  unquantified  level  of  compaction  to  the  ballast  shoulders  only.  No 
further  mention  of  success  or  failure  of  this  tool  appears  in  the  trade  press  nor  is 
there  mention  of  any  similar  activity  elsewhere.  Common  reservation  expressed  as 
to  the  inapplicability  of  the  concept  to  United  States  maintenance  practice  is  usu- 
ally based  on  the  foreseen  interference  of  random  tie  spacing  and  tie  skewness  to 
the  use  of  compaction  inducing  plates  of  some  fixed  size.  This  is  a  curious  scruple 
in  view  of  the  availability  of  one  type  of  proprietary  machine  that  is  specifically 
designed  to  overcome  this  difficulty.  Without  belaboring  the  issue  here,  one  ventures 
that,  in  due  time,  American  railroad  maintenance  engineers  will  elect  to  give  more 
serious  regard  to  a  technique  that  has  general  acceptance  elsewhere. 

What  British  Rail  expects  as  costs  in  connection  with  the  provision  and  mainte- 
nance of  track  for  125  mph  running  may  be  reasonably  inferred  from  the  following 
abstract:"" 


a.  Cost  per  mile,  new: 

(CWR  and  cone,  ties) 

b.  for  90  mph  track: 

Aug.  no.  of  trains 

At//?,  rail 

per  24  hrs. 

life 

60 

30  yrs. 

120 

21     " 

180 

18     " 

200 

17     " 

$63,800.  (1969) 


Avg.  maint. 

cost/mile" 

$  627.00 

946.00 

1243.00 

1463.00 


•  Exclusive  of:   rail,  tie,  and  ballast  renewal   and  overhead. 
Bui.   620 


34 High    Speed    Rail    Transportation 

In  this  case,  the  cost  for  similar  ser\ices  performed  in  the  I'nited  States  is 
given  through  the  use  of  3.0  as  a  multipher.  The  dollar  amounts,  above,  are  literal 
values  equivalent  to  the  Sterling  figures  cited  by  the  source.  For  comparable  costs 
in  this  country  employ  the  multiplier. 

Further  insight  comes  from  the  reported  required  surfacing  inter\al  of  1.5  years 
for  similar  90  mph  track  carrying  in  excess  of  18  million  tons  annually. 

It  is  interesting  to  compare  rail  life  with  traffic  intensity  in  these  data.  Clearly, 
there  is  a  dissimilar  gross  tons  per  train  relationship  operative  when  the  British  expe- 
rience is  related  to  domestic  requirements.  Assuming  rail  life  as  an  indicator  of  sim- 
ilar tonnage  history,  then  the  17  year  life  level  might  be  considered  as  representing 
that  durability  expected  in  fairly  heavy  domestic  service.  To  maintain  track  of  this 
nature  in  the  United  States  in  the  fashion  that  BR  demands  for  90  mph  (and  above) 
would  require  the  allocation  of  $4400  per  mile  primarily  for  restoration  of  profile  and 
alignment.  Rail  holdown  adjustment  may  be  neglected,  it  is  assumed,  in  light  of  the 
widely  heralded  BR  slogan  of  "fit  and  forget." 

It  has  been  shown,  so  far,  that  that  there  are  several  administrations  at  the  verge 
of  entry  into  the  realm  of  train  speeds  of  125  mph  or  higher  and  one  manifestly  well 
within  this  domain.  All  profess  or  exhibit  reliance  on  strengthened  conventional  track 
designs  for  the  guidance  and  support  of  high-speed  trains.  At  the  same  time  there 
are  industrious  but  ambivalent  investigations  into  what  are  often  referred  to  as  non- 
conventional  support  systems:  portland  cement  concrete  beams  and  slabs,  reinforced 
or  prestressed,  and  in  one  case  installed  in  conjunction  with  an  asphaltic  concrete 
pad  under-layment.  A  spokesman  for  one  administration  is  very  plain  in  stating  that 
there  is  no  economic  justification  for  spending  2/2  times  the  first  cost  of  conventional 
track  in  order  to  procure  a  more  rigid  support.  This  same  management  is  participating 
in  the  BR-ORE  (Committee  D87)  "paved  track  experiment"  in  Great  Britain.""  One 
cannot  fault  the  logic  of  weighing  costs  versus  benefits  where  the  full  extent  of  both 
are  known.  One  senses  in  the  variably  tentative  encouragement  afi^orded  these 
advanced  concept  investigations  a  very  real  concern  as  to  future  labor  costs  asso- 
ciated with  the  maintenance  of  both  vehicle  and  guideway  if  conventional  track 
designs  are  to  be  relied  upon  for  high-speed  train  operation  in  years  to  come.  It 
should  be  a  matter  of  great  interest  to  native  railroad  engineers  to  observe  and, 
perhaps,  participate  in  the  resolution  of  this  quandary. 

Canadian   National    Railways    (CN) 

In  concluding  this  rather  subjective  sampling  of  activities  outside  the  United 
States  a  quick  look  at  the  CN  Turbo  service  between  Montreal  and  Toronto  is  in 
order. 

As  an  Appendix  to  the  AREA  Committee  16  report  contained  in  Bulletin  616, 
a  break-down  of  cost  incurred  by  CN  in  up-grading  the  track,  structures  and  right- 
of-way  in  anticipation  of  this  service  was  presented.  Shortly  following  initiation  of 
service  in  late  1968,  a  series  of  mechanical  disorders  forced  the  withdrawal  of  the 
entire  fleet  of  five  7-car  train  sets  for  what  evolved  into  extensive  modification. 

On  May  25,  1970,  revenue  service  was  resumed  with  three  complete  and  mod- 
ified train  sets  on  a  rotating  basis  for  two  round  trips  per  day  (one  idle).  Upon  com- 
pletion of  the  current  CTC  program,  trip  time  will  be  4  hours  and  05  minutes  for 
the  335.6  mile   distance. 

Maximum  speed  for  this  service  is  set  at  95  mph  by  fiat  of  the  Canadian  Board 
of  Transport  Commissioners.  There  is  a  regulation  in  effect  that  limits  the  differen- 


SpecialReport  35 


tial  between  fast  freight  train  operation  and  otherwise  higher  train  speeds  to  35  mph. 
This  is  based  on  grade  erossing  approach  circuit  length  and  the  intention  to  restrict 
dehiy  to  motor  vehicle  traffic  that  could  be  brought  about  by  the  actuation  of  cross- 
ing protection  by  slower  moving  freight  traffic  where  these  ringing  points  could  he 
necessarily  distant  from  the  crossings  for  much  higher  passenger  train  speeds.  A  solu- 
tion to  this  problem  would  lie  in  the  use  of  selective  protection  activating  devices. 
Under  the  present  circumstances,  this  may  be  an  overly  expensive  option. 

In  the  context  of  high-speed  operation,  this  is  a  modest  endeavor.  There  is 
great  promise  inherent  though.  The  equipment  has  been  produced  by  the  same  team 
that  produced  the  Turbos  referred  to  in  the  earlier  discussion  of  PC  high-speed 
experience  and  may  be  considered  as  very  similar  although  the  train  sets  are  longer 
by  four  cars.  The  present  95  mph  restriction  on  this  operation  in  no  way  reflects 
a  lack  of  capaliility  on  the  part  of  the  equipment  to  attain  higher  speeds. 

If  the  understandable  deference  to  and  indeed  apprehension  of  the  general 
grade  crossing  situation  can  be  resolved,  the  CN  enterprise  may  prove  to  be  a  sig- 
nificant informational  contributor  to  the  solution  of  a  problem  now  paramount  in 
the  Northeast  Corridor:  can  an  attractive,  high-speed  rail  service  significantly 
improve   upon   the   region's    endemic   and   growing  transportation   congestion. 

DOMESTIC   HIGH-SPEED    RAIL    RESEARCH 

This  compilation  of  items  of  technical  and  economic  interest  in  association  with 
current  or  near  future  high-speed  rail  operation  can  be  completed  with  a  descrip- 
tion of  the  characteristics  and  costs  connected  with  two  high-speed  rail  research 
tracks  sponsored  by  the  Federal  government  through  the  Office  of  High  Speed 
Ground  Transportation. 

The  first  of  these,  the  so-called  New  Jersey  Test  Track,  was  a  21.2  mile  portion 
of  the  then  Pennsylvania  Railroad's  main  track  No.  3  between  County  and  Millham 
interlockings  in  that  state.  No.  3  track,  of  a  four-track,  electrified  main  line.  New 
Brunswick  to  Trenton,  was  heavily  upgraded  in  1966  to  the  geometric  standards 
shown  in  Table  7  (see  page  32).  The  nature  of  this  rehabilitation  work  and  costs 
incurred  are  listed  by  categories  in  Table  8.  Upgrading  was  carried  out  by  PRR  per- 
sonnel on  what  was,  in  reality,  a  track  completely  adequate  for  the  contemporary, 
conventionally  equipped  service  having,  then,  speed  maximum  of  60  nipli,  freight, 
and  100  mph,  passenger.  In  that  it  was  then  expected  to  operate  trains  in  test  over 
this  track  at  speeds  exceeding  150  mph,  the  belief  was  that  the  track  supporting  such 
train  velocities  must  be  as  strong  as  possible  in  order  to  resist  the  forces  creating 
dynamic  deflection   surpassing  the  established  geometric  tolerances. 

The  particular  site  of  the  test  track  was  chosen  because  of  its  favorable  align- 
ment, absence  of  grade  crossings,  a  minimal  number  of  interlockings  within  which 
it  would  be  difficult  to  maintain  the  requisite  geometric  tolerances  and  few  o\'erhead 
structures  requiring  modification  of  catenary  approach  gradients.  As  it  was  intended 
to  test  equipment  dependent  on  remote  power  generation  as  well  as  other  types 
having  on-board  power  sources,  the  test  track  was  of  necessity  established  in  an 
electrified  territory.  Other  locations  on  the  PRR  route.  New  York  to  Washington, 
could  have  met  the  criteria  listed  above  but  each  lacked  the  useful  multiplicity  of 
main  tracks  and  flexibility  of  signaling  present  in  the  chosen  site. 

I'pon  completion,  this  facility  provided  a  test  bed  for  the  acceptance  trials  of  all 
Turbo,    Metroliner    and    DOT    Hail    Research    Car    e(|uipm(nt,    all    of    which    were 


36 


High    Speed    Rail    Transportation 


TABLE  8 

COST  OF  UPGRADIfC  TEST  TRACK  NO.   3 

NEW  BRUNSWICK-TRENTON 


(21.2  miles) 


Direct 
Labor 

G.O. 
Charges 

Material 

Shop 

and 

Stores 

Expense 

Total 

1. 

Rail  (17  miles) 
Welded  Rail 
Nassau  Interlocking 

$106,000 
7,000 

$  67,700 

U,5oo 

$^08^000 
35,200 

$2l4,500 
2,100 

$     592,200 
U8,800 

2. 

Rail  Grinding 
(21.2  miles) 

6,200 

3,800 

~ 

~ 

10,000 

3. 

Tie  and  Raise  Track 
(21.2  miles) 

110,300 

70,200 

128,500 

7,800 

316,800 

k. 

Surface  Raise  and 
Tamp     (21 .1   miles) 

15,300 

9,700 

— 

— 

25,000 

5. 

Gauge   (21.2  miles) 

15,U00 

9,800 

~ 

~ 

25,200 

6. 

Anchor  Spike 
{h.2  miles) 

1,500 

900 

5,500 

■500 

8,U00 

7. 

Adjust  Track  Center 

100,000 

63,900 

-- 

- 

163,900 

8. 

Catenary-Heavy  Wire 
(21.2  miles) 

31,700 

28,700 

■151,300 

8,700 

220,U00 

9. 

Catenary  Grade  at 
H.   Bridge 

8,500 

7,200 

3,100 

200 

19,000 

10. 

Catenary-Modify  Trolley 
Sec.   Breaks 
(5  locations) 

2l4,600 

$2,100 

7,U0O 

Uoo 

51i.5oo 

TOTAL 

$U26,5oo 

$288,500 

$739,000 

$UU,2op 

$1,1^8^,200 

Source :  Office  of  High  Speed  Ground 
Tranportation. 


SpecialReport  37 


required  to  exceed  150  iiiph  during  trial  runs.  High-speed  (154  mph)  track  geom- 
etry data  acquisition  runs  were  also  successfully  conducted  on  this  segment  of  track 
as  were  pantograph-catenary  studies  in  connection  with  the  then  developing  Metro- 
liner  fleet. 

An  interesting  aspect  of  this  work  lies  in  the  early  recognition  that  there  was 
virtually  no  change  in  the  deflection  of  this  particular  track  at  the  time  measured 
over  a  wide  range  of  train  speeds.  The  geometry  of  the  track  remained  substantially 
unaltered  under  load  between,  say,  100  mph  and  150  mpli.  In  truth,  looking  at 
under-load  geometric  response  alone  strongly  inhiliits  complete  understanding  of 
dynamic  effects  as  a  function  of  speed.  Conclusions  derived  from  the  measurement 
of  track  geometry  in  this  sense  are  largely  dependent  on  the  relative  state  of  excel- 
lence of  the  test  track.  However,  the  repeated  measurement  work,  conducted  in 
1967  partly  to  demonstrate  the  continuance  of  a  constant  level  of  track  input  to  the 
commercial  equipment  undergoing  performance  trials,  lends  some  support  to  the 
belief  of  our  overseas  colleagues  that  conventional  track  is  strong  enough  to  support 
\ery  high  train  speeds.  It  contributes  nothing  to  an  understanding  of  the  costs  of 
maintaining  such  track. 

Maintenance  costs  for  the  21.2  mile  test  track,  for  the  year  and  a  half  that  it 
was  identified  with  these  purposes,  was  approximately  $1000  per  mile.  A  major  part 
of  this  expenditure  to  maintain  a  track  which,  when  not  isolated  for  infrequent  test 
purposes,  carried  a  complete  mix  of  PRR  heavy  tonnage  traffic,  was  allocated  to 
walking  inspection   and  the  surfacing  and  lining  of  interlockings. 

Upon  completion  in  1968  of  the  programmed  test  work,  the  geometric  toler- 
ances established  for  the  project  were  permitted  to  relax  under  service  to  the  prevail- 
ing main  track  standards  of  the  now  Penn  Central  as  the  need  for  a  high-speed  test 
facility  temporarily  passed  out  of  existence. 

Of  more  current  interest  to  railroad  maintenance  engineers,  not  only  here  but 
abroad,  is  the  presently  under  construction  linear  induction  motor  vehicle  (LIMV) 
test  track  in  Pueblo,  Colo. 

A  plan  view  of  the  proposed  lay-out  of  the  first  six  miles  of  an  eventual  20  mile 
oval  is  shown  in  Figure  2. 

This  is  the  first  phase  of  what,  in  time,  will  be  a  much  more  extensive  trans- 
portation research  facility  sponsored  by  DOT.  Also  planned  for  constmction  starts 
within  the  next  few  years  are  a  guideway  for  a  tracked  air  cushion  vehicle,  conven- 
tional railroad  trackage  for  a  wide  variety  of  analytical  studies,  1:)oth  vehicle  and 
track,  and  a  rail  dynamics  laboratory  for  investigation  of  in-place,  full-scale  vehicle 
response  to  a  broad  spectrum  of  inputs. 

To  railroad  engineers  the  part  of  this  initial  phase  effort  that  may  pro\e  of 
greatest  interest  lies,  first,  in  the  range  of  permissilile  geometric  tolerances  assigned 
the  track  structure,  and  second,  in  the  attempt  to  produce  temporally  stable  track 
to  an  almost  exquisite  degree  of  refinement  through  the  employment  of  wliolly  con- 
ventional track  components,  some  of  which  will  have  been  modified  in  a  minor  way. 
(See  Table  7  for  a  description  of  tolerances.) 

Figure  3  displays  the  sectional  characteristics  of  the  test  bed  portion  of  this 
track.  There  is  a  three-mile  access  spur  leading  to  this  test  track  from  the  existing 
trackage  of  the  Pueblo  Army  Depot,  and  this  lead  will  be  of  completely  conven- 
tional design. 

The  choice  of  wood  ties  for  this  track  came  aliout  through  entirely  non-tech- 
nical reasons  involving  anticipated  lead  times  recjuired  for  the  redesign  of  adequate 


38 


High    Speed    R  ail    Transportation 


LENGTH  9.859   MILES 

TEST    OVAL(POR.)  a   ACCESS    SPUR 

PUEBLO    TEST  TRACK 

PUEBLO    COUNTY, COLORADO 


N 


-^ 


Figure   2. 


Special    Report 


39 


21-0' 


LLM. 

REACTION 
RAIL— -^ 


5UB-B4LLAST 


2%  5L0PE 


3.0  Miles  -Test  Track  -T^^ngent 


-SLOPE    -    CONFOPM     TO 
SUPER     ELEVATIOW 
fMAX.    8"  iU    A'-S^e"  GAUGE] 


3.2  Miles  -Test  Track  -  Super  Elevated 


BALLAST    SECTIONS 


BAli/\ST  ~    74  CU  YD./IOO  FT. 

.SL/B-BALL4ST  -   S/CUYD/lOOFT 


L.  I.  M.  Test  Track 

PJEBLO     COLORADO 


Figure   3. 


40 High    Speed    Rail    Transportation 

center  tie  restraint  for  the  21-inch  by  Jii-inch  in\crtcd  tee  reaction  rail  were  con- 
crete ties  to  be  used.  Considering  that  the  test  vehicle  weighs  50,000  lb  and  will  he 
operated  rather  infrequently,  it  is  believed  that  the  chosen  track  designs,  while  eco- 
nomical, will  prove  adequate  for  the  loads  to  be  imposed.  The  singular  departure 
from  c()n\entional  design  practice  in  the  entire  track  system  remains  in  the  provi- 
sion, tluough  the  use  of  nests  of  variable,  thin  steel  shims,  of  a  finely  controllable 
lateral  adjustability  of  rail  and  in  a  reliance  on  mechanically  induced,  simultaneous 
compaction  of  crib  and  shoulder  ballast. 

Shim  nests  are  held  in  place,  adjacent  to  the  rail  base  edge,  in  the  spaces  created 
by  employing  a  six-inch-base-rail  dimensioned  common  tie  plate  under  the  5/2-inch 
base  (119  lb)  running  rail  centered  on  the  oversize  plate.  Through  this  capability 
of  lateral  adjustment,  in  addition  to  the  use  of  full-plate-size  steel  shims,  as  required, 
beneath  the  tie  plates  for  vertical  control,  it  is  anticipated  that  wheel  guiding  sur- 
faces of  the  rails  can  be  placed  within  the  narrow  envelopes  of  permissible  variation 
dictated  by  the  ma.ximum  test  vehicle  speed  (250  mph)  and  its  unique,  suspension 
oriented  requirements  for  a  quite  small  ratio  of  deviation  amplitude  to  wave  length; 
much  less,  in  fact,  at  long  wave  lengths  in  the  order  of  700  ft,  than  the  linear 
relationship  of  0.0003  postulated  liy  Matsudaira  for  NTL. 

The  measurement  techniques  for  establishing  confonnity  to  these  specifications 
are  under  development  now.  Upon  formulation,  this  method,  dependent  as  it  may  be 
on  a  combination  of  optical  and  radiation  source  mechanics,  will  represent  a  distinct 
advance  in  the  state  of  the  art  of  precise  track  and  guideway  mensuration. 

In  usual  practice,  consolidation  of  ballast,  apart  from  the  region  immediately 
beneath  the  tie  which  is  operated  on  by  track  tamping,  occurs  as  a  function  of 
traffic-imparted  vibration.  In  the  general  case,  this  is  undesirable  because  control  of 
the  rate  at  which  consolidation  develops  remains  beyond  the  control  of  the  engineer. 
In  the  specific  case  of  the  Pueblo  LIMV  test  track,  dependancy  on  traffic-induced 
vibration  for  ballast  section  compaction  is  unsupportable.  For  the  xery  finely 
adjusted  track  to  remain  where  it  has  been  placed,  the  ballast  section  must  function 
optimally  at  the  outset.  Clearly,  there  is  no  way  of  achieving  this  end  without  resort- 
ing to  the  use  of  ballast  compacting  machinery  during  the  construction  phase. 

Cost  of  material  for  the  total  miles  of  track,  including  CWR  fabricated  to  a 
weld  alignment  tolerance  level  about  twice  as  rigorous  as  that  called  for  in  AREA- 
considered  specifications,  is  $1,124,400.  Embankment  construction  costs  are  $757,- 
000.  Track  construction  will  cost  $773,000.  This  last  requires  construction  of  the 
track  to  common  main  track  geometric  tolerances.  Final  adjustment  v\'ill  be  handled 
under  a  separate  contract  and  attendant  costs  are  not  known  at  this  writing. 
Undoubtedly,  the  future  will  see  further  discussion  of  this  project. 

In  this  section  a  look  at  some  aspects  of  contemporary  experience  has  proceeded 
with  the  intent  of  not  only  isolating  factors  of  interest  to  the  native  railroad  main- 
tenance community  but  also  to  identify,  if  possible,  portents  apparent  in  current 
activities  that  suggest  high-speed  rail  transport  as  a  feasible  method  of  relieving 
transportation  congestion.  Apart  from  the  deductive  view  that  there  would  scarcely 
be  such  preoccupation  on  so  widespread  a  scale  if  the  chance  of  just  such  success 
were  not  regarded  favorably,  consider  this:  in  the  first  year  of  operation  of  the  New 
Tokaido  Line  air  traffic  along  the  Tokyo-Osaka  axis  declined  by  35  percent.  Further, 
the  London-Manchester  trunk  of  British  Railways,  offering  an  improved  but  by  no 
means  high-speed  service — as  defined  herein — carries  73  percent  of  tlie  total  travel 
between  those  cities  even  though  air  time  for  the  trip  is  only  45  minutes.  Rail  trip 
time  is  2.5  hours  for  the  184  miles. 


SpecialReport  41 


POTENTIAL   FUTURE    SYSTEM    COSTS 

In  the  previous  section  of  this  report  some  idea  was  conveyed  of  the  magnitude 
of  costs  connected  with  overseas  high-speed  rail  ventures.  Except  for  Japan,  in  the 
case  of  the  New  Tokaido  Line,  these  were  costs  projectetl  for  contemplated  construc- 
tion of  new  line  or  the  upgrading  of  existing  facilities.  Here  at  home  similar  analy- 
sis of  a  rather  extensive  nature  has  also  been  carried  on.  Not  surprisingly,  the  bulk 
of  this  work  has  been  directed  toward  potential  future  high-speed  ground  transpor- 
tation in  that  region  of  the  nation  where  the  prospects  for  both  financial  success  and 
social  benefit  are  the  most  attractive. 

Future  high-speed  ground  transportation  within  the  Northeast  Corridor  has 
been  subjected  to  study  of  varying  intensity  from  many  points  of  view.  In  this  text 
the  results  of  two  such  studies  will  be  considered.  The  first  to  be  discussed  was 
conducted  at  the  behest  of  a  regional  commission.  Its  scope  is  limited  in  the  sense 
that  a  portion  of  the  Corridor  rather  than  the  entire  region  was  studied.  The  second, 
a  more  comprehensive  and  exhaustive  examination  was  carried  out  by  an  agency 
of  the  Federal  government  over  a  number  of  years  and  addressed  itself  to  the  trans- 
portation problems  of  the  region  as  an  entity.  Reports  presenting  the  findings  of  these 
investigations  were  published  within  a  few  months  of  each  other  in  late  1969  and 
early  1970. 

An  admonition  is  appropriate  at  this  point.  In  the  ensuing  text  many  of  the 
cost  values  cited  will  be  presented  apart  from  their  development  contexts.  For  so 
complex  a  mechanism  as  a  functioning  regional  transportation  network,  tangible  or 
planned,  such  a  procedure  has  implicit  the  hazard  of  permitting  the  undiscerning 
to  arrive  at  poorly  supported  conclusions.  The  serious  student,  if  interested,  will 
repair  to  the  identified  sources  with  the  understanding  that  the  thrust  of  this  text 
is  aimed  at  a  broad  readership  for  which  a  less  than  thorough  treatment  is 
most  useful. 

The  New  England  Regional  Commission,  in  recognition  of  the  importance  of 
establishing  a  high-speed  ground  transportation  nexus  between  Boston  and  New 
York,  undertook  to  have  the  feasibility  of  high-speed  rail  service  explored.  The 
approach  followed  by  the  investigative  team  included  an  analysis  of  the  economics 
of  alternate  route  approaches  to  the  provision  of  such  service.  This  work  has 
supplied  the  cost   figures  cited  below."* 

Before  proceeding,  note  should  be  taken  of  the  fact  tliat  many  of  the  conclu- 
sions presented  in  this  source  are  clouded  by  controversy.  A  singular  aspect  of  this 
reference  is  visible  in  the  inclusion,  within  the  same  volume,  of  the  investigator's 
thesis  and  challenge  by  an  oppositional  party,  a  rare  and  useful  format.  A  discus- 
sion of  the  nature  of  this  dispute  lies  outside  the  scope  of  these  remarks.  Suffice  it  to 
say  that  it  hinges  in  a  sul)Stantial  way  on  the  definition  of  route  alignment  improxe- 
ment  costs  as  a  function  of  the  demands  of  a  specific  vehicle  type  and  the  pros  and 
cons  of  on-board  power  generation.  Once  this  is  understood,  and  it  is  an  important, 
even  critical  financial  issue  to  comprehend,  the  quantified  costs  developed  in  this 
work  may  be  considered. 

Three  options  for  the  development  of  a  feasible  high-speed  rail  service,  Boston 
to  New  York,  were  developed  througli  this  work.  These  are:  extensive  upgrading 
of  the  existing  Shore  Line,  the  construction  of  three  localized  l)y-pass  routes  to  abet 
an  overall  upgraded  Shore  Line,  and  lastly,  and  of  greatest  potential  impact  on  the 
provision  of  a  genuine  high-speed  service,  the  construction  of  a  90.5  mile  new  line, 


42 


High    Speed    Ra  il    Transportation 


NEW    ROCHEL 


CXISTINt     LINK 

•"^^^  pNONseo   New   moutc* 

•"^•"»  PROPOSED    FUTURE    ROUT! 


Figure  k. 

Source:  Feasibility  of  High  Speed  Rail  Service. 

Systems  Research  and  Analysis  Corp.  and  Thomas  K.  Dyer,  Inc. 


Special    Report  43 


inland  from  tlie  coast,  between  Providence  and  New  Haven.  End  segments  of  this 
new  route  would  be  improved  present  Shore  Line  trackage.   (See  Figure  4.) 

The  general  characteristics  of  these  various  stages  of  reformation  are  best 
described  by  direct  quote  from  die  reference  source.* 

"Capital  Costs  of  Route  Improvements 

"Capital  costs  were  estimated  for  each  of  the  three  routes  outlined  above.  The 
capital  costs  are  preliminary  in  nature  due  to  the  data  available  for  estimating  pur- 
poses. The  estimated  capital  costs  of  fixed  plant  improvements  are  considered  ade- 
quate for  determination  of  preliminary  feasibility. 

"1.  Up-grading  the  existing  Shore  Line 

"The  cost  of  up-grading  the  existing  Shore  Line  to  the  design  criteria  pieviously 
outlined  was  estimated  to  be  $280,000,000.  The  cost  of  work  estimated  included  new 
140-lb  welded  rail  and  track  fastenings;  replacement  of  an  average  of  1,000  ties  per 
mile  of  single  track;  cleaning,  replacing,  or  adding  ballast  as  required;  drainage  im- 
provements; realignment  of  track  to  lengthen  spirals  including  rebuilding  and  relo- 
cating structures  involved;  out-of-face  surfacing  and  lining  of  track;  elimination  of 
road  crossings;  fencing  the  right-of-way;  new  signal  system;  and  up-grading  portions 
of  the  electrification  system  between  the  New  York-Connecticut  state  line  and  New 
Haven  and  building  a  new  catenary  and  power  system  from  New  Haven  to  Boston 
including  increasing  overhead  clearance  as  required.  New  tracks  and  structures  and 
relocation  of  tracks  and  structures  to  avoid  conflicts  with  freight  and  passenger 
service  provided  by  others  were  included  in  the  cost  estimate  and  also  the  cost  of 
Shop  Facilities  for  the  ultra  high  speed  rolling  stock. 

"Station  improvements  were  planned  to  provide  additional  well-lighted  parking 
facilities  at  Route  128  and  New  Rochelle;  good  bus  and  taxi  circulation  to  the 
vicinity  of  station  platforms  at  all  stations  (no  changes  planned  for  Grand  Central); 
raised,  covered,  and  well-lighted  station  platforms;  improved  passenger  circulation; 
improved  road  access  to  stations;  and  modern  ticketing  and  waiting  room  facilities. 

"Major  changes  are  being  planned  at  South  Station  by  the  Massachusetts  Port 
Authority  which  will  improve  taxi,  bus,  and  auto  circulation;  provide  parking  over 
the  tracks  which  will  also  cover  die  platforms  and  provide  waiting  room  and  other 
station  facilities  to  rent  to  the  Railroad.  Only  track  changes  and  platform  costs  would 
be  required  as  South  Station  capital  cost. 

"The  Providence  Station  is  in  an  Urban  Renewal  area,  but  all  costs  for  station 
improvements  were  included  in  the  estimate  except  improved  highway  access  which 
was  assumed  to  be  provided  in  the  Urban  Renewal  Project. 

"The  items  of  work  for  the  cost  estimate  were  obtained  from  examination  of 
Railroad  track  charts  and  valuation  plans,  field  inspection  of  the  Shore  Line  right- 
of-way,  track,  and  structures,  and  data  previously  compiled  in  the  Klauder**"  reports. 
Costs  of  work  items  were  estimated  on  the  basis  of  1968  costs  of  labor  and  material. 
The  difficulty  of  carrying  out  up-grading  work  while  maintaining  existing  railroad 
operations  was  reflected  in  the  estimate. 

"Engineering  and  contingencies  were  included  at  20%  of  the  estimated  cost  of 
work  items.  Interest  during  construction  was  not  included  in  cost  estimates  as  total 
interest  is  included  in  the  cash  flow  in  Chapter  VHI.  (of  the  source — note  added). 


"  Extracted   verbatim   by  j^ermission  of  the   authors. 

"'  Preliminary  Engineering  Report  on  Possible  Improvement  to  Railroad  Passenger  Service 
between  New  York  and  Washington.  L.  T.  Klaiider  and  Associates.  1964.  Preliminanj  Engineering 
Report  on  Possible  Improvements  to  Railroad  Passenger  Service  between  New  York  and  Boston. 
L.  T.  Klauder  and  Associates.  1965. 


44 High    Speed    Rail    Transportation 

"2.  Providence  By-pass,  Bradford  to  Old  Saybrook  Cutoff,  New  Haven  By-pass, 
and  Up-graded  Portions  of  Shore  Line  to  be  UtiHzed 

"Plan  and  profiles  were  prepared  on  the  three  segments  of  new  line  listed  abo\e 
from  U.  S.  Geological  Survey  Maps  and  the  proposed  routes  inspected  in  the  field 
by  highway  principally  to  observe  soil  conditions,  width  of  streams,  rock  conditions 
in  highway  cuts  and  other  conditions  affecting  cost  estimates.  The  plan  and  profiles 

were  prepared  primarily  to  obtain  quantities 

for  items  of  work.  The  new  route  between  Bradford  and  Old  Saybrook  was  planned 
with  maximum  curvature  of  0°-37',  satisfactory  for  speed  of  150  mph.  The  estimated 
cost  of  improvements   for  this  route  is  $487,000,000. 

"$97,000,000  of  this  cost  is  estimated  to  be  work  in  connection  with  grade 
crossing  elimination,  highway  bridge  changes,  and  station  and  parking  improve- 
ments. If  this  work  were  paid  for  by  the  highway  departments  and  municipalities 
involved,  possibly  with  Federal  assistance,  the  cost  to  be  borne  by  the  Ultra  High 
Speed  Railroad  is  estimated  to  be  $90,000,000. 

"3.  Providence  By-pass,  'Inland  Route'  from  Providence  to  New  Haven,  and 
Up-graded  Portions  of  Shore  Line  to  be  Utilized 

"Plans  and  profiles  were  also  prepared  for  the  'Inland  Route'  for  estimating  pur- 
poses .  .  .  maximum  curvature  was  planned  to  provide  alignment  adequate  for  speeds 
up  to  200  mph.  The  estimated  cost  of  this  route  is  $539,000,000. 

Comparison  of  Alternatives 

Construction 
Cost 
Route  Mileage         Best  Running  Time  (millions) 

Upgrading  of  Existing  Route    228  3  hrs.  280 

Revised   Shore  Route    218  2M  hrs.  487 

New  'Inland  Route'    208  2  hrs.  20  min.  539 

(  end  of  quote ) 

Since  the  assignment  to  which  this  report  is  a  response  specifically  requires  a 
consideration  of  the  costs  involved  in  tlie  rehabilitation  of  present  main  tracks  pre- 
cedent to  high-speed  operation,  and  as  the  upgrading  of  the  existing  Shore  Line  is 
exactly  this,  Table  9  is  offered  as  a  detailed  cost  estimate  of  the  various  items  of 
work  necessary  to  accomplish  this  end.  (Recall  that  items  of  expense  assigned  to 
track  alignment  modification  in  this  reference  source  are  considered  by  one  agency 
to  be  greatly  dependent  on  the  curve  negotiating  characteristics  of  the  equipment 
applied  to  the  service). 

Proceeding  from  one  sector  of  the  region  to  the  Corridor  as  a  whole,  it  is  pos- 
sible now  to  acquire  some  insight  into  the  future  effects  and  costs  of  various  trans- 
portation modal  mixes  through  the  work  of  a  Federal  agency  assigned  the  task  of 
carrying  out  an  in-depth  research  into  the  predictable  transportation  needs  of  the 
entire  region. 

As  this  has  been  an  effort  of  considerable  magnitude,  involving  the  application 
of  many  people  and  skills,  and,  further,  as  the  report  and  supporting  studies,  all  of 
which  were  published  between  December  1969  and  April  1970,  do  occupy  a  vmique 
position  in  the  literature,  a  concise  precis  of  the  objectives  and  techniques  employed 
is  in  order.  Moreover,  since  some  of  the  cost  data  associated  with  the  upgrading 
of  present  main  track  or  the  construction  of  a  new  high-speed  line  presented  in  this 
text  are  to  be  drawn  from  this  work,  it  woidd  be  helpful  to  have  some  understand- 
ing of  the  constraints  observed  in  the  derivation  of  the  values. 


Special    Report 


45 


TABLE  9 


COST  ESTIMATE 


Fixed  Plant  -  Upgrading  existing  shore  line  track  and  facilities,  new 
signal  system,  electrification  from  Boston  to  New  Haven,  elimination 
of  grade  crossings,  fencing  right-of-way,  station  improvements,  shop 
facilities 


Distance  -  228.31  miles 


Schedule  Time  -  3  hours  4  minutes 


item 


Cost 


Buildings 

Awnings 

Platforms 

Overhead  Bridges 

Retaining  Walls 

Track  Bridges 

Widen  Fill 

Widen  Cut 

Rock  Excavation 

New  Track 

Throw  Track 

Lower  Track 

New  Turnouts 

Relocate  Turnouts 

Land  Damages 

Road  Construction 

Stations 

Drainage 

Upgrade  Track 

Fencing 

Shop  Facilities 

Electrification 

Signals  and  Communications 

Engineering  and  Contingencies 
Total 
Say 


$ 

742 

000 

840 

000 

85 

000 

9 

417, 

000 

2 

160 

000 

8 

092 

000 

2 

328 

000 

353 

000 

956 

000 

612 

000 

8 

634 

000 

7 

,485 

,000 

528 

000 

780 

000 

716 

000 

1 

,808 

000 

4 

,000 

000 

20 

,000 

000 

58 

,725 

000 

14 

,000 

000 

J 

,400 

000 

58 

,000 

000 

31 

,500 

000 

$233 

,361 

000 

46 

,672 

000 

$280 

.033 

,000 

$280 

,000 

,000 

Source :  Feasibility  of  Hi^^h  Speed  Rail  Service ._ 

Systems  Analysis  Research  Corp.  and  Thomas  K.  Dj^er,  Inc. 


46 High    Speed    Rail    Transpo  r  t  a  t  i  o  n 

Before  passing  on  to  a  diseussion  of  the  background  of  this  vahiable  source, 
mention  should  be  made  of  the  nature  of  the  source  material.  Under  Reference  32 
are  listed  the  formal  Northeast  Corridor  Transportation  Report  and  the  titles  of  all 
17  supporting  volumes.  Also  indicated  is  the  means  of  acquisition  for  those  interested. 

Recognition  of  the  growing  ailments  of  the  transportation  system  of  the  North- 
east Corridor  and  of  the  shortcomings  of  existing  policies  as  remedies  led  in  1964 
to  establishment  of  the  Northeast  Corridor  Transportation  Project.  In  a  deliberately 
experimental  way,  the  Corridor  project  was  a  systematic  attempt  at  determining  the 
intercity  transportation  facility  requirements  of  a  major  region  of  the  Nation.  In 
making  this  attempt,  tlie  project  was  charged  ( 1 )  to  analyze  the  complex  interactions 
between  transportation  and  structure  of  economic  and  demographic  development  of 
the  Corridor,  (2)  to  forecast  the  demand  for  intercity  transportation  services  by 
mode  in  the  Corridor,  (3)  to  describe  the  characteristics  of  transportation  services 
that  might  be  supplied,  and  (4)  in  doing  all  this  to  give  full  consideration  to  the 
potential  of  dynamic,  innovative  transport  technology. 

In  five  years,  starting  at  a  very  inchoate  level  of  knowledge  and  methodology, 
the  Northeast  Corridor  project  has  fulfilled  many,  although  clearly  not  all,  of  these 
assignments.  Using  systems  analysis  techniques  and  newly  developed  computer 
capabilities,  progress  has  been  made  in  developing  and  applying  a  comprehensive, 
general  approach  to  regional  transportation  analysis.  The  most  important  achieve- 
ment of  the  Corridor  project  up  to  now  has  been  to  develop,  link  together,  and 
operate  several  models  in  an  interactive  process  which  simulates  the  forces  of  trans- 
portation supply  and  demand  in  the  Corridor.  The  resulting  system  of  models  per- 
mits examination  of  the  effects  of  changes  upon  the  competitive  interrelationships 
among  modes,  and  also  of  interactions  between  transportation  and  other  sectors  of 
the  Corridor  economy.  A  dynamic  model  process  of  this  nature  has  not  been  applied 
before  to  regional  transportation  in  the  U.S.  The  basic  elements  of  the  model 
system  are  as  follows: 

•  An  econometric  model  which  forecasts  population,  income,  employment, 
and  land  use  for  each  of  131  analysis  districts  (mostly  counties)  of  the 
Northeast  Corridor. 

•  A  demand  model  which  predicts  intercity  passenger  travel  in  the  Corridor 
by  city  pairs  and  by  modes  of  travel. 

•  Supply  models  for  air  and  high-speed  groimd  modes  which  are  sensitive 
to  changes  in  output  levels. 

•  Cost  models  which,  based  on  parametric  relationships,  predict  elements  of 
of  mode  and  .system  cost. 

•  Impact  models  which  predict  the  effect  of  transportation  change  on  popu- 
lation, employment,  income,  and  land  use  in  county-size  analysis  areas. 

•  Supply-demand  balancing  techniques  which  make  possible  simulation  of 
supply-demand  equilibrium. 

The  development  of  the  Corridor  models  and  procedures  is  continuing  with  the 
goal  of  producing  a  set  of  tools  generally  useful  for  the  comparison  and  evaluation 
of  transportation  system  improvements.  The  Corridor  models  can  be  applied  to 
Corridor  transportation  in  a  longer  time  frame  than  has  been  done  in  this  report; 
they  can,  with  further  development,  also  be  applied  to  the  evaluation  of  freight 
transportation   systems.   It   should   be   pointed   out,   however,   that   while   the  models 


Special    Rep  o  r  t 47 


can,  with  relatively  small  but  necessary  recalibration,  be  applied  to  intercity  pas- 
senger movement  in  other  Corridor-type  regions  of  the  U.S.,  they  cannot  be  used 
in  their  present  form  to  predict  intra-urlian  passenger  traffic.  Intra-urban  travel  and 
the  l^ehavior  patterns  of  commuters  are  subject  to  many  other  influences  than  those 
used  in  determining  intercity  transportation. 

It  was  understood  at  the  outset  of  the  Corridor  project  that  transportation 
system  changes  tend  to  have  wide  implications  for  regional  development  and  for 
many  other  aspects  of  public  policy  beyond  the  sphere  of  transportation.  It  was 
clearly  not  appropriate  for  the  Northeast  Corridor  project  staff  to  decide  which  of 
these  public  policies  should  be  pursued.  Therefore,  a  basic  premise  of  die  Corridor 
project  has  been  that  the  project  would  evaluate  and  report  on  a  number  of  alterna- 
tive transportation  systems  which  would  be  responsive  to  a  wide  range  of  policy 
options.  This  strategy  was  intended  to  permit  responsible  officials  at  the  Federal 
level  and  in  the  Corridor  to  relate  transportation  to  fundamental  policy  objectives. 
For  purposes  of  the  evaluations  reported  on  here  the  following  public  policy  options 
were  emphasized: 

(1)  Degree  of  technological  innovation — ranging  from  continued  evolution- 
ary development  of  the  present  set  of  modes  and  services  to  a  quite 
radical  departure  involving  the  introduction  of  a  combination  of  ad- 
vanced  ground   and   air  modes; 

(2)  Emphasis  on  mbiirban  or  central  city  service — ranging  from  modes  pene- 
trating the  city  core  via  timnels  to  air  systems  largely  serving  the 
periphery  of  metropolitan  areas; 

(3)  Magnitude  of  capital  cost — ranging  from  minimal  investment  in  new 
equipment  to  multi-billion  dollar  new  in^'estment  in  fixed  facilities  and 
equipment; 

(4)  Service  characteristics — ranging  from  high  capacity  modes  operating  on 
fixed  rights-of-way  to  more  flexible  systems  capable  of  providing  service 
over  a  wide  area; 

(5)  Degree  of  private  vs.  public  investment — ranging  from  systems  which 
could  be  sustained  by  private  inv&stment  and  ownership  to  systems  which 
would  reqiure  Covernment  support  for  their  construction  and  operation; 

(6)  Requirements  for  institutional  change — ranging  from  alternatives  which 
would  require  only  nominal  inter-governmental  coordination  under  exist- 
ing statutory  authorization  to  those  which  would  require  new  legislation 
and  extensive  coordination  at  Federal,  State,  and  local  levels. 

In  the  development  of  the  Northeast  Corridor  project  nine  alternative  transpor- 
tation systems  were  postulated.  A  description  of  these  is  shown  in  Table  10.  This 
text  will  consider  only  the  first  four,  those  oriented  towards  differing  maximum 
speed  levels  of  high-speed  rail  transportation. 

The  nine  alternative  systems  start  with  the  existing  transportation  system  of 
the  Northeast  Corridor  projected  to  1975-80,  and  add  five  new  models  in  varying 
combinations  with  the  existing  system  and  with  each  other.  Tlic  designed  serxice 
pattern  of  each  alternative  is  generally  north-south  between  Washington  and  Boston. 
Each  of  the  high-speed  ground  modes — demonstration  rail,  high-speed  rail  A,  high- 
speed rail  C  and  tracked  air  cushion  vehicles — was  designed  to  serve  terminals  at 
Washington  and  Boston  and  seven  intermediate  points  in  Providence,  western  Con- 


48 


High    Speed    Rail    Transportation 


TABLE  10. 


NINE    PASSENGER  TRANSPOirfATION    Si'STEM  ALTERNATIVES 
FOR   niE  NORTHEAST  COPiilUOR 


ALTERNATIVE 

MODAL  COMPOSITION 

I 

Auto,    Bus,    Conventional  Air    (CTOL) 

Demonstration   Rail    (DEMO)*   — 125   mpli 

II 

Auto,    Bus,    CTOL,    DEMO 

Short   Tnke-Off  and  Landing  Air    (STOL)— 370  mph 

III 

Auto,    Bus,    CTOL,    STOL 

High   Spaed  Rail    "A"    (HSRA)  — 150  mph 

TV 

Auto,    Bus,    CTOL,    STOL 

High  Speed    Rail    "C"    (HSRC)--200  mph 

V 

Auto,    Bus,    CTOL,    STOL 

Tracked  Air    Cushion  Vehicle    (TACV)  —  300  mj>h 

VI 

Auto,   Bus,    CTOL,    STOL,    DEMO 

Vertical   Take-Off   and- Landing  Air    (VTOI,)— 265  laph 

VII 

Auto,    Bus,    CTOL,    STOL 
VTOL  &  irSkA 

VI 11 

Auto,    Bus,    CTOL,    STCL 
VrOL   &  HSRC 

IX 

Auto,    Bus,    CTOL,    STOL 
VTOL   &  TACV  ■ 

*rXitni>nstration   rail   assumes    that   the    present  Mctrolincr  and  Turbo   train 
services  will   be   expanded   and  cxtctidcd   through   1975. 


Source:  Northeast  Corridor  Trin^JTJort- 
ation  Project  Heport. 


lCliiCTP-209 


SpecialReport  49 


necticut,  New  York,  northern  New  Jersey,  Trenton,  Philadelphia  and  Baltimore. 
The  air  and  highway  modes  serve  more  dispersed  patterns  based  on  existing  net- 
works. 

Alternatives  I  and  II 

Alternatives  I  and  II  would  require  capital  expenditures  by  1975  of  about  $70 
million  for  equipment  and  grade  crossing  elimination. 

Both  alternatives  would  expand  the  present  fleet  of  Metroliners  and  Turbo 
trains  in  accordance  with  increases  in  demand.  Relatively  small  improvements  in 
roadbed  would  focus  primarily  on  eliminating  highway-rail  grade  crossings.  The 
annualized  equipment  cost  and  roadbed  improvement  costs  would  be  less  than  half 
the  additional  revenues  realized  from  the  DEMO  level  of  operation.  Although 
patronage  of  rail  passenger  service  to  Boston-Washington  and  intermediate  points 
would  increase  between  1968  and  1975,  rail  passenger  patronage  as  a  whole  in  the 
Corridor  would  decline.  The  breakdown  of  the  Corridor  intercity  travel  market  by 
modal  shares  in  1968  and  1975  is  shown  in  the  following: 

Shares  of  CoRmooR  Intercity  Tr.a.vel  Market  by  Mode 

Percent  Passenger-Miles 

Alternative  I 

Year  Auto  Bus  Rail  Air 

1968  68  8  13  11 

1975  73  9  9  9 

Although  alternatives  I  and  II  do  no  more  for  the  ground  modes  than  add 
demonstration  rail,  even  this  minimal  action  would  probably  require  Federal  legisla- 
tion action  of  some  kind.  It  is  not  certain  that  without  such  legislation  the  present 
Metroliner  and  Turjjo  train  services  inaugurated  for  two  years  in  response  to  Fed- 
erally supported  high-speed  ground  transportation  demonstrations  would  continue 
and,  in  response  to  demand,  expand  through  1975. 

Under  alternative  I  total  new  public  capital  expenditures  between  1968  and 
1975  for  intercity  passenger  transportation  in  the  Northeast  Corridor  would  be 
$3  bilhon.  Most  of  this  outlay  would  be  for  expansion  of  the  existing  highway  and 
air  modes  assuming  that  current  plans  are  implemented. 

Alternatives  III  and  IV 

Alternatives  III  and  IV,  would  introduce  major  improvements  in  city-center-to- 
city-center  high-speed  groimd  transportation.  The  high-speed  ground  mode  in  alterna- 
tive II  would  rely  on  existing  railroad  rights-of-way;  the  high-speed  ground  mode 
in  alternative  IV  would  require  a  completely  new  right-of-way.  Alternative  III 
would  require  capital  expenditure  for  all  new  modes  of  $1.8  billion  and  alternative 
IV,  $2.8  billion. 

HSRA  would  require  only  moderate  technological  advance;  HSRC  would  re- 
quire substantial  R&D  expenditure  to  bring  rail  operating  speeds  up  to  200  mph. 

Alternatives  III  and  IV  would  utilize  centrally  generated  electric  power  and 
would  operate  underground  in  urban  areas.  Therefore,  their  effect  on  land  use, 
noise,  and  air  pollution  would  be  minimal. 

The  share  of  total  intercity  passenger  traffic  in  1975  which  would  be  captured 
by  the  high-speed  ground  modes  is  shown  in  the  following: 


50 High    Speed    Rail    Transportation 

Shares   of   Corridor  iNTERcrry  Travel   Market  by   HSGT   Mode 
Percent  Passenger-Miles  Including  Private  Auto 

Alternative  II  Alternative  III  Alternative  IV 

(DEMO)  (HSRA)  (HSRC) 

8  12  15 

Forecasts  for  the  two  new  ground  modes  indicate  that  they  would  not  be  com- 
mercially viable  in  the  year  1975,  assuming  a  capital  cost  of  10  percent,  and  would 
probably  not  be  commercially  viable  for  the  10  to  15  years  beyond  1975.  In  the 
year  1975,  largely  as  a  result  of  interest  charges  on  the  initial  investment  in  right- 
of-way  and  track,  HSRA  in  Alternative  III  would  incur  a  deficit  of  $27  million  and 
HSRC  in  alternative  IV,  a  deficit  of  $67  million.  Thus,  at  least  at  the  outset,  the 
liigh-speed  ground  modes  would  presumably  require  substantial  public  support.  This 
could  be  achieved  through  subsidy  to  a  private  corporation,  establishment  of  an 
authority,   charter   of  a   public  corporation,   or  through  outright  Federal  ownership. 

In  order  to  determine  how  incremental  improvement  would  affect  profitability, 
i.e.,  how  the  market  would  respond  to  the  escalation  of  improvement,  further  analysis 
was  applied  to  alternative  II.  Figure  5  shows,  stepwise,  the  effect  of  each  level  of 
improvement  on  expected  net  revenue. 

The  ground  modes  in  alternatives  11  and  III  represent  the  minimum  and 
probably  the  maximum  improved  conditions  applicable  to  the  existing  Penn  Central 
route  between  Washington  and  Boston.  Almost  a  continuum  of  possible  improve- 
ment options  exists,  however,  between  these  extremes.  In  order  to  obtain  an  indi- 
cation of  the  economic  feasiliility  of  these  improvements,  the  Corridor  model  system 
was  applied  to  nine  intermediate  levels  of  improvement  between  alternatives  11 
and  HI. 

The  analysis  was  conducted  by  delineating  a  number  of  separate  projects  such 
as  laying  welded  rail,  easing  curves,  rebuilding  bridges,  and  building  new  tunnels 
and  bypasses,  and  determining  the  costs  and  running  time  savings  attributable  to 
each  project.  By  using  the  passenger  loadings  for  each  link  of  the  DEMO  mode  in 
alternative  II,  the  passenger-minutes  saved  per  dollar  of  expenditure  for  each  project 
were  calculated  and  the  projects  were  ranked  according  to  this  ratio.  (See  Table  11 
for  cost  break-down. ) 

For  the  analysis,  nine  levels  covering  the  range  of  improvements  were  selected. 
For  each  of  these  levels  calculations  were  made  using  the  NECTP  model  system 
to  determine  additional  patronage,  gross  additional  revenues,  additional  operating 
costs,   annual  charges  for  new  investment,   and  additional  net  revenues. 

The  conclusions  to  be  drawn  from  tliis  analysis  are  as  follows: 

1.  The  maximum  benefits  to  the  operator  would  occur  at  a  level  of  improve- 
ment representing  a  capital  expenditure  of  $186.5  million  (including 
$78.2  million  for  vehicles).  Annual  gross  revenues  at  this  level  of  im- 
provement for  1975  would  be  $25.9  million  more  than  rail  (DEMO)  in 
alternative  II,  while  annual  systems  costs  would  be  $18.3  million  higher 
than  the  DEMO  costs.  The  total  surplus  of  additional  revenues  in  1975 
over  additional  costs  annualized  for  1975  would  be  $83  million.  This 
level  of  improvement  results  in  a  25  percent  patronage  increase  over  rail 
in  alternative  II. 

2.  Up  to  a  capital  expenditure  of  $1.3  billion,  1975  annual  gross  revenues 
(additional)    would    exceed    annual    systems    costs    (additional).    At    this 


S  p  ecial    Report 


51 


NET  REVENUE  RESULTS  OF  RAIL   IMPROVEMENTS 


75 


ANNUAL 
SURPLUS 


50- 


25- 


(MILLIONS 
OF 
DOLLARS) 


ANNUAL 
DEFICIT 


IMPROVEMENT 
LEVELS 


25 


i 


800        1 200 
TOTAL  INVESTMENT 
(MILLIONS  OF  DOLLARS^ 


Figure    5. 


investment  level,  representing  a  50  percent  increase  in  patronage  over 
DEMO,  annualized  additional  costs  and  gross  1975  revenues  would  be 
equal. 
3.  From  the  level  of  improvement  representing  maximum  net  revenues  to 
the  operator  to  the  level  of  improvements  represented  by  HSRA  in  alterna- 
tive III,  net  revenues  would  drop.  At  the  upper  levels  of  improvement, 
costs  of  capital  would  become  a  very  significant  element  of  total  cost. 

Each  of  the  nine  transportation  system  alternatives  would  require  some  degree 
of  intergovernmental  cooperation  for  effective  planning  and  implementation  In  a 
broad  sense,  the  efforts  represented  in  thi^  report  reflect  the  need  for  a  coordmatcd 


52 


High    Speed    Rail    Transportation 


(O    3    S-  "O 


<u 

Ol    1/1    1/1 

Cl.  3     S- 

CO 

c 

o  ro 

ir> 

r^ 

o 

ro      O^      00      CO      *^ 


U3       M3       VO 


r—       I—  r—       O 


>.'— 

■—   to 

I. 

(n 

•.-  -a 

QJ 

aj 

(O    c 

Ol+J 

-o  m 

c- 

7) 

0) 

c- 

-o    3 

<D    o 

</l 

fc 

>  -C 

a. 

TO  +J 

VD      •—      Ol 


r~.     .—     "3-      csj 


in     >— 

O     in 
r—    >a- 


r—  r^ 


_^ 

CO    1/) 

Dl  O) 

QJ 

C  -IJ 

H 

>    C 

1— 

<o  •.- 

^-' 

r—         n    r- 


r 

,_, 

-M 

r-i 

1/1 

1- 

I) 

1 — 

ro 

<_) 

1 — 

1 — 

fc 

O 

■o 

r-   I—  ■—        l~        •=!-  I— 


I—     in     fo 


O       r— 


O)         QJ       ,— 


QJ       ■—  I— 


■r-       -r-       e« 


"O     -o     ••-  c 


■r-       o3     E  oO     E 

tt)  QJ  ■— 

>>     in   >  i/l   >  Q) 

<t3         C71  O  CD  O  C 


QJ        QJ       "O 


C3       CD       O 


r—  u  <o  'J  ns  o 

(O  S  3  E 

S-  O)  -O  QJ  "O  ■.- 

QJ  "O     to  T:?     A3  ■»-> 

C  ro    O  tii    O  •— 

QJ  S-     V-  S-    !-  ITJ 


CO     CO     in     CO     OJ 


i£)    r-    CO     en     CD         ■— 


Special    Report 


53 


0) 

0) 

u- 

it 

c 

0) 

Ul 

lA 

a> 

1/) 

+j 

nj 

l/> 

D 

S- 

O 

lO 

+-> 

CJ 

\~ 

XJ 

QJ 

Q. 

LDUnr—       IX5ir)C\Jr—       ^Ln 


o    o    o    o 


SJ^ 


>>'-H 

1 

.—  v> 

i- 

w 

•■-  -o 

Q) 

0) 

•a   c 

cn+-> 

-O    (O 

c 

:j 

w 

0) 

I- 

T3    3 

</1 

•f_ 

0)    O 

1/1 

1- 

>  .c 

CM       00       CD       CM 


ir>     CM     o    crv    CO    «^ 


l/l 

1/) 

n 

q; 

c 

t~~ 

r^ 

> 

t: 

m 

1/) 

t- 

LO       r—        CO 


r—       f—        LO       «* 


CTl       r-~       I— 


«d-       ID       CO       r—       Ln       lO       Ln 

CO     CM     I—     r~-     n     CM     o 


.V 

to 

s- 

fl) 

n 

(.J 

< 

c 

ai 

.V 

n- 

o 

(O 

•  >\ 

s- 

+-> 

4-> 

c 

aj 

^— 

i- 

(O 

Q- 

^- 

0) 

3 

c: 

cj- 

<u 

a> 

c 

c 

XJ 

o 

!_ 

■r- 

CO      CO      IT) 


r-     o     in     .—     C3     00     o 
CO     o     CM     CM     IX)     en     cri 


>^ 

1/1 

n3 

>, 

>" 

w 

(/I 

s- 

<1) 

OJ 

■a 

•r-   T-  UJ 


l/l  QJ  CI. 


■f-        <U        <U 


>     -a      > 


cj     (_)    rs 


cv     cc     r-.     IX,'     <XJ     [^ 


Ol      ClI     •.-     .— 


c 

, — 

(11 

QJ 

1- 

<u 

-n 

> 

iZ 

C5 

m 

l- 

O 

1- 

>, 

(O 

•> 

I 

(O 

OJ 

<X)  Lf)   LD  1 —  CM   O  'O  IX) 

rOLncoocoo-O 
0«3-<<J-t—  OCMODCO 

ooco-^r^coorocM 


o  I—  -i->       -^  c  c: 

EOltZ-i-'l-  QJCUC 

■r-    -O      1)     t'      O  >   -O     O 

+j  n  1-  ra  >-  (o  •.-  +.> 

>—  r—  (—   CL  3;    >   t/i 

T?  ••-■  1    o  3  o  o 


vo     r^     CO     cri     o     r—     CM     f)     «:l-     in     >.o 

>—       I—       t—      r-       CM       C\;       CJ       CO       CM       CM       CvJ 


-o  o  <u 

•^    •!-       '0 

x:  +J  r— 


1     S-  .V 

tl    K,    i- 
O    D-   O 


t—  <\)  <-•)«*  IX)  1X5  r^  CO 


54 High    Sp  eed    Rail    Transportation 


"system"  approach  to  transportation  phmning.  Thus,  each  alternative  should  be 
regarded  in  a  real  sense  as  a  system,  requiring  coordination  among  the  modes  if 
maximum  benefits  are  to  be  achieved.  The  degree  of  coordination  needed  would 
vary  with  the  mode  in  question.  Both  STOL  and  VTOL  would  require  coordinated 
action  on  the  part  of  the  Federal  agencies  involved  (presumably  the  Department 
of  Transportation  and  the  Civil  Aeronautics  Board)  and  the  private  carrier  or  car- 
riers, and  with  the  local  jurisdictions  in  which  STOL  ports  or  heliports  would  be 
located.  DEMO  and  HSRA  would  require  extended  cooperation  between  tlie  Penn 
Central  and  the  Federal  Government  for  funding  and,  perhaps,  operation  of  services. 
HSRC  would  require  extensive  intergovernmental  coordination  for  acquisition  of 
new  rights-of-way  and  for  construction  and  operation. 

All  systems  would  benefit  from  continuous  central  coordination  by  the  Federal 
Government  or  by  a  regional  agency  to  assure  effective  and  efficient  matching  of 
facilities  and  services  of  the  modes  with  each  otlier  and  with  demand  as  a  whole. 

The  nine  increments  of  improvement  lead  direcdy  to  alternative  III,  high-speed 
rail  system  A  (HSRA),  which  envisions  retention  of  the  general  present  route 
alignment  and  includes  the  construction  of  significant  bypass  segments. 

HSRA  refers  to  the  existing  Penn  Central  main  line  from  Washington  to  Bos- 
ton, upgraded  to  permit  passenger  trains  to  run  at  150  mph.  The  present  track, 
catenary,  and  signal  systems  all  require  substantial  work  to  permit  operation  at  this 
speed  (e.g.,  curve  easements,  new  bridges,  continuous  welded  rail,  new  catenary 
systems,  extended  electrification  from  New  Haven  to  Boston,  etc.).  Existing  sta- 
tions, or  new  stations  placed  at  present  locations,  will  be  used  at  Washington, 
Philadelphia,  Trenton,  New  York,  New  Haven,  Providence,  Route  128,  and  Boston. 
The  new  suburban  stations  being  built  at  the  Capital  Beltway  near  Lanham,  Md., 
and  at  a  site  called  Metropark  near  Woodbridge,  N.J.,  will  be  upgraded  to  become 
permanent  facilities. 

The  vehicle  envisioned  for  tliis  system  is  outwardly  similar  to  the  present 
Metroliners.  The  average  speed  including  stops  over  the  entire  route  would  be 
105  mph.  Peak  traffic  periods  would  have  service  as  frequently  as  every  15  minutes, 
or  more  often  if  demand  grows.  Trains  would  vary  in  size  from  a  maximum  of 
10  to  a  minimum  of  2  cars.  HSRA  would  share  die  line  with  both  commuter  and 
freight  service.  The  total  computed  cost  of  up-grading  and  altering  fixed  plant  for 
HSRA  is  shown  in  Table  12. 

High-speed  rail  C  (HSRC)  is  a  major  component  of  alternative  IV.  HSRC  is 
a  completely  new,  200-mph  passenger  railroad.  The  concept  is  similar  to  JNR's  New 
Tokaido  Line,  but  calls  for  a  higher  level  of  performance  from  the  equipment.  Two 
hundred  miles  per  hour  was  selected  as  the  maximum  cruising  speed;  wheel-rail 
interaction,  power  collection  problems  and  safety  considerations  for  speeds  in  excess 
of  200  mph  lead  to  design  requirements  that  tend  to  equalize  the  costs  of  high- 
speed rail  and  tracked  air  cushion  systems,  thus  making  analysis  of  both  somewhat 
redundant.  With  proper  maintenance,  the  safety  of  this  system  will  not  be  compro- 
mised at  200  mph. 

HSRC  would  use  existing  terminals  at  Washington,  New  York,  Boston,  and  the 
new  facility  at  the  Capital  Beltway;  however,  at  all  points  in  between,  the  right-of- 
way  would  be  entirely  new.  Underground  stations  would  be  built  at  Baltimore  and 
Philadelphia,  and  new  surface  stations  would  be  constructed  at  Trenton,  Meadows 
(in  the  Jersey  meadows  near  Secaucus),  Milford  (serving  Bridgeport  and  New 
Haven ) ,  Providence  and  Route  128.  From  Washington  to  New  York  the  route  would 


Special    Report 


55 


Oi 

CO 

C-; 

CM 

CD 

CO 

Csl 

CO 

eg 

■^ 

I 

CD 

75 

tj< 

cr> 

iH 

CT) 

tJ3 

L-^ 

t-^ 

CO 

lO 

•^ 

CTJ 

■^< 

c- 

irj 

O 

CO 

■3< 

■^ 

o 

•<}< 

CO 

o 

H 

4 

g| 

CO 

^ 

q 

l> 

q 

q 

q 

CO 

q 

CO 

q 

2  w 

CO 

t> 

<3 

eg 

CO 

o 

o 

■^ 

C3 

r-J 

eg 

>  5 

CO 

in 

g« 

P, 

« s 

k2 

o 

«D 

q 

1-1 

q 

O) 

in 

■* 

o 

q 

"9 

tD 

rH 

o 

rf 

00 

o 

(N 

CO 

d 

eg 

o 

> 

i-( 

r-( 

CD 

eg 

>  s 

1-1 

tH 

CO 

0)  b 

Z  (^ 

1    c 

•S    5* 

^1    > 
O    rt 

o 

CQ 

q 

q 

in 

q 

eg 

00 

q 

q 

CD 

>^  X 

o 

CD 
00 

o 

o 

CD 

CO 

in 

lA 

CO 

d 

o 

CO 

>    ^ 

r-( 

CJ 

u    a> 

»  Z 

1 

rt   t; 

2  ^ 

q 

q 

q 

q 

r-t 

aj 

q 

00 

q 

q 

q 

o 

CvJ 

■<J< 

o 

CO 

CO 

o 

^ 

o 

o 

LO 

iH 

r-l 

fl 

ti    o 

1^ 

.  -^ 

g  u 

S  ft 

o 

t 

q 

q 

(M 

<# 

o 

q 

q 

q 

°  ! 

Tren 
etro 

o 

o 

vO 

o 

o 

iH 

CO 

o 

CO 

d 

d 

00 
CO 

S 

1 

•S  c 

'i'-S 

o 

in 

q 

q 

q 

cq 

CO 

q 

q 

q 

eg 

O      c 

■s  ^ 

o 

■^ 

M 

o 

o 

CJ 

N 

or 

eg 

d 

o 

CO 

S^ 

(!< 

1      ^ 

T)< 

in 

CO 

Cvl 

q 

q 

q 

in 

CO 

q 

q 

00 

t^ 

CO 

iH 

CO 

o 

d 

CD 

CO 

o 

v}1 

•r;    rt 

t> 

CO 

in 

05 

r::  ^ 

rH 

§    2 

to  2 

o 

in 

o 

cq 

q 

CSl 

CO 

ej 

'^ 

q 

•O 

.£    S 

o 

o 

o 

f-H 

CO 

o 

o 

CO 

rH 

o 

CD 

'"' 

CO 

in 

q 

"w    '-' 

rt    rt 

>.  m 

r 

C 

OJ 

w 

o 

a 

o  . 

O 

ri      .. 

3 

S 

_o 

f 

1  lew  ay  Propar; 
and  GuLdcwa> 
Construction 

6 
o 

o 
o 

o 

3 
(-1 

w 

o 

'c? 

2 

o 

w 

(0 

ft 

1 

O 

O 

o 

SI 
s:2 

o 

Ct) 

m 

o 

o 
o 
Cm 

'3 

'/I 

o 

\p 

6 
u 

4) 

.2 

'u 
o 

o 
o 
o 

o 

O 
H 

g 

;^ 

c 

o 

c 

'«' 

•^  t^ 

U 

M 

« 

K 

«  U. 

\->  H 

r 

"^ 

o 

U 

W 

r. 

,'.:i 

^^ 

rj 

o  <: 





■  Ill 



1.. 



56 High    Speed    Rail    Transportation 

not  deviate  far  from  the  existing  right-of-way,  but  north  of  New  York  the  route 
would  run  farther  inland  than  it  does  at  present,  and  some  tunneling  would  be 
required  to  avoid  the  excess  curvature  that  plagues  the  present  route.  Even  though 
the  existing  Pcnn  Station  in  New  York  would  be  used,  new  tunnels  under  the  Hudson 
and  East  Rivers  have  been  included  for  the  new  service. 

The  new  railroad  will  be  completely  electrified  using  an  overhead  catenary 
system.  Standard  gage  track  is  laid  on  a  concrete  structure  designed  to  hold  the 
rails  to  the  tolerances  required  for  200  mph  operation  without  excessive  maintenance. 
The  cars  are  similar  to  the  HSRA  cars  but  with  increased  tractive  power. 

Trains  could  operate  as  often  as  every  five  minutes  during  peak  hours  on  the 
new  system.  Because  of  stops  en  route  and  a  few  speed  restrictions  (due  primarily 
to  tunnels),  the  trains  would  average  146  mph.  Two  basic  runs  are  considered: 
one  from  Washington  to  Boston  and  return,  and  the  other  between  Philadelphia 
and  Milford  (New  Haven/Bridgeport).  The  two  services  combined  would  result 
in  frequencies  at  the  center  of  the  Corridor  about  double  those  of  the  ends.  Neither 
freight  nor  commuter-type  trips  are  considered,  but  some  form  of  either,  or  both, 
could  be  developed  as  long  as  the  intercity  service  retains  priority. 

Estimates  of  routeway  preparation  and  guideway  costs  for  HSRC  are  displayed 
in  Table  13.  A  comparison  of  total  costs,  HSRA  and  HSRC,  appears  in  Table  14. 

As  the  foregoing  descriptions  indicate,  the  two  ground  transport  systems  differ 
considerably  in  a  temporal  sense.  HSRA  exists  in  part  today  and  can  be  described 
in  detail;  the  right-of-way  is  known  to  within  a  few  feet,  and  similar  vehicles  have 
been  built  and  are  operating.  HSRC,  on  the  other  hand,  incorporates  a  number  of 
features  that  are  still  experimental;  the  right-of-way  is  described  only  by  a  general 
route  location  on  a  map,  the  effects  of  high  speeds  on  car  and  guideway  mainte- 
nance are  still  conjectural,  and  in  a  number  of  ways  the  system  cannot  be  described 
precisely  enough  for  truly  accurate  cost  estimating. 

This  difference  in  quantity  and  quality  of  information  between  the  two  systems 
required  that  the  cost  methodology  embrace  a  variety  of  estimating  procedures.  For 
equipment  of  a  type  that  exists  today,  current  prices  were  used,  adjusted  to  a 
1970  level  by  an  appropriate  index.  (All  costs  presented  in  the  reports  of  the 
Northeast  Corridor  Transportation  Project  are  expressed  in  terms  of  1970  dollars.) 
The  general  approach,  however,  was  to  develop  estimating  relationships  tliat, 
wherever  possible,  would  allow  the  system  designers  to  obtain  estimates  for  a 
variety  of  configurations  and  would  also  ensure  comparability  among  estimates.  In 
some  cases  sufficient  data  were  available  to  derive  statistically  significant  regression 
equations.  More  often,  the  sample  size  was  too  small  to  justify  regression  analysis, 
and  the  estimating  relationships  were  obtained  by  drawing  a  line  through  a  scatter 
of  several  points.  In  other  cases,  cost  estimates  were  based  on  engineering  analogues. 

It  can  be  readily  seen,  from  a  review  of  the  cost  data  presented  for  both  over- 
seas and  domestic  ventures,  that  adequate  high-speed  rail  transportation  will,  in  no 
case,  be  an  inexpensive  enterprise.  One  may  well  ponder  the  question,  however,  of 
the  cost — social  as  well  as  financial — of  not  addressing  the  problem  and  doing  so 
in  an  expeditious  manner.  Undertakings  of  so  large  a  scope  as  the  overall  Shin 
Kansen  program  of  JNR  or,  in  the  instant  case,  a  new  regional  transportation  net- 
work have  substantial  lead  times  from  conceptualization  to  completion.  Illustrative 
of  this  are  the  schematic  timetable  for  development  and  implementation  of  HSRA 
and  HSRC  shown  in  Figures  6  and  7. 


Special    Report 


57 


Si 

H 

CO 

t~ 

oo 

<j> 

cq 

•<»• 

•<)" 

o> 

CO 

r^ 

CO 

CO 

,_, 

<x> 

t> 

eg 

^ 

■D 

a> 

t- 

^ 

K 

T 

CO 

C-J 

•^ 

o> 

!* 

eg 
.-o 

lO 
CO 

CO 

lO 

« 

^ 
« 

^ 

O 

o 

t- 

CO 

lO 

■* 

m 

CO 

in 

in 

CO 

N 

eg 

a; 

■^ 

o 

o 

<D 

t- 

CO 

CM 

o 

lf> 

o> 

CO 

o 

r-( 

eg 

< 

K 

-r 

n' 

o> 

eg 

o 

Tf 

o 

in 

co' 

c- 

CO 

eg 

00 

m 

■        1 

1 

■»! 

CO 

w 

1 

« 

t- 

o 

1 

1 

t- 

eg 

o 

^* 

' 

00 

00 

o 

r)" 

e^^ 

CO 

^ 

"^ 

'* 

•D    & 

a  s 

c- 

00 

CM 

r-( 

t* 

(O 

t-H 

CO 

in 

a> 

o 

a  <v 

o 

O) 

OT 

eg' 

■<»> 

oo' 

eg 

o 

to 

in 

S-B 

'^ 

■^ 

ei 

eg 

eg 

eg 

w  o 

0) 

1 

n 

o 

f- 

■>»• 

oo 

<n 

t- 

CO 

in 

CO 

CO 

ca 

<o 

in 

1 

r-« 

ej 

^_^ 

in 

ki 

^ 

t-H 

t- 

m 

'^ 

a 
X! 

§s 

:3 

^  1^ 

to 

'^ 

'-' 

in 

lO 

CO 

CO 

eg 

oo 

00 

eg 

£ 

c» 

T-* 

*H 

■<(> 

PH 

in 

eg 

O 

CO 

s^ 

■^ 

pf. 

CO 

eg 

<3J 

X 

•§,« 

CO 

C-J 

in 

M 

CO 

o 
eg 

fc" 

t- 

■* 

t- 

CD 

s 

xu 

4) 

w 

•^ 

00 

^ 

ca 

in 

00 

j 

t- 

in 

in 

^ 

N 

m 

eg 

00 

en 

eg 

eg 

o 

a 

T3 

0> 

•fl- 

o 

■§ 

•^ 

00 

CJ> 

O 

« 

&> 

i> 

?  K 

<£> 

c- 

« 

" 

•<«> 

-^ 

<c 

CO 

00 

00 

en 

£ 

fg 

'^ 

*~* 

CO 

CO 

T 

1 

n 

c« 

1 

fa 

p  o 

as 

si 

•a 

j3  u 

c  ^ 
t  2L 

in  -^ 
*   0 

O  L^ 
1^ 

o  -o 
it  S3 

as 

4>  SI 

<5« 

1 

eo 

"^  c 
o  o 

St; 

o 

H 

►JK 

a  c 

&,  t- 

f-l  r-. 

^2. 

>^,  ?; 

Sft. 

1-  IC, 

K  O 

o  o 


^^ 


58 


High    Speed    Rai I    Transportation 


TABLt  14. 

TOTAL  COSTS  BY  COST  ELEMENT 
ftiercent) 


Investment 

HSRA 

HSRC 

Research  and  Development 

2 

2 

Land  Acquisition 

13 

18 

Guideway  Construction 

65 

60 

Guideway  Electrification 

5 

3 

Command,   Control,   Communications 

5 

6 

Terminals 

6 

6 

Yards  and  Shops 

a 

3 

Vehicles  (including  spare  parts) 

4 

2 

Total         (percent) 

100 

100 

Total  Cost  (millions  of  dollars) 

1,591 

2,600 

Annual  Costs 

Enei-gy 

a 

1 

Crew 

4 

X 

Car  Maintenance 

4 

4 

Guidewaj'  Maintenance 

1 

3 

Power  and  Control  Maintenance 

1 

1 

Maintenance  Burden 

4 

3 

Indii'ect  Operating  Cost 

14 

12 

Annualized  Investment 

72 

75 

Total 

100 

100 

1              Total  Cost  (millions  of  dollars) 

225 

344 

a.     Less  than  1  percent. 


So-.orce:   Cost  Analysis  for  NECTP.   Vol  1 
Resoui'ce  I-Ianagement  Coi-p. 

NEClP-222. 


Special    Repor  t 59 


TIMETABLE    FOR   DEVELOPMENT   AND    IMPLE- 
MENTATION  OF   HSRA    IN    THE    NORTHEAST 
CORRIDOR. 


Years   from  Go-Ahead   to  hull   Service 
Task  0  12  3  4 


Research   and   development    • 

Vehicle 

Equipment  testing         . 

Final  design 

Manufacture  and  accept- 
ance 

Guideway 

Test  track  design,  con-   < 
struction  and  testing 

Right-of-way  acquisition  . 

Guideway  and  power  system, 
final  design 

Guideway  and  power  system 
constiuction 

Terminals 

Terminal  design  and  con- 
struction 

Service 

Start  partial  service 

Start  full  service 


Figure  6. 


In  the  pledging  of  financial  resources  of  the  magnitude  indicated  for  these 
sorts  of  projects  the  social  benefits  produced  assume  precedence  over  retvu-n  on 
investment.  This  being  so,  it  seems  unlikely  that  matters  will  go  forward  without 
tangible  encouragement  from  some  level  of  government. 

It  will  have  been  noted,  from  a  study  of  Figures  6  and  7,  that  a  sizeable  period 
of  time  is  allotted  to  research  and  development  in  connection  with  the  advanced 
systems,  HSRA  and  HSRC.  From  these  anticipated  activities  and  even  more  rele- 
vantly, current  rail  research,  the  contemporary  maintenance  engineer  may  expect 
tangible  advantage.  No  great  .stretch  of  the  imagination  is  necessary  to  visualize  the 


60 


High    Speed    Rail    Transportation 


TIME  TABLE  FOR  DEVELOPMENT  AND 
IMPLEMENTATION  OF  HSRC  IN  THE 
NORTHEAST  CORRIDOR. 


Years    from  Go-Ahead    to  hull   Service 


Task 


Research  and 
development 

Vehicle 

Prototype  design 
manufacture  and 
testing 

Final  design 

Manufacture  and 
acceptance  testing 

Guidev/ay 

Test  track  design 
construction  and 
testing 

Right-of-way 
acquisition 

Guideway  and  power 
system  final  design 
and  specification 

Guideway  and  power 
system  construction 

Terminals 


Terminal  design  and 
cons  truction 


Service 

Start  partial  service 

Start  full  service 


Figure  7. 


Special    Report  61 


response  to  advanced  rail  research  of  many  heavily  engaged  maintenance  people 
for  whom  a  consuming  concern  is  the  preservation  of  some  tolerable  degree  of  sur- 
face and  line  for  the  predominantly  freight  trackage  within  their  jurisdictions. 
Hyperbolically,  the  response  may  be  similar  to  the  alleged  underprivileged  view  of 
the  space  program.  But,  to  affect  a  disinterest  because  of  a  presumed  remoteness  of 
high-speed  developmental  work  from  the  arena  of  daily  preoccupation  reflects  a 
certain  lack  of  perception.  Track-vehicle  stability  is  increasingly  crucial  at  higher 
operating  speeds  and  any  useful  investigative  work  toward  this  end  is  bound  to 
rapidly  percolate  to  the  point  of  availability  in  the  solution  of  more  mundane  prob- 
lems. A  position  of  indifference  is  really  difficult  to  sustain  at  a  time  when  the 
application  of  attentiveness  and  financial  resources  to  the  solution  of  problems  in 
many  areas  of  railroad  technology — and  particularly  track  and  roadbed — is  increas- 
ing at  an  exponential  rate  from  a  very  low  base. 

One  commentator  has  suggested  that  research  costs  associated  with  the  imple- 
mentation of  a  system  such  as  HSRC  could  be  classified  as  follows:"" 

wheel-rail  interaction 

adhesion  coefficient  measurement 

electric  power  collection 

frequency  conversion  equipment  GRAND  TOTAL 

high-speed  motors  $23,200,000 

aerodynamics 

control  and  communication 

emergency  braking 

To  this  listing  must  be  added  the  requirement  for  considerable  further  investiga- 
tion into  obstacle  detection,  control  of  acoustic  noise,  and  the  effects  on  the  occu- 
pants of  trains  moving  at  high  .speeds  of  optokinetic  nystagmus  and  intermittent 
photic  stimuli  (flicker). 

Train  nystagmus  occurs  when  a  series  of  objects  is  moving  across  a  person's 
visual  field,  and  his  eyes  follow  one  object  across  the  field,  move  rapidly  back  to 
the  next  object,  follow  it  across,  move  back  to  the  next,  and  so  on.  Dizziness  and 
nausea  are  normally  produced  when  the  stimulus  rate  is  from  3  to  12  objects  passing 
per  second.  At  200  mph,  wayside  utility  poles  having  a  spacing  of  100  ft  would 
create  an  effect  that  lies  witliin  the  critical  nystagmus  envelope. 

Flicker  vertigo,  sometimes  a  problem  in  helicopter  operation,  appears  to  be 
related  to  the  intensity  of  light,  its  wavelength,  and  the  dark-light  ratio  of  the  flash- 
ing. Vertigo  or  even  unconsciousness  may  be  induced  when  flicker  occurs  within  the 
limits  of  9  to  15  hz. 

These  optical  efi^ects  have  slight  bearing  on  present-day  trains  but  may  be  a 
more  pressing  problem  at  the  higher  speeds  envisioned  for  the  future. 

Even  including  the  more  arcane  aspects  of  the  required  research,  the  cflort 
breaks  down  basically  into  a  three-pronged  attack:  propulsion,  control,  and  support. 
From  the  work  progressed  within  this  last  category  will  come  the  aid  and  comfort 
so  fervently  desired  by  the  practical  maintenance  man  even  though  he  may  least 
expect  it  from  this  source.  As  has  been  shown  earlier,  railroad  engineers  abroad  are 
highly  skeptical  of  the  economic  feasibility  of  attempting  to  maintain  conventional 
wood  tie  track  to  sufficiently  support  present-day  loadings  and  provide  the  refine- 
ment of  under-load  track  geometry  necessary  for  future  high-speed  operation. 


62 High    Speed    Rail    Transportation 

Enhancement  of  the  stability  of  track  has  a  high  priority  in  rail  oriented  re- 
search and  usefnl  output  from  this  effort  is  not  preserved  for  high-speed  operation 
alone.  Also  having  an  equally  high  priority  is  the  determination  of  methods  whereby 
the  fruits  of  this  on-going  research  can  be  phased  into  service  in  order  that  early 
benefit  can  be  realized.  Indeed,  even  the  highly  touted  capabilities  of  modern  track 
surfacing  and  aligning  machinery  may  yield  to  greater  improvement  if  functional 
performance  requirements  are  objectively  analyzed,  an  action  heretofore  dependent 
on  the  fragmented  approach  inseparable  from  proprietary  design. 

CONCLUSION 

It  has  been  shown  that,  on  a  world-wide  scale,  there  is  great  interest  and  much 
activity  directed  toward  high-speed  rail  operation.  In  heavily  industrialized  countries 
having  growing  concentrations  of  population,  the  inherent  efficiency  of  moving  large 
numbers  of  people  by  rail  expeditiously  is  proving  increasingly  attractive.  The  large 
capital  investment  required  for  the  establishment  of  a  genuinely  high-speed  rail 
capability  may  be  very  favorably  compared  with  the  costs  incurred  in  providing 
other  facilities  for  transporting  the  same  masses  of  people.  A  growing  awareness  of 
the  minimally  adverse  environmental  contribution  of  rail  transport  compared  with 
other  common  modes  casts  further  salutary  light  on  the  medium.  All  in  all,  and 
contrary  to  the  popular  misconception,  the  future  for  rail  transportation,  both  here 
and  abroad,  seems  not  only  secure  for  at  least  another  generation,  but  even  exciting 
to  behold.  Happily,  some  sense  of  this  is  starting  to  penetrate  certain  levels  of  the 
public  consciousness,  one  evidence  of  which  is  apparent  in  the  growing  interest 
shown  in  rail  transportation  at  the  college  and  university  level.  Commonly,  theses 
that,  a  few  years  ago,  would  have  addressed  another  topic  are  now  structured 
around  some  aspect  of  rail  transportation.  (A  representative  specimen  is  cited  as 
Reference  30. ) 

The  industry  is  in  a  state  of  active  ferment  everywhere.  Present  concepts  will, 
inevitably,  change.  Distress  may  be  felt  in  some  quarters  from  the  rate  at  which 
this  accelerated  change  occurs.  Nevertheless,  one  envies  the  young  railroad  engineer 
embarking  at  this  time  on  a  career  that  will,  unquestionably,  bring  greater  profes- 
sional satisfaction  than  would  have  been  possible  at  any  time  previously.  This  sug- 
gests large  reward,  for  railroad  engineers,  as  a  class,  are  now  distinguished  for  the 
gratification  tliey  derive  from  achieving  the  maximum  with  what  is  at  hand.  Even 
greater  compensation  will  accrue  from  the  introduction  of  substantive  rationality 
for  prevalent  empiricism  in  support  of  the  activities  that  engross  these  people. 


REFERENCES 

1.  Third  Report  on  the  High  Speed  Ground  Transportation  Act  of  1965.  July  1969. 

2.  High  Speed  Rail:  Problems  and  Prospects.  Ullman,  K.  B.,  PR  No.  183  363. 
Clearinghouse  for  Federal  Scientific  and  Technical  Information,  Springfield,  Va. 
22151. 

3.  The  Needs  and  Desires  of  Travellers  in  the  Northeast  Corridor.  National  Analysts, 
Inc.  January  1970.  PR  191  027   (see  2,  above.) 

4.  Rail  Passenger  Statistics  in  the  Northeast  Corridor.  DOT-FRA-OHSGT.  March 
1970. 

5.  Fast  Track  for  Fast  Trains — The  Metroliners.  DilFenderfer,  James  W.,  Railway 
Track  and  Structures.  May  1970. 


Special    Report 63 

6.  a.  Vibration    Measurements   of    the  Penn  Central  MetroUner.   Catherines,   J.   J. 

and  Clevenson,  S.  A.  Langely  Working  Paper  No.  770.  National  Aeronautics 
and  Space  Agency.  July  14,  1969. 
b.  The  Effect  of  Track  Geometry  on  Ride  Qimlitij.  UUman,  K.  B.  and  O'Sullivan, 
W.  B.  IEEE  Paper  No.  69  CP  355-IEA.  April  1969. 

7.  Unconventional  Railway  Track  Support  Systeins.  O'Sullivan,  W.  B.  in:  The 
Dynamics  and  Economics  of  Railway  Systems.  Published  by  the  Railway  Systems 
Management  Association,  February  1970. 

8.  a.  L'Etude  de  Vlnfrastruture.  Verrier,  Guy.  Revue  Generale  des  Chemins  de  fer. 

January  1970. 

b.  La  Yoie.  Prud'homme,  A.  Ibid. 

c.  How  High  Can  Train  Speed  Be  Increased?  Matsudaira,  T.  Japanese  Railway 
Engineering.  June   1966. 

10.  Rail  tracks  for  Japan's  130-mph  trains.  Matsubara,  K.  Civil  Engineering-ASCE. 
December  1969. 

11.  New  San  Yo  Line.  Matsubara,  K.  Permanent  Way,  Nos.  42-43  (Special  Issue), 
Japan  Railway  Civil  Engineers  Association,  May  1970. 

12.  Building  the  San  Yo  Line.  Anon.  The  Railway  Gazette.  Oct.  4,  1968. 

13.  Neiv  Tokaido  Line  Fujii,  M.  Proceedings  of  the  IEEE.  Vol.  56,  No.  4,  April 
1968. 

14.  Som^  problems  about  track  and  maintenance  of  way  under  high-speed  train 
operation.  Ban,  Y.  et  al.  Monthly  Bulletin  of  the  International  Railway  Congress 
Association.  February  1968. 

15.  New  San  Yo  Line.  Matsubara,  K.  Permanent  Way.  Vol.  12,  Nos.  1-2.  May 
1970.  Japan  Railway  Civil  Engineering  Association. 

16.  Simple  track  improvements  permit  fast  USSR  services  at  low  cost.  Bushyev, 
V.  I.,  International  Railway  Journal.  March  1970. 

17.  Statistical  Absiract  of  the  United  States.  1969  ed.  U.S.  Dept.  of  Commerce, 
Bureau  of  the  Census. 

18.  JANE'S  World  Railways.  11th  ed.,  1968-69.  McGraw-Hill  Book  Co.  New 
York,  N.Y. 

19.  The  progress  of  railways  and  of  the  science  of  transport  in  the  USSR.  Karetni- 
kov,  A.  D.  Rail  International.  April  1970. 

20.  Towards  an  Intercity  Trans-port  Vehicle.  Technology  Review.  April  1970. 

21.  a.  Rames  Experimental  a  Turbines  a  Gaz.  Nouvion,  M.  F.,  Revue  Generales  des 

Chemin  de  Fer.  January  1970. 
b.  The  Problems  of  High   Speed  Transport  on  French  Railroads.  Nouvion,  F. 
IEEE  Paper  No.  70  CP  261-IGA.  February  24,  1970. 

22.  (partial  coverage) 

a.  Lateral  dynamics  of  raihvay  vehicles.  Wickens,  A.  H.  Railway  Gazette.   De- 
cember 5,  1969. 

b.  Practical  research  into  vehicle  dynamics.  Wickens,  A.  H.,  Railway  Gazette. 
June  16,  1967. 

c.  Experimental  Four-Wheel  Wagon  Suspension.   Anon.    Railway   Gazette.    De- 
cember 5,  1969. 

23.  Residts  of  a  Survey  of  Railroad  Joint  Irregularities  Using  Matisa  Records.  Gil- 
christ, A.   O.,  British   Railways  Research  Dept.  Report  DYN/44.   1967. 

24.  a.  Preparing   British   Railways   Tracks   for  High   Speed  Running.  Patterson,   A. 

Railway  Gazette,  June  7,  1968. 
b.  British  Railway.  Patterson,  A.  The  Dynamics  and  Economics  of  Railway  Sys- 
tems. (See  Ref.  7,  above.) 

25.  Refurbishing  BR  Track  for  High  Speeds.  Anon.  Railway  Gazette.  November  21, 
1969. 

26.  British  Rail  Paved  Track  Experiment.  Anon.  Modern  Railways  ("Special  Edi- 
tion" devoted  to  BR  activities,  undated,  rec'd  in  1969.) 


64 


High    Speed    Rail    Transportation 


27.  Influence  of  speed  on  the  construction  and  maintenance  cost  of  railway  lities. 
Delvendahl,  H.  Monthly  Bulletin  of  the  International  Railway  Congress  Asso- 
ciation. May  1968. 

28.  Feasibility  of  High  Speed  Rail  Service.  Systems  Analysis  Research  Corp.,  and 
Thomas  K.  Dyer,  Inc.  October  1969. 

29.  High  Speed  Rail  Systems.  TRW  Systems  Group.  PB  No.  192  506.  The  Clearing- 
house for  Federal  Scientific  and  Technical  Iriiformation.  Springfield,  Va.  22151 
(an  excellent  concept  catalogue). 

30.  The  United  States  Railroad  Industry — An  Aimchronism  in  1969.  Terrill,  Linda. 
Simmons  College.  Boston,   Mass.   December  1969. 

31.  a.  High  Speeds,  analijtical  bibliography.  (In  association  with  the  "High  Speeds" 

Symposium,    Vienna,    June    1968.)    International    Railway    Congress    Assoc. 
(19  rue  de  Beau  site,  Brussels  5,  Belgium). 

b.  Bibliography  of  High  Speed  Ground  Transport.  PB  No.  170  581.  The  Clear- 
inghouse for  Federal  Scientific  and  Technical  Information.  Springfield,  Va. 
22151. 

c.  Published  Reports  of  the  Office  of  High  Speed  Ground  Transportation.  The 
Clearinghouse  for  Federal  Scientific  and  Technical  Information.  (PB  number 
not  yet  assigned.  To  be  published  in  November  1970). 

32.  The  following  reports  of  the  Northeast  Corridor  Transportation  Project  providing 
detailed  information  on  project  methodology,  descriptions  of  alternative  systems 
and  various  analysis  techniques  are  available  from  the:  Clearinghouse  for  Fed- 
eral Scientific  and  Technical  Information,  Springfield,  Va.  22151.  The  price  is 
$3.00  per  volume  for  a  paper  copy  and  $.65  per  volume  for  a  microfiche  copy. 

When  ordering  please  use  the  accession  number  shown  below. 
Northeast  Corridor  Transportation  Project  Report  NECTP-209  PB190929 
NEC  Transportation:  Problems  and  Prospects  NECTP-210  PB190930 
Status  of  tlie  Transportation  System  and  Plans  for  Im- 
proving Intercity  Transportation  in  the  NEC  NECTP-211  PB190931 
NEC  Transportation  Facts  and  Statistics  NECTP-212  PB190932 
National  Bureau  of  Standards  Modeling  for  the 

NECTP  NECTP-213  PB190933 

HSGT  Mode  Service  Analysis  in  NEC  NECTP-214  PB  190934 

Air  Mode  Service  Analysis  in  NEC  NECTP-215  PB190935 

TRANSOP  Model  Methodology  NECTP-216  PB190936 
Access  and  Demand  Data  Used  in  the   Development 

and  Calibration  of  NEC  Transportation  Models  NECTP-217  PB  190937 

Impact  Studies:    NECTP  NECTP-218  PB190938 
HSGT   Systems   Engineering   Study,    Tracked    Air 

Cushion   Vehicles  NECTP-219  PB190939 

V/STOL  Mode  Descriptions  NECTP-220  PB.190940 

Prospective  Costs  of  Capital  in  the  NEC  NECTP-221  PB190941 
Cost  Analyses  for  NECTP,  Volume  I,  High  Speed 

'Ground  Modes 
Cost  Analyses  for  NECTP,  Volume  II,  Air  and 

Highway  Modes  NECTP-223  PB190943 

External  Costs  and  Benefits  Analyses,   NECTP  NECTP-224  PB190944 
Theory    and     Implementation    of    Cost    and    Benefit 

Analysis   of  Transportation   Systems:    The    NECTP  NECTP-225  PB190945 

Passenger  Demand  and  Modal  Split  Models  NECTP-230  PB  190946 


NECTP-222     PB190942 


Special    Report  65 


APPENDIX   I 
DATA    SOURCES 
Data  Tag  Program 

The  data  tag  program  is  the  source  of  passenger  vohime  information  on  tlie 
New  York-Washington  and  New  York-Boston  routes.  As  a  means  of  obtaining  ade- 
quate counts  of  passenger  travel  identified  by  stations  of  origin  and  destination,  and 
individual  trains,  OHSGT  devised  machine-readable  tags  serving  both  as  conven- 
tional passenger  seat  checks  for  the  railroad  and  as  a  means  of  collecting  data  for 
OHSGT.  The  system  has  been  in  full-scale  operation  on  a  continuous  basis  since 
July  1966  in  order  to  develop  base  period  information  with  which  passenger  volume 
during  the  demonstrations  will  be  compared  to  aid  in  the  evaluation  of  the 
demonstrations. 

The  data  tag  program,  with  minor  exceptions,  includes  passengers  on  through 
trains  between  New  York,  Philadelphia,  and  Washington  and  on  the  Shore  Line 
between  Boston  and  New  York.  Excluded  from  the  Program  are  commuter  (non- 
through)  trains  and  passengers  who  are  traveling  from  or  to  points  south  of 
Washington. 

On   Train   Survey  (New  York-Washington  Route) 

The  on-train  questionnaire  survey  was  inaugurated  by  OHSGT  in  1967  on  the 
New  York-Washington  route  to  provide  more  comprehensive  information  to  be  used 
in  evaluating  public  response  to  the  improved  service.  This  questionnaire  survey 
is  being  conducted  on-board  the  trains  on  a  continuing  basis  among  a  sample  of 
passengers.  It  obtains  information  on  the  passengers'  socio-economic  characteristics, 
purpose  of  travel,  past  and  expected  travel  mode  usages,  frequency  of  travel  and 
attitudes  toward  the  service.  The  number  of  passengers  surveyed  in  1969  was  as 
follows:    Metroliner  passengers,  5,810;   conventional   train  passengers,  47,950. 

Special  On  Train  Survey  (New  York-Boston  Route) 

An  On  Train  Survey  on  the  New  York-Boston  route  began  on  October  19,  1969 
and  will  continue  tlirough  April  19,  1970.  The  results  of  the  first  three  months  of 
the  survey  are  reported  here.  The  methodology  and  questionnaire  is  basically  the 
same  (although  some  additional  questions  were  included)  as  the  continuing  New 
York-Washington  route  On  Train  Survey.  The  number  of  passengers  surveyed  in 
the  period  reported  was  as  follows:  Turbo  passengers,  1,210;  conventional  train 
passengers,  1,460. 

On  Plane  Survey 

An  On  Plane  Sur\ey  of  a  sample  of  airline  passengers  traveling  between 
Washington  National/Baltimore  Friendship  and  Newark/LaGuardia  airports  was 
conducted  from  July  7,  1969  to  February  4,  1970.  To  evaluate  changes  over  time, 
the  data  were  tabulated  for  three  separate  time  periods.  Following  are  the  sample 
sizes  of  the  plane  passengers  surveyed  as  well  as  the  sample  sizes  of  the  Metroliner 
passengers  surveyed   witli   which   the  data  are  compared  in   the  Tables: 

Number  of  Passengers  Surveyed 
Airplane  Metroliner 

Time  Period  Passengers  Passengers 

July  7-October  4,  1969  3,410  990 

October  5-December  4,  1969  4,170  710 

December  5,   1969-Feliruary  4,   1970  2,970  990 

Hill.   025) 


66  High    Speed    Rail    Transportation 


The  airhnes  participating  in  the  survey  were  Eastern  (Shuttle  Service),  Ameri- 
can (Jet  Express  Service)  and  Allegheny  (Commuter  Express  Service). 

Technical  Notes 

1.  "Non-responses"  to  individual  questions  have  been  distributed  in  the  same  pro- 
portions as  the  answers  received  from  the  otlier  participants. 

2.  With  regard  to  the  survey  question  on  State  of  residence,  passengers  were  coded 
as  "In  Corridor  State"  if  their  residence  is  in  any  section  of  the  following  states: 
New  Hampshire,  Massachusetts,  Rhode  Island,  Connecticut,  New  York,  New 
Jersey,  Pennsylvania,  Delaware,  Maryland,  the  District  of  Columbia  and  Virginia. 


Special    Report 


67 


APPENDIX    II 

DATA    FROM   TRACK    RESPONSE    MEASUREMENTS    ON 

PENN-CENTRAL    HIGH-SPEED    TRACK 

DECEMBER    10-12,    1969 

Investigation  Pursued  by 

Battelle  Memorial  Institute,  Columbus,  Ohio 

Howard  C.  Meacham, 

Chief  Investigator 


■SOIL  PRSSSItRS 
CCLL   JUIKTTON' 


7" 


TRACK  3 


]( 


—  JOINT     r' 


■RAIL -TIT  VSF.TIC/J,  MOTIOlf  DCDT 


TIE  PLATE  LOAD  CELL 


TRACK  2 


ITIACK  1 


RAIL-^ROOra  VERTICAL  MOTIOM 
RVDT  &  ACCELEROMETBR 


RAIL -TIE  VERTICAL  MOTION  DCDT 
TIE  PLATE  LOAD  CELL 


LOCATIO;i  OF  TTJSTRl'hEOTATION  TNST.<a,LED  ON 
PEfrN  CEKTRAL  HIGH  SPEED  TRACK  IJEAR  ECflTE,   MD. 


68 


High    Speed    Rail    Transportation 


>    '1 


f     O    - 

*~p 

I  .. 

_,!=»    '^'  - 

r - 

" 

9        ^3- 

0 

^         :=sr           ci- 

■  Id 

(0 

^      .=-:-Tr£^      LU 

—1 

'  "i3  ^]  - 

7. 

7) 


~^ 


I 


3 


__j 


^13 

— '  '^ 


\ 

5       .,/ 
V,      

"7 

59 

V.0 

r- 

Cr 

r- 

<N( 

19 

i 

\    ■ 

I" 

70 


High    Speed    Rail    Transportation 


(^u^ --r-r     Passenger   irain  (GGl)  (3  77.6  mph. 


'.vA,^  k    j^x    k    A    f\    M    h   K  .  |\  ?\  :  i  ■  M^r^ 


!3,500  L=v. 


RAIL  DISPLACEMENT; 
Z9ih  L!5./DiV. 


ijii.iJir 


^-*^.^V•^^^'/^vs^' 


/      Ww        ,  \W-'  ,        v^^  loJ^V  Uv>,v        ;  \,v(,'.V  ViV'  ^•«'A'   ,.    ,  W    i      -^  ■  U'.'A«.V*»*».'.wouv*i 


lG,&CO  U3. 


,  :  TIE  PLATE  LQAD  ,(?,  JOINT,  , 
:377  LO./D/V-:    ; 


.c:-y 


fl.:.    V'^-  '^  "^  -i  '^  ^■' 


kJ 


^y'-A  ir'\k-u'X\B\ 


■TIE-PLATE-  LOAD  30'   AWAY-  FROM-JOIfrf. 


U'!U 


'Jl.l         -.c. 


^-'i^^mm4H^^^ 


■CIO 


-***  DE^^ECTIVE  CHAN.'iEL  ***  (rail   disiDlacement) 


-:—     1      ^rr 


TlNViE 


3.G4  PSI— 


:AA:AA:iAA-/VliC;Vl!}^ 


U^U 


SUBGRADE  PRESSURE  CELL,  (same  sensor  as  represented  on 
on  preceeding  page) 


Special    Report 


71 


-.-L.-i.  .1.:.  i.JLlj 

...:-..-U.    -iijC 

±t::^„:]:itl: 

1        1  / 

1      [ 

1          T    ■ 

_--_jn_..._.i-- 

i   _[_      1.  '  ^  L 

-1.^1;. l..l£l:; 

■-]  j-j-p  ■>;rj- j- 

-L.J._.i J„..L  ;?..!_. 

-.LjJ-_.JJ:1.L 
-L..ii_...LU£i.. 

aJLJlUXl^ 
-.i-L.L|..._i--i:lj... 

!..:...!-!-£..  ..L|.;vn_ 

•ill        1    i  ..< 

H-: ! ;...4::Vi-- 

....L.J-.1-..I..I    i..l. .}-.!.. 

I  i 


-4--. 


1  I 
..I.J 


J-I-L 


r]-i- 


j:5 


t- 


'  i  I 

u4-'i  ri ! , 


L_!_ 


-I--;, 


QTf- 


i    I    i 


T1" 


l-fH- 


-1-1 


>ij... 


iDzaxiiLu 


ftli 


!    I    i  -irr 

f-TT-rr 

l-L..i...J._;- 

i    I    I 


'T  I  T' 


r^ 


!    \^\ 


.:>.....x.. 


...|::j  Mp.j 


'---]- 


-fl. 


.|._L. 


|...;...|-.|....:..J...i..,.::^  !.J 
I    ;    !    i    •  J.   1    1   ^  ii^^ 

!:T:rL].:f:ij.l:;s 

I         i   i   !   i   !   li   i   (  ;   I 


^ 


>t 

ii:;T: 

(•.1 

'?^.= 

u; 

re 

fn 

ovo 

l-H  Cvj 

to 

VC  i-i 

ft. 

i-f 

?-  i-i 

•< 

c/; 

%r. 

''  -■ 

t-( 

iH 

^^. 

tC    L-" 

f'--;  o 

►•2 

?:>  Ch 

C,  ,  ;> 


f-'4 


q  »-^ 

f-l  J:: 
t-<  t-i 


Ground  Rules  for  Discussion  Section 

Comments  on  the  reports  and  papers  published  in  the  four  technical  issues  of  the 
AREA  Bulletin,  by  either  members  or  non-members,  are  invited.  These  comments 
will  be  printed  in  a  special  discussion  section  located  in  the  back  of  the  Bulletin 
and  in  accordance  with  the  procedures  outlined  below.  The  purpose  of  the  section 
is  to  stimulate  greater  interest  in  the  published  reports  and  papers  and  to  offer  to 
those  not  involved  in  their  preparation  the  opportunity  to  present  their  thoughts 
on  the  diflFerent  subjects,  whether  pro  or  con,  based  on  their  knowledge  and 
experience. 

For  the  information  and  guidance  of  all  concerned,  here  are  the  ground  rules 
adopted  by  the  Board  of  Direction  for  handling  and  publishing  comments  on  AREA 
published  papers  and  reports: 

•  Letter  containing  comments  must  be  addressed  to  executive  manager,  be 
received  by  the  deadline  published  with  paper,  contain  identification  number  of 
paper  or  report,  and  be  identified  with  vmter's  signature,  typed  or  printed  name, 
tide,  company  and  full  address,  including  zip  code. 

•  Reader's  comments  will  be  forwarded  to  author  or  appropriate  committee 
for  further  comments  or  rebuttal. 

•  Both  reader's  comments  and  author's  reply  will  be  published  at  the  same 
time  and  in  the  earliest  Bulletin  having  space  available. 

•  All  comments  must  be  in  good  taste,  add  to  discussion  on  the  subject  of 
paper  or  report,  and  be  constructive  in  nature. 

•  Board  Committee  on  Publications  will  be  the  review  or  mediation  group 
should  some  problem  or  something  questionable  arise. 

•  After  deadline,  no  further  comments  on  a  particular  paper  or  report  will 
be  accepted  for  publication,  unless  extenuating  circumstances  exist. 

Identification  number  of  papers  open  to  discussion  will  be  located  near  the 
tide  and  must  be  used  in  comments  to  positively  identify  the  paper  to  which  they 
refer.  Cormnents  on  committee  reports  should  refer  to  the  proper  committee  and 
assignment  numbers. 

Deadline  for  comments  will  be  given  in  a  footnote  on  the  first  page  of  the 
paper  or  committee  report,  the  latter  covering  all  of  the  subcommittee  reports  of 
that  particular  committee.  In  general,  this  deadline  will  be  approximately  90  days 
after  date  of  issue.  However,  this  will  vary  to  some  extent  because  the  intervals 
between  issues  of  the  Bulletin  are  not  constant  throughout  the  Association's  publica- 
tion year,  which  extends  from  September  to  July,  inclusive. 

The  Board  of  Direction  feels  that,  with  the  cooperation  and  interest  of  all 
concerned,  discussions  on  papers  and  reports  published  by  the  Association  shoiJd 
prove  to  be  both  stimulating  and  informative. 


72 


Advance   report  of  Committee    16 — Economics 
of   Railway   Location   and   Operation 


Report  on  Assignment  6 

Study  the  economics  and  operational  characteristics  of  automatic 
car  identification  to  develop  data  for  evaluating 
the  optimum  location  of  scanners 
72-629-2t 

T.  D.  Kern  (chairman,  subcommittee),  R.  W.  McKnight  (vice  chairman,  subcommit- 
tee), R.  S.  Allen,  D.  E.  Brunn,  J.  J.  Eash,  T.  J.  Mattle,  R.  L.  MoMxtrtrie, 
J.  F.  Partridge,  G.  A.  Payne,  R.  J.  iSchiefelbein,  J.  H.  Seamon,  M.  J. 
Shearer,  Jr.,  D.  M.  Tate,  C.  L.  Towle,  L.  E.  Ward. 

FOREWORD 

This  is  the  second  and  final  report  on  this  assignment.  It  is  concerned  with 
methods  of  making  cost/benefits  analyses  or  economic  studies  of  automatic  car  iden- 
tification systems.  Some  specific  studies  of  the  economics  of  ACI  are  presented. 
However,  information  is  not  available  at  this  time  to  determine  costs  after  a  system 
has  been  in  operation  for  a  considerable  period  of  time.  At  some  futvire  time,  when 
more  ACI  systems  are  in  service  and  the  interchange  freight  car  fleet  is  completely 
labeled,  this  assignment  may  be  re-opened  to  determine  the  economic  and  opera- 
tional benefits  of  ACI. 

The  first  report  on  this  assignment  (AREA  Bulletin  622,  September-October 
1969,  page  12)  discussed  seven  major  areas:  (1)  task  force  to  make  ACI  study, 
(2)  need  for  ACI  including  general  advantages  and  benefits,  (3)  knowledge  of  ACI 
including  operation  of  the  equipment,  (4)  handling  ACI  data  covering  destination 
of  information  and  reports  from  these  systems,  (5)  methods  used  to  determine  loca- 
tion of  ACI  scanners,  (6)  cost/benefits  analyses,  and  (7)  methods  to  use  for  imple- 
mentation of  the  ACI  system  or  network. 

ECONOMIC   JUSTIFICATION 

The  economic  justification  for  ACI  systems  lies  primarily  in  four  basic  areas: 
(a)  direct  labor  savings;  (b)  indirect  labor  savings  such  as  elimination  of  open 
car  records;  and  (c)  timely,  accurate  and  complete  collection  of  data  for  use  in 
improving  control  of  equipment;  and  (d)  improving  service. 

Studies  reveal  that  direct  labor  savings  can  be  available  from  the  use  of  ACI 
in  five  major  areas. 

( I )  ACI  can  be  used  at  the  entrance  and  exits  to  yards  to  verify  the  cars 
and  their  position  in  a  train.  For  the  yard  forces,  this  can  pennit  the 
entrance  to  receiving  tracks  and  departures  to  be  made  at  normal  operat- 
ing speeds.  This  information  can  flow  directly  to  the  users  as  verified 
information.  Direct  labor  savings  are  possible  by  elimination  of  inbound 
and  outbound  manual  checking.  The  normal  operations  speeds  will  reduce 


t  Discussion   open   until    December    lo,    1970. 

73 


74 Economic    Justification   for    ACI    Systems 

initial  and  final  terminal  delay  payments  to  road  crews.  With  ACI  veri- 
fying the  cars  as  they  are  pulled  from  classification  yards,  the  speed  can 
be  increased  from  5  to  15  mph.  This  can  reduce  switch  engine  time  for 
each  track  pulled  and  can    result  in  actual  elimination  of  yard  crews. 

(2)  ACI  can  replace  the  wayside  TV  scanning  systems  that  arc  currently 
used  for  visual  verification  of  cars.  Discontinuance  of  TV  systems  and 
clerical  personnel  used  to  observe  and  record  car  movements  may  offset 
the  expense  of  ACI  systems. 

(3)  ACI  can  be  used  to  make  the  complete  record  for  cars  and  locomotives 
moving  over  joint  track  arrangements.  This  may  reduce  the  number  of 
people  that  maintain  such  records  as  the  input  would  be  mechanically 
processed  for  joint  facility  billing. 

(4)  ACI  can  be  used  to  verify  and  print  out  necessary  information  concern- 
ing interchange  of  cars.  This  may  replace  clerical  personnel  on  the  two 
roads  involved  as  the  ACI  input  would  accurately  serve  both  receiving 
and  delivering  carriers. 

(5)  ACI  can  be  used  for  billing  purposes  where  high  volume  of  cars  of  same 
commodity  are  billed.  Car  numliers  and  weight  from  coupled-in-motion 
scales  can  be  passed  directly  to  computer  systems  for  preparation  of 
waybills  completely  void  of  manual  eff^ort.  Clerical  personnel  used  in 
the  weighing  and  billing  processes  may  be  eliminated. 

A  special  task  force  of  the  General  Managers'  Association  of  Chicago  ( 22  mem- 
ber railroads)  recently  proposed  the  installation  of  an  ACI  interchange  and  informa- 
tion network  connected  to  a  central  computer  complex  for  the  processing  of  scanner- 
generated  data. 

Objectives  of  the  system,  as  reported  by  the  GMA  task  force,  are: 

( 1 )  Maintain  a  central  interchange  bureau  where  the  formal  interchange 
records  will  be  produced,  distributed  and  recorded  for  all  railroads. 

(2)  Provide  accurate  and  understandable  information  on  cars  involved  in 
ACI  scanner  movements. 

(3)  Report  on  a  real-time  basis  advance  information  on  cars  moving  between 
railroads  or  past  scanners,  to  the  location  desired  by  the  interested  rail- 
road. 

(4)  Provide  an  information  bank  of  train,  transfer  and  car  moves  throughout 
the  Chicago  terminal. 

The  hardware  to  provide  the  input  for  such  a  system  and  do  the  processing 
would  consist  of  109  ACI  scanners  and  100  decoders  installed  at  40  strategic  points 
along  Chicago  Terminal  District's  7,689  miles  of  lines.  Scanners  will  monitor  about 
90%  of  the  25,000  interchange  cars  per  day  operating  in  more  than  1100  trains.  The 
system  design  recommended  would  be  a  central  computer  site  with  buffered  scanners 
and  critical  central  site  functions  duplexed. 

Estimated  c-ost  for  leasing  scanners  and  data  processing  equipment,  including 
maintenance,  would  be  about  $120,000  monthly.  Member  roads  would  be  assessed 
a  one-time  charge  for  scanner  site  preparation  and  installation  totaling  about 
$560,000. 

Potential  savings  are  estimated  to  be  about  $10,000  per  month  per  railroad. 
Clerical  labor  savings,  notes  the  report,  can  be  expressed  in  terms  of  reduced  inter- 
change processing  costs  and  reduced  yard  office  costs  resulting  from  advance  con- 


Economic   Justification    f  o  r   A  CI    S  y  stems 75 


sists.  The  GMA-ACI  interchange  and  information  network  would  produce  the  official 
interchange  between  railroads  based  on  cars  actually  scanned  at  the  established 
interchange  points. 

Other  savings  may  include  possible  yard  switch  crews'  time  from  waiting  on 
lists  to  be  prepared  before  being  able  to  handle  cars  in  an  arriving  interchange  cut. 
At  scanner  locations  which  represent  the  final  terminal  delay  point,  the  scanner  time 
of  the  trains  passing  would  be  absolute  validated  record  and  can  resolve  disputes  in 
final  terminal  delay  claims  from  road  crews.  Receiving  yards  will  be  aware  of  exact 
location  of  expected  trains.  This  information  enables  these  yards  to  arrange  their 
internal  moves  in  order  to  have  tracks  available  to  receive  these  trains,  and  also 
enables  planning  of  yard  moxes  so  as  to  avoid  blocking  and  delay  to  yard  engines 
from  an  inbound  train. 

Per  diem  expense  can  be  reduced  on  most  roads  as  follows:  The  AOI  system 
can  furnish  a  schedule  report  by  last  scanner  location  on  system-owned  cars  to  each 
railroad.  This  could  promote  greater  usage  of  owned  equipment  vs.  foreign  equip- 
ment by  the  owner  road. 

Advance  consists  can  identify  immediately  to  the  roads  involved  in  the  inter- 
change cars  delivered  in  error  or  without  waybill  information.  Thus,  the  time  cars 
would  be  held  in  a  hold  status  by  the  receiving  carrier  will  be  reduced.  By  the 
reduction  of  cars  in  a  hold  status,  per  diem  savings  can  be  gained  on  cars  delivered 
in  error  or  cars  delivered  without  waybills. 

Additionally,  car  utilization  and  distribution  would  be  improved  because  the 
system  identifies  empty  available  cars  on  incoming  interchange  cuts  before  they 
arrive  on  the  railroad. 

In  general,  the  ACI  interchange  and  information  system  is  designed  to  receive 
advance  information  on  interchange  cars  from  all  the  member  roads,  storing  this 
information  in  a  central  computer  and  matching  it  with  the  data  as  it  is  being 
received  from  the  scanners  which  are  interfaced  with  the  central  computer. 

The  functions  provided  in  the  design  for  output  to  the  railroads  include: 

— ^Generation  of  an  advance  consist. 

— Arrival  messages  for  use  in  roads'  internal  reporting  systems. 

— O/S  reports. 

— Outbound  train  checks. 

— Detection  and  reporting  of  intermediate  set-outs  by  interchange  transfers. 

— Detection  and  reporting  of  other  set-outs   ( bad  orders ) ,  exception  basis. 

— Detection  and  reporting  of  set-outs  by  in  and  outbound  trains  at  outlying 
interchange  points. 

— Detection   and   follow-up   of  car  data   errors  and  missing  data. 

— Detection  of  cars  moving  without  information  (no  bills)  and  information 
on  car  without  car  movement  (bill  without  car) 

— Provision  of  certified  interchange  document  on  a  daily  basis. 

— Provision  to  railroads  of  listing  of  all  of  their  equipment  by  the  last  scanned 
move  in  the  network. 

— Reporting  on  reverse  record  moves  on  all  empties  received  in  interchange 
that  have  been  scanned. 

Additionally,  the  information  file  of  the  ACI  system  will  furnish  data  to  permit: 
— Developing  and  monitoring  of  transfer  move  standards. 


76 E  c  on  omic    Justification    for    ACI    S  y  stems 


— 'Monitorinjf  of  traffic  density  statistics  for  use  in  determining  optinunn  con- 
dition to  operate  transfers  throuj^h  the  Chicago  terminal. 

— Analysis  of  type  and  ownership  of  empty  equipment  moving  through  the 
terminal. 

— Developing  scanner  performance  statistics. 

— Analyzing  of  car  movements  between  railroads. 

In  addition,  the  ta^k  force  report  mentioned  long  range  computer  applications 
of  the  system  that  could  be  useful  with  the  fully  implemented  system.  These  applica- 
tions include  trailer-container  control,  performance  measurement,  simulation  tech- 
niques, shared  time  computing  and  common  data  interchange.  Also  consideration  is 
given  to  working  with  AAR's  TRAIN  program,  even  in  the  initial  phases  of  the 
GMA  information  network.  Ultimately,  TRAIN  could  dial  the  GMA  computer  and 
obtain  all  interchange  information  for  the  Chicago  Terminal  District  eliminating  the 
need  to  contact  each  member  road  separately.  Similarly,  the  GMA  network  could 
handle  member  roads'  requests  to  AAR's  TRAIN  central  computer  in  Washington. 

Part  of  the  work  involved  in  the  GMA  study  included  development  of  work 
sheets  for  each  ACI  scanner  location.  One  such  sheet  is  a  drawing  showing  scanner 
locations,  railroad  tracks,  access  roads  and  decoders  (Figures  1-5  AREA  Bulletin 
622).  A  site  worksheet  similar  to  that  of  Appendix  A  (AREA  Bulletin  622)  was  used 
in  some  cases.  Also  prepared  was  an  ACI  cost  sheet  for  each  location  containing 
scanners  (Appendix  I)  which  provided  for  costing  site  preparation,  ACI  equipment, 
services  and  hardware. 

The  following  material  from  the  Chicago  GMA  study  indicates  one  method  of 
determining  labor  savings  involved  in  preparation,  validation  and  resolving  of  inter- 
change at  yard  officer  and  car  accountants'  offices.  Based  on  sample  data,  an  average 
of  1500  open  interchange  records  would  be  handled  monthly.  Studies  indicated  that 
480  clerical  manhours  per  month  are  spent  in  yard  offices  on  interchange  prepara- 
tion and  handling,  record  tracing  and  researching  of  information  connected  with 
interchange.  Another  720  clerical  manhours  per  month  are  spent  in  the  car 
accountant's  office  on  tracing  and  research  of  interchange  records,  initiating  tracers, 
resolving  open  records  and  working  off  claims.  These  two  functions  total  1200  man- 
hours  per  month  to  handle  and  close  1500  open  records.  Using  a  figure  of  $3.75 
for  average  clerical  cost  per  manhour  including  additives,  the  GMA  study  deter- 
mined that  it  cost  $4500  per  month  to  close  1500  open  records. 

Clerical  labor  savings  were  determined  as  a  result  of  advance  information  and 
the  interchange  consist  being  generated  by  ACI  for  a  move  from  a  departure  or 
receiving  yard.  One  study  revealed  it  required  three  yard  clerks  for  checking  and 
preparing  inbound  or  outbound  lists,  taking  10  minutes  per  clerk  per  train.  Yard 
clerk  duties  included  making  visual  checks  of  trains,  lining  up  waybills  and  prepar- 
ing lists  of  waybills  mechanically  or  manually.  If  a  railroad  delivered  10  trains  or 
transfers  per  day  and  received  10  trains  or  transfers  per  day,  the  ACI  network  would 
provide  a  saving  of  600  minutes  or  10  clerical  hours.  At  $3.75  per  hour,  this  comes 
to  $37.50.  On  a  monthly  basis  of  300  manhours,  the  saving  is  $1125. 

Crew  savings  can  be  calculated  on  yard  delays  if  yardmasters  do  not  receive 
advance  information  concerning  receiving  trains  or  transfer  moves  so  as  to  make 
yard  tracks  available.  If,  for  example,  one  yard  crew  hour  is  worth  $30  and  an 
average  of  10  minutes  delay  is  incurred  by  yard  engines  due  to  yarding  of  inbound 
trains,  this  amounts  to  $5  per  10  minute  delay.  Again,  taking  the  above  case  of  a 


Economic    Justification    for    ACI    Systems 


77 


yard  receiving  10  trains  daily,  the  delay  would  total  100  minutes  and  cost  $50  per 
day  or  $1500  per  month.  Estimates  in  the  OMA  study  indicate  that  this  delay  cost 
could  be  reduced  by  use  of  the  ACI  interchange  and  information  network. 

To  be  sure  there  may  be  various  views  with  regard  to  specific  dollar  savings, 
but  die  methods  used  can  be  applied  generally.  This  report  and  the  preceding  one 
have  attempted  to  set  general  guidelines  and  provide  examples  to  indicate  what 
can  be  done  in  the  area  of  making  economic  and  operational  studies  of  ACI.  Each 
railroad  can  apply  these  general  guidelines  and  make  adjustments  for  its  individual 
and   operating   characteristics. 


APPENDIX    I — ACI    LOCATION    COST   SHEET 

Location  No 

Scanner  No 

Sheet of 

SITE  PREPARATION 


Electricity,  construction  charges    

Communications,  construction  charges 

Trenching  (number  of  feet)    

Scanner  base  installed    

House  foundation  installed     

House,  set  in  place    

Fill  and  cribbing 

Relocate  service  road    

Relocate  tracks    

Signal  track  circuit 

Miscellaneous    


Total  one  time  charge  $ 


ACI  EQUIPMENT 

Basic   decoder    $  Scanner,  extra    ... 

Message   generator    $  Door  &  lock 

Buffer,  500  label $  Interface— 1050  or 

Clock  &  power  supply $  Teletype,   for 

Carrier  index  ( formatted )    ....  $  example 


Total  of  ACI  e(iuipment  charges 


SERVICES  &  HARDWARE 


Test  and  check  single  scanner.  .$ 

Installation  kit $ 

Hou.se,  single $ 


Dual  scanner 

Cable,  per  ft  X  ft=:  . 
House,  double 


Total  of  services  &  hardware 


Total  ACI  costs  =  SP  +  ACI  EQ  +  S&H  costs 


78 E  c  o  nomic    Justification    for    ACI    Systems 


APPENDIX    II — SELECTED    BIBLIOGRAPHY    ON    AUTOMATIC    CAR    IDENTIFICATION 

Note:     MR  =  Modern  Railroads 
RA  =  Railway  Age 
RSC  =  Railway  Signaling  &  Comininiications 
rsc  ^  Railway  System  Controls 

Automatic  car  identification  equipment   specifications:    RA   April   18,   1966,  page  8; 

RSC  May  1966,  page  13. 
Boston  &  Maine:   KarTrak  ACI  on  test— MR  April   1963,  page  78;  RA  March  25, 

1963,  page  40;  RSC  June  1963,  page  22. 
Canadian  Pacific:    MR  October   1969,  page  61. 

Chicago  Transit   Authority:    MR   February   1966,  page  73;   RA  April  4,   1966,  page 

18;  April  13,  1970,  page  64;  RSC  April  1966,  page  22. 
Detroit,  Toledo  &  Ironton:  MR  September  1968,  page  82;  RA  November  13,  1967, 

page  41;  September  16,  1968,  page  28;  RSC  October  1968,  page  15. 
Duluth,   Missabe    &   Iron   Range:    RA   October  26,    1964,   page   31;    RSC   November 

1964,  page  28;  January   1965,  page  20;  November  1965,  page   16. 
General   Managers'  Association  of  Chicago:   rsc  August   1970,  page  26. 

How  to  make  economic  studies  for  ACI:  RSC  December  1969,  page  22;  February 
1970,  page  22;  March  1970,  page  22. 

KarTrak  ACI  system,  AAR  standard:  MR  January  1968,  page  68;  RA  October 
9/16,  1967,  page  8;  October  23,  1967,  page  25;  RSC  November  1967,  page  22; 
April  1968,  page  20;  May  1968,  page  13;  February  1969,  page  11. 

Missouri  Pacific:   RSC  January  1970,  page  32;  February  1970,  page  23. 

Pennsylvania:  MR  March  1968,  page  97;  RA  November  28,  1966,  page  31;  RSC 
November  1966,  page  23;  January  1967,  page  21. 

Progress  reports:  MR  October  1969,  page  56;  RA  October  21,  1968,  page  29; 
September  15/22,  1969,  page  81;  September  14,  1970,  page  58;  RSC  Septem- 
ber 1969,  page  23. 


Railroads  in   Europe — an  American's  views 

72-629-3t 


By   VINCENT   J.    ROGGEVEEN 

Associate   Professor   of   Transportation    Planning 

Stanford    University 


NOTE.  At  the  March  1970  annual  meeting  of  AREA  the  author  showed 
80  slides  or  views  of  European  railways,  accompanied  by  brief  com- 
mentaries. This  paper,  without  illustrations,  provides  a  more  detailed 
coverage  that  includes  the  author's  views  or  opinions  about  many 
of   the   items  discussed. 


PURPOSE 

An  American,  accustomed  to  the  facilities,  operations,  services,  institutional 
settings,  and  other  features  of  railroads  in  North  America,  finds  much  of  interest 
in  the  similarities  to  and  differences  from  railway  practices  in  Europe.  This  paper 
gives  brief  attention  to  a  number  of  such  items.  Through  American  eyes,  it  looks  at 
aspects  of  organization,  plant,  equipment,  freight  and  passenger  services,  and  mar- 
keting. Some  of  the  problems  and  prospects  of  the  railways  are  then  discussed. 

During  a  14-month  period  in  1968-1969  the  author  traveled  extensively  as  a 
passenger  and  patronized  railroads  as  a  shipper  of  industrial  freight,  in  11  countries 
of  Western  Europe.  The  information  herein  comes  from  that  experience. 

RAILWAY   GEOGRAPHY 

Europe,  from  a  railway  point  of  view,  is  divided  into  five  regions.  The  most 
significant  is  the  large  group  of  20  countries  on  the  continent,  in  both  Western  and 
Eastern  Europe,  with  standard  gauge  (4  ft  8)2  inches),  where  standardized  equip- 
ment is  routinely  operated  in  interchange  over  the  lines  of  a  large  number  of  differ- 
ent railway  administrations,  as  in  the  United  States  and  Canada.  This  occurs  regard- 
less of  political  differences,  as  with  the  East  German-West  German  through  freight 
and  passenger  services.  Four  regions  adjacent  to  this  main  one  have  special  char- 
acteristics. In  the  British  Isles,  including  the  United  Kingdom  and  Ireland,  the 
gauge  is  standard  but  the  rolling  stock  is  different;  the  cross  sections  of  passenger 
and  freight  cars  are  smaller  in  area,  and  the  design  of  couplings  is  especially  archaic. 
Spain  and  Portugal  have  wide-gauge  track,  and  almost  all  their  rolling  stock  is  con- 
fined to  that  peninsula.  In  the  USSR  there  is  both  wide-gauge  track  and  a  different 
and  much  more  modern  system  of  couplings.  Finland  is  a  special  case,  with  a  wide 
gauge  inherited  from  its  former  days  as  a  part  of  prc-1917  Russia,  but  with  its  econ- 
omy oriented  more  toward  the  western  world;  the  break-of-gauge  is  at  the  Swedish 
frontier. 

In  addition,  there  are  scattered  narrow-gauge  railway  lines,  most  of  them  in  the 
mountains  of  Switzerland. 


t  Discussion   open    until   December   15,    1969. 

79 


80  RailroadsinEurope 


It  is  characteristic  of  Western  Europe  that  the  population  densities  arc  high, 
with  about  200,0()0,()00  people  in  the  six  E.E.C.  (Common  Market)  countries,  and 
over  300,000,000  v\'cst  of  the  Iron  Curtain.  There  are  many  cities  with  modest  dis- 
tances between  them,  large  rural  populations,  heavy  concentrations  of  industry, 
thriving  agriculture,  and  pervasive  competition  with  rail  by  waterway,  highway, 
and  air.  The  setting  is  similar  to  an  enlarged  Northeast  Corridor,  with  much  more 
industry  and  agriculture  added  to  it. 

In  this  paper,  "European"  or  "Continental"  refers  to  the  main  region  on  the 
continent  with  standard-gauge  tracks;  British  Rail  is  discussed  separately  from  time 
to  time,  and  litUe  attention  is  given  to  the  broad-gauge  and  narrow-gauge  lines. 
(The  narrow-gauge  lines  are  unusually  interesting  to  a  railroad  enthusiast  ])ut  offer 
no  useful   comparisons  with   American  railroads. ) 

RAILWAY   ADMINISTRATION 

Large  privately  owned  railroads,  as  found  in  North  America,  no  longer  exist. 
Most  of  the  railroads  in  Western  Europe  started  as  private  enterprises  and  came 
under  governmental  control  in  more  recent  times  due  to  their  various  financial  diffi- 
culties, for  example  in  France  just  before  and  in  Britain  just  after  World  War  II. 

In  general,  each  country  has  a  single  railway  enterprise,  operating  all  or  most 
of  the  railways  within  that  country.  It  is  owned  either  entirely  by  the  government 
or  as  a  mixed-stock  company  in  which  the  government  has  majority  control.  The 
railway  is  usually  operated  as  a  corporation  or  self-contained  enterprise  rather  than 
as  a  government  department.  When  wholly  owned,  it  is  more  like  the  Panama  Canal 
Company',  or  the  new  United  States  Postal  Service,  rather  than  like  the  previous 
United  States  Post  Office.  When  it  is  partially  owned  then  the  government  role  is 
like  that  of  any  majority  shareholder  acting  through  the  elected  board  of  directors. 
Government  fimds  received  in  addition  to  operating  revenues  are  usually  as  pay- 
ment of  special  types  of  service,  as  reimbursement  for  special  categories  of  costs, 
for  special  functions  performed,  or  as  investments  in  capital  impro\'ements.  A  few 
railroads  have  really  large  and  chronic  deficits  to  be  made  up  by  their  governments. 
The  relationships  of  the  Canadian  government  with  Canadian  National  Railways 
reasonably  resemble  many  of  those  in  Western  Europe,  and  some  states  like  Massa- 
chusetts, Connecticut,  New  York,  New  Jersey,  and  Pennsylvania  are  finding  them- 
selves in  more  and  more  similar  relationships  with  the  rail  lines  they  own,  lease, 
or  contract  with  for  passenger  services.  In  addition,  in  some  countries  (Britain, 
France,  Italy)  the  railways  receive  large  amounts  of  captive  freight  traffic  originated 
by  nationalized  enterprises,  like  coal  mines,  steel  mills,  automobile  factories,  and  the 
like,  one  or  more  categories  of  which  exist  in  each  of  these  countries. 

In  some  countries  there  are  a  few  privately  owned  railroads,  usually  short 
branches  or  industrial  switching  facilities,  and  there  are  also  lines  owned  by  lower 
levels  of  government  (states,  provinces,  cantons,  cities).  Switzerland  has  the  most 
such  non-Federal  facilities,  for  example  the  standard-gauge  main-line  Lotschberg 
Tunnel  route,  various  branch  lines,  and  the  many  narrow-gauge  and  cog  railway 
enterprises. 

PLANT 

Railroad  lines  are  often  easy  to  observe,  on  the  continent  and  in  Britain,  as 
equipment  is  frequently  designed  so  that  passengers  can  ride  at  the  front  of  the  train. 


Railroads    in    E  u  r  o  p  e  81 


either  standing  and  looking  through  the  car  door,  or  seated  in  a  glassed-in  observa- 
tion area  or  just  behind  a  glass  partition  separating  the  passengers  from  the 
engineer. 

Track 

Standard  track  has  opposed  joints,  giving  a  different  ride  than  with  North 
American  staggered  joints.  Continuous  welded  rail  is  extensively  used  in  a  number 
of  countries;  some  of  it  was  seen  in  most  of  them.  New  bolted  rail  was  also  being 
laid  on  some  main  lines;  standard  rail  lengths,  incidentally,  are  much  longer  than 
in  North  America.  Ties  are  most  typically  wood,  but  there  are  extensive  installations 
of  a  large  variety  of  concrete,  composite  concrete  and  steel,  and  all-steel  ties,  with 
many  more  going  into  place.  Most  track  is  well  ballasted.  Maintenance  looked  excel- 
lent in  all  countries,  with  sound  ties,  clean  ballast,  proper  line  and  surface,  few 
weeds,  and  attention  to  drainage.  Maintenance  of  way  is  well  mechanized,  using  a 
wide  \ariety  of  machines,  but  one  also  sees  much  more  hand  labor  than  in  North 
America,  partly  for  track  work  and  especially  for  the  maintenance  of  adjacent  slopes, 
including  brush-cutting,  a  labor-intensive  activity  of  questionable  value.  One  might 
generalize  to  say  that  trains  are  operated  with  less  labor  than  in  the  United  States, 
but  tracks  are  maintained  with  more.  It  is  important  to  note  that  labor  in  Western 
Europe  is  no  longer  cheap  and  plentiful.  Most  countries  ha\e  full-employment  econ- 
omies with  rapidly  rising  wages;  much  other  employment  is  more  attractive  than 
railway  work,  and  there  is  active  and  often  aggressive  competition  for  capable  man- 
power. All  railroads  are  operating  at  substantial  deficits,  so  that  cost  control  is  of 
ever-increasing  importance.  Thus,  use  of  excess  labor  has  an  importance  it  did  not 
have  even  in  the  recent  past. 

Lines 

Particularly  noticeable  to  a  North  American  are  the  extensive  miles  of  multiple 
track.  Even  with  the  more  frequent  train  services  resulting  from  shorter  freight  trains 
and  many  more  passenger  trains,  many  double-track  lines,  particularly  on  other  than 
main  lines,  seem  unnecessary;  single  tracks  with  passing  sidings  and  CTC  installa- 
tions might  suffice.  Routing  more  trains  over  fewer  routes  (which  might  require 
correlary  substantial  yard  changes)  and  downgrading  many  non-main  lines  might 
be  possible.  In  most  countries  branch  lines  are  gradually  being  abandoned  (often 
uith  pohtical  difficulties  as  in  the  United  States),  and  Britain  and  France  arc  cur- 
rently particularly  aggressive  in  their  retrenchment  programs.  In  Britain  there  are 
many  lines  with  three  and  even  four  tracks;  while  these  may  be  needed  on  main 
intercity  routes,  they  seem  overabundant  on  others.  There  are  only  short  stretches 
of  three-  and  four-track  lines  on  the  continent.  Interesting  examples  of  intensively 
used  single  tracks  are  the  line  along  the  Italian  Riviera  between  Genoa  and  the 
French  frontier  near  Nice,  and  the  main  and  only  line  through  western  Austria. 
There  is  very  clearly  much  less  use  made  of  single  track  with  passing  sidings  and 
CTC  than  is  common  in  North  America,  and  this  is  probably  less  understandable 
to  the  author  than  anything  else  he  observed. 

Structures 

There  are  many  new  bridges  of  interesting  contemporary  structural  design. 
Some  replace  destruction  of  World  W'nr  II,  while  others  are  recently  built  or  still 
under  construction  for  grade  separations,  particularly  with  new  limited-access  high- 


82 Railroads    in    Europe 

ways  (the  E-Routes,  throughout  Europe,  correspond  to  the  Interstate  Highways  in 
the  United  States,  and  a  massive  construction  effort  on  them  is  under  way).  There 
is  frequent  need  for  and  use  of  tunnels  to  achieve  reasonable  grades  and  alignments 
in  mountain  territory.  The  new  high-speed  hne  under  construction  in  Italy  between 
Florence  and  Rome,  162  miles  long  compared  to  the  present  196-mile  route,  will  be 
a  showcase  of  long  and  numerous  bridges  and  tunnels,  as  the  Appenines  are  very 
rugged. 

Signals 

Color  light  signals  of  various  designs  are  standard  on  most  main  lines  and  many 
secondary  ones,  and  one  has  to  hunt  for  the  older  semaphores  ( they  are  now  most 
easily  found  in  Britain)  and  mechanically  operated  signals  that  were  so  common 
a  generation  ago.  CTC  seems  infrequent.  There  are  many  between-rail  electronic 
installations  at  signals,  to  operate  automatic  train-stop  and  dead-man  control  equip- 
ment. 

CommunicaMons 

This  category  of  facilities,  like  signals,  is  not  easy  for  the  observer,  no  matter 
how  interested,  to  learn  much  about.  Direct  long-distance  dialing  of  telephones  for 
both  domestic  and  international  calls,  from  both  homes  and  offices,  is  now  standard 
in  most  of  Western  Europe,  and  telex  service  is  far  more  widely  used  in  business 
there  than  in  America.  As  telecommunications,  like  railroads,  are  governmental 
enterprises,  it  seems  reasonable  to  believe  that  railroads  are  at  least  as  well  provided 
with  such  facilities   as  everyone  else. 

Electric    Traction    Fixed    Facilities 

This  category  of  plant  is  far  more  interesting  in  its  extent,  complexity,  and 
variety  than  in  North  America.  Extensive  electrified  lines  reach  from  the  toe  of  Italy 
to  northern  Germany,  and  from  the  seacoast  to  the  Iron  Curtain,  including  most 
main-line  railroads  in  Western  Europe,  and  almost  all  lines  in  Switzerland.  There 
are  also  electrifications  in  Norway  and  much  of  Sweden,  to  a  much  lesser  extent  in 
Spain,  Portugal,  and  the  United  Kingdom,  and  also  some  of  the  Eastern  European 
countries  (including  the  USSR,  which  has  electrified  the  Trans-Siberian  as  far  east 
as  Irkutsk).  On  standard  gauge  in  the  West,  only  Denmark  has  little  and  Ireland 
has  none. 

Almost  all  electrifications  are  with  overhead  catenaries;  third  rail  is  used  on  the 
Southern  Region  of  British  Rail,  a  few  short  lines  in  France  and  Germany,  and  in 
most  subway  or  metro  systems.  Electrifications  are  1500  volt  D.C.  ( Netlierlands 
and  central  and  southern  France),  3000  volt  D.C.  (Belgium  and  Italy),  15,000  volt, 
16%  hertz  A.C.  (Switzerland  and  West  Germany),  and  25,000  volt,  50  hertz  A.C. 
(France  and  new  hues  in  the  United  Kingdom).  The  16%  hertz  A.C.  system  is  an 
older  one  long  used  in  Switzerland  and  installed  on  a  large  scale  since  World  War  II 
in  West  Germany;  it  compares  to  the  25  hertz  electrifications  on  the  Penn  Central. 
The  standard  industrial  frequency  in  Europe  is  50  hertz  (as  60  hertz  is  in  North 
America),  and  use  of  this  frequency  for  railways  was  perfected  in  France  in  the 
mid  1950's;  it  has  subsequently  been  adopted  in  many  countries  throughout  the 
world.  The  French  are  so  satisfied  with  it  that  it  is  used  on  new  electrifications  and 
even  extensions  of  older  ones,  even  though  they  already  had  long  distances  equipped 
with   1500  volt  D.C;   as   a   result  domestic  services  often  operate  over  routes  with 


Railroads    in    Europe 83 

two  kinds  of  current.  For  exaniplc,  on  the  Paris  to  Marseilles  main  line,  D.C.  was 
installed  north  of  Lyon  in  the  early  1950's;  A.C.  was  installed  south  of  there  several 
years  later.  British  Rail  remodeled  to  A.C.  a  line  completed  only  a  few  years  before 
with  overhead  D.C.  The  virtues  of  25,000  volt,  50  hertz  A.C.  electrification  are  that 
substations  can  be  placed  much  longer  distances  apart  compared  to  a  lower  voltage 
system,  the  use  of  A.C.  eliminates  all  problems  of  conversion  to  D.C,  and  industrial 
frequency  means  that  direct  connections  can  be  made  between  substations  and  the 
national  high-voltage  grid,  without  the  requirement  for  parallel  transmission  facil- 
ities for  a  special  kind  of  alternating  current.  In  addition,  the  catenary  is  lighter,  as 
the  amperage  is  lower. 

It  is  an  interesting  feature  of  these  electrifications  that  the  supporting  poles, 
brackets,  guy  wires,  clips,  and  so  forth,  and  the  configurations  of  catenaries  and 
their  related  wires  are  substantially  different  in  every  country.  For  example,  for 
supports  the  Italians  use  steel  pipes,  H-beams  are  used  in  Belgium,  steel  latticework 
in  Germany,  and  wood  poles  on  some  lines  in  Switzerland.  Cables  between  these 
uprights  hold  up  the  catenaries  in  Germany,  difterent  designs  of  brackets  are  used 
in  Belgium  and  Switzerland,  and  steel  lattice  cross  members  in  Britain.  The  author 
is  confident  that  he  can  identify  the  locations  of  most  electrifications  from  photo- 
graphs, each  standard  design  is  so  different. 

Catenary  is  suspended  at  very  uniform  height;  observing  the  pantographs  for 
long  periods  while  riding  on  high-speed  trains  the  author  saw  almost  no  up-and- 
doun  movement,  and  little  arcing. 

Yards 

European  railroads  all  have  a  very  large  number  of  yards.  These  are  the  result 
of  the  operating  practices  of  the  past,  the  large  numbers  of  cities,  major  factories, 
many  railroad  junctions,  and  numerous  frontier  interchange  points.  Most  railroad 
administrations  are  now  making  major  eff^orts  to  build  new  yards,  and  to  eUminate, 
consolidate,  and  upgrade  old  ones.  Modern  yards  appear  to  have  most  of  the  fea- 
ture's of  similar  installations  in  North  America,  though  they  seem  to  be  smaller, 
presumably  because  of  the  reduced  lengths  of  European  freight  cars  and  die  more 
frequent  dispatch  of  shorter  trains. 

Passenger   Stations 

These  vary  from  nineteenth-century  museum  pieces,  often  repeatedly  remodeled, 
to  highly  attractive  and  functional  new  facilities,  such  as  Euston  in  London,  New 
Street  in  Birmingham,  Montparnasse  in  Paris,  Central  Station  in  Brussels,  the  station 
still  under  construction  in  Berne,  and  many  others.  Most  large-city  stations  are  as 
busy  with  trains  and  people  for  many  hours  per  day  as  only  a  \ery  few  American 
and  Canadian  stations  ever  are.  Extensive  walking  is  usually  required  (the  curse 
of  most  railroad  and  airline  terminals),  and  stair  climbing  from  corridors  to  plat- 
forms is  often  called  for,  even  in  important  stations;  Belgium  seems  to  win  first 
prize  for  the  frequent  use  of  moving  stairways.  Direct  connections  to  subway 
(metro)  stations  are  providt^l  in  most  cities  that  have  such  services.  Air-rights  devel- 
opment over  stations  is  .starting  ( Brussels  Junction  Line,  Care  Montparnasse  in 
Paris,  for  example). 

Freight   Stations    and    Freight   Handling 

The  railroads  of  Europe;  are  major  carriers  of  LCL  frcigiil,  intiuding  much  of 
what   moves    in   the   United  States   as   parcel  post.   Freight  forwarders   are  also  sig- 


84 Railroads    in    Europe 

nificant  in  some  countries  (like  Danzas  in  France)  and  motor  carrier  subsidiaries 
of  railroads  handle  much  LCL  freij^ht  in  others  (like  Van  Gent  &  Loos,  in  the 
Netherlands ) . 

What  is  true  in  North  America  is  about  the  same  in  Europe — freight  handling 
facilities  range  from  ultra-ancient  to  ultra-modern  (the  author  has  seen  all  kinds). 
Buildings  are  of  all  kinds  and  qualities,  fork  lifts  are  in  common  use,  and  there  are 
various  kinds  of  conveyor  systems  in  some  larger  terminals.  For  heavy  freight,  over- 
head cranes  are  more  popular  than  in  North  America.  Large  rublier-tired  mobile 
lifting   devices  for  containers   are   coming  into  service. 

Any  freight  handling  operation  on  the  continent  of  Western  Europe  is  differ- 
ent in  one  respect  from  the  United  States,  Canada,  or  even  Britain — there  is  far 
greater  use  of  palletization.  There  is  a  European  pallet  pool,  with  millions  of  stand- 
ard, high  quality,  reusable  pallets.  Their  dimensions  are  800  mm  by  1200  mm, 
equal  to  31/2  inches  by  47/4  inches.  Collapsible  wire  baskets  of  pallet  size  are  also 
in  this  pool.  The  pool  is  operated  jointly  by  about  ten  railroads;  the  owning  railroad's 
initials  are  branded  into  the  ends  of  each  pallet.  Industries  can  stack  (and  strap) 
merchandise  on  them  upon  initial  manufacture,  use  them  for  shipping  and  receiving 
goods,  and  keep  them  for  storage  as  well — pallets  from  a  half-dozen  railroads, 
stacked  with  merchandise,  may  be  in  a  warehouse  for  years;  goods  move  through 
complex  manufacturing  and  distribution  systems  always  on  a  single  pallet. 

Pallet  dimensions  are  such  that  they  fit  together  nicely  in  standard  European 
box  cars;  alas  they  do  not  quite  fit  in  ISO  containers — the  United  States  measure- 
ment of  a  maximum  8-ft  outside  width  prevailed  in  the  setting  of  the  international 
standards,  and  the  English  and  metrfc  dimensions  are  not  modularly  coordinated. 

This  system  is  financed  by  an  initial  payment  from  a  business  firm  when  it  signs 
a  contract  with  the  railroad  serving  it  to  join  the  pallet  pool,  the  charge  being 
equivalent  to  the  purchase  price  of  an  initial  supply  of  pallets.  Every  time  a  loaded 
pallet  is  offered  to  the  railroad  for  shipment  an  empty  one  is  given  in  return;  the 
opposite  is  true  for  deliveries.  A  small  service  charge  is  levied  each  time  a  pallet 
circulates  through  the  system,  to  allow  for  repairs  and  replacements.  With  this 
arrangement  the  return  shipment  of  empty  pallets,  or  the  alternative  of  scrapping 
pallets  after  a  single  use,  are  both  eliminated. 

STANDARDIZATION,   AND   THROUGH    OPERATION    OF   CARS 

Railways  interchange  freight  and  passenger  rolling  stock  on  a  continent-wide 
basis,  and  some  locomotives  and  special  train-sets  make  through  runs  on  the  tracks 
of  two  or  more  administrations.  These  practices  go  back  many  years,  controlled 
by  the  three  Bern  conventions  signed  in  1886,  1890,  and  1923,  and  the  continuing 
arrangements  that  have  developed  from  them,  supervised  by  the  UIC  (International 
Railway  Union )   and   its  sister  organizations. 

These  provide  rules  for  passenger  and  freight  services,  for  through  operations, 
interchange  of  cars,  routing  of  empty  cars,  scheduling  arrangements,  physical 
standardization  including  dimensions,  construction  features,  brakes,  and  couplings, 
standardization  of  car  numbering  and  marking  (including  the  use  of  check  digits 
as  part  of  the  car  numbers),  timetable  arrangements  for  international  trains,  and  a 
multitude  of  other  details. 

Other  organizations  and  agreements  serve  to  standardize  services  on  the  inter- 
connected railways  of  Europe  and  Asia  that  are  in  the  socialist  countries,  with  most 
Eastern  European  countries  a  party  to  both  arrangements. 


Railroads    in    Europe 85 

Specially  equipped  cars  can  operate  in  interchange  between  regions  with  dif- 
ferent standards.  Some  go  back  and  forth  between  Britain  and  the  continent,  via 
the  rail  ferries  across  the  English  channel;  these  meet  British  clearance  restrictions, 
and  need  two  kinds  of  couplings.  Some  freight  and  conventional  passenger  cars  are 
equipped  with  changeable  axles  or  adjustable  wheels  for  operation  over  the  broad- 
gauge  railways  of  Spain  and  Portugal  as  well  as  the  standard-gauge  tracks  of  most 
of  the  rest  of  Europe  (TRANSFESA  box  cars  and  INTERFRIGO  refrigerator  cars), 
and  a  Spanish  Talgo  train  operates  high-speed  passenger  service  from  Barcelona, 
Spain,  through  France  to  Geneva,  Switzerland  using  adjustable  wheels.  There  are 
passenger  cars  from  the  Soviet  Union,  with  adjustable  axles,  that  are  included  in 
consists  of  through  passenger  trains  operating  as  far  west  as  the  Netherlands, 
Belgium,  and  France. 

FREIGHT   SERVICES 

Freight  rolling  stock  for  international  operation  is  standardized,  as  already 
noted,  and  few  cars  have  to  be  confined  to  any  single  country  within  the  main 
20-country  region,   though  many  special  purpose  cars  are. 

Major  car  building  programs  are  lessening  the  average  age  of  the  total  fleet, 
with  a  majority  of  the  standard-gauge  cars  in  Western  Europe  now  of  post-war 
construction. 

Most  rolling  stock  is  owned  by  the  railway  companies.  A  large  number  of 
general-purpose  freight  cars  are  contributed  to  the  EUROP  pool,  in  which  each 
railroad  can  operate  EUROP  cars  as  if  they  were  its  own,  i.e.,  without  regard  to 
the  normal  interchange  rules  for  routing  and  return  of  empties.  A  per  diem  settle- 
ment is  made  for  the  net  differences,  as  determined  from  records  kept  at  inter- 
change  points.    Much   empty   mileage   is   thus   avoided. 

Significant  quantities  of  freight  rolling  stock  are  privately  owned,  by  all  sorts 
of  shippers,  for  the  transport  of  their  own  freight.  Such  varied  enterprises  as  coal 
mines,  steel  mills,  oil  companies,  grain  and  flour  milling  companies,  breweries,  and 
manufacturers  of  all  sorts  of  commodities  own  freight  cars  operated  in  domestic 
and  international  traffic.  These  cars  often  include  much  modern,  automated,  and 
often  high-cost  equipment  for  use  in  specialized   traffic. 

There  are  also  fleets  of  special-piupose  rolling  stock,  such  as  refrigerator  cars 
and  automobile  rack  cars  ( articulated  with  three  axles )  that  are  owned  by  car 
companies  that  are  in  turn  jointly  owned  by  the  railroad  companies,  rather  like 
Pacific  Fruit  Express  or  Trailer  Train. 

An  important  new  kind  of  car  is  the  container  car,  with  a  framework  eciuipped 
with  lugs  spaced  to  lock  into  the  corner  castings  of  20,  30,  35  (some  cars),  and 
40-ft  containers.  As  used  on  the  continent  the  cars  have  standard  couplings  at 
both  ends.  British  Rail  has  a  large  fleet  of  five-car  permanently  coupled  car  .sets 
for  its  freightliner  container  services. 

Under  the  new  freightliner  concept  in  Britain,  the  liner  trains  transport  ISO 
containers;  these  have  designs  and  dimensions  standardized  by  the  International 
Standards  Organization.  The  containers  are  brought  from  the  .shippers  to  the  trans- 
fer terminals  by  trucks,  and  are  then  transferred  to  railroad  container  cars  operating 
in  non-stop  shuttle  service  between  pairs  of  cities,  avoiding  all  yards,  on  routine 
overnight  schedules.  They  are  then  trucked  from  rail  terminals  to  destinations  the 
following  day.  This  is  envisioned  as  the  means  of  leap-frogging  the  merchandise 
freight  service  of  British  Rail  over  its  equipment  and  operational  obsolescence,  while 


86 Railroads    in    Europe 


tailored  to  the  facts  of  geographical  size  and  truck  competition,  and  assisted  by 
certain  coercive  features  against  long-haul  trucking  included  in  the  1968  Trans- 
port Act. 

Most  freight  cars  have  two  axles.  The  most  compelling  features  in  design  of 
both  continental  and  British  rolling  stock  are  the  much  more  restrictive  clearance 
diagrams  than  in  North  America;  this  is  noticeable  in  the  width,  and  to  some 
extent  maximum  length  (dictated  by  the  clearances  on  curves),  and  in  particular 
in  the  height.  The  height  is  thoroughly  restricted  by  the  thousands  and  thousands 
of  miles  of  electric  catenary  suspended  much  lower  over  the  tracks  than  in  North 
America.  This  limitation  is  particularly  obvious  for  auto-rack  cars,  on  which  auto- 
mobiles can  only  be  placed  in  two  tiers,  and  then  only  by  depressing  the  lower 
level  of  the  car  between  the  wheels.  It  is  also  obvious  in  the  difficulty  with  piggy- 
back, as  it  is  impossible  to  load  a  trailer  equipped  with  wheels  on  top  of  a  Hatcar 
or  piggyback  car  of  similar  height,  as  is  done  in  the  United  States  and  Canada.  A 
special  car  (called  a  kangaroo  car  in  France)  is  needed  on  which  the  trailer  wheels 
fit  in  pockets  and  come  down  close  to  the  rail  height,  making  for  awkward  loading 
and  unloading.  Thus  the  loading  of  containers  is  much  more  attractive  than  the 
loading   of  trailers,  a  significant  diff^erence  from   North  American  practice. 

Freight  trains  are  much  shorter  than  in  North  America.  It  is  very  usual  to  see 
40,  30,  or  even  20-car  trains  on  main  lines,  and  trains  over  50  cars  are  much  less 
common.  There  is  conspicuously  greater  frequency  of  service;  many  lines  have 
trains  every  few  minutes.  There  are  no  cabooses.  The  author  suspects  that  this  ma- 
jor difference  in  operating  practice  is  related  to  the  different  labor  conditions.  A 
single  man  in  an  electric  locomotive  is  the  entire  crew  of  many  a  train;  on  passenger 
trains  he  will  be  supplemented  by  a  single  ticket  collector. 

Most  freight  trains  operate  at  moderate  speeds,  but  there  are  relatively  high- 
.speed  freight  services  (TEEM — Trans  Europe  Express  Merchandise)  operating  over 
a  network  of  domestic  and  international  main  lines  with  published  timetables;  these 
are  an  attempt  to  compete  more  effectively  with  motor  carriers  for  desirable  long- 
haul  merchandise  traffic. 

PASSENGER   SERVICES 

Passenger  services  are  operated  throughout  the  length  and  breadth  of  Europe, 
with  a  volume  and  variety  of  patronage  unknown  in  North  America.  The  volumes 
of  commuters  brought  into  large  cities  by  rail  are  astounding  to  an  American,  and 
the  efficiency  of  operation  of  these  services  is  remarkable.  In  the  Gare  St.  Lazare 
in  Paris,  the  Junction  Railway  under  Brussels,  and  many  other  places  during  peak 
commuter  hours,  standard  railway  trains  are  operated  much  like  rapid  transit  systems 
in  terms  of  headways  and  stopping  times  at  platforms.  In  addition  the  train  is  still 
the  major  carrier  for  longer  distance,  vacation,  and  low-price  travel,  and  the  rail- 
ways actively  compete  with  the  airlines  for  the  business  traveler.  In  all  its  markets, 
however,  the  rail  passenger  services  are  suffering  from  constantly  intensifying  auto- 
mobile, bus,  and  airplane  competition.  The  railway  companies  are  reacting  by  such 
varied  tactics  as  phasing  out  branch  line  .services;  increasing  speeds  to  provide  more 
attractive  schedules,  using  better  equipment  on  main  lines,  especially  those  connect- 
ing major  cities;  reducing  off-peak  main-line  services,  automating,  offering  fares 
that  are  especially  attractive  for  family,  group,  and  vacation  travel;  transporting 
not  only  the  passengers  and  their  baggage,  but  their  automobiles  as  well;  moderniz- 
ing or  constructing  new  railroad  stations;  building  new  suburban  stations  with  large 


Railroads    in    Europe 87 

adjacent  parking  lots;  and  even  starting  construction  of  super-railroads  like  the  one 
between  Florence  and  Rome.  In  addition,  they  also  seek  governmental  subsidies  for 
continuation  of  operations  that  are  otherwise  unremunerative. 

For  passenger  services  there  are  locomotive-drawn  trains  and  nniltiple-unit 
trains,  usually  with  electric  traction.  In  the  Netherlands  and  Belgium,  for  example, 
almost  all  services  o\er  electrified  lines  (most  major  lines  are  electrified)  other  than 
trains  on  international  runs  are  with  electric  multiple  units.  In  most  countries 
passenger  cars  for  domestic  services  are  significantly  different  from  those  for  inter- 
national trains.  Some  countries  have  rolling  stock  with  better  quality  appointments 
than  do  others,  and  with  better  maintenance,  and  experienced  travelers  look  for 
these  when  boarding  a  train  that  includes  cars  in  international  service.  Specialized 
diesel  and  even  gasoline-powered  units  are  in  use  on  light  traffic  branch  lines,  the 
Michelin  cars  in  France  are  one  example;  many  fascinating  sizes,  shapes,  and  per- 
formance characteristics  are  in  use. 

Most  countries  have  specialized  passenger  rolling  stock  confined  to  use  within 
that  country,  to  a  metropolitan  area,  or  even  a  single  line;  frequently  this  is 
multiple-unit  equipment  with  electric  traction.  On  some  Paris  suburban  lines  cars 
have  lower  than  standard  floor  heights,  for  easy  boarding.  Typically  these  fleets 
have  special  systems  of  automatic  couplings  (for  example  in  France,  Belgium,  and 
the  Netherlands).  This  feature  is  especially  desirable  as  the  standard  European 
coupling  is  universally  agreed  to  be  obsolete,  requiring  hand  labor  under  undesirable 
working  conditions  to  connect  and  disconnect  ( the  not-yet-solved  problem  is  how 
to  justify  die  expenditure  for  and  physically  carry  out  the  replacement  of  the 
couplings  on  a  continent-wide  Heet  of  rolling  stock).  As  an  example,  the  special 
coupling  in  use  for  over  30  years  on  multiple-unit  electric  trains  in  the  Netherlands 
also  automatically  couples  brake  lines  and  electrical  connections,  in  a  fashion  similar 
to  the  new  couplings  of  the  Penn  Central's  'Metroliners.  Occasionally  such  non- 
standard equipment  operates  on  specific  international  runs.  Examples  include  the 
hourly  service  operating  between  Amsterdam,  the  Netherlands  and  Brussels,  Belgium, 
and  most  of  the  Trans-Europe  Express  train-sets,  that  are  incompatible  with  any 
others,  and  often  with  each  other. 

The  pride  of  Western  European  passenger  services  are  the  TEE  (Trans  Europe 
Express)  trains.  These  are  first-class-plus-extra-fare,  high-speed  luxury  services  con- 
necting most  principal  cities.  They  operate  within  one  country  and  through  two 
to  as  many  as  five  countries,  with  great  emphasis  upon  eliminating  crew  changes, 
on-time  performance,  short  station  stops,  frontier  formalities  in  the  moving  train, 
and  with  ultra-comfortalile  passenger  amenities,  including  choice  of  compartments 
or  open  coaches  and  with  club  and  bar  cars  and  diners.  They  feature  air  condition- 
ing, advanced  seating  and  lighting,  attractive  interiors,  and  large  panoramic  win- 
dows (Why  are  Metroliner  windows  so  small?).  The  author  regularly  used  a  four 
times  daily  TEE  service  between  Brussels  and  Paris,  195  miles  in  145  minutes,  includ- 
ing two  intermediate  stops,  making  one-day  business  trips  between  the  two  cities 
an  easy  matter;  he  and  one  of  his  sons  even  had  haircuts  in  the  train  barber  shop 
on  the  Mistral,  a  French  TEE  train.  An  even  more  super-luxury  train  is  the  Sette- 
bello,  operated  between  Milan,  Florence,  and  Rome,  in  Italy;  it  features  luxury 
seating  and  space  unlike  diat  on  any  other  train  anywhere,  and  a  head-end  observa- 
tion area  that  is  a  track-watcher's  delight. 

The  TEE  and  similar  services  are  designed  to  compete  with  airlines  for  center- 
city   to  center-city  travelers,  just  as  the  Penn  Central  Metroliner  ser\ice  does.  This 


Railroads    in    Europe 


objective  is  easier  in  Europe  as  the  cities  are  not  too  far  apart.  There  is  frequent 
disruption  of  winter  air  services  by  ground  foR,  and  the  cumbersome  airport  pro- 
cedures in  Europe  relative  to  customs  and  passport  formalities  and  baggage  retrieval, 
which  are  very  time-consuming. 

Sleeping  car  services  are  still  well  patronized  between  some  city  pairs,  with 
evening  departures  and  morning  arrivals,  for  example  between  Paris  and  Hamburg 
or  Milan,  or  between  the  Netherlands  or  Belgium  and  Switzerland.  New  sleeping 
cars  are  still   being  built. 

A  very  popular  new  development  is  the  couchette  car,  in  which  the  compart- 
ments provide  seats  for  six  people  during  the  day,  and  these  seats  and  their  backs 
fold  down  at  night  to  provide  bunks  for  six,  with  a  sheet,  blanket,  and  pillow  pro- 
vided by  the  railway.  With  the  many  family-fare  plans,  use  of  rail  by  a  family 
going  a  long  distance  on  vacation  is  substantially  cheaper  than  flying,  and  the 
couchette  is  priced   only  slightly  above  the  regular   train  fare. 

A  new  service  is  attracting  especially  rapidly  growing  patronage — the  auto- 
sleeper  train.  The  family  car  is  driven  to  a  loading  platform  in  mid-afternoon  or 
early  evening  and  placed  on  an  auto-rack  car;  the  family  then  travels  in  a  sleep- 
ing or  couchette  car  while  the  train  speeds  across  Europe,  non-stop  except 
for  crew  changes.  For  example,  departure  from  northern  points  in  Germany,  the 
Netherlands,  Belgium,  or  northern  France,  including  the  channel  ports,  will  result 
in  morning  arrivals  of  passengers  and  their  cars  in  Switzerland,  Italy,  the  French 
Mediterranean  coast,  Yugoslavia,  and  the  Spanish  frontier.  The  German  and  French 
railways  operate  similar  domestic  services.  Anyone  who  has  experienced  European 
summertime  highway  congestion;  wintertime  snow,  ice,  and  ground  fog;  and  year- 
round  undisciplined  driving  will  immediately  appreciate  the  attractiveness  of  these 
services. 

LOCOMOTIVES 

Europe  is  a  delight  to  anyone  with  an  interest  in  railway  locomotives.  A  large 
number  of  manufacturers  in  many  countries  have  created  a  wide  variety  of  models 
over  many  decades. 

While  many  countries  no  longer  use  steam  engines  (such  as  Netherlands,  Bel- 
gium, Switzerland,  Austria),  they  still  operate  in  several  others,  downgraded  to  less 
important  services  as  the  conversion  to  electric  and  diesel  motive  power  progresses. 
In  France  and  Germany  former  main-line  steam  locomotives  are  operating  on  branch 
line  freight  and  passenger  services.  The  Gare  du  Nord  in  Paris  on  a  frosty  morning 
is  a  delightful  scene,  with  the  sights  and  sounds  of  steam  pulling  numerous  com- 
muter trains  on  some  of  the  not  yet  electrified  suburban  lines.  In  Italy  some  fascinat- 
ing antique  branch-line   steam  locomotives  are  still  in  use. 

At  the  other  extreme,  Switzerland's  locomotives  are  essentially  all  electric,  with 
small  diesel  switching  units  in  some  yards  and  terminals.  In  many  countries  electric 
traction  is  now  the  dominant  form  of  motive  power,  in  use  on  most  main  lines,  with 
a  wide  variety  of  locomotives,  of  all  sizes,  tractive  efforts,  speed  capabilities,  styling, 
and  vintage.  New  high-speed,  high-capacity  electric  locomotives  will  pull  fast  pas- 
senger trains  over  the  same  lines  as  ancient  electrics  pidling  short  freights.  ( When 
does  a  well-designed  and  maintained  electric  locomotive  reach  the  end  of  its 
useful  life?) 


Railroads    in    Europe  89 


Diesel-electric  locomotives  are  also  common,  again  of  many  kinds,  sizes,  and 
power,  and  from  many  builders.  The  U.S.  design  influence  can  sometimes  be  recog- 
nized in  models  built  under  license  from  General  Motors  (Denmark  is  an  example). 

There  are  diesel-hydraulics,  too,  particularly  in  Germany,  bringing  memories 
of  the  imported  Kraus-Maftei  diesel-hydraulics  operated  liy  the  Soutliern  Pacific 
and  the   Denver  &  Rio  Grande  Western  in  the  early  1960's. 

In  the  past  most  locomotives  did  not  operate  lieyond  their  own  country,  and 
at  or  near  frontiers  there  were  yards  and  engine  service  facilities  for  changing  power 
on  trains.  Today  there  is  more  through  operation  on  specific  runs,  particularly  for 
the  TEEM  freight  trains  and  for  the  TEE  and  other  high-speed  passenger  trains. 
For  electric  operation  this  has  necessitated  design  of  locomotives  able  to  operate 
on  two,  three,  and  sometimes  four  kinds  of  electricity  (discussed  earlier  in  this 
paper).  On  newer  models  the  engineer  can  automatically  switch  from  one  kind  of 
electricity  to  another,  as  the  type  of  electrification  of  the  overhead  catenary  changes, 
by  pushing  a  button  on  his   control  panel. 

RAIL   FREIGHT   RATES 

Freight  rates  in  each  country  follow  a  generally  similar  pattern.  They  are  vastly 
simpler  than  in  North  America.  The  tarifl^s  for  a  single  country,  even  as  important 
a  one  as  France,  fill  only  a  relatively  few  books.  The  French  tariffs  are  about  a 
2-ft  high  pile  of  paper,  and  in  an  office  of  the  Belgian  National  Railways  devoted 
to  determining  tariffs  for  freight  moving  throughout  Europe,  the  tariff  collection 
filled   only  one  modest-size  bookcase. 

Basically,  in  each  country  there  is  a  classification,  subdividing  all  freight  into 
a  few  broad  categories,  instead  of  thousands  of  different  classifications  as  in  the 
United  States.  From  this  a  class  is  determined  for  the  freight,  or  the  existence  of  a 
special  classification  is  determined.  The  distance  tables  are  tlien  referred  to,  giving 
the  distance  in  kilometers  between  origin  and  destination;  these  tables  make  up  the 
largest  part  of  the  physical  bulk  of  the  freight  tariff  for  a  country.  A  third  book 
then  presents  tables  with  actual  charges,  for  each  class,  for  each  distance,  and  for 
various  weight  groupings.  Charges  are  tapered,  i.e.,  short  hauls  pay  a  higher  charge 
per  kilometer  than  long  hauls,  or,  stated  otherwise,  the  increments  in  charges  per 
kilometer  become  less  as  the  distances  to  be  moved  l^ecome  longer.  Tliere  are  .special 
commodity  rates  for  some  specific  items  moving  l^etween  specific  points.  These  are 
listed  .separately  (one  loose-leaf  book  in  Belgium)  and  apply  mostly  to  iron  and 
steel  products  and  coal,  with  some  other  items  as  well.  There  are  also  specific 
charges  applicable  to  use  of  special  cars,  or  for  extra  services. 

In  France  there  is  a  dual-rate  structure,  with  the  standard  rate  applicable  to 
ordinary  service,  and  a  .somewhat  higher  rate  applicable  to  accelerated  or  premium 
service.  Another  interesting  feature  in  France  is  that  the  distance  tables  are  ad- 
justed to  provide  for  tariff  distances  somewhat  lower  than  actual  geographic  dis- 
tances on  some  heavy-traffic  main-line  routes,  on  which  economies  of  scale  can  be 
achieved,  and  distances  greater  than  actual  on  light-traffic  lines,  to  allow  for  the 
reduced  efficiency  of  their  use.  This  has  the  result  of  providing  an  incentive  to 
industry  to  locate  along  main  lines,  and  aids  the  long-range  goal  of  eliminating 
many  of  the  branch  lines. 

In  Britain,  greatly  simplified  tariffs  paying  relatively  little  attention  to  classi- 
fication of  the  goods  are  a  part  of  the  new  freightliner  .services. 


90  RailroadsinEurope 


There  is  a  two-fold  rate  penalty  on  international  traffic.  The  charges  on  a 
shipment  moving  in  two  or  more  countries  are  ihe  total  of  those  computed  from  the 
point  of  origin  to  the  frontier,  then  in  the  next  country  from  frontier  to  destination, 
and  in  addition  from  frontier  to  frontier  for  transit  (bridge)  traffic  through  a  third 
country  (Switzerland  has  a  lot  of  such  traffic  moving  between  northern  Europe  and 
Italy).  Instead  of  using  the  overall  distance  between  terminals,  the  shorter  distances 
within  each  country  are  used,  and  with  the  taper  of  rates  built  into  the  mileage 
tables,  a  higher  charge  results  than  for  a  shipment  moving  the  same  distance  entirely 
within  one  country.  In  addition,  a  per-car  charge  is  levied  for  frontier  formalities. 
With  the  growth  of  multi-national  trade  under  the  stimuli  of  the  Common  Market 
and  its  customs  union  these  penalties  are  coming  under  review  by  the  European 
Economic  Community.  The  growth  of  long-haul  international  trucking,  with  its  alto- 
gether different  cost  stmctures  and  rate  practices  is  also  threatening  this  traditional 
form  of  railroad  ratemaking. 

PASSENGER   TICKET   SALES 

Tickets  for  rail  passenger  travel  are  much  more  easily  purchased  in  Europe. 
It  is  not  necessary  to  go  to  a  railroad  station,  or  railway  city  ticket  office,  except 
for  tickets  for  local  travel.  Long  distance  train  tickets,  both  domestic  and  inter- 
national, are  most  frequently  bought  at  travel  agencies.  Like  the  airlines  world- 
wide, and  unlike  American  railroads,  the  railways  in  Europe  pay  an  attractive  com- 
mission to  the  agencies,  and  provide  them  with  l^lank  ticket  stock  and  fare  sched- 
ules. These  schedules  are  simple  to  use,  based  on  determining  the  kilometers  along 
the  exact  route  to  be  traveled,  and  then  looking  up  the  price  for  that  distance  on  a 
chart.  Prepared  tables  are  available  giving  immediately  the  through  fares  to  princi- 
pal cities  and  frontier  points  all  over  Europe,  further  simplifying  these  calculations. 
Thus,  even  the  smallest  agency  can  issue,  on  the  spot,  a  ticket  to  anywhere  in 
Europe,  with  special  tickets,  like  family  fares,  available  on  short  notice.  Reserva- 
tions, such  as  for  sleepers,  TEE,  or  auto-sleepers,  and  for  reserved  seats  in  smoking 
or  non-smoking  compartments  on  regular  trains,  are  secured  by  telephone  from  the 
railroad  by  the  agent  in  the  few  minutes  that  a  customer  is  willing  to  wait.  Payment 
arrangements  are  between  the  travel  agent  and  the  traveler.  The  author,  living  in 
Brussels,  had  a  charge  account  with  a  travel  agency,  could  phone  his  agent  for 
reservations  and  tickets  on  a  particular  train  (or  airplane),  and  have  the  tickets 
delivered  by  messenger  to  his  home  or  office  a  few  hours  later,  at  the  same  price 
charged  at  the  railway  station.  A  bill  followed  in  the  mail,  to  be  paid  later,  also  by 
mail,  with  a  check.  This  contrasts  with  the  trouble  to  buy  a  ticket  for  an  American 
train,  even  for  the  Metroliners,  a  service  where  the  railroad  company  presumably 
really  wants  the  business. 

At  stations  in  some  countries  there  are  ticket  vending  machines.  The  most 
elaborate  model  seen,  in  Switzerland,  automatically  sells  first  and  second  class,  one 
way  and  round  trip  tickets  to  a  choice  of  several  dozen  destinations,  and  delivers 
correct  change   if  too  much   money  is   inserted. 

Special  family,  vacation,  unlimited  travel,  senior  citizen,  student,  and  other 
fares  and  a  wide  variety  of  excursions  and  tours,  often  including  sightseeing  busses, 
accommodations,  meals,  excursions,  and  so  forth  are  all  aggressively  merchandised 
by   the   railroads   through  travel  agencies  and  by  advertising. 


Railroads    in    Euro  p  e 91 

PROBLEMS   AND    PROSPECTS 

The  railroads  of  Western  Europe  are  confronted  by  problems  of  enormous 
magnitude.  These  are  assaulting  them  simultaneously,  and  have  developed  over  a 
shorter  period  of  time  than  it  took  in  the  United  States.  They  are  causing  both 
serious  financial  problems  and  major  challenges  to  the  abilities  of  their  manage- 
ments.  (Eastern  Europe  is  excluded  from  this  discussion.) 

Intermodal    Competition 

Most  important  is  the  evergrowing  pervasive  competition  of  other  modes.  The 
governments  that  own  the  railroads  also  are  engaged  in  massive  highway  construc- 
tion programs.  They  are  building  the  E-Routes,  an  extensive  network  of  limited- 
access  multi-lane  freeways,  similar  to  the  U.  S.  Interstate  System,  that  interconnect 
major  population,  production,  agricultural,  and  recreational  areas,  with  routings 
planned  with  a  continental  as  well  as  an  individual  nation  point  of  view;  there  are 
also  extensive  programs  of  other  highway  improvements  and  large  parking-garage 
construction  programs  in  most  cities.  Canal  systems  and  the  navigable  portions  of 
ri\'ers  are  being  modernized  and  extended,  as  are  ports.  Airports,  both  large  inter- 
national air-line  centers  and  regional  airports  are  being  constantly  enlarged  and 
improved. 

Western  Europe  produces  automobiles  in  a  volume  approaching  the  United 
States,  and  about  %  as  many  trucks,  and  per-capita  automobile  ownership  in  some 
countries  approaches  the  statistics  for  some  U.S.  regions.  Families  and  industries 
are  shifting  many  of  their  transportation  needs  and  uses  to  road  transportation, 
and  cities  and  industries  are   expanding  in  patterns  oriented  towards  the  highways. 

As  a  result  the  railways  retain  many  of  their  peak  passenger  demands — the 
commuters  and  seasonal  (summer,  Christmas,  Easter)  vacation  travel — liut  are 
losing  heavily  in  their  off-peak  volumes.  Thus  they  require  about  the  same  plant 
and  equipment  but  have  less  efficient  utilization  and  lower  income,  in  a  period  of 
rising  costs;  fare  increases  always  push  some  additional  customers  into  their  auto- 
mobiles. The  development  of  new  services,  such  as  TEE,  auto-sleeper,  new  fare 
incentives,  etc.,  has  already  been  discussed. 

In  freight  the  situation  is  even  more  discouraging.  Merchandise  freight  is  mov- 
ing rapidly  to  the  highways,  not  only  for  short-haul  but  increasingly  for  long-haul 
as  well.  In  a  small  country  trucks  can  deliver  anywhere  in  the  same  day,  door  to 
door.  This  is  impossible  for  a  railroad,  even  siding  to  siding.  Goods  can  move 
between  points  in  two  countries,  perhaps  through  one  or  two  others  in  between 
as  well,  in  far  less  time  than  ])y  rail.  In  bulk  commodities,  too,  the  problems  are 
serious.  Waterways  have  long  been  important  carriers  of  bulk  freight  as  well  as 
merchandise  freight,  and  much  heavy  industry  is  located  along  waterways.  This 
mode  is  growing  steadily.  Volumes  are  unbelievable  to  Americans;  1500  ships  per 
day  pass  Dordrecht,  in  the  Netherlands,  on  one  of  the  deltas  of  the  Rhine.  Oil 
pipelines,  slow  to  come  to  Europe,  are  extending  rapidly.  Gas  pipelines  are  extend- 
ing even  more  rapidly,  as  vast  supplies  of  natural  gas  from  the  Netherlands  and 
the  USSR  arc  distributed  through  Western  Europe,  replacing  coal,  until  recently 
the  dominant  heating  fuel,  and  one  that  often  moved  by  rail  as  well  as  by  water. 
Trucks  even  move  such  commodities  as  scrap  iron  and  clay  as  backhauls  o\er  long 
distances  because,  it  is  explained,  "of  poor  raihoad  service."  It  must  be  recalled,  too, 
that  the  truck  has  until  now  been  subjected  to  mucli  less  economic  regulation  as  to 
rates,   routes,   weights,   etc.,   than   in   the   United   States. 


92 Railroads    in    Europe 

The  competitive  situation  in  freight  is  now  adjustinj^  slowly.  While  trucking 
continues  to  develop  aggressively,  in  volume  and  in  services,  governments  are  be- 
ginning to  set  some  limits  on  truck  operations,  partly  because  of  highway  conges- 
tion and  partly  to  protect  their  railways.  For  example,  Germany  bars  trucks  from 
freeways  on  summer  weekends  when  they  are  crowded  with  automobiles,  and  is 
starting  to  limit  the  number  of  them  allowed  to  haul  over  30  miles  ( the  Leber 
Plan).  Britain  intends  to  place  some  limits  on  long-haul  trucking  as  soon  as  the 
freightliner  service  is  well  developed  (1968  Transport  Act).  France  regulates  truck 
rates,  forcing  them  to  be  higher  than  railroad  rates. 

At  the  same  time,  most  railroads  are  starting  to  make  at  least  some  counter- 
moves.  Freight  marketing  has  a  long  way  to  develop  before  it  matches  the  best  of 
American  and  Canadian  practices,  but  it  is  starting.  Technical  and  operational  inno- 
vations are  being  introduced  that  may  help.  Some  railroad  managements  are  begin- 
ning to  realize  that  they  are  now  special-purpose  carriers  that  have  to  develop 
specific  services  for  specific  types  of  freight,  and  that  general-purpose  railroading 
will  no  longer  do.  Freightliner  and  TEEM,  already  discussed,  unit  trains,  special- 
purpose  cars,  container  services,  incentive  rates,  trucking  subsidiaries,  and  many 
others,  are  examples.  This  is  an  area  where  the  railroads  still  have  much  to  learn, 
to  adjust  to  their  new  roles. 

New   Technology 

Railroad  plants  appear  more  than  adequate  for  traditional  railroad  operations, 
but  to  stay  competitive  they  must  change.  This  leads  to  new  technology,  often  ex- 
pensive, and  usually  disruptive.  Applications  of  cybernetics,  high-speed  operation 
(the  French,  Germans,  and  Italians  are  well  along  in  this  area),  automatic  coupling, 
automation,  and  new  operating  concepts  are  examples.  More  exotic  hardware  is 
close  at  hand,  such  as  TACV  ( tracked  air  cushion  vehicles ) .  Whether  these  supple- 
ment railroads  or  offer  new  competition  to  them  may  depend  upon  the  institutional 
relationships  that  develop. 

Redeployment   of   Assets 

There  are  many  obsolete  assets,  in  plant  and  equipment,  often  surrounded  by 
service  commitments,  and  many  new  needs,  usually  expensive.  The  problem  is  to 
phase  out  the  old,  extracting  as  much  capital  as  possible,  to  redeploy  to  new 
uses.  Branch  line  abandonments,  parallel  track  reductions,  and  yard  rationalizations 
are  all  examples  of  disinvestments;  the  opportunities  for  reinvestments  seem  almost 
endless. 

Availability   of  Capital 

As  public  enterprises,  new  investment  capital  must  come  from  or  with  the 
support  of  government,  either  by  direct  grants  or  loans,  or  by  sale  of  bonds  to  the 
public,  usually  with  government  guarantees  to  make  them  marketable.  In  some 
countries,  like  Britain,  the  government  for  most  years  since  World  War  II  made 
only  restricted  amounts  of  capital  available.  By  contrast  France  has  followed  a 
policy  of  generous  investment  in  new  facilities,  parallel  to  disinvestment  from  old 
ones.  The  Italian  government  is  now  committing  $320,000,000  for  the  new  162-mile 
super-railroad  from  Florence  to  Rome.  The  ability  to  adjust  and  to  compete,  coun- 
try by  country,  will  depend  on  the  availability  of  needed  new  investment  funds 
as   much  as  any  other  single  factor. 


RailroadsinEurope  93 


The   Small   Country   Problem 

Small  countries  seem  to  the  author  to  have  particular  and  special  problems. 
How  the  railroads  of  the  Netherlands,  Belgium,  Luxembourg,  Switzerland,  Den- 
mark, and  Austria  are  to  exist  in  the  forms  they  have  in  the  past  is  difficult  to  visual- 
ize in  an  era  when  railroads  are  becoming  more  specialized,  and  the  shift  in  freight 
haulage  is  to  longer  distances  and  away  from  short-haul  business.  Perhaps  they  will 
become  new  kinds  of  regional  rapid  transit  systems  in  the  Europe  of  the  future, 
with  auxiliary  specialized  freight  services.  The  hourly  and  half-hourly  passenger 
services  of  the  Netherlands  Railways  and  their  movement  of  most  freight  only  at 
night  is  a  start  in  this  direction.  The  future  of  the  Long  Island  Rail  Road,  now 
owned  by  the  State  of  New  York,  is  a  partial  American  analogy  to  the  problem, 
with  the  significant  difi^erence  that  Long  Island  has  little  transit  (bridge)  traffic 
or  heavy  industry,  whereas  most  of  the  small  countries  have  either  or  both  of  these 
types  of  business. 

Labor   Cost 

As  already  noted,  labor  costs  are  growing  rapidly,  and  the  railways  bear  the 
burdens  of  generous  welfare  and  pension  programs  for  their  employees.  Most  man- 
agements are  attempting  to  reduce  manpower,  not  only  by  retrenchment  and  auto- 
mation, but  by  eliminating  activities  (checking  tickets  at  stations  and  general  sta- 
tion maintenance,  for  example).  Fortunately,  while  railway  unions  are  strong  and 
have  political  strength  as  government  employees,  the  division  into  craft  unions  on 
the  continent  is  much  weaker  than  in  Britain  or  the  United  States,  thereby  making 
more  efficient  use  of  labor  easier. 

Political    Setting 

It  is  often  argued  that  government  control  brings  the  disadvantage  of  political 
interference,  and  of  capital  starvation  if  a  government  is  not  interested.  However, 
privately  owned  American  railroads  claim  to  suffer  from  discriminations  that  have 
political  causes,  and  certainly  capital  starvation  is  well  known  to  many  of  tliem. 
Actually  some  nationalized  railroads  have  done  well  in  securing  additional  capital. 
As  for  quality  of  management  and  staff,  this  probably  varies  as  much  as  it  does 
in  the  United  States.  There  are  some  outstanding  people  in  government  railroads, 
in  Europe  and  Canada,  just  as  there  are  in  privately-owned  railroads.  Government 
ownership  appears  to  offer  some  protection  from  intermodal  competition,  but  none 
from  inxestment  by  government  in  competing  modes.  On  the  other  hand,  govern- 
ment-owned railroads  do  know  what  sort  of  business  they  are  supposed  to  be  in, 
and  do  not  look  to  extensive  diversification  far  outside  transportation  as  their 
salvation. 

How  one  views  these  matters  is  in  the  realm  of  political  philosophy,  and  that 
is  a  subject  well  beyond  the  scope  of  this  paper. 


Advance   report  of  Committee    16 — Economics  of  Railway 
Location   and   Operation 

Report   on   Assignment   5 

Location  and  operation  of  metropolitan  transit  systems 
as  related  to  current  railway  operations 
72-629-4t 

L.  A.  Durham,  Jr.  (chairman,  subcommittee),  R.  H.  Dunn,  H.  S.  Bull,  G.  B.  Dut- 
TON,  Jr.,  G.  R.  Gaspard,  A.  J.  Gellman,  W.  W.  Hay,  H.  J.  Kay,  T.  D.  Kern, 
F.  A.  Koomanoff,  Douglas  McCorquodale,  J.  S.  Reed,  V.  J.  Roggeveen, 
L.  P.  Rossi,  J.  E.  Teal,  Harold  Wanaselja,  D,  M.  Weinroth,  J.  R.  Wilmot. 

A  nationwide  renaissance  of  interest  in  rapid  transit  systems  has  occurred  in 
recent  years  because  of  tire  increasingly  evident  fact  that  this  is  a  mode  of  trans- 
portation diat  can   economically  serve  expanding  metropolitan  areas. 

The  continuing  population  explosion,  coupled  with  tremendous  increase  in  auto- 
motive traffic  and  spiraling  costs  for  adequate  highway  construction,  has  made  it 
apparent  tliat  the  orderly  fmictioning  and  future  growth  of  concentrated  population 
centers  can  only  be  assured  by  providing  for  the  speedy  movement  of  people  be- 
tween suburban  and  inner-city  residential  areas  and  work  locations.  Exhaustive 
studies  have  indicated  that  tlie  rapid  transit  concept — properly  designed  and  con- 
structed— provides  a  balanced  transportation  system  that  is  so  vitally  needed  in 
many  large  cities  around  the  world. 

Railroad  personnel  on  lines  serving  metropolitan  areas  are  familiar  with  the 
problems  of  pro\iding  conventional  passenger  train  service  in  these  locations.  With 
the  general  decline  in  conventional  passenger  train  service,  on  the  one  hand,  there 
ha\e  arisen  the  problems  of  an  expanding  rapid  rail  transit  system,  on  tlie  other 
hand.  Therefore,  on  the  basis  that  cooperation  between  railroads  and  municipal 
transit  authorities  is  imperative  for  the  betterment  of  all  concerned,  Committee  16 
was  assigned  to  inxesHgate  and  report  on  the  location  and  operation  of  metropolitan 
transit  systems  as  related  to  current  railway  oi^erations. 

Previous  presentations  on  this  assignment  have  been  as  follows: 

1.  AREA  Proceedings,  Vol.  68— Bulletin  602,  page  111:  "Aspects  of 
the  Needs  of  Urban  Areas  for  Rapid  Transit  that  are  of  Interest  to  the  Rail- 
road Industry." 

This  report  presents  the  scope  or  size  of  the  rapid  transit  problem; 
reviews  capacity,  need  and  cost  criteria  for  transit  systems;  and  concludes 
that  railroad  companies  should  collectively  promote  further  investigation  or 
research  to  develop  accurate  information  on  design  criteria  of  rapid  transit 
systems  "to  insure  that  any  participation  in  transit  operations  by  established 
railroads  is  economically  justified." 

2.  AREA  Proceedings,  Vol.  70 — Bulletin  615,  page  25:  "A  comparison 
of  Non-Conventional  Rapid  Transit  Systems  and  Concepts  with  StetM-Wheel- 
on-Steel-Rail  Vehicles." 


t  Discussion  open   until   December   lo,    1970. 

95 


96 Met  r  opolitan    Transit    Systems 


This  rei^ort  presents  a  comparison  of  21  types  of  transit  systems  cur- 
rently in  operation,  planned  and /or  conceived  as  was  developed  in  a  study 
commissioned  by  the  British  Ministry  of  Transport  and  the  City  of  Man- 
chester,  England 

This — the  third  report  for  Assignment  5 — is  concerned  with  a  detailed  com- 
parsion  of  track  structure  and  maintenance  practices  of  seven  American  and  one 
Canadian  rapid  transit  rail  systems.  Six  of  the  subject  systems  have  been  in  opera- 
tion for  many  years  while  two  are  currently  being  constructed.  Location  and  operat- 
ing authorities  are: 

Boston,  Mass. 

Massachusetts  Bay  Transportation  Authority 

Chicago,  111. 

Chicago  Transit  Authority 

Cleveland,  Ohio 
Cleveland  Transit  System 

New  York,  N.  Y. 

New  York  City  Transit  Authority 

Philadelphia,  Pa. 

Philadelphia  Transportation  Company 

Toronto,  Ont. 

Toronto  Transit  Commission 

San  Francisco,  Calif. 

The  San  Francisco  Bay  Area  Rapid  Transit  District 

Washington,  D.  C. 

Washington    Metrpolitan   Area   Transit   Authority 

A  brief  description  of  each  system  is  given  in  Exhibits  A  to  H.  Detailed  com- 
parison of  track  construction  and  maintenance  practices  is  presented  in  Exhibits  I  to 
VIII.  The  latter  exhibits  were  prepared  in  1967  for  the  Washington  Metropolitan 
Area  Transit  Authority  by  DeLeuw,  Cather  &  Company  from  replies  received  to  a 
questionnaire  submitted  to  each  of  the  other  seven  transit  authorities.  Additionally, 
DeLeuw,  Cather  &  Company  and  WMATA  personnel  visited  each  of  the  other 
systems  to  verify  the  information  obtained  and  to  interview  the  engineering  officer. 


Metropolitan    Transit    Systems 


97 


EXHIBIT  A 


BOSTON.  MASSACHUSETTS 


MASSACHUSETTS  BAY  TRANSPORTATION  AUTHORITY 


Number  of  Routes 


3  high-platform  (FOREST  HILLS- 
EVERETT  ,  HARVARD-ASHMONT , 
BOWDOIN-WONDERLAND ) 
5  streetcar  lines  operating  in 
Central  Subway  (RIVERSIDE, 
BEACON  ST.,  COMMONWEALTH  AVE., 
HUNTINGTON  AVE.,  WATERTOWN) 
1  right-of-way  streetcar  line 
between  ASHMONT  AND  MATTAPAN. 


Number  of  Stations 


49  on  high-platform  lines  and  in 

Central  trolley  subway 
H  on  Riverside  line  right-of-way 
8  on  Ashmont-Mattapan  line  right- 
of-way 

71 


Annual  Passengers 


Approximately  175,000,000 


Number  of  Cars 


48  Bowdoin-Wonderland  line  built  1923-24 
40  Bowdoin-Wonderland  line  built  1951 
100  Forest  Hills-Everett  line  built 
1957-58 
92  Harvest-Ashmont  line  built  1963 
"580 

344  PCC  streetcars  built  between 
1941  and  1951* 


*A11  but  25  cars  can  be  operated  in 
2  or  3  car  trains. 


98 


Metropolita  n    Transit    Systems 


CHICAGO.  ILLINOIS 


CHICAGO  TRANSIT  AUTHOhlTY 


EXHIBIT  B 


Number  of  Routes 


6  as  follows: 

State  St.  Subway  Route  (HOWARD- 
ENGLEWOOD,  HOWARD- JACKSON  PARK) 
Dearborn  St.  Subway  Route  (CONGRESS- 
MILWAUKEE,  DOUGUS-MILWAUKEE) 
Loop  "L"  Routes  (UKE  ST.,  RAVENSWOOD) 
Evanston  Route  (HOWARD-LINDEN 
shuttle,  and  rush  hour  express 
service  to  Loop) 
Skokie  Route  (HOWARD -DEMPSTER) 


Number  of  Stations 


137 


Annual  Passengers 


165,000,000  (1964  estimated  total) 


Number  of  Cars 


180  air-conditioned  (built  I964) 
767  "PCC"  type  (built  1951-59) 

4  articulated  (built  1947-48) 
190  (built  1922-24) 


Metropolitan    Transit    Sy  stems 


99 


EXHIBIT  C 


CLEVEUND.  OHIO 


CLEVEUND  TRANSIT  SYSTEM 


Number  of  Routes 


1  (between  Windermere 
in  East  Cleveland  and 
Cleveland  Hopkins  Airport), 


Number  of  Stations 


16 


Annual  Passengers 


16,760,031      (1964) 


Number  of  Cars 


88  —  70      (35  two-car  units] 

18   (18  single  units) 
20-70     (airporters) 


100  M  etropolitan    Transit    Systems 


EXHIBIT  D 


NEW  YORK.  NEW  YORK 


NEW  YORK  CITY  TRANSIT  AUTHORITY 


Number  of  Routes  37  (There  are  3  operating 

divisions— BMT,  IND,  IRT) 


Number  of  Stations  482 


Number  of  Passengers  1,376,255,865  (1964) 


Number  of  Cars  6757 

ef  these,  4820  have  been 
purchased  since  1948. 


M  e  t  r  o  p  o  1  i  tan    Transit    Systems 


101 


EXHIBIT  E 


PHIUDELPHIA.    PENNSYLVANIA 


PHILADELPHIA  TRANSPORTATION  COMPANY 


Number  of  Routes 


4  as  follows: 

MARKET -FRANKFORD  SUBWAY-ELEVATED, 
BROAD  STREET  SUBWAY,  RIDGE  8TH 
SUBWAY,  CAMDEN-LOCUST  LINE 
In  addition,  5  streetcar  routes 
operate  in  the  streetcar  subway. 


Number  of  Stations 


62 


Number  of  Cars 


267  Market-Frankford  (built  196G) 
50  Broad  (built   1938) 

26  Camden  (built   1936) 

150  Broad  (built  1928) 

493 

There  are  approximately  150  PCC 

streetcars  built  in  1941-42  operating 

in  the  streetcar  subway. 


Number  of  Passengers 


1964:   approximately  67,000,000 

revenue  and  118,000,000  total 
passengers  on  rapid  transit 
lines,  and  approximately 
30,0CC,0CC  in  streetcar  subway. 


102 


Metropolitan    Tra  nsit    Systems 


EXHIBIT  F 


SAN  FRANCISCO.  CALIFORNIA 


THE  SAN  FRANCISCO  BAY  AREA  RAPID  TRANSIT  DISTRICT 


Number  of  Routes 


75  miles 
3  different  lines 


Number  of  Stations 


37 


Annual  Passengers   (estimated] 


Forecast  for  1975 
73.000,000 


Number  of  Cars 


1st  order  -  250 

"A"  Front  End  75'  long 

"B"  Middle  Train  Cars  70'  long 


Metropolitan    Transit    Systems 


103 


TOEONTO.  ONTARIO.  CANADA 


TORONTO  TRANSIT  COMMISSION 


EXHIBIT  G 


Number  of  Routes 


2  -  Tonge  Street  & 
Bloor-Danforth 


Number  of  Stations 


45 


Annual  Passengers 


Approximately  66,000,000 
before  Bloor-Danforth 


Number  of  Cars 


13k   built  1954-56 
36  built  1962-63 
164  on  order 


Maximum  Cars  Per  Train 


Line  Opened 


March  30,  1954 


104 


Metropolitan    Transit    Sys  tems 


EXHIBIT  H 


WASHINGTON.  D.C.   (Under  Construction) 


WASHIMGTQN  METROPOLITAN  AREA  TRANSIT  AUTHORITY 


■oaber  of  Routes 


7  major,  3nilnor 

HOCKVILLE 

GLENMONT 

HUNTINGTON 

ARDMORE 

BRANCH 

1-66 

GREENBELT 


■laber  of  Stations 


66 


Ammal  Passengers 


Forecast  for  year  1990: 
292,610,000 


■uaber  of  Cars 


658  (75  ft.   X  10  ft.   - 
175  pass.    cap. -75  m.p.h. 
top  speed) 


DESCRIPTION 


COMPARISON  OF  TRACK  STRUCTURES  AND  MAINTENANCE  PRACTICES 


I   GENERAL 

A.  Date  of  Last  Construction 

B.  SInqle  Revenue  Track  Miles 
) .   Subway 

2.  At-grade 

3.  Aerial 
A.      Total 

C .  Speed    (mph) 

1 .  Haximum 

2.  Average 

D.  Gauge 

I.      Wheel 


E.  Wiee  I    Taper 

F.  "(all    Cant 

I  I      TRACK    STRUCTURE 

A.      Type   of    Track    Constructi 
I .      Subway 


2.  At-grade 

3.  Bridge   &  aerial    structures 

**.  Special  trackwork 

Rai  I  (Main  Line  Tracks) 

1.  Weight  t  section 

2.  Welded  or  jointed 


BOSTON 


28.5 
79. l* 
19.2 
127.1 


35.'* 
20.2 


1.  '•'-7   3/V' 

2.  it'-e    1/2" 

40: 1 
UO:  I 


I .    Tie   i  ballast 


2.    Tie    t   bal last 


3.    Bridge    ties 
open   deck 


U.    Tie    i  bal last 
Bridge    t  ies    on   open 
deck 


1.  \00l>   ARA-B  (78i'o) 

85#  ASCE  (157o) 
I05#  DUDLEY  (7%) 

2.  bS'A  Welded 
355f   Jointed 


CHICAGO 


CLEVELAND 


18 

112 
161. 

3 
5 
1 
9 

58 
23 

0 

1 

ll 

-7 

1/16 

4 

-8 

/2" 

Cyl 

indr 
IfO: 

ical 

1 

1.  Short  ties  embedded 
in  concrete  invert . 
Small  %  tie  t.   bal  last 


2.  Tie  £.  ballast 


3.  Bridge  t  ies  on 

open  deck. 

Small  %   bal lasted  deck 

U.  Tie  t  bal last 
Br  idge  ties  on  open 
deck 


1.  90#  ASCE 

100,112  tll5»  AREA 


2.  20^/:  Welded 
80%  Jointed 


0.3 
36.1 


47.0 
30.0 


k'-8    1/2" 

Cyl  indric, 

20:  1 


I .  Tie  C   bal last  pa 
with  asphalt 


2.  Tie   t   ballast 

3.  Tie   t  ballast 

4.  Tie   t   bal last 
1.  I00#  ARA-A 


2.    Main   track  welded 
Yard   track  jointed 


NEW  YORK 


1.  443.8 

2.  75.5 

3.  202.2 
''.            721.5 

1 . 

2. 
3. 

4. 

33.7 
0.0 
0,0 

33.7 

1.  50.0 

2.  20.5 

1. 

2. 

45.0 
32.0 

1.   4'-5   3/8"  + 
(bk.to  bk.  wheel 

1/32 
flan 

gesl 

1. 

4 

-7    13/ 

2.    4'-8    1/4" 

2. 

4 

-8   1/2 

20:1 

40: 1 

40:  1 

40:1 

I.    Direct    fixa 

invert 

Tie   e.   ballast 


Tie   &   bal last 


3.  Bridge    t  ies    on    o 
deck. 
Small   7:   bal  lasted   deck 

4.  Tie   t   bal last 
Bridge   t  ies   on  open 
deck 


1 .     100#  ARA-B 


2.    Jointed 

Smal 1    %  welded 


PHILADELPHIA 


BROAD  ST.  SUBWAY 
1928 


1 .  Short  t  ies  embedded 
in  concrete  invert  and 
short  ties  bolted  to 
steel  channels  embed- 
ded in  concrete  invert 

2.  Tie  t  bal last 
(Yard  Tracks) 


4.  Tie  i  ballast 
Wood  t  ies  bol ted  to 
channels  embedded  in 


1.  100#  ASCE 


2.  Jointed 


PREPARED     IN     1967    BY  EXHIBIT     r 

DE  LEUW, GATHER    8   COMPANY    FOR 

WASHINGTON  METRO.  AREA  TRANSIT  AUTHORITY 


SAN  FRANCISCO 


System  und 
Constructi 


40.  1 
54.2 
48.5 
142.8 


80.0 
45.0 


1.  5'-5  t/4"  ♦  1/16" 

2.  5'-6" 
Cyl indrical 

40:  1 

1.  Direct  fixation  to 
invert 

2.  Tie  t  ballast 


3.  Direct  fixation  to 
deck. 

Tie  &  ballast 

4.  Tie   &  bal last 
Ties   embedded    in  con- 


2.    Welded  6 


TORONTO 


35-0 
8.0 
2.0 

45.0 


55.0 
22.7 


1.  4'-10   1/16"  +    1/16' 

2.  4'-10  7/8" 

20:  I 
40:  1 


1.    Direct    fixati 


2.    Tie    t    bal last 


3.  Direct  fixation  to 
deck. 

Smal  1  °(   tie  «.  bal  last 

4.  Tie  t  bal last 


I.  IOOp  ARA-A 


2.  Welded  except  for 
heat  treated  rail  In 
curves  of  radius  less 
than  2600' 


WASHINGTON 


System  under 
Construction 


1.  94.0 

2.  84.4 

3.  17.0 

4.  195.4 


75.0 
35.0 


1.  4'-7  11/16" 

2.  4'-8  1/4" 

20: 1 
40:  1 


I.   Direct  fixati 


2.   Tie  £  ballast 


subway  and  aerial 
structures:  tie  a 
ballast   at-grade 


COMPARISON  OF  TRACK  STRUCTURES  AND  MAINTENANCE  PRACTICES 


DESCRIPTION 


3.   Type  of  welds 
9.      Shop 


c.   Max.  length  of  CWR  and 
locet Ion 

h.      Hardened  rail  or  special 
alloyed  ral I 
a.   Type 


b.   Criteria  for  location 


C.   Rail  Fastening 
I.   Details 
a.   Subway 


Bridges  &  aerial  str 
tures 


d.   Special  trackwork 


2.   Spacing 
a.   Subway 


BOSTON 


b.  Thermite 
self-heat  t 
pre-heat 

c.  1500' 


a.  Small  amount 
ful ly  heat  treated 
rail 

b.  On  some  curves 
of  600'  radius  t   undei 


a.  Screw  spikes  & 
double  shoulder  tie 
plates 


d.  Screw  spikes 
&  plates 


a.  30"  on  tangent 
C   curves  over  2500' 
radius. 

2'»  3/8"  on  curves 
under  2500'  radius 

b.  Same  as      a. 

c.  Same   as      a. 


CHICAGO 


b.    Thermite 


c.    7100'    on  open 
deck  structure 


a.    Ful ly  heat 
treated 


b.    On   curves   undei 
1250'    radius   I.    in 
special   traclwork 


a.    Double  shoulder 
tie  plates,   spring 
clips  &  boltSp   screw 
hold  down  spikes 


b.    Cut    spikes, 
double   shoulder    tie 
plates   &   tie   pads 


plates 

a.   2V 


b.    2't"  wood 

30"  concrete 


CLEVELAND 


c.    2000'    on  aerial 
structure 


B.    None   used 


a.   Double   shoulder 
tie  plates  t  cut   spikes 


d.    Cut    spikes    t 


NEW  YORK 


a. Electric   flash 
butt 


a.    Ful ly  heat 
treated 


b.   On    all    curves 
t   In  special   track- 
work 


a.  Cut  spikes  & 
double  shoulder  tie 
plates 

On   tangent    track  mold- 
ed  rubber   rail    seats 
are   replacing   the 


b.    Cut   spikes   & 
ti  e  plates 


d.    Cut   spikes   t 
plates 


a.    22    1/2"  wood 
29"    rail    seat 


c.    22    1/2"    tie   t 
ballast 

18"   open  deck 


PHILADELPHIA 


BROAD  ST.  SUBWAY 


a.  Ful ly  heat 
treated 

High  carbon 

b.  On  high  ra I  I s 
of  curves  of  750'  rad- 
ius &  under  &  in  spec- 
ial trackwork.  High 
carbon, everywhere  else 


a.  Screw  spikes 
for  I ine  and  hold 
down  spikes  and  single 
shoulder  tie  plates 


d.  Screw  spikes  & 
plates 


SAN  FRANCISCO 


a.  Electric  flash 
butt,  and  oxy-acety- 
lene  upset 

b.  Thermite 
pre-heat 

c.  Continuous  on 
tangent 


a.  Fully  heat 
treated 


b.  On  curves  unde 
1900'  radius  i.    in 
special  trackwork 


a.  Rai I  to  be 
fastened  directly  to 
concrete  invert  but 
fastener  is  yet  to  be 
determined 


b.  Cut  spikes  S 
double  shoulder  tie 
plates 


d.    Cut    spikes    & 
plates 


b.    2^"  wood 
30"  concr 


TORONTO 


a.    Fully   heat 
treated 


b.    On   curves 
>f   2600'    radius   S   undei 


"TTC"    fastener 


b.  "TTC"  fastener 
with  cut  spikes  for 
hold  down  spikes 


d.  Same  as  b. 


b.  23  3/8" 

c.  23  3/8" 


WASHINGTON 


Electric  flash  butt 


:,  Continuous  between 
insulated  joints 


b.   Economic  I i  fe 
based  on  rate  of  rail 
wear  (Couard's 
formulas) 


Rai I  to  be  fastened 


but  fastener 
determined  by 


b.  Cut  spitzes  &  double 
shoulder  tie  plates  if 
wood.  Rai 1  CI ips  and 
elastomer  pad  if 

c.  Bridges:  same  as  b 
Aerial  struct:  same  as 


d.  Subwev:  same  as  a 
Bridges  &  at-grade: 
plates,  cut  spikes  t 
lock  spikes. 


27"  wood 
Same  as  a 


COMPARISON  OF  TRACK  STRUCTURES 

AND  MAINTENANCE  PRACTICES 

EXHIBIT     m 

UtbUKIPI  lUN 

BOSTON 

CHICAGO 

CLEVELAND 

NEW  YORK 

PHILADELPHIA 

SAN  FRANCISCO 

TORONTO 

WASHINGTON 

BROAD    ST.    SUBWAY 

d.      Special    trackwork 

d.    Standard  AREA 

d.    Standard   AREA 

d.    Standard  AREA 

d.    Standard  AREA 

d.    Standard  AREA 

d.    Standard  AREA 

d.    Standard  AREA 

d.      Special    METRO 

D. 

Rei 1   Anchorage   Detai 1 

s 

design  based  on 
standard  AREA 

1.      Type 

1.    "True  Temper"   or 
equal 

1.    "Unit" 

1.    "Fair" 

1.    "Fair"   t  "True 
Temper" 

1.    "Fair" 

1.    Rail    fastener  serves 
as   anchor   for   subway 
£  aerial    structure. 
"Fair"   type   anchor  at- 
grade 

1.    Rail    fastener 
serves   as   anchor 

1.   Rail    fastener  serve; 
as  anchor   for  direct 
fixation.    "Fair"   type 
or  equal   at-grade  on 
wood   ties.      Fastener 
on  concrete   ties. 

2.      Anchor  pattern  or 

spacing 

2.    Every   Uth   tie   boxed 

2.    8   forward  with   2 
back-up  anchors    per   39' 
rail 

2.    Every   3rd   tie    for- 
ward anchored    in   direc- 
tion of    traffic  with 
every  6th    tie  boxed 

2.    Patterns   vary  with 
traffic  movements   t 
track  grades 

2,    As    required 

2.    For  at-grade  con- 
struction   the    last    110 
ties   at   end  of   CWR 
strings   boxed  t   remain- 
der  of    CWR    boxed   on 
alternate   ties. 
Welded   ra! 1    is   boxed 
every   tie    for    1 10  ties 
adjoining   non-bal lastec 
deck  structures 

2.    Same   as      1 

2.   See    1    above. 
On  wood, alternate   ties 
boxed  and  every   tie 
boxed  200   ft.    each  way 
of    insulated   joints 

3.      Special    traclMork 

3.    Every   2nd   tie   boxed 

3.    Rail    anchored  at    all 
possible   ties 

3.    Same   as      2 

3.   Where  possible 
alternate  ties  boxed 

3.    None 

3.    Box  anchor  all    rails 
on   the    same    tie   at 
alternate   ties  within 
the    turnout    unit 

3.    Same   as    1    t  2 

3.      Same  as    1    end  box 
anchor  all    rails   on 
the   same   tie  wherever 
possible 

E. 

Ties 

1.      Kind 

1.    Creosote   treated 

1.   Creosote   treated 

t.    Creosote   treated 

1.    Creosote   treated 

1.   Creosote  treated 

1 .   Concrete  or  creosote 

1.    Creosote    treated 

1 .   Concrete   or  creosoti 

southern  pine 

oak  and  pine 

hardwood 

oak  and  pine 

yellow  pine 

treated  Douglas    fir 

hardwood 

treated  hardwood 

2.      Size 

a.      Cross    ties 

a.   6"   X  8"  X  8'-0" 

a.    6"  X  8"  X  8'-0" 
Pine   on  aerial 
structure 

6"   X  8"   X  8'-6" 
Oak  at-grade 

9'-0"   ties   used 
on  all    curves 

a.   6"  X  8"  X  8'-6" 

a.   6"  X  8"  X  8'-6" 

a.   5   3/V'  X  9  3/'t"  x 
2 '-6" 

a .    If  wood : 

6"   X  8"  X  9'-0" 

If  concrete: 
undetermined 

a.    7"  X  9"   x  8'-6" 

a.    If  wood: 

7"  X  9"  X  8'-6" 

If  concrete: 
length  8 '-6" 

b.      Contact    rail 

ies 

(1)      Size 

(1)    6"   X  8"  X  8'-9" 

(1)    Same   as      a 

(1)    None-Catenary 
System 

(1)   6"  X  8"  X  9'-0" 

(1)    5   yl*"  X  9  V*'" 
l.'-J" 

5   3/'* '  X  9  3/V'x 
9'-0" 

(1)    If  wood: 

6"   X  8"  X   10' -0' 
If  concrete: 
undetermined 

(1)    7"  X  9"  X  9'-6" 

(1)    If  wood: 

7"  X  9"  X    lO'-O" 
If  concrete: 
length   9'-6" 

(2)      Spacing 

(2)    Max.    IO'-2    1/2" 

(2)    8'-0"  on 

(2)    None 

(2)    lO'-O"  maximum 

(2)    lO'-O"   maximum 

(2)    lO'-O"  maximum 

(2)       8'-0"   maximum 

(2)    Every  Itth  tie. 
IO*-0"  maximum 

Every  "tth   tie  on 

tangent 

tangents    &  curves 

6'-0"    on 

over  2500'    radius. 

curve 

every  5th   tie  on 

curves   under  2500' 

COMPARISON  OF  TRACK  STRUCTURES 

AND  MAINTENANCE  PRACTICES 

EXHIBIT      Et 

DESCRIPTION 

BOSTON 

CHICAGO 

CLEVELAND 

NEW  YORK 

PHILADELPHIA 

SAN  FRANCISCO 

TORONTO 

WASHINGTON 

BROAD    ST.    SUBWAY 

f . 

Roadbed   and   Ballast    Details 
1.      Roadbed   Section 

a.  \  Track   to  edge   of    sub- 
qrade 

a.           9'-9" 

a.            7'-9" 

a.          9'-0"  min. 

a.        lO'-O" 

a .          None 

a.    II '-0"   minimum 

a.    On    Embankment: 
13'-0"  Min.    one   side 
l5'-0"   Min.    other 

side 
In   Excavation: 
1 1 '-0"    Min.    one    side 
13'-0"   Min.    other 

side 

a.    l2'-0"   min. (tangent 
13'-6"  min.    (super- 
elevated)   with   service 
road  on  opposite   side. 
lU'-6"  min.    (super- 
elevated)   without 
service    road  on 
opposite   side. 

b.      Slope   of   subgrade    sur- 
face 

b.          2k:\ 

b.             '.6:1 

b.    Level   with  2'4: 1 
slopes   from  ends  of 
ties   to  edge   of   berm 

b.    Level 

b.          None 

b.             21t:l 

b.        M;l 

b.        ItO.I 

c.      Slope   of   side    ditch 

c.            2:1 

IM 

li:l 

c.            li:l 

c.          None 

c.    No    Information 

c.    3'-0"    rounded 
bottom  asphalt    paved 

c.        2:1 

d.      Depth   of    side   ditch 

d.        Varies 

d.          I'-O" 

d.          I'-D" 

d.         I'-O" 

d .          None 

d.    No    Information 

d.    Same  as     c 

d.    Varies.    1 '-0"  min. 

e.      Width   of   bottom  of 
side   ditch 

e.        Varies 

e.           I'-O" 

e.       r-0" 

e.         I'-O" 

e .          None 

e.    No    Information 

e.    Same   as     c 

e.    2'-0"   min. 

f.      Slope   of   embanl«T*ent 
and  excavation 

f.             2:1 

f.            H:\ 

f.           \i:\ 

f.           H:l 

f .          None 

f.    No    Information 

f.        2^:1 

f .    Embankment    2: 1 

2.      Ballast    Section 

a.      Distance   from   top  of 
tie   to  top  of  bal last 

a.            1" 

a.    Varies   from  zero 
at   center  of   t  ie   to 
2"   below  at   ends 

a.             1" 

a.             1" 

a.          None 

a.               1" 

a.          1" 

a.    1"  below  base   of 
rai  1 

b.      Width   of    level    ballast 
shoulder 

b.            12" 

b.             6" 

b.           12" 

b.             6" 

b .           None 

b.             12" 

b.        12" 

b.    Wood   ties:    10" 
Concrete   ties:    12" 

c.      Slope   of   bal last 
section 

c.           2:1 

c.          1    i/k:\ 

c.           2:1 

c.    1   3/'t:l 

c .           None 

c.             2:1 

c.        2:1 

c.            2:1 

d.      Depth  of   bal last    below 
bottom  of    tie 

d.     12"   minimum 

d.            12" 

d.         11    1/1<"   t 

d.            /■' 

d.          None 

d.          12"  + 

d.        16" 

d.             12"  + 

e.      Depth   of    sub-ballast 

e.    6"    as    required 

e .             None 

e.           None 

e.          None 

e.           None 

e.      As    required 

e.          6" 

e.           8" 

3.      Ballast 

a.      Top-bal last 

(1)  Kind 

(2)  Size 

(1)  Crushed   Granite 

(2)  1    l/V' 

(1)  Crushed    slag   or 
1 Imestone 

(2)  1/2"    to   2    1/2" 

(1)  Crushed   slag   or 
limestone 

(2)  3/8"   to   1    1/2" 

(1)  Crushed   traprocl< 
or    limestone 

(2)  1/W   to  2    1/2" 

(1)  Crushed   trap- 
roc  li 

(2)  yw   to   1    i/h" 

(1)  Crushed   stone 

(2)  3/V'    to    1    1/2" 

(1)  Crushed   traprock 
in  subway  &   1 im*- 
stone    at-grade 

(2)  3A"    to    1     1/2" 

(1)  Crushed   stone 

(2)  AREA  #lt:    (2"    to 
3/8") 

b.      Sub-ballast 

b.    Us-eH    where 
requi  red 

b.             None 

b .           None 

b.           None 

b .            None 

b.    Used  where 
requi  red 

b.    Bank    run 

b.      Granulated  slag 

COMPARISON  OF  TRACK  STRUCTURES  AND  MAINTENANCE   PRACTICES 


DESCRIPTION 


G.   Special  Trackwork 
I.   Specifications 


2.   Guarded  or  unguarded 


3. 

Welded  or  jointed 

Ill   TRACK 

APPURTEHANCES 

A.   Ra 

il  Lubricators 

'■ 

Type 

2. 

Criteria  for  location 

B.   Restraining  Rai 1 

1. 

Horizontal  or  vertical 

2. 

Criteria  for  location 

3. 

Distance  rail  extends  onto 

adjoining  tangents  to 

curves 

U. 

Flangeway 

5. 

Spacing  of  fasteners 

BOSTON 


1  .  AREA  standards 


2.  Ful 1y  guarded 


1.  Mechanical  feed 
"Meco"  (Poor  i  Co.) 

2 .  On  al 1  curves  of 
1000'  radius  &  under 
and  on  al 1  restrain- 
Ing  rail 


] .  Horizontal 


2.  On  curves  of  1000' 
radius  and  under. 

On  extensions  res- 
training rai I  will  be 
used  on  curves  of 
1500'  radius  and  undei 

3.  15'  on  entering  end 
and  30'  on  leaving  end 


li.l  yU"   except  on 
curves  of  less  than 
200'  radius  where  2" 
Is  used 

5.  Alternate  ties 
except  on  curves  of 
less  than  200'  radius 
where  it  is  every  tie 


CHICAGO 


1 .  AREA  standards 
except    for  No.    k  x- 
overs   of   C.T.A.    Design 

2.  Guards   are   being 
removed  except    for   one 
where   traffic    is    heavy 

3.  Jointed 


1 .  Mechanical  feed 
"Meco"  (Poor  i  Co.) 

2.  On  curves  of  500' 
radius  and  under 
(Running  rails  &  re; 
training  rails) 


1.  Horizontal 


2.  On  curves  of  less 
than  300'  radius  and 
in  special  trackwork 
on  structures 


3.  10'  on  both  enter 
ing  and  leaving  ends 


h.    1    7/8"   No 
for   radi  i 


CLEVELAND 


I .  AREA  standards 


2.  Switch  points  and 
frogs  are    guarded 


1.  "Hurcol" 

(H.T.  Kennedy  Co.) 

2,  Based  on  experic 
(Running  rails  and 
rest ra  ini  ng  ra  i Is) 


than  1000'  radius 


3.  ^0'  on  entering  end 
and  10'  on  leaving  end 


k.    I  7/8"  No 
for  radi  i 


5.  Rest ra  ining  ra t I 
bolted  to  running  rai 
with  spacers  at  each 


NEW  YORK 


I .  AREA  standards  and 
NYCTA  design 


1.  Mechanical  feed 
High  pressure 

2.  On  curves  of  les 
than  3000'  radius, 
on  al I  special  t rac 


2.  On  curves  of  less 
than  2300'  radius 


3.  10'  min.on  entering 
end  and  50'  on  leav- 

h.    2"   except  on  curve 
of  less  than  200' 
radius  where  flange- 
way  is  2  1/V' 

5.  Braces  &  separator 
on  every  3rd  t  ie 
except  on  curves  of 
less  than  500'  radius 
where  it  is  alternate 
ties 


PHILADELPHIA 


BROAD  ST.  SUBWAY 


I .  PTC  design 


2.  Fully  guarded 


2.  Mechanical  lubri- 
cators not  used. Curve 
of  less  than  750' 
radius  lubricated 
da  i ly  by  hand 
(Running  rails  &  res- 
training ra  i  1  s ) 


2.  On  curves  of  less 
than  750"  radius 


3.  12'  on  both  enter 
ing  and  leaving  ends 


it.  1  l/h"    No 
for  radi  i 


5.  No  informati 


SAN  FRANCISCO 


1 .  AREA  standards  modi 
f  icd  for  wide  gauge 


2,    Frogs    are    guarded 


2.  To  be  placed  as 
quired,  probably  o 
curves  of  less  tha 
950'  radius.  Also 
flange  lubricators 
be  installed  on 
vehicles 


1.  Horizontal 


2.  On  curves  of  950' 
radius  and  less 


3.  10'  on  entering  end 
and  50'  on  leaving  end 


k.    I  7/8"  No  variat  ion 
for  radi  i 


5.  36"  for  di 
fixation 
Alternate  tie 
grade 


TORONTO 


I  ,    TTC    design 


2.    Ful ly  guarded 


I.  Rai Is  Co 


2,  Based  on  experience, 
generally  on  curves  ol 
radius  less  than  1000' 
(Running  ra i 1 s  6  res- 
training rai Is) 


1  Horizontal  on 
t  racks .  vert  ica 1 
yard  tracks 

2.  On  curves  of  1 
than  2600'  radius 


3.  10'  on  entering  end 
and   50'  on  leaving  end 


5.  Alternate  ti 


WASHINGTON 


1 .  AREA  standard  with 
IIETRO  design  contlnucu' 
plates 

2.  Frogs   are    guarded 


I.  None  planned 


2.   Undetermined 


radius  and  less 


3.   35'  on  both  ente 
ing  and  leaving  end. 


k.    1-7/8"  vith  p 
VMS  ion  for  adjus 


COMPARISON  OF  TRACK  STRUCTURES  AND   MAINTENANCE  PRACTICES 


DESCRIPTION 


Gu«rd   Rai  1 

1  .      Criteri*    for    locat ic 


2.      Limits   of   construction 


0.      Pads 
1.     Tie 


3.      Elastomeric 


E.      Expansion   Joints 
I.     Type 


2.      Criteria   for   location 


F.      Switch   Heaters 


BOSTON 


I.    On   bridges 
fills 


2.  Approx.  100'  beyoni 

2.  50'  ahead  of  ente 

each  end  of  area  In- 

Ing end  &  10'  beyond 

volved 

leaving  end  of  area 

Involved 

1.  Used  where   noise    h 
problem.    "Bird"   t le 
pads    to  be   used 

t  h  roughout   cons  t  ruc- 
tlon    Including   specia' 
tracb*ork 

2.  Rubber  pads    1/8" 
thick   used  at   one 
location   for   reducing 
vibrat  ion 

3.  None 


1 .  Conley  si iding 
expansion  joints 


2,  Based  on  exper 
ence 


Airco  electric 


CHICAGO 


I .  On  bridges  &  on 
curves  of  less  than 
300'  radius 


I.  Bird  &  Abex  asphalt 
coated  pads  used 
throughout  surface 
aerial  construct  ior 


2.  Used  with  conr- 
press Ion  cl Ips  In 
State  St.  subway  with 
unsatisfactory  results 

3.  1/2"  thick  butyl 
rubber  pads  used  In 
Dearborn  St.  subway 


1,  No  provisions  made 


2.    Same  as   1 


Kerosene   pot »    9*s* 
and  calrod  electric 


CLEVELAND 


1.    On  bridges 


2.    No    information 


1 .    SI iding   expansion 
joints    on    one    long 
b  r  i  dge . 

Plugs   are   used  as 
requi  red. 


2.    Based  on 
experience 


Tubular   type   electric 


NEW  YORK 


1 .    On  bridges 


2 .    No    informat I 


1 . asphalt  coated  tie 
pads  now  standard  for 
use  on  wood   ties 


2.  Molded   rubber   rail 
seats   are   replacing 
ballasted   tangent 
track    In   subway 

3.  Same   as      2 


1.  No  provisions  made 


Tubular  type  electric 


PHILADELPHIA 


BROAD  ST.  SUBWAY 


I .  Used  in  areas  of 
crit leal  clearance 


1.  "Bird"  5  ply.  1/**' 
thick  asphalt  coated 
used  throughout 


1 .  No  si i  di  ng  expan- 


2.  Same  as   1 


Calrod  electr 


SAN  FRANCISCO 


1 .  Reinforced  elasto- 
metric  t le  pads  with 
sealant  coat Ing  on 
bottom  surface  for 
wood  tie  construction 


2.  Component  of  dlrec 
fixation  fasteners 


TORONTO 


1 .  On  curves  of  less 
than  2600'  radius  and 
on  bridges,  embank- 
ments and  areas  where 
extraordinary  damage 
could  occur  from  de- 
rai Iment 

2.  No    Information 


1 .  No  si iding  expan- 
sion  joints 

Puffer  rai Is  used  as 
requ  I  red . 

Special  tie  bars  wi I 
be  used  on  X-Overs  o 
aerial    structures. 

2 .  See   I    above 


None  requi  red 


3.  Neoprene  pads  are 
used  on  curves.  Butyl 
rubber  pads  are  used 
on  tangent . 


1 ,  SI iding  expans 
joints  used  on  br 


2.  Same  as   I 


General  Electr 

and  Rails  Co. 


WASHINGTON 


1  .  On  aerial  structures 
bridges,  retained  fill 


2.   60'  on  approach  end 
25'  on  departure  end 


2.   Component  of  direct 
fixation  fasteners 


2.   Does  not  apply 
Tubular  type  electr 


COMPARISON  OF  TRACK  STRUCTURES  AND  MAINTENANCE  PRACTICES 


DESCRIPTION 


IV      HAIMTEMNCE    OF   WAY 


BOSTON 


CHICAGO 


A.    Track  maintenance 
work  performed   pri- 
marily  by  manual    labor. 
Tracks   are    lined  and 
surfaced  every  ^7  yrs. 


6 .    Rail    is    replaced 
w^er    3'U"    vertical 
headwear  occurs   on 
IDO    lb.    rai I    or    1/2" 
on  85    lb.    rai 1.    No 
rail    grinding    is   per- 
formed.   Rai I    1 ife   on 
tangent    is    12-1^  yrs. 
before   transposing, 
then  an  additional    7 
years.    Rat  I    I ife  on 
curves   of    radius   500 
ft.    is  8-9  years.    Heat 
treated    rai  I    has   kCfi 
greater   rail    life   than 
control-cooled    rail . 

C  .  Tie  life  in  subway 
is  25-30  years  and  on 
surface.    18-25   years. 


D.    Practice    is   to 
remove    fouled   ballast 
and    replace    it  with 
new  bal  last. 


A.  Track  maintenance 
work  performed  primer 
ily   by  manual    labor. 


6  .   Rai 1    is   replaced 
when   5/8"   vertical 
wear  occurs.    Life  of 
control -coo led   rail   of 
tangent   averages   '♦0 
yrs.    and    In   stat  ion 
areas,    maximum  kO  yrs. 
Life  of  heat   treated 
rai 1    on  90'    radius 
curves,   6-7  years. 


C  ,    Ties    renewed   by 
manual    labor. 
Tie    life   of   oak   ties 
on  surface    is    35 
years;   pine  ties  on 
structure,   25  years, 

D.    Practice    is   to 
remove    fouled   ballast 
and   replace    it   with 
new  ballast,   when   the 
ties  are    renewed. 


CLEVELAND 


A.    Track   maintenance 
work  performed   pri- 
marily  by  manual    labor 
Major  out-of-face 
maintenance   work  will 
be   performed   by  a 
contractor. 


B  .    No  major    rai  1 
replacement    to  date. 


C  .    No   ties   have   been 
replaced   to  date. 


D.   To  date   no  ballast 
has   been  cleaned  or 
replaced. 


NEW  YORK 


A.    The    N.Y.C.T.A.    feel 
that    it    is  more  effi- 
cient   to  use  manual 
labor   than  automatic 
machinery    in    the    sub- 
cry 


is   used  wher 


feas- 


B.  Rail  grinding  per- 
formed under  contract. 
Heat  treated  rail  has 
100^  greater  rail  life 
than  control-cooled 
rail. 


C  .  Tie  1 ife  through- 
out the  system  aver- 
ages 25-30  years. 


0.    Practice    is   to 
remove   fouled  ballast 
and   replace    it  with 
new  bal last . 


PHILADELPHIA 


BROAD  ST.    SUeWAY 


A.    Track   maintenance 
work    is    performed 
primarily  by  manual 
labor. 


B ,    Rai I    is    renewed 
when   5/8"   vertical 
headwear  or   3/**"  hor 
zontal    sidewear 
occurs.    Track    is    re- 
gauged  after  3/8" 
s  i  dewea  r . 


C  .  Ti  es  renewed 
approximately  ev 
35   years. 


D .    Practice    is   to 
remove    fouled   ballast 
and    replace    it  with 
new  ballast. 


SAN  FRANCISCO 


A.  System  not  In  opera 
tton  The  bulk  of  tie 
renewal  work  will  be 
performed  by  manual 
labor  and  the  bal last 
tamping  will  be  done 
by  mechanical  machi- 
nery. 


B«    No   rai 1    gri  nding 
will    be  performed 
until    rail    defects 
warrant    it. 


See     A      above 


D      See    A       above 


TORONTO 


A.    Track  maintenance 
work    is    performed   pri- 
marily  by  manual    labor 
Tracks  are   surfaced  s. 
1 i  ned  annual ly    In 
spring   and    fall .      The 
Sperry   car    inspects 
the   track  within   the 
f i  rst   year  and   then 
every    3  years. 

B  .    Heat    treated   rai  1 
has  approximately   100^ 
greater   rail    life   than 
control -cooled   rail. 
Rail    life  of   control- 
cooled   rai 1    on   tangent 
track  estimated   to  be 
20   to   25  years.    Rail 
grinding    Is   performed 
initially   before 
system  operation  and 
subsequently  on  a 
year-round  basis- 
Rai 1    is    replaced  when 
5/8"   heaA*ear  occurs. 


.  The  TTC  has  exper 
ienced  15°/  tie  renew 
in    13  yea rs . 


D .    To   date   no  ballast 
has   been   cleaned  or 
replaced. 


WASHINGTON 


A.  System  not  in 
operation.  As  m 
possible  of  the 


3.  Rail  I ife  of 


est  i 


ted 


be  50  to 
60  years.   Rail 
grinding  is  to  be 
performed  initially 
before  system  oF>erati 
and  subsequently  as 
needed   Rail  is  to  b 
replaced  when  17/32" 
headwear  or  sidewear 


See  A  above 


See  A  above 


COMPARISON  OF  TRACK  STRUCTURES  AND   MAINTENANCE   PRACTICES 


DESCRIPTION 


V.  TEST  INSTALLATIONS  AND  RESEARCH 


VI.  RECOMMENDATIONS  OF  EXISTING 
SYSTEMS  TO  IMPROVE: 


A.   Ride  dual ity 


Track  Maintenance 


C.   Noise  and  Vibration 


BOSTON 


A.    Use    115*    rail 


B.  Space  t les  at  2W' 
spacing  throughout. 
Use  as  much  mechanize 
machinery  for  tie  and 
ballast  work  as  pos- 
sible. 

C.  Use  t  ie  pads 
throughout  including 
under  special  track- 
work 


CHICAGO 


V.    Test    sect  ion   of    SRS 
"101"   concrete    t les 
with   "Fist"    fasteners 
To  date   results   are 
sat  isfactory 

Test    sect  Ion   of    Ra i I- 
road   Rubber   Products 
Co.    molded    rubber    rai 1 
seats    instal  led    in    tan- 
gent   track  on   concrete 
deck   structure.    To  dat< 
results   are   satisfac- 
tory. 

"RS"   concrete   cross 
ties    to  be    installed    i( 
test    sect  ion    i  n   near 
future 


A.  Rigid  tolerances 
for  track  al ignment 
and   surface 


B.  Rigid  qual ity 
trol  of  construct 
materials  and  wor 
manship. 


C.    Use 


CLEVELAND 


V.  A  test  sect  ion  util- 
izing an  asphalt  under- 
lay Is  planned. 


B  .  The  use  of  ra 1 1 
lubricators 


C,  Asphalt  paving  on 
ballast  section. 
The  use  of  rai I  lubr 
cators. 


NEW  YORK 


V.  Test  section  con- 
paring  U.S.  Steel 
Curvemaster  rail  with 
Bethlehem  Steel  fully 
heat  treated  ra  i 1 . 
Results  to  date  not 


A.  Use  of  direct  rail 


ert  utilizing  mol 
rubber  ra  i 1  seats 


C .  Same  as  A. 


PHILADELPHIA 


BROAD  ST.  SUBWAY 


Thermit  type  fi 
Ids  tested. 


A.  Install  "Bird"  tie 
pads  throughout . 


B.  Same  as  A 
Use  1 15"  RE  r 
heat  treated 
high  rail  of 


SAN  FRANCISCO 


'resent    track   deslgr 
based  on    results  ob- 
tained   from   Mt .    Diablo 
Test    Track. 


ect  rail  fixa- 
o  tunnel  invert 
idge  deck. 


B .    Long    lengths  o 
shop  welded   rai 1 


TORONTO 


Some  special  alloy 
steel  rai I  under  test . 
Prel Iminary  results 
indicate  same  wear  as 
with  heat  treated  rai 1 
High  s  i 1  icon  rai I  undei 
order  for  a  test  in- 
stallation. 


pads  where 
to  dampen 
s  from  rail. 


A.  Direct  rail  fixa- 
tion to  tunnel  invert 
and  bridge  deck. 


B  Traprock  ballast 
preferred  to  I ime- 
stone.  Minimum  of  15' 
ballast  under  ties. 


C,  The  use  of  ra ! 1 
lubricators  and  ela 
tomeric  pads. 


WASHINGTON 


V  Proposed  tests 
include  various  ties, 
fasteners  and  spacings 
of  ties  and  fasteners. 
Direct  fixation  rail 
fasteners  and  concrete 
ties  will  undergo 
complete  performance 
testing.   It  is  also 
proposed  to  test 
various  designs  of 
floating  slabs 


A  Use  of  resilient 
direct  fixation  rail 
fasteners  and  CWR  . 


C.   Use  of  CWR  through- 
out, resilient  rail 
fasteners,  floating 
slabs  under  special 
trackwork  in  subway. 


Advertisement 


104-1 


DID  IT  REALLY  NEED  REPLACING? 

Consider  An  Alternative 


IN-PLACE  TREATMENT 


15  To  20  Years  Additional  Life.. . 
For  5-10%  of  Replacement 

OSMOSE  WOOD  PRESERVING  CO.  OF  AMERICA,  INC. 

980   ELLICOTT  STREET  /  BUFFALO,   N.  Y.   14209 


104-2  Advertisement 


THE  DOUBLE  U  RAIL  ANCHOR 

ACHUFF  RAILWAY  SUPPLY  CO. 
ST.  LOUIS,  MO. 


MODEL  441 

Developed  and  Built 
for  Railroad  Maintenance 

180°  BOOM  SWING 

dOBS  AU  JOBS! 


ROOTS  AND  LOADS  TIES 


LAYING  WELDED  RAIL 


12  ¥AST  CHANGE  ATTACHMENTS 


Forks 

T/^  Cu.  Yd.  Bucket 

Tote  Hook 

18'  Boom  Extension 

Fork  Tie  Baler 

Trock   Cleoning   Bucket 


Back  Hoe 

Clamshell 

Back  Filler  Blade 

Pull   Drag   Bucket 

4  Cu.  Yd.  Snow  Bucket 

Pile  Hammer 


Optional  Attachment 
Flanged  Wheels,  Hydroulically  Controlled 

PETTIBONE  MULLIKEN  CORPORATION 


RAILROAD 

141    W.   JACKSON 


DIVISION 

CHICAGO  4,   III 


IDE   TRACK   CLEANING   BUCKET' 


80  Years  of  Service 
to  the  Railroad  Industry 


104-4  Advertisement 


Assure  lower  maintenance  costs,  better  performance  with 

Texaco 

Railroad  Lubricants 

and  Systematic 

Engineering 

Service 

^E]^CO| 

New  York  •  Atlanta  •  Chicago  •  Minneapolis  •  St.  Louis  •  San  Francisco 


LEVELLING,  LINING,  TAMPING... 

n  ONE  OPERATION,  with  ONE  OPERATOR 


.BLECTRONIC 
HEFERENCE 


.  FEELER 
detects  position 
of  track  in  spiral 
or  curve  at  every 
tie  and  leeds 
Inlormalion  to 
"Auto-Control" 


WORKINQ 
SHADOW  BOARD 
controls  lining  at 
point  wtiare 
lilting,  levelling 
and  lamping^ 
Is  done. 

RECEIVER 
BUQQY 

"Auto-Control" 
continuously 
positions 
receivers 
electronically  to 
satisfy  Ideal  curve 
requiroments  and 
establishes 
required  amount 
ol  track 
correction. 


The  Autojack  Electromatic 
with  Autoliner  leads  the  way 
through  these  advantages: 

•  Gives  the  highest  possible  degree  of  accuracy  by  electronic 
beams  projected  100  feet  in  advance  of  where  levelling, 
lining  and  tamping  are  taking  place. 

•  Automatic,  continuous  operation  for  both  tangent  and 
curve  track.* 

•  No  plotting  of  spirals  or  curves  required.  Machine  computes 
as  it  runs  for  the  best  transition. 

•  No  disturbing  or  humping  of  track  —  lining  takes  place 
simultaneously  Vi/ith  lifting  and  tamping  ahead  of  tamping 
tools. 

•  With  the  Autoliner,  it  is  possible  to  make  a  minute  throw 
and  have  it  stay  there  because  tamping  is  done  in  correct 
alignment. 

■Model  ALT  for  Tangent  track  and  Model  ALC  for  Tangent 
and  Curve  Track,  botfi  available  as  attachments  for 
existing  AUTOJACK  ELECTROMATICS. 


Head  Office  &  Plant  — 2401  Ed- 
mund Rd.,  West  Columbia,  S.  C. 
29169  •  8  03/794-9160 
Plant  — 160  St.  Joseph  Blvd., 
Lachine  (Montreal),  Que.,  Canada 
•  514/637-5531 
Parts  Depot  — 1902  University 
Ave.,  St.  Paul,  tVlinn.  55115  • 
612/645-5055 

Sales,  Service  &  Parts  —  Tamper 
(Australia)  Ply.  Ltd.,  34  Mcin- 
tosh St.,  Airport  West,  G.P.O. 
Melbourne,  Victoria  3042,  Aus- 
tralia   •    379-8441 


104-6  Advertisement 


WOODINGS-VERONA  TOOL  WORKS 


▼  Pioneer  Manufacturers 

of 

fflGH  GRADE  TRACK  TOOLS 

and 

SPRING  WASHERS  FOR  TRACK 

Since  1873 

VERONA,  PA.  CmCAGO,  ILL. 


w 

WOODINGS  FORGE  &  TOOL  COMPANY 

Makers 

oi 

WOODINGS  RAIL  ANCHORS 

VERONA,  PA. 

CHICAGO,  ILL. 

Advertisement 


104-7 


Aeroquip  Hose  for  rugged 
railroad  airbrake  service 

At  temperatures  as  low  as  — 40°F.  and  pressures  to 
300  psi,  Aeroquip  Air  Brake  Hose  is  fully  reliable  for 
exposed  or  unexposed  railroad  air  brake  applications. 
This  hose  is  specially  built  to  withstand  the  severe 
conditions  encountered  in  air  brake  service.  And 
Aeroquip  Reusable  Fittings  plus  a  small  stock  of  bulk 
hose  permit  quick  and  easy  replacement  of  any 
length  of  hose  line. 

Constructed  with  a  rugged  Neoprene  inner  tube, 
steel  wire  braid  reinforcement  and  a  synthetic  rubber 
cover,  this  hose  is  available  in  sizes  from  Vi"  to  lYs"  I.D. 

For  more  information,  contact  your  Aeroquip  Dis- 
tributor. Or  write  for  your  free  copy  of  Railroad  Cat- 
alog 405.  Aeroquip  Corporation,  Industrial  Division, 
Jackson,  Michigan  49203,  subsidiary  of  Libbey- 
Owens-Ford  Company.  Aeroquip  products  are  protected 
by  patents  internationally. 


\eroquip 

INDUSTRIAL  DIVISION 


104-8 


Advertisement 


It's  Maintenance  First- and 
PORTEC  Railway  Products 

are  First  in  Maintenance 


Rail  Anchors 


IMPROVED  FAIR  Anchors 
XL-1  FAIR  Anchors 
Anchor  Renewal  Service 


Rail  Joints 

^^ 

•  standard  Joints 

•  Insulated  Joints— armored 
and  continuous 

•  Compromise  Joints 

•  Poly-insulated  Joints 

•  Poly-insulated  Plates 

•  Insulation 


830-1 


Rail  and  Flange 
Lubricators 


Reversible  Switch 
Point  Protectors 


Diesel  and 
Caboose  Batteries 


Literature  available  on  request. 

1    UK  I  Wu\m  inc.  RAILWAY  PRODUCTS  DIVISION 
300  Windsor  Drive.  Gale  Broolc,  Illinois  60521  •    In  Canada:  Portec,  Limited 


CONOMICALMCKDRAINAG 

"'■  SPENO  Ballast  Cleaning 

ge  after  cleanin|  witli  SPEND  bllast  CleMK 

One  of  the  SPEND  BiUast  aeaning  nuchinei. 


The  transformation  In 
drainage  conditions  shown 
in  these  photos  was 
accomplished  with  a 
SPEND  Ballast  Cleaning 
Machine... Time  Tested 
—and  Proved  — Year 

after  Year  on  the  railroads 
of  the  Nation. 

For  just  a  few  pennies 
per  track  foot  you  can 
have  good  track  drainage 
that  saves  maintenance 
dollars. 


Write  or  telephone  for  a  Ballast 
Cleaning  program  for  your  railroad. 


RPA 


FRANK  SPEND  RAILROAD  BALLAST  CLEANING 

Clo,k;$...   Eo..   Syrao,.,,   N.V.  306   N    CbyuM   St.,    I.SotC 

Pt..  315  437  2547        •  '        .>„   „    ' 


HLLHoi  bLCAninu  CO.,  inc 

306  N    Cbyucia   Si,,   llSotci,  N  Y. 
Ph.  607  17f.   3:.t3 


^•li?"  ulS  R«prM«nUtJve:  lEC-HOLDEM  LTD..  614  St  Jmm 
St.  W.,  Mont/Ml  3,  QuW).e,  Cwudi     nm:  514  M^-iuT 


THE  TRASCO  CAR  RETARDER 

HUNDREDS  IN  SERVICE 
IN  aASS  YARD  TRACK 

TRACK  SPECIALTIES  COMPANY 

P.O.  BOX  729  WESTPORT,  CONNECTICUT 


American  Railway 

Engineering  Association— Bulletin 


Bulletin  630  November-December  1970 

Proceedings  Vol.  72* 


PART   1— MANUAL  RECOMMENDATIONS 

Committee   1 — Roadway  and  Ballast 107 

Committee  6 — Buildings 120 

Committee  8 — Concrete  Structures  and  Foundations 136 

Committee   15 — Steel  Structures 153 

Committee  31 — Continuous  Welded  Rail 157 

CommiHee  4 — Rail    160 

Committee  5 — Track 161 

PART  2— REPORTS  OF  COMMITTEES 

Committee  16 — Economics  of  Railway  Location  and 

Operation 165 

Committee  20 — Contract  Forms 167 

Committee  9 — Highways    169 

Committee  22 — Economics  of  Railway  Construction  and 

Maintenance    183 

Committee   13 — Environmental   Engineering 203 

Committee   14 — Yards  and  Terminals 227 

Committee   11 — Engineering    Records   and   Property  Ac- 
counting     239 

Committee  27 — Maintenance  of  Way  Work  Equipment  _  249 


•  The  contents  of  this  Bulletin  and  the  other  Bulletins  of  the  Association  from 
Bulletin  629,  September-October  1970,  to  and  including  Bulletin  633,  June-July  1971 
(except  the  blue-covered  Directory  Issue,  Bulletin  632,  April-May  1971),  will  constitute 
the  Annual  Proceedings  of  the  Association,  Vol.  72.  Accordingly,  this  issue  of  the 
Bulletin  should  be  carefully  preserved  for  inclusion  in  the  Proceedings  book-type  binder 
which  will  be  made  available  on  request  from  Association  Headquarters,  following 
publication  of  the  June— July   issue. 


Copyright  1970,  by  Amartcan  Railway  En0tn**rlng  Atteclallon 


BOARD  OF  DIRECTION 

1970-1971 

President 
E.  Q.  Johnson,  Chief  Engineer,  Norfolk  &  Western  Railway,  Roanoke,  Va.  24011 

Vice  Presidents 

A.  L.  Sams,  Vice  President  and  Chief  Engineer,  Illinois  Central  Railroad,  Chicago,  111. 

6060S 
R.  M.  Brown,  Chief  Engineer,  Union  Pacific  Railroad,  Omaha,  Neb.  68102 

Past  Presidents 

H.  E.  Wilson,  Assistant  Chief  Engineer  System,  Atchison,  Topeka  &  Santa  Fe  Railway, 

Chicago,  m.  60604 
H.  M.  Williamson,  Chief  Engineer,  System,  Southern  Pacific  Transportation  Company, 

San  Francisco,  Calif.  94105 

Directors 

D.  V.  Sartore,  Chief  Engineer — ^Design,  Burlington  Northern,  Inc.,  St.  Paul,  Minn.  SSlOl 
S.  A.  Cooper,  Chief  Engineer,  Gulf,  Mobile  &  Ohio  Railroad,  Mobile,  Ala.  36601 

J.  F.  Piper,  Chief  Engineer,  Pennsylvania-Reading  Seashore  Lines,  Camden,  N.  J.  08103 

C.  T.  PoPMA,  Chief  En^eering  Officer,  Penn  Central  Transportation  Company,  Phila- 
delphia, Pa.  19104 

C.  W.  Wagner,  Industrial  Engineering  Officer,  Canadian  National  Railways,  Montreal, 
101,  Que.,  Can. 

R.  F.  Bush,  Chief  Engineer,  Erie  Lackawanna  Railway,  Cleveland,  Ohio  44115 

A.  W.  Carlson,  Chief  Engineer,  Western  Pacific  Railroad,  San  Francisco,  Calif.  94105 

E.  T.  Franzen,  Chief  Engineer,  Missouri  Pacific  Raihroad,  St.  Louis,  Mo.  63103 

J.  T.  Ward,  Senior  Assistant  Chief  Engineer,  Seaboard  Coast  Line  Raikoad,  Jackson- 
ville, Fla.  32202 

E.  M.  Hastings,  Jr.,  Utility  Engineer,  Chesapeake  &  Ohio  Railway-Baltimore  &  Ohio 
Raikoad,  Huntington,  W.  Va.  25718 

B.  J.  WoRLEY,  Vice  President-Chief  Engineer,  Chicago,  Milwaukee,  St.  Paul  ft  Pacific 

Railroad,  Chicago,  HI.  60606 
W.  J.  Jones,  Engineer  Maintenance  of  Way  and  Structures,  System,  Southern  Pacific 
Transportation  Company,  San  Francisco,  Calif.  94105 

Treasurer 
A.  B.  HnxMAN,  Jr.,  Chief  Engineer,  Belt  Railway  of  Chicago,  Chicago,  ID.  60638 

Executive  Manager 
Eabl  W.  Hodgkins,  59  East  Van  Buren  Street,  Chicago,  HI.  60605 

Administrative  Secretary 
E.  L.  Abbott,  59  East  Van  Buren  Street,  Chicago,  111.  60605 

Technical  Secretary 
N.  V.  Enoman,  59  East  Van  Buren  Street,  Chicago,  111.  60605 

Published  by   the  American  RaUway   Engineering  Association,   Bi-Monthly,  Januarjr-Febniary,  April- 
May,   June-July,    September-October    and   November-December,   at 
59  East  Van  Buren  Street,  Chicago,  HI.  6060S 

Second  das  postage  at  Chicago,  III.,  and  at  additional  mailing  offices. 
Subscription  $15  per  annum. 


PART  1 
MANUAL  RECOMMENDATIONS 


All  the  recommendations  submitted  by  committees  for  adoption  and 
publication  in  the  1971  Supplements  to  the  AREA  Manual  for  Railway  Engi- 
neering and  the  Portfolio  of  Trackwork  Plans  are  printed  in  this  issue  of  the 
Bulletin.  These  recommendations  will  be  formally  submitted  for  review  and 
approval  to  the  Special  Board  Committee  on  Publications  and  the  AREA  Board 
of  Direction.  Comments  or  objections  by  Members  regarding  any  of  these 
recommendations  should  be  submitted  to  the  Executive  Manager  not  later 
than  FEBRUARY  15,   1971. 


105 
Bui.  6:to 


Manual   Recommendations 
Committee   1 — Roadway  and  Ballast 

Report   on   Assignment  4 
Culverts 

W.  M.  Dowdy  (chairman,  subcommittee),  G.  C.  Fenton,  J.  L.  Vickers,  C.  W.  Bean, 
T.  F.  De  Capiteau. 

Your  committee  submits  for  adoption  and  publication  in  tlie  Manual  the  follow- 
ing Height  of  Cover  Tables,  to  be  inserted  in  Chapter  1  following  page  1-4-37. 


MINIMUM  AND  MAXIMUM  HEIGHT  OF  COVER  IN  FEET 

2%-Inch  by  Jz-Inch  and  2-Inch  by  K-Inch  Corrugations 

Riveted,  Spot  Welx)ed  or  Helical  Lock  Seam  Pipe-Arch 

Cooper  E  80  Live  Load  Plus  50%  of  the  Lr\'E  Load  for  Impact 

Granut^ar  Backfill  Compacted  to  85%  Standard  Density  Based  on  ASTM  D  698 


Size 

Inchea 

Sheet  Thickness  (Inch)  and  Gage 

0.064  {16 Ga.) 

0.079  (14Ga.) 

0.10!)  (12 Ga.) 

0.138  (lOGa.) 

0.16S  (8Ga.) 

Equic.  Pipe 

Diam. 

Span  Rine 

Min. 

Max. 

Min. 

Max. 

Min. 

Max. 

Min. 

Max. 

Min. 

Max. 

15 

18  X  11 

o 

20 

■-) 

20 

18 

22  X  13 

2 

20 

■> 

20 

21 

25  X  IC 

•> 

20 

■) 

20 

24 

29  X  18 

4 

20 

3 

20 

30 

30  X  22 

8 

20 

5 

20 

3fi 

43  X  27 

11 

15 

42 

50  X  31 

11 

15 

7 

20 

5 

20 

48 

58  X  31  i 

9 

20 

Design  Criteria 

Dead  Load  Pressure  =  120  psf  per  foot  of  height  of  cover 

Seam  strength,  based  on  AISI  "Handbook    of   Steel    Drainage    and    Highway   Con- 
struction Products.  " 
Safety  Factors  Based  on: 

FS  =  3.33  For  Longitudinal  Seams. 

FS  =  2        For  Pipe  Wall  Buckling. 

FF  =  0.0433;   Maximum  Span  Limited  by  Flexibility  Factor. 


Note:  The  vertical  load  represented  by  the  mininnim  and  maximum  fill  heights  shown  in  the 
table  is  limited  to  intensities  which  will  distribute  uniformly  over  the  bottom  area  without 
exceedin)?   the   flexural   strength  of  the   bottom   segment. 

If  foundation  conditions  are  adequate  for  high  comer  pressures,  flexural  strength  of  the 
bottom   segment   may  not   be   a   limiting   factor  and   larger  structures  may  he  justified. 


107 


108 


Manual    Recommendations 


MINIMUM  AND  MAXIMUM  HEIGHT  OF  COVER  IN  FEET 

2%-Incii  by  )2-Inch  and  2-Inch  uy  /2-Inch  Corrugations 

Riv-ETED,  Spot  Welded  or  Helical  Lock  Seam  Pipe 

Cooper  E  80  Live  Load  Plus  50%  of  the  Live  Load  for  Impact 

Granular  Backfill  Compacted  to  85%  Standard  Density  Based  on  ASTM  D  698 


Sheet  Thickness  (Inch)  and  Gage 

Walenr   ij 
Area 

Pipe  Diarn. 

0.064  {16 Ga.) 

0.079  (HGa.) 

0.109  {12Ga.) 

0.138  (lOGa.) 

0.1G8  {8Ga.) 

Inches 

Sq.  Ft. 

Round 

Elony* 

R 

E 

R 

E 

R 

E 

R 

E 

12 

0.8 

2-83 

2-91 

15 

1.2 

2-07 

2-72 

18 

1.8 

2-55 

2-00 

2-78 

21 

2.4 

2-48 

2-52 

2-07 

24 

:m 

2-42 

2-45 

2-59 

30 

4.9 

4-33 

3-30 

2-47 

2-49 

30 

7.1 

()-25 

5-29 

3-39 

2-40 

2-42 

42 

9.(i 

5-29 

2-42 

2-40 

2-07 

2-48 

2-70 

2-50 

2-73 

48 

12.0 

7-24 

3-37 

2-44 

2-59 

2-45 

2-01 

2-47 

2-64 

54 

15.9 

4-33 

2-43 

2-52 

2-44 

2-54 

2-45 

2-57 

(iO 

19.  (i 

2-43 

2-47 

2-43 

2-49 

2-44 

2-51 

(SO 

23.8 

2-43 

2-43 

2-43 

2-45 

2-43 

2-4C 

72 

28.3 

2-41 

2-41 

2-43 

2-43 

78 

33.2 

2-40 

2-40 

84 

38.5 

3-30 

3-30 

♦Vertical  Elongation  =5%  of  Nominal  Dian)et?r. 


Design  Criteria 

Dead  Load  Pressure  =  120  psf  per  foot  of  height  of  cover. 

Seam  strength,  based  on  AISI  "Handbook    of    Steel    Drainage    and    Highway    Con- 
struction Products". 
Safety  Factors  Based  on: 

FS  =  3.33  For  Longitudinal  Seams. 

FS  ,=  2        For  Pipe  Wall  Buckling. 

FF  =  0.0433;   Maximum  Span  Limited  by  Flexibility  Factor. 

For  Granular  Backfill  85%  Density 

K  =  0.22;  Soil  Stiffness  Coefficient. 
£'  =z  1400  psi;  Modulus  of  Soil  Reaction. 
-^,  ^  5%  Allowable  Deflection  Below  Circular  Shape. 


Note:    This    table    is    based    on    structural    considerations.    Abrasive    or   corrosive    conditions 
the    site   may   require   a   greater   sheet   thickness   or   jirotective   coating   and   invert   paving. 


Manual    Recommendations  109 


Report  on  Assignment  5 
Pipelines 

E.  E.  Farris  (chairman,  subcommittee),  C.  R.  Bergman,  I.  P.  Cook,  W.  T.  Ham- 
mond, G.  B.  Harris,  H.  L.  Van  Horn,  M.  E.  Vosseller,  A.  J.  Wegmann. 

Your  committee  submits  for  adoption  the  following  revised  version  of  Part  5 — 
Pipelines,  Chapter  1  of  the  Manual,  to  replace  the  present  material  on  pipelines 
printed  on  pages  1-5-1  to  1-5-10,  incl. 


Part  5 
Pipelines 

5.1  SPECIFICATIONS  FOR  PIPELINES  CONVEYING 
FLAMMABLE  SUBSTANCES 

5.1.1  SCOPE 

These  specifications  cover  pipelines  installed  on  railway  rights-of-way  to  carry 
oil,  gas,  petroleum  products,  or  other  flammable  or  highly  volatile  substances  under 
pressure.  The  tenu  "engineer"  as  used  herein  means  the  chief  engineer  of  the  railway 
company  or  his  authorized  representative. 

5.1.2  GENERAL  REQUIREMENTS 

Pipelines  under  railway  tracks  and  across  railway  rights-of-way  shall  be  encased 
in  a  larger  pipe  or  conduit  called  the  casing  pipe  as  indicated  in  Fig.  5.1.2.1.  Casing 
pipe  may  be  omitted  in  the  following  locations: 

(a)  Under  secondary  or  industry  tracks  as  approved  by  the  engineer. 

(b)  On  pipelines  in  streets  where  the  stress  in  the  pipe  from  internal  pres- 
sure and  external  loads  does  not  exceed  40  percent  of  tlie  specified  mini- 
mum yield  strength  (multiplied  by  longitudinal  joint  factor)  of  the  steel 
pipe  material. 

Pipelines  shall  be  installed  under  tracks  by  boring  or  jacking,  if  practicable. 

Pipelines  shall  be  located,  where  practicable,  to  cross  tracks  at  approximately 
right  angles  thereto  but  preferably  at  not  less  than  45  deg  and  shall  not  be  placed 
within  a  culvert,  under  railway  bridges  nor  closer  than  45  ft  to  any  portion  of  an\- 
railway  bridge,  building  or  other  important  structure,  except  in  special  cases  and 
then  by  special  design  as  approved  by  the  engineer. 

Pipelines  carrying  liquefied  petroleum  gas  or  natural  gas  liciuids  shall,  wlui' 
practicable,  cross  any  railway  where  tracks  are  carried  on  an  embankment. 

Pipelines  laid  longitudinally  on  rail\\a>-  rights-of-way  shall  be  located  as  far  as 
practicable  from  any  tracks  or  other  important  structures.  If  located  within  25  ft 
of  the  center  line  of  any  track  or  closer  tlurn  45  ft  to  nearest  point  of  an\  bridge, 
building  or  other  important  .structure,  the  carrier  pipe  shall  be  enca.sed  or  of  special 
design  as  appro\ed  by  the  engineer. 


no 


Manual    Recommendations 


See  Art.   5.1.3 


Pee    .Art .   5.1.4 


Vent ,  .See 
.Art .  5.1.5.5 


" ROADBED 


Min-SeeArt.   5.1.5.2 


CARRIER  PIPE 


-CASING  PIPE 


—  Seal,  See  Art.   5.1.5.4 


Seal,  See    Art.   5.1.5.4 


D 


Fig.  5.1.2.1 


Any  replacement  of  a  carrier  pipe  shall  be  considered  a  new  installation,  subject 
to  the  requirements  of  these  specifications. 

Where  laws  or  orders  of  public  authority  prescribe  a  higher  degree  of  protec- 
tion than  specified  herein,  then  the  higher  degree  of  protection  so  prescribed  shall 
be  deemed  a  part  of  these  specifications. 

Pipelines  and  casing  pipe  shall  be  suitably  insulated  from  underground  conduits 
carrying  electric  wires  on  railway  rights-of-way.  All  pipelines,  except  those  in  streets, 
shall  be  prominently  marked  at  the  rights-of-way  ( on  both  sides  of  track  for  under- 
crossings)   by  signs  substantially  worded  thus: 

"High  pressure main ft  under" 


5.1.3  CARRIER  PIPE 

Pipelines  carrying  oil,  liquefied  petroleum  gas,  natural  or  manufactured  gas  and 
other  flammable  products  shall  conform  to  the  requirements  of  the  current  ANS 
B  31.4  Liquid  Petroleum  Transportation  Piping  Systems,  B  31.8  Code  for  Gas  Trans- 
mission and  Distribution  Piping  Systems,  and  other  applicable  ANS  codes,  except 
that  the  maximum  allowable  stresses"  for  design  of  steel  pipe  shall  not  exceed  the 
following  percentages  of  the  specified  minimum  yield  strength  ( multiplied  by  longi- 
tudinal joint  factor)  of  the  pipe  as  defined  in  the  above  codes. 

Requisites  for  carrier  line  pipe  under  railway  tracks  shall  apply  for  a  minimum 
distance  of  50  ft  (measured  at  right  angles)  from  center  line  of  outside  tracks  or 
2  ft  beyond  toe  of  slope  or  25  ft  beyond  the  ends  of  casing  ( when  casing  is  required ) , 
whichever  is  greater.  This  requirement  does  not  apply  to  lines  in  streets. 

The  pipe  shall  be  laid  with  sufficient  slack  so  that  it  is  not  in  tension. 


'  If  the  niaximuin  allowable  stress  in  the  carrier  pipe  on  either  side  of  the  crossing  is  less 
than  specified  above,  the  carrier  pipe  at  the  crossing  shall  be  designed  at  the  same  stress  as  the 
adjacent  carrier  pipe. 


Manual    Recommendations  111 


5.1.3.1  Allowable  Hoop  Stress 

5.1.3.1.1  With  Casing  Pipe 

The  following  percentages  apply  to  hoop  stress  in  steel  pipe  within  a  casing 
under  railway  tracks  and  across  railway  rights-of-way: 

(a)  Seventy-two  percent  on  oil  pipelines. 

(b)  Fifty  percent  for  pipelines  carrying  condensate,  natural  gasoline,  natural 
gas  liquids,  liquefied  petroleum  gas,  and  other  petroleum  products. 

(c)  Sixty  percent  for  gas  pipelines. 

5.1.3.1.2  Without  Casing  Pipe 

The  following  percentages  apply  to  hoop  stress  in  steel  pipe  without  a  casing 
under  secondary  or  industry  tracks: 

(a)  Sixty  percent  for  oil  pipelines. 

(b)  Forty  percent  for  pipelines  carrying  condensate,  natural  gasoline,  natural 
gas  liquids,  liquefied  petroleum  gas,  and  otlier  petroleum  products. 

(c)  Fifty  percent  for  gas  pipelines. 

5.1.3.1.3  On  Right-of-Way 

The  following  percentages  apply  to  hoop  stress  in  steel  pipe  laid  longitudinally 
on  railway  rights-of-way: 

( a )  Sixty  percent  for  oil  pipelines. 

(b)  Forty  percent  for  pipelines  carrying  condensate,  natural  gasoline,  natural 
gas  liquids,  liquefied  petroleum  gas,  and  other  petroleum  products. 

(c)  Forty  percent  for  gas  pipelines. 

5.1.4  CASING  PIPE 

Casing  pipe  and  joints  shall  be  of  metal  and  of  leakproof  construction,  capable 
of  withstanding  railway  loading.  The  inside  diameter  of  the  casing  pipe  shall  be 
such  as  to  allow  the  carrier  pipe  to  be  removed  subsequently  witliout  disturbing 
the  casing  pipe.  All  joints  or  couplings,  supports,  insulators  or  centering  devices  for 
the  carrier  pipe  within  a  casing  under  railroad  tracks   shall  be  taken  into  account. 

Table  5.1.4.1 

Minimum  Wall  Thickness  for  Steel  Casing  Pipe  for  E  72  Loaijing 

Xoniiual  Nominal 

Thickness  Diameter 

Inches  Inches 

0.138  Under  14 

0.219  14  and  16 

0.250  18 

0.281  20 

0.312  22 

0.344  24 

0.375  26 

0.406  28  and  30 

0.438  .32 

0.469  34  and  36 

0..500  38,  40  and  42 

When  casing  is  installed  without  benefit  of  a  protective  coating,  and  .said  casing 
is  not  cathodically  protected,  the  wall  thickness  sliown  above  shall  be  increased  to 


112 Manual    Recommendations 

the  nearest  standard  size  which  is  a  minimum  of  0.063  in.  greater  than  the  thickness 
shown  except  for  diameters  under  12-^  in. 

5.1.4.1  Steel  Pipe 

Steel  pipe  shall  have  a  minimum  yield  strength  of  35,000  psi. 

5.1.4.2  Cast  Iron  Pipe 

Cast  iron  pipe  may  be  used  for  a  casing  provided  the  method  of  installation 
is  by  open  trench.  Cast  iron  pipe  shall  conform  to  American  National  Standards 
Institute  standard  A  21.  The  pipe  shall  be  of  the  mechanical  joint  type  or  plain-end 
pipe  with  compression-type  couplings.  The  strength  of  cast  iron  pipe  to  sustain  exter- 
nal loads  shall  be  computed  in  accordance  with  ANS  A  21.1  "Manual  for  the  Com- 
putation of  Strength  and  Thickness  of  Cast  Iron  Pipe." 

5.1.4.3  Flexible  Pipe 

For  flexible  casing  pipe,  a  minimum  vertical  deflection  of  the  casing  pipe  of 
3  percent  of  its  diameter  plus  /2  in.  clearance  shall  be  provided  so  that  no  loads 
from  the  roadbed,  track,  traffic  or  casing  pipe  itself  are  transmitted  to  the  carrier 
pipe.  When  insulators  are  used  on  the  carrier  pipe,  the  inside  diameter  of  flexible 
casing  pipe  shall  be  at  least  2  in.  greater  than  the  outside  diameter  of  the  carrier 
pipe  for  pipe  less  than  8  in.  in  diameter;  at  least  3^4  in.  greater  for  pipe  8  in.  to 
16  in.,  incl.,  in  diameter  and  at  least  4/2  in.  greater  for  pipe  18  in.  in  diameter 
and  over. 

5.1.4.4  Length  of  Pipe 

Casing  pipe  under  railway  tracks  and  across  railway  rights-of-way  shall  extend 
to  the  greater  of  the  following  distances,  measured  at  right  angles  to  center  line 
of  track.  If  additional  tracks  are  constructed  in  the  future  or  the  railway  determines 
that  the  roadbed  should  be  widened,  the  casing  shall  be  extended  correspondingly: 

( a )  2  ft  beyond  toe  of  slope. 

(b)  3  ft  beyond  ditch  line. 

(c)  A  minimum  distance  of  25  ft  each  side  from  center  line  of  outside  track 
when  casing  is  sealed  at  both  ends. 

(d)  A  minimum  distance  of  45  ft  each  side  from  center  line  of  outside  track 
when  casing  is  open  at  both  ends. 

5.1.5  CONSTRUCTION 

Casing  pipe  shall  be  so  constructed  as  to  prevent  leakage  of  any  substance  from 
the  casing  throughout  its  length,  except  at  ends  of  casing  where  ends  are  left  open, 
or  through  vent  pipes  when  ends  of  casing  are  sealed.  Casing  shall  be  so  installed 
as  to  prevent  the  formation  of  a  waterway  under  the  railway,  and  with  an  even  bear- 
ing throughout  its  length,  and  shall  slope  to  one  end  (except  for  longitudinal 
occupancy ) . 

Wliere  casing  and/or  carrier  pipe  is  cathodically  protected,  the  engineer  shall 
be  notified  and  a  suitable  test  made  to  ensure  that  other  railway  structures  and 
facilities  are  adequately  protected  from  the  cathodic  current  in  accordance  with  the 
recommendation  of  current  Reports  of  Correlating  Committee  on  Cathodic  Protec- 
tion, published  by  the  National  Association  of  Corrosion  Engineers. 


Manual    Recommendations 113 

5.1.5.1  Method  of  Installation 

(a)  Installations  by  open-trench  methods  shall  comply  with  Installation  ol 
Pipe  Culverts,  Part  4,  this  Chapter. 

(b)  Bored  or  jacked  installations  shall  have  a  bored  hole  diameter  essentially 
the  same  as  the  outside  diameter  of  the  pipe  plus  the  thickness  of  the 
protective  coating.  If  voids  should  develop  or  if  the  bored  hole  diameter 
is  greater  than  the  outside  diameter  of  the  pipe  (including  coating)  by 
more  than  approximately  1  in.,  remedial  measures  as  approved  by  the 
engineer  shall  be  taken.  Boring  operations  shall  not  be  stopped  if  such 
stoppage  would  be  detrimental  to  tlie  railway. 

(c)  Tunnelling  operations  shall  be  conducted  as  approved  by  the  chief  engi- 
neer of  the  railway  company.  If  voids  are  caused  by  the  tunnelling  opera- 
tions, they  shall  be  filled  by  pressure  grouting  or  by  other  approved 
methods  which  will  provide  proper  support. 

5.1.5.2  Depth  of  Installation 

5.1.5.2.1  Casing  Pipe 

Casing  pipe  under  railway  tracks  and  across  railway  rights-of-way  shall  be  not 
less  than  SM  ft  from  base  of  railway  rail  to  top  of  casing  at  its  closest  point,  except 
that  under  secondary  or  industry  tracks  this  distance  may  be  4/2  ft.  On  other  portions 
of  rights-of-way  where  casing  is  not  directly  beneath  any  track,  the  depth  from 
ground  surface  or  from  bottom  of  ditches  to  top  of  casing  shall  not  be  less  than 
3  ft. 

5.1.5.2.2  Carrier  Pipe 

Carrier  pipe  installed  under  secondary  or  industry  tracks  without  benefit  of 
casing  shall  be  not  less  than  4/2  ft  from  base  of  railway  rail  to  top  of  pipe  at  its 
closest  point  nor  less  than  3  ft  from  ground  surface  or  from  bottom  of  ditches. 

5.1.5.2.3  On  Right-of-Way 

Pipeline  laid  longitudinally  on  railway  rights-of-way,  50  ft  or  less  from  center 
line  of  track,  shall  be  buried  not  less  than  5  ft  from  ground  surface  to  top  of  pipe. 
Wliere  pipeline  is  laid  more  than  50  ft  from  center  line  of  track,  minimum  cover 
shall  be  at  least  2  ft. 

5.1.5.3  Inspection  and  Testing 

ANS  Codes  B  31.8  and  B  31.4,  current  at  time  of  constructing  the  pipeline,  shall 
govern  the  inspection  and  testing  of  the  facility  within  the  railway  rights-of-way 
except  as  follows: 

(a)  One-hundred  percent  of  all  field  welds  shall  be  inspected  by  radiographic 
examinations,  and  such  field  welds  shall  be  inspected  for  100  percent 
of  the  circumference. 

(b)  The  proof  testing  of  the  strength  of  carrier  pipe  shall  be  in  accordance 
with  the  requirements  of  ANS  B  31.8  for  Class  Locations  2,  3,  or  4, 
or  B  31.4  as  applicable. 

5.1.5.4  Seals 

Where  ends  of  casing  are  below  ground  they  shall  be  suitably  sealed  to  outside 
of  carrier  pipe. 


114 Manual    Recommendations 

Where  ends  of  casing  are  at  or  above  ground  surface  and  above  high-water  level 
they  may  be  left  open,  provided  drainage  is  afforded  in  such  manner  that  leakage 
will  be  conducted  away  from  railway  tracks  or  structure.  Where  proper  drainage 
is  not  provided,  the  ends  of  casing  shall  be  sealed. 

5.1.5.5  Vents 

Casing  pipe,  when  sealed,  shall  be  properly  vented.  Vent  pipes  shall  be  of 
sufficient  diameter,  but  in  no  case  less  than  2  in.  in  diameter,  shall  be  attached  near 
end  of  casing  and  project  through  ground  surface  at  right-of-way  lines  or  not  less 
than  45  ft  (measured  at  right  angles)  from  center  line  of  nearest  track.  Vent  pipe, 
or  pipes,  shall  extend  not  less  than  4  ft  above  ground  surface.  Top  of  vent  pipe 
shall  be  fitted  with  down-turned  elbow  properly  screened,  or  a  relief  valve.  Vents  in 
locations  subject  to  high  water  shall  be  extended  above  the  maximum  elevation  of 
high  water  and  shall  be  supported  and  protected  in  a  manner  that  meets  the  approval 
of  the  engineer.  Vent  pipes  shall  be  at  least  4  ft  ( vertically )  from  aerial  electric  wires. 

5.1.5.6  Shut-Off  Valves 

Accessible  emergency  shut-off  valves  shall  be  installed  within  effective  distances 
each  side  of  the  railway  as  mutually  agreed  to  by  the  engineer  and  the  pipeline 
company.  Where  pipelines  are  provided  with  automatic  control  stations  at  locations 
and  within  distances  approved  by  the  engineer,  no  additional  valves  shall  be  required. 

5.1.6  APPROVAL  OF  PLANS 

Plans  for  proposed  installation  shall  be  submitted  to  and  meet  the  approval  of 
the  engineer  before  construction  is  begun. 

Plans  shall  be  drawn  to  scale  showing  the  relation  of  the  proposed  pipeline  to 
railway  tracks,  angle  of  crossing,  location  of  valves,  railway  survey  station,  right-of- 
way  lines  and  general  layout  of  tracks  and  railway  facilities.  Plans  should  also  show 
a  cross  section  (or  sections)  from  field  survey,  showing  pipe  in  relation  to  actual 
profile  of  ground  and  tracks.  If  open-cutting  or  tunnelling  is  necessary,  details  of 
sheeting  and  method  of  supporting  tracks  or  driving  tunnel  shall  be  shown. 

In  addition  to  the  above,  plans  should  contain  the  following  data: 

Carrier  Pipe  Casing.  Pipe 

Contents  to  be  handled 

Outside   diameter    

Pipe  material 

Specification  and  grade    

Wall  thickness    

Actual  working  pressure    

Type  of  joint 

Coating    

Method  of  installation    

Vents:  Niunber Size Hgt.  above  ground 

Seals:  Both  ends   One  end 

Bury:  Base  of  rail  to  top  of  casing ft in. 

Bury:    ( Roadway  ditches )    ft in. 

Cathodic   protection    

Type,  size  and  spacing  of  insulators  or  supports. 


Manual    Recommendations 


115 


5.1.7  EXECUTION  OF  WORK 

The  execution  of  the  work  on  railway  rights-of-way,  including  the  supporting 
of  tracks,  shall  be  subject  to  the  inspection  and  direction  of  the  engineer. 

5.2  SPECIFICATIONS  FOR  PIPELINES  CONVEYING 
NON-FLAMMABLE  SUBSTANCES 

5.2.1  SCOPE 

Pipelines  included  under  these  specifications  are  those  installed  to  carry  steam, 
water  or  any  non-flammable  substance  which,  from  its  nature  or  pressure,  might 
cause  damage  if  escaping  on  or  in  the  vicinity  of  railway  property.  The  term  "engi- 
neer" as  used  herein  means  chief  engineer  of  the  railway  company,  or  his  authorized 
representative. 

5.2.2  GENERAL  REQUIREMENTS 

Pipelines  under  railway  tracks  and  across  railway  rights-of-way  shall  be  encased 
in  a  larger  pipe  or  conduit  called  the  casing  pipe  as  indicated  in  Fig.  5.2.2.1.  Cas- 
ing pipe  may  be  omitted  under  the  following  conditions: 

( a )  Under  secondary  or  industry  tracks  as  approved  by  the  engineer. 

(b)  On  pipelines  in  streets  where  joints  are  of  leakproof  construction  and 
the  pipe  material  will  safely  withstand  the  combination  of  internal  pres- 
sure and  external  loads. 

(c)  For  non-pressure  sewer  crossings  where  the  pipe  strength  is  capable  of 
withstanding  railway  loading. 

Pipelines  shall  be  installed  under  tracks  by  boring  or  jacking,  if  practicable. 

Pipelines  shall  be  located,  where  practicable,  to  cross  tracks  at  approximately 
rights  angles  thereto  but  preferably  at  not  less  tlian  45  deg,  and  shall  not  be  placed 
within  culverts  nor  under  railway  bridges  where  there  is  likelihood  of  restricting 
the  area  required  for  the  purposes  for  which  the  bridges  or  culverts  were  built,  or 
of  endangering  the  foundations. 

Pipelines  laid  longitudinally  on  railway  rights-of-way  shall  be  located  as  far 
as  practicable  from   any   tracks  or  other  important  structures.   If  located  within  25 


See   Art.   5.2.4.4 


'•.vS:j/'/}K\'S.vji 


ROADBED 
lin-See  Art.   5.2.5.2 
J 


j>CA 


CASING  PIPE 

Fig.  5.2.2.1 


RRIER   PIPE 


116 Manual    Recommendations 

feet  of  the  center  line  of  any  track  or  where  there  is  clanger  of  damage  from  leak- 
age to  any  bridge,  building  or  other  important  structure,  the  carrier  pipe  shall  be 
encased  or  of  special  design  as  approved  by  the  engineer. 

Any  replacement  of  a  carrier  pipe  shall  be  considered  a  new  installation,  sub- 
ject to  the  requirements  of  these  specifications. 

Where  laws  or  orders  of  public  authority  prescribe  a  higher  degree  of  protec- 
tion than  specified  herein,  then  the  higher  degree  of  protection  so  prescribed  shall 
supersede  the  applicable  portions. 

Pipelines  and  casing  pipe  shall  be  suitably  insulated  from  underground  con- 
duits carrying  electric  wires  on  railway  rights-of-way. 

5.2.3  CARRIER  PIPE 

Carrier  line  pipe  and  joints  shall  be  of  accepted  material  and  construction  as 
approved  by  the  chief  engineer  of  the  railway  company.  Joints  for  carrier  line  pipe 
operating  under  pressure  shall  be  mechanical  or  welded  type. 

The  pipe  shall  be  laid  with  sufficient  slack  so  that  it  is  not  in  tension. 

5.2.4  CASING  PIPE 

Casing  pipe  and  joints  shall  be  of  leakproof  construction,  capable  of  witlistand- 
ing  railway  loading. 

The  inside  diameter  of  the  casing  pipe  shall  be  at  least  2  in.  greater  than  the 
largest  outside  diameter  of  the  carrier  pipe,  joints  or  couplings,  for  carrier  pipe  less 
than  6  in.  in  diameter;  and  at  least  4  in.  greater  for  carrier  pipe  6  in.  and  over  in 
diameter.  It  shall,  in  all  cases,  be  great  enough  to  allow  the  carrier  pipe  to  be  re- 
moved subsequently  without  disturbing  the  casing  pipe  or  roadbed. 

Table  5.2.4.1.1 

Minimum  Wall  Thickness  for  Steel  Casing  Pipe  for  E  72  Loading 

Nominal  Nominal 

Thickness  Diameter 

Inches  Inches 

0.188         Under  14 

0.219         14  and  16 

0.250         18 

0.281        20 

0.312        22 

0.344        24 

0.375        26 

0.406        28  and  30 

0.438        32 

0.469        34  and  36 

0.500        38,  40  and  42 

When  casing  is  installed  without  benefit  of  a  protective  coating,  and  said  casing 
is  not  cathodically  protected,  the  wall  thickness  shown  above  shall  be  increased 
to  the  nearest  standard  size,  which  is  a  minimum  of  0.063  in.  greater  than  the 
thickness  shown  except  for  diameters  under  12^  in. 

5.2.4.1  Steel  Pipe 

Steel  pipe  shall  have  a  minimum  yield  strength  of  35,000  psi. 


Manual    Recommendations  117 


5.2.4.2  Cast  Iron  Pipe 

Cast  iron  pipe  may  be  used  for  a  casing  provided  the  method  of  installation 
is  by  open  trench.  Cast  iron  pipe  shall  conform  to  American  National  Standards  In- 
stitute A  21.  The  pipe  shall  be  of  the  mechanical-joint  type  or  plain-end  pipe  with 
compression-type  couplings.  The  strength  of  cast  iron  pipe  to  sustain  external  loads 
shall  be  computed  in  accordance  with  ANS  A  21.1  "Manual  for  the  Computation  of 
Strength  and  Thickness  of  Cast  Iron  Pipe." 

5.2.4.3  Concrete  Pipe 

For  pressures  under  100  psi  in  the  carrier  pipe,  the  casing  pipe  may  be  rein- 
forced concrete  pipe  conforming  to  the  AREA  Specifications  for  Reinforced  Concrete 
Culvert  Pipe,  Part  10,  Chapter  8,  or  bituminous-coated  corrugated  metal  pipe  con- 
forming to  the  AREA  specifications  for  such  pipe,  Part  4,  this  Chapter. 

5.2.4.4  Length  of  Pipe 

Casing  pipe  under  railway  tracks  and  across  railway  rights-of-way  shall  extend 
to  the  greater  of  the  following  distances,  measured  at  right  angles  to  center  line  of 
track : 

(a)  2  ft  beyond  toe  of  slope. 

(b)  3  ft  beyond  ditch. 

(c)  A  minimum  distance  of  25  ft  from  center  line  of  outside  track  when 
end  of  casing  is  below  ground. 

(d)  If  additional  tracks  are  constructed  in  the  future  or  the  railway  deter- 
mines that  the  roadbed  should  be  widened,  the  casing  shall  be  extended 
correspondingly. 

5.2.5  CONSTRUCTION 

Casing  pipe  shall  be  so  constructed  as  to  prevent  leakage  of  any  substance  from 
the  casing  throughout  its  length  except  at  ends.  Casing  shall  be  so  installed  as  to 
prevent  the  formation  of  a  waterway  under  the  railway,  with  an  even  bearing  through- 
out its  length,  and  shall  slope  to  one  end  (except  for  longitudinal  occupancy). 

Where  casing  and/or  carrier  pipe  is  cathodically  protected,  the  engineer  shall 
be  notified  and  suitable  test  made  to  ensure  that  other  railway  structures  and  facili- 
ties are  adequately  protected  from  the  cathodic  current  in  accordance  with  the 
recommendations  of  current  Reports  of  Correlating  Committee  on  Cathodic  Protec- 
tion, published  by  the  National  Association  of  Corrosion  Engineers. 

5.2.5.1   Method  of  Installation 

(a)  Installations  by  open-trench  methods  shall  comply  with  Installation  of 
Pipe  Culverts,  Part  4,  this  Chapter. 

(b)  Bored  or  jacked  installations  shall  have  a  bored  hole  diameter  essentially 
the  same  as  the  outside  diameter  of  the  pipe  plus  the  thickness  of  the 
protective  coating.  If  \oids  should  develop  or  if  the  bored  hole  diameter 
is  greater  than  the  outside  diameter  of  the  pipe  (including  coating)  by 
more  than  approximately  1  in.,  remedial  measures  as  appro\ed  by  the 
chief  engineer  of  the  railway  company  shall  be  taken.  Boring  operations 
shall  not  be  stopped  if  such  stoppage  would  be  detrimental  to  the 
railway. 


118  Manual    Recommendations 


(c)  Tunnelling  operations  shall  be  conducted  as  approved  by  the  engineer. 
If  voids  are  caused  by  the  tunnelling  operations,  they  shall  be  filled  by 
pressure  grouting  or  by  other  approved  methods  which  will  provide 
proper  support. 

5.2.5.2  Depth  of  Installation 

5.2.5.2.1  Casing  Pipe 

Casing  pipe  under  railway  tracks  and  across  railway  rights-of-way  shall  be  not 
less  than  SJa  ft  from  base  of  railway  rail  to  top  of  casing  at  its  closest  point,  except 
that  under  secondary  or  industry  tracks  this  distance  may  be  4/2  ft.  On  other  portions 
of  rights-of-way  where  casing  is  not  directly  beneath  any  track,  the  depth  from 
ground  surface  or  from  bottom  of  ditches  to  top  of  casing  shall  not  be  less  than  3  ft. 

5.2.5.2.2  Carrier  Pipe 

Carrier  pipe  installed  under  secondary  or  industry  tracks  without  benefit  of 
casing  shall  be  not  less  than  4/2  ft  from  base  of  railway  rail  to  top  of  pipe  at  its 
closest   point   nor   less   than    3   ft   from   ground  surface  or  from  bottom   of  ditches. 

5.2.5.2.3  On  Right-of-Way 

Pipeline  laid  longitudinally  on  railway  rights-of-way  50  ft  or  less  from  center 
line  of  track,  shall  be  buried  not  less  than  4  ft  from  ground  surface  to  top  of  pipe. 
Where  pipeline  is  laid  more  than  50  ft  from  center  line  of  track,  minimum  cover 
shall  be  at  least  2  ft. 

5.2.5.4  Shut-OflF  Valves 

Accessible  emergency  shut-off  valves  shall  be  installed  within  effective  distances 
each  side  of  the  railway  as  mutually  agreed  to  by  the  engineer  and  the  pipeline 
company.  Where  pipelines  are  provided  witli  automatic  control  stations  at  locations 
and  within  distances  approved  by  the  engineer,  no  additional  valves  shall  be 
required. 

5.2.6  APPROVAL  OF  PLANS 

Plans  for  proposed  installation  shall  be  submitted  to  and  meet  the  approval  of 
the  engineer  before  construction  is  begun. 

Plans  shall  be  drawn  to  scale  showing  the  relation  of  the  proposed  pipeline  to 
railway  tracks,  angle  of  crossing,  location  of  valves,  railway  survey  station,  right-of- 
way  lines  and  general  layout  of  tracks  and  railway  facilities.  Plans  should  also  show 
a  cross  section  (or  sections)  from  field  survey,  showing  pipe  in  relation  to  actual 
profile  of  ground  and  tracks.  If  open-cutting  or  tunnelling  is  necessary,  details  of 
sheeting  and  method  of  supporting  tracks  or  driving  tunnel  shall  be  shown. 

In  addition  to  the  above,  plans  should  contain  the  following  data: 

Carrier  Pipe  Casing  Pipe 

Contents  to  be  handled 

Outside  diameter 

Pipe  material   

Specification  and  grade    

Wall  thickness   

Actual   working  pressure    

Type  of  joint 

Coating   

Method  of  installation    


Manual    Recommendations  119 


Protection  at  ends  of  casing: 

Both  ends: One  end Type 

Bury:   Base  of  rail  to  top  of  casing ft   in. 

Bury:    ( Not  beneath  tracks )    ft    in. 

Bury:    ( Roadway  ditches )    ft   in. 

Cathodic   protection    

5.2.7  EXECUTION  OF  WORK 

The  execution  of  the   work   on  railway  rights-of-way,  including  the  supporting 
of  tracks,  shall  be  subject  to  the  inspection  and  direction  of  the  engineer. 


120 Manual    Recommendations 

Manual   Recommendations 
Committee  6 — Buildings 

Report   on   Assignment   B 
Revision   of  Manual 

W.  C.  Sturm  (chairman,  subcommittee),  R.  R.  Cahal,  F.  D.  Day,  K.  E.  Hornung, 
D.  F.  Logan,  G.  H.  McMillan. 

Your  committee  recommends  the  adoption  and  publication  in  Chapter  6  of  the 
Manual  the  following  new  material   on  design   criteria  for  railway  office  buildings: 

Part  2 
Design  Criteria  For  Railway  Office  Buildings 

2.1  FORWORD 

( a )  There  are  many  determining  factors  tlrat  must  be  considered  when  design- 
ing railroad  office  buildings.  Prior  to  construction,  every  facet  of  the  building's  use 
and  ultimate  designation  should  be  thoroughly  investigated  as  there  are  many  ele- 
ments contributing  to  the  final  design  for  each  building. 

(b)  As  railroad  office  buildings  are  used  for  various  purposes,  die  use  to  which 
a  particular  building  will  be  put  is,  of  course,  the  primary  requisite.  Headquarters  or 
division  office  buildings,  yard  offices,  telegraph  or  dispatcher's  offices  and  control 
towers  are  the  basic  office  buildings  with  which  the  designer  is  concerned. 

(c)  The  same  basic  criteria  may  be  applied  to  railway  offices  whether  housed 
in  an  independent  building,  as  part  of  a  complex  such  as  a  station,  or  as  rental  space 
in  an  office  building. 

(d)  Office  layout  plannings  take  place: 

1.  When  a  new  office  building  is  to  be  constructed 

2.  When  an  office  is  to  be  moved 

3.  When  changes  occur  within  an  office  such  as  establishment  of  new  pro- 
cedures, increase  or  decrease  in  personnel  or  alteration  in  organization 
or  function. 

2.2  SITE  CONSIDERATIONS 

2.2.1  Location 

The  location  (urban,  industrial  or  railroad  yard)  and  space  available  for  the 
building  will  be  important  factors  in  the  design  of  the  overall  structure;  and  the 
value  per  square  foot  of  the  site  must  be  considered.  Local  codes  and  fire  and  sani- 
tary regulations  must  be  taken  into  consideration,  and  where  applicable,  followed. 
While  each  community  of  any  significant  size  has  its  own  codes  and  ordinances,  a 
small  community  will  probably  make  use  of  national  codes. 


Manual    Recommendations 121 

2.2.2  Parking 

(a)  The  practice  of  providing  space  for  automobile  parking  for  the  personnel 
working  in  the  office  building  and  for  visitors  is  now  required  in  most  large  com- 
munities by  ordinance,  and  if  not  specifically  set  forth  by  law,  the  architect,  as  a 
matter  of  good  practice,  should  carefully  consider  this  requirement. 

(b)  The  number  of  parking  spaces  is  generally  governed  by  either  the  number 
of  persons  occupying  the  office  building  or  the  square  foot  area  of  the  stnicture.  The 
design  of  the  parking  areas  depends  upon  the  site  available  for  this  use,  and  there 
are  many  standard  details  available  in  texts  on  the  subject. 

2.2.3  Landscaping 

(a)  Landscaping  generally  becomes  a  part  of  the  parking  layout.  The  architect 
should  detemiine  from  local  ordinances  if  landscaping  is  required  and  what  percent 
of  the  site  area  must  be  landscaped.  If  there  are  no  landscaping  requirements  by  law, 
it  is  now  generally  considered  good  practice  to  provide  some  planting  around  the 
building  or  parking  areas. 

(b)  The  vegetation  used  in  landscaping  should  be  easy  to  grow  in  the  chmate 
involved  and  not  too  costly  to  maintain. 

2.2.4  Expansion 

Future  building  expansion  should  be  considered.  This  can  be  determined  by 
using  the  rate  increase  in  volume  of  work  handled  in  the  past  several  years  as  a 
guide. 

2.3  FUNCTIONAL  REQUIREMENTS 

2.3.1  General  Considerations 

(a)  The  functional  requirements  of  railway  office  planning  are  those  design 
criteria  which  are  directly  related  to  the  purpose,  duties,  and  characteristic  opera- 
tional patterns  of  a  peculiar  office  situation.  As  work  is  processed  by  an  office,  there 
is  a  characteristic  flow  or  movement  between  individual  work  stations.  There  is  also 
a  flow  of  people  in  conjunction  with  the  flow  of  work.  Providing  for  continuity  and 
efficiency  of  these  flow  patterns  is  the  major  concern  of  functional  planning. 

(b)  Before  commencing  an  immediate  design  problem,  the  architect  should 
investigate  interoffice  and  interdepartmental  relationships  to  better  coordinate  an 
entire  sphere  of  operation.  He  should  determine  whether  consolidation  of  offices  or 
departments  could  provide  increased  operational  efficiency  and  decreased  plant  dup- 
lication. He  should  investigate  existing  flow  patterns,  develop  possible  variations,  and 
analyze  all  choices  for  improved  efficiency.  New  flow  patterns  should  not  be  initiated 
without  thorough  analysis,  but  neither  should  old  practices  be  retained  witliout 
re-evaluation. 

(c)  The  architect  must  consider  the  possibility  and  probability  of  expansion 
of  activity  and/or  revision  of  existing  or  proposed  flow  patterns.  Final  spacial  design 
should  provide  adequate  expansion  space  which  could  be  occupied  with  minimum 
disruption  of  office  activity.  Retention  of  desirable  flow  patterns  after  expansion  is 
necessary  for  continued  efficient  operation.  Open  planning  with  .spaces  free  of  restric- 
tions is  desirable  to  allow  simple  rearrangement  of  work  stations  as  activity  volume 
and  flow  patterns  change. 


122  Manual    Recommendations 


2.3.2  Work  Flow  Considerations 

(a)  The  location  of  inter-related  offices  should  be  sucii  that  any  work  flow 
between  offices  can  be  accomplished  speedily  and  with  a  minimum  of  traxel  distance 
or  congestion  involved.  Adjacent  locations  reduce  employee  transit  time  and  inter- 
communication equipment  overloads.  \'ertical  as  well  as  horizontal  spacial  relation- 
ships .should  be  investigated. 

(b)  Work  stations  within  an  office  should  be  spacially  arranged  according  to 
the  most  efficient  flow  pattern  of  operations.  Continuity  of  flow  through  the  office 
should  be  accomplished  with  a  minimum  of  backtracking,  congestion,  or  excessive 
distance   involved  in  station  to  station  work  transfer. 

(c)  Work  stations  used  commonly  by  several  individuals  .should  be  centrally 
located  with  respect  to  their  users  while  still  satisfying  the  overall  flow  pattern  con- 
tinuity. Minimal  distances  to  the  centralized  work  stations  encourage  more  efficient 
operation  and  better  use  of  the  specialized  facilities. 

2.3.3  Employee  Flow  Considerations 

(a)  Frequent  inter-office  traffic  is  best  accommodated  by  direct  passageways 
ratlier  than  by  use  of  the  common  building  corridor.  This  reduces  corridor  and  office 
entry  congestion  and  is  usually  easier  to  integrate  with  inner  office  flow  patterns. 
Where  direct  inter-office  connection  is  impossible,  efficient  and  economical  corridor 
and  elevator  design  is  more  important. 

(b)  Office  spaces  should  be  so  designed  as  to  allow  unrestricted  circulation 
between  work  centers,  allowing  sufficient  space  to  eliminate  congestion.  Circulation- 
ways  should  be  designed  with  maximum  flexibility  to  accommodate  varied  flow- 
pattern  developments. 

(c)  Employees  require  interaction  among  themselves  and  with  their  supervisors, 
necessitating  office  designs  which  allow  easy  communication  with  a  minimum  of 
mechanical  devices.  Over-generous  space  between  employee  work  stations  causes 
inefficient  communication  and  loss  of  time.  The  need  for  private  offices  should  be 
thoroughly  investigated  for  each  situation,  with  the  supervisor's  desire  for  one  sub- 
ordinate to  objective  analysis  of  efficient  operating  techniques. 

( d )  Where  tlie  office  has  frequent  visitors,  suitable  reception  and  waiting  areas 
should  be  provided  adjacent  to  both  the  public  entrance  and  the  work  station  to  be 
visited.  The  visitor's  area  should  be  located  on  the  periphery  of  the  office  to  reduce 
distraction  and  interruption  to  other  functions.  Provision  should  be  made  for  this 
activity  to  enter  the  office  flow-structure  in  the  correct  position. 

(e)  Provision  must  be  made  for  additional  employee  circulation  to  drinking 
fountains,  lockers,  washrooms,  and  eating  areas.  Fountains  and  lockers  should  be 
dispersed  diroughout  work  areas  to  reduce  circulation  time  and  congestion,  thereby 
increasing  employee  efficiency.  Washrooms  and  eating  facilities,  where  required,  can 
be  centralized,  allowing  use  by  several  adjacent  offices.  Overall  circulationways, 
especially  in  complex  office  structures,  must  be  designed  to  accommodate  the  morn- 
ing, mid-day  and  evening  rush  periods  as  well  as  the  normal  inter-office  circulation 
patterns. 

2.3.4  Special  Equipment  Considerations 

(a)  Work  spaces  or  mechanical  equipment  used  commonly  by  several  indi- 
viduals should  be  centrally  located  with  respect  to  their  users  to  increase  efficiency. 
Work    stations    which    supervise    or    perform    services   for   other   stations    should   be 


Manual    Recommendations  123 


similarly  located.  Circulation  space  around  and  to  these  central  areas  should  be  suffi- 
cient to  eliminate  congestion.  Accoustical  considerations  nnist  be  given  to  centrally 
locating  functions  or  equipment  which  produce  excessive  or  distracting  noise. 

(b)  Communications  equipment  and  machines  frequently  used  by  many  of  the 
individuals  within  an  office  are  best  dispersed  throughout  the  area.  Equipment  can 
be  completely  distributed  to  every  work  station  or  can  be  allocated  to  a  group  of 
neighboring  stations  when  frequency  of  use  is  less.  Congestion,  confusion,  and  waste 
time  are  reduced  while  efficiency  is  increased.  Dispersal  will  reduce  the  concentra- 
tion of  activity  and  noise  inlierent  in  centralized  work  stations,  but  distraction  of 
individual  employees  may  rise  as  disturbances  are  brought  nearer  to  them.  Accous- 
tical control  is  also  more  difficult  in  dispersed  situations  than  with  centralized  facil- 
ities where  sound  barriers  are  feasible. 

(c)  Isolation  of  equipment  or  work  stations  from  tlie  basic  office  area  is  nor- 
mally undertaken  because  of  extreme  disturbance  problems.  Accoustical  disturbance 
is  the  most  frequent  reason  for  isolation  of  functions.  Private  offices  are  needed  when 
the  general  office  is  too  noisy  for  the  conditions  required  during  private  conferences. 
Equipment  isolation  is  required  when  the  operating  noise  of  the  machinery  is  dis- 
turbing to  the  general  office.  In  each  case,  total  physical  and  accoustical  isolation  is 
important  to  the  efficient  operation  of  the  office.  Dirty,  messy  or  odorous  functions 
are  also  possible  causes  for  isolation. 

2.4  SPACIAL  REQUIREMENTS 

2.4.1  General  Considerations 

(a)  To  determine  the  required  floor  area  it  is  necessary  to  consider  the  number 
of  employees  and  departments,  the  number  of  private  offices  and  the  size  of  the 
general  office  area  for  each  department.  Adequate  space  must  be  provided  for  stair- 
ways, elevators,  corridors,  mechanical  and  electrical  equipment  rooms,  toilet  rooms, 
janitor's  closets,  conference  rooms,  lounges,  food  service  areas,  public  area,  and 
storage  and  record  rooms.  Each  space  must  be  individually  evaluated.  The  delivery, 
service,  and  mail  room  and  special  equipment  requirements  should  be  carefully  con- 
sidered when  detennining  the  floor  area  of  the  building. 

(b)  Before  any  office  can  be  planned,  relocated  or  expanded,  there  must  be  a 
reasonable  estimate  of  the  amount  of  space  required  to  house  the  working  activity. 

(c)  The  amount  of  space  required  to  house  office  functions  can  \'ary  greatly. 
A  good  average  would  provide  100  to  150  sq  ft  per  employee  for  an  office  having  all 
functions  under  one  roof,  including  a  small  allowance  for  expansion.  This  can  \ary 
considerably,  however.  For  example,  the  headquarters  office  of  a  company  might  use 
25,000  sq  ft  for  100  people  if  it  were  primarily  composed  of  private  offices  and  con- 
ference rooms,  while  a  department  with  a  large  number  of  typists  and  clerks  miglit 
need  only  7,500  sq  ft  for  the  same  number  of  employees. 

(d)  The  actual  space  requirements  are  dictated  by  five  basic  factors: 

1.  Nature  of  the  work — the  specific  requirements  of  the  office  operations 
performed  dictate  the  type  and  size  of  equipment  used,  the  size  of  the 
working  area,  the  aisle  widths,  the  distance  between  desks,  the  number 
and  type  of  files,  cabinets  and  tables. 

2.  Nature  of  .space — the  shape  of  the  space,  whether  square,  rectangular 
or   irregular,    affects   its   utilization   economy.   The   position   of  columns. 


124 Manual    Recommendations 

depth  of  bays,  exposure  of  radiators,  pipes,  windows  and  availability  of 
utility  outlets  affect  the  economical  placement  of  equipment. 

3.  Need  for  privacy — private  offices,  conference  rooms,  partitions  and  rail- 
ings add  to  space  requirements. 

4.  Need  for  services — the  service  requirements  of  rest  rooms,  coat  rooms, 
show  rooms,  lunch  rooms,  lounges,  transfer  files,  stock  rooms,  janitor 
rooms,  mail  rooms  and  air  conditioning  and  other  utility  service  rooms 
must  be  considered  in  space   allotments. 

5.  Need  for  expansion — possible  futine  needs  must  be  considered  in  allo- 
cating space. 

(e)  After  making  a  preliminary  evaluation  of  space  required  and  evaluating 
the  functional  requirements,  a  more  refined  estimate  must  be  made  prior  to  executing 
a  layout. 

1.  Inventory  of  the  space  required  in  each  department  for  people,  equip- 
ment and  special  facilities. 

2.  Forecast  by  department  of  the  space  required  for  normal  expansion  over 
a  reasonable  period  of  time. 

(f)  Taking  a  space  inventory,  worker  by  worker,  in  each  department,  has  an 
additional  benefit  of  permitting  a  close  look  at  each  work  station  to  see  if  present 
space  is  sufficient,  or  if  changes  in  work  assignments  and  equipment  would  alter 
requirements. 

(g)  A  simple  inventory  form  can  be  drawn  up  to  provide  the  space  estimate. 
Supervisors  can  prepare  the  inventorj'  with  department  heads'  approval.  To  assist 
the  architect  during  his  inventory  and  interviews  with  supervisors,  a  check  list  would 
provide  a  handy  and  valuable  reminder  in  obtaining  desired  information. 

2.4.2  Office  Space 

(a)  The  fundamental  unit  (module)  for  office  space  planning  is  the  individual 
worker,  seated  at  his  or  her  desk  or  work  station.  In  larger  offices  where  diere  are 
many  routine  jobs,  space  standards  tend  to  be  economical. 

(b)  In  the  general  office  area,  allotment  of  100  sq  ft  per  clerical  worker  is  gen- 
erally considered  a  liberal  standard,  75  sq  ft  is  an  economical  standard,  90  sq  ft 
would  be  a  reasonable  average. 

(c)  Wliere  a  more  liberal  space  standard  can  be  used,  it  offers  these  advan- 
tages : 

1.  Automatic  room  for  future  expansion 

2.  Better  morale — less  assembly  line  feeling 

3.  Efficiency — conversation  is  not  as  easy 

(d)  A  general  guide  to  floor  area  requirements  including  usual  furniture  but 
not  including  special  cabinets,  machines  or  computers.  The  lower  figure  represents 
the  miniminn  floor  area  required  and  tlie  higher  figure  the  desirable  floor  area. 

1.  Private  offices: 

executive  250  to  350  sq  ft 

other  120  to  200  sq  ft 


Manual    Recommendations    125 

2.  General  offices: 

2  to  5  persons  150  sq  ft  per  person 

more  than  5  persons  100  sq  ft  per  person 

(e)  Certain  types  of  office  machines  require  more  space  than  normally  allowed 
in  an  estimate  based  on  the  average  clerk  or  typist  position.  Any  space  taken  up 
by  this  equipment  and  their  operators  should  be  added  to  that  considered  for  regular 
office  space.  Equipment  in  this  category  include: 

1.  Tabulating  equipment 

2.  Duplicating  equipment 

3.  Telephone  switchboard 

4.  Teletype  equipment 

5.  Time  clock  space 

6.  Other  special  equipment 

2.4.3  File  Space 

(a)  The  actual  space  taken  up  by  a  file  cabinet  and  its  open  drawer  is  easily 
measured.  It  is  difficult  to  estimate  how  much  should  be  added  to  these  measure- 
ments for  working  area  until  decisions  are  made  on  arrangements  of  the  filing  area. 
Each  open  file  will  require  the  following  space  allowance  without  consideration  of 
any  working  area  in  front  of  the  open  drawer: 

1.  Standard  letter  file  6     sq  ft 

2.  Standard  legal  file  7     sq  ft 

3.  Side  opening  letter  file  3/2  sq  ft 

4.  Side  opening  legal  file  4     sq  ft 

(b)  For  preliminary  planning  allow  9  sq  ft  per  file  in  central  active  file  rooms 
and  6  sq  ft  per  file  in  inactive  file  storage. 

2.4.4  Storage  Space 

(a)  Storage  requirements  depend  on  the  nature  of  the  firm's  work,  its  age,  and 
the  inclination  of  the  administration  to  retain  records. 

( b )  Consideration  should  be  given  to  various  types  of  storage? 

1.  Vaults 

2.  Stock  rooms 

3.  Transfer  files 

4.  Shelving 

5.  Janitor  supplies 

6.  Coat  rooms 

2.4.5  Special  Room  Allowance 

(a)  Depending  on  the  operations,  offices  will  require  allied  rooms  of  a  size 
matched  to  their  use.  Allow  500  sq  ft  for  15  persons  plus  10  sq  ft  for  each  additional 
person. 

1.  Reception  room 

2.  Waiting  room 

3.  Conference  room 


126 Manual    Recommendations 

(b)   Space  must  be  provided  for: 

1.  Lunch  room 

2.  Employee  lounge 

3.  Mail  room 

4.  Toilet  rooms 

(e)  The  size  of  toilet  rooms  will  be  governed  by  the  number  of  fixtures  desired 
or  required  by  code  for  the  number  of  people  occupying  the  building. 

2.4.6  Space  Required  For  Furniture  and  Aisles 

(a)  For  various  minimimi  clarances  involving  desks,  files  and  passageways,  see 
Fig.   1. 

(b)  Minimum  width  for  single-desk  office,  7  ft  0  in;  depth  12  ft  0  in  to  14  ft 
0  in. 

(c)  Minimum  width  for  two-desk  office,  11  ft  0  in  to  12  ft  0  in;  depth  14  ft 
0  in. 

(d)  Aisles  or  passageways  leading  to  main  exits: 

1.  Minimum,  3  ft  8  in  wide. 

2.  Desirable,  5  ft  6  in  wide. 

(e)  Aisle  space  between  desks: 

1.  Secondary  aisle — minimum,  3  ft  0  in  wide. 

2.  Intermediate  aisle — 3  ft  3  in  wide. 

3.  Main  aisle — 5  ft  0  in  wide. 

(f )  Space  between  desks  for  the  chair: 

1.  Minimum,  2  ft  4  in  wide. 

2.  Desirable,  3  ft  0  in  wide  (especially  with  more  than  2  desks  in  a  row). 

(g)  Working  space  in  front  of  files: 

1.  Minimum,  2  ft  4  in  from  front  of  open  drawer. 

2.  Desirable,  3  ft  8  in  from  front  of  open  drawer  (especially  if  work  space 
is  also  on  aisle). 

(h)   Working  space  in  front  of  shelves: 

1.  Minimum,  2  ft  4  in  from  front  of  shelf. 

2.  Desirable,  3  ft  8  in  from  front  of  shelf. 

2.5  STRUCTURAL  REQUIREMENTS 

2.5.1  Framing  Systems 

(a)  The  type  of  basic  construction  will  be  influenced  by  the  size  and  type  of 
building.  Small  offices  in  an  industrial  or  railroad  yard  location  would  use  appropriate 
constniction  elements  such  as  masonry,  with  metal,  masonr>'  or  wood  walls;  pre- 
fabricated metal  buildings;  portable  prefabricated  buildings;  or  buildings  with  wood 
framing.  Both  large  and  small  buildings  could  incorporate  aesthetic  components  into 
the  structure,  such  as  steel  frames  with  masonry  or  panel-type  exterior  walls  or  pre- 
fabricated metal  buildings  with  additives  of  masonry  or  stone  trim. 

(b)  The  building  designer  must  use  his  own  judgment  in  making  the  final  deci- 
sion for  the  type  of  construction  desired  as  there  can  be  no  hard-and-fast  rule  to 
govern.  A  careful  study  of  the  principal  use,  location  and  cost  will  be  a  factor  in 
the  selection  of  the  structural  system  and  the  exterior  and  interior  finishes. 


Manual    Recommendations 

127 

« 

n 

n 

■^ 

PASSAGEWAY 

4r 

STANDARD  DESK 

"]   1     Beokcos* 

r' 

F=1 

STANDARD   DESK 

1  1 

1 1 

WITH   BOOKCASE 

Fil 

•  > 

STANDARD  DESK 
WITH       FILES 

TWO   DESKS 
BACK  TO  BACK 

Clearances  for  Office    Equipment 
with  Passageway 


STANDARD  DESK 
WITH       FILES 


TWO  DESKS 
BACK  TO  BACK 


Clearances  for  Office  Equipment 
without  Passageway 


' 

r 

^ 

, 

"^ 

o 

m 

o 

* 

■— 

1 

1 

1 

1 1 

!  i 

1 1 

1  1 
1 1 

1     1 
1     ! 

— 1 — p 

1      1 
1     1 

L_J 

PASSAGE,  DRAWERS 
CLOSED  ONLY 

-^ 

1 — 1 

PASSAGE,   DRAWER 
OPEN 

L 

' 

FILES,  FACE  TO  FACE 
PASSAGE.  DRAWERS 

CLOSED   ONLY 

FILES.  FACE   TO  FACE 

PASSAGE,  DRAWERS 

OPEN 

Clearances  for  F 

i  le  Cabinets 

Fij 

J. 

1 

128 Manual    Recommendations 

(c)  An  office  building  is  a  complex  made  up  of  many  units.  It  is,  therefore, 
wise  to  base  the  floor  phui  on  a  mocUdar  design.  The  architect  should  study  many 
modular  and  bay  sizes  in  order  to  make  the  space  fit  the  requirement.  He  should 
also  study  the  eftect  difl^erent  modules  would  have  on  the  installation  costs  for  light- 
ing and  heating.  Future  rearrangement  of  interior  partitions  will  be  simplified  since 
windows,  lighting  and  air  conditioning  will  not  be  affected  by  partition  rearrangement. 

1.  Have  as  few  columns  as  possible  and  have  them  in  exterior  or  corridor 
walls  rather  than  free  standing. 

2.  Use  a  practical  module  of  4  ft  6  in  or  5  ft  0  in  and  integrate  lighting, 
air  conditioning,  imderfloor  duct  outlets  and  window  mullions  so  that 
subsequent  subdivision  will  permit  partitions  on  the  module  lines  with- 
out requiring  relocation  of  these  facilities. 

(d)  A  center  core  design  which  includes  mechanical  rooms,  stairways,  elevators 
and  toilet  rooms  will  leave  the  office  area  open  for  arranging  offices  and  planning 
for  the  most  economical  use  of  floor  area. 

2.5.2  Floor  Systems 

(a)  With  the  growing  trend  to  install  moveable  interior  partitions  in  office 
buildings  and  with  the  absence  of  partitions  in  large  general  office  areas,  it  is  im- 
portant that  an  economical  and  practical  method  be  devised  to  provide  outlets  in  the 
floors  under  desks  for  power  and  communication  cables. 

(b)  A  system  of  metallic  ducts  and  junction  boxes  can  be  installed  in  cast-in- 
place  concrete  floors  to  provide  for  the  installation  of  service  fittings  at  frequent 
intervals  along  the  runs  of  ducts.  These  fittings  can  be  installed,  removed  or  relo- 
cated as  furniture  and  equipment  layouts  change. 

(c)  Other  types  of  floor  construction,  using  hollow  metal  or  precast  concrete 
with  voids,  can  be  used  to  install  an  underfloor  duct  system. 

(d)  Underfloor  duct  systems  have  the  obvious  advantage  of  eliminating  un- 
sightly and  sometimes  dangerous  extension  cords  or  surface-mounted  wire  mouldings. 
The  ducts  may  be  installed  in  single,  double  or  triple  runs,  as  needed,  for  electric 
power,  telephone  or  intercommunications  wiring,  and  junction  boxes  have  access 
covers  flush  in  the  floor  so  that  wiring  connections  and  circuit  changes  may  be  read- 
ily made.  Cable  raceways  in  the  floor  for  communications  equipment  will  also  ease 
future  equipment  rearrangement  as  previously  described. 

(e)  In  large  rooms  where  computers  are  installed,  it  is  generally  desirable  to 
install  a  double  floor  system  for  the  many  large  cables  connecting  the  various  ma- 
chines. These  elevated  floors  are  manufactured  in  square  panels  and  supported  sev- 
eral inches  above  the  existing  floor  on  metal  pedestals.  The  panels  are  usually  about 
24  in  square  and  can  be  easily  lifted  out,   when  necessary,  to  install  floor  fittings. 

(f)  Recommended   (minimum)   live  loads  for  various  types  of  occupancy: 

1.  Offices  50  psf 

2.  Public  corridors  100  psf 

3.  Light  storage  125  psf 

4.  Rest  rooms  50-100  psf 

5.  Computer  rooms  100  psf 


Manual    Recommendations 129 

2.5.3  Partitions 

(a)  Moveable  partitions  are  particularly  practical.  Future  expansion  and  rear- 
rangement can  be  made  quickly  and  economically  with  partitions  of  this  type  in  the 
office  areas.  Moveable  partitions  are  available  in  various  styles,  heights,  materials 
and  finishes. 

(b)  Core  areas  should  be  constructed  of  a  pennanent  type  partition  such  as 
masonry,  with  or  without  plaster,  or  other  permanent  finish;  metal  or  wood  studs 
with  plaster  or  plasterboard  would  fulfill  safety  and  privacy  requirements  if  condi- 
tions warrant. 

2.6  FINISH  MATERIALS 

2.6.1  Exterior  Materials 

(a)  The  selection  of  exterior  materials  will  be  largely  dependent  on  tlie  type 
of  structural  system  selected.  The  location  of  the  building  and  usage  will  determine 
to  a  great  extent  the  amount  of  aestlietic  treatment. 

(b)  In  many  instances  local  building  codes  will  specifically  prohibit  certain 
types  of  exterior  finish  or  specify  a  minimum  fire  rating  to  be  provided. 

(c)  The  exterior  treatment  will  also  be  influenced  by  the  degree  of  permanency 
required  of  the  building.  A  prefabricated  or  portable  building  which  can  reasonably 
be  expected  to  be  relocated  should  not  have  masonry  or  other  permanent  materials 
incorporated  into  its  exterior  treatment. 

(d)  Large  central  office  buildings  which  become  a  showcase  for  the  company 
may  utilize  the  most  modern  exterior  treatment  which  could  not  be  economically 
justified  for  lesser  buildings. 

(e)  The  building  designer  must  utilize  his  own  judgment  in  tlie  selection  of 
materials. 

2.6.2  Wall  and  Ceiling  Finishes 

(a)  The  type  of  wall  finish  to  be  applied  will  be  determined  by  the  type  of 
appearance  required.  Maintenance  considerations  will  be  an  important  factor. 

(b)  Lobby  and  corridor  walls,  in  many  cases,  influence  public  opinion.  There- 
fore, attractive,  easily  cared  for  materials  should  be  used  in  such  locations.  Vinyl  or 
plastic  coverings,  marble,  ceramic  tile  or  paint  are  appropriate.   ( See  Fig.  2 ) 

(c)  In  general,  office  wall  surfaces  should  he  painted.  However,  private  offices 
may  be  planned  with  wood  paneling  or  a  combination  of  paneled  and  painted  siu- 
faces.  Many  .special  paints  and  epoxy  finishes  are  available  which  are  attractive  and 
durable.   (See  Fig.  2) 

(d)  Sanitary  requirements  in  toilet  rooms  can  be  met  by  using  ceramic  tile, 
plastic  surfaces,  enamels  and  epoxies  which  are  durable  and  easily  cleaned. 

2.6.3  Floor  Coverings  and  Finishes 

(a)  The  selection  of  Hoor  coverings  and  finishes  will  be  governed  by  the  use 
to  which  specific  areas  are  subjected.  Heavy  traffic  areas  such  as  lobbies  and  corri- 
dors require  substantial  materials  such  as  terrazzo,  ceramic  or  cjuarry  tile.  Resilient 
type  coverings  may  also  be  used. 

(b)  Asphalt  and  vinyl  resilient  floor  coverings  are  suitable  for  general  offices 
or  private  offices.  Executive  offices  are  generally  carpeted.  The  newer  types  of  carpet- 
ing which  have  resilient  backing  and  which  may  be  cemented  in  place  are  being 
used  more  often  where  tile  or  resilient  surfaces  have  pre\  iously  been  used. 


130 


Manual    Recommendations 


Wall    Finish    Materials 


TYPE      OF       OCCUPANCY 

MATERIAL 

DECORATIVE 
VALUE 

PUBLIC 
CORRIDORS 

GENERAL 
OFFICES 

PRIVATE 
OFFICES 

EXECUTIVE 
OFFICES 

CLAY    PRODUCTS 
glaied  and  ceramic  tile 

MUIAlt 

KCOMMINDID 

iAIIlEACIOtl 
lOI    MUlAll 

lAIISFACIOtt 
lot  MUlAlt 

CONCRETE 

NOI    IICOMMfNOlO 

oeosio 

DRVWALL 

MUJI    11    rAINTfD 

NOI    •tCOMMINDiO 

SATISIACIOIT 

SAIISFACIOir 

SAIIIFACIOH 

MASONRY 

exposed   block 

5MOU10    >I    fAlNItO 

SAIlSFACIOtT 

SAIIWACIO., 

SAIISFACIOtr 

NOI   .ECOMMENDED 

MASONRY 
marble-slone-brick 

OOOD    NAIUIAl    FINISH 

■  iCOMMINOIO 

SUIIAIIE    10.    DECOI 

METALS 
stainless  steel'-bronie 

IIMIIIO 

■  ECOMMINDID 

PAINT 
latei-alkyd-epoxy 

COIOI 

SAIISFACIOIT 
AlOVI     WAINSCOII 

IICOMMINOEO 

■  ECOMMfNDIO 

.ECOMMENDED 

PAPER 

COO.    ANOrAMi.H 

NOI    «(COMMtNOiO 

NOI     «ECOMMIN0ID 

NOI    lECOMMBNDEO 

SUIIAItE   FOE    DECO. 

PLASTER 

liCOMMiNDtD 
AlOVi     WAINSCOrl 

■  ECOWHENOED 

■  ECOMMENDiO 

.ECOMMENDED 

PLASTIC     COVERING 
vinyl 

COIO..N„,AM..N 

lECOMM'NOlO 
AtOVE    WAIUSCOIf 

SAIISFACIOIT 

SAIISFACICIT 

SAIISFACIOKT 

PLASTIC    LAMINATES 

COlOt   AND    PAIIHN 

■  ECOMMIHDED 

RECOMMENDED 

•  ECOMMENDED 

•  tCOMMENDEO 

PLASTICS 

SPiCIAl     OfCOI 

0ECO«    ONIT 

DECO.    ONH 

PORCELAIN 
on  metal 

CO.O. 

•  ECOMMiNDED 

TEXTILES 

COtOI    AND    PAIIE>N 

NOI    HECOMMEHDtD 

NOI    lECOMMENOIO 

AECOMMINOiO 

•  ECOMMEHDiS 

WOOD    PANELING 

COIOI    AND  OAIN 

SATISFACTOUT 

lATISFACTOHr 

SATiSF*CTO«T 

•  ICOMMINDED 

Fig.  2 


(c)  Concrete  floor  may,  in  some  cases,  be  surfaced  with  the  new  epoxy  finishes, 
which  are  durable  and  easily  cleaned. 

2.6.4  Colors 

(a)  Color,  texture,  lighting  and  other  decorating  aspects,  when  used  witli  dis- 
cretion, comprise  that  extra  ingredient  that  sets  apart  the  extraordinary  building  from 
the  commonplace.  Too  often,  drab  paint  and  drab  furnishings  make  for  undistin- 
guished railway  buildings.  The  proper  use  of  color  and  texture  can  enhance  archi- 
tectural features. 

(b)  The  goal  of  good  decorating  is  to  produce  an  attractive  and  pleasant  envi- 
ronment. Colors  should  be  carefully  selected,  keeping  in  mind  the  purpose  of  the 
building.  Colors  should  be  balanced  to  make  areas  congenial  and  easy  to  work  and 
live  with. 

(c)  Consideration  shovild  be  given  to  die  shape,  exposure  and  lighting  of  the 
room  in  deteniiining  colors  to  be  used.  If  the  employees  in  a  room  all  face  the  same 
direction,  use  an  eye-resting  color  such  as  green  for  the  wall  they  face.  The  other 
three  walls  should  be  painted  a  color  that  has  a  good  light  reflectance. 

(d)  To  bring  the  greatest  amount  of  natural  light  into  a  dark  office,  carry  the 
white  of  the  ceiling  onto  the  upper  walls.  Warm  incandescent  light  may  be  comple- 
mented by  the  use  of  cool  blues  or  greens  in  rooms  dependent  on  artificial  light. 
White  fluorescent  light  works  well  with  gray  and  "daylight"  fluorescent  or  mercury 
vapor  lighting  can  be  used  with  warmer  colors  in  the  yellow-orange-reds. 


Manual    Recommendations 


131 


(e)  The  goal  of  good  decorating  is  to  produce  an  attractive,  pleasant  environ- 
ment. Colors  should  be  carefully  selected,  keeping  in  mind  the  scale  and  purpose 
of  the  building.  It  has  long  been  known  that  colors  can  establish  moods,  so  colors 
should  be  balanced  to  make  areas  congenial  and  easy  to  live  with. 

1.  Green — the  best  all-around  color,  fresh  in  appearance,  slightly  passive 
( cool  colors  as  green,  blue-green  and  blues  create  a  cooling,  relaxing 
atmosphere;   they  seem   to   retreat  from   you). 

2.  Blue-green — another  good  color;  direct  complement  of  the  human  com- 
plexion. 

3.  Yellow-green — highlight  reflecting  characteristics,  unpleasant  to  human 
coloring  (warm  colors,  the  reds,  oranges,  yellows  and  yellow-greens 
seem  to  advance  toward  you;  they  convey  a  feeling  of  wannth). 

4.  Yellow — good  for  large  areas,  if  toned  with  gray.  All  colors  used  in  an 
olRce  should  be  grayed.  This  keeps  them  from  being  too  vivid  and  dis- 
tracting and  makes  maintenance  easier.  Bright  yellow  and  odier  bright 
colors  can  be  used  to  draw  attention  from  unattractive  objects. 

5.  Gray — best  in  areas  where  jobs  require  strict  visual  or  mental  concen- 
tration. 

6.  Blue — not  a  good  color;  tends  to  distort  the  focus  of  the  eye. 

7.  White — best  for  storage  spaces, 

(f )  Color  combinations  in  office  spaces  should  be  carefully  coordinated  wherever 
possible  to  create  an  atmosphere  conducive  to  productive  work.  (See  Fig.  3) 


Suggested    Office  Color  Combinations 


WALLS 

RUG 

UPHOLSTERY 

DRAPERIES 

30YSTER    WHITE 
1  LIGHT    BRICK    RED 

SILVER   GRAY 

LIGHT    BRICK    RED 

GRAY     PLAID,    SILVER 
METALIC  THREADS 

LEMON    YELLOW 

CORK    TAN 

NATURAL    PIGSKIN 

HEATHER    WITH    TAN. 
GOLD    AND    BROWN 

LIGHT   GRAYED 
VIOLET-   BLUE 

SEPIA 

ROYAL    BLUE 

TAN    AND     BROWN 
TWEED 

3  LIGHT  GRAY-GREEN 
1  FOREST   GREEN 

VERY     LIGHT   GRAY 

BRIGHT   RED-ORANGE 

WHITE 

TURQUOISE,  MEDIUM 
LIGHT,  GRAYED 

RUST   RED 

DARK  TURQUOISE 

BROWN,  RUST    AND 
TURQUOISE     PLAID 

)  SILVER   GRAY 
1   EMERALD  GREEN 

ROYAL    BLUE 

EMERALD    GREEN, 
VERMILION 

ROYAL    BLUE 

LIGHT    TAN 

DARK    GREEN 

CHARTREUSE  ,    TAN 

CHARTREUSE 

Fig.  3 


132 Manual    Recommendations 

2.6.5  Sound  Control 

( a )  Sound  control  is  an  important  factor  to  be  considered  in  the  design  of  office 
buildings.  Acoustic  ceilings,  either  glued  or  suspended,  will  alleviate  noise  problems. 
These  are  available  in  either  metal  or  fiber. 

(b)  Most  manufacturers  offer  a  fiber  tile  with  plastic  coating.  This  has  many 
desirable  features  when  considering  future  maintenance.  Repainting  many  times  can 
reduce  the  efficiency  of  the  acoustic  qualities  of  the  ceiling;  this  would  be  eliminated 
with  the  plastic  coated  tile. 

(c)  Acoustic  ceiling  systems  that  incoiporate  lighting,  ventilating  and  acoustical 
qualities  are  also  available  from  various  manufacturers. 

(d)  Special  care  must  be  exercised  in  the  design  of  suspended  ceilings  and  par- 
titions to  overcome  the  transmission  of  sound  from  office  to  office. 

2.6.6  Furniture 

(a)  Furnishing  the  office  building  witli  new  furniture  will  require  a  sui^vey  of 
departmental  and  individual  requirements.  Modular  desk  units  offer  more  surface 
working  area,  and  can  have  more  storage  area  then  conventional  units.  Five-drawer 
files  or  conserv-a-files  reduce  floor  area  needed  for  filing  units. 

(b)  The  public  or  reception  area  of  the  building  should  have  a  directory  placed 
in  a  prominent  position.  Lounge  furniture  should  be  comfortable  and  of  durable, 
attractive  design.  Ash  trays  in  the  lounge  area  and  sand  urns  in  the  corridors  will  aid 
in  protecting  floor  finishes. 

2.7  MECHANICAL  CONSIDERATIONS 

2.7.1  Heating  and  Air  Conditioning 

( a )  To  provide  for  the  comfort  and  efficiency  of  the  occupants  of  offices,  it  is 
desirable  in  all  climates  that  offices  be  heated  in  the  winter  season  and 
cooled  widi  mechanical  refrigeration  equipment  in  the  summer  season.  The 
selection  of  the  most  suitable  equipment  will  vary  and  will  be  detennined 
by  several  factors.  Some  of  these  factors  that  must  be  considered  are: 

1.  Sizes  and  particulars  of  spaces  to  be  conditioned 

2.  Extremes  of  temperature 

3.  Availability  and  relative  costs  of  fuels  and  electric  power 

4.  Initial  and  operating  costs 

(b)  Some  of  the  more  common  systems  used  to  heat  small  offices  are: 

1.  Steam  radiation 

2.  Hot  water  radiation 

3.  Raseboard  convectors 

4.  Forced  warm  air  systems 

5.  Radiant  heating 

(c)  Cooling  of  smaller  office  spaces  can  be  economically  accomplished  by  the 
installation  of  package  type  air  conditioning  units  incorporating  air  cooled  or  water 
cooled  condensers,  cooling  towers  or  evaporative  condensers.  This  type  of  cooling 
system  may  economically  be  used  to  provide  25  to  40  tons  of  refrigeration. 

(d)  Steam  or  electric  resistance  coils  may  be  added  to  air  handling  units  to 
provide  heat  and  ventilation  in  the  wintertime.  The  heat  pump  system  can  be 
installed  where  winter  design  temperatures  are  above  35  F. 


Manual    Recommendations 133 

(e)  Individual  small  rooms  or  offices  that  may  be  separated  by  unconditioned 
space  may  be  cooled  by  the  window-type  units. 

(f)  For  the  larger  nnilti-story  buildings  there  are  four  basic  heating  and  air 
conditioning  systems   that   are  widely  used  today: 

1.  The  double-duct  system  with  controlled  mixing  boxes  under  windows 
and/or  in  the  ceiling  lends  itself  to  good  zone  control  and  adapts  well 
to  modular  partitioning.  This  system  is  supplied  by  a  single  high-pressure 
fan  to  two  sets  of  coils  connected  in  parallel.  One  coil  cools  the  air  and 
the  other  heats  the  air.  These  in  turn  feed  two  parallel  ducts,  one  cold 
and  one  hot,  into  mixing  boxes  located  as  above.  The  mixing  boxes  con- 
tain dumpers  ( or  valves )  positioned  by  a  thermostat  to  deliver  air  at  the 
proper  temperature  required  for  the  area.  Most  of  these  boxes  have 
volume  adjustments  so  that  more  or  less  air  can  be  supplied  to  a  given 
area. 

2.  The  fan-coil  system  consists  of  fan-coil  units  generally  located  under 
windows  or  in  die  ceiling  supplying  recirculated  air  through  a  coil,  or 
coils,  one  of  which  is  supplied  with  chilled  water  and  the  other  supplied 
with  steam  or  hot  water.  The  temperature  and  velocity  of  tlie  water  are 
controlled  to  provide  the  proper  temperature  of  air  delivered  to  main- 
tain the  desired  temperature  in  the  space.  This  system  is  used  in  con- 
junction with  a  single  duct  system  supplying  fresh  air  to  all  zones  includ- 
ing the  cooling  and  heating  of  the  interior  zones.  Fan-coil  units  have 
fresh-air  intakes  through  the  outside  wall  so  that  a  separate  fresh-air 
system  is  not  required  for  the  peripheral  zones. 

3.  The  induction  system  consists  of  metal  cabinets  under  windows,  some- 
times in  a  continuous  sill  construction.  Generally  the  units  are  placed 
under  each  window  and  are  supplied  with  primary  air  of  about  15  to 
20  percent  of  the  total  air  to  be  circulated.  The  primary  air  is  filtered, 
humidified  or  dehumidified  as  necessary,  cooled  or  heated  for  the  differ- 
ent seasons  and  delivered  at  considerable  pressure  to  the  units,  where 
by  means  of  ejector  nozzles,  the  primary  air  aspirates,  or  induces  several 
times  its  volume  of  air  flow  from  the  room  into  the  units,  mixes  with  it 
and  delivers  the  mixture  back  into  the  room.  The  aspirated  air  passes 
through  a  finned  coil  where  it  is  heated  or  cooled  as  required.  Generally, 
the  flow  of  water  is  controlled  by  a  room  thermostat  to  maintain  the 
selected  temperature.  The  water  can  be  supplied  by  two  or  three  pipes 
from  cold  to  hot  water  systems  to  the  different  zones  to  compensate  for 
sunshine,  wind  and  outdoor  temperature  effects. 

4.  Radiant  cooling  and  heating  consists  of  coils  located  in  ceiling  and/or 
walls  through  which  cold  or  hot  water  is  circulated.  In  sinnmer  the  water 
is  about  15  deg  cooler  than  room  temperature  to  absorb  the  heat  of  the 
room.  In  high  humidity  areas  the  temperature  of  the  cold  water  cannot 
be  lowered  below  the  dewpoint,  as  condensation  will  de\elop  on  the 
ceilings.  A  .separate  fan  system  supplying  filtered  air,  humidified  or  de- 
humidified as  necessary  and  cooled  or  heated  for  the  different  seasons, 
is  required  to  maintain  proper  ventilation  and  odor  control. 

(g)  Although  it  is  impo.ssible  to  establish  a  set  of  rules  for  the  .selection  of 
an  air  conditioning  system  for  any  specific  case,  a  few  important  factors  can  be 
stated  for  the  larger  buildings: 


134  Manual    Recommendations 


1.  The  peripheral  systems  are  always  convenient  and  are  economical  for 
narrow  buildings  or  wings  where  nearly  all  useable  space  is  within  15 
to  20  ft  of  the  windows;  especially  if  the  space  is  subdivided  into  small 
private  rooms  and  particularly  if  windows  are  large. 

2.  Among  peripheral  systems  the  induction-type  imits  concentrate  the  equip- 
ment and  eliminate  much  wiring.  The  fan-coil  unit  allows  fresh  air  to  be 
delivered  separately  where  this  is  convenient.  For  high  buildings,  the 
overall  costs  are  often  lower  with   induction  units. 

3.  Radiant  cooling  and  heating  units  may  be  considered  where  their  appear- 
ance and  other  details  are  acceptable.  The  climate  should  be  dry  with 
little  or  no  dehumidification  required. 

4.  Where  large  interior  spaces  must  be  cooled,  the  double  duct  system  may 
be  used;  it  is  especially  desirable  where  zoning  can  be  accomplished 
with  the  use  of  one  system. 

2.7.2  Plumbing 

( a )  Sanitary  facilities  should  be  located  in  a  central  core  area,  where  possible, 
to  reduce  the  amount  of  piping  required.  Toilet  rooms  should  be  located  back-to- 
back  where  practical. 

(b)  All  main  piping  should  be  accessible  to  the  degree  possible  to  facilitate 
alterations   and  maintenance. 

2.7.3  Lighting  and  Power 

(a)  The  bay  size  and  modular  increment  selected  by  the  architect  will  definitely 
affect  the  design  of  the  lighting  system.  To  quickly  rearrange  office  space  and  par- 
titions requires  that  the  lighting  be  planned  to  facilitate  rearrangement  without 
disturbing  the  basic  lighting  system.  Many  systems  currently  in  use  provide  adequate 
office  illumination: 

1.  Suspended  luminous  ceilings 

2.  Surface-mounted  fixtures 

3.  Flush  troffers  in  suspended  ceilings 

4.  Combination  luminous  ceiling  with  air  conditioning 

5.  Flush-mounted  troffers  including  air  conditioning  outlets 

(b)  The  architect,  with  the  help  of  an  electrical  engineer,  must  make  a  thor- 
ough study  of  the  lighting  requirements  for  the  various  offices  and  the  work  to  be 
performed  within  the  building.  The  lighting  budget  and  the  type  of  construction 
must  also  be  considered.  These  factors  will  determine  the  type  of  system  most 
appropriate. 

(c)  It  is  generally  good  practice  to  install  decorative  luminous  ceilings  in 
executive  and  public  areas.  A  modular  system  of  recessed  or  siuface-mounted  troffers 
is  installed  in  general  office  areas. 

(d)  Illumination  levels  for  office  buildings  can  be  selected  from  the  lES 
Standards. 

(e)  The  architect  must  give  consideration  to  lighting  of  the  building  exterior, 
walkways  and  parking  lot.  The  amount  and  type  of  lighting  will  be  determined  by 
the  location  and  use  of  the  building. 

(f)  Railroad  operations  are  becoming  closely  connected  with  rapidly  expanding 
communications    systems.    Therefore,    the    architect   must    give    consideration    in   the 


Manual    Recommendations  135 


design  of  the  building  for  ample  size  conduits  or  cellular  flooring  for  present  and 
future  expansion  of  the  power  distribution  system,  hghting  requirements  and  com- 
munications facilities. 

(g)  The  design  of  the  electrical  system  of  the  building  is  governed  by  local 
and  national  codes  which  must  be  strictly  adhered  to. 

2.7.4  Elevators 

(a)  Office  buildings  of  more  than  two  stories  should  have  an  elevator,  not  only 
for  passengers,  but  one  equipped  for  conveying  equipment  and  supplies. 

(b)  If  the  building  size  can  only  justify  the  installation  of  a  combination  pas- 
senger and  freight  elevator,  consideration  should  be  given  to  an  adequate  hatchway 
in  the  cab  roof  for  transportation  of  imwieldly  equipment. 

2.7.5  Fire  Protection 

(a)  Fire  protection  should  be  incorporated  early  in  the  design  and  planning 
of  the  structme.  Local  and  national  codes  should  be  observed. 

2.7.6  Special  Equipment 

(a)  In  the  event  a  building  is  being  designed  to  house  special  equipment,  such 
as  computers,  communication  equipment,  PBX,  or  any  other  pieces  of  specialized 
machinery,  the  requirements  for  this  equipment  must  be  analyzed  and  provisions 
made  early  in  the  planning  stage. 

(b)  With  the  advent  of  automation,  new  elements  of  design  must  be  considered: 

1.  Floor  strength 

2.  Vibration  control 

3.  Double  floor  system 

4.  Air  conditioning  with  humidity  control 

5.  Acoustics 

6.  Illumination 

(c)  Computer  machines  require  very  close  temperature,  humidity  and  dust  con- 
trol. The  equipment  is  heavy,  placing  concentrated  loads  on  building  floors.  The 
architect  developing  an  office  system  should  obtain  detailed  infonnation  from  com- 
panies that  produce  the  units  and  consultants  who  specialize  in  this  field  to  solve 
specific  design  problems. 


Manual   Recommendations 
Committee  8 — Concrete  Structures  and   Foundations 

Report  on   Assignment   B 
Revision  of  Manual 

R.  J-  Brueske  {chairman,  s-ub committee),  G.  W.  Cooke,  T.  L.  Fuller,  F.  A.  Kempe, 
L.  M.  Morris,  R.  E.  Pearson,  J.  M.  Williams,  J.  R.  Williams. 

Your  committee  sulimits  for  adoption  the  following  editorial  revisions  to  Chap- 
ter 8  of  the  Manual: 

Pages  8-22-1  to  8-22-3,  incl. 

ASTM   SPECIFICATIONS   AND  DESIGNATIONS 

A  6-69,  change  to  A  6-70 

A  36-69,  change  to  A  36-70a 

A  82-66,  change  to  A  82-70 

A  185-69,  change  to  A  185-70 

C  33-69,  change  to  C  33-67 

C  76-68,  change  to  C  76-70 

C  91-68,  change  to  C  91-70 

C  144-66T,  change  to  C   144-70  and  delete   (tentative)   from  title. 

C  150-68,  change  to  C   150-70 

C  175-68,  delete 

C  185-59,  change  to  C  185-70 

C  190-63,  change  to  C  190-70 

D  15-68,  change  to  D  15-70 


Your  committee  submits  for  adoption  the  following  revisions  and  additions  to, 
and  deletions  from.  Chapter  8  of  the  Manual: 

Pages  8-9-1  to  8-9-15,  incl. 

PART  9— REINFORCED  CONCRETE  TRESTLES 

Delete  Part  9  in  its  entirety,  leaving  only  on  page  8-9-1  the  name  of  the  Part, 
the  Proceedings  references  footnote,  and  a  notation  that  this  Part  was  removed 
from  the  Manual. 

Pages  8-1-1  to  8-1-32,  incl. 

PART   1— PLAIN   AND   REINFORCED   CONCRETE   RAILROAD 
BRIDGES  AND  OTHER  STRUCTURES 

Revise  Sec.  H  on  pages  8-1-12  and  8-1-13  as  follows: 

136 


Manual    Recommendations  137 


H.   METAL  REINFORCEMENT  PLACING 

1.  Cleaning 

Delete,  substituting  therefor  the  following  new  Art.   1: 

1.  Surface  Conditions  of  Reinforcement 

Metal  reinforcement  at  the  time  concrete  is  placed  shall  be  free  from  mud,  oil 
or  other  non-metallic  coatings  that  adversely  affect  bonding  capacity. 

Metal  reinforcement,  except  prestressing  steel,  with  rust,  mill  scale,  or  a  com- 
bination of  both  shall  be  considered  as  satisfactory,  provided  the  minimum  dimen- 
sions, including  height  of  deformations,  and  weight  of  a  hand  wire-brushed  test 
specimen   are   not  less   than   the   applicable   ASTM   specification   requirements. 

Prestressing  steel  shall  be  clean  and  free  of  excessive  rust,  oil,  dirt,  scales  and 
pitting.  A  light  oxide  is  permissible. 

2.  Bending 

Delete  the   text   of  this   Article,   substituting   therefor   the   following: 

Reinforcement  shall  be  accurately  formed  to  the  dimensions  indicated  on  the 
plans. 

All  bars  shall  be  bent  cold  unless  otherwise  permitted  by  the  engineer.  No 
bars  partially  embedded  in  concrete  shall  be  field  bent,  except  as  shown  on  the  plans 
or  permitted  by  the  engineer. 

The  diameter  of  bend  measured  on  the  inside  of  the  bar  for  standard  hooks 
shall  not  be  less  than  the  following: 

(a)  For  .stirnips  and  ties,  sizes  No.  3,  No.  4,  and  No.  5  only  4  bar  diameters 

(b)  For  Grade  40  bars  with  180-deg  hooks  and  in  sizes 

No.  3  to  No.  11,  incl 5  bar  diameters 

( c  )   For  all  other  bars : 

sizes  No.  3  through   No.   8    6  bar  diameters 

sizes  No.  9,  No.   10,  No.   11    8  bar  diameters 

sizes  No.  14,  No.  18 10  bar  diameters 

Inside  diameter  of  bends  in  welded  wire  fabric,  plain  or  deformed,  for  stirrups 
and  ties  shall  not  be  less  than  4  wire  diameters  for  defomied  wire  larger  than  size 
D6  and  2  wire  diameters  for  all  other  \\  ires.  Bends  \\  ith  inside  diameter  of  less  than 
8  wire  diameters  shall  be  made  no  closer  than  4  wire  diameters  from  the  welded 
intersection. 

3.  Straightening 

No  changes. 

4.  Placing 

Delete  the  text  of  this  Article,  substituting  therefor  the  following; 

Supports: 

Reinforcement,  prestressing  steel  and  ducts  shall  be  accurately  placed  and  ade- 
(juately  supported  before  concrete  is  placed,  and  shall  be  .secured  against  displace- 
ment within  pemiitted  tolerances.  Welding  of  bars  shall  not  be  permitted  for  assem- 
bly of  reinforcement  imless  authorized  b>-  the  engineer  and  unless  special  care  is 
taken  to  pre\  ent  loss  of  bar  strength  or  ductility  at  critical  sections. 

nui.  6:(0 


138 Manual    Recommendat  ions 

Tolerances: 

Unless  otlierwise  specified  by  the  engineer,  reinforcement,  prestressing  steel  and 
prestressing  steel  ducts  shall  be  placed  within  the  following  tolerances: 

For  clear  concrete  protection  and  for  depth,  (/,  in  flexural  members,  walls  and 
compression  members  where  (/  is  8  inches  or  less:  ±  )a  inch.  More  than 
8  inches  but  less  than  24  inches:  ±  fs  inch.  24  inches  or  more:  ±32 
inch,  but  the  cover  shall  not  be  reduced  by  more  than  %  of  the  specified 
cover. 

For  longitudinal  location  of  bends  and  ends  of  bars:  ±  2  inches  except  at 
discontinuous  ends  of  members  where  tolerance  shall  be  ±  /2  inch. 

Draped  Fabric: 

When  welded  wire  fabric  with  wire  of  }i  in  diameter  or  less  is  used  for  slab 
reinforcement  in  slabs  not  exceeding  10  ft  in  span,  the  reinforcement  may  be  cuned 
from  a  point  near  the  top  of  the  slab  over  the  support  to  a  point  near  the  bottom 
of  the  slab  at  mid-span,  provided  such  reinforcement  is  either  continuous  o\er,  or 
securely  anchored  at,  the  support. 

5.  Moisture  Protection 

Renmnber  this  Article  as  Art.  6  with  no  change  in  the  text,  and  add  the  fol- 
lowing new  Art.  5: 

5.  Spacing  of  Reinforcement 

The  clear  distance  between  parallel  bars  in  a  layer  shall  be  not  less  than  the 
nominal  diameter  of  the  bars,  nor  1  in.  Where  parallel  reinforcement  is  placed  in 
two  or  more  layers,  the  bars  in  tlie  upper  layers  shall  be  placed  directly  above  those 
in  tlie  bottom  layer  with  the  clear  distance  between  layers  not  less  tlian  1  in. 

Groups  of  parallel  deformed  reinforcing  bars  bimdled  in  contact,  assumed  to  act 
as  a  unit,  not  more  than  four  in  any  one  bundle,  may  be  used  only  when  stirrups  or 
ties  enclose  the  bundle.  Bars  larger  than  No.  11  shall  not  be  bundled  in  beams  or 
girders.  Individual  bars  in  a  bundle  cut  off  within  the  span  of  flexural  members 
shall  tenninate  at  different  points  with  at  least  40  bar  diameters  stagger.  Where 
spacing  limitations  and  minimum  clear  cover  are  based  on  bar  size,  a  unit  of  bundled 
bars  shall  be  treated  as  a  single  bar  of  a  diameter  derived  from  the  equivalent 
total  area. 

In  walls  and  slabs  the  principal  reinforcement  shall  be  spaced  not  farther  apart 
than  3  times  the  wall  or  slab  thickness,  nor  more  than  18  in. 

In  spirally  reinforced  and  tie  compression  members,  the  clear  distance  between 
longitudinal  bars  shall  be  not  less  than  I/2  times  the  nominal  bar  diameter,  nor  I/2  in. 

The  clear  distance  limitation  between  bars  shall  also  apply  to  tlie  clear  distance 
between  a  contact  lap  splice  and  adjacent  splices  or  bars. 

The  clear  distance  between  pretensioning  steel  at  each  end  of  the  member  shall 
be  not  less  than  4  times  the  diameter  of  individual  wires  nor  3  times  the  diameter 
of  strands.  Prestressing  steel  may  be  bundled  in  the  middle  portion  of  the  span 
provided  the  requirements  for  spacing  at  the  end  of  the  member  are  satisfied. 

Ducts  for  post-tensioning  steel  may  be  bundled  if  it  can  be  shown  that  the 
concrete  can  be  satisfactorily  placed  and  when  provision  is  made  to  prevent  die  steel, 
when  tensioned,  from  breaking  through  the  duct. 


Manual    Recommendations 139 

6.  Splicing 

Delete  in  its  entirety. 

7.  Future  Bonding 

No  changes. 

Pages  8-2-1  to  8-2-27,  incl. 

PART  2— PLAIN  AND  REINFORCED  CONCRETE  MEMBERS 

Revise  the  material  on  pages  8-2-5  through  8-2-27  of  Part  2  as  follows: 
Delete  Arts.  1,  2,  and  3  of  Sec.  D,  substituting  therefor  the  following: 

D.  ALLOWABLE  UNIT  STRESSES 

1.  Modular  Ratio  n 

The  ratio  of  the  modulus  of  elasticity  of  steel  to  tliat  of  concrete,  Es/Ec,  equals  n 
and  shall  be  based  upon  the  compressive  strength  of  the  concrete  as  follows: 

f'c  (psi)  n 

2000-2499    15 

2500-2999    12 

3000-3999    10 

4000-4999    8 

5000  or  more 6 

For  lightweight  concrete  the  values  of  n  shall  be  determined  by  the  engineer. 

f'c  is  the  ultimate  compressive  strength  of  the  concrete  at  the  age  of  28  days, 
based  upon  tests  of  6-in  by  12-in,  or  8-in  by  16-in  cylinders  made  and  tested  in 
accordance  with  ASTM  Specifications,  designations  C  31  and  C  39. 

2.  Concrete    ( all  Stresses  in  Pounds  per  Square  Inch ) 

fc     is  the  unit  compressive  stress  in  the  concrete. 
V     is  tlie  unit  shearing  stress. 
u     is  tlie  unit  bond  stress. 

f,    is  the  imit  tensile  stress  in  the  longitudinal  reinforcement. 
fw   is  the  unit  tensile  stress  in  the  web  reinforcement. 
/',  is  the  unit  compressive  stress  in  the  longitudinal  reinforcement. 
d     is  the  depth  from  compression  surface  of  beam   or  slab  to  the  center  of 
gravity  of  longitudinal   reinforcement. 

Flexure  fd 

Extreme  fiber  stress  in  compression 0.45  f'c 

Extreme  fiber  stress  in  tension  (plain  concrete  footings  and  walls 

only     1.6  Vf7 

Bearing  /, : 

Full  area  loaded .  .    0.25  /'. 

Load  on  one-third  of  area  or  less  with  minimum  edge  distance 

of  6  in   0..35  /', 

but  not  more  than  1050  psi. 

When  the  loaded  area  is  reasonably  concentric  and  is  greater  than 
one-third  but  less  than  the  full  area,  the  allowable  bearing  stress  shall 
be  interpolated,  but  the  mininnun  edge  distance  shall  be  6  in. 


140  Manual    Recommendat 


ions 


Axial  compression  /, : 

In  pedestals    0.25  f'c 

In  columns  see  Sec.  I,  Arts.  2,  3  and  4. 

Shear  v"    (as  a  measure  of  diagonal  tension   at  a  distance  (I  from  the  face  of 
the  support ) : 

Beams  with  no  web  reinforcement l.I  V/'c 

Beams    with   vertical   or  inclined  web   reinforcement   or   properly 

combined  bent  bars  and  vertical  stirrups   5V/', 

Slabs  and  footings  (peripheral  shear,  Sec.  F,  Art.  8)     2V/'o 

Bond  «*: 

Tension  bars  sizes  No.  3-No.  11  with  deformations  conforming  to  ASTM 
A  615,  A  617  ("D"  is  the  nominal  diameter  of  bar,  inches): 

Top  bars***   3.4  V/'c,  350  psi  max. 

~D 

Bars  other  than  top  bars 4.8 V/'c,  500  psi  max. 

D 
Tension  bars  sizes   No.    14   and  No.    18  with  defonnations  confonning  to 
ASTM  A  615,  A  617: 

Top  bars**   2.1  V/V 

Bars  other  than  top  bars   3  V  /'c 

All  compression  bars  with  deformations  conforming  to 

ASTM  A  615,  A  617    6.5  V7'7,  400  psi  max. 

For  all  plain  bars  the  allowable  bond  stress  shall  be  %  of  those  pennitted 
for  deformed  bars,  but  not  more  than  160  psi.  Plain  bars  must  have 
hooked  ends. 

3.  Reinforcement 

Flexure  fs  ( with  or  without  axial  loads ) : 

Grade  40— ASTM  A  615,  A  617   20,000  psi 

Grade  60— ASTM  A  615,  A  617   24,000  psi 

Wire  mesh  not  exceeding  M  inch  in  diameter  when  used  in  one-way 
solid  slabs  only — 50  percent  of  the  minimum  yield  strength  but 
not  to  exceed 24,000  psi 

Tension  /«,  in  web  reinforcement: 

Grade  40— ASTM  A  615,  A  617    20,000  psi 

Grade  60— ASTM  A  615,  A  617    24,000  psi 

Compression  fs  in  column  verticals: 

Grade  40— ASTM  A  615,  A  617    16,000  psi 

Grade  60— ASTM  A  615,  A  617    24,000  psi 

Compressive  reinforcement  in  flexural  members — See  Sec.  E,  Art.  4. 

Compression  in  composite  and  combination  columns — See  Sec.  I,  Arts.  4  and  5. 

"  For  lightweight  aggregate  concrete,  shear  and  bond  values  shall  be  determined  by  the 
engineer. 

"*'  Top  bars  in  reference  to  bond  are  horizontal  bars  so  placed  that  more  than  12  inches 
of  concrete  is  cast  in  the  member  below  the  bar. 


Man  ual    Recommendations 141 

Delete  text  on  page  8-2-8  following  the  heading  Compressive  Reinforcement 
IN  Beams  and  substitute  the  following: 

Compression  reinforcement  in  beams  or  girders  shall  be  enclosed  by  ties  or 
stirrups  at  least  No.  3  in  size  for  longitudinal  bars  No.  10  or  smaller,  and  at  least 
No.  4  in  size  for  No.  11,  No.  14,  No.  18  and  bundled  longitudinal  bars.  The  spacing 
of  tlie  closed  ties  or  stirrups  shall  not  exceed  16  longitudinal  bar  diameters,  48  tie  bar 
diameters,  or  the  least  dimension  of  the  member.  Welded  wire  fabric  of  equivalent 
area  may  be  used.  Such  stirrups  or  ties  shall  be  used  throughout  the  distance  where 
the  compression  reinforcement  is  required. 

Where  compression  reinforcement  is  used,  the  value  of  n  for  calculating  the 
amount  of  compression  reinforcement  required  shall  be  taken  as  twice  the  value 
given  in  Sec.  D,  Art.  1.  However,  in  no  case  shall  a  stress  in  compression  reinforce- 
ment be  greater  than  that  allowed  in  Sec.  D,  Art.  3  for  compression  in  column 
verticals. 

Delete  present  Sections  F  and  G  on  pages  8-2-9  through  part  of  8-2-13  and 
substitute  therefor  the  following  new  Sections   F,   G,   and  H: 

F.  SHEAR  AND  DIAGONAL  TENSION 

1.  Notation 

Ag  =  gross  area  of  section. 
As  =  area  of  tension  reinforcement. 

A„  =  total  area  of  web  reinforcement  in  tension  within  a  distance,  s,  measured 
in  a  direction  parallel  to  the  longitudinal  reinforcement, 
a  =  angle  between  inclined  web  bars  and  longitudinal  axis  of  member. 
b  =  width  of  compression  face  of  flexural  member. 
b'  =  width  of  web  in  I-  and  T-sections. 
bo  =  peripher>'  of  critical  section  for  slabs  and  footings. 
d  =  distance  from  extreme  compression  fiber  to  centroid  of  tension  reinforce- 
ment. 
/',.  =  compressive  strength  of  concrete. 
fv  =  tensile  stress  in  web  reinforcement. 
M  =  bending  moment. 
M'  =  modified  bending  moment. 

iV  =  load  normal  to  the  cross  section,  to  be  taken  as  positive  for  compression, 
negative  for  tension,  and  to  include  the  effects  of  tension  due  to  shrink- 
age and  creep. 
P,r  =  As/b'd. 
s  =  spacing  of  stirrups  or  bent  bars  in  a  direction  parallel  to  the  longitudinal 

reinforcement. 
t  =  total  depth  of  .section. 

V  =  shear  stress. 

Vc  =■  shear  stress  carried  by  concrete. 

V  =  total  .shear. 

y  =:  shear  carried  by  web  reinforcement. 

2.  Shear  Stress" 

(a)  The  nominal  shear  stress,  as  a  measure  of  diagonal  tension,  in  reinforced 
concrete  members  shall  be  computed  by: 


•  The   term    ;    is   omitted    in   determination   of  nominal    shear   stress. 


142  Manual    Recommendations 


V  =  V/bd  (2) 

For  design,  the  maximum  shear  shall  be  considered  as  that  at  the  section  a  distance, 
d  from  the  face  of  the  support.**  Wherever  applicable,  effects  of  torsion  shall  be 
added  and  effects  of  inclined  flexural  compression  in  variable-depth  members  shall 
be  included. 

(b)  For  beams  of  I-  or  T-  section,  h'  shall  be  substituted  for  b  in  Eq.  (2). 

(c)  The  shear  stress,  Vc,  permitted  on  an  unreinforced  web  shall  not  exceed 
l.lV/'c  at  a  distance  d  from  the  face  of  the  support  unless  a  more  detailed  analysis 
is  made  in  accordance  with  ( d )  or  ( e ) .  The  shear  stresses  at  sections  between  the 
face  of  the  support  and  the  section  a  distance  d  therefrom  shall  not  be  considered 
critical.**  For  members  with  axial  tension,  Vc  shall  not  exceed  the  value  given  in  (e). 

(d)  The  shear  stress  permitted  on  an  imreinforced  web  shall  not  exceed  that 
given  by: 

u,=  V7%+  1300  P,o  Vd   (2a) 

M 

but  not  to  exceed  1.75  V/'c.  The  shear  stresses  at  sections  between  the  face  of  tlie 
support  and  the  section  a  distance  d  therefrom  shall  not  be  considered  critical.** 
V  and  M  are  the  shear  and  bending  moment  at  the  section  considered,  but  M  shall 
be  not  less  than  Vd. 

(e)  For  members  subjected  to  axial  load  in  addition  to  shear  and  flexure,  Eq. 
(2a)  shall  apply  except  that  M'  shall  be  substituted  for  M  where 

M'  =  M  —  N^'^*~^^ (2b) 

8 

and  Vc  shall  not  exceed 


Vc  =  1.75  V/'c   ( 1  +  0.004  N/A,)    (2c) 

3.  Web  Reinforcement 

(a)  A  minimum  area  of  shear  reinforcement  conforming  to  Sec.  F,  Art.  7  shall 
be  provided  in  all  reinforced  concrete  flexural  members  except: 

( 1 )  Slabs  and  footings. 

(2)  Beams  where  the  total  depth  does  not  exceed  either  10  in.,  2/2  times  the 
thickness  of  the  flange,  or  one-half  the  width  of  the  web. 

(3)  Where  die  nominal  shear  stress,  v,  is  less  than  one-half  of  die  permissible 
shear  stress  carried  by  the  concrete,  Vc. 

This  requirement  may  be  waived  if  it  is  shown  by  tests  that  tlie  required  flexural 
and  shear  capacity  of  the  member  can  be  developed  when  shear  reinforcement  is 
omitted. 

(b)  Wherever  the  value  of  the  shear  stress,  v,  computed  by  Eq.  (2),  plus  effects 
of  torsion,  exceeds  the  shear  stress,  Vc,  permitted  for  the  concrete  of  an  unreinforced 
web  by  Art.  2  (c),  (d),  or  (e),  web  reinforcement  shall  be  provided  equal  to  the 
depth,  d,  of  the  member  beyond  the  point  theoretically  required.  Web  reinforcement 
between  the  face  of  die  support  and  the  section  at  a  distance  d  tlierefrom  shall  be 
the  same  as  required  at  diat  section. 


""  This  provision   does  not   apply  to  brackets  and  other  short  cantilevers. 


Manual    Recommendations 143 

(c)  Web  reinforcement  may  consist  of: 

1.  Stirrups  perpendicular  to  the  longitudinal  reinforcement. 

2.  Stirrups  making  an  angle  of  45  deg  or  more  with  the  longitudinal  tension 
reinforcement. 

3.  Longitudinal  bars  bent  so  diat  the  axis  of  the  bent  bar  makes  an  angle  of 
30  deg  or  more  with  the  axis  of  the  longitudinal  portion  of  the  bar. 

4.  Combinations  of  1  or  2  with  3. 

(d)  Stirrups  or  other  bars  to  be  considered  effective  as  web  reinforcement  shall 
be  anchored  at  both  ends  according  to  the  provisions  of  Sec.  G. 

4.  Stirrups 

(a)  The  area  of  steel  required  in  stirrups  placed  perpendicular  to  the  longi- 
tudinal reinforcement  shall  be  computed  by: 

A,.  =  V's/f.d (3) 

(b)  The  area  of  inclined  stirrups  shall  be  computed  by  Eq.   (4b). 

5.  Bent  Bars 

(a)  Only  the  center  three-fourths  of  the  inclined  portion  of  any  longitudinal  bar 
that  is  bent  up  for  web  reinforcement  shall  be  considered  effective  for  that  puqoose. 

(b)  When  the  web  reinforcement  consists  of  a  single  bent  bar  or  of  a  single  group 
of  parallel  bars  all  bent  up  at  the  same  distance  from  the  support,  the  required  area 
shall  be  computed  by: 

A,.=  -y^ (4a) 

/,  sm  a 

in  which  V  shall  not  exceed  1.5  hd^ f'c 

(c)  Where  there  is  a  series  of  parallel  bars  or  groups  of  bars  bent  up  at  dif- 
ferent distances  from  the  support,  the  required  area  shall  be  computed  by: 

A,.  =  ^,— -^-^ r      (4b) 

/, «  (  sm  a  +  COS  a  ) 

(d)  Bent  bars  used  alone  as  web  reinforcement  shall  be  so  spaced  that  the 
effectixe  inclined  portion  defined  in  (a)  meets  the  requirements  of  Art.  7. 

(e)  Where  more  than  one  type  of  web  reinforcement  is  used  to  reinforce  the 
sauie  portion  of  the  web,  the  total  shear  resistance  shall  be  computed  as  the  sum  of 
the  resistances  computed  for  the  various  types  separately.  In  such  computations,  the 
resistance  of  the  concrete,  Vr,  shall  be  included  only  once,  and  no  one  type  of  rein- 
forcement shall  be  assumed  to  resist  more  than  2V'/3. 

6.  Stress  Restrictions 

(a)  The  tensile  stress  in  web  reinforcement,  /,•,  shall  not  exceed  the  \alues  given 
iu  Sec.  D,  Art.  3. 

(b)  The  shear  stress,  v,  shall  not  exceed  SV/'I  in  sections  with  web  reinforce- 
uient. 

7.  Web   Reinforcement  Spacing  and  Area  Restrictions 

Where  web  reinforcement  is  required  by  Sec.  F,  Art.  3  (a)  or  by  calculations. 
it  shall  conform  to  the  following  provisions: 


144  Manual    Recommendations 


(a)  It  shall  be  so  spaced  that  every  45  deg  line,  representing  a  potential 
diagonal  crack  and  extending  from  mid-depth,  d/2,  of  the  member  to  the  longi- 
tudinal tension  bars,  shall  be  crossed  by  at  least  one  line  of  web  reinforcement. 
When  the  shear  stress  exceeds  3V/'c,  every  such  45  deg  line  shall  be  crossed  by  at 
least  two  lines  of  web  reinforcement. 

(b)  Its  area  shall  not  be  less  than  0.15  percent  of  the  area,  b's,  computed  as 
the  product  of  the  width  of  the  web,  and  the  spacing  of  the  web  reinforcement 
along  the  longitudinal  axis  of  the  member. 

8.  Shear  Stress  in   Slabs  and  Footings 

(a)  The  shear  capacity  of  slabs  and  footings  in  the  vicinity  of  concentrated 
loads  or  concentrated  reactions  shall  be  governed  by  the  more  se\'ere  of  two  con- 
ditions: 

1.  The  slab  or  footing  acting  essentially  as  a  wide  beam,  with  a  potential 
diagonal  crack  extending  in  a  plane  across  the  entire  width.  This  case 
shall  be  considered  in  accordance  with  Sec.  F,  Art.  2. 

2.  Two-way  action  existing  for  the  slab  or  footing,  with  potential  diagonal 
cracking  along  the  surface  of  a  trimcated  cone  or  pyramid  aroimd  the  con- 
centrated load  or  reaction.  The  slab  or  footing  in  this  case  shall  be  de- 
signed as  required  in  the  remainder  of  this  section. 

(b)  The  critical  section  for  shear  to  be  used  as  a  measiu'e  of  diagonal  tension 
shall  be  perpendicular  to  the  plane  of  the  slab  and  located  at  a  distance  d/2  out 
from  the  periphery  of  the  concentrated  load  or  reaction  area. 

(c)  The  nominal  shear  stress  shall  be  computed  by: 

v  =  V/b„d (5) 

in  which  V  and  ho  are  taken  at  the  critical  section  specified  in  (b).  The  shear  stress, 
V,  so  computed  shall  not  exceed  2V/'r,  vmless  shear  reinforcement  is  provided  in  ac- 
cordance with   (d),  in  which  case  v  shall  not  exceed  3V/',. 

(d)  When  v  exceeds  2V/',-,  shear  reinforcement  shall  be  provided  in  accordance 
with  Sec.  F,  Arts.  3  to  7,  except  that  the  allowable  stress  in  shear  reinforcement 
shall  be  50  percent  of  that  prescribed  in  Sec.  D,  A.rt.  3.  Shear  reinforcement  consist- 
ing of  bars,  rods  or  wire  shall  not  be  considered  effective  in  members  with  a  total 
thickness  of  less  than  10  in. 

9.  Torsion 

(a)  Where  torsion  is  a  consideration,  the  stirrups  provided  shall  be  closed  and 
at  least  one  longitudinal  bar  shall  be  placed  in  each  corner  of  the  beam  section,  the 
bar  to  be  at  least  the  diameter  of  the  stirrup  or  M  in.,  whichever  is  larger. 

G.  BOND  AND  ANCHORAGES 

1.  Notation 

(/  =  distance  from  extreme  compression  fiber  to  centroid  of  tension  reinforce- 
ment. 
D  =:  nominal  diameter  of  bar,  inches. 
/V  =  compressive  strength  of  concrete,  psi. 
/  =  ratio  of  distance  between  centroid  of  compression  and  centroid  of  ten- 
sion to  the  depth,  d. 


Manual    Recommendations 145 

Ho  =  Sinn  of  perimeters  of  all  effective  bars  crossing  the  section  on  the  ten- 
sion side   if  of  uniform  size;   for  mixed  sizes,  substitute  4As/D,  where 
As  is  the  total  steel  area  and  D  is  the  largest  bar  diameter.  For  bundled 
bars  use  the  sum  of  the  exposed  portions  of  the  perimeters. 
1/  =  bond  stress. 
V  =  total  shear. 

2.  Computation  of  Bond  Stress  in  Flexural  Members 

(a)  In  flexural  members  in  which  tlie  tension  reinforcement  is  parallel  to  the 
compression  face,  the  flexural  bond  stress  at  any  cross  section  shall  be  computed  by 

"  =  ^ <«' 

Bent-up  bars  tliat  are  not  more  than  d/3  from  the  level  of  the  main  longitudinal 
reinforcement  may  be  included.  Critical  sections  occur  at  the  face  of  the  support, 
at  each  point  where  tension  bars  terminate  within  a  span,  and  at  the  point  of 
inflection. 

( b )  To  prevent  bond  failure  or  splitting,  the  calculated  tension  or  compression 
in  an\-  bar  at  any  section  nuist  be  developed  on  each  side  of  that  section  by  proper 
embedment  length,  end  anchorage,  or,  for  tension  only,  hooks.  Anchorage  or  develop- 
ment bond  stress,  ;/,  shall  be  computed  as  the  bar  forces  divided  by  tlie  product  of 
-o  times  the  embedment  length. 

(c)  The  bond  stress,  ii,  computed  as  in  (a)  or  (b)  shall  not  exceed  the  limits 
given  in  Sec.  D,  Art.  2,  except  that  flexural  bond  stress  need  not  be  considered  in 
compression,  nor  in  diose  cases  of  tension  where  anchorage  bond  is  less  than  0.8 
of  the  pennissible. 

( d )  Adequate  anchorage  shall  be  provided  for  the  tension  reinforcement  in  all 
flexural  members  to  which  Eq.  ( 6 )  does  not  apply,  such  as  sloped,  stepped  or  tapered 
footings,  brackets,  or  beams  in  which  the  tension  reinforcement  is  not  parallel  to  the 
compression  face. 

3.  Anchorage  Requirements — General 

( a )  The  calculated  tension  or  compression  in  any  bar  at  any  section  nuist  be 
developed  on  each  side  of  that  .section  by  proper  embedment  length,  end  anchorage, 
or  hooks.  A  tension  bar  may  be  anchored  by  bending  it  across  the  web  at  an  angle 
of  not  less  than  1.5  deg  with  the  longitudinal  portion  of  the  bar  and  making  it  con- 
tinuous with  the  reinforcement  on  the  opposite  face  of  the  member. 

(b)  Except  at  supports,  every  reinforcing  bar  shall  be  extended  beyond  the 
point  at  which  it  is  no  longer  needed  to  resist  flexural  stress,  for  a  distance  equal  to 
the  effective  depth  of  the  member  or  12  bar  diameters,  whichever  is  greater. 

(c)  No  flexural  bar  shall  be  terminated  in  a  ten.sion  zone  unless  one  of  the 
following  conditions  is  satisfied: 

1.  The  .shear  is  not  over  one-half  that  normally  permitted,  including  allowance 
for  shear  reinforcement,  if  any. 

2.  Stirrups  in  excess  of  those  normally  required  are  pros  ided  each  wa\  from 
the  cut-off  a  distance  equal  to  three-fourths  of  the  deptli  of  tlie  beam. 
The  exce-ss  stirrups  shall  be  at  least  the  mininunu  specified  in  Sec.  F, 
Art.  7  (b).  The  stirrup  spacing  .shall  not  exceed  d/Hr,.  where  r,,  is  the  ratio 
of  the  area  of  bars  cut  off  to  the  total  area  of  bars  at  the  section. 


146 Manual    Recommendations 

3.  The  continuing  bars  provide  double  the  area  required  for  flexure  at  that 
point  or  double  the  perimeter  required  for  flexural  bond. 

(d)  Tensile  negative  reinforcement  in  any  span  of  a  continuous,  restrained  or 
cantilever  beam,  or  in  any  member  of  a  rigid  frame,  shall  be  adequately  anchored 
by  bond,  hooks,  or  mechanical  anchors  in  or  through  the  supporting  member. 

(e)  At  least  one-third  of  the  total  reinforcement  provided  for  negative  moment 
at  the  support  shall  be  extended  beyond  the  extreme  position  of  the  point  of  inflection 
a  distance  not  less  than  1/16  of  the  clear  span,  or  the  efi"ective  depth  of  the  member, 
whichever  is  greater. 

(f)  At  least  one-fourth  the  area  of  the  positive  reinforcement  in  continuous 
beams  shall  extend  along  the  same  face  of  the  beam  into  the  support  a  distance  of 
10  or  more  bar  diameters.  Where  extension  of  the  reinforcement  this  distance  is 
impractical,  the  bars  shall  be  extended  as  far  as  possible  into  the  support  and 
terminated  in  standard  hooks  or  other  adequate  anchorage. 

In  simple  beams,  or  at  the  outer  or  freely  supported  ends  of  end  spans  of 
continuous  beams,  at  least  one-half  the  positive  reinforcement  shall  extend  along 
the  same  face  of  the  beam  into  the  support  a  distance  of  12  or  more  bar  diameters, 
or  shall  be  extended  as  far  as  possible  into  the  support  and  tenninated  in  standard 
hooks  or  other  adequate  anchorage. 

(g)  Plain  bars  in  tension,  except  bars  for  shrinkage  and  temperature  reinfoice- 
ment,  shall  terminate  in  standard  hooks,  except  that  hooks  shall  not  be  required  on 
the  positive  reinforcement  at  interior  supports  of  continuous  members. 

(h)  Standard  hooks  in  tension  may  be  considered  as  developing  10,000  psi 
in  the  bars  or  may  be  considered  as  extensions  of  the  bars  at  appropriate  bond 
stresses. 

(i)  Hooks  shall  not  be  considered  effective  in  adding  to  the  compressive  resist- 
ance of  bars. 

(j)  Any  mechanical  device  capable  of  developing  the  strength  of  the  bar  with- 
out damage  to  the  concrete  may  be  used  in  lieu  of  a  hook.  Test  results  showing  the 
adequacy  of  such  devices  must  be  presented. 

4.  Anchorage  of  Web  Reinforcement 

(a)  The  ends  of  bars  fonning  simple  U-  or  multiple  U-  stirrups  shall  be  an- 
chored by  one  of  the  following  methods: 

1.  By  a  standard  hook,  considered  as  developing  50  percent  of  tlie  allowable 
stress  in  the  bar,  plus  embedment  sufficient  to  develop  by  bond  the  re- 
maining stress  in  the  bar,  in  conformance  witli  other  Articles  of  this  Sec- 
tion. The  effective  embedment  of  a  stirrup  leg  shall  be  taken  as  the 
distance  between  the  mid-depth  of  the  member,  d/2,  and  the  center  of 
radius  of  bend  of  the  hook. 

2.  Bending  tightly  aroimd  the  longitudinal  reinforcement  through  at  least 
180  deg. 

3.  Embedment  above  or  below  the  mid-deptli,  cl/2,  of  the  beam  on  the  com- 
pression side,  a  distance  sufficient  to  develop  by  bond  the  stress  to  which 
the  bar  will  be  subjected,  at  the  bond  stresses  permitted  by  Art.  2  but, 
in  any  case,  a  minimum  of  24  bar  diameters. 

(b)  Between  the  anchored  ends,  each  bend  in  the  continuous  portion  of  a 
simple  U-  or  multiple   U-  stirrup  shall  be  made  around  a  longitudinal  bar. 


Manual    Recommendations  147 


(c)  Hooking  or  bending  stirmps  around  die  longitudinal  reinforcement  shall  be 
considered  effective  only  when  these  bars  are  perpendicular  to  the  longitudinal 
reinforcement  or  make  an  angle  of  at  least  45  deg  with  deformed  longitudinal  bars. 

(d)  Longitudinal  bars  bent  to  act  as  web  reinforcement  shall,  in  a  region  of 
tension,  be  continuous  with  the  longitudinal  reinforcement  and  in  a  compression  zone 
shall  be  anchored  as  in  4(a)l  or  4(a)3. 

(e)  In  all  cases  web  reinforcement  shall  be  carried  as  close  to  the  compression 
surface  of  the  beam  as  cover  requirements  and  the  proximity  of  other  steel  will 
permit. 

5.  Anchorage  of  Bars  in  Footing  Slabs 

Plain  bars  in  footing  slabs  shall  be  anchored  by  means  of  standard  hooks.  The 
outer  faces  of  these  hooks  and  tlie  ends  of  defonned  bars  shall  be  not  less  than  3  in 
nor  more  than  6  in  from  the  face  of  the  footing. 

6.  Hooks 

(a)  The  tenn  "standard  hook"  as  used  herein  shall  mean  either: 

1.  A  semicircular  turn  plus  an  extension  of  at  least  four  bar  diameters  but 
not  less  than  2/2  in.  at  the  free  end  of  the  bar,  or 

2.  A  90-deg  turn  plus  an  extension  of  at  least  12  bar  diameters  at  the  free 
end  of  the  bar,  or 

3.  For  stirrup  and  tie  anchorage  only,  either  a  90-deg  or  a  135-deg  turn  plus 
an  extension  of  at  least  six  bar  diameters  but  not  less  than  2/2  in.  at  the 
free  end  of  the  bar. 

(b)  Minimum  radii — The  radii  of  bend  measured  on  the  inside  of  the  bar  for 
standard  hooks  shall  not  be  less  than  the  \'alues  given  in  Part  1,  Sec.  H,  Art.  2. 

H.  SPLICES  IN  REINFORCEMENT 

1.  General 

No  .splices  of  reinforcement  shall  be  made  except  as  shown  on  the  design 
drawings  or  as  specified,  or  as  authorized  by  the  engineer.  Except  as  provided 
herein,  all  welding  shall  confonn  to  AWS  D12.1,  "Recommended  Practices  for  Weld- 
ing Reinforcing  Steel,  Metal  Inserts  and  Connections  in  Reinforced  Concrete 
Con.struction." 

2.  SpUces  in  Reinforcement  in  Which  the  Critical  Design  Stress  Is  Tensile 

Lapped  splices  in  tension  .shall  not  be  used  for  bar  sizes  larger  than  No.  11. 

Splices  at  points  of  maximum  tensile  stress  .shall  be  avoided  wherever  possible; 
such  splices  where  used  shall  be  welded,  lapped,  or  otherwi.se  fully  developed.  In 
any  case  tlie  splice  shall  transfer  the  entire  computed  stress  from  bar  to  bar  without 
exceeding  three-fourths  of  the  pennissible  bond  values  given  in  Art.  D,  Sec.  3.; 
however,  the  length  of  lap  for  defonned  bars  shall  not  be  less  than  24,  30,  and  36 
bar  diameters  for  specified  yield  strengths  of  40,000,  50,000  and  60,000  psi.  respec- 
tively, nor  less  than  12  in.  For  plain  bars  the  minimum  length  of  lap  shall  be  twice 
that  for  deformed  bars. 

For  contact  splices  spaced  laterally  closer  than  12  bar  diameters  or  located 
closer  than  6  in.  or  6  bar  diameters  from  an  outside  edge,  the  lap  shall  be  increa.sed 
by  20  percent,  or  stirmps  as  prescribed  in  Art.  C,  Sec.  3  (c)  2  or  doscK-  spaced 
spirals  shall  enclo.se  the  splice  for  its  full  length. 


148  Manual    Recommendations 


Where  more  than  one-half  of  the  bars  are  spliced  within  a  length  of  40  bar 
diameters  or  where  splices  are  made  at  points  of  maximum  stress,  special  precautions 
shall  be  taken,  such  as  increased  lenj^th  of  lap  and  the  use  of  spirals  or  closely 
spaced  stirrups  around  and  for  the  lenytli  of  the  splice. 

3.  Splices  in  Reinforcement  in  Which  the  Critical  Design  Stress  Is  Compressive 

(a)  Where  lapped  splices  are  used  and  the  concrete  has  a  strength  of  3000  psi 
or  more,  the  minimum  length  of  lap  for  deformed  bars  shall  be  20,  24,  and  30  bar 
diameters  for  specified  yield  strengths  of  50,000  and  under,  6(),()()0,  and  75,000  psi, 
respectively,  nor  less  than  12  in.  When  the  specified  concrete  strengths  are  less  than 
3000  psi,  the  amount  of  lap  shall  be  one-third  greater  than  the  values  given  above. 

For  plain  bars,  the  minimum  amount  of  lap  shall  be  twice  that  specified  for 
deformed  bars. 

Lapped  splices  in  compression  shall  not  be  used  for  bars  larger  than  No.  11. 

(b)  Welded  splices  or  other  positive  connections  may  be  used  instead  of 
lapped  splices.  In  bars  required  for  compression  only,  the  compressive  stress  may 
be  transmitted  by  bearing  of  square-cut  ends  held  in  concentric  contact  b>-  a  suitably 
welded  sleeve  or  mechanical  device. 

(c)  Where  longitudinal  bars  are  offset  at  a  splice,  the  slope  of  the  inclined 
portion  of  the  bar  with  the  axis  of  the  column  shall  not  exceed  1  in  6,  and  the  por- 
tions of  the  bar  above  and  below  the  offset  shall  be  parallel  to  the  axis  of  the 
column.  Adequate  horizontal  support  at  the  offset  bends  shall  be  treated  as  a  mat- 
ter of  design,  and  shall  be  provided  by  metal  ties,  spirals,  or  other  parts  of  the 
construction.  Metal  ties  or  spirals  so  designed  shall  be  placed  near  (not  more  than 
8  bar  diameters  from)    the  point   of  bend. 

The  horizontal  tlirust  to  be  resisted  shall  be  assumed  as  1^2  times  the  horizontal 
component  of  the  nominal  stress  in  the  inclined  portion  of  the  bar. 
Offset  bars  shall  be  bent  before  they  are  placed  in  the  forms. 

(d)  Where  member  faces  are  offset  3  in.  or  more,  splices  of  vertical  bars 
adjacent  to  the  offset  face  shall  be  made  by  separate  dowels  overlapped  as  specified 
above. 

(e)  In  tied  columns  the  amount  of  reinforcement  spliced  by  lapping  shall  not 
exceed  a  steel  ratio  of  0.04  in  any  3-ft  length  of  column. 

4.  Approved  Welded  Splices 

An  approved  welded  splice  is  one  in  which  the  bars  are  butted  and  welded  so 
that  it  will  develop  in  tension  at  least  125  percent  of  the  specified  yield  strength  of 
the  reinforcing  bar.  Approved  positive  connections  for  bars  designed  to  carry  critical 
tension  or  compression  shall  be  equi\  alent  in  strength  to  an  approved  welded  splice. 

5.  Metal  Cores  in  Composite  Columns 

Metal  cores  in  composite  columns  shall  be  accurately  milled  at  splices  and 
positive  provision  shall  be  made  for  alignment  of  one  core  above  another.  At  die 
column  base,  provision  shall  be  made  to  transfer  the  load  to  the  footing  at  safe  unit 
stresses  in  accordance  with  Sec.  D.  The  base  of  the  metal  section  shall  be  designed 
to  transfer  the  load  from  the  entire  composite  column  to  the  footing,  or  it  may  be 
designed  to  transfer  the  load  from  the  metal  section  only,  provided  it  is  so  placed 
in  the  pier  or  pedestal  as  to  leave  ample  section  of  concrete  above  the  base  for  the 
transfer  of  load  from  the  reinforced  concrete  section  of  the  column  by  means  of 
bond  on  the  vertical  reinforcement  and  by  direct  compression  on  the  concrete. 


Manual    Recommendations 149 

6.  Welded  Wire  Fabric 

Welded  wire  fabric  used  as  reinforcement  in  structural  slabs  shall  be  spliced  in 
accordance  with  the  following  provisions: 

(a)  Lapped  splices  of  wires  in  regions  of  maximum  stress  (when  they  are 
carrying  more  than  one-half  of  the  permissible  stress)  shall  be  avoided  wherever 
possible;  such  splices  where  used  shall  be  so  made  that  the  overlap  measured  be- 
tween outermost  cross  wire  of  each  fabric  sheet  is  not  less  than  the  spacing  of  the 
cross  wire  plus  2  in. 

(b)  Splices  of  wires  stressed  at  not  more  than  one-half  the  permissible  stress 
shall  be  so  made  that  the  overlap  measured  between  outermost  cross  wires  is  not 
less  than  2  in. 


Reletter  Section  on  Design  of  Columns  on  page  8-2-13  from  H  to  I  and  revise 
the  text  as  follows: 

Under  Art.  1 — General,  change  reference  in  sixth  line  to  Sec.  I  instead  of 
Sec.  H. 

Substitute  for  the  definition  for  /'»  on  page  8—2-14  the  following:  /'»  is  the 
nominal  working  stress  in  vertical  column  reinforcement  as  given  in  Sec.  D,  Art.  3. 

Delete  on  page  8-2—14,  Splices  in  Longitudinal  Reinforcement  and  text 
thereinafter. 

Delete  on  page  8-2-15,  Splices  in  Longitudinal  Reinforcement  and  text 
thereinafter. 

Delete  on  page  8-2-16,  Splices  and  Connections  and  text  thereinafter. 

Delete  all  of  present  Sections  I  and  J  on  pages  8-2-20  through  8-2-27,  and  add 
the  following  new  material: 

J.  DESIGN  OF  FOOTINGS 

1 .  Scope 

(a)  The  requirements  prescribed  in  Arts.  2  through  9  apply  to  isolated  footings 
and  where  applicable  to  combined  footings. 

( b )  Additional  general  procedures  for  the  design  of  combined  footings  are  given 
in  Art.   10. 

2.  Loads  and  Reactions 

(a)  Footings  shall  be  proportioned  to  sustain  the  applied  loads  and  induced 
reactions  without  exceeding  the  stresses  or  strengths  prescribed  in  other  Sections 
of  Part  2  and  as  further  provided  in  this  Section. 

(b)  In  cases  where  the  footing  is  concentrically  loaded  and  the  member  being 
supported  does  not  transmit  any  moment  to  the  footing,  computations  for  moments 
and  shears  shall  be  based  on  an  upward  reaction  assumed  to  be  imiformly  distributed 
per  unit  area  or  per  pile  and  a  downward  applied  load  assumed  to  be  uniformK 
distributed  over  the  area  of  the  footing  covered  by  the  colimin,  pedestal,  wall  or 
metallic  column  base. 

(c)  In  ca.ses  where  the  footing  is  eccentrically  loaded  and/or  the  member 
being  supported  transmits  a  moment  to  the  footing,  proper  allowance  shall  be  made 
for  any  \ariation  that  may  exist  in  the  intensities  of  reaction  and  applied  load  con- 
sistent with  the  magnitude  of  the  applied  load  and  the  amoimt  of  its  actual  or 
virtual  eccentricity. 


150 Manual    Recommendations 

( d )  In  the  case  of  footings  on  piles,  computations  for  moments  and  shears  may 
be  based  on  the  assumption  that  the  reaction  from  any  pile  is  concentrated  at  the 
center  of  the  pile. 

3.  Sloped  or  Stepped  Footings 

(a)  In  sloped  or  stepped  footings,  the  angle  of  slope  or  depth  and  location  of 
steps  shall  be  such  that  the  allowable  stresses  are  not  exceeded  at  any  section. 

(b)  In  sloped  or  stepped  footings,  the  effective  cross  section  in  compression 
shall  be  limited  by  the  area  above  the  neutral  plane. 

(c)  Sloped  or  stepped  footings  that  are  designed  as  a  imit  shall  be  cast  as  a 
unit. 

4.  Bending  Moment 

(a)  The  external  moment  on  any  section  shall  be  determined  by  passing 
through  the  section  a  vertical  plane  which  extends  completely  across  tlie  footing  and 
computing  the  moment  of  the  forces  acting  over  the  entire  area  of  the  footing  on 
one  side  of  said  plane. 

(b)  The  greatest  bending  moment  to  be  used  in  the  design  of  an  isolated 
footing  shall  be  the  moment  computed  in  the  manner  prescribed  in  (a)  at  sections 
located  as  follows: 

1.  At   the   face   of   the   column,   pedestal  or  wall,   for   footings   supporting   a 
concrete  colmnn,  pedestal  or  wall. 

2.  Halfway  between  the  middle  and  the  edge  of  the  wall,  for  footings  under 
masonry  walls. 

3.  Halfway  between  the  face  of  the  column  or  pedestal  and  the  edge  of  the 
metallic  base,   for  footings  under  metallic  bases. 

(c)  The  width  resisting  compression  at  any  section  shall  be  assumed  as  the 
entire  width  of  the  top  of  the  footing  at  the  section  under  consideration. 

(d)  In  one-way  reinforced  footings,  tlie  total  tensile  reinforcement  at  any 
section  shall  provide  a  moment  of  resistance  at  least  equal  to  the  moment  computed 
as  prescribed  in  (a);  and  the  reinforcement  thus  detennined  shall  be  distributed 
uniformly  across  the  full  width  of  the  section. 

(e)  In  two-way  reinforced  footings,  the  total  tension  reinforcement  at  any 
section  shall  provide  a  moment  of  resistance  at  least  equal  to  the  moment  computed 
as  prescribed  in  ( a ) ;  and  tlie  total  reinforcement  thus  determined  shall  be  distributed 
across  tlie  corresponding  resisting  section  as  prescribed  for  square  footings  in  (f), 
and  for  rectangular  footings  in  (g). 

(f)  In  two-way  square  footings,  tlie  reinforcement  extending  in  each  direction 
shall  be  distributed  uniformly  across  the  full  width  of  the  footing. 

(g)  In  two-way  rectangular  footings,  the  reinforcement  in  the  long  direction 
shall  be  distributed  uniformly  across  the  full  width  of  the  footing.  In  the  case  of 
the  reinforcement  in  tlie  short  direction,  that  portion  detennined  by  Eq.  ( 19 )  shall 
be  unifoniily  distributed  across  a  band-width  (B)  centered  witli  respect  to  the 
center  line  of  the  column  or  pedestal  and  having  a  width  equal  to  tlie  length  of  the 
short  side  of  the  footing.  The  remainder  of  the  reinforcement  shall  be  uniformly  dis- 
tributed in  the  outer  portions  of  the  footing. 

Reinforcement  in  band- width  (B)      c=         2 


Total  reinforcement  in  short  direction        ( S  -j-  1 ) 
where  S  is  the  ratio  of  the  long  side  to  the  short  side  of  the  footing. 


(19) 


Manual    Recommendations 151 

5.  Shear  and  Bond 

(a)  For  computation  of  shear  in  footings,  see  Sec.  F,  Art.  8. 

(b)  Critical  sections  for  bond  shall  be  assumed  at  the  same  planes  as  those 
prescribed  for  bending  moment  in  Sec.  J,  Art.  4(b)l;  also  at  all  other  vertical  planes 
where  changes  of  section  or  of  reinforcement  occur. 

(c)  Computation  for  shear  to  be  used  as  a  measure  of  flexural  bond  shall  be 
based  on  a  vertical  section  which  extends  completely  across  the  footing,  and  the 
shear  shall  be  taken  as  tlie  sum  of  all  forces  acting  over  the  entire  area  of  the  footing 
on  one  side  of  such  section. 

( d )  The  total  tensile  reinforcement  at  any  section  shall  provide  a  bond  resistance 
at  least  equal  to  the  bond  requirement  as  computed  from  the  external  shear  at  tlie 
section. 

(e)  In  computing  the  external  shear  on  any  section  through  a  footing  supported 
on  piles,  the  entire  reaction  from  any  pile  whose  center  is  located  6  in.  or  more  out- 
side the  section  shall  be  assumed  as  producing  shear  on  the  section;  the  reaction 
from  any  pile  whose  center  is  located  6  in.  or  more  inside  the  section  shall  be 
assumed  as  producing  no  shear  on  the  section.  For  intennediate  positions  of  the  pile 
center,  tlie  portion  of  the  pile  reaction  to  be  assumed  as  producing  shear  on  the 
section  shall  be  based  on  straight-line  interpolation  between  full  value  at  6  in.  out- 
side the  section  and  zero  value  at  6  in.  inside  the  section. 

(f)  For  allowable  shearing  values,  see  Sec.  D  and  Sec.  F. 

(g)  For  allowable  bond  values,  see  Sec.  D  and  Sec.  G. 

6.  Transfer  of  Stress  at  Base  of  Column 

(a)  The  stress  in  the  longitudinal  reinforcement  of  a  column  or  pedestal  shall 
be  transferred  to  its  supporting  pedestal  or  footing  either  by  extending  the  longi- 
tudinal bars  into  the  supporting  member,  or  by  dowels. 

(b)  In  case  the  transfer  of  stress  in  the  reinforcement  is  accomplished  by 
extension  of  the  longitudinal  bars,  they  shall  extend  into  tlie  supporting  member 
the  distance  required  to  transfer  this  stress  to  the  concrete  by  bond. 

(c)  In  cases  where  dowels  are  used,  their  total  sectional  area  shall  be  not  less 
than  the  sectional  area  of  the  longitudinal  reinforcement  in  tlie  member  from  which 
the  stress  is  being  transferred.  In  no  case  shall  the  number  of  dowels  per  member 
be  less  than  four  and  the  diameter  of  the  dowels  shall  not  exceed  the  diameter  of 
the  column  bars  by  more  than  Js  in. 

(d)  Dowels  shall  extend  up  into  the  column  or  pedestal  a  distance  at  least 
equal  to  that  required  for  lap  of  longitudinal  column  bars  (see  Sec.  H)  and  down 
into  the  supporting  pedestal  or  footing  the  distance  required  to  transfer  to  the  con- 
crete, by  allowable  bond  stress,  the  full  working  value  of  the  dowel  (see  Sec.  G, 
Art.  3(i)  ). 

(e)  The  compression  stress  in  the  concrete  at  the  base  of  a  cohnnn  or  pedestal 
shall  be  considered  as  being  transferred  by  bearing  to  the  top  of  the  supporting 
pedestal  or  footing.  The  compression  stress  on  the  loaded  area  shall  not  exceed  the 
bearing  stress  allowable  for  the  quality  of  concrete  in  the  supporting  member  as 
determined  by  the  ratio  of  the  loaded  area  to  the  supporting  area. 

(f)  For  allowable  bearing  stresses,  design  shall  confonn  to  the  \ahies  in  Art.  D, 
Sec.  2. 

(g)  In  sloped  or  stepped  footings,  the  supporting  area  for  bearing  may  be 
taken  as  the  top  horizontal  surface  of  the  footing,  or  assumed  as  the  area  of  tJie 


152 Manual    Recommendations 

lower  base  of  the  largest  frustum  of  a  pyramid  or  cone  contained  wholly  v\'ithin 
the  footing  and  ha\ing  for  its  upper  base  the  area  actually  loaded,  and  having  side 
slopes  of  one  vertical  to  two  horizontal. 

7.  Pedestals  and  Footings   (Plain  Concrete) 

(a)  The  allowable  compression  stress  on  the  gross  area  of  a  concentrically 
loaded  pedestal  under  service  load  shall  not  exceed  0.25  f'c.  Where  this  stress  is 
exceeded,  reinforcement  shall  be  provided  and  the  member  designed  as  a  reinforced 
concrete  column. 

(b)  The  depth  and  width  of  a  pedestal  or  footing  of  plain  concrete  shall  be 
such  that  the  tension  in  the  concrete  in  flexure  shall  not  exceed  1.6  V/',-.  The  average 
shear  stress  shall  satisfy  the  requirements  of  Sec.  F. 

8.  Footings   Supporting  Bound  Columns 

( a )  In  computing  the  stresses  in  footings  which  support  a  round  or  octagonal 
concrete  column  or  pedestal,  the  "face"  of  the  column  or  pedestal  may  be  taken  as 
the  side  of  a  square  having  an  area  equal  to  the  area  enclosed  within  the  perimeter 
of  the  column  or  pedestal. 

9.  Minimum  Edge  Thickness 

( a )  In  reinforced  concrete  footings,  the  thickness  above  the  reinforcement  at 
the  edge  shall  be  not  less  than  6  in.  for  footings  on  soil,  nor  less  than  12  in.  for 
footings  on  piles. 

(b)  In  plain  concrete  footings,  the  thickness  at  the  edge  shall  be  not  less  than 
8  in.  for  footings  on  soil,  nor  less  than  14  in.  above  the  tops  of  the  piles  for  footings 
on  piles. 

10.  Combined  Footings  and  Mats 

(a)  The  following  recommendations  are  made  for  combined  footings  and  mats 
— those  supporting  more  than  one  colmnn  or  wall: 

1.  Soil  pressures  shall  be  considered  as  acting  uniformly  or  varying  linearly, 
except  that  other  assumptions  may  be  made  consistent  with  the  properties 
of  the  soil  and  the  structure  and  with  established  principles  of  soil 
mechanics. 

2.  Shear  as  a  measure  of  diagonal  tension  shall  be  computed  in  conformance 
with  Sec.  F,  Art.  8. 


Manual  Recommendations 
Committee   15 — Steel  Structures 

Report  on   Assignment   B 
Revision  of  Manual 

D.  V.  Messmax  (chairman,  suhcammitiee),  E.  Bond,  T.  J.  Boyle,  H.  L.  Chamber- 
lain, A.  C.  Danks,  G.  F.  Fox,  T.  J.  Mearsheimer,  D.  L.  Nord,  R.  D.  Nord- 
strom, D.  D.  Rosen,  G.  W.  Salmon,  R.  D.  Spellman,  J.  E.  Stallmeyer, 
J.  L.  DuRKEE,  G.  E.  Morris,  Jr.,  E.  S.  Birkenwald. 

Your  committee  submits  the  following  revisions  of  Chapter  15  of  the  Manual 
for  adoption  and  publication: 

PART  1— DESIGN— ASTM  A  36  STEEL 

Page   15-1-11,  Art.   1.3.9 — Delete  entire  paragraph  and  substitute: 

1.3.9  Lateral  Forces  from  Equipment 

(a)  For  bracing  systems  or  for  longitudinal  flexural  members  entirely  without 
a  bracing  system,  a  single  moving  concentrated  lateral  force  equal  to  /4  of  the 
weight  of  the  heaviest  axle  in  the  specified  design  live  load  shall  be  applied  at  the 
base  of  rail,  in  either  direction  and  at  any  point  along  the  span,  in  addition  to  the 
other  lateral  forces  specified.  On  structures  supporting  multiple  tracks,  the  force 
shall  be  applied  on  one  track  only.  The  resulting  vertical  forces  shall  be  disregarded. 

Page  15-1-28,  Art.   1.8.3   (c)— Change  to  read: 

"For  stringers,  the  gage  from  back  of  angle  to  first  line  of  fasteners  in  the 
flexing  legs  .   .   ." 

Page   15-1-36,  Art.   1.13.5   (b) — Add  comma  after  word  roller  in  third  line. 

Page  15-3-16,  Art.  3.5.5  (d) — Remove  asterisk  at  the  end  of  article  and  the 
footnote  at  the  bottom  of  page  15-3-16. 


Report  on  Assignment  7 

Bibliography  and  technical  explanation  of  various  requirements 
in  AREA  specifications  relating  to  steel  structures 

J.  G.  Clark  (chairman,  subcommittee),  H.  T.  Alexander,  D.  S.  Bechly,  L.  S. 
Beedle,  T.  J.  Boyle,  J.  L.  Durkee,  J.  J.  Fiala,  G.  F.  Fox,  J.  M.  Hayes,  A. 
Hedefine,  D.  V.  Messman,  M.  Schifalacqua,  J.  D.  Tapp,  Jr.,  W.  WiLnvm, 
R.  H.  Wengenroth. 

Your  committee  submits  the  following  for  adoption  and  publication   in  Part  9 
of  Chapter  15  of  the  Manual: 

153 
niii.  A.10 


154 Manual    Recommendations 

9.3  FABRICATION 

Many  of  the  articles  in  Part  3  of  these  specifications  havini;  to  do  witli  welded 
fabrication  were  copied  verbatim,  or  with  some  modifications,  from  the  Specifica- 
tions for  Welded  Highway  and  Railway  Bridges  (D2.0-66  and  D2.0-69)  of  the 
American  Welding  Society.  Listed  below,  where  applicable,  are  the  paragraph 
numbers  from  the  AWS  Specifications  (D2.0-69)  on  which  corresponding  articles 
of  these  AREA  Specifications  are  based.  As  stated  in  the  Commentary  remarks 
covering  Sections  1.10  and  2.8,  it  is  the  intent  of  these  specifications  to  include 
such  provisions  as  are  necessary  to  ensure  that  the  welds  will  be  of  such  quality, 
and  made  under  such  controls,  as  will  ensure  safe  bridge  structures.  It  is,  however, 
not  the  intent  of  these  specifications  to  cover  tlie  mechanics  of  the  welding  process 
being  used,  or  the  qualification  of  the  welding  process  or  of  the  welder  or  operators 
of  welding  equipment,  since  these  matters  are  judged  to  be  adequately  controlled 
by  the  American  Welding  Society. 

9.3.1.6  Flame  Cutting 

The  flame-cutting  procedures  described  in  (a),  (b)  and  (c)  of  this  article 
are  applicable  to  all  types  of  fabrication,  and  are  from  AWS  Paragraph  302  (c) 
modified.  Subarticle  (d),  applicable  to  materials  used  in  riveted  or  bolted  construc- 
tion only,  is  included  since  flame-cut  edges  of  the  two  specified  relatively  hard 
steels  (A  440  and  A  572  Grade  60)  are  subject  to  edge  cracking  which  can  initiate 
fatigue  failures  in  the  finished  structure. 

9.3.1.7  Straightness  and  Dimensional  Tolerances 

Prior  to  the  1969  edition,  these  specifications  did  not  include  specific  require- 
ments for  straightness  and  dimensional  tolerances.  As  long  as  the  steel  used  met 
the  mill  tolerance  requirements,  members  fabricated  by  riveting  and/or  bolting 
procedures  were  usually  satisfactory  in  these  respects.  The  distortion  and  shrink- 
age connected  with  welding  make  necessary  the  specific  tolerances  covered  by 
requirements  of  this  article,  which  correspond  to  AWS  Paragraph  305,  with  the 
addition  of  requirements  covering  the  length  tolerances  with  floorbeams  and  stringers 
with  facing  connections,  and  for  members  with  milled-to-bear  ends. 

9.3.1.8  Planing  Sheared  Edges 

Any  sheared  edge  may  have  incipient  cracks  resulting  from  the  shearing  oper- 
ation, which  literally  tears  the  material  apart.  Since  such  cracks  might  be  harm- 
ful, the  requirements  for  edge  planing  of  sheared  material  have  been  included  in 
these  and  other  specifications  for  many  years. 

The  planing  requirements  need  not  be  applied  to  thin  A  36  material  because 
the   shearing   operation   does   not  produce   structurally   damaging   defects   therein. 

9.3.2.2  High-Strength  Bolts,  Nuts  and  Washers,  and 

9.3.2.3  Installation  Procedure  for  High-Strength  Bolts 

The  procedure  for  the  installation  of  high-strength  bolts  in  railroad  structures 
which  best  ensures  that  such  bolts  are  adequately  tightened  is  the  turn-of-nut  method 

(26)    (27). 

9.3.2.6  Preparation  of  Holes  for  Shop  Fasteners 

In  (a)  3,  holes  in  members  subject  to  live-load  stress  are  required  to  be 
drilled    or   reamed    in    order    to    avoid    the    incipient   peripheral    cracking    at   holes 


Man  ual    Recommendations 155 

punched    full    size    through    thick    material    and    the    resultant    lessening    resistance 
against  fatigue  failures. 

9.3.2.7  Preparation  of  Holes   for  Field  Fasteners 

The  same  comments  as  for  Article  3.2.6  regarding  cracks  in  the  periphery  of 
punched  holes  apply  also  to  holes  for  field  connections,  and,  in  addition,  there  must 
be  provision  for  accurate  alignment  of  field  connection  holes.  This  article  calls  for 
field  connection  holes  to  be  so  located  that  they  will  register  exactly  when  the  struc- 
ture is  in  its  geometric  configuration.  This  requires  that  truss  members,  as  erected 
under  a  no-stress  (or  practically  so)  condition,  must  be  bent  and  forced  to  fit  the 
end  connections,  thus  introducing  an  initial  reverse  secondary  stress  which  will  the- 
oretically disappear  when  the  structure  assumes  the  loading  for  which  it  is  cambered. 

9.3.3.2  Preparation  of  Material  for  Welding 

Thi.s  article  is  AWS  Paragraph  302  (a)  modified. 

9.3.3.3  Assembly  of  Material  for  Welding  and  Control  of  Distortion  and 
Shrinkage 

Subarticle  (a)  is  AWS  Paragraph  304  (a)  and  (c),  modified. 
Subarticle  (b)  is  AWS  Paragraph  304  (f ),  modified. 
Subarticle  (  c )  is  AWS  Paragraph  304  ( g ) . 
Subarticle  (d)  is  AWS  Paragraph  303  (a),  modified. 
Subarticle  (e)  is  AWS  Paragraph  303  (c). 
Subarticle  (f)  is  AWS  Paragraph  303  (d),  modified. 

9.3.3.4  Flange-to-Web   Welds  of  Flexural  Members 

The  only  method  considered  accep.able  for  making  flange-to-weli  welds  of 
flexural  members  is  a  properly  selected  automatic  procedure.  In  order  to  make  such 
welds  having  the  necessary  uniformity  and  (juality  l?y  any  other  method,  elaliorate 
and  costly  inspection  procedures  would  be  required. 

9.3.3.5  Tack  Welds  and  Temporary  Welds 

Subarticle  ( a )  is  included  because  of  fatigue  considerations. 
Subarticle  (b)  is  AWS  Paragraph  303  (g)  (1),  modified. 
Subarticle  (c)  is  AWS  Paragraph  303  (g)  (2). 
Subarticle  (d)  is  AWS  Paragraph  303  (n),  modified. 

9.3.3.6  Backings,  Extension  Bars  and  Run-OfF  Plates 

This  article  is  a  combination  of  the  apphcable  portions  of  tlie  reciuirements  of 
A\\'S  Paragraphs  102  (d),  406  and  407. 

9.3.3.7  Details  of  Welds 

Thi.s  article  is  AWS  Paragraph  306,  modified. 

9.3.3.8  Quality  of  Welds 

This  article  is  AWS  Paragraph  307,  modified,  with  subarticle  (b)  added  to 
make  the  .\WS  requirements  more  explicit. 

9.3.3.9  Corrections 

This  article  is  AWS  Paragraph  308,  modified. 


156 M  an  u  a  1    Recommendations 

9.3.3.10  Peening 

This  article  is  AWS  Para)J;rapli  309,  modified. 

9.3.3.11  Stress-Relief    Heat    Treatment 

This  article  is  AWS  Paragraph  310,  modified. 

9.3.5  Inspection 

This  section  incorporates  references  to  procedures  specified  by  the  Research 
Council  on  Riveted  and  Bolted  Structural  Joints  and  by  the  American  Welding 
Society,  with  modifications  to  suit  railroad  bridge  fabrication  reciuirements.  Infor- 
mation on  determining  acceptability  of  welds  tested  ultrasonically  can  be  found 
in  "Proposed  Specifications  for  Ultrasonic  Testing  of  Butt  Welds  in  Highway  and 
Railway  Bridges,"  BPR-UTI,  dated  May  1,  1968,  of  the  United  States  Bureau  of 
Public  Roads. 

9.3.6.4  Pay  Weight 

Editions  of  these  specifications  prior  to  that  of  1969  permitted  payment  for 
pound-price  contracts  to  be  based  on  either  scale  weight  or  computed  weight.  Con- 
sequently, it  was  necessary  to  specify  a  method  of  computing  the  weight  which  is 
compatible  with  scale  weight. 

Since  it  is  practically  impossible  in  many  cases  to  determine  an  accurate  scale 
weight,  and  since  the  procedure  of  computing  a  weight  compatible  with  a  scale 
weight  is  tedious  and  serves  no  useful  purpose,  the  1969  edition  of  these  specifi- 
cations follows  the  procedure  developed  by  the  American  Institute  of  Steel  Con- 
struction for  computing  weight.  Although  this  results,  in  most  cases,  in  a  computed 
weight  greater  than  would  be  the  case  under  the  former  AREA  procedure,  the 
resulting  weight  is  essentially  the  same  as  the  gross  weight  of  the  steel  furnished 
to  the  fabricator  by  the  mill.  The  fabricator  will  normally  adjust  his  price  proposal 
so  that  the  purchase  price  of  the  structural  steel  is  not  affected. 

9.5  SPECIAL  TYPES  OF  CONSTRUCTION 

9.5.1  Composite  Steel  and  Concrete   Spans 

The  two  types  of  shear  connectors  included,  i.e.,  manually  welded  channels 
and  automatically  welded  studs,  are  those  most  commonly  used  ( 28 ) .  Other  types 
may  be  satisfactory,  however. 

Specification  requirements  are  generally  based  on  performance,  allowing  the 
manufacturer   and   fabricator   considerable   leeway   as    to   details   and   procedures. 

9.5.1.2      Basic  Design  Assumptions,  and 

9.5.1.3.1  Design  Load  for  Shear  Connectors 

The  calculations  for  the  value  of  the  horizontal  shear  between  the  steel  beam 
and  the  concrete  slab  in  Article  5.1.2  (j)  involve  the  determination  of  the  value 
Sm  of  the  maximum  horizontal  shear,  and  the  value  of  S,  of  the  range  of  the  hori- 
zontal shear. 

The  effect  of  repeated  stress  variations  was  studied  at  Lehigh  University  by 
making  fatigue  tests  on  composite  spans  (28).  The  results  indicated  that  the  range 
of  horizontal  shear  resulting  from  live  load  and  impact,  rather  than  the  maximum 
horizontal  shear  from  dead  load  combined  with  live  load  and  impact,  controls  fatigue 


Manual    Recommendations 157 

capacity.  The  allowable  design  load  per  shear  connector,  based  on  maximum  range 
as  specified  in  Article  5.1.3.1,  is  therefore  less  than  is  specified  in  that  same  article 
for  maximum  shear. 

9.5.2.8  Longitudinal  StiflFeners 

The   requirements   of  this   article   correspond   to  specifications   of  the  American 
Association  of  State  Highway  Officials,   1966  edition,  with  some  modifications. 


Add   the  following   to   Bibliography,  page   15-9-20: 

(26)  Installation  and  Tightening  of  Bolts,  E.  F.  Ball  and  J.  J.  Higgins,  Jour- 
nal of  the  Structural  Division,  ASCE,  Vol.  85,  No.  ST3,  Proc.  Paper 
1974,  March  1959,  pp.  117-132. 

(27)  Calibration  of  A  325  Bolts,  J.  L.  Rumpf  and  J.  W.  Fisher,  Journal  of 
the  Structural  Division,  ASCE,  Vol.  89,  No.  ST6,  Proc.  Paper  3731,  Dec. 
1963,  pp.  215-234. 

(28)  Fatigue  Strength  of  Shear  Connectors,  Roger  C.  Slutter  and  John  W. 
Fisher,  Highway  Research  Record  No.  147,  Highway  Research  Board, 
Washington,  D.  C,  1966,  pp.  65-88. 


Manual   Recommendations 
Committee  31 — Continuous  Welded  Rail 

Report   on   Assignment   7 
Field   Welding 

K.  H.  KaiNnowski  {chairman,  subcommittee),  B.  J.  Gordon,  R.  A.  Hunziker,  B.  J. 
Johnson,  G.  G.  Knupp,  W.  S.  Lovelace,  L.  H.  Martin,  C.  R.  Merriman, 
M.  S.  Reid,  E.  C.  Rudolph,  V.  R.  Terrill,  G.  R.  Thurston,  H.  J.  Vale,  C.  E. 
Weller. 

Your  committee  submits  for  adoption  the  following  material  on  Thermite  Weld- 
ing— Rail  Joints,  with  the  recommendation  that  it  be  placed  in  Chapter  4  of  the 
Manual   following  page  4-2-6.6. 

THERMITE  WELDING— RAIL  JOINTS 

GENERAL 

The  ASM   Handbook  and  Webster  define  thermite,  thermite  reaction  and  ther- 
mite welding  as  follows: 
Thermite — A   mixture  of   finely   divided   aluminum   with   an   oxide  of  iron   or  other 

metal. 

Thermite  Reaction — Strongly  exothermic  self-propagating  reaction  where  finely 
divided  aluminum  reacts  with  a  metal  oxide.  A  proper  mixture  of  aluminum 
and  iron  oxide  produces  sufficient  heat  to  weld  steel. 


158 Manual    Recommendations 

Thermite  Welding — Welding  with  heat  produced  by  the  reaction  of  aluminum 
with  a  metal  oxide.  Filler  metal  is  obtained  from  the  reduction  of  the  appro- 
priate oxide. 

When  ignited,  the  reaction  within  the  thermite  mixture  develop.s  a  temperature 
approaching  5000  F  and  produces  a  filler  metal  of  about  3500  F  which,  when  in- 
troduced into  a  gap  l>etvvcen  the  rails,  welds  or  fuses  the  ends  together.  The  reac- 
tion metal  is  generally  iron  which  has  been  enriched  with  alloys  to  produce  a  filler 
metal   assimilating   the   characteristics   of   the   rail   steel   being   welded. 

In  all  ahuninothermic  or  thermite  welding  processes,  the  reaction  takes  place 
in  a  separate  crucible  or  in  a  reaction  chamber  integral  with  the  mold.  When 
complete,  the  resultant  metal  is  tapped,  either  manually  as  in  the  European  proc- 
esses, or  is  self-tapping  as  in  the  United  States  processes,  into  disposable  prefabri- 
cated molds  properly  placed  over  the  opening  between  the  rail  ends  previously 
prepared  for  the  butt  welding. 

Preheating,  an  important  part  of  thermite  welding,  is  applied  differently  by 
the  \'arious  rail  welding  processes  available  today.  Separate  preheating  equipment, 
operated  independent  of  the  reaction  crucible,  along  with  accessory  clamps,  etc.,  is 
common  to  the  foreign  developed  systems,  while  United  States  processes  employ 
shell  molds,  in  one  case  provided  with  an  exothermic  binder  in  the  mold  to  be  con- 
sumed as  the  preheater,  while  in  another  case  the  preheat  is  supplied  by  an  initial 
portion  of  the  filler  metal  washing  the  rail  end  faces  as  it  passes  through  the  joint 
gap  to  a  sump  provided  in  the  mold  beneath  the  base  of  the  rails  to  be  welded. 

Small  hand  tools,  luting  material,  and  cutting  and  grinding  equipment  are 
required  with  all  processes. 

WELDING 

The  basic  requirements  for  thermite  welds  are: 

1.  Remove  moisture  and  all  foreign  substances  such  as  dirt,  grease,  loose 
oxide,  slag,  etc.,  from  the  weld  area. 

2.  Align  rail  ends  properly.  Joint  gap  and  lateral  and  vertical  positioning  of 
the  ends  are  very  important. 

3.  Apply   mold   in   exact  location   over   rail   gap   and   properly   seal. 

4.  Follow  detailed  instructions  of  the  qualified  thermite  process  without 
deviation. 

5.  It  is  assumed  that  flotation  of  impurities  in  the  crucible  and  the  mold, 
and  proper  gating  and  feeding,  are  provided  for  in  the  equipment  and 
instructions   supplied   with    the    thermite   package. 

Following  are  minimum  requirements  for  quality  welds,  good  track  alignment 
through  the  weld,  and  satisfactory  riding  characteristics  over  the  welded  joint: 

1.  The  rail  end  faces  should  be  square  to  the  running  surface  of  the  rail. 
In  order  to  obtain  this  condition,  the  rail  should  be  properly  aligned 
first  if  the  gap  is  to  be  cut  in  track,  or  pre-cut  square  rail  ends  .should 
be  properly  aligned  and  spaced. 

2.  The  gap  between  the  rail  end  faces  should  be  between  %  inch  and  1 
inch,  depending  on  the  welding  process  and  rail  section  involved. 

3.  The   joint   gap   may    be    either   flame,    saw,    or   abrasive-disc   cut.    Flame 
cuts   should  be   reasonably  smooth.   A  precaution  should  be  ob-served   in 


Manual    Recom mendations 


159 


the  case  of  flame  cutting  in  that  the  weld  should  be  made  within  an 
hour  m  order  to  prevent  deep  thermal  cracks  from  forming  on  the 
name-cut  rail  end  faces. 

4.  All  burrs  should  be  removed  from  tlie  cut  rail  ends  at  the  joint  gap  all 
fans  and  head  metal  flow  in  relayer  rail  ground  away,  and  loose  oxides 
and  foreign  material  removed  from  the  weld  area  .surfaces  for  at  least 
5  inches  back  from  tlie  ends  of  the  rails.  This  permits  close  fitting  of  the 
molds  and  reduces  contamination  of  the  weld. 

5.  Sufficient  preheat  to  promote  good  fusion  is  desirable.  Preheating  strictly 
to  prescribed  times  is  desirable.  Preheating  may  be  accomplished  with  a 
propane-oxygen  flame,  a  generated  gas  flame,  a  higher  temperature  filler 
metal,  or  by  the  initial  filler  metal  pa.s-sing  over  the  rail  end  faces  into 
a  sump. 

6.  The  prefabricated  molds  used  in  any  of  the  processes  should  be  cen- 
tered exacdy  with  the  center  of  the  rail  gap. 

7.  The  luting  or  sealing  of  the  molds  to  the  rail  should  be  performed  ^^■ith 
care  so  that  the  luting  material  is  not  introduced  into  the  weld 
chamber.  It  has  been  found  practical  and  economical  to  use  car  and 
locomotive  sand  mixed  with  western  bentonite  at  a  proportion  of  4-1 
AAR  ll-lm-sT  °^  ""'"'"'  "  "^^  ™"*"''-   ^^'  ^'"^  specification  is 

8.  The  crucible  or  reaction  chamber  should  be  dry  and  clean  at  all  times 

ally.  It  IS  desirable  that  the  metal  should  not  be  tapped  until  the  reac- 
tion IS  completed  and   the  slag  has  separated  from  the  filler  metal 

''■  el!!sdef ofT"^'^?  '''"  l'™  "™r^'  '^'  ^^'^^^  -^'d  "-^-I  should  be 
ehrseled  off  and  ground  to  match  the  rail  contour,  at  least  on  the  top 
and  sides  of  the  head.  At  no  time  is  it  permissible  to  use  a  cutting  to  eh 
to  perform  the  above  operation. 

11.  The  use  of  X-ray  or  ultrasonic  equipment  to  evaluate  the  qualitv  and 
soundness  of  the  completed  weld  is  recommended. 

In  order  to  cope  with  all  possible  conditions  which  may  be  encountered  when 
weldmg  joints  in  connection  with  rail  laying  operations,  the  asrorXr  uhc  ,Wck 
IS  recommended.  The  jack  i.s  installed  after  the  rail  is    ihVned  .nVl  7'"''"'''  ^'"'.'^ 

z'i  h^rT  ''•'  ^'1  -?  r-' ''-  -^'^^-^-  ^  ^^Z:jz: 


Manual  Recommendations,  Committee  4 — Rail 

Report   on   Assignment   B 
Revision  of  Manual 

V.  E.  Hall  (chairman,  subcommittee),  R.  E.  Catlett,  J.  T.  Collinson,  R.  G. 
Garland,  T.  B.  Hutcheson,  A.  V.  Johnston,  R.  R.  Lawton,  A.  B.  Merritt, 
R.  B.  Rhode,  H.  M.  Williamson. 

Your  committee  recommends  that  the  119-lb  CF&I  rail  section  be  adopted  as 
an  AREA-recommended  section,  and  that  the  accompanying  drawing  showing  the 
dimensions  and  properties  of  this  section  be  published  in  Chapter  4  of  the  Manual. 


Area 
Sq  In 

Head 4.32 

Web   3.04 

Base    4.29 

Total 11.65 


Percent 
37.1 
26.1 
36.8 


100.0 


Moment  of  inertia 71.4 

Section  modulus,  head   19.4 


Section  modulus,   base 

Ratio  m.i.  to  area   

Ratio  s.m.  head  to  area   .  .  .  . 

Ratio  height  to  base 

Galculatea  weight,  lb  per  yd 


160 


22.9 
6.13 
1.70 
1.24 
118.8 


Manual  Recommendations 
Committee  5 — Track 

Report   on   Assignment   2 
Track  Tools 


T.  L.  BiGGAR  (chairman,  subcommittee),  W.  E.  Billingsley,  S.  W.  Bruner,  R.  V. 
Dangremond,  G.  E.  Fischer,  L.  D.  Freeman,  M.  P.  Moore,  C.  W.  Morrison, 
T.  C.  Netherton,  G.  Perko,  E.  F.  Pittman,  L.  L.  Rekuch,  R.  W.  Tipper. 

Your  committee  recommends  that  the  Rail  Thermometer  plans  and  specifications 
shown  below  be  adopted  and  published  in  Chapter  5  of  the  Manual. 


M. 


T 


^ 


Hrt^MtTvC.  ftA-.K.  ■ 

6ttAS<;,  4TA1MI.C/,   STtLl.   OK.   ImTAaO/ 


TVERVAOnETtR,   S.HX\-\.  «>t  EHCl-OSC  C>  IM  A    BRASS, 
,        tTMULUS  4Ttti.jO«.  SU\T/\av.6  L\4,KTWE\<:,Ht 
M£T<M.1«.   CASt     A?Pao>.lf^»^TCuY     1.   llOtMdS    liO 
6\ft>JlCTttt.    A«^  MOT    ^^OP.C  TH/SWl     -L   |\1C«    THICIC. 

THtB.Mov^E^t.^  «hp,\.u  v,p,ve.  ^  Fv.ftT,fttV£\.tD 

ST. 

THfcfrHo>lSTCR     SHftV-l,    HKV£    ft    Wrt\Tc,    FAe^tj 

3i       tWAI-l.  ft£    f^S    UWjLit    ftS   POiM^itt    pot    t.«'>Y 
t>i.    \U    ^  ■DEAatt    lUatl.ertC.)^^'.    Aviti     \0  D£f-,«.t.V. 

ttOS^^JO   EV.tMtVT  ,  P(^fc-C0^5D1T^P^JC  O     ^>J^ 
4.       T6*TC.t>   T0«-    PtV.\AAl.ltUT    anui  taP)TlD>^    Von 
f^al^.\^JC!)C-^    TO   vj\Tl«<S     tl.y'a    of     fauu 
SCAUt    ttAUCiC-. 

T»tll.>'\on6TtH.    6E)06)VCi    ei.tr'\tOT    SHI^U.    tin 
_         GOMPLETELM    e>JC.>-Ose.t>   '=.>i"D    -SHftl-U    R.CACH 

ThISEECsS  HlOUTtS 

TV*E.avM)>-\c.Tli.a   tHfttU    rtAN'6   CriCLOStti  MAdl-'tT 

&,      Or  GA->t .  tA(=h(-,wb~s  iv^f^-.v-v  "e^e  c>TC-OOt~ 

IPOUvCiH    To    S05T«)/K    tT.5   OW«  >V£(SHT    ftV 
fliVy    Po&lTlo^/ 

PROPOSED    "RAIL  THE-RMOMETIU 


Uul.  ((.'tU 


161 


Report  on   Assignment  5 
Turnout  and  Crossing  Design 

C.  J.  McCoNAUGHY  (chairnwn,  subcommittee),  W.  G.  Crone,  A.  G.  Ellefson,  E.  E. 
Frank,  V.  C.  Hankins,  C:.  P.  Huhlein,  D.  L.  Jerman,  R.  J.  Jones,  C.  N. 
King,  G.  G.  Knupp,  R.  E.  Kuston,  J.  R.  Masters,  M.  P.  Moore,  G.  H.  Per- 
kins,'G.  Perko,  C.  E.  Peterson,  L.  E.  Porter,  A.  J.  Schavet,  K.  H.  von  Kam- 
pen,  J.  F.  Warrenfells,  Jr. 

Your  committee  submits  for  adoption  and  publication  the  following  recom- 
mendations regarding  the  AREA  Portfolio  of  Trackwork  Plans: 

Plan  No.  504-55,  Guard  Rails—  Tee  Rail  Design  with  Planed  Flares  and  Flat  Plates 

Lengthen  the  tapered  approaches.  The  present  tapered  approaches  in  tlie  guard 
rails  are  considered  too  short  to  accommodate  present  higher  train  speeds.  The  revised 
version  of  Plan  No.  504-55  is  presented  herewitli. 

Plan  No,   1010-55,  Permissible  Variations  in  Completed  Frogs 

Revise  to  eliminate  difficulties  encountered  by  manufacturers  in  completing 
frogs  to  the  tolerances  shown  on  the  present  plan,  and  to  add  certain  tolerances 
not  now  shown.  The  revised  version  of  Plan  No.  1010-55  is  presented  herewith, 
which  also  incorporates  a  redesigned  railbound  insert  casting  which  should  add  to 
easier  and  better  manufacturing. 

AREA  Specifications  for  Special  Trackwork 

In  the  Specifications  for  Special  Trackwork,  Appendix  A-59,  page  4,  revise  the 
first  and  last  paragraphs  of  Art.  410,  Depth  Hardening,  as  shown  below: 


Present 

410.  Depth  Hardening 

When  specified,  the  impact  areas 
described  on  the  Trackwork  Plans  shall 
be  hardened  by  hammering  or  pressing 
integrally  cast  pads  of  suitable  thickness 
and  area  to  a  minimum  surface  Brinell 
hardness  of  350  for  the  areas  within  1" 
of  the  gage  or  guard  lines  and  a  mini- 
mum Brinell  hardness  of  320  for  the 
balance  of  the  hardened  area.  The 
method  to  be  used  is  at  the  option  of 
the  manufacturer  and  shall  insure  that 
the  depth  from  the  tiead  surface  to  the 
normal  hardness  of  cast  manganese  steel 
shall  not  be  less  than  1"  near  the  flange- 
way  walls,  tapering  to  not  less  than  ii" 
throughout  the  hardened  area. 

Castings  failing  to  meet  the  hard- 
ness requirement  will  be  acceptable  pro- 
vided the  cost  for  the  hardening  process 
is  deducted  from  the  price. 


Proposed 
410.  Depth  Hardening 

When  specified,  the  impact  areas 
described  on  the  Trackwork  Plans  shall 
be  hardened  by  flexible  sheet  explosive 
or  by  hammering  or  pressing  integrally 
cast  pads  of  suitable  thickness  and  area 
to  a  minimum  surface  Brinell  hardness 
number  of  352  for  the  areas  witliin  1" 
of  the  gage  or  guard  lines  and  a  mini- 
mum Brinell  hardness  number  of  321 
for  the  balance  of  the  hardened  area. 
The  hardening  method  to  be  employed, 
if  not  otherwise  specified,  shall  be  at  the 
option  of  the  manufacturer. 


Castings  failing  to  meet  the  hardness 
requirement  will  be  acceptable  provided 
the  fee  for  the  hardening  process  is  not 
assessed. 


162 


3i- 


NOTN 
DEPTH  ( 


SI 


ENJ 
OE 


SE 


SEC 


L^ CENTER  Oi 


Of  GUARD  RML 


SECTION  THRU  SEPARATOR  BLOCK        BEVELED  END  OF  RAIL 


GUARD  RAIL   TIE   PLATE 


1— GUARD    RAILS   shall   be   furnished    to   leogth 
called  (or  and,   ualess  otherwise  specified,  with 
illustrated  in  plan  views  and  per 
s   follows; 
Separator  blocks  aod   bolts  per  Note  No.    2 
End   blocks  and    bolts   per   Note   No.   3 
Tie  plates  per  Note  No.  4 


+— PLATES— Shall  be  7"  x  H"  x  16"  (or  raib 
less  than  100  lb.  per  yd.,  and  8"  x  M"  ^  IT' 
for   rails    100   lb.    per  yd.   and   heavier,  except 


5— ALTERNATES. 

(a)  CLAMP  GUARD  RAILS  —  Clamps  per 
Plan  Basic  No.  505  may  be  used  instead 
of  separator  blocks  and  bolts  in  approxi- 
mately the  same  locations,  and  shall  be 
furnished  when   specified. 

(b)  RAIL  BRACES— Approved  type  of  guard 
rail  braces  to  be  furnbbed  when  required: 
purchaser  shall  specify  details  and  state 
on  which  plates  they  are  to  be  used. 


Plans  Basic  No.    502   and   790. 

■SPECIFICATIONS— See   Appendix 

Bolt   sizes    and   details   shall    be    [ 
1402.  Appendix 


American  Railway  Engineering  Association 

proposed  Revisions 

GUARD  RAILS 

TEE  RAIL  DESIGN  WITH  PLANED 
FLARES  AND  FLAT  PLATES 

PLAN  NO.    504-55 


TOE  SPREAD  ±  f 

1 


'^ 


[ 


w 


SECTION  II 
TOE  AND 


i  MAX 

3Z 

__j 

STIti 
CROSS     LEVEL 


ri3HIN0  HCI6MT  OF 
TRUC  «»IU  SECTION 
4-0,"  -1/32* 


DN 


TOE  SPREAD  ±ii 


''PLCTEO 


ALINEMENT 

E  LIMES 
FROOS    SMftLL    NOT   VARY   MORE    TH*M 
1/18"   FROM    TRUE    ALINEU 
UNE   PRODUCED   FflCM    TOE    SHALL 
NOT  TOUCH  AOrUAL  FROQ  POINT. 


e2£«&ferS:^<!^kto 


,  SPECIFIED 
VDISTAHCE  ±  Ji^ 


^^^,r^ 


^n 


SECTION    THROUGH     HEEL    RISER 


CLOSED  POSITION 


tTRAI<ft^T   LINE    CONTACTtNO  DOTH  RAIL  BASES 
CROSS     LEVEL    OF   RAIL    BASES     THRU    LENGTH  OF    FROGS    ^^^  y,£yy  Qp  hq^q  dO.VN  SECTION  OF  A    SPRING    RAIL    FROG 

SECTION    AT    BEND   CF   SPfllNO    WINO,    PLAN    BASIC    NO.     4CI 


CASTING    SHALL    FIT   RAIL    BASES    FOR   AT  LEAST 
76 1    OF   IT5   LENOTH   WITH  MA>t 

.    .,-.      ABOVE     NOR    1/64"  Of   1/32"  IM    HEIGHT   AND   «"1N   LCNQTH 

RFACe    OF   TRUE    KAIL  tEOTION 


OTINO    NOT   TO 


SECTION    F-F,   PLAN   OA 


FIT   OF  CA5TIN0   IN  A  HAIL   BOUND 


PROPOSED       REVISIONS 
American  Railway  Engineering  Association 


PERMISSiBLE  VARIATIONS  IN 
COMPLETED  FROGS 

PLAN  NO.     1010-55 


MODEL  441 

Developed  and  Built 
for  Railroad  Maintenance 

180°  BOOM  SWING 

J^OiS  All  JOBS! 


LAYING  WEIDED  R 


GUTSMAINTE  NANCE     COSTS 


J  2  fASl  CHANGE  ATTACHMENTS 


•  Forks 

•  T/4  Cu.  Yd.  Bucket 

•  Tote  Hook 

•  18'  Boom  Extension 

•  Fork  Tie  Baler 

•  Track  Cleaning  Bucket 


•  Back  Hoe 

•  Clamshell 

•  Back  Filler  Blade 

•  Pull   Drag   Bucket 

•  4  Cu.  Yd.  Snow  Bucket 

•  Pile  Hammer 


Optional  Attachment 
Flanged  Wheels,  Hydraulically  Controlled 


PETTIBONE  MULLIKEN  CORPORATION 


RAILROAD 

Ml    W.   JACKSON 


DIVISION 

CHICAGO  4,  III. 


WIDE   TRACK   CLEANING   BUCKET* 


80  Years  of  Service 
to  the  Railroad  Industry 


162-2 


Advertisement 


It's  Maintenance  First-and 
PORTEC  Railway  Products 

are  First  in  Maintenance 


Rail  Anchors 


•  IMPROVED  FAIR  Anchors 

•  XL-1  FAIR  Anchors 

•  Anchor  Renewal  Service 


Rail  Joints 


n^ 


•  standard  Joints 

•  Insulated  Joints— armored 
and  continuous 

•  Compromise  Joints 

•  Poly-insulated  Joints 

•  Poly-insulated  Plates 

•  Insulation 


839-1 


Rail  and  Flange 
Lubricators 


Reversible  Switch 
Point  Protectors 


Diesel  and 
Caboose  Batteries 


Literature  available  on  request. 

PUK  I  lC\m  inc.  RAILWAY  PRODUCTS  DIVISION 
300  Windsor  Drive,  Oak  Brook,  Illinois  60521  •    In  Canada:  Portec,  Limited 


.EVELLING,  LINING,  TAMPING... 

n  ONE  OPERATION,  with  ONE  OPERATOR 


PROJECTOR 


.ELECTRONIC 
REFERENCE 


,  FEELER 
detects  position 
of  track  in  spiral 
or  curve  at  every 
tie  end  leads 
Inlormation  to 
"Auto-Control" 


USER  UNIT 


WORKINa 
SHADOW  BOARD 
controls  lining  at 
point  where 
lilting,  levelling 
and  tamplng_ 
l»  done. 

RECEIVER 
BUQQY 
"Auto-Control" 
continuously 
positions 
receivers 
electronically  to 
salialy  Ideal  curve 
requiremonls  and 
establishes 
required  amount 
ot  track 
cotreciion 


The  Autojack  Electromatic 
with  Autoliner  leads  the  way 
through  these  advantages: 

#  Gives  the  highest  possible  degree  of  accuracy  by  electronic 
beams  projected  100  feet  in  advance  of  where  levelling, 
lining  and  tamping  are  taking  place. 

#  Automatic,  continuous  operation  for  both  tangent  and 
curve  track.' 

#  No  plotting  of  spirals  or  curves  required.  Machine  computes 
as  it  runs  for  the  best  transition. 

#  No  disturbing  or  humping  of  track  —  lining  takes  place 
simultaneously  w/ith  lifting  and  tamping  ahead  of  tamping 
tools. 

#  With  the  Autoliner,  it  is  possible  to  make  a  minute  throw 
and  have  it  stay  there  because  tamping  is  done  in  correct 
alignment. 

"Model  ALT  for  Tangent  track  and  Model  ALC  (or  Tangent 
and  Curve  Track,  both  available  as  attachments  (or 
existing  AUTOJACK  ELECTROMATICS, 


^    Head  OflRce  &   Plant  — 2401   Ed- 
1    mund   Rd.,  West  Columbia,  S.  C. 
29169    •    803/794-9160 
Plant  — 160   St.   Joseph   Blvd., 
Lachine   (Montreal),  Que.,  Canada 
•    514/637-5531 
Parts   Depot  — 1902   University 
Ave.,  St.   Paul,  l\^inn.   55115    • 
612/645-5055 
!   Sales,   Sertice   &   Parts  —  Tamper 
(Australia)    Ply.    Ltd.,   34    Mcin- 
tosh   St.,    Airport    West,    G.P.O. 
Melbourne,    Victoria    3042,    Aus- 
-j    tralia    •    379-8441 


162-4  Advertisement 


THE  DOUBLE  U  RAIL  ANCHOR 

ACHUFF  RAILWAY  SUPPLY  CO. 
ST.  LOUIS,  MO. 


Advertisement 


162-5 


f 

What's  he  doing  1 


Drilling  one  of  12,000 
inspection  holes  in 
this  1300'  creosoted 
pine  trestle 


Why? 


to  locate  internal 
decay  and  evaluate 
remaining  timber 
strength. 

That's  what  we 
mean  by  inspection 
and  in-place  treatment 


OSMOSE  WOOD  PRESERVING  CO. 
OF  AMERICA,  INC. 

980  Ellicell  St.,  Buffalo,  N.  Y.  14209 


162-6  Advertisement 


<^ 


WOODINGS-VERONA  TOOL  WORKS 


Pioneer  Manufacturers 

of 

HIGH  GRADE  TRACK  TOOLS 

and 

SPRING  WASHERS  FOR  TRACK 

Since  1873 

VERONA,  PA.  CHICAGO,  ILL. 


WOODINGS  FORGE  &  TOOL  COMPANY 

Makers 

of 

WOODINGS  RAIL  ANCHORS 

VERONA,  PA.  CHICAGO,  ILL. 


Assure  lower  maintenance  costs,  better  performance  with 

Texaco 

Railroad  Lubricants 

and  Systematic 

Engineering 

Service 

New  York  •  Atlanta  •  Chicago  •  Minneapolis  •  St.  Louis  •  San  Francisco 


Advertisement 


162-7 


162-8 


Advertisement 


YOUR  RAILROAD  HAS  A  FUTURE! 
DO  YOUR  RAIL  ANCHORS? 

They  do,  if  they  are  rugged  Unit  Rail  Anchors.  High  carbon,  high 
manganese,  spring  steel,  improved  heat  treating  methods,  and  truly 
effective  no-overdrive  design  give  the  Unit  Rail  Anchor  the  holding 
power  it  needs  —  for  today's  job  and  for  repeated  future  use.  You 
get  maximum  service  —  Unit  Rail  Anchors  can  be  used  over  and  over 
again  without  significant  loss  of  holding  power.  Due  to  the  UNIT'S 
design,  it  CANNOT  be  overdriven  .  .  .  assuring  economy  through 
REAPPLICATION,  without  costly  re-forming.  Initial  investment  is  paid 
for  many  times  over  through  high  REAPPLICATION  value.  Unit  Rail 
Anchors  —  the  Future  is  designed  into  them. 
ALSO  AVAILABLE  —  UNIT  II,  Same  high  quality  at  a  lower  cost  .  .  . 
Made  from  a  slightly  lighter  section  of  steel,  for  requirements  where 
the  very  high  holding  power  and  reserve  strength  of  the  Standard 
Unit  are  not  considered  essential. 


MEMBER 

RRI 

RAIlWAr         I 

PKOoness    I 

INSTITUTt  ^t^ 


UNIT  RAIL  ANCHOR  COMPANY,  INC. 


P.O.  Box 4004 
Pittsburgh,  Pa.  15201 
(412)781-4800 


Midwest  Office:  322  S.  Michigan  Ave. 
Chicago,  III.  60604 
(312)427-7442 

70RA3 


PART  2 
REPORTS  OF  COMMITTEES 


163 


Report  of  Committee   16 — Economics  of  Railway 
Location  and  Operation 


Thomas  J.  Lamphier, 
Chairman 

W.  G.  Byers, 
Vice  Chairman 

R.  W.  McKnight, 

Secretary 

G.    RUGGE 

J.  C.  Martin 
R.  J.  Lane 

T.    C.   NORDQUIST 

L.  A.  Durham,  Jr. 
T.  D.  Kern 
K.  W.  Bradley 
H.  J.  Kay 


R.  S.  Allen 

J.  W.  Barriger 

D.  E.  Brunn 

H.  S.  Bull 

L.  P.  Diamond 

W.  J.  Dlxon 

R.  H.  Dunn 

G.  B.  DuTTON,  Jr. 

J.  J.  Eash 

P.  C.  Fuller 

B.  G.  Gallagher 
G.  R.  Gaspard 
A.  J.  Gellman 
R.  C.  Gilbert 

R.  L.  Gray 

A.  M.  Handwerker 

G.  E.  Hartsoe 

W.  W.  Hay 

L.  W.  Ha\T)ON 

R.  P.  Hoffman 

G.  R.  Janosko 

F.  A.  Koomanoff 

H.  N.  Laden 

A.  S.  Lang 

K.  L.  Lawson 

J.  H.  Marino 

T.  J.  Mattle 

R.  McCann 

D.  McCorquodale 

R.  L.  McMurtrie 

C.  J.  Meyer 
M.  B.  Miller 

R.    L.    MiLNER 

F.  N.  Nye  (E) 


J.  F.  Partridge 

W.  L.  Paul 

G.  A.  Payne 

R.  D.  Penhallegon 

M.  Price 

J.  S.  Reed 

F.    J.    RiCHTER 
V.    J.    ROGGEVEEN 

A.  L.  Sams 

R.   J.   SCHIEFELBEIN 

J.  H.  Seamon 
M.  J.  Shearer 
L.  K.  SiLLCOx  (E) 
T.  H.  Sjostrand 

C.  W.    SOOBY 

J.  J.  Stark,  Jr. 
A.  J.  Strobel 

D.  M.  Tate 

J.  E.  Teal  (E) 

C.  L.    TOWLE 
W.   S.   TUINSTRA 

R.  Turner 

D.  E.  TuRNEY,  Jr. 
H.  Wanaselja 
L.  E.  Ward 

F.  Wascoe 

D.  M.  Weinroth 

J.    R.    WiLMOT 

P.  B.  Wilson 
T.  D.  Wofford 

H.    L.    WOLDRIDGE 

J.  D.  Worthing 

Comm,ittee 


(E)  Member  Emeritus. 

Those  whose  names  are  shown  in  boldface,  in  addition  to  the  chairman,  vice  chairman  and 
secretary,   are   the  subcommittee  chairmen. 

To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

B.  Revision  of  Manual. 

Emphasis  this  year  has  been  on  the  complete  reworking  of  Part  4  of 
Chapter  16  of  the  Manual,  and  it  is  hoped  that  during  1971  the  neces- 
sary work  will  be  completed  so  that  this  new  Part  can  be  submitted  for 
approval.  New  Parts  1,  2,  3,  and  5  were  completed  and  approved  for 
adoption  in  the  Manual  and  were  issued  to  Manual  holders  in  the  1970 
Manual  Supplement. 

1.  Study  optimum  length,  speed  and  weight  of  freight  trains  under  vary- 
'"         '  ■  ■  '  ■■  j-i- —  "elating  to  (a)  bal- 


mg 


ly  optmium  lengtn,  spcea  ana  weignt  or  rreignc  u 
...ft  traffic  and  competitive  and  operating  conditions  rel 
anced  trains,  (b)  long  train  operation,  and  (c)  short  train  operation. 

A  draft  of  a  proposed  report  on  this  subject  is  now  being  reviewed  by 


165 


liui.  6:to 


166        Economics    of    Railway    Location    and    Operation 

the  subcommittee,  and  will  be  taken  up  by  the  full  committee  at  its 
next  meeting. 

2.  Engineering  methods  and  economic  considerations  involved  in  improv- 
ing the  quality  of  transportation  service. 

An  outline  has  been  prepared  for  this  subject  and  work  is  continuing. 

3.  Determination  of  maintenance  of  way  expense  variations  with  various 
traffic  volumes  and  effect  of  using  such  variations,  in  terms  of  equated 
mileage  or  other  derived  factors,  for  allocation  of  available  funds  to 
maintenance  of  way,  collaborating  as  necessary  or  desirable  witli  Com- 
mittees H  and  22. 

No  report  this  year.  Work  is  continuing  on  this  most  difficult  and  con- 
troversial subject. 

5.  Location  and  operation  of  metropolitan  transit  systems  as  related  to 
current  railway  operations. 

An  advance  report  on  the  track  structures  and  practices  of  seven  metro- 
politan transit  systems  was  published  in  Bulletin  629,  September- 
October  1970.  Under  this  assigimient  the  committee  will  next  take  up 
the  relationship  between  metropolitan  transit  systems  and  their  coor- 
dination with  existing  railroad  systems. 

6.  Study  the  economics  and  operational  characteristics  of  Automatic  Car 
Identification  to  develop  data  for  evaluating  the  optimum  location  of 
scanners. 

The  final  report  on  this  assigrmient  was  published  in  advance  in  Bulle- 
tin 629,  September-October  1970.  It  deals  with  the  economics  of  ACI 
systems.  It  is  anticipated  that  the  assigrmient  will  be  reactivated  in 
about  two  years  when  some  experience  has  been  gained  with  the  use  of 
ACI  systems. 

7.  Applications  of  industrial  engineering  functions  to  the  railroad  industry. 

A  final  report  on  the  evaluation  of  the  performance  of  hot  box  detectors 
has  been  prepared.  The  subcommittee  currently  is  working  on  two  sub- 
jects: (1)  the  use  of  yard  performance  standards,  and  (2)  the  role  of 
industrial  engineering  departments  on  railroads. 

9.  Determine  factors,  including  costs,  involved  in  rehabilitation,  operation, 
and  maintenance  that  may  be  incurred  in  upgrading  present  main  tracks 
to  support  very  high  sustained  speeds  above  80  mph. 

An  advance  report,  in  two  parts,  was  published  in  Bulletin  629,  Sep- 
tember-October 1970.  Part  1  deals  with  basic  mechanical  considera- 
tions. Part  2  is  a  special  report  on  high-speed  rail  transportation  written 
by  W.  B.  O'SuUivan  of  the  Federal  Railroad  Administration.  The  pro- 
posed report  on  locomotive  horsepower  requirements  is  still  undergoing 
review  and  revision. 

The  Committee  on  Economics  of  Railway  Location  and  Operation, 

Thomas  J.  Lamphier,  ChaitTnan. 


AREA   Bulletin    630,   November-December   1970. 


Report  of  Committee  20 — Contract  Forms 


C.    W.    COLBORG 

J.  K.  Christensen 

P,  J.  Freeman 

E.  E.  Zacharias 

J.  P.  Van  Hoorebeke 

R.  M.  Mason 

L.  V.  Bowers 

J.  C.  Britt 

J.  F.  Bruckner,  Jr. 

R.  F.  Correll  (E) 

A.  B.  Costic 

\'.    G.    DONLIN 

J.  T.  Evans 

C.  W.  Farrell 

A.  P.  Fish 

W.  T.  Hammond 

E.  M.  Hastings,  Jr. 

R.  C.  Heckel 

S.  O.  Heckman 


W.  P.  Houwen,  Jr. 

F.  M.  Jones 
O.  E.  Knox 

J.  S.  Lillie  (E) 
D.  F.  Lyons 
J.  T.  Mc Andrew 
C.  G.  Nelson 

G.  W.  Patterson  (E) 
J.  L.  Perrier 

R.  M.  RxnJDicK 

C.  W.  Smith 

D.  R.  Stewart 

W.  R.  Swatosh  (E) 
W.  B.  Titts worth,  Jr. 
J.  R.  Vecchio 
P.  P.  Wagner,  Jr. 

E.  E.  Williams 
Committee 


E.  A.  Graham, 

Chairman 
R.  W.  Humphreys, 

Vice  Chairman 
W.  F.  Burt,  Secretary 

(E)  Member  Emeritus. 

Those   whose   names   are   shown  in  boldface,   in   addition  to  the  chairman,  vice  chairman  and 
secretary,    are    the   subcommittee   chairmen. 

To  the  Anjerican  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

B.   Revision  of  Manual. 
No  report. 

1.  Form  of  agreement  for  trackage  located  in  industrial  parks. 

A.  draft  of  agreement  has  been  prepared  which  needs  certain  revisions. 
The  committee  will  continue  to  progress  the  assignment. 

2.  Form  of  contract  (short  form)  for  miscellaneous  work. 

A  draft  of  agreement  has  been  prepared  which  needs  certain  revisions. 
The  committee  will  continue  to  progress  the  assigmnent. 

3.  Form  of  agreement  for  filling,  grading  or  disposing  of  waste  materials  on 
company  property. 

The   subcommittee   will  continue   actively  to  progress  this  assigrmient. 

4.  Form  of  agreement  for  emergency  work. 

The   subcommittee  will  continue   actively  to  progress  this   assigmnent. 

5.  Bibliography  on  subjects  pertaining  to  contract  forms. 

Progress  report,  presented  as  information   page  168 

The  Committee  on  Contract  Forms, 

E.  A.  Graham,  Chairman. 


AREA    Bulletin    630,   November-December    1970. 

167 


168  Contract    Forms 


Report   on   Assignment   5 
Bibliography  on   subjects  pertaining  to  contract  forms 

R.  M.  Mason  (chairman,  subcommittee),  L.  V.  Bowehs,  J.  F.  Bruckner,  W.  F. 
Burt,  A.  B.  Costic,  J.  T.  Evans,  A.  P.  Fish,  E.  A.  Graham,  E.  M.  Hastings, 
Jr.,  S.  O.  Heckman,  R.  W.  Humphreys,  F.  M.  Jones,  D.  F.  Lyons,  R.  M. 
RuDDiCK,  C.  W.  Smith,  J.  R.  Vecchio,  P.  P.  Wagner,  Jr.,  E.  E.  Williams. 

Your  committee  submits  the  following  annotated   bibliography  as  information: 
Engineering  News-Record,  August  7,  1969,  "Subcontractor  Wins  Suit  Over  Extras." 

"Contractor  Recovers  Interest." 
Engineering  News-Record,   August   14,   1969,   "Arbitration   Award — Lack  of  Impar- 
tiality  is   Enough   to   Void   Decision."   "Implied   Contract   Allows   Contractor  to 
Recover." 

Engineering  News-Record,   September  4,  1969,  "Vandalism  E.xcused  a  Delay." 

Engineering  News-Record,  September  25,  1969,  "Filing  of  Miller  Act  Claim  was 
Timely."  "Recovery  Allowed  For  Work  Done." 

Engineering  News-Record,  March  13,  1969,  "A-E's  Fee  Was  Set."  "Owner  War- 
rants Adequacy  of  Plans  Contractor  Uses."  "Acceptance  Not  Final  and  Con- 
clusive." "Guaranty  Survived  Approval." 

Engineering  News-Record,  March  27,  1969,  "Painter  Takes  Fiftli,  Pacts  Dropped." 
"Impact  Costs  Not  Recoverable."  "Good  Workmanship  Does  Not  Require  Extra 
Work." 

Engineering  News-Record,  April  10,   1969,  "Errors  in  Contract." 

Engineering  News-Record,  April  17,  1969,  "Owners  Acceptance."  "Delays  by  a 
Sub's  Sub  Excused  Prime  Contractor."  "Contractor's  Liability  Limited  to  Work 
He  Bid." 

Engineering  News-Record,  May  22,  1969,  "Cash  in  Lieu  of  Bid  Bond  Not  Entitled 
to  Interest."  "Pay  for  Extras  Not  Keyed  To  Written  Authorization." 

Engineering  News-Record,  December  4,  1969,  "Responsibility  for  Work  not  Detailed 
in  Drawings."  "Contractor  Loses  Poor  Borrow  Pit  Claim."  "Bid  Lost  Because 
of  Addendum."  "Paid  for  Changed  Conditions." 

Engineering  News-Record,  January  1,  1970,  "Liquidated  Damages."  "Contract 
Clause  To  Be  Reasonably  Interpreted."  "Contractor  Loses  Claim  for  Its  Over- 
time Costs."  "Court  Denies  Lien."  "  'No  Damage'  Clause. " 


Report  of  Committee  9 — Highways 


R.  E.  Skinner, 
Chairman 

K.  E.  Wyckoff, 
Vice  Chairman 

C.  A.  Christensen, 
Secretary 


M.    A.    WOHLSCHLAECER 

C.  L.   HOLMAN 

L.  T.  Cerny 
H.  L.  Michael 
J.   M.   LOWRY 

D.  J.  Moody 

T.  P.  Cunningham 
C.  I.  Hartsell 
R.  D.  Pamperl 

F.  N.  Barker 
H.  J-  Barnes 
J.  M.  Bates 
W.  A.  Buckmaster 
W.  B.  C alder 
A.  L.  Carpenter 
J.  W.  Cruikshank 
F.  Daugherty 
R.  Dejaiffe 

V.  G.  DONLIN 

W.  E.  Free 

Wm.  J.  Hedley  ( E ) 

J.  A.  Holmes 

P.  G.  Jefferis,  Jr. 

A.  J.  Knobloch 

T.  H.  Kruttschnitt,  Jr. 


T.  D.  Livingston 

R.   V.   LOFTUS 

R.  F.  MacDonald 

R.  A.  Mather 

R.  W.  Maler 

R.  L.  Mays 

E.  S.  Miller 

J.  C.  Miller 

H.  G.  Morgan  ( E ) 

D.  G.  Newnan 

R.  E.  Nottingham  (E) 

W.  C.  PiNSCHMIDT  ( E ) 

J.  E.  Reynolds 

H.  A.  Richards 

P.  A.  Shuster 

J.  E.  Spangler 

R.  F.  Spars 

W.  S.  TiTLOw,  Jr. 

J.  M.  Trissal 

"S.  C.  Walker 

W.  E.  Webster,  Jr. 

J.  L.  Whitmeyer 

H.  J.   WiLKINS 
H.   L.  WOLTMAN 

Comynittee 


(E )  Member  Emeritus.  .  , 

Those   whose   names   are   shown   in  boldface,   in   addition  to  the   chairman,   vice   chairman  ana 
secretar>-,    are    the   subcommittee   chairmen. 

To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

B.  Revision  of  Manual. 

No  Manual  revisions  are  recommended  this  year. 

1.  Roadbed  stabilization  for  highway-railway  grade  crossings,  collaborating 
with  Committee   1. 

Progress    report   on   one   example   of    stabilization    submitted   as    infor- 
mation     P'^ge  171 

2.  Merits  and  economics  of  prefabricated  types  of  highway-railway  grade 
crossings. 

Report  on  concrete  slab  crossings  submitted  as  information page   17- 

3.  Merits  of  various  types  of  highway-railway  grade  crossing  protection, 
collaborating  with   Communication   and  Signal  Section,  AAR. 
Additional   reports  on  various  publications   and  papers    related  to   this 
assignment  and  a  summary  of  safety  merits  of  Protection  Devices  sub- 
mitted as  information   P-ige   173 


Note — Discussion   on   subcommittee   reports   herein   closes   on   January   18,    1971. 

169 


170 Highways 

4.  Merits  and  economics  of  marking  and  signing  grade  crossings. 

Progress  report  on  activities  in  this  field  submitted  as  information   ....    page   177 

5.  Extent  of  use  and  effectiveness  of  highway-type  stop  signs  at  highway- 
railway  grade  crossings. 

Your  committee  has  made  a  number  of  studies  of  "stop  sign"  crossings 
and  has  concluded  that  for  certain  low  vehicular  volume  crossings  these 
signs  are  very  effective,  provided  the  requirement  to  stop  is  enforced  by 
the  police  and  the  courts.  Since  we  do  not  expect  to  develop  much  addi- 
tional infonnation  and  further  reports  can  be  made  under  other  assign- 
ments, your  committee  recommends  this  assignment  be  discontinued. 

6.  Air  rights  for  highways  over  railroad  property. 
No  report  is  submitted  for  publication  this  year. 

7.  Conduct  study  with  the  view  toward  developing  alternate  types  of 
automatic  crossing  protection,  collaborating  with  Communication  and 
Signal  Section,  AAR. 

Progress  report  on  new  types  of  protection  for  highway-railway  grade 

crossings  submitted  as  information page   178 

8.  Investigate  uses  and  types  of  rumble  strips  and  their  adaptability  for 
approaches  to  highway-railway  grade  crossings. 

Progress  report  on  two  highway  rumble  strip  installations  submitted  as 
information    page   180 

The  Committee  on  Highways, 

R.  E.  Skinner,  Chairman. 


AREA    Bulletin    630,    November-December    1970. 


Highways  171 


1^.  m.  ma\bvii\)t 
1922=1970 

H.  W.  Walbright,  48,  a  member  of  AREA  and  of  Committee  9  since  1960,  and 
chairman  of  Subcommittee  4  since  1966,  died  on  May  19,  1970.  He  is  sur\'ived  by 
his  wife,  Audrey;  a  daughter,  Lynn;  and  a  son,  PhiUip,  of  Portsmouth,  Ohio. 

A  native  of  Portsmouth,  Mr.  Walbright  was  bom  on  May  2,  1922.  He  attended 
Portsmouth  PubUc  Schools  and  completed  two  years  of  civil  engineering  courses  at 
Ohio  University. 

Mr.  Walbright  started  his  railroad  career  on  January  29,  1947,  as  an  axeman 
with  the  Norfolk  &  Western  Railway  at  Portsmouth.  On  September  1,  1958,  he  was 
promoted  to  crossing  engineer  at  Roanoke,  Va.,  and  on  February  1,  1965,  he  became 
pubhc  projects  engineer.  On  November  1,  1965,  Mr.  Walbright  was  elevated  to  the 
position  of  division  engineer  at  Roanoke,  being  transferred  to  Portsmouth  as  division 
engineer  on  November  1,  1966.  He  remained  in  this  position  until  his  decease. 

A  civic  leader  in  his  community,  Mr.  Walbright  served  on  the  Junior  Chamber 
of  Commerce  of  Portsmouth,  and  on  the  Portsmouth  Planning  Commission. 

In  his  personal  and  professional  life,  he  was  a  man  of  the  highest  character, 
always  giving  the  best  of  which  he  was  capable. 

R.  D.  Pamperl, 

Memorialist. 


Report   on   Assignment    1 
Roadbed  stabilization  for  highway— railway  grade  crossings 

C.  L.  HoLMAN  (chairman,  subcommittee),  A.  L.  Carpenter,  L.  T.  Cerny,  V.  C 
DoNLiN,  W.  E.  Free,  T.  D.  Livingston,  R.  D.  Pamperl,  J.  E.  Reynolds,  P.  A. 
Shuster,   W.  S.  Titlow,  Jr. 

There  are  several  methods  of  stabilizing  the  roadbed  for  highway-railway  grade 
crossings,  including  the  use  of  asphalt,  cement  or  lime.  Subsurface  conditions  and 
drainage  must  be  considered  in  any  indicated  corrective  action. 

One  example  of  stabilization  by  the  use  of  asphalt  is  a  crossing  of  the  Atchison, 
Topeka  &  Santa  Fe  Railway  in  Santa  Fe,  N.M.,  reconstructed  in  1964.  The  railroad 
crosses  diagonally  through  the  intersection  of  Cerrillos  Street  and  St.  Francis  Drive, 
the  crossing  being  325  ft  long.  The  average  daily  rail  traffic  is  eight  trains,  wnth  a 
maximum  speed  of  20  mph.  The  average  daily  vehicular  traffic  is  25.000.  witJi  a 
maximum  speed  of  35  mph.  The  old  solid  timber  crossing  was  die  source  of  com- 
plaints by  a  number  of  motorists  and  was  very  difficult  to  maintain  both  for  vehicular 
and  rail  traffic. 

The  crossing  was  reconstructed  by  excavating  to  a  depth  of  6  inches  below  thf> 
bottoms  of  the  ties  and  the  earth  material  compacted  to  9515  relative  compaction 
with  a  sheep's  foot  roller.  Three  2-inch  layers  of  asphaltic  concrete,  10  ft  wide.  wer<' 
placed  on  the  prepared  earth  with  each  layer  being  compacted  with  a  10-ton  roller 

Grade  stakes  were  placed  on  10-ft  centers  on  each  side  of  ths  excavation.  Sawn 
hardwood  ties  of  uniform  depth  were  placed  directly  on  the  asphaltic  concrete  and 


172 Highways 

the  tie  cribs  filled  with  volcanic  cinders  and  compacted.  It  was  not  necessary  to 
surface  or  spot  raise  the  track.  Solid  timber  crossing  planks  were  installed,  with 
asphaltic  concrete  placed  in  the  flangeways.  There  were  110  tons  of  asphaltic  con- 
crete used  in  this  crossing. 

This  grade  crossing  has  now  been  in  sei^vice  for  six  years  and  is  in  excellent 
condition  witliout  any  expenditure  for  maintenance. 

Infomiation  on  other  metliods  of  roadbed  stabilization  will  be  submitted  in  future 
reports. 

This  is  a  progress  report,  submitted  as  information,  with  the  recommendation 
the  assignment  be  continued. 


Report  on  Assignment  2 

Merits  and  economics  of  prefabricated  types 
of  highway— railway  grade  crossings 

L.  T.  Cerny  (chairman,  subcommittee),  W.  A.  Buckmaster,  A.  L.  Carpenter,  T.  P. 
Cunningham,  R.  Dejaiffe,  W.  E.  Free,  C.  I.  Hartsell,  Wm.  J.  Hedley, 
T.  D.  Livingston,  R.  V.  Loftus,  J-  M.  Lovvtiy,  R.  L.  Mays,  E.  S.  Miller, 
R.  E.  Nottingham,  R.  D.  Pamperl,  P.  A.  Shuster,  W.  S.  Titlow. 

In  1967  your  committee  reported  on  the  use  of  concrete  slab  crossings  in  the 
City  of  Edmonton,  Alta.,  Can.,  dealing  with  installations  made  in  1959  and  1960. 

The  Canadian  Good  Roads  Association  published,  in  April  1970,  a  report  on 
Edmonton's  experience  with  these  slabs  for  the  10-year  period  1959-1969.  This 
report,  entitled  "Precast  Concrete  Rail-Highway  Grade  Crossings,"  Technical  Publi- 
cation No.  38,  is  available  through  the  Canadian  Good  Roads  Association,  875  Carling 
Avenue,  Ottawa  1,  Ont.,  Can.  This  publication  also  includes  detailed  plans  and 
step-by-step  construction  photographs. 

Starting  with  one  installation  in  1959  and  eight  in  1960,  tliere  are  now  90 
such  installations  in  Edmonton  and  24  in  other  Canadian  cities.  The  slabs  are  pre- 
cast reinforced  concrete  with  2-inch  steel  channels  around  the  top  edges.  The  normal 
installation  has  a  single  center  slab  47  inches  wide  between  the  rails  and  a  I5?i-inch 
slab  on  the  outside  of  each  rail. 

On  curved  tracks  and  for  special  situations,  three  of  the  15/4-inch  slabs  are  used 
between  the  rails.  The  slabs  are  6  ft  or  9  ft  long  and  are  eitlier  5/1  or  6/8  inches 
thick,  depending  on  the  weight  of  rail.  The  outside  slabs  weigh  from  483  to  780  lb 
and  the  center  slabs  from  1449  to  2530  lb,  depending  on  the  thickness  and  length. 

The  Edmonton  report  states  that  the  rocking  and  breaking  problem  usually 
associated  with  concrete  slab  crossings  has  been  solved  by  the  use  of  an  arched- 
bottom  design  which  allows  only  certain  areas  of  the  bottom  of  the  slab  to  contact 
tlie  cross  ties  or  shims.  In  addition,  each  slab  is  fastened  to  the  ties  by  two  or  more 
lag  screws  with  spring  washers  under  the  heads. 

The  original  cost  of  these  crossings  ranged  from  $25  to  $55  per  track  foot.  In 
the  10  years  reviewed,  very  little,  if  any,  maintenance  has  been  required.  Included 
In  the  installations  requiring  no  maintenance  (other  than  routine  servicing)  is  a 
9-year-old  crossing  witli  23,000  vehicles  per  day,  an  8-year-old  crossing  with  16,300 
vehicles  per  day,  and  a  10-year-old  crossing  with  18,500  vehicles  per  day.  The 
servicing  that  has  been  required  involved  refilling  the  small  gaps  between  the  slabs 


Highways 173 

with  hot  asphalt  e\'ery  2  years  and  spraying  the  slabs  \\'ith  a  varsol-linseed  oil  to 
prevent  spalling.  Where  some  spalling  had  occurred  on  other  crossings,  the  slabs 
were  resurfaced  in  place  using  an  epoxy  product.  The  report  states  that  this  should 
extend  the  life  of  the  crossing  from  5  to  8  years. 

According  to  the  report  diese  crossings  have  the  following  advantages:  ease  of 
manufacture,  installation  and  rail  renewal,  longer  life,  salvagability  and  high  degree 
of  public  satisfaction.  The  life  of  these  crossings  are  now  estimated  at  about  20 
years. 

This  report  is  submitted  as  information  with  the  recommendation  that  the  sub- 
ject be  continued. 


Report   on   Assignment   3 

Merits  of  various  types  of  highway-railway 
grade  crossing  protection 

H.  L.  Michael  (chairmaii,  subcommittee),  T.  H.  Kruttschnitt  (vice  chairman  sub- 
commtttee),¥.  N.  Barker,  W.  B.  Calder,  A.  L.  Carpenter,  C.  A.  Chhisten- 
SEN  V  G.  DoNLiN,  W.  E.  Free,  C.  L.  Holman,  J.  A.  Holmes,  P.  G.  Jefferis 
J.  M.  LowRY,  J.  C.  Miller,  R.  E.  Nottingham,  R.  D.  Pamperl  H  A  Rich- 
ards, J.  E.  Spangler,  W.  S.  Titlow,  J.  L.  Whiti^ieyer,  H.  J.  Wilkins'  H    L 

WOLTMAN.  'J  ,        .        . 

As  in  each  of  the  past  few  years,  several  reports  related  to  the  assignment  of 
this  subcommittee  have  been  released  during  the  past  year.  The  subcommittee,  as 
part  of  its  activities,  reviewed  these  reports  and  submits  below  a  summary  of  im- 
portant information  relative  to  its  assignment  from  three  of  them.  It  also  presents  a 
summary  of  tlie  safety  merits  of  currently  used  crossing  protection  de\'ices. 

BEFORE  AND  AFTER  REPORT  OF  ILLINOIS  COMMERCE  COMMISSION 
The  Illinois  Commerce  Commission  reported  on  accomplishments  from  use  of 
the  grade  crossing  protection  fund  establi.shed  by  the  Illinois  Legislature  in  1955. 
The  report  noted  that  from  1955  through  1968  the  Fund  had  contributed  to  the 
cost  of  placing  modem  warning  signal  devices  at  532  Illinois  railroad-highway  grade 
crossings  where  the  signals  had  been  inservice  12  months  or  more.  The  tabular 
listing  which  follows  (see  next  page)  compares  the  number  of  accidents,  fatalities 
and  injuries  which  have  occurred  since  installation  of  the  new  protection  with  the 
number  of  accidents,  fatalities  and  injuries  which  occmred  in  a  like  period  prior  to 
installation  of  the  new  protection. 

The  crossings  are  located  throughout  the  State  of  Illinois  and  the  "Before" 
protection  at  each  of  the  crossings  was  the  standard  crossbiick.  The  reductions  in 
accidents,  fatalities  and  injuries  are  substantial  and  are  an  indication  of  the  safety 
merits  of  the  "After"  types  of  highway-railway  grade  crossing  protection  shown. 
Inasmuch  as  the  degree  of  hazard  was  not  the  same  at  crossing  in  each  group  in  the 
tables,  the  reduction  percentages  for  the  several  t>'pes  of  protection  devices  are  not 
comparable. 

Bui.  630 


174 


Highways 


Type  of  Protection  Installed 

Accident  fi 

Fatalities 

Injuries 

Flashing  Hght  signals 

Before 

After.,. 

Reduction 

23,002  "cross 
270 
97 
64% 

mg  months"  at  293  crossings 
91                      163 
26                       31 
72%                  81% 

Flashing  light  signals  and 

2-train  indicators 

Before 

After 

Reduction 

1,229  "crossing  months"  at  2',i  crossings 
20                           2                         20 
7                           0                           4 
65%                  100%                   80% 

Flashing  light  signals  and  gates 

Before 

After 

Reduction 

17,449  "crossing  mouths"  at  216  crossings 
266                       92                      126 
89                        18                       31 
66%                   80%                   76% 

Total  all  protection 

Before.  _       .      __ 

After... 

Reduction     _    _    . 

41,680  "crossing  months"  at  532  crossings 
556                      185                     309 
193                         44                         66 

65%                    76%                    79% 

SUMMARY   OF   SAFETY   MERITS   OF   PROTECTION    DEVICES 

The  report  noted  above  of  the  safety  merits  of  currently  used  types  of  highway- 
railroad  crossing  protection  provides  findings  similar  to  tliose  reported  in  a  large 
number  of  research  projects  during  the  past  several  decades.  The  findings  relative 
to  the  safety  merits  of  tlie  several  types  of  railroad-highway  grade  crossing  protec- 
tion have  been  so  similar  that  relative  evaluations  of  these  merits  are  generally 
recognized. 

Four  major  types  of  grade  crossing  protection  are  used — the  standard  cross- 
buck,  stop  signs,  flashing  lights  and  flashing  lights  with  automatic  gates.  The  first 
two  of  these  types  are  passive  in  nature  and  only  warn  the  motorist  of  the  location 
of  a  railroad  crossing.  The  latter  two  are  active,  and  in  addition  to  providing  warn- 
ing of  the  location  of  the  crossing,  tell  the  motorist  of  the  absence  or  presence  of  a 
train  in  or  approaching  the  crossing. 

It  is  recognized  that  the  types  of  active  protection  provide  greater  protection 
to  the  motorist  than  the  passive  types.  Although  exact  agreement  as  to  the  relative 
value  afforded  to  the  motorist  by  each  of  the  four  types  of  protection  does  not  exist, 
the  several  research  studies  indicate  that  if  the  hazard  of  crossbuck  protection  is  the 
unit  value  of  1.00,  the  relative  hazard  of  each  of  the  four  types  is  as  follows: 

Crossbuck  1.00 

Stop  signs  0.5-0.6 

Flashing  lights  0.2-0.4 

Automatic  gates  0.1-0.2 

Much  disagreement,  however,  exists  relative  to  the  use  of  stop  signs  at  railroad- 
highway  grade  crossings.   Although  they  are  more  effective  in  reducing  accidents 


Highways 175 

than  just  the  crossbuck,  they  result  in  much  delay  to  motorists,  an  increase  in  rear- 
end  vehicular  accidents  on  high-volume  roads,  and  are  claimed  by  many  to  result 
in  increasing  disrespect  for  the  stop-sign  method  of  vehicular  control.  If  one  places 
a  value  on  tlie  time  lost  by  motorists  in  stopping  at  stop-sign-controlled  grade  cross- 
ings, few  grade  crossings  would  warrant  this  t>T3e  of  control. 

The  type  of  protection  to  be  installed  at  a  crossing,  however,  should  not  be 
based  solely  on  the  probability  of  accident  reduction.  The  costs  of  installation  and 
maintenance  of  flashing  lights  and  automatic  gates  are  considerable,  and  limited 
funds  are  available  for  upgrading  crossing  protection.  These  facts  require  that  a 
decision  to  change  the  type  of  protection  at  a  railroad-highway  grade  crossing  must 
be  based  on  a  total  analysis  of  the  economics  of  such  an  action.  Such  an  analysis 
requires  an  estimation  of  the  benefits  to  be  expected  at  a  crossing  and  an  evaluation 
of  the  costs  of  installing  and  maintaining  the  higher  type  of  protection. 

The  major  factors  influencing  the  benefits  to  be  received  are  those  which  affect 
the  probability  of  almost  simultaneous  arrival  at  the  crossing  of  a  vehicle  and  a 
train.  Major  factors  are  the  volmnes  of  train  and  vehicular  traffic  using  the  crossing. 
Another  factor  which  may  influence  benefits  is  very  poor  visibility  for  motorists  of 
trains  approaching  a  crossing.  Such  a  condition  may  make  the  provision  of  active 
types  of  protection  desirable.  It  is  also  generally  recognized  that  automatic  gates 
with  flashing  lights  are  desirable  at  crossings  where  both  vehicle  and  train  volumes 
are  high  and  two  or  more  tracks  provide  a  probability  that  two  trains  will  approach 
the  crossing  at  nearly  the  same  time. 

The  economic  analysis  of  the  benefits  and  costs  of  improving  grade  crossing 
protection  requires  good  data  on  expected  accidents  and  costs  of  improvements  and 
maintenance,  and  proper  use  of  techniques  of  analysis.  An  example  of  such  an  analysis, 
including  difficulties  encountered  and  advantages  resulting,  is  given  in  the  Proceed- 
ings, National  Conference  on  Rail-Highway  Grade  Crossing  Safety,  February  11-13, 
1969,  in  a  paper  titled  "A  Preliminary  Economic  Analysis  of  123  Railway  Grade 
Crossings  Using  EEP-16  and  NCHRP  50  Techniques,"  by  Donald  G.  Newnan. 

A   PROGRAM   DEFINITION   STUDY   FOR   RAIL-HIGHWAY  GRADE   CROSSING   IMPROVEMENT, 
A    REPORT    PREPARED    FOR    THE    FEDERAL   RAILROAD   ADMINISTRATION 

The  vast  number  of  crossings  in  the  United  States  which  are  candidates  for 
increased  protection  and  the  limited  availability  of  resources  for  such  improvement 
necessitate  that  evaluations  of  grade  crossing  protection  improvements  for  iudi\idual 
crossings  should  be  done  as  part  of  a  program  which  has  evaluated  all  crossings. 
The  Federal  Railroad  Administration  in  recognizing  the  soundness  of  this  approach 
contracted  with  Alan  M.  Voorhees  and  Associates  for  the  preparation  of  a  national 
program  of  policy  formulation,  program  administration  and  research  in  the  area  of 
highway-railroad  grade  crossings.  The  resulting  report,  dated  October  1969  and 
titled  "A  Program  Definition  Study  for  Rail-Highway  Grade  Crossing  Improvement." 
has  been  released  by  the  Federal  Railroad  Administration  with  the  notation  tliat  the 
contents  do  not  necessarily  reflect  the  views  or  policy  of  the  Department  cf  Tr.ins- 
portation   and  that  the  report  is  not  a  standard,  specification  or  regulation. 

The  report  is  an  important  one,  however,  and  provides  a  good  owr;,"  \:ow 
of  the  current  grade  crossing  protection  situation.  As  it  is  of  interest  to  iim:;  ,i.  :  .ons 
in  the  railroad  profession,  a  brief  summary  of  its  contents  and  some  ;  .<p!  ai  ;for>' 
comments  on  a  few  of  its  findings  are  presented  in  the  following  n.ir .  -   ,  ,1,.. 

abstract  of  the  report  is  as  follows: 


176 Highways 

"This  study  describes  in  general  terms  the  present  status  of  grade  cross- 
ing inventories,  improvement  programs  and  other  significant  considerations. 
It  identifies  available  information  with  respect  to  the  cost  of  accidents  and 
motor  vehicle  operations,  as  well  as  the  preparation  of  estimates  of  the  ninn- 
ber  of  crossings  in  classes  related  to  the  volume  of  train  movements  and  the 
volume  of  vehicle  traffic.  From  these  estimates,  the  number  of  crossings  at 
which  improvements  would  yield  benefits  in  excess  of  costs  was  estimated, 
together  with  the  reduction  in  accidents  which  those  improvements  could  be 
expected  to  bring. 

It  develops  a  five-year  program  of  study  related  to  policy  formulation, 
program  administration  and  research;  also,  it  identifies  and  describes  projects 
which  can  be  initiated  as  action  programs,  research  and  special  studies.  This 
includes  a  recommended  program  to  correct  data  deficiencies  and  develop 
a  comprehensive  information  system." 

One  portion  of  the  report  that  may  cause  confusion  to  readers  of  the  report  is 
that  concerned  with  stop  signs  at  crossings.  In  their  detemiination  of  crossings  which 
warrant  improved  grade  crossing  protection,  every  current  crossing  at  which  stop 
signs  are  located  is  shown  to  warrant  a  change  to  at  least  flashing  light  signals.  This 
finding  is  the  result  of  an  arbitrary  decision  by  the  authors  of  the  report  that  no 
current  crossing  protection  would  be  decreased.  With  this  decision  and  the  high  costs 
accruing  to  all  motorists  stopping  at  stop  signs  (delay  costs),  the  economic  analysis 
perfonned  by  the  authors  resulted  in  the  finding  that  the  installation  of  flashing 
light  signals  or  better  was  economically  justified.  Such  installations,  however,  might 
not  be  as  realistic  and  desirable  from  a  safety  standpoint  as  installation  of  such  de- 
vices at  other  crossings  with  only  a  crossbuck. 

The  Appendices  of  the  report  are  concerned  with  economic  factors  involved 
and  economic  analysis  techniques  employed.  Although  generally  adequate,  some 
disagreement  with  the  detailed  discussions  and  evaluations  of  the  several  techniques 
available  does  exist.  A  careful  study  of  the  report  by  individuals  knowledgeable  in 
economic  analysis  is  encouraged. 

AREAS    FOR    PROPOSED    RESEARCH 

Improvement  of  railroad  crossing  protection  devices  is,  of  course,  still  a  very 
fruitful  area  for  research,  and  research  in  this  area  is  continuing.  A  Task  Group  of 
the  Highway  Research  Board's  Committee  on  Traffic  Control  Devices  explored  this 
area  in  1969  and  in  January  1970  prepared  a  report  on  areas  for  further  research 
and  development.  This  group  concluded  that  present  protection  devices,  by  making 
use  of  the  visual  channel  of  communications  only,  have  serious  limitations.  They 
note  that  the  tasks  of  driving  are  demanding;  that  communication  via  the  visual 
channel  must  compete  with  many  other  signs,  signals  and  tasks;  that  environmental 
conditions  of  fog,  rain  and  snow  cause  further  communication  difficulties;  that  fogged 
windows  and  headlight  glare  further  compound  the  problem;  and  that  the  motoring 
public  does  not  have  great  respect  for  existing  crossing  protection  devices. 

The  group  noted  recent  progress  in  electronic  highway-motorist  communica- 
tion systems  and  the  trend  in  research  to  tlie  use  of  displays  within  the  vehicle  of 
information  required  for  electronic  route  guidance  (ERGS),  passing  assistance,  and 
other  applications.  The  concluding  paragraph  of  their  brief  report  is  as  follows: 


Highways     177 

"The  on-board,  in-vehicle  display  of  information  relative  to  railroad 
crossings  would  overcome  most,  if  not  all,  of  die  objections  raised  earlier  in 
this  report  concerning  present  railroad  crossing  protection  devices.  Research 
is  needed  to  investigate  the  possible  application  of  electronic  highway- 
motorist  communications  for  railroad  crossing  protection.  Such  a  research 
project  should  include  a  determination  of  the  information  to  be  displayed, 
the  type  of  display  to  be  used,  and  the  method  of  operating  the  conununi- 
cations  system.  A  variety  of  messages  could  be  communicated  depending  on 
conditions  at  the  railroad  crossing.  Considerably  more  flexibility  and  effective- 
ness would  e.xist  with  such  a  system  than  presently  exists  with  current  rail- 
road crossing  protection   devices." 

CONTINUATION    OF   ASSIGNMENT 

This  report  includes  a  summary  of  the  safety  merits  of  the  \'arious  types  of 
highway-railway  grade  crossing  protection,  the  assignment  of  this  subcommittee. 
The  continuing  research  and  interest  in  this  assignment  and  the  probability  of  early 
development  of  new  protection  systems  and  devices,  however,  forces  the  subcom- 
mittee to  propose  continuation  of  the  assignment.  Continuation  will  permit  the  moni- 
toring of  these  developments  and  evaluation  of  the  merits  of  any  resulting  devices 
or  systems. 

This  is  a  progress  report  submitted  as  information  with  the  recommendation  the 
assignment  be  continued. 


Report   on   Assignment  4 

Merits  and  economics  of   marking  and  signing 
grade  crossings 

J.  M.  LowRY  (chairman,  subcommittee),  H.  J.  Barnes,  F.  Daugherty,  J.  A.  Holmes, 
P.  G.  Jefferis,  R.  F.  MacDonald,  R.  L.  Mays,  R.  W.  Mauer,  D.  J.  Moody, 
R.  E.  Nottingham,  H.  A.  Richards,  R.  F.  Spars,  S.  C.  Walker,  J.  L.  Wiirr- 
MEYER,   H.  J.   WiLKINS,   H.   L.   Woltman. 

Considerable  interest  has  been  shown  in  the  Alan  M.  Voorhees  &  Associates, 
Inc.'s  report  "A  Program  Definition  Study  for  Rail-Highway  Grade  Crossing  Im- 
provement" of  October  1969  prepared  for,  and  at  the  request  of,  the  Department  of 
Transportation.  This  report  is  recommended  reading  for  all  who  are  interested  in 
this  subject. 

The  Voorhees'  study  assigns  values  to  the  \arious  types  of  grade  cro.ssing 
protection  devices  in  such  a  manner  as  to  permit  comparison  of  the  economics  be- 
tween such  devices  and  with  grade  separations.  One  of  the  interesting  points  made 
in  tlie  study  is  the  high  cost  of  mandatory  stop  signs  at  grade  crossings  due  to  the 
value  of  motorists'  time  and  vehicular  delay.  This  fact  emphasizes  that  the  m'c  of 
stop  signs  at  grade  crossings  should  be  restricted  to  crossings  with  low  \'I.ieular 
\olumes  and  high  hazard  due  to  inadequate  sight  distance  and  other  factoni. 

Highway  and  railroad  engineers  are  showing  an  increa-sing  interest  in  P'^'^'«'^'^ 
warning  markers  and  devices  as  early  indicators  of  a  grade  cro-ssing.  Tli.rr  ;■  ;'ood 
reason  for  this  interest.  The  Department  of  Transportation,  Federal  Railroac  vur.un- 
istration,  Bureau  of  Railroad  Safetv  Bulletin  for  the  year  ending  Dec-ember  31,  1969, 


178 Highways 

presents  statistics  showinji  that  for  the  years  1966  throiij^h  1969  one-third  of  the 
highway-railway  accidents  invoK'ing  motor  vehicles  were  caused  by  motor  \ehicle 
striking  the  side  of  train  (see  Table  2,  Page  8).  This  is  a  clear  indication  that  the 
driver  of  a  motor  vehicle  needs  to  be  "awakened"  before  he  is  so  near  an  occupied 
crossing  he  is  unable  to  stop. 

"Rumble  strips"  have  been  used  effectively  for  advance  warning  on  some  high- 
ways. These  strips  must  be  placed  far  enough  ahead  of  the  crossing  to  alert  the 
driver  in  sufficient  time  to  stop  before  occupying  the  crossing  area.  Another  effective 
advance  warning  is  the  painting  of  a  large,  elongated,  reflectorized  "X"  on  the 
pavement  of  die  approach  lanes  to  the  crossing.  Advance  warning  signs  of  standard 
design  are  also  required  by  the  Unifonn  Manual  on  Traffic  Control  Devices.  Such 
standard  advance  warning  signs  are  used  effectively  with  "rumble  strips"  and  the 
elongated  "X"  on  the  pavement  with  automatic  signals  or  crossbucks.  The  Proceed- 
ings of  the  1969  "National  Conference  on  Rail-Highway  Grade  Crossing  Safety" 
co-sponsored  by  the  Highway  Research  Board  and  tlie  U.S.  Department  of  Transpor- 
tation, illustrates  the  use  of  various  types  of  advance  warning  methods,  singly  or  in 
combinations. 

Marking  and  signing  grade  crossings  should  and  will  continue  to  receive  the 
attention  of  safety  engineers.  Because  it  is  the  least  expensive  of  crossing  protective 
devices,  this  method  will  continue  in  prominent  use  for  the  foreseeable  future. 

This  is  a  progress  report,  submitted  as  information  with  the  recommendation 
that  the  assignment  be  continued. 


Report   on   Assignment  7 

Conduct  study  with  the  view  toward  developing  alternate 
types  of  automatic  crossing  protection 

C.  I.  Hartsell  (chairman,  subcommittee),  F.  N.  Barker,  H.  J.  Barnes,  W.  B.  Cal- 
DER,  T.  P.  Cunningham,  V.  G.  Donlin,  W.  E.  Free,  Wm.  J.  Hedley,  C.  L. 
Holman,  p.  G.  Jefferis,  R.  F.  MacDonald,  H.  L.  Michael,  E.  S.  Miller, 
J.  C.  Miller,  R.  D.  Pamperl,  J.  E.  Reynolds,  H.  A.  Richards,  J.  E.  Spangler, 
R.  F.  Spars,  W.  S.  Titlow,  H.  L.  Woltman. 


GREEN   LIGHT  TYPE    CROSSING   PROTECTION 

Two  railroads,  at  the  suggestion  of  the  Indiana  Public  Service  Commission, 
have  "green  light  type  crossing  protection"  at  27  highway-railway  grade  crossings 
in  the  State  of  Indiana. 

There  are  two  variations  of  the  protection,  as  follows: 

1.  (See  Fig.  1).  The  regular  crossbuck  sign  supplemented  with  a  highway 
traffic  "STOP"  sign  installed  on  each  side  of  the  crossing  with  an  additional 
sign  reading  "When  Light  Is  Out."  Adjacent  to  tlie  "STOP"  sign  is  an  8-ft 
mast  with  back-to-back  traffic  light  imits  with  green  lenses.  The  green 
light  is  tied  to  the  railroad's  APB  block  system  circuits.  The  traffic  light 
heads  utilize  67- watt  120-volt  bulbs  displaying  a  green  light  to  motorists 
approaching  the  crossing,  provided  no  train  has  preempted  the  XR  relay. 


Highways 


179 


Fig.  1 


On  approach  of  a  train,  the  ivlay  is  de-energized  and  the  green  light  is 
extinguished.  The  cost  of  the  instalhition  is  less  than  $1,000.  This  installa- 
tion is  not  considered  "fail  safe."  Further,  the  "Creen  Light"  stays  ofl"  longer 
than  necessary  on  account  of  the  length  of  the  .\PB  block. 
2.  The  second  style  consists  of  a  13-ft  3Ji-inch  mast  with  a  standard  crossJMick 
near  the  top  of  a  4-inch  pipe  post.  Iinniediatel>-  below  the  crossbuck  is  a 
sign  reading  "If  Cireen  Light  Is  Out."  Next  below  is  an  HC-81  signal  unit 
with  green  lens.  Next  below  is  an  HC-81  signal  luiit  with  red  lens.  The 
bottom  unit  is  a  sign  reading  "Look  Out  For  Trains"  located  53  inches 
aboxe  the  foundation  for  the  mast.  This  system  has  starting  track  circuits 


180  Highways 

3857-ft  and  4820-ft  lonj?.  The  cost  of  this  installation  was  over  $8,000. 
Basically,  the  installation  is  a  standard  flashing-light  signal  system  with 
different  hardware. 

The  two  types  of  crossing  protection  are  being  used  at  low  highway  traffic 
density  rinal  roads,  at  crossings  with  poor  sight  distances  and  at  private  crossings. 
There  has  been  a  decided  improvement  in  the  accident  records  at  tliese  crossings. 
The  travelling  public  has  not  only  expressed  appreciation  for  the  added  protection 
but  has  also  requested  many  of  the  27  installations. 


MISSOURI    BLINKING-LIGHT 

In  Bulletin  609,  November  1967,  your  committee  reported  on  the  test  installa- 
tions on  four  railroads  of  the  "Electric  Railroad  Crossing  Signals"  by  order  of  the 
Missouri  Public  Service  Commission. 

The  original  150-watt  lights  were  reduced  to  100  watts  by  order  of  the  Public 
Service  Commission  late  in  1967  as  a  result  of  complaints  that  the  lights  were  too 
bright. 

The  20-year  accident  record  at  these  four  crossings  prior  to  the  installation  of 
the  "blinking  lights"  reveals  eight  separate  accidents  resulting  in  8  fatalities  and  12 
persons  injured.  There  have  been  no  accidents  since  the  installations  were  completed. 

It  appears  that  there  has  been  confusion  in  the  meaning  of  these  signs.  Experi- 
ence indicates  that  an  improvement  could  be  attained  by  burning  the  beacons  at 
higher  voltage  during  the  day  than  at  night,  which  would  necessarily  require  the 
addition  of   resistors,   relays,  photoelectric  cells   and  other  equipment. 

This  is  a  progress  report,  submitted  as  information,  with  tlie  recommendation 
the  assignment  be  continued. 


Report  on   Assignment   8 

Investigate  uses  and  types  of  rumble  strips  and  their 
adaptability  for  approaches  to  highway- 
railway  grade  crossings 

R.  D.  Pamperl  (chairman,  subcommittee),  W.  A.  Buckmaster,  W.  B.  Calder,  L.  T. 
Cerny,  R.  Dejaiffe,  C.  I.  Hartsell,  J.  A.  Holmes,  A.  J.  Knobloch,  T.  H. 
Kruttschnitt,  R.  V.  Loftus,  R.  F.  MacDonald,  H.  L.  Michael,  E.  S.  Miller, 
J.  E.  Reynolds,  P.  A.  Shuster,  H.  J.  Wilkins. 

Your  committee  continues  to  inspect  rumble-strip  installations  on  highways  and 
at  highway-railway  grade  crossings  in  carrying  out  its  assignment. 

Traffic  engineers  of  several  midwest  and  southeastern  states  were  contacted  by 
members  of  the  committee  to  discuss  with  them  their  experience  with  rumble-strip 
installations  on  state  highways.  It  was  indicated  that  for  short  periods  of  time  after 
tlieir  installation  there  was  a  significant  reduction  in  the  accident  rate.  However,  it 
is  feared  that  after  these  installations  have  been  in  service  for  some  time,  the  accident 
rate  will  return  to  approximately  the  same  frequency  as  was  experienced  prior  to 
construction  of  the  facility. 


Highways 181 

Generally  speaking,  highway  engineers  do  not  favor  rumble  strips  as  advance 
warning  devices  to  motorists  on  approaches  to  railway-highway  grade  crossings. 
Although  the  subject  is  controversial,  some  engineers  are  making  efforts  to  install 
test  facilities  at  railway-highway  grade  crossings. 

The  behavior  of  a  motorist  negotiating  a  rumble-strip  installation  inHuences  the 
obser\er  to  conclude  that  this  type  of  advance  warning  does  alert  the  motorist  to  a 
hazard  ahead.  It  develops,  then,  that  tlie  important  factors  in  the  application  of 
rumble  strips  at  railway-highway  grade  crossings  are  primarily  their  design  and  use, 
the  latter  factor  being  the  hardest  to  develop  since  there  are  few  test  installations 
in  existence  today  at  railway-highway  grade  crossings. 

To  exemplify  the  importance  of  design  of  rumble  strips  as  advance  warning  to 
motorists  approaching  a  hazard,  the  committee  cites  two  installations  on  highways 
that  were  inspected  by  some  of  its  members,  one  at  Rogersville,  Tenn.,  and  the  other 
at  Litchfield,  111. 

Rogersville,   Tenn. 

.At  Rogers\ille  rumble  strips  were  installed  in  the  eastbound  lane  of  U.S.  Route 
11-W  Bypass.  The  highway  is  undivided  and  surfaced  with  an  asphaltic  concrete 
t\'pe  of  surfacing  material.  U.S.  Route  11-W  has  a  maximum  posted  speed  limit  of 
55  mph.  The  purpose  of  this  nimble-strip  installation  is  two-fold: 

1.  To  warn  eastbound  traffic  of  the  approaching  danger  at  the  "T"  inter- 
section of  S.  R.  70  with  U.S.  Route  11-W  Bypass.  The  intersection  is 
formed  by  a  connector  ramp  from  Route  70  to  the  east  and  westbound 
traffic  of  U.S.   11-W. 

2.  To  warn  eastbound  traffic  of  the  extreme  curvature  in  tlie  highway's  align- 
ment just  east  of  the  "T"  intersection  of  Route  70  and  11-W.  The  ap- 
proved speed  to  the  sharp  curve  in  the  highway  \'eering  to  the  right  is 
25  mph. 

There  are  three  rumble-strip  installations  at  200-ft  intervals  in  advance  of  the 
intersection.  These  installations  consist  of  seventeen  1-  by  6-inch  strips  of  asphaltic 
materials  applied  to  the  pavement  surface  and  spaced  on  11-inch  centers. 

Obser\ation  of  the  motorists'  behavior  at  this  facility  indicated  that  the  rumble 
strips  alerted  the  motorist  to  the  danger  aliead  but  the  rough  riding  qualities  of  the 
strips  aggravated  the  driver.  Motorists  were  observed  driving  on  the  shoulder  or  in 
the  opposing  traffic  lanes  to  avoid  the  rumble  strips. 

It  was  concluded  that  these  strips  were  too  rough  and,   therefore,  imdesirable. 

Litchfield,    III. 

At  Litchfield  rumble  strips  were  installed  in  the  northboimd  and  .soutliijoiuid 
lanes  of  U.S.  Route  66.  The  highway  is  divided  and  posted  for  maxinnnn  spf.xis 
of  65  mph.  The  purpose  of  the  runil)le-strip  installation  is  to  warn  the  motorist  tii.it 
he  must  reduce  his  speed  to  45  mph  when  approaching  the  signalized  intersecllou 
of  State  Route  16. 

There  are  two  rmiible-strip  installations  at  275-ft  intei-vals  on  the  high^^'ay 
approaches  to  this  intersection.  The  installations  con.sist  of  sixteen  li-  by  fv.iuh 
adhesive  strips  applied  to  the  paved  surface  and  spaced  on  14Ji-inch  centers.  The 
strips  span  the  entire  width  of  the  pa\ed  traffic  lanes. 


182 Highways _^ 

Observation  of  the  motorists'  behavior  at  the  facihty  indicated  that  the  strips 
alerted  the  motorist  to  the  oncoming  intersection.  The  motorist  showed  no  signs 
of  being  aggravated  when  passing  over  the  rumble  strips. 

There  was  no  indication  of  motorists  trying  to  avoid  these  rumble-strip  installa- 
tions and,  therefore,  it  was  concluded  that  the  design  of  the  strips  was  more  desirable 
than  those  at  Rogersville. 


The  committee  will  continue  to  inspect  rumble-strip  installations  at  highway 
intersections  or  at  highway-railway  grade  crossings  whenever  and  wherever  they 
are  reported,  and  a  subsequent  report  will  be  furnished  the  committee  at  the 
appropriate  time  thereafter. 

This  is  a  progress  report,  submitted  as  information,  with  the  recommendation 
the  assignment  be  continued. 


Report  of  Committee   22 — Economics  of  Railway 
Construction   and  Maintenance 


R.  W.  Pember,  Chairman 

H.    C.    MiNTEER, 

Vice  Chairman 

John  Fox,  Secretary 

J.  A.  Caywood 
E.  R.  Anderson 
R.  A.  Kendall 
G.  E.  Wahfel 

W.    S.    AUTREY 

W.  Glavlv 
J.  E.  Sunderland 
J.  W.  Brent 
A.  D.  Alderson 


R.  J.  Aschmeyer 

F.  S.  Barker 
A.  S.  Barr 

H.  B.  Berkshire 
A.  Bornhoft 
C.  J.  Bryan 
J.  S.  Busby 
L.  B.  Cann,  Jr. 
A.  W.  Carlson 
J.  I.  Casbeer,  Jr. 

A.  B.  Chaney  (E) 
S.  A.  Cooper 

P.   A.   COSGROVE 

C.  G.  Davis 
M.  H.  Dick 
L.  E.  Donovan 
W.  M.  S.  Dunn 

H.   B.   DURRANT 

J.  E.  Eisemann 
L.  C.  Gilbert 
C.  R.  Harrell 
W.  H.  Hoar 

J.    O.    HOLLADAY 

R.  P.  Howell 

B.  G.  Hudson 
E.  Q.  Johnson 
W.  J.  Jones 

T.  L.  Kan  AN 
H.  W.  Kellogg 
W.  E.  Laird 

G.  Liljeblad 

L.  A.  LoGGiNS  (E) 

J.    M.    LO'W'RY 


T.  D.  Mason 
R.  G.  Maughan 
A.  L.  Maynard 
J.  R.  Miller 

E.  T.  Myers 
J.  A.  Naylor 

G.  M.  O'RouBKE  (E) 

C.  T.    POPMA 

R.  W.  Preisendefer 

F.  L.  Rees 
M.  S.  Reid 

D.  F.  Richardson 
C.  L.  Robinson 
M.  Rougas 

g.  e.  scholze 
H.  W.  Seeley 

A.  E.  Shaw,  Jr. 
R.  G.  Simmons 
W.  B.  Stackhouse 
J.  Stang 

J.    T.    SuLLrVAN 

W.  A.  Swartz 

S.  W.  Sweet 

W.  B.  Throckmorton 

J.  D.  Vaughan,  Jr. 

J.  T.  Ward 

H.  E.  Wilson 

G.  H.  Winter 

T.    P.    WOLL 

F.  R.  Woolford  (E) 

B.  J.  Worley 

C.  R.  Wright  (E) 

Committee 


( E )  Member  Emeritus. 

Those   whose   names   are   shown   in  boldface,   in   addition   to  the   chairman,   vice   chairman   and 
secretary,    are    the   subcommittee   chairmen. 


To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

B.  Revision  of  Manual. 
No  report. 

1.  Analysis  of  operations  of  railways  that  have  substantially  rcchiccd  tin- 
cost  of  construction  and  maintenance  of  way  work. 

Progress  report,  presented  as  information   paRt'   ^^"^ 

2.  Economics  of  \arious  types  of  highway-railway  grade  crossing  installa- 
tions, including  full-depth  timbers,  planking,  shallow  blacktop,  full- 
depth  blacktop  (.3  to  6  inches  below  tie  to  top  of  rail),  shallow  con- 
crete, full-depth  concrete,  cast  steel  and  rubber,  collaborating  as  necL'H- 
sary  or  desirable  with  Committee  9. 

Final  report,  presented  as  infonnation 


Note:    Discussion   on   subcommittee    reports   herein   closes   on   January    18.    1971. 

183 


184 Economics  of  Railway  Construction   and   Maintenance 

3.  Economics  of  head(jiiarters  maintenance  of  way  j^an^s  versus  floating 
gangs  in  \'iew  of  recent  arbitration  awards. 

Final  report,  presented  as  information    page  201 

4.  Economics  of  double  shifting  where  gang  has  heavy  investment  in 
equipment. 

No  report. 

5.  Potential   labor  economies  to  be  derived  through  the  use  of  ad\anced 
types  of  track  inspection  cars  in  formulating  maintenance  programs. 
This  subject  to  be  discontinued  for  the  time  being. 

6.  Economies  to  be  realized  from  the  use  of  a  two-rail  method  of  laying 
and  picking  up  rail  with  a  rail  train  versus  the  one-rail  method  being 
used  by  a  majority  of  roads. 

No  report. 

7.  Develop  and  recommend  procedures  for  producing  unit  costs  for  main- 
tenance of  way  work. 

No  report. 

The  Committee  on  Economics  of  Railway  Construction 

AND  Maintenance, 

R.  W.  Pember,  Chairman. 


AREA    Bulletin    630,    November-December    1970. 


Report  on   Assignment    1 


Analysis  of  operations  of  railways  that  have  substantially 

reduced  the  cost  of  construction  and 

maintenance  of  way  work 

E.  R.  Anderson  (chairman,  subcommittee),  F.  S.  Barker,  A.  B.  Cann,  Jr.,  A.  W. 
Carlson,  J.  I.  Casbeer,  Jr.,  W.  E.  Laird,  H.  C.  Minteer,  R.  W.  Preisendefer, 
F.  L.  Rees,  M.  S.  Reid,  G.  E.  Scholze. 

The  following  report  of  an  inspection  made  on  June  23,  1970,  of  the  Burling- 
ton Northern,  Inc.'s  (Great  Northern)  line  change  in  Montana  between  Stryker 
(approximately  30  miles  northwest  of  Whitefish)  and  Jennings  (approximately  15 
miles  east  of  Libby)   is  presented  as  information. 


INTRODUCTION 

Libby  Dam  and  Reservoir  on  the  Kootenai  River  in  Northwestern  Montana  is 
under  construction  in  the  interest  of  flood  control,  power  generation,  recreation  and 
related  water  uses. 

The  Kootenai  River  rises  on  the  western  slopes  of  the  Rocky  Mountains  in 
Southeastern  British  Columbia.  It  Hows  south  into  Montana  then  north  and  west  into 
British   Columbia   to  meet  the  Columbia   River. 


Economics   of   Railway   Construction   and   Maintenance 


185 


Libby   Dam  under  construction  3.5  miles  north  of  Jennings  along  old   main   line. 


The  dam  will  rise  about  420  ft  above  bedrock,  be  3,055  ft  long  at  the  crest, 
and  will  include  a  hydropower  plant  with  an  initial  installation  of  three  105,000- 
kilowatt  generators  and  pro\'isions  for  future  additional  units.  The  reservoir,  with 
gross  storage  capacity  of  5,850,000  acre-ft,  will  be  90  miles  long,  backing  water  42 
miles  into  Canada,  approximately  5  miles  upstream  from  Wardner,  British  Columbia. 
The  noniial  full-pool  elevation  at  the  dam  will  be  2,459  ft  aliove  mean  .sea  level 
and  the  minimum  elevation  will  be  2,287  ft. 

Within  the  United  States,  construction  of  the  dam  \\'ill  recpiire  relocation  of 
about  60  miles  of  Burlington  Northern's  main  trans-continental  line,  52  miles  of  Mon- 
tana State  Highway  No.  37,  50  miles  of  Forest  Service  roads,  and  utilities  and  ser\'- 
ices  affected  by  the  reservoir.  In  Canada,  a  few  comnnmities,  roads,  and  sections 
of  a  railroad  will  be  affected  by  the  resei"voir. 

The  total  cost  of  the  project  will  be  about  $349,000,000  based  on  1964  prices. 


LINE   CHANGE   PLANNING 

In  1961,  after  Congress  ratified  a  treaty  with  Canada  relating  to  international 
cooperation  in  water- resource  development  of  the  Columbia  Ri\er  Basin,  the  Corps 
of  Engineers  advised  the  Railway  Company  that  all  engineering  work  for  the  Libby 
Dam  Project,  including  relocation  of  the  railroad,  was  to  proceed.  After  considering 
eight  possible  routes,  four  were  .selected  for  preliminary  in\estigation,  designated  as 
follows: 

Route  No.  1,  Stryker-Jennings  1%  Route 
Route  No.  2,  Reservoir  Route 


186 Economics  of  Railway  Construction  and   Maintenance 

Route  No.  3,  Cood  Creek  1%  Route  with  12-Mile  Tunnel 
Route  No.  4,  Fortine  Creek — Five  Mile  Creek  Route 

After  completion  of  preliminary  engineering  and  a  joint  inspection  and  review, 
further  consideration  to  Routes  No.  2  and  No.  4  was  discontinued  for  the  following 
general  reasons: 

Route  No.  2 — Difficult  terrain  and  materials  and  substantially  higher  cost  of 
construction. 

Route  No.  4 — Unstable  and  poor  soil  in  Five  Mile  Creek  Valley,  poor  soil  and 
location  above  and  along  the  reservoir  from  Warland  to  the  dam,  steep  grade  in 
tunnel,  and  substantially  higher  cost  of  construction. 

The  Corps  wished  to  consider  only  Route  No.  1,  because  of  indications  that  it 
would  be  tlie  lowest  cost  satisfactory  replacement  route,  but  the  Railway  asked  for 
continued  study  also  of  Route  No.  3,  because  its  substantially  shorter  length  would 
help  compensate  for  undesirable  features  of  all  feasible  routes,  such  as  1%  grades, 
higher  summit  elevations,  greater  annual  operating  and  maintenance  costs,  operating 
time  for  traffic,  etc. 

After  further  economic  and  engineering  study  in  1962,  Route  No.  1  was  selected. 

GEOLOGY   AND   TOPOGRAPHY 

The  terrain  along  the  new  line  is  steep,  rugged  and  heavily  forested.  Most 
mountain  peaks  are  between  5,000  and  6,000  ft  above  sea  level  and  the  valley  floors 
range  from  2,000  to  4,000  ft.  Fortine  Creek,  Tobacco  River,  Wolf  Creek  and  Fisher 
River,  all  tributaries  of  the  Kootenai  River,  are  the  principal  streams.  The  area  is 
very  sparsely  populated,  with  few  settlers  and  no  towns  or  villages  along  the  route, 
although  the  area  is  served  by  Forest  Service  and  logging  roads. 

Normal  annual  preciptation  in  the  vicinity  of  Jennings  is  19  inches  and  mean 
snowfall  is  57  inches,  with  correspondingly  greater  amounts  at  higher  elevations. 
Temperatures  vary  from  a  high  of  109  F  to  a  low  of  — 46  F  with  a  mean  annual 
of  44.9  F. 

Sedimentary  rock  is  most  prevalent  in  this  area  although  a  few  igneous  intrusions 
occur  in  scattered  localities.  The  sedimentary  rock  is  largely  composed  of  quartzites 
and  argillites  with  considerable  variations  of  numerous  bedding  planes.  The  rock 
also  has  several  well  defined  jointing  patterns  and  contains  many  faults  which 
present  problems  in  obtaining  stable  cuts. 

The  area  was  largely  covered  with  ice  during  the  Wisconsin  stage  of  the  Cordil- 
leran  Ice  Sheet  and  many  of  the  valleys  were  covered  with  ice  3,000  ft  deep  or  more. 
As  a  result  of  the  glaciation,  much  of  the  area  is  covered  with  glacial  till,  drift, 
ground  moraine,  lacustrine  stratified  silts  and  clays.  The  fine-grained  silts  and  clays 
presented  many  problems  during  construction  as  large  amounts  of  this  material  were 
too  wet  for  constructing  the  roadbed.  Many  areas  required  special  designs  to  improve 
stability.  Sands  and  gravels  along  the  route  were  quite  common,  but  because  of  a 
high  fines  content,  were  unsuitable  for  use  in  concrete  and  marginal  for  other  uses. 
Several  sources  of  quartzitic  rock  were  found  suitable  for  ballast  and  a  metadiorite 
sill  (igneous  fonnation)  adjacent  to  the  new  line  on  the  lower  Fisher  River  was 
selected  for  a  ballast  source. 


Economics   of   Railway   Construction   and   Maintenance  187 


,01.1  ^ j»^^ A° 


^—PRESENT    LOCATION 
'rexforo 

PRESENT  LOCATION 

AND 

PROPOSED   RELOCATION 


Comparison  of  Characteristics 
LiBBY  Line  Relocation 


Ruling  Grade  W.  B. 

Ruling  Grade  E.B 

Line  Change  Distance 

Total  Length  Tangent 

Total  Length  Curves 

Number  of  Curves 

Maximum  Curve 

Total  Central  Angle 

Maximum  Elevation. 

Total  Rise  W.B 

Total  Rise  E.B 


Present 


0.25% 

0.70% 
73.88  Miles 
47.43  Miles 

26.45  Miles 
108 

4°24' 
2899° 
3295  Ft 

19.46  Ft 
1163.12  Ft 


Proposed 


1.00% 
1.00% 
59.35  Miles 
43.18  Miles 
16.17  Miles 
37 
2°24' 
1218° 
3693  Ft 
449.60  Ft 
1601.57  Ft 


Difference 


+       0.75% 
+       0.30% 

-  14.53  Miles 

4.25  Miles 

-  10.28  Miles 

-  71 

-  2°0()' 
-1681° 

+  398  Ft 
+  430.11  Ft 
+  438.45  Ft 


188 


Economics   of  Railway  Construction   and    Maintenance 


Economics  of  Proposed  Line  Change  Compared  with  Present  Line  Between 
Whitefish  and  Troy,  Mont. 


Present  Line 

Route  No.   1 

No.    Units 

Annual  Cost 

No.    Units 

Annual  Cost 

MAINTENANCE  OF  WAY  AND 
STRUCTURES 

134.48 

$ 

13.200 

.578.800 

6,700 

64 , 800 

119.93 

$         8 . 300 

1 2 . 200 

503 . 200 

17.000 

77 .  .500 

26 . 300 

Totals — Maintenance  of  Way  and  Structures 

S     663 , 500 

$     644.500 

MAINTENANCE  OF  EQUIPMENT 

2 , 233 . 982 

3.318.547 

13,798,589 

2,423,060 

$     122.900 

.391,600 

74.900 

64 , 500 

2.087.262 

3.404.616 

12.305.6.58 

2.160.899 

4 

$     1 1 4 , 800 

Locomotive  Repairs,  Gallon  fuel  at  .118 

Freight  Car  Repairs,  G.N.  car  mile  at  .00543  ._ 
Passenger  Car  Repairs,  G.N.  car  mile  at  .0266  _ 

401,700 
66.800 
57 . 500 
76.500 

Totals — Maintenance  of  Equipment 

$     653,900 

$     717.300 

TRANSPORTATION 

Freight  Wages,  train  and  enginemen  @  1.195 
and  1.204  per  mile 

Passenger  Wages,  train  and  enginemen  @ 

408,416 

206 , 696 
3,318,547 

$     488,100 

212,700 

311.900 

43 . 700 

$1,056,400 

364.707 

184.. 33  2 
3.404,616 

94 . 985 

$     439.100 
189.700 

Diesel  Fuel,  .094  gallon 

320.000 

Oil  and  Supplies,  14%  of  fuel _    _ 

44 . 800 

1.100 

Ventilation  Operation 

54 . 800 

$1.049,. 500 

RENTAL  PRIVATE  CARS 

$       74,000 
157,000 
90,000 

$       65 , 900 

Reefers - 

139,900 

Tank  and  Others .    .  _ . 

80 . 200 

Totals — Private  Car  Rental 

$     321,000 

$     286,000 

Net  Additional  Cost  Eureka  Branch  and 
Other  Tracks-  -.. 

0 

80 .  500 

Total  Including  Branch  Line  Operation  and 
Maintenance  _     _    - 

$2 ,  694 , 800 

525,. 300 
3,220.100 

$2,777,800 

Average  Annual  Cost  of  Renewals  Not  Included 
in  Maintenance   of  Way  and  Structures, 

748.700 

Total  Annual  Cost.  . 

3 , 526 , 500 

+   306,400 

Government  will  pay  the  Railway  Company  $6,347,000  as  reimbursement  for 
increased  maintenance  and  operation  costs  due  to  new  elements  in  the  line  change, 
consisting  of  the  7-mile  tunnel,  its  ventilation  system  and  associated  facilities. 

Total  cost  of  construction  of  railway  relocation  including  tunnel   .  .  $98,000,000 


Economics   of   Railway   Construction   and   Maintenance 189 

DESCRIPTION    OF   NEW   LINE   AND    CONSTRUCTION   PROCEDURES 

I.  Construction    Facts 

Grading: 

Clearing     1,930  acres 

Exca\'ation,   unclassified    10,630,661  cu  yd 

Common  borrow    5,394,373  cu  yd 

Embankment    13,218,230  cu  yd 

Sub-ballast    271,692  cu  yd 

Rock  riprap    242,878  cu  yd 

Cuherts: 

Total   number    278 

Total  length   40,083  lin  ft 

Sizes   8  inch  to  120  inch 

Bridges:  Number  Total  Length 

Prestressed  concrete,  ballasted  deck 12  2,071  ft 

Steel  beams,  concrete  ballasted  deck   2  251  ft 

Steel  girder  span,  treated  timber  ballasted  deck        1  127  ft 

Steel    span   on   timber   pile,   pile   and   timber 

approaches    1  147  ft 

Tunnel: 

Total  length 7  miles 

Length,  cut  and  cover  section 1,655  ft 

Excavation 783,423  cu  yd 

Rock   bolts    516,464  lin  ft 

Support  steel    13,582,294  lb 

Reinforcing  steel    6,791,968  lb 

Concrete      207,220  cu  yd 

Tunnel  drainage  system    ( 12-18"   reinf.  concrete)    75,209  lin  ft 

Embedded  drain  pipe  system 13,890  lin  ft 

Average  drilling  progress  per  day 77  lin  ft 

II.  Tunnel    Construction    Procedures 

The  tunnel  was  dri\en  from  one  heading  at  each  end  of  the  tunnel,  three  8-hour 
shifts  per  day,  six  days  per  week.  Major  equipment  at  each  heading  consisted  of  a 
60-ft-long  Jumbo  with  four  drill  levels  carrying  eleven  l?»-inch  rock  drills,  one  5-inch 
bum  hole  drill  and  four  Jackleg  l?»-inch  drills  for  rock  bolting.  A  IM-yd  mucking 
machine,  13-yd-capacity  cars  and  25-ton  diesel  locomotives  were  u.sed  to  handle  exca- 
\ation  materials.  A  single-track  42-inch-gage  (80  lb  rail)  railroad  was  constructed 
for  hauling  muck  and  supplies.  A  sliding  floor  (418  ft  long)  was  u.sed  at  the  head- 
ings and  included  trackage  for  operating  the  jumbo  and  nnicking  machine.  Wntila- 
tion  was  provided  by  an  overhead  46-inch  fan  line  which  delivered  fresh  air  at  the 
rate   of    38,000   cfm. 

Concrete  was  mixed  at  each  portal  in  a  batch  plant  equipped  with  two  2-cu-yd 
mixers  with  a  capacity  of  150  cu  yd  per  hour.  Agitator  cars  having  a  capacity  of 
6  cu  yd  were  used  to  transport  concrete  into  the  timnel. 

The  error  of  closure,  detennined  after  lioling  through,  was  approximately  0.12 
ft  vertical  and  0.41  ft  in  alinement. 

Sequence  of  Operations: 

1.  Timnel  excavation — full  heading   (drilling  and  mucking). 

2.  Set  support  steel  or  place  rock  bolts  and  wire  mesh. 

3.  Pour  concrete  curb  walls. 

4.  Pour  tunnel  invert. 

Bui.  630 


190 


Economics   of  Railway  Construction   and   Maintenance 


East   portal   of   tunnel. 


5.  Place  embedded  items   (arch  drains  and  conduits). 

6.  Place  reinforcing  steel. 

7.  Pour  concrete  lining  by  continuous-pour  method. 

8.  Place  internal  drainage  system  and  sub-ballast. 

III.   Tunnel   Ventilation 

Main  Components: 

1.  Two  2000-hp  fans,  motors  and  auxiliaries.  Fan  capacity — 562,000  cfm  at 
90  F,  flushing  sequence;  305,000  cfm  at  90  F,  ventilation  sequence. 

2.  One  1750-kw  diesel-electric  generator  set  and  aiLxiliaries,  standby  power 
for  one  fan. 

3.  One  200-kw  diesel-electric  generator  set  and  auxiliaries,  standby  power  for 
all  other  tunnel  lighting  and  power  requirements. 

4.  Portal  gate  machinery  control  equipment. 

5.  Electrical  switchgear. 

Operating  Procedures: 

Ventilation  of  die  tunnel  is  required  to  provide  four  specific  functions  as  follows: 

1.  Ventilation  to  provide  a  colmnn  of  air  under  an  established  pressure  to 
provide  cooling  of  an  eastbound  train. 

2.  Flusliing — to  remove  fumes  from  the  tunnel  after  passage  of  any  train 
travelling  in  either  direction  by  the  operation  of  two  ventilating  fans  for 
a  fixed  time  interval  of  18  minutes. 

3.  Purging — the  removal  of  vapors  aliead  of  an  eastbound  train  just  prior  to 
its  reaching  the  east  portal  by  operating  one  fan. 


Economics   of  Railway   Construction   and   Maintenance  191 

4.  Exhausting — tlie  removal  of  vapors,  contaminants  and  smoke  from  the  tun- 
nel by  reversing  the  direction  of  flow  through  the  fans. 

5.  Normal  tumiel  door  position:  closed. 

Safety  Features: 

1.  Fail-safe  provision — in  the  event  of  a  power  failure  tlie  portal  gate  shall 
be  opened  and  the  relief  damper  opened. 

2.  Portal  gate  interlock — portal  gate  to  be  interlocked  with  a  track  circuit 
which  shall  positively  de-energize  the  power  supply  to  tlie  clutch  solenoid 
whenever  a  train  is  within  the  track  block  section. 

3.  Abnormal  tunnel  pressures — the  relief  dampers  shall  be  interlocked  to 
fully  open  when  the  tunnel  pressure  either  exceeds  a  predetermined  posi- 
tive or  becomes  less  than  a  predetermined  negative  value. 

IV.  Track  Structure 

Total  length  of  main  line 59.5  miles 

Total  length  of  secondary  tracks 19.5  miles 

Main  Line  rail  section New  RE  132  lb 

Secondary  track  rail  section Secondliand   112  lb 

Main  line  turnouts  ( 14 )    No.  20 

(   2)    No.  11 

Secondary  track  turnouts  (28)    No.  9 

Main  line  track  welded 58.1  miles 

Average  length  of  welded  strings   1,365  ft 

Number  of  strings 456 

Nvunber  of  welds 15,504 

Welding  process — electric  flash  butt  welding 

Total  number  of  track  ties  (7"x9"-8J^'  and  7"x8"-83^')   .  .  243,600  pieces 

Primary  ballast  (inch  45,000  cu  yd  in  stockpile)    195,000  cu  yd 

Secondary  ballast  (inch  30,000  cu  yd  in  stockpile) 68,000  cu  yd 

Distribution  of  Main-Line  Rail: 

"A"  Rail — Ends  of  strings  (except  tunnel) 
— On  tangents  between  turnouts 
— On  tangents  with  grade  of  0.3%  or  less 
— In  turnouts 
High  Carbon  Rail — On  curves  of  1°  or  more 

— In  the  tunnel 
No.  2  Rail — On  tangents  bet\\'een  turnouts 

— On  tangents  with  grade  of  0.3%  or  less 
No.  1  Rail — All  other  locations 

Distribution  of  Ties: 

No.  5  Hardwood — All  curves  on  main  track 

■ — Ballast  deck  bridges 

■ — Public  crossings 

— ^Tunnel 
No.  5  Softwood — All  other  locations  on  main  track  and  main  sidings 
No.  4  Softwood — All  other  tracks 

Distribution  of  Rail  Anchors: 

Approximately  7488  anchors  per  mile  for  welded  rail.  Four  anchors  per  tic  for 
144  ties  each  side  of  joint  and  foin-  anchors  per  c\i'ry  third  tic  on  rcniaindi'! 
of  string. 
Thirty-two  anchors  per  39-ft  panel  of  jointed  track. 

V.  Track    Laying    and   Ballasting    Procedures 

1.  Prepare  sub-ballast  by  scarif\ing  and  blading. 

2.  Lay   ties   with   contractor-designed    tic   distribution   machine   which   places 


192 


Economics   of   Railway  Construction  and  Maintenance 


) 


Tie  distribution  machine  designed  by  contractor.  It  is  approximately  12  ft  wide  by 
90  ft  long  and  weighs  about  100,000  lb.  As  machine  travels  along  subgrade,  previously 
distributed  tie  bundles  are  placed  on  the  machine  where  tie  plates  are  affixed  to  gage  on 
each   tie  with  two  anchor  spikes   per  tie.  There  are  approximately   14   men  on  the  machine. 


Economics  of  Railway  Construction   and   Maintenance 


193 


The  machine  distributes  the  ties  to  exact  spacing  (some  spacing  was  required  after- 
wards). The  number  of  men  on  the  machine  and  on  the  ground  for  tie  distribution  totals  22. 
Production  averaged   166  ties  per  hour.   Two   10-hour  shifts  were  worked  each  day. 


tie  plates  to  gage,  drives  2  anchor  spikes.  Also,  machine  places  ties  on 
grade  to  exact  spacing.  Rail  temperature  when  laid  must  be  55  F  to  75  F 
except  in  tunnel  and  from  10°  above  ambient  to  not  below  ambient  in 
timnel. 

3.  CWR  placed  by  using  wide-axle  straddle  buggy. 

4.  Spike  every  fifth  tie,  move  steel  train  ahead,  then  adjust  ties,  complete 
spiking,  apply  anchors  and  realine  track  with  autosled. 

5.  Dump  initial  spread  of  ballast,  spread  and  compact  to  a  4-inch  depth  with 
two  passes  of  a  contractor-modified  autosled  equipped  with  vibratory  pan 
compactors. 

6.  Dump  remaining  ballast,  raise  and  tamp  2-inch  lift  with  automatif  power 
tampers. 

7.  Final  lining  and  dressing  with  a  liner  and  ballast  regulator. 

VI.    Signal    System 

A  centralized  traffic  control  system  is  being  installed  between  Stryker  and  Jen- 
nings, a  distance  of  59.5  miles,  and  will  be  controlled  from  a  master  control  center 
at  Spokane,  Wash. 

The  signal  system  will  include  circuits  to  tie  in  the  rock-slide  detector  fences, 
also  dragging  eciuipment  detectors  and  hot  box  detectors  which  are  located  on  both 
ends  of  the  tunnel.  Additional  .signal  circuits  will  control  various  functions  of  the 
tunnel  ventilation  system.  The  signal  lines  are  carried  on  the  open  pole  line.  e.\cept 
the  timnel  .section  which  is  in  conduit. 


VII.    Communications 

The  communication  system  consists  of  telephone  circuits  and  subscriber  carrier 
circuits  carried  on  an  open  pole  line  except  for  the  section  in  the  timnel  which  is 
in  conduit.  The  pole  line  is  constructed  with  butt  treated  western  r. -1  .dir  i.ol.  >, 
and  penta-treated  Douglas  fir  crossarms. 


194 


Economics   of  Railway   Construction   and   Maintenance 


|M||        Wide-axle    machine    pulling    CWR    from    rail 
cars  onto  rollers  resting  on  ties. 


The  radio  system  consists  of  a  two-way  VHF  radio  system,  frequency  modu- 
lated and  operated  within  the  railroad  band.  Radio  stations  are  located  at  Stryker, 
East  Portal,  West  Portal,  Tamarack  and  Riverview  in  addition  to  the  four  stations 
within  the  tunnel.  An  overhead  antenna  is  mounted  in  the  tunnel  to  insure  con- 
tinuous radio  coverage. 

VIII.    Station    Facilities 

In  addition  to  the  depot  and  maintenance  tool  house  at  Stryker,  housing  is 
provided  for  a  signal  maintainer  and  ventilation  engineer.   At  Wolf  Prairie,  hous- 


Economics  of  Railway   Construction   and   Maintenance  195 


H    >'<}  lilT  i;i  (100 

1' 

H   I.TW'T  4:uuu\ 

'  ^_^^ 

RF' "        ---^"^iHBlHi 

^HV'"'1flMII 

■K^^^'.jgl^l^^llJjM^^                                        m^^HH^^^^^^^Hj 

^^H^^^^^^^^H 

Wlh -^^^^^^^Hl                       ^..^^^B^^^l 

_^_p 

n^P^^^^I^^^^BH^^H 

BP^^ 

^^_/ 

Ballast  being  dumped  through   ballast  doors  newly  designed  to  be  opened  and  closed  at  wil 
They    provide    greater   versatility    in   spot   spreading    and   trim   spreading   of   ballast. 


:!4ii 


196  Economics   of  Railway  Construction   and  Maintenance 


Plow   attached    to   car  a7   rear  of   ballast   train    for   distributing    ballast. 


ing   is   provided   for   a   signal   maintainer,   track   gang   foreman   and   five   laborers   in 
addition  to  a  maintenance  tool  house. 


This  project  has  been  a  cooperative  venture  between  the  Corps  of  Engineers 
and  the  Creat  Northern  RaiWay  (now  Burlington  Northern,  Inc.).  The  Corps  pre- 
pared plans  and  specifications  and  administered  the  construction  contracts.  The 
Railway  Company  furnished  information  for  track,  signal  and  communication  speci- 
fications and  assisted  in  the  inspections.  The  cost  of  the  project  is  borne  by  the 
Government,  but  the  cost  of  betterments,  consisting  of  CTC  system  ( in  lieu  of  auto- 
matic block  signals)  and  132-lb  main-line  rail  (in  lieu  of  115-lb  rail)  is  borne  by  the 
Railway. 

It  is  evident  that  the  contractor  used  innovations  to  substantially  reduce  the 
cost  of  constructing  this  line  by  using  a  newly  developed  tie  distribution  machine, 
hopper  cars  equipped  with  special  ballast  doors  to  regulate  the  flow  of  ballast, 
ballast   compaction   units   attached   to  sled,   and  efficient   methods   of  handling   rail. 


Economics  of   Railway   Construction   and   Maintenance 


197 


Vibratory  compactors  used  with  auto- 
sled  on  initial  4-inch  raise  on  ballast.  It 
compacts  the  ballast  bed  which  normally  is 
compacted  over  a  long  period  of  time  by 
the  passage  of  trains.  The  compactor  requires 
a  heavy  ballast  spread  to  avoid  center- 
bound  ties. 


Lining   track. 


198 


Economics  of  Railway  Construction  and  Maintenance 


Report  on  Assignment  2 

Economics   of  various  types  of  highway-railway  grade 

crossing   installations,   including   full-depth   timbers, 

planking,  shallow  blacktop,  full-depth  blacktop  (3 

to  6  inches  below  tie  to  top  of  rail),  shallow 

concrete,  full-depth  concrete,  cast  steel 

and  rubber 

R.  A.  Kendall  (chairman,  subcommittee),  A.  D.  Alderson,  L.  B.  Cann,  Jr.,  J.  A. 
Caywood,  p.  a.  Cosgrove,  W.  M.  S.  Dunn,  J.  E.  Eisemann,  L.  C.  Gilbert, 
J.  K.  Gloster,  C.  R.  Harrell,  R.  P.  Howell,  J.  M.  Lowry,  R.  G.  Maughan, 
C.  L.  Robinson,  H.  W.  Seeley,  A.  E.  Shaw,  Jr.,  J.  E.  Sunderland,  W.  B. 
Throckmorton,   R.   H.  Uhrich,   G.   H.  Winter,  B.  J.  Worley. 

Your  committee  submits  the  following  report  as  information. 

A  questionnaire  was  submitted  to  Member  Roads  in  the  United  Stales  and 
Canada.  Answers  were  received  from  34  railroads  and  provide  the  basic  informa- 
tion for  this  report. 

From  the  information  received  in  the  questionnaire,  it  was  determined  that 
standard    construction    practice    is    divided    as    follows    by    classification    of    service: 


Mai7i 
Tracks 

Branch  or 

Secondary 

Tracks 

Primarv  or 

*Solid  timber                          .          _          . 

50% 

39% 

3% 

3% 

5% 

44% 

main  highways 

Shallow  blacktop  with  flange  way  timber 

Full-depth  blacktop  with  flange  way  timber_ 
Rail 

29% 
3% 

Other 

Plank     __   

15% 
9% 

Secondary 
roads 

Shallow  blacktop  with  flange  way  timber 

Solid  timber                                     __   . 

56% 
20% 
12% 

8% 
4% 

57% 
4% 

Shallow  blacktop  without  timber 

Plank 

Other 

14% 
21% 

4% 

*A11  timber  or  plank  referred  to  in  this  report  is  treated. 


The  reasons  for  selection  of  a  particular  type  of  crossing  were  basically  eco- 
nomic. Initial  labor  and  material  costs  were  considered  and  balanced  against  main- 
tenance costs.  Availability  of  materials  and  simplicity  of  construction  were  also 
factors   which  entered   into   the   selection   of   the  specific   crossing   construction. 

Between  periods  of  complete  reconstruction,  which  includes  tie  and  rail  re- 
placement, 67  percent  of  the  reporting  roads  find  it  necessary  to  remove  the  surface 
material  of  the  crossing  in  order  to  tamp  or  align  the  track  in  the  crossing  area. 
The  amount  of  labor  required  to  remove  and  replace  various  types  of  crossings  is 
listed  below.  This  may  vary  widely  depending  on  traffic  conditions,  both  rail  and 
highway. 


Economics   of   Railway   Construction   and   Maintenance 


199 


Crossing  Type 


Solid  timber 

Planking 

Shallow  blacktop  with  flangeway  timber 

Full-depth  blacktop  with  flangeway  timber 

Shallow  concrete 

Full-depth  concrete 

Cast  steel  and  rubber 


Man-  Hours 
Per  Foot 


3.2 
2.2 
2.6 
6.0 
4.0 
No  figure 
4.5 


The  availability  of  mechaniLal  or  hydraulic  digging  machines  for  crossing  work 
has  changed  the  standard  for  crossing  construction  for  537c  of  the  reporting  roads, 
and  resulted  in  improved  efficiency  for  another  lOf . 

Crossing  maintenance  is  performed  by  section  forces  for  oO%  of  the  roads  re- 
porting. Specialized  gangs  were  utilized  for  30%  of  the  work,  with  production  ( tie 
or  surfacing)  gangs  assisted  by  section  or  bridge  and  building  gangs  performing 
the  remaining  20%  of  the  crossing  work. 

Crossing  gangs,  where  used,  consist  of  6  to  16  men,  with  a  median  of  8  men. 
The  most  frequent  organization  consists  of: 

Foreman 

Truck  driver 

Back  hoe   or  hydraulic   tractor   operator 

4  or  more  laborers 

The  machinery  used  in  crossing  work  is  as  follows: 

Back  hoe  or  hydraulic  digger   67% 

Air   compressor    50% 

Dump  truck,  roller,  or  spot  tamper  as  needed. 

The  preference  for  specific  types  of  crossings  because  of  adaptability  to  cross- 
ing gang  maintenance  is: 

Blacktop  with  flangeway  timber   33? 

Solid  timber  28% 

Plank 3% 

No  preference  shown    36'i 

The  specific  maintenance  operations  required  for  each  particular  crossing  arc 
listed  below: 

Full-depth  timber  Retighten  fasteners. 

Planking  Install  additional   fasteners   and   replace   broken 

planks. 

Shallow  blacktop  Patch  and  retighten  fasteners. 

Full-depth  blacktop  Patch  and  retighten  fasteners. 

Shallow  concrete  Reset  slabs. 

Full-depth  concrete  None  listed. 

Cast  steel  and  rubber  Replace  shims  and  retighten  fasteners. 


200 


Economics   of  Railway  Construction   and   Maintenance 


A  table  has  been  compiled  to  indicate  the  economics  of  various  crossing  types. 
This  is  a  guide  only,  which  provides  a  comparison  for  the  experienced  user.  Class 
of   service,   both   rail   and   highway  and   other  local  conditions,  must  be  considered. 

Interest  charges  on  investment  and  freight  cliarges  have  not  been  considered. 
The  costs  tabulated  do  not  include  track  preparation;  only  building  the  crossing  on 
the  prepared  track  is  considered. 


Tupe 

Installation 

Mainte- 
nance 
(Annual) 

Avg. 
Life 

Cost  Per 
Year 

Material 

Labor 

Full-depth  timber 

Planking 

'Full-depth  blacktop 

'Shallow  blacktop 

^Full-depth  concrete 

Cast  steel  and  rubber 

%  22. 00 /ft 

20.00/ft 

10.76/ft 

7.56/ft 

10.40/ft 

114.00/ft 

$  5.30/ft 
6. 40/ft 
14. 80/ft 
6.00/ft 
3.70/ft 
6.90/ft 

$  1.85/ft 
4.25/ft 
1.85/ft 
3.25/ft 

12  vrs. 

8  yrs. 

9  yrs. 
6  vrs. 

20  yrs. 
16  yrs. 

$  4.13/ft 
7.55/ft 
4. 69/ft 
5. 51 /ft 
0.70/ft 

1.05/ft 

8.60/ft 

'  Includes  flangeway  guard  timbers. 

-Basic  use  is  for  industrial  tracks  and  specialized  locations.  Not  in  general  use  for  situation.s  where 
track  speed  or  tonnage  will  require  track  maintenance  during  life  of  the  crossing.  The  cost  to  remove 
for  track  maintenance  is  extremely  high.  The  time  interval  required  for  construction  or  removal  is  not 
compatible  with  either  rail  or  highway  traffic  requirements  in  most  circumstances.  Variations  in  costs 
are  extreme,  depending  on  conditions  at  the  individual  location. 


No  analysis  of  shallow  concrete  construction  is  included  in  the  table.  The  34 
railroads  which  replied  to  the  questionnaire  did  not  recommend  its  use  and  no 
cost  figures  were  available. 

In  all  types  of  crossing  construction,  the  use  of  welded  rail  is  recommended. 
The  presence  of  joints  in  or  near  the  crossing  will  shorten  the  life  of  the  crossing 
and  result  in  higher  annual  costs.  Some  roads  also  specify  the  placing  of  tie  pads 
under  the  rail  to  lengthen  crossing  life.  This  practice  is  not  universal  and  this  report 
does  not  discuss  the  economics  of  tie  pads. 

Adequate  drainage  and  good  workmanship  are  two  other  items  which  are  man- 
datory to  obtain  the  ma.ximum  life  from  any  crossing  construction.  It  is  more  eco- 
nomical to  completely  close  a  crossing  to  highway  traffic  when  rebuilding.  Lower 
costs,  improved  quality,  and  thus  a  longer  lasting  crossing  will  result  with  less 
overall  delay  to  the  highway  user. 


Economics  of   Railway  Construction   and  Maintenance  201 

Report   on   Assignment   3 

Economics  of  headquarters  maintenance  of  way  gangs 
versus  floating  gangs  in  view  of  recent  arbitration  award 

G.  E.  Warfel  (chairman,  stibconimittec),  A.  D.  Alderson,  E.  R.  Anderson,  R.  J. 
AscHMEYER,  VV.  S.  AuTREY,  C.  J.  Bryan,  A.  W.  Carlson,  J.  I.  Casueer,  Jr., 
S.  A.  Cooper,  C.  G.  Davis,  L.  E.  Donovan,  H.  B.  Durrant,  W.  J.  Jones, 
M.  D.  Kenyon,  a.  L.  Maynard,  J.  R.  Miller,  D.  F.  Richardson,  C.  L.  Roij- 
iNSON,  H.  W.  Seeley,  John  Stang,  J.  T.  Sullivan,  John  T.  Ward,  G.  H.  Win- 
ter, B.  J.  WORLEY. 

Your   committee  submits   the  followinjf  report  as  information. 

A  questionnaire  was  submitted  to  Member  Roads  in  the  United  States  and 
Canada.  Answers  were  received  from  25  railroads,  of  which  number  11  railroads 
were  not  involved  in  the  298  Award  or  did  not  have  sufficient  data  to  answer  the 
questionnaire.   From   the  answers   received,   we   have   compiled   the  following: 

Five  railroads,  with  29,000  miles  of  main  line,  made  no  change  in  their  gang 
organization  after  the  Arbitration  Award.  The  average  travel  time  for  both  Fixed 
and  Floating  Headquarter  Gangs  is  45  minutes.  The  average  annual  cost  for  the 
298  Award  is  $840  for  Floating  Gang  employe,  plus  an  annual  cost  of  $470  per 
employe  for  outfit  cars. 

Five  railroads,  with  18,000  miles  of  main  line,  changed  less  than  10%  of  the 
gangs  from  Floating  to  Fixed  Headquarter  Gangs  after  the  Award.  The  average 
travel  time  for  Fixed  Headquarter  Gangs  is  60  minutes  per  day.  The  average  travel 
time  for  Floating  Headquarter  Cangs  is  o5  minutes  per  day.  Annual  cost  for  the 
298  Award  for  Floating  Gang  employe  is  $684,  plus  an  annual  cost  of  $520  per 
employe  for  outfit  cars. 

Four  railroads,  with  12,700  miles  of  main  line,  changed  from  105?.  to  99%  of 
their  gangs  from  Floating  Headquarters  to  Fixed  Headquarters.  The  average  travel 
time  for  the  Fixed  Headquarter  Gangs  is  1  hour  and  30  minutes.  The  average  travel 
time  for  Floating  Headquarter  Gangs  is  30  minutes.  The  annual  cost  of  the  Award 
is  $780  for  Floating  Gang  employe,  plus  $340  annual  expense  per  employe  for 
outfit  cars. 

The  298  Award  did  not  change  the  Bridge  &  Building  Organi/atioii  appre- 
ciably. The  railroads  responding  to  the  questionnaire  changed  only  one  or  two 
gangs  from  Floating  to  Fi.xed  Headquarters,  with  little  increa.se  in  tra\el  time.  The 
298  Award  cost  per  B&B  employe  varies  from  $408  to  $1,152  aniuially.  In  addi- 
tion, the  annual  cost  of  outfit  cars  per  B&B  employe  varies  from  $230  to  $835, 
depending   on   contractual   or  legal   recjuirements. 

In  conclusion,  the  annual  cost  per  employe  for  outfit  cars  includes  the  annual 
maintenance  cost  plus  the  annual  operational  cost  of  the  outfit  cars.  Floating  gangs 
with  outfit  cars  can  be  justified  when  the  cost  of  the  298  Award  plus  the  cost  of 
outfit  cars  is  less  than  the  difference  in  the  cost  of  tra\el  time  between  Fixed  an.! 
Floating  Headquarter  Gangs  and  when  due  consideration  is  given  to  tlie  differeiKi- 
in  the  daily  productive  hours  of  work  at  the  job  site  as  multiplied  b>-  the  1iouiI> 
wage  rate  of  the  gangs  under  comparison. 


Report  of  Committee    13 — Environmental   Engineering 

J.  L.  Goss  P.  M.  Miller 

A.  F.  BuTcosK  E.  T.  Myers 

P.  P.  DuNAVANT,  Jr.  G.  H.  Nick 

R.  S.  Bryan,  Jr.  M.  F.  Obrecht 

T.  L.  Hexdrix  C.  a.  Obma 

H.  W.  AzER  H.  Parrish,  Jr. 

R.  C.  Archambeault  W.  D.  Peters 

W.  F.  Arksey  C.  E.  Peterson 

R.  A.  Bardwell  J.  a.  Pruett 

R.  C.  Brownlee  a.  D.  Ranklns 

L.  R.  Burdge  J.  C.  Roberts 

D.  E.  Drake  N.  E.  Smith 

A.  E.  Dulik  C.  a.  Stokes 

J.  L.  Engler  a.  E.  Speers 

H.  E.  Graham  T.  A.  Tennyson 

J.  W.  Gwyn  L.  R.  Tierney 

T.  L.  Hendrix  C.  B.  Voitelle 

C.  F.  Muelder,  r   r  Holmes  E.  M.  Walters 

Chairman  ^   §  Johnson  J.  M.  Wetzel 

C.  E.  DeGeer,  F.  O.  Klemstine  .T-  E.  Wiggins 

Vice  Chairman  h.  L.  McMullen  (E)  j.  W.  Zwick 

J.  J.  Dwyer,  Secretary  W.  H.  Melgren  Committee 

(E)  Member  Emeritus. 

Those   whose   names   are   shown   in   boldface,   in   addition  to  the   chairman,   vice  chairman  and 
secretary,    are   the   subcommittee   chairmen. 

To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

B.  Revision  of  Manual. 

Complete  revision  of  Chapter  13  was  accomplished  last  year.  No  recom- 
mendations are  made  for  revision  of  the  Manual  at  this  time. 

1.  Water  pollution  control. 

Progress  report,   submitted  as  information    page  204 

2.  Air  pollution  control. 

Progress  report,  submitted  as  information    page  217 

3.  Land  pollution  control. 

Brief  progress  statement,  submitted  as  information   page  225 

4.  Industrial  hygiene. 

Progress   report,  submitted  as  information    page  225 

5.  Plant  utilities. 
No  report. 

Note:    Discussion  on  subcommittee   reports  herein  closes  on   Ianuar>-   18,   1971. 

203 


204 Environmental    Engineering 

6.  Corrosion  control. 

Progress  report,  submitted  as  infomiation    page  226 

The  CoMMirrEE  on  Environmental  Engineering, 

C.  F.  Muelder,  Chairman. 


AREA  Bulletin  630,  November-December  1970. 


Report  on   Assignment   1 
Water  pollution   control 

J.  L.  Goss  (chairman,  subcommittee),  G.  H.  Nick  (vice  chairman,  subcommittee), 
J.  L.  Engler,  W.  H.  Melgren,  C.  A.  Obma,  J.  A.  Pruett,  J.  C.  Roberts, 
C.  B.  Voitelle. 

During  the  past  year.  Subcommittee  1  has  been  preparing  a  report  on  tlie  design 
of  facihties  for  treatment  of  railway  waste  water.  The  design  of  railroad  facilities 
was  broken  down  into  three  categories.  This  report  covers  the  treatment  of  two  of 
these.  The  third  category  will  be  the  subject  of  study  for  next  year. 

1.2.5  Design  of  Facilities 

(a)  A  "systems  approach"  should  be  used  in  selecting  the  proper  equipment 
for  the  most  economical  and  satisfactory  solution  for  handling  liquid  waste  treat- 
ment and  disposal  problems.  The  basic  parameters  in  design  of  a  treatment  system 
depend  on  the  liquid  waste  composition,  permissible  discharge  levels  and  tlie 
amenability  of  the  pollutants  to  treatment. 

(b)  Liquid  wastes  from  railway  operations  most  generally  fall  into  three  cate- 
gories as  follows: 

1.  Waste  oils — free  floating,  little  or  no  emulsions,  minimum  settleahle  solids: 
Controlled  by  a  gravity  type  clarifier. 

2.  Waste  oils — free  floating,  with  emulsions;  with  settleahle  solids:  Controlled 
by  methods  and  equipment  designed  to  regulate  pH,  break  emulsions,  re- 
move settleahle  solids. 

3.  Waste  water  with  pollutants  other  than  oils,  greases  or  sanitary  waste, 
having  a  B.O.D.:  Such  as  from  box  car  cleaning  and  washing.  Controlled 
by  removal  of  settleahle  solids,  pH  control,  flotation  of  suspended  solids 
and  subsequent  removal. 

1.2.5.1  Waste  Oils — Free  Floating,  Containing  Little  or  no  Emulsions  with  a 
Minimum  of  Settleahle  Solids;  Controlled  by  a  Gravity-Type  Separator 

(a)  Free  oils  and  grease  in  waste  water  with  little  or  no  emulsions  and  a 
minimum  of  settleahle  solids  such  as  that  discharged  from  a  diesel  fuel  handling 
area  should  be  trapped  and  removed,  if  possible,  prior  to  mixing  with  other  wastes 
which  may  produce  emulsions  that  are  extremely  difficult  to  break.  Sources  of  waste 
which  may  produce  emulsions  are  from  cleaning  vats,  rag  laundries,  filter  cleaning, 
paint  stripping,  locomotive  washing  tracks  and  other  areas  where  cleaning  com- 
pounds are  used.  Water-borne  oily  waste  without  emulsions  are  seldom  found;  tliere- 
fore,  design  details  and  means  provided  for  separation  of  oil  to  produce  a  clean 


^_____ Environmental    Engin  e  e  r  i  n  g  205 

eflfluent  suitable  for  release  into  a  surface  stream  will  vary  widely,  depending  on 
waste  water  characteristics,  topography,  pollution  control  agency  requirements,  and 
economics. 

(b)  Separators  for  removal  of  free  oil  are  divided  into  two  basic  groups — 
those  employing  a  surface  skimming  device  and  those  using  a  rotating  oil  pickup 
mechanism  with  plastic  or  nylon  belts  for  oil  removal.  Both  types  are  available 
commercially.  Belt-type  skimmers  are  usually  furnished  with  a  free-floating  sub- 
merged tail  pulley  installed  in  guide  slots.  The  tail  pulley  provides  belt  alignment 
and  tension.  Belt  skimmers  are  especially  effective  if  the  oil  is  of  heavy  gravity  or 
if  of  necessity  the  water  level  fluctuates  widely.  One  type  of  surface  skimmer  in 
general  use  is  die  power-drixen  flight  skimmer  as  illustrated  in  Fig.  1-D.  This 
skimmer  consists  of  wood  or  Neoprene-backed  metal  flights  attached  about  5  ft 
apart  to  two  endless  strands  of  chain.  The  flights  are  driven  by  a  gear  drive  at 
about  5  ft  per  minute,  skimming  the  surface  of  the  separator  vessel  and  gently 
propelling  the  floating  material  and  free-floating  oil  to  and  up  a  low  ramp  into  a 
trough  from  which  it  flows  to  a  storage  receptacle.  The  water  level  in  the  separator 
is  controlled  by  an  outlet  weir  trough,  with  adjustable  overflow  plates.  These 
skimmers  are  furnished  commercially,  either  shop  assembled  in  a  package  separator, 
or  separate  for  installation  in  a  concrete  basin.  Light-gravity  oils  as  well  as  heavy 
oils,  grease  scum  and  floating  trash  are  removed  with  low  water  carryover  in  the 
skimmed  oil. 

(c)  Where  topography  permits,  the  separators  should  be  installed  below  the 
waste  water  outfall  to  avoid  pumping  \\hich  tends  to  agitate  the  oil  water  mixture, 
producing   emulsions  making  separation   more  difficult. 

(d)  In  selection  of  a  separator,  it  should  be  kept  in  mind  that  for  best  per- 
foniiance,  oil  must  be  removed  from  the  separator  as  quickly  as  possible.  If  the 
percentage  of  oil  in  the  waste  water  is  great  enough  to  maintain  a  heavy  layer  of 
oil  behind  the  retaining  weir  or  baffle,  a  surface  skimmer  usually  performs  well; 
however,  if  the  quantity  of  oil  is  such  that  only  a  thin  film  exists,  a  belt,  drum,  or 
other  rotating  oil  pickup  device  is  efficient.  Some  equipment  manufacturers  ha\e 
attempted  to  overcome  this  deficiency  in  the  surface  skimmer  by  use  of  an  electrical 
pickup  system  mounted  on  oil-filled  floats.  Confirmed  information  concerning  the 
effectiveness  of  such  a  system  is  not  available  at  this  time,  although  it  is  claimed 
that  the  device  will  not  pick  up  below  the  surface  oil. 

(e)  Where  the  volume  of  oil-bearing  runoff  will  vary  widel>-  with  the  intensity 
of  rainfall,  consideration  should  be  given  to  the  installation  of  a  retaining  sump  to 
be  used  in  conjunction  with  a  separating  unit.  Use  of  an  installation  such  as  that 
illustrated  in  Fig.  1-A  will  permit  use  of  a  much  smaller  separator  than  would  be 
required  should  it  be  necessary  to  pass  the  entire  nmoff  through  the  imit.  The  sump 
is  usually  designed  for  a  retention  time  of  about  15  minutes  for  normal  rainfall.  If 
the  drainage  area  consists  of  unpaved  surfaces  or  platforms  where  engines  are  sanded, 
a  sand  trap  must  be  constructed  in  front  of  the  sump  inlet.  The  oil-retaining  baffle 
should  extend  from  about  6  inches  above  the  normal  water  surface  to  approximate!) 
half-way  to  the  sump  bottom.  A  submersible  pump  is  located  at  an  elevation  such 
that  it  will  continuously  skim  the  surface  during  normal  flow.  One  or  more  additional 
pumps  may  be  installed  at  progressi\el\'  higher  elevations  in  order  that  oil  will  be 
picked  up  mitil  such  time  as  the  vohnne  of  water  is  sufficient  to  dilute  the  oil  to  an 
acceptable  percentage.  A  rainfall  of  sufficient  intensity  and  duration  to  completeb 
inundate  the  sump,  will  produce  only  temporary  ineffectiveness  of  the  system.  The 


206                                   Environmental    Engineering 

1    E  :E  end                                                      1 

/, 

NLE  T    WEI  R    OPTIONAL 

F 

J  JT  FAL  L 

B 

0  /ERFLOW    BAFFLE 

r, 

0     F  T.    Dl  A.    CONG.   PIPE 

r 

UNDERFLOW     BAFFLE 

hi 

SUBMERSIBLE    PUMP 

I  ■, 

PL.Vlf    BRACKET     ADJUSTABLE 

1 

OIL-WATER     LINE 

E 

OIL    RETAINING     SLEEVE 

A        F 


PLAN 


.0         t 


t, 


y' 


SECTION     A-A 


FIG.I-A 


Environmental    Engineering 


207 


^EGEND                            1 

A 

OIL-  WATER    INLE  T  * 

B 

C 

INLET    SECTION 

QUIESCENCE    BAFFLES 

D 

SEPARATOR     SECTION 

E 

OIL    =ICK-UP    DEVICE 

F 

UNDERFLOW     BAFFLE 

G 

OVERFLOW    BAFFLE 

hi 

DISCHARGE    SECTION 

1 

BEL0W-5URFACE    DISCHARGE 

J 

OUTFALL 

K 

DRAIN    PLUG    OR    VALVE 

L 

ELECTRICAL     PANEL 

M 

OIL     SUMP 

N 

OIL  LINE     TO    STORAGE 

0 

MANUAL    Ol^    RECOVERY 

* 

WEIR    &   SCREEN    OPTIONAL 

SECTION    A-A 


B 


208 Environmental    Engineering 

distance  from  normal  water  surface  or  outfall  invert  to  the  top  of  oil-retaining 
baffle  determines  the  maximum  flow  capacity  of  the  sump  and  the  point  at  which 
dilution  must  compensate  for  oil  removal.  Since  the  establishment  of  this  distance 
is,  to  some  extent,  a  guess,  approval  of  the  pollution  control  agency  having  juris- 
diction should  be  obtained  prior  to  making  such  an  installation. 

(f)  Capacity  of  a  sump  or  separator  can  sometimes  be  increased  by  the  addi- 
tion of  an  emulsion  breaker  injected  at  a  rate  based  on  laboratory  and  field  tests. 
Addition  of  suitable  chemicals  will  accelerate  the  demulsification  and  enhance  the 
flotation  of  oil,  reducing  the  required  retention  time,  thus  increasing  the  capacity  of 
the  system. 

( g )  Satisfactory  performance  of  any  water  treatment  facility — and  this  includes 
simple  oil-water  separation — is  dependent  upon  thorough  laboratory  and  field  investi- 
gation and  proper  interpretation  of  test  results.  Bench  tests  made  on  the  site  must 
be  used  to  check  all  laboratory  reports  since  samples  can,  and  do,  change  consid- 
erably between  the  time  they  are  taken  and  the  laboratory  analysis.  A  series  of 
bottle  tests  is  recommended  for  sizing  the  separator  or  sump  vessel.  A  series  of 
numbered  bottles  each  containing  identical  and  typical  samples  is  sufficient  for 
this  work.  A  slight  adjustment  of  the  pH,  either  upward  or  downward,  may  prove 
beneficial  in  accelerating  the  flotation  of  oil.  The  addition  of  specific  quantities  of 
an  emulsion  breaker  to  each  of  the  several  samples  will  assist  in  determining  if 
the  chemical  addition  will  economically  improve  effluent  quality  or  permit  a  reduc- 
tion in  size  of  the  separator. 

(h)  Since  most  emulsion  breakers  perform  best  within  a  specific  pH  range, 
the  test  should  include  two  or  more  samples,  for  each  chemical  to  be  tested,  adjusted 
by  the  addition  of  sulfuric  acid  or  an  alkali.  The  chemicals,  preferably  from  more 
than  one  manufacturer,  are  added  to  the  sample  and  gently  stirred.  The  preliminary 
test  should  be  wide  enough  in  scope — say  from  5  to  75  ppm  chemical  added — to 
determine  if  there  is  any  difference  in  the  test  samples  after  5,  10  and  15  minutes 
settling  time.  If  one  sample  shows  a  distinct  improvement  in  appearance  over  all 
others,  the  testing  can  then  be  narrowed  in  range  to  find  the  optimum  dosage  and 
pH.  The  pH  of  waste  waters  can  to  some  extent  be  controlled  by  selecting  a 
specific  type  of  cleaning  compound  in  the  areas  where  used. 

(i)  If  chemical  additives  are  desirable  or  necessary,  it  is  advisable  to  install  a 
metering  device  at  the  vessel  inlet  for  proportional  flow  application  or  pH  adjust- 
ment. A  chart  indicating  the  setting  of  the  metering  pump  corresponding  to  a  given 
flow  is  beneficial  in  maintaining  optimum  balance.  Not  only  is  performance  adversely 
aff^ected  by  the  addition  of  too  much  additive,  as  well  as  too  little,  but  there  is  also 
a  cost  factor  involved. 

(j)  Specific  design  details  of  belt  and  drum  skimmers  are  omitted  since  they 
are  readily  available  from  a  number  of  manufacturers  who  are  capable  of  modifying 
or  adapting  their  units  to  conditions,  as  determined  by  investigation. 

(k)  Optimum  rotational  speed  of  the  belt  or  drum  skimming  equipment  varies 
between  Yi  ft  per  second  and  IM  ft  per  second,  depending  upon  temperature,  viscosity, 
and  amount  of  oil  available  for  pickup;  dierefore,  it  should  be  adjustable  within  this 
range.  Pickup  of  water  along  with  the  oil  increases  directly  with  an  increase  in 
rotational  speed,  making  it  desirable  to  operate  the  mechanism  no  faster  than  is 
required  to  remove  the  oil  as  it  collects.  Inasmuch  as  there  will  be  some  pickup  of 
water,  a  water  drain  is  necessary  in  the  recovered  oil  storage  tank.  Water  drained 
from  the  tank  should  be  returned  to  the  separator,  by  pumping,  if  necessary. 


Environmental    Engineerin 


209 


Srr.TION   A-A 


210 


Environmental    Engineerinj; 


1 

'in 

1 

^ 

r — ~- 

'• 

s 

i\ 

'• 

(1 

—  v 

ioi 

V -'- 

Environmental    Engineering 211 

( 1 )  The  oil  separator  vessel  consists  of  three  basic  sections,  each  of  which 
performs  specific  functions.  The  inlet  section  which  may  include  or  be  preceded 
by  a  grit  and/or  trash  collector,  serves  to  reduce  flow  velocity  and  turbulence  for 
collection  of  oil.  Where  required,  a  bar  screen  cleaned  either  manually  or  auto- 
matically, may  be  installed  at  the  separator  inlet.  A  grit  collector  which  may  be 
equipped  with  a  screw  or  drag  conveyor  or  manually  cleaned,  will  prevent  rapid 
silting  of  the  separator  vessel  and  will  increase  the  time  between  shutdowns  for 
sand  and  silt  removal.  When  the  addition  of  a  chemical  emulsion  breaker  is  desirable, 
it  should  be  added  at  a  pimip  inlet,  if  pumps  are  used,  otherwise,  at  the  separator 
inlet,  and  the  separator  inlet  should  be  sized  to  permit  a  velocity  of  appro.\imately 
15  ft  per  minute.  Velocity  may  be  somewhat  less,  if  necessary,  to  provide  the  reten- 
tion time,  as  determined  by  field  tests. 

(m)  The  separator  section  is  designed  for  a  quiescent  flow  to  permit  the  oil, 
\\'hich  enters  this  section  floating  on  the  water  surface,  to  remain  so  for  pickup  by 
the  skimmer.  The  oil-retaining  baSle  should  extend  far  enough  below  the  surface 
to  prevent  oil  being  carried  underneath;  however,  it  should  not  extend  so  near  the 
vessel  bottom  that  silt  and  settled  solids  will  be  picked  up  by  the  flow  velocity. 
The  baffle  should  extend  approximately  24  inches  below  the  oil  surface,  or  about 
half-way  to  the  tank  bottom.  The  skimmer  is  located  4  to  8  inches  from  the  baffle 
depending  upon  the  type  used. 

(n)  If  design  of  the  inlet  and  separator  sections  are  properly  balanced  with 
respect  to  volumes  and  velocities,  the  discharge  should  be  relatively  free  of  oil; 
however,  there  is,  on  occasion,  some  emulsification  of  oil  that  cannot  be  avoided; 
therefore,  it  is  ad\'isable  to  design  the  outlet  to  provide  an  additional  oil-retaining 
section  that  can  be  skimmed  periodically,  if  required.  This  can  be  accomplished  by 
extending  the  outfall  pipeline  to  a  point  of  about  one-third  of  the  tank  deptli,  or  b\ 
a  sleeve  around  the  outlet.  The  sleeve  should  extend  18  to  24  inches  below  the 
water  surface. 

(o)  The  pH  control  is  usually  unncessary  where  only  free  oil  is  receixed;  how- 
ever, the  retention  section  provides  a  place  for  the  addition  of  a  mild  caustic  solution 
or  an  acid  to  change  the  pH  for  emulsion  breaking. 

( p )  Oil  recovered  by  the  separator  may  be  either  drained  by  gra\ity,  or  pumped 
from  the  oil  recovery  sump  to  the  storage  tank.  Recovered  oil  may  be  disposed  of 
by  burning  it  as  a  fuel,  used  in  a  weed  and  brush  spray  program,  or  sold.  Incinera- 
tion may  in  some  cases  prove  to  be  a  satisfactory  means  of  disposal;  however,  with- 
out proper  design,  it  is  usually  unsatisfactory  and  could  result  in  \iolation  of  air 
pollution  regulations. 

(q)  Fig.  1-B  .shows  a  typical  separator  vessel  for  use  with  a  belt  or  drum-t\pe 
oil  pickup  device  while  Fig.  1-C  shows  a  ves.sel  for  use  with  a  surface  skimmer. 

1.2.5,2  Waste  Oils — Free  Floating,  with  Emulsions  and  Settleable  Solids;  Con- 
trolled by  Methods  and  Equipment  Designed  to  Regulate  pH,  Rreak 
Emulsions,  Remove  Settleable  Solids 

(a)   Definitions 

Free  Oil— That  fraction  of  oils  in  a  waste  stream  that  will  separate  as  a  well 
defined  float  upon  a  quiescent  settling  period  of  up  to  60  minutes.  In  addition  to 
oils,  this  will  include  grease  and  any  floatable  trash. 


212  Environmental    Engineering 

Emulsion — An  oil-in-water  suspension  of  finely  di\ided  oil  particles  main- 
tained in  suspension  by  the  effect  of  an  ionic  atmosphere.  The  finely  divided  oil 
particles  carry  a  negative  charge  in  the  ionic  protective  layer  that  isolates  the  particles 
and  prevents  them  from  joining  with  other  particles  of  like  material  to  form  agglom- 
erates sufficiently  large  to  separate  from  the  water  media. 

The  process  of  separating  the  oil  from  the  water  in  an  emulsion  is  known  as 
"cracking."  Cracking  is  done  by  either  addition  of  chemical  or  by  heating  (thermal 
cracking). 

Fine  Oil  Suspensions — In  between  the  free  oil  phase  and  the  emulsion  phase 
is  a  broad  phase,  without  well  defined  boundaries,  in  which  all  particles  will  not 
separate  gravimetrically,  yet  are  not  maintained  in  suspension  by  the  isolating  effect 
of  the  like,  negative  particle  charges.  In  this  phase,  the  oil  particles  are  so  fine  that 
they  cannot  overcome  the  surface  tension  of  the  water  and  float,  or  they  are  attached 
to  some  solid  particle,  such  as  fine  sand,  that  counters  their  buoyancy  to  where 
its  gravity  approximates  that  of  water  and  will  not  float  or  settle. 

In  some  cases,  oil  in  this  phase  will  float  eventually  on  long  periods  (6  to  10 
hours)   of  quiescence. 

This  phase  is  sometimes  referred  to  as  "pseudo-emulsion,"  and  is  often  mis- 
taken for  a  true  emulsion. 

( b )  Preliminary  Considerations 

Before  a  waste  treatment  system  can  be  selected  or  a  proposed  system  properly 
evaluated,  a  survey  should  be  made  and  infomiation  secured,  as  follows: 

1.  Housekeeping  and  work  habits  should  be  sur\'eyed  to  locate  and  correct, 
as  far  as  possible,  gross  oil  spillage.  It  is  generally  more  economical  to 
collect  and  handle  concentrated  waste  oil  such  as  crankcase  drainings, 
machining  coolants,  etc.,  in  portable  containers  than  to  discharge  these 
oils  to  the  sewer  for  separation  and  collection  at  the  treatment  unit. 

2.  Spillage  of  diesel  oil  at  fueling  points  has  long  been  a  troublesome  prob- 
lem, and  no  complete  solution  has  been  devised.  Automatic  shut-off  nozzles 
have  helped  considerably  to  reduce  spillage,  but  have  not  completely 
solved  this  problem.  Curbing  the  immediate  area  at  the  fueling  track  to 
provide  a  collecting  pan  for  the  spilled  oil,  with  a  drain  to  a  storage  tank 
has  been  used.  This  may  not  be  feasible  everywhere,  but  it  is  worth  look- 
ing into.  It  would  appreciably  reduce  tlie  amount  of  oil  to  be  removed  at 
the  treatment  plant.  This  could  be  important  where  belt-type  or  roller-type 
skimmers  are  used,  as  these  skimmers  have  a  very  poor  pick-up  of  light- 
gravity  oil  such  as  diesel  oil. 

3.  The  sur\'ey  should  study  the  storm  water  drainage  of  the  area  with  a 
view  to  excluding  as  much  run-off  as  possible  from  the  oily  waste  sewers. 
This  will  require  some  new  sewer  construction,  and  tlie  amount  of  sewer 
construction  required  could  very  well  influence  the  selection  of  the  plant 
site. 

4.  The  survey  should  include  flow  measurements  of  individual  waste  streams 
or  the  combined  streams,  if  indi\'idual  streams  measurement  is  not  feasible. 
Weir  measurements  at  half-hour  intervals  over  a  representative  24-hour 
period  will  give  adequate  measurement.  Weir  tables  for  90°  notch  or 
rectangular  weirs  will  be  found  in  most  engineering  handbooks  or  in 
"Cameron  Hydraulic  Data." 


E  n  \'  i  r  o  n  m  e  n  t  a  1    Engineering 213 

5.  At  the  same  time  waste  samples  should  be  collected  at  half-hour  intervals 
in  proportion  to  the  flow  for  analysis  at  a  laboratory.  The  pi  I  should  be 
measured  when  sample  increments  are  collected.  Analysis  then  should  be 
made  for  total  oil  (hexane  soluble),  free  oil,  suspended  solids,  settleable 
solids,  and  5-day  BOD. 

Information  gathered  by  such  a  survey  is  essential  in  order  to  meaningfully 
determine  treatment  requirements  and  evaluate  proposals.  It  will  also  be  very  help- 
ful in  dealing  with  the  pollution  control  authorities. 

(c)  Selection  of  treated  waste  outlet.  Tliree  outlets  for  treated  wastes  are 
ordinarily  available: 

1.  Streams,  rivers  or  lakes. 

2.  Evaporation  lagoon.  This  may  be  very  good  in  arid  regions  where  evapora- 
tion rate  exceeds  rainfall  by  3  or  more  feet  per  year. 

3.  City  sewerage  system. 

Of  the  above,  tlie  third — city  sewerage  system — is  by  far  the  preferred  choice. 
The  reason  is  that  relatively  simple  pre-treatment  works  will  be  adequate  prior  to 
discharge  into  a  municipal  sewerage  system,  whereas  more  elaborate  and  sophisticated 
works  and  much  more  precise  operations  are  required  if  the  treated  wastes  are  to 
be  discharged  into  a  surface  waterway.  Most  city  ordinances  permit  an  oil  content 
of  up  to  100  ppm,  although  some  now  use  a  50  ppm  limit;  suspended  solids  of  400 
ppm,  and  5-day  BOD  of  up  to  300  ppm.  On  the  other  hand,  State  water  quality 
regulations  limit  oil  content  to  as  low  as  5  ppm;  suspended  solids  and  5-day  BOD 
to  less  than  225  ppm  each.  In  addition  an  increasing  number  of  States  are  limiting 
phosphorus  to  1  to  10  ppm.  Accordingly,  what  may  look  hke  an  expensive  con- 
necting sewer  or  force  main  may  actually  produce  an  important  initial  saving  as 
well  as  a  permanent  reduction  in  operating  cost. 

Evaporation  lagoons,  where  land  is  available  and  the  climate  is  arid,  are  also 
a  good  choice.  Primary  treatment  for  removal  of  free  oil  will  greatly  extend  lagoon 
life. 

Lagoons  in  porous  soil,  where  all  or  part  of  the  flow  seeps  into  the  soil  are 
not  recommended  because  they  can  cause  ground  water  pollution.  Oily  tastes  and 
odors  can  appear  in  water  wells  in  the  near  and  even  distant  vicinity  of  an  oily 
waste  lagoon  long  before  bacteriological  tests  show  contamination. 

(d)  Treatment  Systems  Generally  Used 

A  number  of  systems  of  oily  waste  treatment  are  in  use  in  industry,  each  one 
of  which  has  special  advantages  and  disadvantages.  AccordingK',  the  selection  would 
be  based  on  whichever  system  best  meets  the  particular  project  at  hand.  This,  in 
turn,  can  be  determined  by  field  tests  with  laboratory  confirmation. 

At  engine  terminals  with  diesel  repair  shops,  about  half  the  oil  content  is  free 
oil  and  half  finely  divided  and  emulsified  oil.  Accordingly,  a  primary  treatment  unit 
for  removal  of  free  oil  and  settleable  solids  as  described  in  Art.  1.2.5b.(l)  above 
would  precede  all  of  the  following  systems: 

1.  Required  Effluent  Oil  Content  50  to  100  PPM  Oil: 

a.  Chemical  and/or  polymer  coagulation  with  gravity  separation.  Tliis 
system  requires  a  flocculation  period  of  10  to  20  minutes,  followed  by 
a  settling  period  of  about  90  minutes.  Gentle,  diffused  air  flocculation 


214 Environmental    Engineering 


is  \ery  good.  Settling  tank  should  be  equipped  with  surface  skimming 
as  well  as  a  sludge  collector  mechanism.  Combination  flocculator  clari- 
fiers  are  commercially  available  in  a  single,  nested  vessel. 

Flocculating  chemical  used  is  either  alum,  ferric  chloride,  ferric 
sulfate  or  polymer. 

A  holding  tank  preceding  this  imit  would  not  be  needed  unless 
the  stormwater  peak  flow  was  greater  than  twice  the  design  rate  of 
flow.  If  a  holding  tank  is  required,  it  would  be  sized  to  store  an  amount 
that  would  supply  the  flocculator-clarifier  at  twice  the  design  rate  for 
a  twelve  hour  period. 

Skimmed  oil  and  settled  sludge  would  be  drawn  to  a  batch  crack- 
ing tank  for  chemical  and/or  thermal  cracking,  the  separated  oil  drawn 
off  to  a  storage  tank  for  scavenger  disposal  and  the  bottom  sludge  drawn 
to  drying  beds.  The  cracking  tank  will  require  a  suitable  acid  resisting 
coating.  This  step  may  be  eliminated  if  scavenger  costs  are  low. 
Polymer  coagulation  with  pH  adjustment  and  dissolved  air  flotation 
separation.  In  tliis  system,  air  is  added  to  the  waste  stream,  which  is 
pressurized  to  35  to  50  psi,  causing  air  to  dissolve  in  the  stream,  and 
a  polymer  is  added.  After  a  short  detention  period  in  a  dwell  tank,  the 
pressurized  stream  is  released  in  the  flotation  cell  where  the  polymer 
flocculated  fine  oil  particles  are  buoyed  to  the  surface  by  the  fine  air 
bubbles  coming  out  of  solution.  A  skimmer  mechanism  continuously 
collects  the  float. 

Flotation  cells,  normally,  operate  at  a  constant  flow  rate.  Accord- 
ingly, a  holding  tank  is  required  to  even  out  flow  peaks  including  storm 
water  peaks. 

Polymer  response  is  closely  pH  related.  Accordingly,  the  pH  of 
the  waste  stream  must  be  adjusted  by  feeding  an  acid  or  an  alkali.  The 
chemical  feed  pump  is  paced  by  a  pH  meter  that  automatically  main- 
tains the  set  pH.  The  sensing  bulb  of  the  pH  meter  should  be  con- 
veniently located  as  it  must  be  cleaned  frequently  for  accurate  measure- 
ment. 

Some  flotation  cells  use  full  stream  pressurizing,  and  some  use 
recycle  pressurizing.  Strong  claims  are  made  for  each.  However,  in 
this  application,  both  work,  and  the  choice  can  usually  be  based  on 
cost. 

Skimmed  oil  float  is  drawn  to  a  batch  cracking  tank  for  concen- 
tration   as    in    Paragraph    a    abo\'e. 

Flotation  cells  are  used  widely  in  industry  for  oil  separation.  They 
are  compact  and  are  commercially  available  as  a  package  with  their 
auxiliaries.  However,  they  are  more  sophisticated  tlian  the  simpler 
flocculator-clarifier  described  in  Paragraph  a  above,  and  require  more 
skillful  operation  and  attention. 

Coalescing  filters.  This  is  a  packed  bed,  pressure  filter  using  fibrous  or 
granular  or  screen  media,  that  induces  the  finely  dispersed  oil  particles 
to  coalesce  into  larger,  readily  floatable  particles.  They  have  been  used 
mainly  on  shipboard  for  removing  oil  from  ballast  water  and  bilge 
water.  Effluents  are  in  the  range  of  20  ppm  to  200  ppm  of  oil  content. 
There  are  several  proprietary  units  on  the  market. 


Environmental    Engineering 215 

There  is  little  information  available  on  their  application  to  ordi- 
nary industrial  oily  waste  treatment.  Shipboard  application  involves 
removal  of  heavy  Bunker  "c"  oils  from  water.  How  they  would  work 
on  lighter  gravity  oils  such  as  diesel  fuel  is  not  generally  known.  How- 
ever, they  have  distinct  possibilities,  and  their  compactness  and  ease 
of  operation  have  much  to  commend  them. 

2.  Required  Effluent  Oil  Content  10  to  15  PPM  Oil 

Treatment  plants  in  this  category  will  require  very  reliable  equipment, 
controls  and  instrumentation.  At  this  effluent  quality  level,  the  discharge 
will  be  to  a  surface  stream  or  lake.  Pollution  control  authorities  are  in- 
clined to  closely  monitor  such  discharges,  and  since  even  a  very  thin, 
mono-molecular  oil  slick  is  readily  visible,  any  slip-up  will  attract 
attention. 

Operation  of  plants  in  this  category  will  require  a  supervisor  who  is 
a  competent,  well  trained  technician  who  will  have  undivided  responsi- 
bility for  the  operation  of  this  plant. 

Plants  in  this  category  will  be  identical  to  those  in  Paragraph  (d)   1  a 
above  with  the  addition  of  emulsion  breaking  facilities, 
a.   Industrial    practice,    particularly    the    automobile    industry,    uses    batch 
process  emulsion  cracking. 

The  batch  cracking  tanks  are  located  in  the  system  after  primary 
treatment  and  before  secondary  treatment,  and  will  take  the  place  of 
the  holding  tanks  normally  used  for  flow  equalizing. 

Emulsion  cracking  is  accomplished  by  lowering  the  pH  to  less 
than  7.0,  and  to  a  level  at  which  the  repelling  negative  particle  charges 
are  neutralized.  This  can  be  accomplished  by  adding  sulfuric  acid, 
alum,  or  an  iron  salt.  The  best  cracking  agent  is  detennined  by  field 
test. 

Multiple  tanks  are  used,  usually  three.  Cracking  agent  is  added  as 
a  tank  is  filling.  When  filled,  a  plant  laboratory  test  is  made  to  check 
whether  the  emulsion  is  cracked,  and  if  required,  additional  cracking 
agent  is  added.  The  cracking  reaction  takes  from  15  minutes  to  an 
hour.  The  oil  in  the  cracked  emulsion  precipitates  as  a  fine  suspension 
that  is  removed  in  the  chemical  precipitation  or  dissolved  air  flotation 
unit  following.  Multiple  tanks  permit  a  uniform  feed  to  the  following 
units.  The  batch  process  makes  it  possible  to  acciuately  monitor  and 
correct  the  process,  if  necessary,  to  be  sure  emulsions  are  cracked  be- 
fore the  stream  is  released. 

The  cracking  tanks  would  be  equipped  with  mixers  ha\  ing  a  turn- 
over capacity  of  about  15  minutes.  These  can  be  \ariablc  speed  mechan- 
ical mixers  or  air  mixers.  The  latter  has  proved  very  satisfactory-  in  the 
automobile  industry.  The  tanks  should  have  a  mild  acid  resistant  coat- 
ing such  as  a  coal  tar  paint  or  coal  tar  and  epoxy  paint. 

A  fraction  of  the  finely  di\ided  oil  will  Hoat  on  the.se  tanks,  and 
accordingly,  they  should  be  provided  with  oil  skimming  facilities.  This 
oil  float  will  be  sufficiently  concentrated  .so  that  it  can  be  discharged 
to  the  storage  tank  at  the  primary  separator. 

Chemical   feeding  equipment   selected   should   be   of   good   qualit>- 


216 Environmental    Engineering 

that  can  accurately  measure  the  feed.  There  are  a  number  of  good 
feeders,  commercially  available.  The  exact  type  will  depend  on  the 
nature  and  amount  of  chemicals  to  be  fed. 

b.  Fmal  polishing.  In  some  cases,  where  receiving  stream  conditions  are 
critical,  one  more  step  after  chemical  precipitation  or  air  flotation  may 
be  required.  This  would  be  filtration  in  a  packed  filter,  either  sand  or 
diatomaceous  earth.  This  would  be  a  simpler  filter  than  the  coalescing 
filter  described  in  paragraph  (d)  1.  b  above.  Its  function  would  be  to 
strain  out  flocculated  particles  escaping  the  chemical  precipitation  unit 
rather  than  coalescing  finely  divided  particles  into  larger  floatable 
particles. 

Sand  filters  would  be  sized  for  6  gpm  per  sq  ft.  Diatomaceous 
earth  filters  would  use  a  much  higher  rate.  There  are  a  number  of 
good   units  of  both  types  commercially  available. 

Polishing  filters  would  only  be  used  where  demanded  by  the  pol- 
lution control  authorities.  They  also  might  be  added  at  a  later  date  to 
overcome  a  deficiency  in  a  flotation  cell. 

c.  Miscellaneous  Considerations 

It  is  not  always  feasible  for  the  railroad  to  do  all  of  the  engineering 
required  on  this  type  of  project  with  its  own  engineering  department. 
Alternatives  are: 

1.  Retain  a  consultant  to  make  the  surveys,  design  the  facilities,  secure 
approval  of  the  appropriate  reviewing  authorities,  and  to  provide 
plans,  specifications  and  contract  documents  for  general  contractor 
bids.  In  selecting  such  a  consultant,  it  would  be  well  to  use  one  who 
has  had  industrial  waste  treatment  background.  Many  otherwise  ex- 
cellent municipal  engineering  consultants  are  not  entirely  equipped 
for  industrial  work. 

2.  Invite  a  "unit  responsibility"  proposal  from  companies  specializing 
in  industrial  waste  treatment.  The  proposal  would  include  field  sur- 
vey, design  and  construction  of  required  facilities,  and  instruction 
of  operating  personnel  and  assumption  of  responsibility  for  required 
operating  results.  Invitations  to  bid  are  normally  extended  to  only 
those  companies  with  a  good  history  in  the  field  and  well  enough 
financed  and  established  to  assure  their  being  around  in  years  to 
come.  More  attractive  proposals  are  secured  if  miscellaneous  sewer 
work  and  minor  construction  beyond  the  boundary  limits  of  the 
treatment  system  are  covered  in  a  separate  project.  Also,  it  may  be 
advantageous  in  some  cases  if  site  preparation  and  some  buildings 
and/or  foundation  work  were  separated  from  the  treatment  system 
project.  A  preliminary  survey  by  the  railroad,  in  general,  to  "scope" 
the  project  will  be  very  helpful  in  evaluating  proposals. 

.3.  Retain  a  consultant  to  make  the  surveys,  establish  the  design 
parameters,  and  invite  "imit  responsibility"  proposals  from  companies 
specializing  in  this  field,  for  design  and  construction  of  the  treatment 
system,  instruction  of  operating  personnel  and  assumption  of  respon- 
sibility for  the  required  operating  results.  The  petro  chemical,  petro- 
leum, and  paper  industries,  among  others,  frequently  prefer  this 
option. 


Environmental    Engineering  217 

Report  on   Assignment  2 
Air  pollution   control 

A.   F.    BuTCOSK  (chairman,   subcommittee),    R.   C.   Archambeault,   W.   F.   Arksey, 
E.  S.  Johnson,  C.  E.  Stokes,  L.  R.  Tiebney,  E.  M.  Walters. 

Your  committee  submits  the  following  report  as  information,  looking  to  submit- 
ting it  for  adoption  and  publication  in  the  Manual  as  a  recommended  practice  at  a 
future  date. 


2.3  INCINERATORS 

2.3.1  General  Statement 

(a)  Disposal  of  combustible  material  is  one  of  the  most  perplexing  problems 
facing  society  today.  Refuse  is  created  by  industry,  commerce  and  the  public.  It 
has  been  an  accepted  practice  to  burn  refuse  in  open  areas  or  in  simply  designed 
incinerators  producing  various  amounts  of  particulate  matter. 

(b)  During  the  past  few  years  every  community  has  become  aware  of  the 
large  quantities  of  dust  in  the  atmosphere,  which  is  slow  to  settle,  thus  producing 
a  haze  over  the  cities  and  farm  land.  The  public  is  demanding  clean  air,  and  in 
some  instances  causing  industries  to  desist  operation  until  means  have  been  achieved 
in  meeting  the  necessary  emission  reduction.  Industry  can  obtain  a  variance  in  the 
State  Pollution  Control  laws  for  continuation  of  some  operations,  but  this  variance 
is  reviewed  periodically.  Therefore,  the  variance  is  not  a  solution  of  the  problem, 
but  only  a  bid  for  time. 

(c)  Refuse  can  be  burned  in  a  properly  designed  multiple-chamber  incinerator. 
However,  caution  is  necessary  so  that  adequacy  of  design,  proper  methods  of  con- 
struction, and  quality  of  materials  are  utilized  in  construction  of  an  incinerator  that 
will  meet  air  pollution  control  requirements  and  have  an  average  service  life 
expectancy. 

(d)  The  configuration  of  modem  multiple-chamber  Incinerators  falls  into  two 
general  types,  as  illustrated  below.  These  are  the  retort  type,  named  for  the  return 
flow  of  gases  through  the  "U"  arrangement  of  component  chambers,  and  the  in-line 
type,  so  called  because  the  component  chambers  follow  one  after  the  other  in  a  line. 

2.3.2  Retort  Type 

Essential  features  that  distinguish  the  retort  type  of  design,  as  shown  in  Fig.  1, 
are  as  follows: 

(a)  The  arrangement  of  the  chambers  causes  the  combustion  gases  to  flow 
through  90-deg  turns  in  both  lateral  and  \ertical  directions. 

(b)  The  return  flow  of  the  gases  permits  the  use  of  a  common  wall  between 
the  primary  and  secondary  combustion  stages. 

(c)  Mixing  chambers,  flame  ports,  and  curtain  wall  ports  ha\e  length-to- 
width  ratios  in  the  range  of  1:1  to  2.4:1. 

(d)  Bridge  wall  thickness  under  the  flame  port  is  a  function  of  dimensional 
requirements  in  the  mixing  and  combustion  chambers.  This  results  in 
construction  that  is  somewhat  unwieldy  in  the  size  range  above  500  lb 
per  hour. 


218 


Environmental    Engineering 


INCINERATION 


milNG  CHANBER 


CURHIK  ««U   PORT 


Fig.    1 — Cutaway  of  a  retort  multiple-chamber  incinerator. 


Environmental    Eng  i  n  e  e  r  i  n  g 


219 


MUING  CHAMBER 


Fig.  2 — Cutaway  of  an  in-line  multiple-chamber  incinerator. 


2.3.3  In-line  Type 

Distinguishing  features  of  the  in-line  type  design,  as  shown  in  Fig.  2,  are  as 
follows : 

(a)  Flow  of  the  combustion  gases  is  straight  through  the  incinerator  with 
90-deg  turns  only  in  the  vertical  direction. 

(b)  The  in-line  arrangement  is  readily  adaptable  to  installations  that  require 
separated  spacing  of  the  chambers  for  operating,  maintenance,  or  other 
reasons. 

(c)  All  ports  and  chambers  extend  across  the  full  width  of  the  incinerator 
and  are  as  wide  as  the  ignition  chamber.  Length-to-width  ratios  of  the 
flame  port,  mixing  chamber,  and  curtain  wall  port  How  cross  sections 
range  from  2:1  to  5:1. 

2.3.4  Description  of  the  Process 

(a)  The  combustion  process  in  a  multiple-chamber  incinciatoi  pioeccd.s  m  iwo 
stages — primary  or  solid  fuel  combustion  in  the  ignition  chamber,  followed  by  sec- 
ondary  or  gaseous-phase  combustion.  The  secondary  combustion  zone  is  com; 

of  two  parts,  a  downdraft  or  mixing  chamber  and  an  up-pass  expansion  or  coinl 
chamber. 

(b)  The  two-stage  multiple-chamber  incineration  begim  in  the  ignition  cham- 
ber and  includes  the  drying,  ignition,  and  coinbiistion  of  the  solid  refuse.  As  tlic 


220 Environmental    Engineering 

burning  proceeds,  the  moisture  and  volatile  components  of  the  fuel  are  vaporized 
and  partiall)-  oxidized  in  passing  from  the  ignition  chamber  through  the  flame  port 
connecting  the  ignition  chamber  \\'ith  the  mixing  chainl)er.  From  the  flame  port,  the 
volatile  components  of  the  refuse  and  the  products  of  combustion  flow  down  through 
the  mixing  chamber  into  which  secondary  air  is  introduced.  The  combination  of  ade- 
quate temperature  and  additional  air,  augmented  by  mixing  chamber  or  secondary 
burners  as  necessary,  assists  in  initiating  the  second  stage  of  the  combustion  process. 
Turbulent  mixing,  resulting  from  the  restricted  flow  areas  and  abrupt  changes  in 
flow  direction,  furthers  the  gaseous-phase  reaction.  In  passing  through  the  curtain 
wall  port  from  the  mixing  chamber  to  the  final  combustion  chamber,  the  gases 
undergo  additional  changes  in  direction  accompanied  by  expansion  and  final  oxida- 
tion of  combustible  components.  Fly  ash  and  other  solid  particulate  matter  are  col- 
lected in  the  combustion  chamber  by  wall  impingement  and  simple  settling.  The 
gases  finally  discharge  through  a  stack  or  combination  of  a  gas  cooler  (for  example, 
a  water  spray  chamber)  and  induced-draft  system.  Either  draft  system  must  limit 
combustion  air  to  the  quantity  required  at  the  nominal  capacity  rating  of  the 
incinerator. 

2.3.5  Selecting  Type  of  Incinerator 

(a)  Incinerators  with  capacity  of  less  than  500  lb  per  hour  are  usually  con- 
structed as  retorts,  while  the  in-line  styles  will  accommodate  capacities  in  excess 
of  1,000  lb  per  hour.  When  large  quantities  of  refuse  are  to  be  burned  it  is  more 
economical  to  use  the  in-line  incinerator  due  to  cost  of  construction  and  ease  of 
controlling  temperature  of  internal  walls. 

2.3.6  Incinerator  Requirements 

2.3.6.1  Air  Inlets 

(a)  Positive  control  for  all  combustion  air  inlets  should  be  provided  by  means 
of  fully  adjustable  dampers.  The  retort  incinerator  designs  shown  in  Fig.  3  incor- 
porate round,  spinner-type  controls  with  rotating  shutters  for  both  underfire  and 
overfire  air  openings,  and  rectangular  ports  with  sliding  or  hinged  dampers  for  the 
secondary  air  openings.  The  in-line  incinerator  designs  shown  in  Fig.  4  have  rec- 
tangular ports  for  both  overfire  and  secondary  air  openings,  and  spinner-style  ports 
for  the  underfire  air  openings.  Air  ports  may  be  of  any  convenient  shape,  though 
the  port  arrangement  indicated  in  the  in-line  designs  with  rectangular  overfire  ports 
is  preferred  since  tlie  combustion  air  is  distributed  more  evenly  across  the  fuel  bed. 

2.3.6.2  Stack 

(a)  Stacks  for  incinerators  with  a  capacity  of  500  lb  or  less  per  hour  are 
usually  constructed  of  a  steel  shell  lined  witli  refractory  and  mounted  over  the  com- 
bustion chamber.  A  refractory-lined,  reinforced,  red  brick  stack  is  an  alternative 
method  of  construction  when  appearance  is  deemed  important.  Stacks  for  incinera- 
tors with  a  capacity  of  more  than  500  lb  per  hour  are  normally  constructed  in  the 
same  manner  as  those  for  smaller  units  but  are  often  free  standing  for  structural 
stability,  as  indicated  in  Fig.  4.  Stack  linings  should  be  increased  in  thickness  as 
the  incinerator  becomes  larger  in  size. 

2.3.6.3  Refractories 

(a)  Super-duty  plastic  refractory  or  super-duty  fire  clay  firebrick  are  recom- 
mended for  the  interior  walls  and  arches  that  comes  into  direct  contact  with  flames 


Environmental    Eng  i  n  e  e  r  i  n  g 


221 


STACK 

SECONOAHV     AIR    PORT 

GAS    BURNERS 

ASM    PIT    CLEANOOT    DOOR 

GRATES 

CHARGING    DOOR 

FLAME    PORT 

8. 

UNOERFIRE    AIR    PORT 

9. 

IGNITION    CHAMBER 

10, 

OVERFIRE     AIR     PORT 

1  1. 

MIXING    CHAMBER 

1?. 

COMPUSTION     CHAMBER 

1  3. 

CLEANOUT    OOOR 

14. 

CURTAIN    WALL    PORT 

SIDE  ELEVATION 


END  ELEVATION 


3 

LENGTH,    inches 
ABCDEFGH'-I       JKLMNOPQHSTUVWXYZ 

50 

Hi 

13» 

22t 

» 

61 

20* 

IS* 

» 

18* 

20 

31 

10 

«* 

2* 

2* 

«* 

«* 

•  * 

6 

100 

■  Oi 

18 

28i 

13» 

9 

27 

18 

19 

12 

23 

28 

S 

IS 

2* 

« 

1«* 

0 

•  * 

«* 

•  i 

8 

150 

IS 

22* 

334 

ISt 

111 

29 

22* 

20 

14 

27 

3S* 

5 

16* 

«* 

«* 

2* 

•  * 

•  * 

•  * 

9 

250 

s« 

27 

37* 

1* 

13* 

36 

27 

22 

18 

30 

«0 

7* 

18 

•  * 

«* 

2* 

** 

«* 

•  * 

11 

500 

7«J 

it 

»7  4 

27 

18 

*9* 

36 

28 

2t 

36* 

•8* 

12* 

23 

9 

«* 

S 

9 

9 

9 

16 

7  50 

SSi 

*9i 

S« 

3» 

22* 

SI 

«S 

32 

30 

«0 

tl* 

IS 

28 

9 

•* 

10 

9 

9 

9 

It 

1000 

9li 

51 

J9* 

5« 

27 

S8* 

«S 

3S 

3« 

•s 

»•* 

17* 

30 

9 

1* 

27* 

7* 

12* 

9 

9 

t 

» 

10 

'Ol.tnl.ox     -"*    fi'in     In     •••< .                                                                                                       ! 

Fig.  3 — Design  standards  for  multiple-chamber,  retort  incinerators. 


222 


Environme  ntal    Engineering 


,M.|.|.| H- 

PLAN    VIEW 


SIDE    ELEVATION 


1  .  STACK 

2.  SECONDARY  AIR  PORTS 

3.  ASH  PIT  CLEANOUT  DOORT 

4.  GRATES 

5.  CHARGING  DOOR 


FLAME  PORT 
IGNITION  CHAMBER 
OVERFIRE  AIR  PORTS 
MIXING  CHAMBER 
COMBUSTION  CHAMBER 


I  1 .  CLEANOUT  DOORS 

12.  UNOERFIRE  AIR  PORTS 

13.  CURTAIN  WALL  PORT 

14.  DAMPER 

15.  GAS  BUHNERS 


LENGTH,    inches 
ABCDEFGHIJKL'MNOP 

Q     R      S     T      U     V 

W     X      Y 

7  50 

09« 

«9t 

sit 

«5 

181 

9« 

27 

27 

9i 

2« 

16 

32 

4* 

S 

74 

9 

Ik 

24 

30 

9 

«* 

8 

11 

81 

7 

1000 

$Ri 

S« 

58 

«7* 

18 

63 

31* 

31* 

11 

29 

22* 

3S 

«* 

s 

10 

9 

li 

2* 

30 

9 

«* 

7 

12 

92 

a 

1500 

95 

76i 

<S 

B8 

19 

72 

36 

36 

12i 

32 

27 

38 

«* 

s 

7* 

9 

«* 

«* 

30 

9 

«* 

8 

14 

61* 

9 

2000 

108 

se 

i9Jl 

S7i 

22i 

79* 

«0i 

«0i 

IS 

36 

31* 

40 

(* 

s 

10 

9 

«* 

«* 

30 

9 

«* 

9 

18 

63* 

10 

•Oim.niion     "L"    giv.n     In     f,,t.                                                                                                                   I 

Fig.   4 — Design    standards   for  multiple-chamber,   in-line  incinerators. 


Environmental    Engineering  223 

and  hot  gases,  since  temperatures  usually  exceed  2,000  F.  Expansion  joints  with 
/2-inch  minimum  width  should  be  installed  for  every  6-ft  section  of  refractory.  These 
joints  must  be  sealed  completely  with  high-duty  ceramic  packing  with  minimum 
service  temperatures  of  2,500  F.  Packing  of  this  type  is  necessary  to  prevent  ashes 
from  collecting  in  the  open  joints  and  fusing  in  such  a  way  as  to  render  tlie  joint 
useless. 

(b)  The  first  10  ft  of  stack  must  be  lined  with  high-duty  firebrick  or  an  equiva- 
lent castable  refractory.  The  remainder  of  the  stack  may  be  lined  with  a  lower  duty 
material  since  flame  impingement  in  this  area  does  not  nomially  occur.  The  charg- 
ing door  and  other  access  doors,  with  the  exception  of  the  ash  pit  cleanout  doors, 
should  be  lined  with  120-lb-per-cu-ft,  ASTM  Class  24,  castable  refractory. 

(c)  The  minimimi  heights  for  free-standing  firebrick  walls  of  given  tliickness 
are  as  follows: 

Tliickness  of  Walls,  Inches  Unsupported  Height,  Feet 

4ii  4 

9  10 

13?^  14 

(d)  Firebrick  walls  extending  above  these  heights  should  be  held  to  exterior 
supports  with  stainless  steel  anchors  that  permit  a  difi^erential  rate  of  expansion. 
Walls  constructed  of  plastic  refractory  should  be  anchored  to  exterior  structural 
steel  members  on  18-inch  centers. 

(e)  Arches  may  be  constructed  of  firebrick  or  plastic  refractory.  Firebrick 
arranged  to  form  60-deg  arches  should  be  limited  to  a  maximum  span  of  5  ft  10 
inches  for  4/2-inch  thickness  and  8  ft  for  9-inch  tliickness.  Arches  with  spans  greater 
than  8  ft  should  be  constructed  of  suspended,  super-duty,  fire  clay  shapes  or  super- 
duty,  plastic  refractory.  Plastic  refractory  used  for  this  purpose  must  be  suspended 
from  refractory  cones  or  stainless  steel  anchors  spaced  not  more  than  15  inches  apart. 

2.3.6.4  Grates 

(a)  Two  materials  satisfactory  for  construction  of  grates  are  cast  iron  and 
castable  refractory.  Cast  iron  grates  are  available  in  a  wide  variety  of  sizes  and 
shapes.  They  are  of  much  heavier  construction  than  those  used  in  comparable  gen- 
eral-refuse incinerators,  to  minimize  deformation  at  high  temperatures,  \\1iere  blocks 
or  scraps  of  wood  are  to  be  burned,  bar-  or  channel-shaped  grates  should  be  em- 
ployed, but  when  wood  waste  accumulated  from  woodworking  equipment  is  to  be 
burned,  pinhole  grates  should  be  installed.  Typical  pinliole  grates  consist  of  6-inch- 
wide  by  24-inch-long  by  ?4-inch-thick  slab  sections  of  cast  iron  with  Js-inch  holes 
on  2-inch  centers.  Grates  of  this  type  are  capable  of  retaining  small  wood  particles 
that  might  otherwise  fall  unburned  into  the  a.sh  pit. 

(b)  Refractory  grates  are  nearly  always  constructed  in  the  form  of  OO-dcg 
sprung  arches.  On  incinerators  of  250-Ib-per-hour  capacity  or  less,  grates  are  con- 
structed of  ASTM  Class  24  refractory  5  to  6  inches  thick,  with  1-inch  holes  on  5- 
to  6-inch  centers.  ASTM  Class  27  castable  refractory  6  to  8  inches  thick,  with  1-inch 
holes  on  6-  to  9-inch  centers  is  used  in  larger  incinerators. 

(c)  Caution  is  required  in  operating  incinerators  with  cast  iron  grates.  Under- 
fire  air  must  not  be  unduly  restricted  nor  siiould  the  ash  pit  be  aIlo\v<'d  to  fill 
within   1   ft  of  the  grates.   Heat  build-up   in   the  ash  pit  fn)m  either  condition  can 


224  Environmental    Engineering 

cause  the  grates  to  warp  and  sag.  Misoperation  of  this  type  does  not  deform  grates 
constructed  of  castable  refractory.  These  grates  are,  however,  susceptible  to  damage 
from  careless  stoking  and  cleaning. 

(d)  When  most  of  the  cliarge  consists  of  sawdust  or  similar  small  wood  par- 
ticles delivered  by  a  uniform  feed  system,  a  solid  hearth  should  l>e  installed  at  the 
rear  of  the  ignition  chamber  to  prevent  the  introduction  of  excessive  underfire  air 
at  this  location.  As  the  size  of  the  incinerator  increases,  hearths  are  sometimes 
installed  along  the  sidewalls  also  to  prevent  excessive  underfire  air.  In  any  event, 
the  hearth  area  should  not  exceed  30  percent  of  the  total  horizontal  area  of  the 
primary  ignition  chamber. 

2.3.6.5  Exterior  Walls 

(a)  Incinerators  can  be  constructed  with  exterior  walls  of  red  brick  or  steel 
plate.  Red  brick  exteriors  are  usually  constructed  of  two  layers  of  red  brick  bonded 
by  a  reinforced  concrete  center.  Exterior  steel  plate  may  be  of  the  thin,  corru- 
gated type  used  to  back  plastic  refractory,  or  as  heavy  as  10  gauge  to  support 
interior  brick  construction. 

2.3.7  Operation  of  Incinerators 

(a)  The  operator  of  a  general-refuse  incinerator  generally  relies  on  auxiliary 
burners  to  maintain  temperatures  for  maximum  combustion  in  the  secondary  cham- 
ber. The  operator  of  a  wood-burning  incinerator,  without  provisions  for  auxiliary 
burners,  is  able  to  maintain  adequate  secondary  chamber  temperatures  by  proper 
charging  and  control  of  combustion  air. 

(b)  Generous  amounts  of  clean  dry  paper  are  mixed  with  the  wood  for  the 
initial  charge.  After  the  ignition  chamber  is  one-half  to  two-thirds  full,  additional 
paper  is  placed  on  top  of  the  pile  to  ensure  quick  flame  coverage  at  the  surface. 
It  is  important,  in  keeping  smoke  to  a  minimum,  that  only  clean  dry  paper  and 
dry  scrap  wood  comprise  the  initial  charge.  After  charging  is  completed,  the  paper 
is  ignited  near  the  front  of  the  chamber  and  the  charge  door  is  closed.  All  com- 
bustion air  ports  are  almost  completely  closed  to  restrict  combustion  air. 

(c)  As  burning  proceeds,  the  incinerator  passes  through  the  most  critical 
period  of  its  operation.  By  observing  the  emissions  from  the  stack,  the  necessary 
adjustments  can  be  made  promptly  to  reduce  or  eliminate  smoke.  Gray  or  white 
smoke  emitted  after  lightoff  indicates  that  the  incinerator  is  cold.  This  smoke  can 
be  minimized  or  eliminated  by  closing  all  air  ports.  Smoke  of  this  color  usually 
ceases  within  a  few  minutes  after  lightoff  .when  flames  completely  cover  the  refuse 
pile  and  fill  the  flame  port.  A  few  minutes  later,  black  smoke  may  appear,  resulting 
from  a  lack  of  adequate  combustion  air.  These  emissions  can  usually  be  eliminated 
by  opening  primary  air  ports  and  then  the  secondary  air  ports.  If  additional  com- 
bustion air  is  required,  it  may  be  supplied  by  opening  the  charge  door. 

(d)  Although  each  incinerator  has  its  own  operating  characteristics,  the  over- 
fire  and  underfire  air  ports  can  usually  be  opened  5  to  10  minutes  after  lightoff,  and 
the  secondary  port,  20  to  30  minutes  later.  If  opening  of  the  secondary  ports  results 
in  gray  or  white  smoke  emissions,  the  ports  should  be  closed  immediately  since  the 
incinerator  has  not  yet  reached  its  normal  operating  temperature. 

(e)  After  attaining  normal  operating  temperatures,  maximum  combustion  is 
maintained  by  placing  the  mechanical  feed  system  in  operation  or  by  hand  charg- 
ing at  regular  intervals. 


Environmental    Engineering 225 

REFERENCE 

Air  Pollution  Engineering  Manual,  999-AP-40,  U.  S.  Department  of  HEW, 
PHS,  Bureau  of  Disease  Prevention  Environmental  Control,  National  Center  for 
Air  Pollution  Control,   Cincinnati,  Ohio,   1967,  pp.  413-445. 


Report  on   Assignment  3 
Land  pollution  control 

P.  P.  DuNAVANT,  Jr.  (cliairman,  subcommittee),  D.  E.  Drake,  E.  T.  Myers,  J.  M. 
Wetzel,  J.  W.  Zwick. 

Your  committee  reports  that  a  study  on  the  disposal  of  toxic  wastes  is  in  prog- 
ress, and  will  be  completed  next  year. 


Report  on   Assignment  4 
Industrial   hygiene 

R.  S.  Bryan,  Jr.  (chairman,  subcommittee),  R.  A.  Bardwell,  J.  J.  D\\yer,  W.  D. 
Peters,  P.  M.  Miller. 

Your   committee   submits   the   following   report  for  information   only. 

Having  submitted  for  adoption  a  complete  re\'ision  of  Part  4  of  Chapter  13 
of  the  Manual  Revision,  your  committee  was  instructed  to  investigate  any  new 
retention-type  toilets  which  might  be  feasible  for  use  on  locomotives,  cabooses, 
and  camp  cars. 

Since  the  Manual  revision  was  submitted,  two  additional  toilets  were  studied. 
One  is  a  portable  chemical  toilet  originally  designed  for  boats  and  trailers.  This  is 
an  inexpensive  toilet  but  has  a  very  limited  capacity  which  reciuircs  extensi\e 
servicing.  This  toilet  may  be  feasible  for  installation  on  old  equipment  if  such 
installation   becomes   a   requirement   by   law. 

The  second  toilet  studied  depends  on  aerobic  digestion  to  reduce  organic 
waste  and  the  use  of  chlorine  to  disinfect  the  effluent  being  discharged.  This  toilet 
is  being  tested  by  The  National  Sanitation  Foundation,  but  a  report  has  not  yet 
been  released. 

Further  studies  on  efficiency,  .servicing,  and  maintenance  of  the  variou-;  t>pes 
of  toilets   being  offered   will   be  continued   and   progress  reports   submitted. 


226 Environmental    Engineering 

Report  on   Assignment  6 
Corrosion   control 

H.  W.  AzER  {chairman,  suhcommittcc),  H.  E.  Chaham  (vice  chairman,  suhcommi'- 
tee),  R.  R.  Holmes,  A.  J.  Levene,  M.  F.  Obrecht,  A.  D.  Rankins,  T.  A.  Ten- 
nyson. 

Your  committee  is  presently  investigating  corrosion  control  in  engine  cooling 
systems.  Progress  is  reported,  but  further  study  is  needed  for  completion  of  a  report 
to  show  compatibilities  of  different  types  of  corrosion  control  compounds,  recom- 
mended concentrations,  compatibili:y  with  anti-freezes  and  the  pollution  effects  on 
discharge  to  waterways  and  sewers. 


Report  of  Committee   14 — Yards  and  Terminals 


C.  E.  Stoecker, 
Chairman 

G.  H.  Chabot, 
Vice  Chairman 

A.    E.    BlERMANN, 

Secretary 

R.  O.  Balsters 
C.  F.  Intlekofer 
J.  L.  Dahlrot 

J.    A.    COMEAU 

H.  L.  Bishop 
P.  C.  White 
J.  K.  AusT 


H.  D.  Armstrong 

K.   F.  Beck 

H.  R.  Beckmann 

W.   O.    BOESSNECK    ( 

R.  E.  Bredberg 
H.  E.  Buchanan 
E.  W.  Buckles 

C.  M.  BURNETTE 

G.  P.  Burns 

B.  E.  BUTERBAUGH 

I.  F.  Chandler 
H.  P.  Clapp 
M.  K.  Clark 

D.  V.  Clayton 

E.  H.  Cook 

B.  E.  Crumpler 

C.  R.  Danielson 
A.  V.  Dasburg 

F.  D.  Day 

P.  J.  DeIvernois 
V.  F.  Demarais 

E.  E.  Frank 

V.  H.  Freygang 
H.  H.  Gamble 

G.  F.  Graham 
W.  W.  Gray 

D.  C.  Hastings 
I.  M.  Hawver 
Wm.  J.  Hedley 
L.  J.  Held 

F.  A.  Hess  (E) 
D.  B.  Kendall 


J.  B.  Kerry 
A.  S.  Krefting 
C.  J.  Lapinski 
E)  W.  D.  Lewis 

V.    L.    LjUNGREN 

E.  T.  LucEY 
L.  L.  Lyford  ( E ) 
S.  N.  MacIsaak 
G.  W.  Mahn,  Jr. 
H.  J.  McNally 
J.  G.  Martin 

A.  Matthews,  Jr. 
R.  E.  Metzger 
R.  G.  Moffat 

C.  H.  Mottier  ( E ) 
W.  L.  Patterson 
W.  H.  Pollard 

B.  H.  Price 

J.  M.  Randles 
L.  J.  Riekenberg 
A.  E.  Robinson 
R.  J.  Samoska 

C.  W.  Silver 
W.  D.  Slater 
Jack  Sutton 
K.  D.  Tidwell 
L.  G.  Tieman 
J.  N.  Todd  (E) 
A.  J.  Trzeciak 

P.  E.  Van  Cleve 
H.  Watts,  Jr. 

D.  W.  Wessels 
C.  C.  Yespelkis 

Committee 


(  E )  Member  Emeritus. 

Those   whose   names   are   shown   in   bo'dface,   in   addition  to  the   chairman,   vice  chainiian   and 
secretary,    are   the   subcommittee   chairmen. 

To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

B.  Revision  of  Manual. 
No  report. 

1.  Classification  yards,  collaborating  as  necessary  or  desirable  with  Com- 
mittee 16. 

A  review  of  methods  of  preventing  roll-outs  at  lower  end  of  classifica- 
tion yards,   presented   as   information    pagi-  --) 

2.  Scales  used  in  railway  .service,  collaborating  as  necessary  or  desirable 
with  the  AAR  Engineering  Division  Committee  on  Electrical  Facilities 
— Fixed  Properties. 

No  report. 


Note:    Discussion   on   subcommittee    reports   herein   closes   on   January    18,    1971. 

227 


228 Yards    and    Terminals 

3.  Automatic  car  identification — Applications  in  yards  and  terminals  and 
weighing  systems. 

Final   report,  presented  as  information    page  230 

4.  Urban  mass  transportation:  (a)  yards  for  storing  and  cleaning  pas- 
senger cars;  (b)  station  and  terminal  facilities;  (c)  parking  facilities  at 
stations. 

No  report. 

5.  Layout  and  characteristics  of  loading  and  unloading  facilities  for  auto- 
mobiles and  trucks. 

Final  report,  presented  as  infomiation page  232 

The  Committee  on  Yards  and  Terminals, 

C.  E.  Stoecker,  Chairman. 


AREA  Bulletin  630,  November-December  1970. 


(1902=1970) 

Willard  Abel  Wood,  retired  senior  consulting  engineer  of  WABCO,  Signal  and 
Communications  Division,  died  at  Pittsburgh,  Pa.,  on  24  March  1970.  He  is  survived 
by  his  wife,  Dorothy  E.  Wood;  one  daughter,  Mrs.  Virginia  Wood  Harbison;  and 
one  son,  Willard  A.  Wood,  Jr. 

Mr.  Wood  was  born  on  25  November  1902,  at  Hammonton,  N.  J.,  and  was 
graduated  in  civil  engineering  from  Rutgers  College,  Class  of  1924.  After  graduation, 
"Woody,"  as  he  became  known  affectionately  by  all,  joined  Union  Switch  &  Signal 
Company  (later  WABCO  Signal  and  Communications  Division)  on  2  March  1925 
as  a  field  installation  wireman.  A  year  later  he  became  engineer — estimates  in  the 
Commercial  Engineering  Department.  In  December  1953,  he  headed  the  Automatic 
Signaling  and  Highway  Crossing  Section,  then  moved  to  manager  of  the  Classifica- 
tion Yard  Application  Section  in  November  1959.  Prior  to  his  retirement  on  30 
November  1967,  he  became  a  senior  consulting  engineer  reporting  to  the  director  of 
engineering  in  June  1964. 

Throughout  his  almost  43  years  of  service.  Woody  worked  on,  or  supervised, 
signaling  and  railroad  control  system  projects  for  all  the  major  railroads  of  the 
nation.  He  returned  to  WABCO  after  retirement  to  do  extensive  inventory  control 
work. 

His  work  career  was  paralleled  by  an  equally  productive  service  to  his  com- 
munity. Woody  was  an  elder  in  the  Swissvale  Prestbyterian  Church  for  many  years, 
as  well  as  a  member  of  the  Swissvale  Civil  Service  Commission.  As  vice  president 
of  the  local  Midget  Baseball  League,  he  helped  many  youngsters  grow  in  character. 

Woody  joined  the  AREA  and  Committee  14  in  1960  and  was  an  active  and 
valued  member. 


Yards    and    Terminals 229 

Report  on  Assignment   1 
Classification  yards 

F.  Intlekofer  (chairman,  subcommittee),  J.  K.  Aust,  R.  F.  Beck,  H.  R.  Beck- 

MANN,    A.    E.    BlERMANN,    H.    L.    BiSHOP,   G.    P.    BURNS,   B.    E.    BUTERBAUGH,   G.    H. 

Chabot,  J.  F.  Chandler,  H.  P.  Clapp,  B.  E.  Crumpler,  J.  L.  Dahlrot,  A,  V, 
Dasburg,  F.  D.  Day,  P.  J.  DeIvernois,  V.  F.  Demarais,  E.  E.  Frank,  V.  H. 
Freygang,  H.  H.  Gamble,  Wm.  J.  Hedley,  L.  J.  Held,  F.  A.  Hess,  J.  B. 
Kerby,  C.  J.  Lapinski,  \^  L.  Ljungren,  E.  T.  Lucey,  S.  N.  MacIsaac,  H.  J. 
McNally,  J.  G.  Martlv,  A.  Matthews,  Jr.,  R.  E.  Metzger,  W.  H.  Pollard, 

B.  H.  Price,  J.  M.  Randles,  L.  J.  Riekenberg,  R.  J.  Samoska,  W.  D.  Slater, 

C.  E.  Stoecker,  Jack  Sutton,  L.  G.  Tieman,  A.  J.  Trzeciak,  P.  E.  Van  Cleve, 
Howard  Watts,  Jr.,  D.  W.  Wessels,  P.  C.  White,  C.  C.  Yespelkis. 

Your  committee  submits  the  following  report  as  information: 


A  review  of  methods  of  preventing   roll-out  at 
lower  end  of  classification  yards 

There  is  a  need  for  methods  or  devices  to  prevent  cars  from  running  out  of  the 
lower  end  of  classification  yards. 

A  review  of  methods  used  by  14  railroads  showed  that  the  most  conmion  metliod 
of  preventing  roll-outs  was  the  use  of  inert  (weight-activated  or  spring-loaded) 
retarders  and  a  short  upgrade  to  the  ladder  at  the  pull-out  end  of  the  classification 
yard.  Other  methods  include  the  use  of  skates,  but  the  high  cost  of  labor  is  a  serious 
disadvantage  of  this  method  and  many  railroads  are  discarding  it. 

One  other  method  uhich  is  quite  new  in  this  country  and,  therefore,  experience 
with  it  on  American  Railroads  is  quite  limited,  is  the  use  of  a  "hydrabrake."  This 
device  is  fastened  to  the  rail  at  about  the  location  where  inert  retarders  would  be 
placed.  The  flange  of  the  wheel  presses  down  on  the  pad  of  a  pivoted  arm.  The  arm 
activates  a  piston  which  displaces  hydraulic  fluid  through  an  orifice  and  so  off^ers 
no  resistance  at  low  speed  and  higher  resistances  as  speed  increases. 

As  mentioned  above,  the  most  popular  method  of  preventing  roll-outs  is  the 
use  of  upgrade  and  inert  retarders.  The  length  of  upgrade  varies  from  200  ft  of 
0.5%  grade  to  400  ft  of  0.3^  grade.  Comments  from  various  railroads  indicate  that 
the  0.5%  grade  is  too  steep  as  it  sometimes  causes  cars  to  roll  back  towards  the 
hump  and  results  in  an  impact  with  another  car.  Most  railroads  reported  the  use 
of  300  ft  of  0.3^  or  0.4%  grade  along  with  the  use  of  inert  retarders. 

The  inert  retarders  are  usually  placed  at  the  beginning  of  the  upgrade  and 
on  one  rail.  The  length  and  grade  of  the  classification  tracks  are  the  two  most 
important  factors  in  determining  the  capacity  of  inert  retarders  and  length  and 
steepness   of   upgrade   at   the   lower   end   of   the   classification   yard. 


230 Yards    and    Terminals 

Report  on  Assignment  3 

Automatic  car  identification — applications  in  yards 
and  terminals  and  weighing   system 

J.  A.  CoMEAu  (chairman,  suhcomrmUce),  R.  F.  Beck,  H.  R.  Beckmann,  A.  E.  Biek- 
MANN,  H.  E.  Buchanan,  E.  W.  Buckles,  G.  P.  Burns,  B.  E.  Butehbaugh,  C^  H. 
Chabot,  M.  K.  Clark,  E.  A.  Cook,  J.  L.  Dahlhot,  A.  V.  Dasburg,  F.  D.  Day, 
V.  F.  Demarais,  V.  H.  Freygang,  H.  H.  Gamble,  G.  F.  Graham,  D.  C. 
Hastings,  L.  J.  Held,  C.  F.  Intlekofer,  D.  B.  Kendall,  J.  B.  Kerry,  C.  J. 
Lapinski,  V.  L.  LjuNGREN,  E.  T.  LucEY,  S.  N.  MacIsaac,  G.  W.  Mahn,  Jr., 
J.  G.  Martin,  A.  Matthews,  Jr.,  R.  E.  Metzger,  W.  H.  Pollard,  B.  H.  Price, 
J.  M.  Randles,  a.  E.  Robinson,  F.  Samoska,  C.  E.  Stoecker,  C.  W.  Silver, 
W.  D.  Slater,  K.  D.  Tidwell,  L.  G.  Tieman,  P.  E.  Van  Cleve,  D.  W.  Wes- 
sels,  p.  C.  White,  C.  C.  Yespelkis. 

Your  committee  submits  the  following  progress  report  as  information  on  the 
applications  of  automatic  car  identification  system  ( ACI )  in  yards  and  terminals, 
and  recommends  that  the  subject  be  discontinued. 

Improved  yard  efficiencies  and  performance,  including  total  terminal  control, 
can  be  achieved  by  a  thorough  investigation  of  a  yard  or  terminal  to  provide  infor- 
mation in  the  development  of  a  plan  for  the  progressive  steps  which  should  be 
taken  toward  a  coordinated  yard  operation.  The  possibilities  are  limited  only  to 
the  ability  to  plan  and  coordinate  the  most  efficient  use  of  today's  technology  in 
automatic  car  identification  equipment.  This  will  depend  on  factors  that  must  be 
evaluated  for  each  location,  among  which  are  the  volume  of  the  traffic  and  the 
maintenance  cost  of  equipment. 

Strategically  positioned  widiin  the  yard,  ACI  scanners  can  capture  all  the 
data  required  for  an  effective  "real-time"  control  system,  and  an  accurate,  complete 
reporting  and  recording  system. 

There  are  six  major  areas  of  consideration  which  reflect  the  logical  develop- 
ment of  an  ACI  system  for  improved  yard  performance.  These  include  the  installa- 
tion of  scanners:  (a)  on  the  mains  leading  into  a  yard;  (b)  on  the  hump;  (c)  at 
the  bowl  end  of  the  yard;  (d)  on  the  rip  tracks  and  shop  leads;  (e)  at  the  engine 
house;  and  (f)  weighing  system. 

Each   has   operational   benefits   which   are   discussed  below. 

(a)  Scanners  located  at  leads  in  and  out  of  the  yard  provide  accurate  "real- 
time" data  on  inbound  and  outbound  traffic  movements.  These  scanners  should  be 
located  outside  the  yard  entrance  to  avoid  intra-yard  switching  movements.  Infor- 
mation from  them  can  be  used  as  a  planning  tool  to  give  an  accurate  record  of 
the  consist  of  all  inbound  and  outbound  trains  and  to  tell  precisely  what  is  in  the 
train  in  train  order  by  recording  car  movements.  If  the  previous  yard  had  a  scanner 
covering  its  outbound  moves,  it  could  be  used  for  generating  an  advance  consist. 
No-bill  cars  would  then  be  detected  in  advance  of  humping  operations  and  possibly 
prevent  the  car  from  being  routed  to  the  hold  track  where  it  could  be  delayed  24 
hours  or  more. 

With  the  inclusion  of  a  computer,  capable  of  handling  the  wayl)ill  information 
in  conjunction  with  the  ACI  scanner,  switch  lists  can  be  prepared  automatically  and 
ultimately  when  the  train  leaves  the  previous  yard.  Also,  data  processing  equipment 
can  be  used  to  compile  information  on  excessive  delays  within  the  yard. 


Yards    and    Terminals 231 

(b)  Scanners  on  the  hump  crest  verify  the  switch  Hst  and  provide  identity 
of  car  movement  over  the  hump  into  the  classification  yard  needed  to  keep  an 
inventory  of  car  movements,  and  prevent  the  generation  of  no-bill  cars  within 
the  yard.  Wirh  the  coordination  of  the  hump  scanners  with  the  scanners  at  the 
entrances  to  the  yard,  records  can  be  kept  of  the  time  it  takes  a  car  from  its  arrival 
in  the  yard  until  it  is  humped,  how  frequently  it  is  humped  and  the  time  from 
humping  until  it  is  dispatched. 

When  ACI  at  the  hump  is  combined  with  weight  information,  the  total  tonnage 
of  tracks  can  be  determined  automatically.  Tracks  can  be  combined  as  required  and 
advance  notice  of  the  to^al  tonnage  of  a  train  compiled  to  give  reasonable  advance 
notice   to   the  engine  house  specifying  the  power  necessary  to  move  the  train. 

(c)  Scanners  installed  at  the  bowl  end  of  the  yard,  permit  creation  of  an 
accurate  record  of  cars  pulled  from  the  classification  yard  to  the  departure  yard, 
keeping  record  of  switching  bills.  The  information  could  also  be  used  to  monitor 
yard  performance  as  an  aid  to  yard  control. 

( d )  Scanners  installed  on  the  rip  tracks  and  shop  leads  permit  creation  of 
accurate  "real-time"  information  regarding  repair  of  bad-order  cars.  Maintenance 
records  can  be  simplified  through  the  use  of  ACI  as  a  recording  device  for  equip- 
ment routed  into  the  shop  for  repair  and  to  expedite  the  movement  of  these  cars. 

(e)  Scanners  located  at  the  engine  house  will  provide  information  for  creating 
an  accurate  record  of  mileage  between  servicing  of  each  locomotive.  The  informa- 
tion can  be  used  for  generating  analytical  reports  to  determine  if  units  are  going 
to   the   shops  for  refueling  or  for  periodic  maintenance  and  servicing. 

(f)  Scanners  located  in  conjunction  with  the  scale  on  the  hump,  transmit  the 
car  initial  and  number  to  the  recorder  where  the  gross  weight  is  added  and  trans- 
mitted for  waybill  data. 

The  scanner  should  be  located  with  relation  to  the  scale  so  that  the  car  will 
pass   over  the   scale   before  another  car  will  pass  before  the  scanner. 

Weighing  uncoupled  while  classifying  will  reduce  the  number  of  hold  tracks 
previously  required  for  weighers;  this  will  eliminate  delays  in  car  movement  due 
to  weigh  requirements. 

In  summary,  with  the  installation  of  automatic  car  identification  equipment, 
"real-time"    operational    control    jjecomes   possil)le    and   will   assist    in: 

( a  )   improving  train  performance; 

(b)  improving  motive  power  utilization; 

(c)  improving  car  utilization; 

(d)  providing  better  service  to  the  customer; 
(e  )  tracing  cars  at  the  request  of  customers; 

(f  )   reducing  delay  to  cars  caused  by  lack  of  waybill  or  route  information; 

(g)  eliminating  repetitive  reporting. 

These  factors  strengthen  competitive  positions  through  better  service  and  more 
effective  use  of  plant  and  rolling  stock. 


232 Yards    and    Terminals 

Report  on  Assignment  5 

Layout  and  characteristics  of   loading  and  unloading 
facilities  for  automobiles  and  trucks 

p.  C.  White  (chairman,  subcommittee),  J.  K.  Aust,  A.  E.  Biermann,  H.  L.  Bishop, 
R.  E.  Bredberg,  H.  E.  Buchanan,  G.  P.  Burns,  B.  E.  Buterbaugh,  G.  H. 
Chabot,  J.  F.  Chandler,  H.  P.  Clapp,  D.  V.  Clayton,  J.  A.  Comeau,  E.  H. 
Cook,  B.  E.  Crumpler,  H.  H.  Gamble,  W.  W.  Gray,  G.  F.  Graham,  Wm.  J. 
Hedley,  L.  J.  Held,  F.  A.  Hess,  C.  F.  Intelkofer,  D.  B.  Kendall,  A.  S. 
Krefting,  E.  T.  Lucey,  G.  W.  Mahn,  Jr.,  J.  G.  Martin,  R.  E.  Metzger,  L.  J. 
Riekenberg,  R.  J.  Samoska,  W.  D.  Slater,  C.  E.  Stoecker,  J.  Sutton,  L.  G. 
TiEMAN,  A.  J.  Trzeciak,  p.  E.  Van  Cleve,  H.  Watts,  Jr. 

Your  committee  presents  as  information  and  for  future  consideration  as  Manual 
material,  the  following  report  on  the  layout  and  characteristics  of  loading  and  unload- 
ing facilities  for  automobiles  and  trucks,  inviting  comments  and  criticism  thereon. 
This  report  in  its  final  fomi  will  replace  Sec.  K,  page  14-3-18,  of  the  Manual. 

1.  Automobile  Transport  Terminal 

a.  General: 

The  loading  and  unloading  of  finished  automobiles  require  equipment  and  plant 
that  contribute  to  the  overall  expeditious  distribution  from  assembly  plants  to  local 
dealers.  Automobile  companies  place  a  premimn  on  total  time  in  transit  and  do 
consider  all  aspects  of  equipment  utilization,  interest  charges  and  delivered  auto 
condition. 

Loading  is  usually  accomplished  at  an  assembly  plant,  on  automobile  company 
property,  by  the  automobile  company  or  its  contractor.  The  actual  facilities  utilized 
are  similar  in  nature  to  the  unloading  facilities.  However,  tliere  are  exceptions  which 
must  be  given  consideration  on  an  individual  basis.  Exceptions  can  vary  from  loading 
inside  the  plant  with  multi-level  cars  handled  by  a  transfer  table  to  and  from  a  sup- 
port yard  to  simply  driving  the  finished  vehicle  to  a  more  conventional  loading 
facility  located  at  some  convenient  point  other  than  the  plant  itself. 

Unloading,  on  the  otlier  hand,  is  usually  accomplished  by  the  rail  carrier  or  its 
contractor,  on  railroad  company  property,  utilizing  facilities  provided  by  the  railroad 
company.  The  contractor  engaged  by  the  railroad  company  to  actually  perform  the 
unloading  task  will  more  than  likely  be  the  same  organization  engaged  by  an  indi- 
vidual automobile  company  to  prepare  and  deliver  units  via  highway  to  dealers.  It  is, 
therefore,  suggested  that  close  consultation  between  all  entities  involved  in  the  auto- 
mobile distribution  process  be  maintained  during  design  phase  in  order  to  assure  an 
efficient  and  usable  facility. 

Examination  of  facilities  now  in  existence  discloses  a  wide  variety  of  sizes, 
shapes,  equipment,  trackage,  etc.,  as  dictated  by  such  factors  as  availability  of  real 
estate,  proximity  to  highway  networks  and  volumes  of  vehicles  handled.  A  typical 
flow  diagram  of  an  unloading  area  is  shown  as  Fig.  1.  Certain  factors  are  germane 
to  most  all  auto  unloading  or  loading  facilities.  They  are  enumerated  below  from 
the  unloading  viewpoint;  however,  the  factors  apply  equally  as  well  to  loading  areas 
given  appropriate  modification  for  volume. 


Yards    and    Terminals 


233 


STRF.LT 


234  Yards    and    Terminals 

b.  Location: 

Location  of  the  unloading  area  should  be  selected  for  its  proximity  to  dealers 
in  the  area  to  be  distributed  to  in  order  to  reduce  highway  mileage  to  the  minimum. 
It  should  be  so  located  with  respect  to  the  railroads  main  trackage  as  to  minimize 
switching,  spotting  and  ijulling  delays.  Consideration  should  also  be  given  to  the 
potential  of  \  andalism  so  as  to  avoid  missile  damage  and  theft. 

0.  Size; 

The  size  of  the  unloading  facility,  its  trackage,  ramping  and  vehicle  storage 
areas,  should  be  large  enough  to  handle  the  maximum  expected  load  under  tlie  pro- 
posed operating  conditions.  Some  of  the  conditions  to  be  considered  are:  the  average 
work  week,  type  and  quantity  of  vehicles  handled  and  the  number  of  agencies  using 
the  same  facilities.  The  atito  production  and  distribution  process  by  its  very  nature 
iequires  a  considerable  degree  of  advance  planning,  including  volume  predictions. 
All  of  the  auto  manufacturers  can  and  do  make  rather  good  volume  predictions 
which  can  be  utilized  for  planning  purposes. 

d.  Buildings: 

Office  space,  washrooms  and  locker  facilities  should  be  adequate  to  provide  for 
foreseeable  needs  of  the  operation.  Communication  facilities  required  should  be 
provided  for.  Local  conditions  may  require  space  for  maintenance  of  highway  tractors 
and  predelivery  preparation  of  autos,  including  washing  and  undercoating. 

e.  Surfaces: 

It  is  recommended  that  vehicular  operating  and  storage  areas  be  paved  and  be 
as  flat  as  possible,  limiting  loading  and  unloading  angles  to  eliminate  bumper  damage. 
Gradients  sufficient  to  keep  all  accumulation  of  water  off  the  area  should  be  provided. 

Parking  spaces  should  be  clearly  marked  in  an  arrangement  with  ample  center 
distances,   thereby  maximizing  turning  radii  and  minimizing  door  contact. 

f.  Security: 

The  entire  area  should  be  fenced  and  of  such  a  nature  as  to  discourage  unau- 
thorized entry  and  theft.  A  common  solution  is  barbwire-topped  chain  link  fencing. 
Gating  and  fencing  should  be  so  arranged  so  as  to  segregate  new  car  storage  from 
employee  parking.  To  minimize  the  possibility  of  theft,  one  auto  manufacturer  rec- 
ommends that  new  vehicles  can  only  be  driven  out  of  the  storage  area  over  a  haul- 
away dock.  Provision  for  checking  employees  and  visitors  in  and  out  should  be 
made.  Locking  devices  on  all  gates  are  recommended. 

g.  Lighting: 

Lights  should  be  provided  for  the  entire  area  for  sufficient  intensity  to  be 
adequate  for  loading,  unloading,  inspection  and/or  security. 

h.  Multi-Level  Unloading  Area: 

This  area  should  be  placed  as  close  as  possible  to  the  center  of  operations  in 
order  to  minimize  travel  distances. 

(1)  Unloading  Tracks:  The  number  and  length  of  tliese  tracks  will  be 
dependent  upon  the  volume  of  rail  cars  handled  and  tlie  availability  of 
switching  service.  Rail  cars  and  thence  the  autos  on  tliem  may  not  always 
be  oriented  in  the  same  direction,  thereby  making  it  desirable  to  provide 
for  unloading  multi-levels  from  either  end.  Since  the  backing  of  automo- 


Yards    and    Terminals 235 

biles  from  rail  cars  is  not  permitted,  the  alternatixe  to  providing  facilities 
to  unload  from  either  end  of  the  rail  car  is  to  turn  cars  on  a  wye  or  turn- 
table prior  to  unloading.  This  may  not  be  desirable  from  an  operating 
or  time  standpoint. 

Track  centers  and  surfacing  between  tracks  should  be  sufficient  to 
allow  passage  of  ser\ice  vehicles  for  the  puipose  of  alleviating  the  prob- 
lems of  flat  tires,  missing  wheels,  dead  batteries,  lack  of  gasoline  and 
others  that  may  occur  with  the  automobiles. 
(2)  Unloading  Equipment:  Unloading  equipment  should  allow  quick  drive- 
off  of  automobiles.  Where  economically  justifiable,  the  ramp  should  be 
power  controlled  \ertically  for  adjustment  to  deck  levels  as  well  as  hori- 
zontally to  adjoining  tracks.  Manufacturers  should  be  consulted  regarding 
maximum  ramp  angle  permitted. 

At  points  where  it  is  considered  advisable  to  provide  unloading  in 
either  direction,  one  of  two  methods,  other  than  simply  turning  the  car, 
can  be  employed.  Ramps  may  be  mounted  on  flanged  wheels  and  rails 
perpendicular  to  the  unloading  tracks.  This  method  requires  a  certain 
amount  of  switching  to  orient  the  rail  cars  with  the  appropriate  ramp. 
The  second  method  is  to  mount  the  ramps  on  rubber  tires,  pave  the 
unloading  track  area,  and  move  the  ramp  to  the  cars  to  be  unloaded. 

i.   Haul-away  Loading  Area: 

The  provision  of  a  loading  dock  where  highway  trailers  can  be  spotted  for  load- 
ing is  recommended  in  order  to  reduce  loading  angle  and  decrease  loading  time.  The 
preference  of  the  specific  contractor  should  be  determined  to  assure  compatibility 
with  his  equipment,  the  dimensions  and  extent  of,  or  e\en  the  need  for,  this  feature. 

2.  Truck  Transport  Terminal 

a.  General: 

Factors  regarding  location,  size,  buildings,  surfacing,  security  and  lighting 
enumerated  above  for  automobiles  apply  equally  as  well  to  trucks.  The  rail  equip- 
ment and  the  placement  of  the  trucks  on  the  rail  equipment  differs.  Trucks  with 
cabs,  but  without  bodies,  are  commonly  shipped  in  "saddleback"  fashion  on  a 
specially  equipped  flat  car.  Thus,  the  use  of  a  crane  is  required  for  loading  and 
unloading.  While  the  loading  may  be  done  at  a  plant  site  exclusively  de\otcd  to 
trucks,  the  unloading  operation  can  conveniently  be  incoiporated  into  and  made  a 
part  of  a  typical  automobile  unloading  facility. 

b.  Unloading  Tracks: 

Truck  shipping  volumes  being  considerably  less  than  autos,  a  single  track  set 
apart  from,  but  adjacent  to,  auto  facilities  should  'uffice.  Volume  and  economic  con- 
siderations will  dictate  the  degree  of  separation  f  om,  and/or  incorporation  within, 
auto  facilities. 

c.  Unloading  Facilities: 

Trucks  loaded  in  "saddleback"  fashion  must  be  remo\ed  from  the  truck  they 
have  been  set  upon  and  .secured  to  for  transport  to  a  le\el  position  on  the  car  di-ck 
before  being  started  and  dri\t-n  from  the  car.  Tlie  job  can  be  accomplished  !)>•  a  mo- 
bile crane  of  sufficient  capacity  operated  adjacent  to  the  rail  car  where  xolnmc  is  light 
and  the  need  only  occasional.  Where  \olumes  require  a  greater  degree  of  specializa- 


236 Yards    and    Terminals 

tion,  it  is  recommended  that  an  "A"  frame  crane,  track  mounted  and  electrically  oper- 
ated, with  running  rails  located  outside  of  regular  track  rails,  be  provided.  The  "A" 
frame  straddles  the  car  to  be  unloaded  and  can  be  positioned  to  handle  any  car 
spotted  wdthin  its  reach.  Fig.  2  details  a  tie  layout  to  accommodate  the  "A"  frame. 
Access  to  the  unloading  track  for  pre-starting  service  should  be  given  consid- 
eration.  Air  supply  sufficient  to  release  truck  brakes  is  a  necessity. 

3.  Vertically  Loaded  Automobiles 

a.  General: 

Factors  regarding  location,  size,  buildings,  surfacing,  security  and  lighting 
enumerated  for  automobiles  on  conventional  tri-levels  apply  equally  as  well  to 
vertically  loaded  small  autos.  The  rail  car  itself  differs  from  multi-level  rail  equip- 
ment in  that  automobiles  are  loaded  vertically.  Five  doors,  holding  three  autos  each, 
on  either  side  of  the  car,  actually  serve  the  comliined  functions  of  loading,  unload- 
ing and  securement  devices.  The  car  design  requires  special  consideration  as  explained 
below  for  one  engaged  in  planning  an  unloading  area  for  such  cars. 

b.  Unloading  Track: 

The  number  of  tracks  and  their  lengths  will  be  dependent  upon  die  predicted 
volume  of  rail  cars.  An  area  60  ft  wide  is  recommended  on  both  sides  of  the  car 
to  provide  adequate  unloading  and  maneuvering  space.  See  Fig.  3  for  dimensions. 

c.  Unloading  Equipment: 

The  car  doors  themselves  serve  as  ramps  for  loading  and  unloading;  therefore, 
no  special  fixed  equipment  is  required.  A  mobile  machine  ha\'ing  the  reach  and 
capacity  to  open  and  close  the  doors  must  be  available. 


Yards    and    Terminals 


237 


IDC  Lb.  crUss 


I  CATB'/y^Y  Toll 
/ 


© 


EiJHEhL  5/Dc. 


V 


2' 


3\NiTCM  Tie 


-i 


/3'-/i>' 


C£o5t> 


C 


2'- 


r- 


5'<f's 


Zl 


fLA//3£D     \A/HF.CLS.-  Tci_AL  If^lDTfi     (d'-O  _       .. 

5PACLL  P::^^.fhjz  ?};!<  h^.c/L/rr-  /7-S  •*-'<S-  2 

- TyP '  c  \L   LKv  OUT  ^0  ^  "  >x-"--'^^.'- 


238 


Yards    and    Terminals 


|2O'0"- 


6vOT/ 


^  ...        i 

^- —  20-0    — 


O 


DOC'S 
IN  D0'-'-.'»' 


CCC  XI    A  ores 


— IctEI 


i 


^U'OS      ..C)L,vrU>    \/r^--' c;\_^^ 


T  YPl  C.\L 
UN LOAD.IMS.  A RFA 


-l-o. 


Report  of  Committee   11 — Engineering   Records  and 
Property  Accounting 


J.  Bert  Byars,  Chairman 

C.    R.    DOLAN, 

Vice  Chairman 
J.  W.  Kelly,  Secretary 
J.  L.  Manthey 

M.    W.    BONNOM 


W.  C.  Kanan 

R.  L.  Ealy 

L.  F.  Grabowski 

H.    C.    BOLEY 

C.  E.  Bynane 
R.  D.  Igou 

F.  B.  Baldwin  (E) 
R.  O.  Bassett 
\y.  M.  Berryman 

B.  A.  Bertenshaw  (E^ 
P.  J.  Beyer,  Jr. 

J.  \I.  Bourne 
P.  L.  Conway,  Jr. 
W.  V.  Eller 
L.  D.  Farrar 

C.  C.  Haire  (E) 
A.  P.  Hammond 
J.  E.  Hebbron 
M.  J.  Hebert 

P.  J.  Hendricksen 

E.   H.   HOFMANN 

P.  R.  Holmes 
J.  J.  Hoolahan 
L.  W.  Howard 
N.  J.  Hull,  Jr. 


W.    H.    KlEHL 
J.    G.    KiRCHEN 

J.  G.  Maker 

D.  C.  Maris 

M.   F.   McCORCLE 

John  McKeague 

F.  J.  Merscher 
C.  W.  Meyer 

G.  L.  MucHow 
W.  B.  Myers 

B.  F.  Nauert 
J.  J.  O'Hara 

C.  F.  Olson 

H.  L.  Restall  (E) 

F.  A.  Roberts 
J.  H.  Robinson 
R.  S.  Shaw,  Jr. 

G.  W.  Smith 

E.  E.  Strickland 
J.  B.  Styles 

T.  A.  Valacak 

J.   J.  WeIS BECKER 

H.  R.  Williams 
Louis  Wolf  (E) 
M.  C.  Wolf 

Committee 


( E )  Member  Emeritus. 

Those   whose   names   are   shown    in  boldface,   in  addition  to   the  chairman,   vice  chairman    and 
secretary,  are  the  subcommittee  chairmen. 


To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

B.  Revision  of  Manual. 
No  revisions  to  report. 

2.  Bibliography. 

Progress  report,  submitted  as  information    

3.  Office  and  drafting  practices. 

No  report  for  past  year's  activity.  Further  study  in  progress. 


page  241 


4.  Special  studies. 

Report  on  progress  of  study   of  responsibility  reporting,  presented  as 
infonnation     

5.  Application   of  data  processing:    (a)   accounting  phases;    (b)   engineer- 
in  phases. 

Brief  status  and  progress  report  on  three  subjects,   presented  as  infor- 
mation     


page  243 


page  244 


Note — Discussion   on   subcommittee   reports   herein   closes   on  January    18,    1971. 

239 


240        Engineering    Records    and    Property    Accounting 

6.  Valuation  and  depreciation:  (a)  current  developments  in  connection 
with  regulatory  bodies  and  courts;  (h)  ICC  valuation  orders  and  re- 
ports;  (c)   development  of  depreciation  data. 

Progress  report  on  current  developments  in  depreciation,  presented  as 
information    page  245 

7.  Revisions  and  interpretation  of  ICC  accounting  classifications. 

Progress  report,  submitted  as  information   page  246 

The  Committee  on  Engineering  Records  and  Property  Accounting, 

J.  Bert  Byabs,  Chairman. 


AREA   Bulletin    630,   November-December   1970. 


Cbtoin  (g.  Terrell 

(1908=1969) 

Edwin  G.  Terrell,  auditor  of  capital  expenditures  of  the  Norfolk  &  Western 
Railway,  passed  away  at  Roanoke,  Va.,  on  July  30,  1969. 

He  was  born  on  December  8,  1908,  in  Roanoke,  and  attended  Jefferson  High 
School  there.  He  studied  law  at  night  and  passed  the  Virginia  Bar  Examination  in 
1932. 

Mr.  Terrell  began  his  railroad  career  with  the  Norfolk  &  Western  in  1924.  He 
left  the  railway  company  in  1933  and  worked  for  the  Public  Service  Commission 
of  West  Virginia  from  1934  until  April  1942,  when  he  returned  to  Norfolk  &  West- 
ern as  engineer  in  the  Valuation  Section  of  the  Engineering  Department.  On  Sep- 
tember 1,  1965,  he  was  appointed  auditor  of  capital  expenditures  in  the  Accounting 
Department,  which  position  he  held  at  the  time  of  his  death. 

He  joined  AREA  in  1965  and  was  an  active  member  of  Committee  11.  He  was 
exceptionally  well  versed  in  valuation  matters  and  thoroughly  enjoyed  interchanges 
of  ideas  with  his  fellow  Committee  members. 

He  was  vice  chairman  of  the  Official  Board  of  Trinity  United  Methodist  Church, 
a  member  of  the  Cave  Spring  Lions  Club  and  the  Cave  Spring  Recreational  Foun- 
dation, a  past  scoutmaster  of  Troop  15  at  Trinity  United  Methodist  Church  and 
chairman  of  the  Roanoke  Scout  District.  He  served  as  vice  chairman  of  the  Board 
of  Supervisors  of  Roanoke  County  from  1956  through  1960  and  was  chairman  from 
1960  to  1966.  He  was  a  former  official  of  the  League  of  Virginia  Counties,  a  past 
member  of  the  Urban  Planning  Committee  of  the  League  of  Virginia  Municipalities, 
and  a  member  of  the  Roanoke  County  School  Board  at  the  time  of  his  death. 

Mr.  Terrell  is  survived  by  his  wife,  Yvoare  O'Dell  Terrell;  a  daughter,  Mrs. 
Patricia  Anderson,  Roanoke;  two  sisters,  Mrs.  Dorothy  Black,  Roanoke,  and  Mrs. 
Mildred  Smith,  South  Hill,  Va.;  two  brothers,  William  O.  Terrell,  and  Lewis  N.  Ter- 
rell, Roanoke;  and  three  grandchildren. 


Engineering    Records    and    Property    Accounting         24 1 

Report  on  Assignment  2 
Bibliography 

M.  W.  BoNNOM  (chairman,  subcommittee),  P.  J.  Beyer,  Jr.,  C.  R.  Dolan,  L.  D. 
Farrar,  a.  p.  Hammond,  L.  W.  Howard,  R.  D.  Igou,  J.  L.  Manthey,  J.  J. 
O'Hara,  G.  W.  Smith,  T.  A.  Valacak,  J.  J.  Weisbecker. 

Your  committee  submits  the  following  report  of  progress,  presenting  additional 
references  with  annotations. 

OFFICE    PROCEDURES 

Modern  Office  Procedures,  November  1969,  pages  21-28  "Harnessing  the  Infor- 
mation Explosion." 

COM  (Computer  Output  on  Microfilm)  assists  the  data  processing  manager 
by  switching  from  paper  printout  of  computer  information  to  microfilm. 

Reprographics,  November  1969,  page  14.  "Routing  Highways  by  Computer 
Graphics." 

Highway  location  studies  are  prepared  with  the  aid  of  aerial  photograph  and 
computer  technologies. 

Reproduction  Methods,  January  1970,  page  14.  "Microfilm  Primer — Why  Micro- 
film." 

Latent  image  films  may  become  just  one  of  many  media  available  for  the 
handling  of  compressed  information. 

Reprographics,  March  1970,  pages  18-21.  "Color  Contract  Printing  to  Enhance 
Photogrammetric  Detail." 

Aerial  color  photography,  almost  unheard  of  10  years  ago,  is  now  becoming 
more  and  more  important  in  many  fields  of  photogrammetry. 

Reproduction  Methods,  July  1970,  pages  30-37.  "RM's  Directory  of  Copiers." 
Thirty  copier  manufacturers  furnish  detailed  information  on  153  of  their  copiers. 

Reproduction  Methods,  August  1970,  pages  6  and  37.  "Manager's  Viewpoint — 
The  Forgotten  Reproduction  Method." 

Carbon  paper  is  still  one  of  the  most  economical  methods  of  producing  distribu- 
tion and  file  copies. 

Reproduction  Methods,  August  1970,  pages  13,  36  and  37.  "Microfilm  Primer — 
Microfilm   Processing,  Duplicating  and  Reading." 

The  .selection  of  a  microfilm  processor  is  just  as  important  as  the  selection  of 
the  camera. 

TAXES 

The  Jounud  of  Accountancy,  April  1970,  pages  45-52.  "Theoretical  Concepts 
For   Interpreting  The   Investment  Credit." 

An  examination  of  the  two  main  methods  of  interpreting  the  investment  credit 
(the  subsidy  concept  and  the  reduction  of  income  tax  concept)  reveals  that  there 
is  a  possible  third  which  is  supported  by  current  accounting  theory — the  RTE 
4-6-8  method. 

The  Journal  of  Taxation,  May  1970,  pages  307-310.  "Tax  Reform  Act  of  1969 
Provides   New  Special  Tax   Benefits  for   Railroads." 


242        Engineering    Records    and    Pro  party    Accounting 


The  article  explains  three  main  l^enefits  for  tlie  railroad  industry  that  are 
included  in  the  Tax  Reform  Act  of  1969,  namely,  rapid  amortization  of  certain  rollinj» 
stock,  amortization  deductions  for  railroad  grading  and  tunnel  bores,  and  increased 
deductions  for  rehal)ilitation  of  rolling  stock. 

VALUATION 

Engineering  News  Record,  March  21,  1970,  pages  74-93.  "EN-R  Indexes  of 
Cost  Trends  1913-1970." 

The  latest  trends   in   building   cost  indexes. 
Building    equipment   cost  indexes. 
Heavy  construction  price  indexes. 

American  Appraisal,  Clients'  Service  Bulletin,  April  1970.  "Meeting  Property 
Information  Needs  Through  The  Computer." 

Computerization  of  property  records  will  provide  management  with  control  over 
the  corporation's  largest  single  asset. 

The  Appraisal  Journal,  July  1970,  pages  424-438.  "Valuation  Education  For 
Valuers — Assessors  and  Appraisers." 

Explains  why  it  is  necessary  to  have  highly  competent  personnel  as  assessors 
and  appraisers. 

The  Appraisal  Journal,  July  1970,  pages  455-460.  "Building  Costs  and  Trends." 
Dow  building  cost  calculator — summary  for  United  States  with  Canadian  com- 
parisons. 

Engineering  News-Record,  June  18,  1970,  pages  78-130.  "2nd  Quarterly  Cost 
Roundup — Construction  Cost  Inflation  Knows  No  Bounds." 
The  latest  trends  in  building  cost  indexes. 
The  four  "M's"  of  Construction. 

ACCOUNTING 

American  Appraisal,  December,  1969.  Clients'  Service  Bulletin,  Vol.  LXVI, 
No.  6. 

Pooling  of  interest  concept  in  accounting  might  be  on  the  way  out. 

GENERAL 

Operations  and  Maintenance  Department,  Association  of  American  Railroads, 
Washington,  D.  C,  October  1969.  "Railway — Highway  Grade  Crossing  Protective 
Devices." 

Digest  of  State  provisions  for  allocation  to  railroads  of  the  costs  of  construction 
and  maintenance  where  Federal  funds  are  not  used. 

Railway  Age,  April  13,  1970,  page  62.  "Track  Maintenance  and  the  Money 
Problem — New  Accounting  Plan  Ahead?" 

Depreciation  accounting  for  the  roadbed  or  goxernment  ownership  might  be 
necessary  to  correct  deferred  maintenance. 

Management  Services,  May-June  1970,  pages  37-45.  "Quality  Control  of  Data 
Through   Statistical  Control." 

Sampling  techniques  for  quality  control,  common  in  industry  and  in  financial 
auditing,  could  equally  well  be  applied  to  all  data  flowing  through  a  system.  The 
article  examines  two  basic  techniques  for  control  of  data. 


Engineering    Records    and    Property    Accounting        243 

Modem  Office  Procedures,  July  1970,  pages  15-17.  "Are  Computer  Time-Sharing 
Services  Right  For  You." 

A  distinguished  panel  of  experts  express  their  views  on  the  advantage  and  dis- 
advantages  of  sharing   computer  time. 

Management  Services,  July-August  1970,  pages  29-36.  "Using  PERT  In 
Accounting  Reports." 

Even  though  many  CPA's  have  made  heavy  use  of  PERT  ( Program  Evaluation 
and  Review  Technique)  for  their  clients,  comparatively  few  have  used  it  for  their 
own  internal  project  management.  Yet  it  is  a  logical  method  of  solving  problems 
the  accountant  encounters. 


Report  on   Assignment  4 
Special   Studies 

R.  L.  E.\LY  (chairman,  subcommittee),  P.  L.  Con\\ay,  Jr.  (assisiant  chairman),  R.  O. 
Bassett,  H.  C.  Bolev,  C.  E.  Bynane,  P.  R.  Holmes,  W.  C.  Kanan,  W.  H. 
Kiel,  F.  J.  Merscher,  J.  M.  Morgan,  J.  J.  O'Hara,  F.  A.  Roberts,  R.  S.  Shaw, 
Jr.,  E.  E.  Strickland,  J.  J.  Weisbecker. 

Report  on   responsibility  code   reporting 

"Responsibilit>'  reporting"  is  a  method  of  assigning  costs  for  work  to  the  party 
or  parties  who  are  responsible  for  the  expenditure.  The  mechanics  of  setting  up  such 
a  system,  assigning  responsibilities  and  assuring  that  the  proper  expenses  are  charged 
to  the  responsible  parties  is  rather  complex.  In  order  to  better  understand  this  system 
we  will  take  a  look  at  some  of  the  structures  of  this  system. 

What  are  the  uses  of  such  a  system?  Most  engineers  are  aware  that  most  capital 
expenditures  are  budgeted  for,  prior  to  their  inauguration.  Many  roads  are  now 
becoming  aware  that  this  shoidd  also  be  true  of  operating  expenses,  and  that  in  order 
to  control  expenses  it  is  necessary  to  know  what  the  money  is  being  spent  for.  With 
a  limited  amount  of  money  to  spend,  it  becomes  a  matter  of  priorities,  and  with  a 
l)udget  and  a  means  of  accumulating  cost,  a  comparison  can  be  made  as  to  whether 
the  budget  is  being  adhered  to. 

It  is  also  possible  to  accumulate  costs  for  similar  operations  using  different  types 
of  equipment  to  compare  the  efficiency  of  the  equipment,  thus  enabling  a  decision 
to  be  made  on  the  purchase  of  future  equipment. 

Cash  management  is  another  important  use  of  this  system. 

How  is   the   information   gathered   for  the  reports? 

Each  physical  location  and  office  is  assigned,  through  a  uniform  system,  a  unique 
number.  These  numbers  will  fall  within  a  numerical  group  assigned  to  a  higher 
responsibility  level  so  that  the  costs  can  be  determined  not  only  for  specific  locations 
but  for  departments.  All  requi.sitions  and  labor  distribution  have  the  responsibility 
code  entered  and  then  these  are  accumulated  for  the  period  of  reporting. 

Various  railroads  have  instituted  this  system.  Some  roads  have  fully  instituted 
systems,  other  roads  are  iuNolvcd  to  a  les.ser  degree. 

What  use  is  made  of  a  computer  in  this  system? 

Until   the  computer  became  a   tool,   the  mass  of  detail  made  it  impractical   to 


244        Engineering    Records    and    Property    Accounting 

try  to  pin-point  expenditures.  Now  with  a  computer  it  is  possible  to  handle  each 
transaction. 

Results  from  the  survey  of  several  railroads  show  a  num1)er  of  types  of  com- 
puters in  use  for  responsibility  rcportin.y;  however,  the  360  system  seems  to  l)e  the 
one  most  prevalent  in  use. 

The  sources  of  data  for  input? 

Depending  on  the  extent  of  use  of  the  system,  the  data  submission  is  quite 
varied.  Data  ranges  from  only  labor  reporting,  made  by  use  of  postcards,  on  a  daily 
basis  in  one  instance  and  the  reporting  of  only  vouchers  and  material  issues  in 
anotlier,  to  the  draw-off  from  magnetic  tape  of  all  costs  in  other  more  sophisticated 
systems. 

Data  can  be  introduced  into  the  computer  in  a  variety  of  forms,  such  as  punched 
cards,  magnetic  tape,   discs,  etc. 

Reporting  data  ranges  from  labor  only  and  material  only  to  the  assignment  of 
all  costs  including  retirement  credits  to  a  responsibility  code.  Some  systems  also 
report  in  ICC  accounts. 

Output  reports  are  in  various  forms. 

Detailed  charge  reports  are  made  to  the  individual  responsibility  person  or 
gang  and  a  detailed  and  summarized  report  to  the  next  higher  responsible  office, 
etc.,  so  that  tlie  upper  levels  of  management  will  not  be  burdened  with  a  mass  of 
detail   that  would   require  considerable  time  to  analyze. 

The  difficulties  that  have  been  encountered  are  not  of  a  major  nature  but  should 
be  pointed  out.  One  difficulty  is  the  assignment  of  responsibility,  that  is,  specifying 
who  is  the  responsible  party.  Another,  particularly  in  the  complex  systems,  is  the 
education  of  the  personnel  whose  duty  is  showing  the  responsibility  number  on  the 
reporting  documents.  Also,  a  surveillance  is  needed  in  this  area.  The  identification 
of  individual  charges  to  a  responsibility  code  is  also  a  problem,  especially  when 
those  charges  originate  outside  of  that  office. 

This  study  is  being  continued  and  further  detailed  reports  will  be  made  so  that 
each  railroad  may  have  the  results  of  benefits  received  from  different  systems. 


Report  on   Assignment  5 
Application  of  data  processing 

L.  F.  Grabowski  (co-chairman,  subcommittee  on  Accoiniting  Phases),  H.  C.  Boley 
(co-chairman,  subcommittee  on  Engineering  Phases),  J.  B.  Byars,  C.  E.  Bynane, 
P.  L.  Conway,  Jr.,  C.  R.  Dolan,  R.  L.  Ealy,  W.  V.  Eller,  A.  P.  Hammond, 
W.  H.  KiEHL,  J.  G.  Kirchen,  W.  A.  Krauska,  F.  J-  Merscher,  J.  M.  Morgan, 
B.  F.  Nauert,  G.  S.  Rogers,  J.  B.  Styles,  H.  R.  Wu^liams. 

DATA    PROCESSING   AND    RESPONSIBILITY    REPORTING 

A  short  report  on  "Responsibility  Reporting"  was  made  by  this  subcommittee 
at  the  March  1969  meeting.  A  method  of  control  of  expenditures  identified  by  some 
roads  as  "Responsibility  Accounting"  has.  been  initiated  by  a  number  of  railroads. 
The  study  of  this  subject  has  been  assigned  to  Subcommittee  4.  As  information  and 
procedvu'es  are  developed  and  assembled.  Subcommittee  5  will  lend  any  assistance 
desired  to  coordinate  the  data  processing  aspects  that  will  produce  pertinent  data 
required  by  management  for  budget  control  and  money  flow. 


Engineering    Records    and    Property    Accounting        245 

MECHANIZATION   OF  PROPERTY   RECORDS 

Increasing  interest  in  being  indicated  in  the  area  of  average  pricing  of  track 
accounts,  and  the  subsequent  mechanization  of  the  vahiation  records  for  these  imits 
and  their  corresponding  investment  dollars. 

The  progress  of  a  program  of  average  pricing  is  being  delayed  by  many  roads 
pending  a  study  proposing  revised  and  simplified  requirements  for  future  ICC 
reporting. 

Also  tied  into  this  v^^ork  is  the  study  of  mechanization  of  track  records  and 
mileage  statistics. 

MECHANIZATION    OF    DEPRECIATION    DATA 

Several  roads,  and  die  ICC,  are  studying  the  application  of  data  processing  to 
"life  studies"  of  road  property.  The  two  methods  being  experimented  with  are 
"Simulated  Plant  Record  Metliod  of  Life  Analysis"  and  "Period  Retirements  Metliod 
of  Life  Analysis."  Although  good  results  have  been  obtained  by  several  companies, 
it  is  too  early  to  predict  an  acceptable  product  for  all  concerned.  The  studies  will 
be  reported  on  more  fully  in  the  coming  year. 


Report  on  Assignment  6 
Valuation  and  depreciation 

C.  E.  Bynane  {chairman,  subcommittee),  W.  M.  Berryman,  P.  L.  Conway,  Jr., 
W.  V.  Eller,  L.  F.  Grabowski,  M.  J.  Hebert,  P.  J.  Hendricksen,  E.  H.  Hof- 
MANN,  p.  R.  Holmes,  L.  W.  Howard,  N.  J.  Hull,  Jr.,  R.  D.  Igou,  J.  G.  Maker, 
D.  C.  Maris,  J.  B.  Styles,  H.  R.  Williams. 

(A)    CURRENT    DEVELOPMENTS    IN    CONNECTION    WITH    REGULATORY    BODIES    AND    COURTS 
ICC   Bureau    of   Accounts 

During  the  fiscal  year  1970  the  Commission  continued  its  5-year  cyclical  review 
of  depreciation  orders,  and  the  Accounting  and  Valuation  Board  issued  30  railroad 
depreciation  orders. 

Special  depreciation  studies  of  Account  26 — Communication  Systems,  Account 
27 — Signals  and  Interlockers,  Account  37 — Roadway  Machines,  and  Account  44 — 
Shop  Machinery,  were  ordered  for  14  railroads  during  fiscal  1970. 

All  interested  railroads  are  invited  to  participate  with  the  ICC  Bureau  of  Ac- 
counts, Depreciation  Branch,  in  a  study  of  the  application  of  data  processing  to 
"life  studies"  of  depreciable  road  property. 

Internal    Revenue   Service 

The  Tax  Reform  Act  of  1969  included  se\'eral  changes  of  importance  to  rail- 
roads. Added  to  the  Internal  Revenue  Code  was  Code  Section  49  repealing  the 
investment  tax  credit  and  precluding  any  property  acquired  after  April  18,  1969. 
from  qualifying  for  the  investment  credit.  Tliere  are  some  few  exceptions  with  respt-ct 
to  so-called  "preterinination"  property. 

Code  Section  184 — Amortization  of  Railroad  Rolling  Stock,  provides  that  cer- 
tain rolling  .stock,  original  use  of  which  commenced  with  the  taxpayer,  may  be  writ- 
ten off  over  a  60-month  period  and  applies  only  to  rolling  stock  placed  in  scr\ice 


246        Engineering    Records    and    Property    Accounting 

after  1969  and  before  1975.  Rollinjr  stoek  placed  in  ser\'ice  in  1969  may  qualify  for 
a  4-year  write  oil. 

Code  Section  185 — .Amortization  of  Railroad  Grading  and  Tunnel  Bores,  pro- 
\ides  that  a  railroad  may  elect  to  write  olF  o\er  a  50-year  life  grading  and  tunnel 
bore  costs  incurred  after  1968.  This  provision  is  ellecti\'e  for  taxable  years  beginning 
after  1969. 

New  Section  263  (e)  provides  that  for  taxable  years  beginning  after  1969 
railroads  are  permitted  to  currently  deduct  rehabilitation  expenses  in  connection  with 
any  unit  of  rolling  stock  (except  locomotives)  if  the  total  of  those  costs  in  any  12- 
month  period  does  not  exceed  20%  of  its  unadjusted  basis. 

(B)    ICC   VALUATION    ORDERS   AND   REPORTS 

The  special  ad  hoc  committee  appointed  to  review  ICC  Valuation  Orders  is 
continuing  its  review  of  Valuation  Order  No.  3. 


Report   on   Assignment  7 
Revisions  and  interpretations  of  ICC  Accounting  Classifications 

R.  D.  Igou  (chairman,  subcommittee),  R.  O.  Bassett,  W.  M.  Berryman,  M.  W. 
BoNNOM,  J.  M.  Bourne,  P.  L.  Conway,  Jr.,  N.  J.  Hull,  Jk.,  J.  W.  Kelly,  J.  G. 
Maker,  D.  C.  Maris,  J.  C.  McKeague,  F.  A.  Roberts,  T.  A.  Valacak. 

This  is  a  progress  report,  presented  as  information. 

Reference  made  to  the  Bureau  of  Accounts,  Interstate  Commerce  Commission, 
Accounting  Series  Circular  No.  138  appearing  on  page  501  in  Bulletin  624,  Decem- 
ber 1969,  should  read  Circular  No.  139  instead  of  Circular  No.  138.  The  subject 
matter  remains  the  same. 

The  ICC  Bureau  of  Accounts  issued  the  following  Accounting  Series  Circulars: 

Circular  No.  141,  issued  November  7,  1969^ — Provides  for  consistency 
in  reporting  operating  expenses,  rents  and  taxes  separated  between  freight 
and  passenger  service. 

Circular  No.  136,  Supplement  No.  2,  issued  January  5,  1970 — Applies 
the  intent  of  Accounting  Series  Circular  No.  136,  dated  December  3,  1964, 
to  the  estimated  amount  of  wage  increases  and  other  benefits  applicable  to 
die  year  1969  for  employees  affiliated  with  shop  unions  still  under  negotiation. 

Circular  No.  142,  issued  May  28,  1970 — Provides  instructions  to  clarify 
the  recordkeeping  required  in  accounting  for  Incentive  Per  Diem  Charges — 
1968,  by  the  Commission's  notice  and  order  in  Ex  Parte  No.  252  (Sub.  No. 
1),  published  in  the  Federal  Register  December  31,  1969. 

Circular  No.  143,  issued  September  7,  1970,  notifies  that — Effective  Sep- 
tember 1,  1970,  hire  of  freight  cars,  previously  based  on  time  only  per  diem 
rates,  will  be  based  on  per  diem  consisting  of  time  and  line-haul  mileage, 
pursuant  to  the  Commission's  order  in  Docket  No.  33145,  Railroad  Freight 
Car  Per  Diem  Charges.  This  Circular  also  provides  revised  accounting  pro- 
cedures relative  to  the  revised  rates. 

The  ICC  issued  a  Revised  Notice  of  Proposed  Rulemaking,  dated  August  24, 
1970,   under   Docket   No.   32153,   which  modified  the   Conuuission's  original   Notice 


Engineering    Records    and    Property    Accounting        247 


of  Proposed  Rulemaking,  dated  October  7,  1969.  The  revised  Notice  states  that  the 
Commission  now  has  under  consideration  modified  proposed  amendments  to  the  Uni- 
fomi  System  of  Accounts  for  Railroad  Companies,  to  be  effective  as  of  January  1, 
1971. 

The  intent  of  the  proposed  revisions  is  to  give  proper  recognition  ( not  pro- 
vided in  current  regulations)  in  the  primary  accounts  of  the  effects  of  certain  tech- 
nological changes  that  have  occurred  in  the  railroad  industry  respecting,  among 
other  things,  the  substantial  investment  cost  of  tenninals  and  highway  equipment 
which  are  now  being  used  extensively  in  TOFC/COFC  (piggyback)  service,  the 
expanding  utilization  of  special-purpose  automotive  vehicles  in  the  maintenance  of 
way   and  structures,   and  the   modernization  of  railroad  equipment. 

The  ICC  order  dated  May  28,  1970,  under  Docket  No.  31358  was  issued  to 
establish  the  eftectixe  date  as  September  1,  1970,  of  the  Commission's  order  dated 
January  17,  1968,  coxering  time  and  mileage  freight  car  per  diem  charges. 

The  ICC  notice  and  order  dated  December  12,  1969,  served  December  22, 
1969,  in  Ex  Parte  252  (Sub.  No.  1),  Incentive  Per  Diem  Charges— 1968,  covers  the 
Commission's  interim  report  containing  its  tentative  findings  of  fact  and  provisional 
conclusions  thereon,   including  the  proposed  rules  and  regulations. 

The  ICC  order  dated  April  28,  1970,  in  Ex  Parte  252  (Sub.  No.  1),  Incentive 
Per  Diem  Charges — 1968,  made  final  and  effective  June  1,  1970,  the  interim  report 
dated  December  12,  1969. 

The  ICC  order  dated  September  1,  1970,  modified  its  order  of  April  28,  1970, 
in  Ex  Parte  No.  252  (Sub.  No.  1),  Incentive  Per  Diem  Charges — 1968,  pending 
reconsideration. 


Report  of  Committee  27 — Maintenance  of  Way  Work  Equipment 


C.  R.  Turner,  Chairman 
F.  H.  Smith, 
Vice  Chairman 

C.  D.  Deal,  Secretary 

D.  D.  Fisher 

E.  H.  Fisher 

K.  E.  Henderson 
M.  E.  Kerns 


C.  H.  Olds 
E.  H.  Taylor 
G.  L.  Zipperian 

J.  y.  Adams 
R.  W.  Bailey 
R.  E.  Berggren 
L.  J.  Calloway 
John  S.  Collins 
L.  E.  Conner 

y.    W.   CUMMINGS 

H.  F.  Dully 

J.  O.  Elliott 

V.  L.  Emal 

V.  R.  Erquiaga 

Emil  Eskengren 

W.  D.  Gilbert 

W.  J.  Gilbert 

R.  A.  Hostetter 

J.  T.  Hunter 

N.  W.  Hutchison  (E) 

C.  Q.  Jeffords 

D.  C.  Johnson 
R.  M.  Johnson 
H.  D.  Jordan 
Joseph  Kelly 
C.  F.  King 


E.  W.  Knight 

W.  F.  Kohl 

W.  E.  Kropp  (E) 

C.  F.  Lewis  (E) 
H.  F.  Longhelt 
G.  J.  Lyon 

W.  A.  MacDonald 

D.  F.  Merrill 
A.  W.  Munt 
R.  W.  Patton 

R.  S.  Radspinner 
R.  H.  Richmond 

T.   R.   RiGSBY 

J.  W.  Risk  (E) 
R.  T.  Ruckman 
J.  T.  Smith 
M.  M.  Stansbury 
C.  H.  Stephenson 

E.  A.  Stewart 
M.  L.  Stone 
K.  O.  Strode 
g.  a.  swanson 
S.  E.  Tracy  (E) 
J.  W.  Winger 

J.  P.  ZOLLMAN 

Committee 


i  E )  Member  Emeritus. 

Those   whose  names   are   shown   in  boldface,   in   addition  to  the   chairman,  vice  chainnan  and 
secretar\-,    are   the   subcommittee   chairmen. 


To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

B.  Revision  of  Manual. 

(a)   Revision  of  Handbook  of  Instructions  for  Care  and  Operation  of 
Maintenance  of  Way  Equipment. 

This  work  has  been  completed,  and  the  revised  version  is  in  the 
hands  of  the  Executive  Manager  for  further  handling. 

2.  Improvements  to  be  made  to  existing  work  equipment. 

Progress  report,  presented  as  infonnation   

3.  Study  of  recommended  practice  for  training  supervisors,  mechanics  and 
operators  to  obtain  desired  production  and  improve  operation  of  road- 
way machines. 

Study  in  progress,  but  no  report 

4.  Machine  design. 

Study  in  progress,  but  no  report 

5.  Aspects  of  data  processing  for  work  eqmpment,  collaborating  as  neces- 
sary or  desirable  with  Committee  32. 

Study  in  progress,  but  no  report 

249 


page 


250 Maintenance    of    Way    Work    Equipment 

6.   Rail  heaters  and  coolers  for  layinji  continuous  welded  rail,  collahoratinj^ 
as  necessary  or  desirable  with  Connnittee  31. 
Stndy  in  progress,  but  no  report. 

The  Committee  on  Maintenance  of  Way  Wohk  EguiPMENT, 

C.  R.  Turner,  Chuiniuin. 


AREA  Bulletin  630,  November-December  1970. 


Report  on   Assignment  2 
Improvements  to  be  made  to  existing  work  equipment 

K.  E.  Henderson  (chairman,  stibcommittec),  J.  ^^  Adams,  C.  M.  Deal,  V.  L.  Emal, 
R.  A.  HosTETTER,  C.  Q.  JEFFORDS,  E.  W.  Knight,  R.  W.  Patton,  T.  R.  Rigsby, 
R.  T.  RucKMAN,  J.  T.  Smith,  M.  M.  Stansbury,  J.  P.  Zollman. 

Your  committee  submits  the  following  recommendations  pertaining  to  improve- 
ments to  be  made  to  existing  work  equipment 

Pneumatic  Dual  Spike  Drivers 

Replace  /2-inch  standard  bolts  with  9/16-inch  hardened  bolts  to  prevent  failure 
of  guide  tube  cap. 

Tie  Saw 

Crank  wheel  shaft  fits  into  outer  bearing  only  M  inch.  Where  bearing  fits  into 
saw  housing  front  cover,  bore  %  inch  deeper  so  bearing  can  be  pressed  further  down 
on  the  shaft,  giving  Js-inch  bearing;  a  ?8-inch  spacer  can  then  be  added  to  the  outside 
of  the  bearing  to  take  up  the  slack. 

Rubber-Tired  Mobile  Crane 

Replace  all  fuses  with  circuit  breakers  enclosed  in  standard  electrical  switch  box 
located  in  cab.  Replace  wiring  with  heavier  wiring  enclosed  in  standard  loom  con- 
tinued to  within  2  inches  of  component,  color  coded.  Use  standard  automotive-type 
gromets  where  wires  pass  through  metal  except  where  main  harnesses  pass  through 
firewall  and  circuit  breaker  box,  plastic  insulators  to  be  used  at  these  locations.  All 
looms  and  wires  supported  every  10  inches  by  rubber-insulated  wire  clips. 

Headlights  should  be  mounted  on  a  bar  attached  to  the  front  of  the  cab  20 
inches  abo\'e  deck  plate  to  prevent  breakage. 

Panel  should  be  installed  to  receive  four  individual  gauges  to  replace  present 
cluster  gauge,  as  this  unit  is  too  costly  to  maintaia 

Install  mechanical  lock  on  swing  table  to  axoid  boom  and  bucket  from  swinging 
into  other  traffic  while  traveling  on  public  roads  in  event  of  chain  breakage,  cylinder 
leakage  or  failure,  or  accidental  striking  of  control  lever. 

Swing-table-to-frame  mounting  bolts  should  be  changed  to  grade  8,  as  anything 
less  rapidly  elongates.  Axle  assembly  mounting  bolts  should  be  changed  to  grade  8. 


Maintenance    of    Way    Work    Equipment 251 

Grease  fittings  to  be  recessed  into  pins  on  all  boom  and  bucket  pins  to  avoid 
constant  breaking  of  fittings  and  pin  not  being  lubricated. 

Eyes  on  ball  housing  assemblies  which  receive  tie  rod  pins  should  be  bushed 
with  /8-inch  wall  hardened  and  ground  steel  bushings. 

Rotary  Brush  Cutter 

Cutter  head  shields  should  have  1-inch  x  1-inch  x  /4-inch  angle  iron  around 
outer  edge  and  welded  to  sheet  metal  shield  to  avoid  constant  shield  deterioration. 
Shield  material  should  be  increased  to  3/16-inch  thickness. 

Install  shield  over  emergency  hydraulic  pump  to  avoid  fires  from  combustibles 
building  up  on  electric  motor. 

Both  inner  and  outer  booms  should  be  made  from  3/16-inch  steel  instead  of 
present  is  inch. 

Sockets  in  upper  and  lower  boom  sections  which  hold  lift  cylinder  pins  are  now 
gussetted  parallel  to  boom  section.  These  should  also  be  gussetted  at  right  angle  to 
present  gussets. 

Cutter  head  motors  should  be  changed  from  present  rotary  gear  to  vane  type  to 
better  \\'ithstand  impact. 

Vibratory  Tampers 

Front  bumper  should  be  added  to  protect  vibrators.  Rear  bumpers  should  be 
added  to  protect  oil  cooler  when  mounted  on  rear  of  machine. 

Production  Tampers 

Apply  split  cylinder  wedge  plate  to  jack  frame  extension  cut  to  fit  small  outside 
jack  cylinder.  On  lower  end  of  jack  cylinder,  add  /4-inch  strip  around  outer  edge  of 
lower  plate  and  slot  bolt  holes  to  accept  smaller  jack  cylinder.  This  modification 
allows  interchangeable  use  of  either  small  or  larger  outside  jack  cylinder. 

Add  18-inch  fan  to  center  roof  support  immediately  above  operator's  seat  to 
protect  him  against  dust  when  working  fouled  ballast  in  dry  weather. 

Add  fire  extinguisher  cabinet  bolted  to  inside  of  right  center  roof  support  and 
resting  on  top  of  the  main  control  junction  box. 

Tie  Injector 

Main  roller  guide  frames  should  be  braced  on  outside  to  keep  roller  frame  from 
spreading  out.  Plastic  air  lines  should  be  replaced  by  copper  tubing.  Add  manually 
operated  bleed-off  of  accumulators  as  a  safety  measure  when  engine  is  shut  down. 
Inserter  arm  needs  to  be  structurally  stronger,  particularly  at  ram  connections.  Tie 
conveyor  chain  is  weak.  Use  roller  chain  instead  of  link  chain  to  simplif>  repair. 

Tie  Inserter 

Provide  portable  turntable  similar  to  that  used  witli  heavy  motor  cars,  along 
with  carrier  rack  on  machine  so  unit  can  be  turned  on  job  when  going  into  areas 
requiring  ties  to  be  inserted  from  opposite  side  of  track.  Reverse  hydraulic  hose  to 
cable  control  .so  that  winch  pulls  tie  in  when  control  lexer  is  pulled  toward  operator. 

Tie  Sprayer 

Reinforce  tank  and  spray  head  roller  assenibU.  Add  hand-operated  crane  for 
handling  creosote  barrels. 


252 Maintenance    of    Way    Work    Equipment 

Track  Liner 

Install  a  1-incli  bolt  through  middle  of  wear  block  and  spot-weld  bolt  and 
wear  block  to  spud  gvu'de  casting  on  models  with  this  arrangement.  This  will  prevent 
wear  block  from  coming  loose  causing  damage  to  guide  casting. 

On  models  using  main  frtune  roller  guide,  replace  hollow  tubing  under  main 
frame  with  solid  half-round  for  longer  service.  Four  short  slide  blocks  on  platform 
frame  should  be  replaced  with  full-length  solid  bar  for  longer  service  life.  Short 
angle  iron  guides  on  main  frame  which  ride  on  the  slide  blocks  should  also  be 
replaced  with  full-length  heavy  angle  iron,  thus  providing  long,  maintenance-free 
service  life. 

Track  Lining  Light 

Better  support  is  required  along  with  locking  device  to  protect  engine  and 
alternator  from  damage  when  machines  are  in  transit. 

Tie  Shear 

Main  frame  to  anti-derail  wheels  is  weak.  Reinforcing  gussett  on  rear  should 
be  increased  from  3/16  inch  to  M  inch  and  made  larger.  Changing  shear  blades  takes 
too  long.  Modification  needed  to  materially  reduce  time  required. 

Side  Boom  Crawler  Tractor 

Machine  comes  from  factory  with  counterweights  on  right  side  and  removable 
side  boom  on  left  side  and  is  awkward  to  handle.  This  can  be  corrected  by  removing 
counterweights  and  installing  hydraulically  operated  outrigger  on  left  side.  Mount 
boom  permanently  on  left  side,  hinged  in  the  middle  so  it  can  be  folded  crosswise 
over  top  of  machine.  Use  hydraulic  cylinders  on  hinge  side  to  raise  and  lower  top 
half  of  boom  and  square  taper  pins  on  opposite  side  to  hold  top  and  bottom  sections 
in  upright  position.  Install  hydraulic  cylinder  to  swing  boom  away  from  machine. 
Add  box  for  blocking,  cutting  torches  and  tools;  brackets  for  cables  and  hooks;  and 
protective  guards  for  operator. 


ECONOMICAL  TRACK  DRAINAGE 
...  I  SPENO\  B^l'^st  Cleaning 


Cnm-Section  showing  good  drainage  after  cleaning  mitli  SPEND  Ballast  Cleaner. 

One  of  the  SPEND  Ballad  Cleaniiif  machines. 


the  transformation  in 
drainage  conditions  shown 
In  these  photos  was 
accomplished  with  a 
SPENO  Ballast  Cleaning 
Machine... Time  Tested 
—  and  Proved— Year 
2fter  Year  on  the  railroads 
of  the  Nation. 

For  just  a  few  pennies 
per  track  foot  you  can 
have  good  track  drainage 
that  saves  maintenance 
dollars. 


Write  or  telephone  for  a  Ballast 
Cleaning  program  for  your  railroad. 


PPf 


FRANK  SPENO  RAILROAD  BALLAST  CLEANIN6  co .  inc 


Clork  St.,  Eoif  SyracuM,   N.Y. 
Ph.   315   437  aS47 


306   N.   Coyujia   St..   Ithaca,   N.Y. 
Ph.  607  272  3313 


Canadian  Sales  Representative:  IE&-HOLDEN  LTD.,  614  St  J^imes 
St.  W.,   Montreal  3,  Quebec,  Canada     Phone:  514  849-8131 


THE  TRASCO  CAR   RETARDER 

HUNDREDS  IN  SERVICE 
IN  CLASS  YARD  TRACK 


TRACK  SPECIALTIES  COMPANY 

P.O.  BOX  729  WESTPORT,   CONNECTICUT 


American  Railway 

Engineering  Association— Bulletin 


Bulletin  631  January-February   1971 

Proceedings  Vol.  72* 


REPORTS  OF  COMMITTEES 

1 — Roadway  and  Ballast 255 

3 — Ties  and  Wood  Preservation 291 

4— Rail 305 

5— Track 401 

31 — Continuous  Welded  Rail 415 

6— Buildings 419 

7 — Timber  Structures 421 

8 — Concrete  Structures  and  Foundations 425 

15 — Steel   Structures 429 

30 — Impact  and  Bridge  Stresses 431 

32 — Systems  Engineering 435 

28 — Clearances 439 

25 — Waterways  and  Harbors 441 

24 — Engineering  Education 449 

Address  by  J.  H.  Spicer  at  Toronto  Regional  Meeting  __   454 
Address  by  Dr.  R.  S.  Thoman  at  Toronto  Regional  Meet- 
ing  458 

Ground  Rules  for  Discussion  Section 254 


•  The  contents  of  this  Bulletin  and  the  other  Bulletins  of  the  Association  from 
Bulletin  629,  September-October  1970,  to  and  including  Bulletin  633,  June-July  1971 
(except  the  blue-covered  Directory  Issue,  Bulletin  632,  April-May  1971),  will  constitute 
the  Annual  Proceedings  of  the  Association,  Vol.  72.  Accordingly,  this  issue  of  the 
Bulletin  should  be  carefully  preserved  for  inclusion  in  the  Proceedings  book-fype  binder 
which  will  be  mode  available  on  request  from  Association  Headquarters,  following 
publication   of  the  June-July   issue. 

Copyright   1971,   by   American    Roilwoy   Enninetring   Anociolion 


BOARD  OF  DIRECTION 

1970-1971 

President 
E.  Q.  JoHKSON,  Chief  Engineer,  Norfolk  &  Western  Railway,  Roanoke,  Va.  24011 

Vice  Presidents 

A.  L.  Sams,  Vice  President  and  Chief  Engineer,  Illinois  Central  Railroad,  Chicago,  111. 

60605 
R.  M.  Brown,  Chief  Engineer,  Union  Pacific  Railroad,  Omaha,  Neb.  68102 

Past  Presidents 

H.  E.  Wilson,  Assistant  Chief  Engineer  System,  Atchison,  Topeka  &  Santa  Fe  Railway, 

Chicago,  111.  60604 
H.  M.  Williamson,  Chief  Engineer,  System,  Southern  Pacific  Transportation  Company, 

San  Francisco,  Calif.  94105 

Directors 

D.  V.  Sartore,  Chief  Engineer — Design,  Burlington  Northern,  Inc.,  St.  Paul,  Minn.  55101 
S.  A.  Cooper,  Chief  Engineer,  Gulf,  Mobile  &  Ohio  Railroad,  Mobile,  Ala.  36601 

J.  F.  Piper,  Chief  Engineer,  Pennsylvania-Reading  Seashore  Lines,  Camden,  N.  J.  08103 

C.  T.  PoPMA,  Chief  Engineering  Officer,  Penn  Central  Transportation  Company,  Phila- 
delphia, Pa.  19104 

C.  W.  Wagner,  Industrial  Engineering  Officer,  Canadian  National  Railways,  Montreal, 
101,  Que.,  Can. 

R.  F.  Bush,  Chief  Engineer,  Erie  Lackawanna  Railway,  Cleveland,  Ohio  44115 

A.  W.  Carlson,  Chief  Engineer,  Western  Pacific  Railroad,  San  Francisco,  Calif.  94105 

E.  T.  Franzen,  Chief  Engineer,  Missouri  Pacific  Railroad,  St.  Louis,  Mo.  63103 

J.  T.  Ward,  Senior  Assistant  Chief  Engineer,  Seaboard  Coast  Line  Railroad,  Jackson- 
ville, Fla.  32202 

E.  M.  Hastings,  Jr.,  Utility  Engineer,  Chesapeake  &  Ohio  Railway-Baltimore  &  Ohio 
Railroad,  Huntington,  W.  Va.  25718 

B.  J.  WoRLEY,  Vice  President-Chief  Engineer,  Chicago,  Milwaukee,  St.  Paul  ft  Pacific 

Railroad,  Chicago,  111.  60606 
W.  J.  Jones,  Engineer  Maintenance  of  Way  and  Structures,  System,  Southern  Pacific 
Transportation  Company,  San  Francisco,  Calif.  94105 

Treasurer 
A.  B.  HiLLMAN,  Jr.,  Chief  Engineer,  Belt  Railway  of  Chicago,  Chicago,  III.  60638 

Executive  Manager 
Earl  W.  Hodgkins,  59  East  Van  Buren  Street,  Chicago,  Dl.  60605 

Administrative  Secretary 
E.  L.  Abbott,  59  East  Van  Buren  Street,  Chicago,  111.  60605 

Technical  Secretary 
N.  V.  Engman,  59  East  Van  Buren  Street,  Chicago,  111.  60605 

Published   by    the   American    Railway    Engineering   Association,    Bi-Monthly,   January-February,   April- 
May,    June-July,    September-October    and    November-December,    at 
59  East  Van  Buren  Street,  Chicago,  HI.  60605 

Second  daa&  postage  at  Chicago,  111.,  and  at  additional  mailing  ofBceL 
Sub-scription   $15   p<>r   annum. 


CORRECTION 

Bulletin    630,    November— December    1970 

Part    1 — Manual    Recommendations — Page    1  1  1 

(5.1     Specifications    for    Pipelines    Conveying    Flammable    Substances) 

5.1.4  CASING  PIPE 

Casing  pipe  and  joints  shall  be  of  metal  and  of  leakproof  construction,  capable 
of  witlistanding  railway  loading.  The  inside  diameter  of  the  casing  pipe  shall  be 
such  as  to  alow  die  carrier  pipe  to  be  removed  subsequently  without  disturbing 
the  casing  pipe.  All  joints  or  couplings,  supports,  insulators  or  centering  devices  for 
the  carrier  pipe  within  a  casing  under  railroad  tracks  shall  be  taken  into   account. 

Table  5.1.4.1 

Minimum  Wall  Thickness  for  Steel  Casing  Pipe  for  E  72  Loading 

Nominal  Notninal 

Thickness  Diameter 

Inches  Inches 

0.188  Under  14 

0.219  14  and  16 

0.250  18 

0.281  20 

0.312  22 

0.344  24 

0.375  26 

0.406  28  and  30 

0.4.38  32 

0.469  34  and  36 

0.500  38,  40  and  42 

When  casing  is  installed  without  benefit  of  a  protective  coating,  and  said  casing 
is  not  cathodically  protected,  the  wall  thickness  shown  above  shall  bo  increased  to 
the  nearest  standard  size  which  is  a  minunum  of  0.063  in.  greater  than  tlie  thickness 
shown  except  for  diameters  under  12?4  in. 


253 

lliil.  6.tl 


Ground  Rules  for  Discussion  Section 

Coninients  on  the  reports  and  papers  published  in  the  four  technical  issues  of  the 
AREA  Bulletin,  by  either  members  or  non-members,  are  invited.  These  comments 
will  be  printed  in  a  special  discussion  section  located  in  the  back  of  the  Bulletin 
and  in  accordance  with  the  procedures  outlined  below.  The  purpose  of  the  section 
is  to  stimulate  greater  interest  in  the  published  reports  and  papers  and  to  offer  to 
those  not  involved  in  their  preparation  the  opportunity  to  present  their  thoughts 
on  the  difiFerent  subjects,  whether  pro  or  con,  based  on  their  knowledge  and 
experience. 

For  the  information  and  guidance  of  all  concerned,  here  are  the  ground  rules 
adopted  by  the  Board  of  Direction  for  handling  and  publishing  comments  on  AREA 
published  papers  and  reports: 

•  Letter  containing  comments  must  be  addressed  to  executive  manager,  be 
received  by  the  deadline  published  with  paper,  contain  identification  number  of 
paper  or  report,  and  be  identified  with  writer's  signature,  typed  or  printed  name, 
title,  company  and  full  address,  including  zip  code. 

•  Reader's  comments  will  be  forwarded  to  author  or  appropriate  committee 
for  further  comments  or  rebuttal. 

•  Both  reader's  comments  and  author's  reply  wiU  be  published  at  the  same 
time  and  in  the  earliest  Bulletin  having  space  available. 

•  All  conaments  must  be  in  good  taste,  add  to  discussion  on  the  subject  of 
paper  or  report,  and  be  constructive  in  nature. 

•  Board  Committee  on  Publications  will  be  the  review  or  mediation  group 
should  some  problem  or  sometliing  questionable  arise. 

•  After  deadline,  no  furdier  comments  on  a  particular  paper  or  report  will 
be  accepted  for  pubhcation,  unless  extenuating  circumstances  exist. 

Identification  number  of  papers  open  to  discussion  will  be  located  near  the 
tide  and  must  be  used  in  comments  to  positively  identify  the  paper  to  which  they 
refer.  Comments  on  committee  reports  should  refer  to  the  proper  committee  and 
assignment  numl)ers. 

Deadline  for  comments  will  be  given  in  a  footnote  on  the  first  page  of  the 
paper  or  committee  report,  the  latter  covering  all  of  the  subcommittee  reports  of 
that  particular  committee.  In  general,  this  deadline  will  be  approximately  90  days 
after  date  of  issue.  However,  this  will  vary  to  some  extent  because  the  intervals 
between  issues  of  the  Bulletin  are  not  constant  throughout  the  Association's  publica- 
tion year,  which  extends  from  September  to  July,  inclusive. 

The  Board  of  Direction  feels  that,  with  the  cooperation  and  interest  of  all 
concerned,  discussions  on  papers  and  reports  published  by  the  Association  should 
prove  to  be  both  stimulating  and  informative. 


254 


Report  of  Committee  1 — Roadway  and  Ballast 


M.  B.  Hansen,  Chairman 
G.  F.  Nigh, 
Vice  Chairman 

E.  L.  Robinson, 
Secretary 

C.  E.  Webb 

F.  L.  Peckover 

G.  E.  Ellis 

N.  E.  Whitney,  Jr. 
W.  M.  Dowdy 
E.  E.  Farris 
J.  B.  Wackenhut 
J.  A.  Goforth 

D.  H.  Yazell 


A.  G.  Altschaefel 
L.  W.  Anderson 
H.  C.  .\rchdeacon 
M.  L.  Atkins 
R.  D.  Baldwin 
H.  E.  Bartlett 
C.  W.  Bean 
G.  \V.  Becker 
R.  H.  Beeder 

F.  X.  Beighley 

C.  R.  Bergman 

D.  L.  Bloem 

R.  H.  Bogle,  Jr. 

E.  W.  Burkhardt 
S.  F.  Burmeister 

D.  H.  Cook 
I.  P.  Cook 
M.  \V.  Cox 

A.  P.  Crosley  (E) 

G.  W.  Deblin 

T.  F.  deCapiteau 

L.  J.  Deno 

H.  K.  Eggleston 

W.  P.  Eshbaugh  (E) 

J.  B.  Farris 

G.  C.  Fenton 

W.  T.  Hammond 

E.  M.  Hardin 
G.  B.  Harris 

T.  J.  Hernandez 
P.  R.  Houghton 
H.  O.  Ireland 
W.  P.  Jones 


E.  C.  Jordan 
R.  J.  Kemper 
C.  F.  King 

J.  H.  Kirch 
H.  W.  Legro  (E) 
W.  D.  Lovell 
J.  K.  Lynch 
P.  G.  Martin 

W.   C.   McCORMICK 

F.  H.  McGuigan 
H.  E.  McQueen 
Paul  McKay  (E) 
H.  E.  Moore 

W.  G.  Murphy 

J.  E.  Newby 

F.  P.  Nichols,  Jr. 

R.  H.  Peterson 

W.  B.  Peterson 

S.  R.  Pettit 

H.  E.  Richards 

N.  B.  Roberts 

P.  J.  Seidel 

W.  M.  Snow 

\V.  J.  Sponseller 

R.  a.  Swanson 

H.  L.  Van  Horn 

M.  Van  Kuiken 

J.  L.  Vickers 

S.  S.  Vinton 

M.  E.  Vosseller 

A.  J.  Wegmann  (E) 

R.  D.  White 

R.  H.  Uhrich 

Committee 


( E  )  Member  Emeritus. 

Those  whose   names   are   shown    in  boldface,   in   addition  to  the  chairman,  vice   chairman   and 
secretan.',  are  the  subcommittee  chairmen. 

To  the  American  Railwaij  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 


1.  Roadbed. 

Progress  report,  submitted  as  information 


page  256 


Ballast. 

Your  committee  has  been  active  in  developing  a  laboratory  and  field 
procedure  to  qualitatively  evaluate  ballast  material.  While  no  further 
progress  can  be  reported  at  this  time,  we  are  planning  exploratory  meet- 
ings with  representatives  of  the  Department  of  Transportation.  Through 
these  meetings,  it  is  hoped  we  can  coordinate  our  activities  and  take 
advantage  of  tests  of  the  same  type  that  the  Department  is  planning  to 
progress  in  the  near  future. 


Note — Discussion   on    suhcnmniittee   report    herein    closes   on    May    1,    1971. 

25.5 


^56      Roadway    and    Ballast       

3.  Natural  Watenvays. 

Study  in  progress  to  review  pages  1-3-3  to  1-3-7,  Chapter  1  of  the 
Manual,  involving  drainage  areas  and  computation  of  the  size  of  water- 
way openings. 

4.  Drainage  and  Culverts. 

Additional  Manual  material  submitted  for  adoption  was  published  in 
Part  1  of  Bulletin  630,  November-December  1970. 

5.  Pipelines. 

Revision  of  Part  5,  Pipelines,  Chapter  1  of  the  Manual,  submitted  for 
adoption,  was  published  in  Part  1  of  Bulletin  630,  November-December 
1970. 

6.  Fences. 

Study  in  progress  to  update  and  convert  Manual  to  decimal  format. 

8.  Tunnels. 

Study  is  in  progress  on  Assignments  (a)  \^enti]ation,  (b)  Methods  to 
Increase  Clearance  and  (c)  Mediods  of  Open  Cutting.  The  committee 
is  keeping  in  touch  with  the  Big  Walker  Mountain  Tunnel  Project  on 
1-77  in  Bland  County,  Virginia,  viewing  all  phases  of  the  construction 
methods  and  techniques. 

9.  Vegetation  Control. 

Publication  of  the  report  on  brush  control  is  being  deferred  until  gov- 
ernment agencies  arrive  at  a  common  understanding  regarding  the  use 
of  2,4,5-T.  Aldiough  2,4,5-T  has  been  cleared  for  use  on  rights-of- 
way,  it  has  not  been  cleared  for  use  along  drainage  and  irrigation 
ditches.  Inasmuch  as  most  railroads  have  a  large  number  of  such  ditches, 
the  committee  deems  it  necessary  to  wait  for  additional  information. 

The  Committee  on  Roadway  and  Ballast, 

M.  B.  Hansen,  Chairman. 


AREA   Bulletin  631,  January-February  1971. 


Report   on   Assignment    1 
Roadbed 

F.  L.  Peckover  (chairman,  subcommittee),  G.  W.  Deblin,  W.  P.  Eshbaugh,  J.  B. 
Fabris,  E.  M.  Habdin,  H.  O.  Ireland,  W.  P.  Jones,  E.  C.  Jordan,  H.  W. 
Legro,  F.  H.  McGuigan,  W.  G.  Murphy,  J.  E.  Newby,  S.  R.  Pettit,  P.  J. 
SEroEL,  W.  M.  Snow,  W.  J.  Sponseller. 

Your  committee  submits  the  following  revision  of  parts  of  Chapter  1,  Part  1, 
of  the  Manual  for  information  and  discussion.  A  complete  revision  of  this  Part  is 
being  prepared  in  two  stages.  The  first  stage,  presented  here,  includes  information 
on  Exploration  and  Testing,  and  Design.  The  second  stage,  in  preparation,  includes 
information  on  Construction  and  Maintenance. 


Roadway    and    Ballast 257 


The  first  stage  of  ie\  ision  here  presented  is  for  information  and  \\  ill  be  recom- 
mended for  adoption  and  publication  in  the  Manual  with  any  changes  raised  by 
discussion  and  appro\ed  by  the  committee,  or  required  for  coordination  with  the 
sections   on  Construction  and  Maintenance. 

This  presentation  is  a  complete  rearrangement  and  revision  of  existing  Manual 
material  together  with  new  material  assembled  under  this  assignment. 


Part  1 
Roadbed 

FOREWORD 

Since  the  development  of  soil  and  foundation  engineering  as  an  important  branch 
of  civil  engineering  during  the  past  few  decades,  earth  and  rock  have  come  to  be 
treated  as  construction  materials.  They  have  properties  which  can  be  evaluated  and 
they  are  subject  to  strains  and  failures  in  the  same  way  as  other  building  materials. 

Earth  and  rock  are  different,  however,  from  such  materials  as  steel  and  concrete 
in  one  fundamental  way  of  which  the  designer  should  always  be  aware:  each  soil 
and  rock  deposit  is  extremely  variable  and  has  its  own  characteristics  which  reflect 
its  origin  and  the  factors  affecting  it  since.  As  a  result,  investigation  and  testing 
are  uniquely  important  if  soils  and  rock  are  to  be  used  economically  and  safely  in 
engineering  work. 

This  Part  of  the  Manual  is  prepared  with  recognition  of  the  importance  of  geo- 
technical  knowledge  in  the  design,  construction  and  maintenance  of  track.  The  sub- 
grade  is  considered  to  be  as  important  to  track  performance  as  the  rail  and  ballast. 
Keeping  this  balanced  point  of  view  in  mind,  an  engineered  approach  is  presented 
for  many  roadbed  problems  rather  than  reference  to  standard  practice. 

The  choice  of  available  methods  is  given  along  with  an  evaluation  of  the  judg- 
ment factors  imolved  in  many  of  the  questions  relating  to  the  design  and  construc- 
tion of  new  roadbed  and  the  upgrading  and  maintenance  of  existing  roadbed.  Con- 
siderations such  as  drainage  and  slope  stability  which  affect  the  roadbed  directly 
but  are  centered  outside  its  physical  limits  are  included. 

Because  of  the  \ariety  of  foundation  conditions  which  occur  and  their  asso- 
ciated problems,  a  number  of  references  are  given.  Details  of  methods  are  presented 
only  when  adeciuate  information  is  hard  to  find  elsewhere.  Specialized  help  is  advis- 
able when  a  detailed  appraisal  of  the  suitability  and  performance  of  particular  deposits 
is  required. 

CONTENTS 

Section  Page 

1.1   Exploration  and  Te.sting   2.58 

1.1.1  Ceneral     2.58 

1.1.2  Preliminary    Exploration     258 

1.1..3   Detailed    Exploration    2fiO 

1.1.4  Sampling  and  Testing   262 


258  Roadway    and    Ballast 

1.2  Design      266 

1.2.1  General     266 

1.2.2  Cuts    266 

1.2.3  Fills    276 

1.2.4  Drainage    281 

1.2.5  Roadbed     285 

1.3  Construction    (to  be  prepared) 

1.4  Maintenance    (to  be  prepared) 


1.1  EXPLORATION  AND  TESTING 

1.1.1  GENERAL 

This  section  describes  steps  required  to  assemble  sufficient  information  on  site 
conditions  so  that  a  suitable  design  of  roadbed  with  cuts,  slopes  and  drainage,  can 
be  made  and  construction  can  proceed.  With  some  change  in  emphasis,  the  same 
steps  can  be  applied  to  investigations  for  structural  foundations  and  earthworks. 

Site  investigations  are  usually  done  in  two  phases: 

(1)  Preliminary — Review  of  information  available  from  published  sources 
and  previous  investigations,  supplemented  by  site  reconnaissance. 

(2)  Detailed — Collection  of  detailed  knowledge  of  soil,  rock  and  ground- 
water conditions  by  exploration  and  sampling,  field  measurements  and 
laboratory  tests. 

1.1.2  PRELIMINARY  EXPLORATION 

1.1.2.1  Information  Available 

Depending  on  tlie  extent  of  the  project,  geological,  climatic  and  other  informa- 
tion from  published  sources  may  be  useful  in  planning  exploration  work  and  inter- 
preting site  observations.  The  types  of  such  information,  source  and  use  are  given 
in  Table  1.1.1. 

In  developed  areas,  information  from  previous  local  observations  may  be  par- 
ticularly useful.  Available  information  may  include  record  of  site  exploration,  wells, 
ground  water  conditions,  floods,  and  the  construction  and  performance  of  structures. 

1.1.2.2  Air  Photographs 

Air  photographs  at  various  scales  are  available  for  most  states  from  the  U.S. 
Department  of  Agriculture.  Photo  mosaics  can  be  assembled  and  used  in  intensive 
studies  of  site  conditions.  Photos  on  a  large  scale  may  be  required  for  detailed  studies 
and  can  be  obtained  on  order. 

Stereoscopic  viewing  of  overlapping  air  photographs  assists  in  recognizing  land- 
forms,  landslides,  general  soil  types,  drainage  and  erosional  features.  Air  photo  inter- 
pretation can  aid  in  supplementing  ground  observations  and  help  in  planning  an 
appropriate  site  investigation  program.  It  should  be  remembered  that  as  air  photos 
only  show  conditions  at  or  near  the  ground  surface,  they  cannot  be  used  dependably 
to  give  detailed  information  for  design. 


Roadway    a  n  d    Ballast 


259 


Table  l.U 
Sources  of  Site  Information 


Source 

Type  of  Information 

Use 

Geological  Surveys: 
— r.  S.  and  States 
— Canada  and  Provinces 

Dept.  of  Mines: 

— Canada  and  Provinces 

Index  to  geological  map- 
I)ing. 

Mai)s  ot  bedrock  and  sur- 
face   materials,    topogra- 
phy. 

Bulletins,  {papers,  etc.,  some 
including   detailed   maps 
of  specific  areas. 

Guide  to  si)eci(i(;  rejjorts 
and  maps. 

Classification  and  distribu- 
tion of  dei)osits. 

Correlations  and  character- 
istics of  dei)osits. 

Geological  Society  of 
America 

Water  sui)j)ly  papers. 

Maps   of   general    geology, 
some  special  features. 

Bulletins,  i)apers,  etc.,  some 
including  maps. 

Ground  water  conditions 
and  resources  in  specific 
areas. 

Classification  and  <Iistril)u- 
tion  of  deposits. 

Correlation  and  detailed 
characteristics  of  depos- 
its. 

U.  S.   Dept.  of  Agriculture, 
Soil  Conservation  Service 

Canada — Dejit.    of    Energy, 
Mines  and  Resources 

Air  ])hotographs 

See  Article  1.1.2.2 

U.  S.  Dept.  of  Agriculture, 
Soil  Conservation  Service 

Soil  Survey  Services, — 
Canada  and  Provinces 

Soil  maps  and  reports 

Detailed  classification  of 
surface   soils,   with   sum- 
mary of  geolog>'. 

V .  S.  Weather  Bureau 
Canada — Meteorological 
Office,  Dept.  of  Transport 

Rainfall  and  temiierature 
records 

Information  on  drainage, 
weathering,    frost    pene- 
tration. 

r.  S. — Variou.'^  l)uilding 

codes 
National    Building   Code   of 

Canada 

Building   code    and    earth- 
(juake  zone  reciuirements 

Design  of  structures  and 
slopes 

The  inteipretation  of  air  photo.s  by  e.\perienced  personnel,  whose  services  may 
be  warranted  on  certain  projects,  can  yield  a  \ariety  of  useful  information.  E\en  in 
relatively  (mskilled  hands,  air  photos  are  helpful  in  planninu  sidiny  extensions,  drain- 
aj?e,   industrial  de\elopments  and  other  projects. 

1.1.2.3  Site  Reconnaissance 

.•\  thorough  reconnais.sance  of  the  site  to  a.s.sess  conditions  and  the  need  for 
detailed  exploration  should  be  done  after  preliminar\-  alignment,  grades  and  the  loca- 
tion of  structures  have  been  chosen  from  major  cf)nsideralions  of  the  project.  Detailed 
knowledge  of  the  site  conditions  rarely  allects  the  general  location  of  a  project  but 
often  leads  to  adjustments  in  final  location  to  reduce  construction  and  maintenance 
co.sts.  Effective  site  reconnaissance  re<|uires  close  obserxation  of  ground  surhice  and 


260 Roadway    and    Ballast 

drainajff  characteristics  by  an  experienced  perscm.  Soil  and  rock  exposures  should 
be  examined  in  detail  and  the  interrelation  of  difFerent  deposits,  their  physical  char- 
acteristics and  their  ellect  on  construction  operations  should  be  assessed.  Factors  such 
as  slope  stability,  weathering  and  seepage  can  usually  be  evaluated  in  the  field  much 
better  than  widi  samples  in  a  laboratory.  A  particular  warning  is  shown  by  tlie 
presence  of  soft  ground,  soils  which  become  weak  when  disturbed,  ground  water 
seepage  and  eroding  earth  banks.  Unstable  ground  calls  for  special  observations,  and 
these  are  discussed  in  Section  1.4,  Maintenance. 

From  reconnaissance  of  the  site,  information  available  from  other  sources  and 
die  nature  of  tlie  project,  a  decision  can  be  made  on  the  need  for  detailed  exploration. 
Answers  will  be  required  to  questions  such  as: 

Are  excavated  materials  suitable  for  fills? 

If  not,  where  are  the  nearest  sources  of  suitable  borrow? 

Are  standard  roadbed  sections  and  slopes  suitable? 

What  type  of  excavation  procedures  can  best  be  used? 

Can  excavation  and  replacement  of  unsuitable  materials  be  avoided? 

Will  instability,  drainage  or  erosion  problems  influence  the  design? 

What  are  foundation  conditions  for  stmctures? 

If  the  project  is  large  or  sensitive  to  site  conditions,  it  will  probably  be  advisable 
to  retain  the  services  of  a  geotechnical  engineer  at  this  stage  to  assist  in  planning 
the  most  economical  construction. 

1.1.3  DETAILED  EXPLORATION 

1.1.3.1  Fill  Foundations 

Fill  foundations  are  explored  so  that  fills  may  be  designed  to  avoid  failure  of  the 
subsoil  or  excessive  settlement  of  the  fill.  For  this  purpose  the  subsoil  conditions 
should  be  explored  to  a  depdi  at  least  equal  to  the  width  of  the  proposed  fill  or  to 
competent  material. 

In  general  the  exploration  of  the  fill  foundation  should  be  accomplished  with 
test  boring  and  sampling  techniques.  The  exploration  program  should  be  governed 
by  the  kinds  of  materials  present.  In  the  case  of  sands  and  gravels,  it  is  usually 
adequate  to  determine  the  standard  penetration  test  resistance  and  obtain  a  descrip- 
tion of  the  materials.  In  softer  materials  it  is  important  to  obtain  suitable  samples 
for  laboratory  tests  of  their  shear  strength  characteristics;  die  unconfined  compressive 
strength  will  generally  suffice  in  cohesive  materials.  In  some  instances,  such  as 
unusually  soft  fine-grained  soils,  a  program  of  vane  shear  testing  conducted  in  place 
may  be  desirable  to  supplement  die  boring  and  sampling  program.  Refer  to  Article 

1.1.4  for  exploration,  sampling  and  testing  procedures. 

If  the  alignment  of  a  proposed  fill  is  optional,  it  may  be  possible  for  comparative 
puiposes  to  explore  alternative  locations  by  means  of  geophysical  methods  that  can 
indicate  the  depth  to  bedrock  or  much  denser  materials.  However,  the  interpretation 
of  geophysical  data  requires  considerable  expertise  and  supplementary  test  borings, 
and  should  only  be  used  by  someone  skilled  in  this  work. 

1.1.3.2  Cuts 

For  purposes  of  design  the  stability  of  cut  slopes  is  estimated  in  order  to  choose 
suitable  arrangements  of  slopes  and  berms.   In  soils  this  calls  for  suitable  samples 


Roadway    and    Ballast 261 

and  appropriate  laboratory  tests  to  find  the  shear  strength  charaeteristics  of  the  mate- 
rials. This  is  usually  not  a  problem  in  sands,  as  disturbed  samples  and  standard  pene- 
tration test  \alues  are  adefjuate.  In  clayey  or  silty  soils,  however,  it  may  be  necessary 
to  obtain  undisturbed  tube  samples  for  laboratory  tests  which  should  include  classi- 
fication tests,  natural  \\ater  content  and  shear  strength.  Exploration  should  be  car- 
ried below  the  bottom  of  tlie  cut.  This  is  most  important  for  the  design  of  stable 
cuts  in  bodi  cohesi\e  materials  and  rock. 

Particular  care  should  be  taken  to  identify  cohesionless  layers  that  might  become 
water-bearing  in  certain  seasons,  as  these  can  be  expected  to  erode  backward  from  the 
face  of  the  cut,  causing  local  instability  or  build-up  of  excess  water  pressure  leading 
to  failure  by  lateral  spreading. 

The  exploration  program  should  find  the  level  of  the  groundwater  table  and 
efforts  should  be  made  to  find  whether  or  not  perched  water  tables  exist.  In  some 
instances  this  may  require  rather  elaborate  investigation,  including  the  installation 
of  standpipes  at  selected  locations. 

The  exploration  program  should  provide  sufficient  information  to  classify  reliably 
the  materials  likely  to  be  encountered,  particularly  when  some  might  be  classified  as 
rock  excavation.  If  rock  is  encountered  above  grade,  the  rock  should  be  cored  and 
the  cores  should  be  carefully  described  (see  Table  1.1.2). 

If  the  cut  is  of  major  dimensions  and  predominantly  in  rock,  it  is  recommended 
that  an  engineering  geologist  be  engaged  to  investigate  the  joint  patterns  and  the 
strike  and  dip  of  the  area,  as  the  joints  and  fractures  within  the  rock  are  of  primary 
importance  in  determining  the  most  economical  and  suitable  cut  slopes. 

The  subsurface  exploration  of  cut  areas  should  also  provide  information  on  the 
suitability  of  the  materials  for  use  in  adjacent  fills.  Procedures  described  in  Article 
1.1.3.4  may  be  used  for  tliis  purpose.  Most  materials,  howe\'er,  can  be  utilized  in 
fills  with  the  exception  of  highly  organic  soils,  distinguished  visually,  and  soils  that 
have  a  natural  moisture  content  considerably  above  the  optimum  water  content  for 
compaction. 

A  knowledge  of  the  geology  of  an  area  is  useful  to  indicate  the  necessity  for 
<idditional  tests  of  a  specialized  nature.  For  example,  some  geological  formations 
have  swelling  characteristics  and  should  be  investigated.  The  presence  of  swelling 
materials  may  be  of  considerable  importance  in  the  stability  of  cut  slopes  as  well  as. 
in  the  perfonnance  of  a  compacted  fill. 

1.I..3.3  Roadbed 

Natural  materials  forming  subgradc  .should  be  explored  to  assess  their  .suitability. 
They  should  be  classified  and  tested  to  find  water  content  and  remolded  strength 
with   due  allowance  for  seasonal  influences. 

1.1.3.4  Construction  Materials  of  Earth  and  Rock 

Borrow  areas  for  earth  construction  materials  are  often  in\estigated  by  augers 
supplemented  by  test  pits.  Relatively  large  samples  are  required  for  man>-  of  the 
tests  to  be  performed  on  borrow  materials,  which  include  grain-size  anai\sis,  natural 
water  content,  and  laboratory  compaction  tests  to  find  the  maximum  dr\-  densit\'  and 
optimum  water  content. 

It  is  of  primary  importance  on  major  projects  to  \erif>  the  full  extent  of  the 
proposed  borrow  area  if  large  quantities  of  materials  are  required,    ihis  may  recjiure 


262  Roadway    and    Ballast 


test  boring  and  sampling.  Wliere  the  borrow  area  may  be  underlain  by  bedrock, 
geophysical  methods  may  provide  a  convenient  means  of  assessing  the  amouTil  of 
available  material. 

Construction  with  .select  granular  fill  usually  presents  no  problems  because  this 
is  usually  obtained  from  commercial  sources  and  meets  certain  speeification.s.  If  pit- 
run  graxels  or  sands  are  to  be  used,  however,  it  is  advisable  to  do  grain-size  tests 
on  typical  samples  as  a  guide  to  the  selection  of  proper  techniques  for  placing  these 
materials.  For  example,  a  pit-run  gravel  that  contains  more  than  about  10  percent 
finer  than  No.  200  sieve  is  not  likely  to  be  successfully  compacted  with  vibratory 
compaction  equipment. 

Particular  attention  is  required  for  materials  to  be  used  ivs  backfill  around  struc- 
tures, as  the  strength  of  the  backfill  is  an  inherent  consideration  of  the  structural 
design. 

1.1.4  SAMPLING  AND  TESTING 

1.1.4.1  Rock  Materials 

1.1.4.1.1  Sampling 

Rock  samples  are  obtained  from  fresh,  imweathered  exposures  at  the  site  or  froin 
cores  recovered  from  borings.  Bodi  soiuces  should  be  used  on  projects  involving 
significant  rock  problems.  Borings  should  be  made  by  experienced  drillers.  Cores  of 
at  least  BX  size   ( 1%  in. )   should  be  recovered. 

The  quantity  and  variety  of  rock  sampled  depends  on  the  needs  of  the  project 
and  the  variation  in  type  and  quality  of  rock  present.  The  quantity  should  be  tlwt 
required  for  a  detailed  examination  and  the  necessary  tests.  Sampling  of  rock  and 
gravel  for  ballast  is  described  in  Part  2,  Ballast,  this  chapter. 

1.1.4.1.2  Examination 

Except  where  the  rock  is  to  be  used  in  a  broken  or  crushed  condition  it  is 
important  to  note  the  structural  characteristics  of  the  rock  formation.  Details  of  the 
geometry  of  a  rock  formation  are  important.  The  strike  and  dip  of  layers,  presence 
of  joints  and  faults,  anticlines  or  synclines  should  be  noted,  along  with  signs  of 
porosity  or  seepage.  Wliere  rock  stability  is  concerned,  classification  of  the  rock  type 
is  less  important  than  the  properties  of  the  rock  formation  except  where  soft  or 
layered  sedimentary  rocks  or  very  heavily  weathered  rocks  are  present.  General 
information  on  the  overburden  is  also  useful. 

A  rock  formation  may  be  described  as: 

Massive — when  layers  and  joints  are  spaced  more  than  6  ft. 
Blocky  when  joint  spacing  is  1  to  6  ft. 
Broken  — when  joint  spacing  is  less  than  1  ft. 
Layered — when  the  bonding  between  strata  is  weak. 

Test  borings  in  rock  should  include  such  information  as  drilling  rates,  water 
losses  and  groundwater  levels,  identification  of  drill  cuttings,  color  of  drilling  fluid, 
percent  recovery  and  length  of  pieces  of  core.  Although  influenced  by  drilling 
methods,  the  latter  indicates  the  quality  of  rock. 

Rock  samples  and  cores  should  be  examined  and  described  by  the  procedure 
given  in  Table  1.1.2,  keeping  in  mind  their  relation  to  the  rock  formation  which  is 
involved  in  the  engineering  problem. 


R  o  a  d  w  ay    and    Ballast 


263 


Table  1.1.2 
Technical  Description  of  Cores  or  Fresh  Exposures  of  Rock 


Feature 

Description  or  Uccurrence 

Importance 

Dist'ontinuitv 

— tvpc 

Joints 

Influence  permeability. 

Faults 

strength  and  deformation 

Bedding  planes  (as  in  sedimentary  rock) 

of  rock  mass 

Cleavage  planes  (as  in  slates) 

Fractures  with  striations  or  slickensides 

(from  past  movement) 

— position 

Closeness  and  orientation  (jf  joints 

Of  major  importance  in  cut 

Thickness  of  bedding  layers 

slopes  and  tunnels 

Length  of  core  jiieces  (also  influenced  by 

drilling  techni<iues) 

Dip  or  angle  of  inclination  hom  hori- 

zontal 

— suifaco 

Fit  of  surfaces — tight  or  open 

Govern  amount  of  interlock- 

Shape— plane,  curved  or  iiiegular 

ing  and  apparent  sheaiing 

Texture — slick,  smooth  or  rough 

resistance  along  fractures 

Filling  mate- 

Properties— t\'pe,  hardness,  thickness. 

Mav  govern  movement 

rial 

variations 
Origin — derived  from  rock  by  alteration, 
or  from  external  source 

along  discontinuities 

Rock  tvpe 

Geologic  name  based  on  mineral  compo- 

and texture 

sition,  texture  and  origin 

(Ref.  1,2) 

Size  and  angularity  of  grains,   tyjie  of 
fracture,  lustre,  lamination 

Texture — interlocking  gi-ains   cemented 
or  laminated — foliated,  preferred  ori- 
entation 

Rock  hardness 

Relative  hardness   (give  basis  of  com- 

Severe  design  and  construc- 

l^arison) 

tion    ]iroblems   may   arise 

X'ariations  due  to  changes  in  rock  type, 

when  hardness  of  parts  ot 

weakened  rock,  weathering  or  decom- 

rock mass  diffei-  radically 

position  products 

iron)  average  value 

Derived  from  Ref.  3 


On  important  jobs  the  services  of  an  engineering  geologist  should  be  obtained 
to  assess  significant  information  on  rock  conditions  and  to  judge  whether  or  not  the 
rock  is  subject  to  deterioration  on  exposure. 

1.1. 4.1. .3  Testing 

In  planning  a  rock  testing  program,  it  should  be  remembered  tiial  altiioiigh  the 
characteristics  of  the  rock  formation,  such  as  joints,  bedding  planes  and  faults  are  the 
major  inHncnces  in  most  engineering  problems,  most  test  techniques  only  show  the 
characteristics  of  the  rock  specimens  used.  For  this  reason  only  tests  witii  a  definite 
use  in  engineering  problems  should  be  made.  Typical  tests  are  listed  in  Table  1.1.3. 


264 


Roadway    and    Ballast 


Table  1.1.3 
Typical  Tests  for  Rock  Samples 


Procedure 


Specific  gravity  and  absorption  of 

— coarse  aggregate 

— fine  aggregate 

Soundness  of  aggregates  by  use  of 
sodium  sulfate  or  magnesium 
sulfate 


Resistance   to  abrasion   by  use  of 
the  Los  Angeles  machine  of 

— large  size  coarse  aggregate 

— small  size  coarse  aggregate 

Petrographic   examination   of 
aggregates 

Compression 

— uniaxial 

— triaxial 


ASTM 

Method 


C  127 
C  128 


C88 


C535 
C  131 


C295 


Special 


D2664 


Comments 


To  indicate  rock  resistance  to  weath- 
ering 


See  text 


To  classify  rock  for  strength  and  defor- 
mation properties.  Diamond  drill 
cores  are  used. 

To  find  angle  of  shearing  I'esistance  of 
weak  rock  material  with  random  ori- 
entation of  joints,  and  of  material  in 
seams  and  joints.  Range  of  normal 
stresses  occurring  in  field  are  applied. 


Petrographic  analysis  involves  the  examination  by  a  petrologist  of  rock  samples, 
sometimes  in  the  form  of  thin  slices,  under  a  microscope.  The  analysis  aids  in  the 
interpretation  of  other  tests.  From  the  mineralogical,  physical,  structural  and  chemical 
characteristics  of  the  rock  material,  it  is  often  possible  to  predict  its  respon,se  to 
changed  conditions  caused  by  construction  or  exposiue. 

1.1.4.2  Soil  Materials 
1.1.4.2.1  Sampling 

Soil  samples  are  taken  from  test  borings  or  occasionally  from  test  pits  or  trenches. 
The  boring  and  sampling  methods  chosen  for  a  site  depend  on  their  applicability  to 
the  materials  present,  their  ability  to  differentiate  changes  in  the  materials,  and  the 
disturbance  caused  to  the  samples. 

Bore  holes  may  be  made  by  auger,  wash  or  rotary  drilling.  Soil  sampling  is 
commonly  done  with  a  split  spoon  drive  sampler  when  disturbed  samples  and  standard 
penetration  test  results  are  required,  and  with  thin-walled  tube  samplers  when 
undisturbed  samples  are  required. 

Procedures  for  site  investigations  given  in  Table  1.1.4  may  be  used  as  a  guide. 
Boring  and  sampling  methods  and  requirements  for  exploration  programs  are  dis- 
cussed in  literature  (Ref.  4). 


Roadway    and    Balla  s  t 


265 


1.1.4.2.2  Classification 

For  soil  materials  it  is  reconiniended  that  the  Unified  Classification  System  ( Ref. 
5  and  ASTM  Method  D  2487T)  be  used  with  supplemental  descriptions  which  are 
helpful  to  those  not  familiar  with  the  unified  terminology.  Symbols,  soil  groups  used 
in  the  system  and  their  identification  are  set  out  in  Columns  1,  2  and  3  of  Table  1.2.5. 

1.1.4.2.3  Testing 

Standard  procedures  for  description,  classification  and  testing  of  soils  are  listed 
in  Table  1.1.5. 


Table  1.1.4 
Procedures  for  Site  Investigations 


Procedure 


Surveying  and  sampling  soils  for  highway  subgrades 

Soil  investigation  and  sampling  by  auger  borings 

Diamond  core  drilling  for  site  investigation 

Penetration  test  and  split-barrel  sampling  of  soils,  __ 

Thin-wall  tube  sampling  of  soils 

Field  vane  shear  test  in  cohesive  soil 


ASTM 

Method 

D    420T 

D  1452 

D2113T 

D  1586 

D  1587 

D  2573T 

T  means  tentative  method. 


Table  1.1.5 
Standard  Procedures  for  Soil  Testing 


Procedure 


D('scrij)tion  of  soils  (visual-manual  procedure) 

Classification  of  soils  for  engineering  purposes 

Grain  size  analysis  of  soils 

Materials  finer  than  Xo.  200  sieve  in  mineral  aggregates  by  washing 

Moisture  content  of  soils 

Li(|ui(l  hmit  of  soils 

I'lastic  limit  and  {)la.sticity  index  of  soils 

riiconfiiied  compressive  strength  of  cohesive  soil 

Sl)ecific,  gravit}'  of  soils 

One-dimensional  consolidation  properties  of  soils 

Moislure-ilen.sitv  relations  of  soils,  using  5.5-lb  rammer  and  12-in.  drop 

(  Proctor  te.st)!. 

.Moisture-den.sity  relations  of  soils,  using  10-lb  rammer  and  18-in.  drop 

(modified  Proctor  test) 

Density  of  soil  in  i)l;ice  by  the  rubber-balloon  method 

Density  of  scjil  in  place  by  the  saiHl-conc  met  lux! 


ASTM 
Method 


D  2488T 
D  2487T 
D  422 
C  117 
D  2210 
D  423 
D  424 
D  21()() 
D  S.54 
D  2435T 

D    OUST 

D  15o7T 
D  155(» 
D21G7 


T  means  tentative  method. 


266  R  o  a  dway    and    B  a  Hast 


REFERENCES 

(1)  The  Identification  of  Rock  Types,  U.S.  Cioxernnient  Priiitinj^  Office,  Washington, 
rev.  Nov.  1960. 

(2)  H.  S.  Zini  and  P.  R.  Sehafter,  Rocks  and  Minerals,  Golden  Nature  Guide  Serv- 
ices, New  York,  1957. 

(3)  D.   U.   Deere,  Technical    Description  of  Rock   Cores  for  Engineering  Puiposes, 
from  Rock  Mechanics  and  Engineering  Geology,  Springer-Verlag,  Vienna,  1963. 

(4)  Design  Manual:   Soil  Mechanics,  Foundations,  and  Earth  Structures,  Navdocks 
DM-7,  Washington,  1962. 

(5)  Earth  Manual,  Bureau  of  Reclamation,  Washington,  1963. 

1.2  DESIGN 

1.2.1  GENERAL 

Sui-veys  and  pertinent  tests  supply  data  on  which  the  location  and  design  of 
roadway  is  based.  Horizontal  alignment,  grades  and  typical  sections  are  based  on 
traffic  considerations  and  topographical  features  with  modifications  as  indicated  by 
the  drainage,  soil  and  rock  data.  Ref.  1  and  2  are  helpful  with  man>-  aspects  of 
design.  Overall  environmental  conditions  also  influence  the  design. 

For  reference  purposes,  subjects  which  may  require  attention  in  the  design  stage 
but  which  are  more  commonly  dealt  with  in  maintenance  operations  are  foimd  in 
Section  1.4,  Maintenance. 

Such  subjects  include    


REFERENCES 

( 1 )  K.  Terzaghi  and  R.   B.  Peck,  Soil  Mechanics  in  Engineering  Practice,  \\'iley  & 
Sons,  New  York,  2nd  ed.  1967. 

(2)  Foundation    Engineering,    ed.    by   G.    A.    Leonards,    McGraw-Hill,    New  York, 
1962. 

1.2.2  CUTS 

1.2.2.1  Cuts  in  Rock 

1.2.2.1.1  General 

The  design  of  a  rock  cut  is  based  on  obtaining  the  lowest  balanced  construction 
and  maintenance  cost  consistent  with  safety.  The  ratio  between  construction  and 
maintenance  costs  will  vary  with  individual  situations  and  should  be  developed  for 
each  project. 

1.2.2.1.2  Assembly  of  Design  Information 

Factors  determining  the  amount  of  attention  which  should  be  given  to  the  design 
of  a  rock  cut  are  the  competence  of  the  rock  and  overburden,  and  the  depth  and 
length  of  the  cut 


Roadway    and    Ballast 


267 


The  first  steps  in  design  are  tlie  preparation  of  profiles  and  cross  sections  on 
which  are  plotted  data  obtained  dnring  site  investigation,  test  borings  and  laboratory 
testing,  interpreted  with  the  aid  of  geological  maps,  groundwater  surveys  and  air 
photos.  Most  important  is  knowledge  of  the  behavior  of  similar  rock  in  compar- 
able cuts. 

In  layered  formations  where  dip  or  strike  of  the  bedding  planes  is  not  normal 
to  the  center  of  the  cut,  it  may  be  desirable  to  construct  sections  on  the  dip  of  the 
bedding  planes  to  aid  in  examining  the  stability  of  the  cut  slope. 

As  the  characteristics  of  bedrock  vary  greatly,  often  over  short  distances,  it  is 
fundamental  for  economy  that  the  slope  be  fitted  to  the  material  and  exposure  on 
each  side  of  the  cut  at  each  location.  A  unifonn  slope  in  one  rock  is  not  necessarily 
appropriate  throughout  the  length  of  a  cut  if  the  condition  of  the  rock  changes. 

1.2.2.1.3  Width  of  Base  of  Cut 

The  base  width  of  a  rock  cut  is  determined  by  the  total  width  of  zones  A,  B 
and  C,  sho\vn  in  Fig.  1.2.1  and  described  in  Table  1.2.1.  Refer  also  to  Article 
1.2.2.1.7. 

Table  1.2.1 
Factors  Affecting  Base  Width  of  Rock  Cuts 


Zone 

Purpose 

Where  Provided 

Width  and  Profile 

A— Roadbed 
zone 

To  provide  base 
for  ballast 

Throughout  cut 

Standard  width 

li— Ditc-h 
zone 

To  carr.\'  run-off 
from  watershed 
served    and    seep- 
age entering  cut 

In  all  cuts 

Ditch  ])rofile  may  have  to  t)e 
steeper  than  grade  profile  in 
long  level  cuts. 

C — Optional 
zone 

To  contain  mate- 
rial which  may  fall 
from  faces  of  cut, 
and  for  mainte- 

With   broken    or 
rapidly   weather- 
ing I'ocks 

Of  variable  width  deiiending  on 
slope  and  height  of  cut  face, 
size  and  rate  of  fall  of  frag- 
ments and  desiiable  fretiuencv 

nance  access 

of  ditch  cleaning.  Primary 
consideration  in  setting  width 
is  to  po.'jition  toe  of  sIojm'  at 
point  which  will  not  allow  fall- 
ing fragments  to  Ixiuncc  into 
track  area.  Working  width  re- 
(juired  by  ditcli  cleaning  ma- 
chines is  important . 

1.2.2.1.4  Stabihty  of  Rock  Slopes 

Slopes  are  governed  by  materials  in  the  slope,  and  slope  angles  should  be  chosen 
independently  even  in  the  same  cut  for  .sound  rock,  weathered  or  shattered  rock,  and 
o\erbnrden.   See  Figs.   1.2.2   (a),   (b),    (c),  and    (d). 

In  each  material  the  slope  is  governed  to  a  major  degree  I)\  bedding  planes, 
joints  which  are  usually  perpendicular  to  the  bedding,  fracture  patterns  and  faulting, 


268 


Roadway    and    Ballast 


C 

3 

A 

3  ^ 

C 

/ 

'^ 

/ 

y^ 

/ 

^ 

/ 

V 

7N 

^   X 

1  ^ 

/.  ■ 

I 

.<i3(^^?5 

yii^i^ 

1 

y 

"^--^ 

/■;-./ 

WiDT^  o/^  cur  B/^S£ 

Fig.   1.2.1 


all  of  which  tend  to  make  the  rock  perform  as  a  number  of  segments  rather  than  as 
a  mass.  The  influence  of  each  of  these  characteristics  should  be  carefulK-  assessed  in 
analyzing  the  slope  stability.  It  should  be  noted  that  the  slope  of  such  discontinuities 
as  entered  on  cross  sections  and  profiles  will  not  necessarily  show  tlieir  true  angle 
of  interception  with  the  cut  slope,  which  should  be  considered  in  design. 

Stability  of  rock  slopes  can  be  analyzed  by  the  method  of  slices  as  used  with 
soil  slopes,  but  it  should  be  realized  that  the  surface  of  sliding  will  follow  rock  joints 
and  defects  where  possible.  Values  of  shear  strength  and  cohesion  are  chosen  accord- 
ingly. Cohesion  in  fact  is  usually  neglected  as  its  value  along  joints  in  rock  may  be 
small.  Experience  is  needed  to  design  major  slopes  with  safety  and  economy. 

Design  factors  for  the  more  conmion  rock  conditions  are  discussed  in  Table 
1.2.2.  The  effect  of  water  pressures  in  fissures  is  of  primary  importance  in  all  cases. 


R  o  a  dway    and    Ballast 


269 


Rock  falls  and  slides  commonly  occur  during  or  soon  after  heavy  rains,  an  indi- 
cation of  tlie  major  importance  of  seepage  pressures  on  slope  stability.  Water  has  the 
dual  effect  of  increasing  shear  stresses  in  the  slope  by  its  weight  and  h>drostatic 
pressure,  and  at  the  same  time  decreasing  the  shear  strength  of  rock  materials  by 
weathering,  freezing  and  expansion.  Hence,  it  is  most  important  to  keep  water  out 
of  the  slope  if  possible. 

In  most  rock  masses,  the  ground  water  table  cannot  be  lowered  economically. 
However,  intercepting  surface  ditches  at  the  top  or  horizontal  relief  drains  in  the 
face  or  toe  of  slope  may  have  benefits  in  certain  cases  (see  Section  1.4,  Maintenance). 

Table  1.2.2 
Design  Factors  For  Rock  Slopes 


Condition  of  Rock 


Hard  rock  with  random  joints. 


Lavered  rock. 


Fractured  or  weathered  rocks. 


Clav-shale  rocks. 


Design  of  Slope 


Providing  there  are  no  adverse  bedding  ])Ianes,  ground 
water  pressures  are  low  and  blasting  is  presplit,  slopes 
of  70°  are  stable. 

An  accurate  joint  survey  is  important.  If  rock  dips 
with  the  slope,  and  dip  angle  is  greater  than  angle  of 
friction,  critical  slope  is  at  angle  of  dip.  If  l)edding  is 
horizontal,  stability  is  as  for  massive  rock. 
If  bedding  dips  into  slope,  critical  slope  is  between 
70°  and  90°;  local  rock  falls  may  be  frequent. 

Stability  can  be  analyzed  as  for  granular  soil,  finding 
cohesion  and  angle  of  friction  from  lab  tests.  Angle 
of  friction  for  angular  crushed  rock  is  45-50°. 

Specialist  advice  is  required  as  unloaded  shale  tends 
to  decrease  in  .strength  with  time. 


1.2.2.1.5  Effect  of  Blasting 

Uncontrolled  blasting  tends  to  open  up  cracks  near  the  face  of  rock  slopes, 
allowing  an  increase  in  the  rate  of  weathering,  infiltration  of  water  and  consequent 
deterioration  of  the  slope.  As  such  blasting  may  produce  excessive  rock  falls  for 
many  years,  a  decision  on  the  type  of  blasting  should  be  part  of  die  design  proce- 
dure. The  technique  of  presplitting  by  blasting  a  line  of  drill  holes  on  centers  less 
than  4  ft  apart  can  produce  a  slope  surface  with  minimum  disturbance  and  negligible 
oxerbreak.  Pre.ser\'ation  of  the  rock  segments  in  their  preconstruction  position  allows 
valid  design  assumptions  to  be  made  and  minimizes  ultimate  maintenance  costs. 


1.2.2.1.6  Use  of  Benches 

Benches  in  rock  cuts  are  u.sed  to  catch  falling  rock,  to  prevent  undermining  oi 
hard  strata  by  differential  weathering,  to  reduce  pressure  at  the  toe  of  cut  and  to 
handle  drainage.  Principles  applying  to  the  choice  of  rock  slopes  and  benches  are 
illustrated  in  Figs.  1.2.2  (a),  1.2.2  (b),  1.2.2  (c),  and  1.2.2  (d).  \Vhere  permanent 

(Text  continued  on  pafie  274} 


270 


Roadway    and    Ballast 


^o/£^ 


/^^/eup> 


A7£Z>/UA^ 


/Yyf/<tX> 


';<^i^0i 


l/4/e//iBL£  Slope: 


Fig.  1.2.2  (a) 


R  o  a  d  w  a  y    and    Ballast 


271 


Fig.  1.2.2   (b) 


272 


Roadway    an d    Ballast 


\\^\^14:^:^ 


r.<?/«=":7^  : 


jO£RjyfJ\NFNT      3E-A/CH 


Fig.  1.2.2  (c) 


Roadway    an  d    Ballast 


273 


/A//T//P^    COT' 


h^^7?y£-ye^O    SA£>/=>^^/l  J4/^f^O- 


/ 


._5-<!P/Cr- 


7- 


T^/>opaj^^/eY   J5^/VC// 


Fig.  1.2.2  (d) 


274 Roadway    and    Ballast 

benches  are  used  to  intercept  falling  rock,  as  shown  in  Fig.  1.2.2  (c),  access  should 
be  provided  for  periodic  reuio\'al  of  debris.  The  width  of  such  benches  should  be 
adequate  for  machine  access  after  weathering  of  the  softer  rock  has  taken  place.  .\ 
niinimiun  width  of  20  to  30  ft  may  be  required. 

In  shales  and  other  soft-rock  cuts,  temporary  benches  may  be  designed  to  con- 
tain all  debris  from  a  steep  slope. 

A  typical  arrangement  is  shown  in  Fig.  1.2.2  (d).  Debris  from  the  top  of  the 
steep  slope  accumulates  on  the  bench  to  form  a  protective  zone  for  the  toe  of  the 
slope,  while  the  upper  portion  of  the  steep  slope  weathers  back  to  its  angle  of  repose. 
Provision  for  access  to  such  slopes  may  not  be  required 

Benches  used  to  reduce  the  effects  of  differential  weathering  are  located  at  the 
top  of  the  weaker  rock  where  the  stronger  rock  is  set  back  to  form  the  bench.  The 
width  of  the  bench  is  governed  by  the  weathering  characteristics  of  the  weaker  rock 
and  the  height  and  angle  of  its  slope.  Provision  for  access  may  not  be  required. 

In  deep  cuts,  where  weaker  rock  appears  in  the  base  of  the  cut,  it  may  be 
necessary  to  introduce  benches  to  relieve  the  toe  pressure.  Such  benches  may  serve 
other  puiposes,  as  noted  above,  to  increase  safety  and  reduce  maintenance  costs. 

A  permanent  bench  is  required  for  accommodating  longitudinal  drainage  from 
surface  run-off  or  subsurface  seepage.  Such  an  arrangement  is  usually  complicated 
and  expensive  and  should  be  avoided,  except  in  special  circumstances. 

Drainage  of  benches  is  best  accomplished  by  sloping  them  to  the  face  of  cut, 
moving  water  off  the  bench  as  quickly  as  possible.  Where  rock  on  the  surface  of  the 
bench  presents  open  joints  or  fractures,  water  may  be  prevented  from  entering  the 
rock  mass  by  covering  the  bench  with  a  layer  of  clay  or  other  impervious  material, 
thus  reducing  or  eliminating  deterioration  of  the  rock  by  ice  wedging  and  erosion. 

1,2.2.1.7  Ditches  and  Drainage 

In  rockfall  zones  were  benches  cannot  be  provided,  design  of  the  slopes  and 
ditches  are  important  to  prevent  rock  fragments  from  reaching  the  track.  Falling  rocks 
striking  a  slope  flatter  than  vertical  will  receive  a  horizontal  component  of  force 
tending  to  throw  them  toward  the  track  area.  For  this  reason,  in  rockfall  zones  the 
slope  should  be  kept  as  nearly  vertical  as  possible  consistent  with  overall  stability. 

Unless  mature  cuts  in  similar  rock  can  be  observed,  it  is  difficult  to  predict  at 
tlie  design  stage  the  manner  in  which  rocks  will  fall  and  how  fast  tliey  will  accumu- 
late at  the  base  of  slope.  Hence,  ditches  should  be  designed  widi  ample  width  to 
collect  rockfall  material,  keep  it  out  of  the  track  area  and  permit  economical  remo\  al 
of  debris.  The  cost  of  enlarging  ditches  later  in  rock  cuts  is  prohibiti\e. 

Measures  described  under  Section  1.4,  Maintenance,  on  rock  slopes  ma\"  be  in- 
corporated in  the  design  stage  if  difficulties  can  be  predicted. 

1.2.2.2  Cuts  in  Soil 

1.2.2.2.1  General 

Soil  types  and  drainage  are  die  most  significant  influences  on  the  design  of 
earth  slopes.  All  sloping  ground  masses  have  a  tendency  to  move  under  the  influence 
of  gravity.  Slopes  of  1.5  to  1  are  considered  minimal  in  cohesionless  soils  and  in 
sands  or  gravels  with  binder  soils  for  cuts  up  to  20  ft  deep.  Observations  of  nearby 
cuts  in  similar  soils,  natural  slopes  in  the  vicinity  or  trial  cut  excavations  are  Aaluable 
guides  in  slope  design.  A  slope  stability  analysis  should  be  made  to  select  the  cross 


Roadway    and    Ballast 275 

section  for  all  cuts  o\er  20  ft  deep  and  where  soil  conditions  are  loose,  soft,  fissured 
or  subject  to  seepage  water  pressures. 

It  is  important  that  the  cut  cross  section  be  wide  enough  to  pro\  ide  side  ditches 
for  interception  of  surface  water.  In  addition,  special  conditions  need  to  be  considered, 
such  as  wide  ditches  for  snow  storage  in  areas  of  high  snowfall  and  flat  slopes  to 
facilitate  self-clearing  by  prevailing  winds.  Where  it  is  not  practical  to  collect 
surface  drainage  with  adequate  side  ditches,  buried  drain  pipes  should  be  provided. 

It  is  important  to  relieve  subsurface  water  pressures  in  sloping  ground  by  inter- 
cepting ditches  or  drains  above  the  slope  or  horizontal  drains  pro\ided  in  the  face 
by  drilling  or  excavation.  In  extreme  cases,  vertical  wells  can  be  used. 

1.2.2.2.2  Cuts  in  Sand 

Sand  in  any  condition  above  the  ground  water  table  can  be  designed  with  a 
1.5  to  1  slope.  Dense  to  medium  sands  are  normally  stable  on  this  slope  even  when 
located  below  the  water  table.  In  areas  of  loose  saturated  sand,  special  provisions 
are  ad\isable  to  a\'oid  spontaneous  liquefaction. 

The  stability  of  slopes  in  sand  can  be  increased  by  any  technique  which  in- 
creases the  density. 

1.2.2.2.3  Cuts  in  Clay 

Cuts  in  clay  should  be  designed  according  to  a  slope  stability  analysis  unless 
adequate  experience  locally  has  shown  a  particular  profile  to  be  stable.  A  slope  of 
2  to  1  in  clay  soils  is  considered  minimum.  Clay  slopes  over  15  ft  in  height  should 
be  designed  on  the  basis  of  laboratory  tests  and  stability  analyses.  In  general  the 
higher  the  slope  in  clays  the  flatter  it  must  be  for  stability 

The  stability  of  clay  slopes  can  be  increased  by  reducing  stresses  in  the  soil 
through  the  use  of  berms  and  drainage.  As  a  general  rule  the  width  of  berm  should 
not  be  less  than  one-half  of  the  vertical  rise,  such  as  a  20-ft  rise  \\ith  a  10-ft  berm 
at  the  top  followed  by  a  second  20-ft  rise.  The  use  of  berms  is  influenced  by 
topography  and  economics.  They  may  be  desirable  in  deeper  cuts  and  should  be  at 
least  10  ft  wide  if  required  for  access. 

Cuts  in  clays  require  caution  in  design.  Slopes  which  have  long  been  stable  are 
known  to  have  failed.  Safety  can  be  assured  in  some  localities  only  by  assuming 
slides  as  inevitable  and  designing  the  cut  to  allow  for  slope  movement  without  inter- 
ference to  traffic. 

1.2.2.2.4  Cuts  in  Non-Uniform  Soils 

Cuts  in  soils  which  are  layered  or  contain  pockets  of  varied  soil  types  should  be 
designed  on  the  basis  of  a  slope  stability  analysis.  The  coarser  layers  or  pockets 
frequently  are  water-bearing  during  some  part  of  the  year  and  drainage  must  be 
provided.  Elfecti\c  drainage  may  stabilize  the  slope  in  a  cut  when  soil  properties 
are  favorable. 

In  addition  to  the  improvement  of  soil  properties  from  drainage,  berms  are 
usually  effective  in  increasing  stability  in  non-uniform  soil  areas.  Berms  at  the  line 
of  change  of  soil  types  allow  the  slope  to  be  varied  for  each  soil. 

1.2.2.2.5  Cuts  in  Loess 

Cuts  in  loess  should  have  a  near-vertical  face  and  be  carefully  drained  at  the 
foot.   This   soil   type  possesses   a  natural   cementation  which  is  soluble,   a   uniform 


276 Roadway    and    Ballast 

grading  and  a  vertical  root  hole  structure.  Widths  of  cut  greater  than  normal  are 
provided  since,  in  spite  of  all  precautions,  local  failures  are  inevitable.  Deep  cuts 
can  be  made  with  vertical  faces  and  berms  but  it  is  important  that  drainage  be 
carefully  designed  and  maintained. 

1.2.2.2.6  Control  of  Slopes 

In  every  soil  type  the  control  necessary  to  maintain  the  cut  section  should  be 
a  consideration  in  design.  Berms,  drainage,  erosion  protection,  filter  layers,  vegeta- 
tion and  slope  angle  selection  may  be  used.  Details  are  given  in  Section  1.4,  Mainte- 
nance. Cribs  or  retaining  walls  may  be  used  in  troublesome  sections.  Details  of 
design  are  given  in  Chapter  8,  Concrete  Structures  and  Fovmdations.  While  slope 
control  techniques  add  to  costs,  they  will  pay  dividends  in  reduced  requirements  for 
slope  restoration  and  ditch  cleaning. 

1.2.3  FILLS 

1.2.3.1  General 

Fills  are  used  when  it  is  desirable  to  raise  the  ground  surface  to  a  new  le\el 
for  roadbed  construction.  They  serve  to  elevate  the  grade  abo\'e  existing  or  predicted 
water  levels  or  snow  depths,  to  bury  obstructions,  undesirable  topographic  xariations 
or  unstable  subsoils  and  to  maintain  design  grades. 

Every  fill  must  satisfy  the  following  requirements: 

( 1 )  Support  its  own  weight  and  superimposed  loads  with  safety 

( 2 )  Settle  not  more  than  can  be  economically  tolerated  by  the  imposed  loads 
or  the  fill  material, 

(3)  Retain  its  shape  and  properties. 

The  requirements  are  met  by  carefully  selecting  the  soil  or  rock  to  he  used, 
controlling  the  construction  and  assuring  an  environment  which  prevents  intolerable 
changes.  Some  fills  must  also  function  as  dams  and  must  consequently  be  designed 
to  satisfy  criteria  of  impermeability. 

The  volume  of  fill  resulting  from  a  given  cut  or  borrow  area  depends  on  the 
relative  in-place  density  of  the  borrow  and  fill  materials.  No  standard  "shrinkage 
factor"  should  be  assumed.  Fill  materials  are  often  compacted  to  a  densit>'  different 
from  their  original  density.  On  large  projects  it  is  advisable  to  find  cut-to-fill  ratios 
by  field  density  tests. 

1.2.3.2  Foundations  of  Fills 

Fill  foundations  are  subject  to  the  basic  requirements  for  any  shallow  founda- 
tions. The  subsoil,  or  foundation  soil,  should  have  the  strength  to  support  the 
proposed  loads,  including  the  weight  of  the  fill,  with  an  adequate  factor  of  safety 
and  the  magnitude  of  probable  foundation  settlement  should  be  within  tolerable 
limits.  Otherwise  it  may  be  necessary  to  remove  and  replace  the  weak  subsoil 
elements  or  to  improve  their  characteristics  by  using  stabilization  procedures  or 
controlled  construction  techniques.  The  latter  may  include  compaction,  construction 
in  stages,  surcharging  or  subdrainage. 

Vegetation,  topsoil  and  organic  soils  are  normally  removed  to  provide  for  the 
development  of  a  good  bond  between  the  fill  and  the  subsoil. 

A  fill  underlain  by  a  free-draining  sand  or  gravel  will  have  an  adequate  factor 
of  safety  irrespective  of  the  fill  height.  The  presence  of  a  silty  or  clayey  subsoil  will 
call  for  a  careful  investigation  of  the  factor  of  safety. 


Roadway    and    Ballast 277 

The    ultimate    bearing   capacity   of   a    foundation   when   the   soil    is   cohesive   is 

where  T  =  unit  weight  of  fill  material 
h  =  height  of  fill 
c  :=  minimum  shear  strength  of  subsoil 

Generally  a  factor  of  safety  of  1.5  is  considered  adequate,  although  the  need  to 
construct  a  fill  in  an  area  of  very  unfavorable  foundation  soils  may  dictate  an  even 
smaller  factor  of  safety.  The  stability  is  found  by  slope  stability  analysis  with  the 
critical  circle  or  failure  surface  passing  through  the  foundation. 

If  the  stability  analysis  indicates  an  adequate  factor  of  safety  for  the  foundation, 
the  fill  itself  is  designed.  When  the  foundation  is  too  weak,  one  or  more  of  the 
following  procedures  should  be  adopted  to  achieve  a  satisfactory  fill: 

( 1 )  Removal  or  displacement  of  weak  foundation  materials, 

(2)  Change  of  the  assumed  fill  section  by  flattening  slopes  or  berming, 

( 3 )  Foundation  drainage  to  reduce  pore  water  pressures, 

(4)  Preloading  tlie  area  to  accelerate  consolidation  of  clay  or  organic  soils, 

(5)  Densification  of  sandy  foundation  soils. 

Wliere  feasible,  die  best  method  is  removal  of  the  unsatisfactory  material  by 
increasing  the  depth  of  initial  stripping. 

Berms  should  extend  beyond  the  arc  of  the  most  critical  failure  circle  and  be 
checked  for  tlieir  own  stability. 

It  is  of  primary  importance  to  make  a  decision  before  construction  starts  on 
whether  the  fill  should  be  floated  or  the  foundation  materials  removed  or  displaced. 

Where  fills  are  built  on  soft  ground  or  where  the  fill  material  will  consolidate, 
an  estimate  of  the  ultimate  settlement  of  both  foundation  and  fill  should  be  made 
and  the  top  width  of  the  fill  increased  accordingly.  Peat  material  in  foundations  may 
be  expected  to  consolidate  under  fills  to  about  half  its  original  thickness   ( Ref .   1.) 

1.2.3.3  Rock  Fills 

1.2.3.3.1  General 

Articles  1.2.3.1  and  1.2.3.2  apply  to  rock  fills  as  well  as  earth.  As  with  earth 
fills,  rock  fills  by  economic  necessity  are  composed  of  materials  available  from  cuts 
except  in  unusual  circumstances  where  the  rock  is  of  a  nature  that  will  not  support 
the  loads  placed  upon  it  or  some  other  unacceptable  condition  exists. 

One  such  condition  is  the  tendency  of  some  rock  fills  to  be  subject  to  a  long 
period  of  settlement  due  to  the  gradual  consolidation  of  the  fill  itself.  Where  such 
long-term  settlements  cannot  be  tolerated,  the  use  of  select  borrow  or  a  bridge  or 
trestle  may  be  required.  Rock  fills,  however,  are  successfully  used  for  railway  installa- 
tions where  settlements  may  be  easily  corrected  by  periodic  track  lifting.  Many  rock 
fills  over  100  ft  high  have  been  successfully  constructed  and  maintained,  but 
specialists  should  be  consulted  for  design  and  development  of  construction  details 
where  very  high  fills  appear  economically  feasible. 

1.2.3.3.2  Soft  Rock 

The  term  "soft  rock"  used  herein  refers  to  rock  which  may  be  cxca\ated  by 
power  machinery  without  Ijlasting  or  to  rock  which  weathers  rapidly  upon  exposure, 
even  though  blasting  may  be  required  for  its  initial  removal. 


^78 Roadway    and    Ballast 

Soft  rock  may  result  in  an  impervious  fill  and  therefore  must  be  so  located 
in  tlie  fill  cross  section  as  to  permit  proper  drainage.  It  is  usually  best  dealt  with  in 
the  same  manner  as  earth  to  determine  strength  characteristics  and  compaction 
requirements.  Slope  design  is  best  based  on  the  results  of  tests,  with  due  regard  to 
possible  softening  of  the  rock  with  aging  and  observation  of  performance  of  similar 
fills  constructed  in  past.  The  recommended  minimum  slopes  for  fills  up  to  30  ft  high 
are  2  to  1  for  impervious  rock  and  1.5  for  jiervious  rock.  Assistance  of  specialists 
is  recommended  for  higher  fills. 

1.2.3.3.3  Hard  Rock 

Hard  rock  retiuires  blasting  for  removal  and  is  sufficiently  weather-resistant 
to  retain  its  strength  after  long  exposure.  Fills  containing  hard  rock  only  are 
usually  resistant  to  slides  and  are  otherwise  stable  except  that  such  fills  often  contain 
a  high  percentage  of  voids  which  cause  long-term  settlements.  Recommended  slopes 
are  1.5  to  1  for  fills  up  to  50  ft  high  and  2  to  1  for  higher  fills  of  hard  rock. 

The  percentage  of  voids  and  hence  the  settlement  of  a  rock  fill  may  be  reduced 
by  limiting  the  depth  of  each  layer  placed  during  construction,  mixing  soft  rock  or 
soil  with  the  hard  rock,  compacting  the  fill  in  place,  or  any  combination  of  these 
methods.  Layers  24  to  30  in.  deep  are  recommended  with  the  maximum  individual 
rock  size  not  exceeding  the  layer  thickness.  Heavy-duty,  rubber-tired  rollers  (50 
tons  or  heavier)  have  been  used  to  compact  well-graded  broken  rock  to  83  to  88 
percent  of  its  vmit  weight  in  the  solid  state. 

1.2.3.3.4  Zoning  of  Rock 

When  both  hard  and  soft  rock  are  available  to  construct  a  fill,  it  is  recom- 
mended that  each  material  be  located  in  such  a  position  as  to  take  advantage  of  and 
preserve  its  natural  strength,  reduce  or  eliminate  slope  erosion,  pro\ide  necessary 
drainage  and  avoid  trapping  water  within  the  fill. 

Fig.  1.2.3  shows  a  cross  section  of  a  fill  where  the  softer,  weaker  and  less 
pervious  rock  is  located  in  the  core  of  the  fill.  The  outer  slope  of  the  fill  is  deter- 
mined by  the  slope  needed  for  the  weaker  core  material.  By  enveloping  the  core 
with  the  hard  rock,  the  resulting  slopes  are  strengthened,  drainage  is  pro\ided  and 
the  strength  of  the  weaker  material  is  maintained  by  keeping  its  surface  from  the 
weather.  Settlement  is  also  reduced  because  the  softer  core  material  may  be  com- 
pacted to  a  density  more  nearly  to  that  which  existed  in  its  natural  state. 

Other  zoning  arrangements  may  be  made,  such  as  protecting  a  soft-rock  core 
with  clay  soil,  placing  hard  and  soft  materials  in  alternate  layers,  and  mixing 
hard  and  soft  materials  to  reduce  settlement. 

1.2.3.4  Selection  of  Soil  for  Fills 

The  quality  and  ease  of  construction  of  fills  varies  widely  with  different  types  of 
soil.  Sands  and  gravels  generally  result  in  excellent  bearing  capacity  but  may  require 
great  care  to  compact.  Silts  and  clays  can  often  be  conditioned  or  compacted  to  an 
acceptable  streng'th,  but  are  susceptible  to  freezing  and  changes  in  water  content, 
which  create  maintenance  problems.  Fine  sands,  topsoils  and  organic  soils  should  be 
rejected  as  fill  soil.  A  mixture  of  sands  and  gravels  witli  a  clay  ])inder  is  the  most 
favorable  soil  for  fill  material. 

The  ability  of  various  soil  types  to  resist  erosion  on  slopes  is  shown  in  Column  7 
of  Table  1.2.5.  The  stability  of  soil  types  in  rolled  fills  and  their  compaction  charac- 


Roadway    and    Ballast 


279 


M 

/  f 

0 

/  0 

O 

a: 

/'     ■  \^' 

N 

/ 

'     '  1 

^- 

/ 

/ 

«♦- 

/• 

•  • '        IV^Vv'* 

0        / 

■  '.I        lt^>v 

CO     / 

1    1        P^ 

J^ 

/' 

vi'     r 

0 

o 

A       -,j 

•■ii     E 
1      ^ 

~a          / 

■•1 

;;;;;; 

15 

t-        / 
d       /• 

[4 

XI            1 

R 

1  1   w 

"d 

/' 

•■I 

^ 

— 

J) 

A'' 

•i  \  1    ' 

J^ 

7^ 

3 

/'\            ■  ■  1 

•1"  w 

ll'l 

1  1 

#|i 

w 

0 

o 

fl          ■          ■••   ' 

1 

m 

"h- 

1                     ' 

III        1 

^ 

0 

if 

1 

f 

0-3 
C 

C 

o 

"[o 

\  '■■    "'•■! 

1 

i> 

N 

z. 

\  •'  ,        *'■' 

1 

1   1^ 

^ 

-•.. 

1 

\t=::zy 

+- 

\-  # 

Yyy^ 

\     " 

1 

:| 

R 

« 

v.- 

■■'.  1 

im 

5 

v.". 

"■■-.  1 

I  wv 

d 

\ 

■  1 

1 

■4- 

v- 

■■ 

i 

0 

V 

^ 

z- 

_w 

1 

^•■.. 

o 

V- 

' 

<0 

M 

\ 

J 

j — 

'\ 

1 

(£4 


280 


Roadway    and    Ballast 


teristics  is  shown  in  Columns  10  and  11  of  the  same  Table.  Methods  of  improving 
soils  for  use  in  fills  are  reviewed  in  Article  1.2.3.5. 

The  source  of  suitable  soil  is  a  primary  factor  in  fill  projects.  Excavation,  trans- 
portation and  placement  costs  govern  the  final  choice.  Fill  may  be  obtained  from 
adjacent   cuts,   borrow  areas   or  commercial  suppliers. 

1.2.3.5  Improvement  of  Soils 

The  improvement  of  the  beha\ior  of  soil  for  any  engineering  purpose  by 
methods  which  alter  or  control  tlie  properties  of  the  soil  is  generally  termed  soil 
stabilization.  There  are  many  techniques  used  to  create  a  desired  property  iu  a  soil, 
but  each  has  limitations  as  to  the  soil  type  and  the  minimum  grain  size  for  which 
it  will  be  effective.  The  choice  depends  on  the  nature  of  the  soil  and  the  objective 
in  improvement  of  it.  A  stabilization  method  or  admixture  should  be  suitable  for 
the  soil,  have  the  required  durability,  provide  the  necessary  performance  economically 
and  be  practicable  to  the  site.  Table  1.2.3  categorizes  the  principal  methods  and 
materials. 


Table  1.2.3 
Improvement  of  Soils 


Improvement 
by 

Method  or 
Admixture 

Procedure 

Densification 

Comjjaction 
♦Other  Methods 

Rolling  or  vibrating  of  fill  in  layers  with  moisture 
control. 

Vil)ration  in  depth  (Vibrofioation — patented 

method ) 
Compaction  piles,  blasting. 

Drainage 

Gravity 
Pumping 
♦Consolidation 
Transpiration 

Gravity  removal  of  water. 
Mechanical  removal  of  water. 
Surcharge  loading  with  drainage. 
Planting  or  seeding  with  vegetation. 

Modification 

♦Blending 
♦Cement,  lime, 

bitumen  or 

calcium  chloride 

Adding  select  soil,  mixing,  compacting. 

Adding  to  soil  in  small  quantities,   mixing  with 

moisture  control,  comi)acting,  curing. 

Note — Methods  marked  *  require  specialist  advice. 


1.2.3.6  Earth  Fills 

An  earth  fill  has  three  basic  components:  a  center  core,  shoulders  or  shell,  and 
a  drainage  system.  Homogeneous  fills  use  the  same  material  for  the  core  and  shoul- 
ders. Site  conditions  may  not  require  special  drainage  provisions  other  than  side 
ditches.  When  the  fill  functions  as  an  eartli  dam  or  levee,  the  core  is  constructed  of 
relatively  impermeable  material  while  the  shell  can  be  of  any  material  but  ideally 
of  greater  permeability  than  the  core. 


Roadway    and    Ballast 281 

Minimum  slopes  with  granular  materials  range  from  1.5  to  1,  and  with  cohesive 
materials  from  2  to  1  for  low  sections  to  3  to  1  and  Hatter  for  high  sections.  The 
slope  for  a  given  material  should  be  found  by  a  slope  stability  analysis. 

It  is  important  to  study  the  effects  of  a  new  fill  on  the  drainage  of  surface  water. 
When  culverts  are  needed  to  permit  and  control  flow  through  a  fill,  the  probable 
settlement  of  the  fill  shoidd  be  considered  in  order  to  predict  the  required  camber 
of  the  cuKert  and  avoid  a  low  spot. 

Structures  located  in  a  fill  are  likely  to  receive  a  transfer  of  load  from  the  fill 
due  to  settlement.  If  the  factor  of  safety  of  the  fill  and  its  foundation  is  greater  than 
2,  soil  creep  will  generally  be  tolerable,  and  the  structure  can  be  constructed  at  any 
time  with  little  danger  of  damage.  If  the  factor  of  safety  is  less  than  2,  precautions 
should  be  taken  to  schedule  construction  so  that  the  fill  is  built  in  stages  with  ap- 
propriate construction  controls  to  warn  of  impending  failure.  In  such  cases,  preferably 
the  fill  should  be  completed  and  its  stability  demonstrated  before  the  structure  is 
started.  Otherwise  the  structure  may  be  seriously  damaged  in  the  event  of  a  failure. 
Li  many  instances  such  precautions  are  advisable  even  though  removal  of  a  large 
portion  of  the  previously  placed  fill  may  be  required  in  order  to  erect  the  structure. 

Procedures  for  placing  and  compacting  fills  are  given  in  Section  1.3,  Construction. 

1.2.3.7  SidehiU  Fills 

The  construction  of  a  sidehill  fill  involves  the  stability  of  natural  slopes  both 
above  and  below  the  fill.  The  stability  of  these  slopes  and  the  fill  should  be  analyzed 
separately  and  as  a  unit. 

Construction  procedures  should  be  provided  to  prevent  the  fill  from  sliding  on 
the  original  slope.  The  old  surface  should  be  thoroughly  roughened  or  stepped  and 
drainage  provided  to  intercept  water  on  the  uphill  side  from  seeping  along  the  fill- 
slope  interface. 

The  slopes  of  the  fill  need  protection  from  runoif  in  addition  to  that  pro\'ided 
at  the  uphill  toe.  Erosion  protection  for  the  slopes  may  be  necessary,  as  detailed  in 
Section  1.4,  Maintenance. 

Where  it  is  not  possible  economically  to  provide  an  adequate  factor  of  safety  for 
the  uphill  slope,  an  added  width  of  ditch  or  other  protection  should  be  pro\'ided  on 
the  uphill  side  of  the  fill.  The  fill  and  its  loads  combine  to  reduce  the  stability  of 
tlie  original  slope.  Care  should  be  exercised  to  assure  that  excavation  does  not  remo\e 
material  below  the  toe  of  the  fill  which  will  contribute  to  tlie  resistance  to  failure 
or  that  construction  does  not  place  a  surcharge  on  or  above  tlie  uphill  slope  which 
will  increase  the  moving  forces. 

REFERENCE 

(1)   Muskeg   Engineering   Handbook,   University   of  Toronto   Press,   Toronto,    1969. 

1.2.4  DRAINAGE 

1.2.4.1   General 

This  section  deals  with  the  surface  and  subsurface  drainage  of  the  roadway 
as  distinguished  from  drainage  of  the  ground  surface  by  natural  waterways.  The  lat- 
ter subject  is  dealt  with  in  Part  3,  Natural  Waterways,  and  Part  4,  CuKerts,  this 
chapter. 


282 


Roadway    and    Ballast 


Since  water  is  the  principal  influence  on  soil  stability  in  roadbed,  subgrade  and 
slopes,  control  of  surface  and  subsurface  water  is  one  of  the  most  iuiportant  factors 
in  roadw  ay  design  and  maintenance. 

1.2.4.2  Surface  Drainage 

Surface  water  from  the  roadway  area  is  usually  handled  by  a  system  of  ditches 
parallel  to  the  roadbed  with  offtake  ditches  where  necessary.  The  roadbed  cross 
section,  slopes  of  cuts  and  fills,  ditches,  catch  basins  and  culverts  should  all  fonn  a 
balanced  system  to  dispose  of  the  water  without  accumulation  or  damaging  effects. 

The  design  capacity  of  any  part  of  the  system  can  be  calculated  if  the  quantity 
of  water  to  be  carried,  the  distance  and  grade  to  outfall  and  the  infiltration  factor 
of  the  soil  is  known  ( Ref.  1 ). 

The  ditch  grade  will  normally  be  governed  by  the  track  grade,  particularly  in 
long  cuts.  When  the  ditch  is  constructed  in  earth  materials  the  minimum  grade  should 
not  be  less  than  0.25  percent  to  minimize  sedimentation.  Likewise  to  prevent  erosion 
the  maximum  grade  should  not  be  greater  than  that  which  will  produce  a  velocity 
shown  in  Table  1.2.4.  Erosion  may  also  be  prevented  or  reduced  by  paving,  riprap- 
ping,  sodding  or  constructing  check  dams  to  reduce  the  water  velocity  (see  Part  3, 
Natural   Waterways  this  chapter). 

Table  1.2.4 
Limiting  Velocities  to  Prevent  Erosion 


Material 


Sand 

liOam 

Grass 

Clay 

Clay  and  gravel 

Good  sod,  coarse  gravel,  cobbles,  soft  shale. 


Velocity 
(Ft  per  Sec) 


Up  to 
2-3 
2-3 
3-5 
4-5 
4-6 


Ditches  may  be  trapezoidal  or  V-shaped  in  section.  Minimum  bottom  width  for 
trapezoidal  ditches  in  earth  materials  is  3  ft.  Side  ditches  should  be  located  so  that 
the  stability  of  adjacent  cuts  and  fills  will  be  maintained.  The  berm  between  the  toe 
of  a  fill  and  the  ditch  should  be  sloped  toward  the  ditch  for  good  drainage. 

Wide  ditches  are  desirable  at  the  toe  of  slopes  in  cuts  where  sloughed  material 
tends  to  accumulate.  Wide  ditches,  in  addition  to  providing  storage  space,  also  pro- 
vide working  space  for  equipment. 

Ditches  at  the  top  of  cut  slopes  to  intercept  runoflF  water  from  the  uphill  slope 
are  often  useful  in  reducing  slope  erosion  or  in  preventing  the  deterioration  of  a  rock 
slope  due  to  ice  fonnation  in  cracks  of  the  rock. 

The  same  care  should  be  taken  in  designing  intercepting  ditches  as  side  ditches 
lest  they  create  serious  erosion  problems  themselves.  Seepage  water  occurring  on 
the  face  of  a  slope  may  be  intercepted  and  conducted  away  on  benches.  Benches 
used  for  drainage  should  be  sloped  back  from  the  face  and  thence  laterally,  and 
should  be  lined  if  it  is  important  to  prevent  infiltration. 


Roadway    and    Ballast 283 

In  low-lying  or  flat  country,  it  may  be  necessary  to  dig  ofltake  ditches  away 
from  the  roadway  for  a  considerable  distance  to  provide  sufficient  difference  in  eleva- 
tion to  produce  drainage.  In  such  locations,  sedimentation  may  occur  requiring  regu- 
lar cleaning  of  ditches. 

1.2.4.3  Subsurface  Drainage 

1.2.4.3.1  Importance 

Only  a  portion  of  rainwater  is  handled  by  natural  and  man-made  water-courses. 
The  remaining  water  infiltrates  the  soil  and  becomes  either  ground  water  or  capillary 
water.  Where  ground  water  is  high,  subsurface  drainage  may  be  needed  to  draw  the 
water  table  down  so  that  softening  of  the  subgrade  soils,  sloughing  or  instability  of 
slopes  will  not  occur.  Capillary  water  cannot  be  removed  by  drainage  but  can  some- 
times be  controlled  by  lowering  the  water  table.  Lowering  the  water  table  will  assist 
in  reducing  the  amount  of  heaving  track  caused  by  frost.  In  such  locations  it  is 
desirable  to  maintain  the  ground  water  table  at  least  4  ft  below  the  top  of  subgrade. 

The  suitability  of  various  soil  types  to  gravity  drainage  is  given  in  Column  5 
of  Table  1.2.5. 

1.2.4.3.2  Types 

A  subdrain  is  any  covered  drain  below  the  ground  surface  receiving  water  along 
its  length  through  perforations,  porous  walls  or  joints,  placed  in  a  trench  backfilled 
with  filter  material. 

A  rock  or  French  drain  is  a  trench  loosely  filled  with  stones,  where  water  is 
intended  to  pass  through  the  interstices  of  the  stones  instead  of  a  pipe.  Rock  drains 
frequently  plug  with  fines  from  the  adjacent  ground  unless  protected  by  adequate 
filters.  For  this  reason  they  are  not  recommended  unless  properly  designed  and  care- 
fully installed. 

Subdrains  may  serve  as  cross  drains  or  side  drains.  Cross  drains  are  laid  under 
the  roadbed  or  other  areas  to  prevent  water  from  gathering.  They  are  placed  below 
the  level  of  water  accumulation  and  connected  to  a  side  drain.  Side  drains  are  built 
to  collect  water  from  cross  drains  and  to  intercept  water  flowing  toward  the  roadbed. 
A  side  drain  may  be  placed  at  the  lowest  part  of  a  seepage  zone  so  as  to  collect  as 
much  of  the  flow  of  ground  water  as  possible. 

1.2.4.3.3  Design 

Subdrainage  pipe  is  available  in  perforated  corrugated  metal,  rigid  plastic, 
bitununized  fiber  and  porous  concrete.  Part  4,  Culverts,  this  chapter,  gives  specifi- 
cations for  piping  and  methods  of  installation. 

Subdrainage  pipe  is  available  in  diameters  ranging  from  2  to  24  in.  Where 
periodic  cleaning  of  subdrains  is  required,  6-in.  pipe  or  larger  is  recommended.  Sucli 
cleaning  should  not  be  required,  however,  for  pipe  laid  at  a  proper  gradient  and 
surrounded  with  a  proper  filter  material. 

The  design  of  subdrainage  installations  is  made  from  knowledge  of  the  depth, 
direction  of  flow  and  seasonal  fluctuations  of  the  ground  water  table.  Such  informa- 
tion is  best  obtained  by  obser\'ing  the  soil  deposits  and  water  levels  in  test  pits  dur- 
ing the  wet  season.  The  location,  depth  and  size  of  pipe  are  chosen  accordingh. 

In  normal  subdrainage,  approximately  500  ft  of  6-in.  intercepting  drain  may 
be  used  before  a  change  to  a  larger  size  is  necessary.  Manholes  used  for  cleanout 
purposes  are  usually  installed  at  the  same  inter\als. 


284 


Roadway    and    Ballast 


'''amped  earth 


Roadbed 


^OriqinaJ  ground 
/      water  table . 


Intercepting  drain 


Lowered  6y 
drainage 


FIG.   1.2.4.       INTERCEPTION    OF  SIDEHILL  SEEPAGE 
BY  SUBDRAINAGE. 


Original  around 
'/c. 


Tamped  earth 


Intercepting  drains 


water  labi 
Lowered  by  cut 


Lowered  6>i/ 
subdrain  age 


FIG.  1.2.5. 


LOWERING   OF  GROUND    WATER 
IN  A    WET  CUT 


A  slope  to  ensure  a  velocity  of  2  ft  per  sec  should  be  used  (see  Ref.  2  and  3 
for  design).  It  is  important  to  locate  the  outlet  where  it  can  be  maintained  free 
from  any  manner  of  clogging. 

1.2.4.3.4  Uses 

Typical  uses  of  subdrainage  installations  can  be  illustrated  by  the  following  ex- 
amples. More  details  are  found  in  tlie  references. 

SidchiU  Seepage  Under  Track — Fig.  1.2.4  shows  a  condition  where  a  seepage 
zone  tends  to  cause  subgrade  softening.  After  investigation  by  auger  borings  or  test 
pits,  the  seepage  is  intercepted  before  it  enters  the  roadbed  area  by  a  side  drain, 
placed  at  a  deptii  so  that  the  effect  of  ground  water  is  no  longer  significant. 

Wet  Cuts — Fig.  1.2.5  shows  a  condition  where  track  maintenance  is  required 
due  to  the  saturated  condition  of  the  subgrade.  In  addition  to  a  substantial  thickness 
of  subballast,  intercepting  subdrains  installed  as  shown  on  either  side  of  track  are 
necessary  to  stabilize  subgrade. 


Roadway    and    Ballast 285 

Cut  to  Fill  Transitions — At  such  locations  the  flow  of  ground  water  from  a 
cut  is  often  interrupted  by  cross-sloping  impervious  layers,  causing  wet  conditions 
and  soft  subgrades.  A  subdrain  placed  across  the  roadbed  may  intercept  the  seepage, 
and  the  local  use  of  a  sub-ballast  thickness  greater  than  normal  will  ensure  a  stable 
subgrade. 

Yard  and  Station  Areas — Unless  the  subgrade  soil  is  free-draining,  a  system 
of  subdrainage  will  be  advisable  in  yard  and  station  areas,  usually  combined  with 
a  storm  drainage  system.  Longitudinal  subdrains  between  pairs  of  tracks  with  cross 
drains  at  200-  to  300-ft  intervals  will  normally  be  satisfactory.  Depth  and  spacing 
will  depend  on  soil  and  ground  water  conditions. 

Other  Uses — ^Subdrains  have  also  proven  of  benefit  at  road  crossings,  rail  cross- 
ings and  behind  bridge  abutments. 

REFERENCES 

( 1 )  H.  W.  King,  Handbook  of  Hydraulics,  McGraw-Hill,  New  York,  3rd  ed.  1939. 

(2)  American  Iron  and  Steel  Institute,  Chicago. 

(3)  Concrete  Pipe  Design  Manual,  American  Concrete  Pipe  Association,  Chicago. 

1.2.5  ROADBED 

1.2.5.1  Design 

The  roadbed  consists  of  that  zone  of  soil  or  rock  which  supports  loads  from 
the  track  structure  and  is  subject  to  weathering  and  deterioration  from  traffic  loads. 

Roadbed  soils  should  support  the  loads  imposed  by  traffic  without  excessive 
failure  or  deformation.  To  achieve  this,  the  design  of  roadbed  includes: 

( 1 )  Identification  of  the  properties  of  the  roadbed  soils, 

( 2 )  Consideration  of  their  performance  in   track  with   respect  to  supporting 
strength,  tendency  to  foul  the  ballast  and  tendency  to  frost  heave. 

1.2.5.2  Roadbed  Soils 

The  performance  of  various  soil  types  in  subgrades  is  indicated  in  Column  8  of 
Table  1.2.5.  This  applies  to  both  cut  and  fill  materials 

The  performance  of  plastic  or  cohesive  soils  in  the  roadbed  may  be  differentiated 
on  the  basis  of  whether  or  not  their  plasticity  index  is  above  10.  Use  of  soils  with 
a  plasticity  index  greater  than  10  for  a  depth  of  4  ft  below  sub-ballast  should  be 
avoided  if  possible.  Such  materials  rapidly  become  saturated  in  the  roadbed,  soften 
and,  if  not  protected  by  an  adequate  thickness  of  ballast,  squeeze  out  of  place  and 
require  frequent  lifting  and  lining  of  track.  This  type  of  failure  is  usually  progressive 
and  may  liecome  serious  if  axle  loads  are  increased  without  a  compensating  in- 
crease in  the  thickness  of  ballast  (see  Article  1.2.5.4). 

To  ensure  the  satisfactory  performance  of  roadbed  soils  it  may  be  necessary: 

( 1 )  In  fills  to  select  or  stabilize  soils  in  the  top  of  subgrade, 

( 2 )  In  cuts  to  stabilize  inferior  soils  in  place  or  excavate  and  replace  them, 

(3)  In   any   case   to  provide   a   graded   filter   layer   of  sub-ballast   to   avoid 
pumping  of  subgrade  materials  into  ballast. 

Kill,  (i^tl 


286 


Roadway    and    Ballast 


TABLE     !.?.<; 


son,  GROUPS, THEIR  CHARACTERISTICS  AND  USSS 


TIT" 

STMBOL 


ID 

SOIL  CROUP 


H) 

FIELD   IDENTIFICATION 


— ro~" 

FROST 
HEAVmC 


— m TTi m 

VALUE  AS     s'osr^;;  of; 

DRAIHAr.E  FILTER  LAYER  EXPOSED  SLOPS 


Well-graded  GRAVELS  md  GRAVEL-     Wide  ranso  In  grain  sizes, 
GW       SAND  mixturos,   trace  to  no  silt     substantial  amounts  of  all 
or  clay  intermediate  sizes,  no 

dry  strength 

Poorly-graded  GRAVELS  and 
GP       GRAVEL-SAND  mixtures,    trac 
to  no  silt  or  clay 


GRAVEL  some  SILT.   GRAVEL-SAND- 
SILT  mixtures 


GRAVEL  some  CLAY, 
GRAVEL-SAND-CLAY  mixtures 


Well-graded  SAMPS  and  SAND- 
GRAVEL  mixtures,  trace  to  no 
silt  or  cUy 


Poorly-graded  SANDS  and  SAND- 
SP      GRAVEL  mixtures,  trace  to  no 
silt  or  clay 

SAHD-SILT  mixtures 


SAND-CLAY  mixtures 


an 

eo  o  S  CUYS  of  low  to  medium 

§      S:     CL  plasticitT,   CLAY-GRAVEL- 

u      SAND-SILT  mixtures 

en      >-  SILTS.   SILT-SA>n3  mixtures  of 

ggM     MH  high   pUsticlty 

f  3  CLAYS  of  high  plasticity 
o3    OH 

_^ 

"  Organic  SILTS  or  CLAYS 


WBJSl,    PEAT 


Predominantly  one  size, or 
a  range  of  sizes  vrlth  some 
missing,  no  dry  strength 

None  to 
very  slight 

Excellent 

Fair  to 

None  • 

Fines  with  low  or  no  plas- 
ticity, slight  to  no  dry 
strength 

Slight  to 
medium 

Fair  to 
very  poor 

Very 
poor 

None  to  slight 

Plastic  fines,  medium  to 
high  dry  strength 

Slight  to 
medium 

Poor  to 
very  poor 

Not  to 
be  used 

None  to  slight 

Wide  range  in  grain  sizes, 
substantial  amounts  of  all 
intermediate  sizes,  no 
dry  strength 

None  to 
very  slight 

Excellent 

Excellent 

Slight  to  high 
with  decreasing 
gravel  content 

Predominantly  one  size,  or 
a  range  of  sizes  vfith  some 
missing,  no  dry  strength 

None  to 
very  slight 

Excellent 

Fair  to 
poor 

High 

Fines  of  low  to  no  plasti- 
city, slisht  to  no  dry 
strength 

Slight 
to  high 

Fair  to 
very  poor 

Very 
poor 

High 

Plastic  fines,  medium  to 
high  dry  strength 

Slight 
to  high 

Very  poor 

Not  to 
be  used 

Slight 

Fine  grained,  slight  to 
no  dry  strength 

Medium  to 
very  high 

Fair  to 
very  poor 

Not  to 
be  used 

Very  high 

Medium  to  high  dry 
strength 

Medium 
to  high 

Very  poor 

Not  to 
be  used 

None  to  slight 

Slight  to  medium  dry 
strength 

Medium  to 
very  high 

Poor  to 
very  poor 

Not  to 
be  used 

None  to  slight 

Sticky  when  wet,  high 
dry  strength 

Medium 

Very  poor 

Not  to 
be  used 

None 

High  smell,  dark  colour, 
mottled  appearance,  slight 
to  high  dry  strength 

Medium  to 
high 

Poor  to 
very  poor 

Not  to 
be  used 

Variable 

Eferk  colour,  sponey  feel 
and  fibrous  texture 

Slight  to 
high 

Poor 

Not  to 
be  used 

Not  applicable 

Adapted  from  ASM  Method  D  2U87I 


Roadway    and    Ballast 


287 


U) 

(9) 

(10) 

(u) 

VAL'JS  AS 

?v;-i'iHG 

STAFILlrV  ij; 

COMPACTION' 

SU=G?JUE 

ACTION 

COMPACTED  FILLS 

CHAEACTSRISTICS 

Excellent ; 

crawlor-'-ype  tractor, 
rubbor-tlred  roller, 
gt,ool-whael«d  roller 


Reasonably  Good; 

sood  crawler-type  tractor 

rubber-tired  roller, 
steel-wheeled  roller 

Reasonably  Good  with  close  mois 

good  ture  control; 

rubber-tired  roller, 
sheepfoot  roller 


Fai 


Excellent; 

rubber-tired  roller, 
sheepfoot      roller 

Excellent; 

crawler-type  tractor 
rubber-tired  roller 


NOTES 

Soil  t^/pes   in  capitals  and  'jndorlined 
make  up  more  than  50?  of  sample. Other 
scil  types   in  capitals  nake  up  more 
than  10^. 

Tendency  of  soil  to  frost  heave. 

Ability  of  soil  to  drain  water  by 
gravity.    Drainage  ability  decreases 
with  decreasine  average  grain   size. 

Value  of  soil  as  filter  backfill  around 
subdrain  pipes  to  prevent  cloj^^ine  wit 
fines,   and  as  filter  layer  to  prevent 

deration  of  fines  from  below. 


Reasonably 
^'ood  with 
flat   slopes 


Slight     Fair 


Good  with  close 
ture  control; 
rubber-tired 
sheepfoot  roller 

Excellent ; 
rubber-tired  rol' 
sheepfoot 


lie 


Her 


Poor  to  good  with  cl 
control  of  moisture; 
rubber-tired  roller, 
sheepfoot  roller 

Fair  to  good; 
rubber-tired  roller, 
sheepfoot  roller 


?)ul 

V8I7  Sad 

Poor 

Poor     to  very  poor| 
aheepioot  roller 

3u) 

Very  had 

F»lr  irith 
rut  slopes 

Fair  to  poor; 
sheepfoot  roller 

?ad 

Very  h«d 

Not,  to 
be  used 

Poor  to  very  poor 

P-acove 

cocpl«t 

,«lT 

Very  bad 

Not  to  be 
used 

Conpaction  not  poss: 

Ability  of  natural   soil  to  resist 
erosion  on  an  exposed   slope.      Soils 
siarked  *  may  be   used  to  protect 
eroding  slopes  of  other  materials. 

Value  as   stable  sub^rade  for  roadbed, 
when  protected  by  suitable  ballast 
and  aubbellast  material.     Good  soils 
may  be  used  to  protect  poorer  soils 
in  subrrade 


Stability  of  soil  against  bul^lnr  and 
subsidence  when  used   in  a   rolled   fill 
Cross  check  with   Column   (?)   to  fore- 
cast  tendency  to   erode. 

Equipment  listed  will  usually  produce 
the  required  densities  with  a   reason- 
able number  of  passes  when  moisture 
content  and  thickness  of  lift  are 
properly  controlled. 


288 


Roadway    and    Ballast 


On  earth-moving  jobs  of  appreciable  size  there  may  be  various  t\pes  of  soil 
present.  If  the  most  suitable  soils  can  be  selected  and  reserved  for  use  in  roadbed, 
long-term    maintenance    costs    can    be   minimized   at   little   extra    construction    cost. 

1.2.5.3  Treatment  of  Roadbed  Soils 

If  local  clays  are  known  to  swell  in  the  presence  of  water,  or  if  laboratory 
consolidation  tests  on  undisturbed  samples  show  the  tendency  to  swell,  such  clays 
should  not  be  used  in  track  su])grade  witliout  treatment  to  improve  their  qualities. 

Clay  subgrades  may  be  stabilized  by  mixing  with  drier  soils  or  additi\es  such 
as  lime  or  portland  cement  in  small  quantities.  The  use  of  such  stabilization  methods 
to  strengthen  clays  in  the  roadbed  will  reduce  the  thickness  of  sub-ballast  required. 
Stabilization  metliods  are  reviewed  in  Article  1.2.3.5. 

Under  saturated  conditions  and  repetitive  traffic  loads,  fine-grained  subgrade 
materials  may  pump  and  fill  the  voids  of  ballast  or  sub-ballast.  The  tendency  of 
various  soil  types  to  do  this  is  indicated  in  Column  9  of  Table  1.2.5.  Pumping  can 
be  controlled  by  designing  the  sub-ballast  as  a  graded  filter  layer  to  prevent 
migration  of  the  subgrade  particles.  The  most  useful  standardized  gradings  for  filter 
piuposes  are  those  for  asphalt  and  concrete  sand.  They  are  plotted  and  their  applica- 
bility shown  in  Fig.  1.2.6.  The  figure  also  gives  the  criteria  for  designing  filter 
layers  for  any  base  material.  Some  natural  soils  will  serve  as  filters  as  shown  in 
Column  6  of  Table  1.2.5. 


U.S     STANDARD    SIEVE    S/ZES 

10  20  40  100  200 


- 

1 

\ 

1 
\ 
\ 

\ 
\ 

DS5b\ 

K^ 

- 

\                \ 

\^ 

For  silts  in  ffiis 

- 

\ 

\/ 

/      range  use  asphatt 
y  sand  filter  y 

- 

- 

\ 

V 

/ 

r' 

Fine  lir 

concrete 

4-  asphc 

filt 

nit   of 
sand,  A 
2/1  sane 
ers 

5TM  i 
i,  ASTS/ 

OI073-k 

'^SOB  1 

/    / 

/ 

- 

\        \ 

/  / 

- 

\ 

\ 
\ 
\ 

Firjfst  base  for 
concrete  sand 
filter -^ 

^ 

/ 

- 

^ISF 

q         \ 

0/5sX< 

/       / 

\ 

\ 

^ 

/o 


10 


GRAIN  SIZS   (MM) 
FILTER   DESIGN  REQUIREfvlENTS  :  F  -    FIL  TBR        B  --  BASE 

I.     To  avoid  movement  of  particles  from  base     ■§—  <  5  ,     ^f^l  "^  ^^ ,      "5^  "^  ^°  (^'^'^  ^°^ ''  <^'ll 


2.    Filter  sizes   -     0%> 3 IN. ,4- 5%  passing   no.  ?00  sieve. 

FIG.  1.2.6.        GRADED  FILTERS 


graded  base) 


Roadway    and    Ballast 289 

Use  of  the  principle  of  graded  filter  layers  is  most  important  in  choosing 
backfill  which  will  remain  unclogged  around  perforated  pipe  subdrains  and  in  all 
other  locations  where  two  adjacent  materials  are  to  remain  unmixed. 

An  alternate  means  of  separating  two  adjacent  layers  and  at  the  same  time 
preventing  saturation  of  the  lower  one  is  by  means  of  waterproof  plastic  membranes. 
As  the  membrane  prevents  natural  evaporation,  however,  saturation  of  a  clay 
subgrade  may  eventually  occur  in  any  case.  For  this  reason  use  of  buried  membranes 
is  only  suggested  where  it  is  wished  to  prevent  surface  water  from  penetrating  the 
subgrade.    Neoprene   film   of   1/16   in.    thickness   is   recommended  for  the  purpose. 

1.2.5.4  Ballast  Thickness 

To  give  proper  support  to  ties  in  a  main-line  track  a  minimum  of  12  in.  of  top 
ballast  under  ties  and  6  in.  of  sub-ballast  should  be  provided.  To  spread  the  load 
to  subgrade,  however,  a  greater  combined  thickness  of  ballast  and  sub-ballast  may 
be  needed  depending  on  the  strength  of  tlie  subgrade  soil.  This  required  thickness 
may  vary  over  the  length  of  a  railway  line,  depending  on  variations  in  the  subgrade 
strength. 

Prediction  of  the  design  strengtii  of  a  roadl^ed  soil  should  be  liased  on  laboratory 
testing  of  saturated  remolded  samples.  If  the  same  soil  is  in  use  in  a  railwa\'  roadlied 
in  similar  conditions  elsewhere,  the  design  strength  should  be  found  from  in-place 
strength  tests. 

The  design  strength  of  subgrade  should  not  be  exceeded  by  the  traffic  loads 
to  be  applied,  distributed  through  the  rail,  ties,  and  ballast.  The  load  distribution 
may  be  estimated  on  the  basis  of  Talbot's  work  ( Ref.  1 )  and  a  factor  of  safety  of 
1.5  or  greater  depending  on  the  frequency  of  traffic  expected.  This  analysis  will  give 
a  first  approach  to  finding  the  comliined  thickness  of  ballast  and  sub-ballast  required 
for  a  given  axle  load  and  subgrade  strength.  Judgment  from  experience  should  then 
be  applied  to  choose  a  final  design  thickness. 

When  select  soils  are  to  be  placed  at  the  top  of  a  fill  or  after  sub-excavation 
in  a  cut,  or  when  subgrade  soils  are  to  be  stabilized,  the  above  analysis  will  assist 
in  deciding  the  economic  depth  of  treatment  required. 

In  the  same  way  when  axle  loads  or  frequency  of  traffic  is  to  be  increased  on 
an  existing  track,  the  analysis  is  useful  in  helping  to  predict  how  much  more  ballast 
is  required  to  avoid  subgrade  failure.  In  this  instance  the  design  should  be  based 
on  the  in-place  strength  of  the  saturated  roadbed  soils. 

1.2.5.5  Frost  Heaving 

To  reduce  maintenance  costs,  frost-heaving  soils  should  not  be  left  in  the  sub- 
grade  within  a  depth  of  about  60  percent  of  the  depth  of  frost  penetration. 

Frost  heaving  is  caused  by  the  growth  of  ice  layers  fed  by  a  flow  of  moisture 
from  below.  In  general,  four  conditions  must  be  satisfied  for  the  formation  of  ice 
lenses : 

(a)  Capillary  saturation  of  the  soil, 

(b)  A  free  supply  of  water, 

(c)  3  to  10  percent  of  soil  grains  smaller  than  0.02  mm, 

(d)  A  decrease  in  soil  temperatures  to  below  freezing. 

Presumably,  if  any  of  these  conditions  is  nnssing,  fro.st  heaving  will  not  occur. 
Since  factors  (a)   (b)  and  (d)  are  difficult  to  control,  the  most  expedient  procedure 


290 Roadway    and    Ballast 


is  to  avoid  use  of  soils  having  3  to  10  percent  smaller  than  0.02  mm  in  grain  size. 
The  tendency  of  various  soils  to  frost  heave  is  shown  in  Column  4  of  Table  1.2.5. 

Where  frost-heaving  soils  predominate  on  a  site,  it  may  be  possible  to  minimize 
frost  hcaxing  by  introducing  a  coarser  layer  to  break  the  capillary  rise  of  water 
within  the  depth  of  frost  penetration. 

If  undesirable  frost  hea\'ing  occurs  under  the  track,  methods  of  dealing  with  it 
are  given  in  Section  1.4,  Maintenance. 

1.2.5.6  Roadbed  Dimensions 

When  horizontal  and  vertical  alignment  and  depth  of  ballast  are  known,  the 
width  of  roadbed  can  be  chosen.  Although  the  width  can  often  be  standardized  o\er 
the  length  of  a  new  line,  track  shoulders  should  be  wider  on  fills  resting  on  founda- 
tions which  will  settle.  The  width  chosen  should  be  based  on  an  estimate  of  the 
ultimate  settlement  of  both  foundation  and  fill  (see  Article  1.2.3.2),  combined  with 
req<uirements  for  standard  ballast  sections  given  in  Part  2,  Ballast,  this  chapter. 

REFERENCE 

( 1 )  A.  N.  Talbot  and  others.  Transmission  of  Pressures  in  Ballast,  Part  5,  2nd 
Progress  Report,  Special  Committee  on  Stresses  in  Railway  Track,  AREA  Proc. 
Vol.  21,  1920,  pp.  765-814. 


Report  of  Committee  3 — Ties  and  Wood  Preservation 


W.  F.  Ahksey,  Chairman 

G.  H.  Way, 

Vice  Chairman 

R.  G.  ZiETLOw,  Secretary 


F.  J.  Fudge 

E.    M.    CUMMINGS 

W.  R,  Jacobson 

L.    C.    COLLISTER 

J.  T.  Slocomb 

C.  p.  Bird 

H.  C.  Archdeacon 
A..  B.  Baker 
S.  L.  Barkley 
R.  S.  Belcher  (E) 

G.  W.  Brenton 
R.  G.  Brohaugh 
W.  Buehler  (E) 
G.  A.  Burdell 
G.  S.  Burt  (E) 
R.  E.  Gase' 

M.  J.  Grespo 

D.  L.  Davies 

R.  F.  Dreitzler 
K.  G.  Edscorn 
D.  E.  Embling 
W.  E.  Fuhr 
J.  K.  Gloster 


R.  S.  Henry 

F.  F.  Hornig 

R.  P.  Hughes  (E) 

G.  P.  Huhlein 

L.  W.  Kistler  (E) 
M.  A.  Lane 
H.  G.  Martin 
W.  G.  Merritt 
G.  H.  Nash 
L.  M.  Nichols 
T.  H.  Patrick 
J.  A.  Peebles 
R.  B.  Radkey 
H.  E.  Richardson 
R.  J.  Shelton 
y.  T.  Skerczak 
"R.  B.  Smith 
R.  G.  Weller 

F.  M.  Whitmore 

J.    L.    WiLLLAMS 

E.  L.  Woods 

G.  W.  York,  Jr. 

Committee 


i  E )  Member  Emeritus. 
•  Deceased. 

Those  whose   names   are  shown   in   boldface,   in   addition   to   the  chainnan,  vice  chairman  and 
secretary,  are  the  subcommittee  chairmen. 

To  the  American  Railway  Engineering  Association: 

Your  conmiittee  reports  on  the  following  subjects: 

B.  Re\ision  of  Manual. 

Brief  progress  statement  submitted  as  infomiation   piige  292 

2.  Gross  and  switch  ties. 

(a)  Keep  up  to  date  specifications  for  cross  and  switch  ties. 
No  report. 

(b)  Extent  of  adherence  to  specifications  for  cross  and  switch  ties  as 
ob.ser\ed  on  field  inspections. 

No  report. 

2.    (c)   Possible  revision  of  cross  tie  design  and/or  spacing,  collaborating 
as  necessary  or  desirable  with  Gonnnittee  5. 
Progress   report   submitted    as    infoniiatiou    page  293 

.3.  Wood  preservatives. 

(a)  Keep  up  to  date  specifications  for  preservati\es. 
No  report. 

(b)  New  preservatives. 
No  report. 


Note — Discussion   on   subcommittee   reports   herein   closes   on    Ma>     1,    1971, 


291 


292 Ties    and    Wood    Preservation 

4.  Pre.ser\'ative  treatment  of  forest  products. 

(a)  Keep  up  to  date  specifications  for  treatment. 

Progress   report   submitted   as   information    page  294 

(b)  Methods  of  conditioning  prior  to  treatment. 
No  report. 

(c)  Advisability  of  preparing  specifications  to  cover  care  and  handling 
of  forest  products  before  and  after  treatment. 

No  report. 

5.  Service  records  of  forest  products. 

(a)  Annual    tie    renewal    statistics    as    furnished    by    Economics    and 
Finance  Department,  AAR. 

Progress  report  submitted  as  information   page  301 

(b)  Marine  organisms. 

Progress  report  submitted  as  information piige  301 

(c)  Service  test  records   of  forest  products  used  in  railroad  construc- 
tion and  maintenance. 

Progress  report  submitted  as  information   pt^ge  301 

6.  Collaborate  with  AAR  Research  Department  and  other  organizations  in 
research  and  other  matters  of  mutual  interest: 

( a )   Substitute  for  wood  ties. 

A  Special  Committee  on  Concrete  Ties,  which  includes  representa- 
tives from  Committee  3,  is  developing  a  performance  specification 
for  concrete  ties. 

The  Committee  on  Ties  and  Wood  Preservation, 

W.  F.  Arksey,  Chairman. 


AREA  Bulletin  631,  January-February  1971. 


Report   on   Assignment   B 
Revision  of  Manual 

F.  J.  Fudge  (chairman,  subcommittee),  W.  F.  Arksey,  D.  E.  Embling,  W.  E.  Fuhr, 
M.  A.  Lane,  R.  B.  Smith,  J.  L.  Williams. 

Chapters  3  and  17  of  the  Manual  are  being  reviewed  and  revised.  A  completely 
revised  single  chapter  to  replace  present  Chapters  3  and  17  will  be  recommended  for 
adoption  next  year. 


Ties    and    Wood    Preservation 


293 


Report  on   Assignment   2 
Cross  and  switch  ties 

E.  M.  CuMMiNGs  (chairman,  subcommittee),  W.  F.  Arksey,  G.  H.  Way,  W.  R. 
Jacobson,  y.  T.  Slocomb,  C.  P.  Bird,  G.  B.  Boggs,  J.  K.  Gloster,  F.  F.  Hornig, 
H.  F.  Kanute,  M.  a.  Lane,  T.  F.  Maloney,  G.  H.  Nash,  R.  C.  Weller. 

POSSIBLE    REVISION    OF   CROSS   TIE    DESIGN   AND/OR   SPACING 

Committee  3  joined  the  Research  and  Product  Development  Committee  of  the 
Railway  Tie  Association  in  an  inspection  of  the  joint  RTA-AAR  tie  test  on  Sep- 
tember 1,  1970.  There  are  a  number  of  Committee  3  members  who  are  also  on  the 
RTA  committee. 

This  test  is  installed  on  tlie  Chicago  &  North  Western  Railway  near  Des  Plaines, 
111.,  on  a  line  carrying  approximately  25  million  gross  tons  of  traffic  per  year.  The 
AAR  staff,  which  inspects  the  ties  annually,  is  looking  primarily  at  the  performance 
of  the  test  track  with  regard  to  settlement,  stiffness,  and  track  profile — that  is,  cross 
le\el  and  riding  qualities.  The  ties  were  installed  in  the  test  track  in  November  1967. 
It  was  hoped  that  the  1970  AAR  inspection  would  have  been  completed  by  Septem- 
ber 1,  but  due  to  uncontrollable  circumstances  tlie  inspection  was  delayed.  (The 
inspection  was  actually  made  between  September  8  and  September  17,  1970).  The 
tie  sizes  and  spacings  under  test  are  shown  below. 

Investigation  of  Tie  Size  and  Spacing 
Chicago  &  North  Western  Railway 


Section 

Tie  Size 

Tie  Centers 

1 

6x8—  9' 
7  X    9—10' 
7  X    9—  9' 
7  X    9—  8'  6" 
7  X    9—  8'  6" 
7  X    9—8'  0" 
7  X  12—  8'  6" 
7  X  12—  8'  6" 

19^" 
19H" 
19H" 
19^" 

23  H" 
27^" 

29  M" 
23  H" 

2 

3                     

4                                 .   - 

5 

6.     

7_       ._-                     --         -       -         

8         

Each  section  is  20  rail  lengths  long.  The  location  is  on  the  double  track  of  the 
C&NW  line  connecting  the  West  line  at  Proviso  with  the  North  line  at  Northbrook. 
The  eight  sections  are  located  between  Old  Ri\er  Road  and  Milwaukee  .\\enue, 
which  is  in  the  vicinity  of  Central  Road,  Dearlove  Road  and  Glen\iew  Road. 


294  Ties    and    Wood    Preservation 


Report   on   Assignment  4 
Preservative  treatment  of  forest  products 

L.  C.  CoLLisTER  {chairman,  subcommittee),  W.  F.  Arksev,  G.  H.  Way,  R.  G.  Zeit- 
Lovv,  G.  W.  Brenton,  R.  E.  Case,  K.  C.  Edscorn,  T.  H.  Patrick,  R.  B.  Smith, 
F.  M.  Whitmore,  C.  a.  Burdell,  D.  L.  Davies,  R.  F.  Dreitzler. 

KEEP   UP   TO   DATE   SPECIFICATIONS   FOR   TREATMENT 

The  following  tabulation  of  treating  practices  is  a  summary  of  replies  received 
to  a  questionnaire  sent  to  chief  engineers  of  the  railroads. 


Ties    and    Wood    Preservation 


295 


0 
" 

« 

« 

t^ 

in 

X 

«t^ 

QO 

CO 

t^ 

CO 

1 

P 

g 

0 

S 

0 

0 

0 

0 

0 
10 

g 

g 

g 

0 
in 

0 

0 

0 

C<5 

§ 

0 

0 

0 

s 

s 

s 

gs 

0 

CO 

0 
in 

0 
in 

° 

t? 

-a 

X 

X 

-3 
X 

X 

§_• 

OK 

0 

-c 

X 

0 
-6 

X 

0 

0 

Zee 

0 

c 

•3 
X 

s 

-a 

■3 

K 

X 

0 

< 

S3 

:3^ 

M 

X 

M 

1 

t~ 

is 

«t^ 

1^               CO 

t^ 

CO 

a 

a:; 

P 

s 

0 

0 

0 

0 

0 

2  S 
"S  ^ 

a,~ 

0 
1^ 

0 
10 

0 

•n 

0 

0 
in 

0 
in 

0 
in 

0  == 

0 

CO 

g 

s 

0 

CO 

0 

0 

0 

0 

g§ 

0 

0 

0 

lO 

0 

CO 

-a 
K 

X 

X 

5x 

■d 
is 

■a 

OK 

X  X 

tfOK 

SK 
LT  X 

ZoQ 

T3 
X 

5S 

•a 
K 

So 

■6 

K 
•6 

X 

0 
0 

< 

Locust;  Red  & 
White  Oak, 
Black  Walnut; 
Gum 

s 
0 

'0 

i 

•3 

0 
0 

c 
< 

• 

'a 

« 

.2 

OJ 

a 

u 
i 
e 

e 

d 

0 

a 
'3 

1 

3 

CO 

> 

01 

«-! 
0; 

"o 

? 

2 

§ 
0 

■5 

0 

!s 

0 

•a 

01 

1 

C9 

u 

Chicago,  Burlington  &  Quincy 
Railroad  (BN,  Inc.) 

•8 

3 

oT 

~  03 

0 

> 

03 

B 
1 

1 

J3 

•£ 
0 
/; 

0 
0 

03 

§ 
1 

X 

■3 
Q 

B 

•8 

11 

g 

0> 

1 

T3 
B 
03 

0 

1" 

09 

a 

OS 

B 
B 

ee 
it 

03 

« 

.Ss 

296 


Ties    and    Wood   Preservation 


U 


s 

^S 

■M 

^   3 

00 

M 

t^oJoo 

t^ 

00 

t-o 

CI 

« 

o 

00 

t^ 

a: 

3^ 

•3^ 

O 

ooo 

o 

o 

1 

o 

o 

o 

If 

•^•w 

<N 

« 

1 

■* 

'J" 

a 

0 

c 

s 

2S 

o 

o 

o 

o 

o 

s 

"S  r 

o 

<o 

lO 

h- 

•ra 

.^ 

»^ 

O,^ 

3 

a, 

1 

1 

1 

1 

■/J 

J.  - 

1 

1 

1 

1 

o  « 

o 

o 

ooo 

o 

o 

o 

1         o 

o 

o 

o 

o 

o 

a° 

lO 

tr 

•o 

00 

■o 

t^ 

m 

'— 

m 

«J 

a 

i      ? 

..JS 

_s 

_s 

S 

$. 

i."^ 

—    .>  Hi 

^ 
s 

ia  3.E 

1-= 

X 

U  03  S 

J 

_2 

0. 

B 

El 
^1 

OS 

tffeO, 

C 

OOO^ 

OK 

PiCC 

^ 

K 

OS 

O 

s 

^  ^ 

\ 

C^=^ 

(M 

^ 

N 

oc 

1    t~O300 

cr 

i~. 

oc 

t^C 

r 

oc 

c 

oc 

1^ 

<^ 

:3^ 

1 

"ie 

c 

1 
OOO 

c 

c 

! 

t      c 

c 

o 

.=  S 

t 

•t-f -* 

0- 

1     ^ 

t 

^ 

O" 

1 

1 

a 

"1 

1 

1 

1    ' 

.s 

0 

s 

^i 

c 

1 

c 

1 
c 

1 

c 

c 

1       < 

S 

^ 

"£  ? 

t^ 

» 

0,-2 

1      I 

o 

Q. 

1    i 

O 

1 

o  » 

c 

c 

ooc 

c 

c 

c 

c 

c 

c 

c 

c 

o  1 

^  s 

IT 

c 

CCCDC 

« 

IT 

tN 

c 

^ 

O  '" 

1 

1 

1 

1 

i 

1 

1 

1 

i 

1 

! 

1 

i'i 

0) 

(U 

t 

sc^ 

.tS          ..i 

"XL 

■^ 

-»J      — 

~ 

T 

^> 

c 

s:—  is  c 

0 

I 

^ 

15      5 

^1 

i 

1 

'z 

^^gfeS 

1 

" 

^ 

^    3 

LT^ 

1 

f? 

^^-i'i 

> 

i 

I 

^. 

'    J.-^ 

OS 

i 

E  c 

j 

;  ^ij 

i 

-k.2 

a 

PiOffiH. 

< 

^    OOa 

1^ 

CI 

picS 

£h 

o? 

k 

C'l 

O 

o 

1 

3 
> 

1 

■« 

C 

^      "3 

1 

OS 

d 
O 

1 

_^ 
'5 
Pi 
c 

t 

c 

C 

■*      o 

3       '3 

=      c 

2          0) 

p: 

t 
c 

c 

0 

1 

1       o 

if    i 
;     '5 

1 
1 

1   % 
e 

1  s 

o 
x 

1 

Pi 

1 

'5 

Pi 

B 

1 

J 

1 

c 

2^ 

?  £ 
;     >i 

03 

:     ^ 

3       'S 

;    Pi 

\  f 

_o 

(S 

o 

1 

g 

H 

1 

o 

2: 

< 

s    ^ 

7 

3        > 

a; 

■|| 

c 

»8 

■g 

-    '3 

D        .2 

i 

w  <s 

"o 

'  t 

c: 

£ 

" 

3     :3 

i 

a      c 

1  -5 

.2C, 

jl 

1   = 

\ 

5        O 

s 

O 

C 

3     P 

- 

1  S 

S 

\y. 

1  J^ 

? 

'.    ■z. 

IS 

Ties    and    Wood    Preservation 


297 


U 


04 


e 

1 

b  ~ 

t^o 

"a 

g 

<^^ 

1 

'^o 

ira 

: 

1 

V 

^  s 

b- 

:roo 

t~ 

—  C^l 

0: 

M--J 

00 

t- 

1      0 

5^ 

1      ^ 

PS 

1 

1 

■i^ 

o 

O 

1        ; 

1 

0 

0 

:^ 

5^ 

^ 

m 

•i" 

-* 

e 

i  e 

K 

■fe  £ 

o 

oo 

•n 

0 

5S 

in 

t^t~ 

i> 

L*^ 

t^ 

^ 

5- 

(^~ 

CO 

u 
•? 

tt^ 

1 

1 

1 

1 

'^ 

, 

1 

1 

g- 

o 

o 

o 

oo 

in 

00 

0 

c 

>o 

^  S 

t- 

lO 

coco 

01 

eo 

lO 

^ 

■M 

o 

1 

jii 

c 

C 

2 

1 

o 
0 

o  ft 
<U  »5  - 

t.  0 

0 

<^ 

S 

Li'l 

^"1^ 

■^"s 

E 

-^\ 

El 

- 

E 

!    0373 

1^  oi     . 

05  3 

03. t; 

.  a 

S 

CSi" 

OO 

0 

Ofc. 

QK 

S 

c 

1 

S 

e 

lO 

03 

.o 

**  -w> 

t^ 

0 

0 

c 

^^ 

b- 

o« 

1 

ir 

t~- 

"la 

.. 

1     T 

coo 

&^ 

3^ 

1 

0 

•^ 

1 
1 

a 

1 

o  5 

O 

oc 

1       : 

c 

c 

:^::^ 

a^ 

't 

lOT 

't 

1 

t 

t^t>- 

'. 

1 
1 

C<3C0 

a 

s 

j 

t 

o 

oo 

c 

1 

::^:^ 

S 

^ 

IC 

t^r- 

I- 

1 

t^t^ 

s- 

"i,-" 

1 

MM 

i 

a; 

1 

1 

<j 

^  ^ 

c 

oc 

o 

oo 

ir 

c 

c 

c 

10  IC 

P 

lOir 

in 

nm 

c^ 

c 

1 

M  M 

^ 

c 

1  •- 

j 

c 

c 

0. 

c 

a 

.«^ 

1 

^.  i," 

£ 

£ 

..t: 

^   0   t.   = 

■a 

C 

'o'a 
01  oa  „ 

J4  " 

1 

S 

t- 

^1, 

3X 
0 

is 

j  ;:= 

1  E-d 

ost 

OC 

08  3 

00 

c 

OS 

ES 

OMKC 

1 

d 

e 

^b 

C 

oS 

>, 

S  ^ 

c 

A 

oX, 

_c 

s 

•8 

II 

c 

'S 

>. 

M 

»K 

t 

,     0 
u 

1 

08 

5 
5 

3 

.2  5 

l<5 

c 

a 

'5 

as 

i| 

c 
( 

( 

i 

E- 
c 
(C 

1 
'S 

1.1 

!; 

s 

08 
08 

0 
'2 

V 

1 

•oS 

1 

(S 

«.2 
'5 

a 

^ 

a. 

s 

§i 

E  = 

£ 

.2 

3 

a 

a 

Jl 

0/  — 

a 

u 

■M 

^ 

X   . 

J 

^ 

1 

S 

ii 

g 

ti 

o 
o 

■r 

73 

e 
•r 

0 

.8 

298 


Ties    and    Wood    Preservation 


P3 


1 

c 
c 

00 

CO 

IMOO 

(M 

00 

IM 

IM 

0 

i^ 

i 

c 

g 

O 

1 

Is 

o 

1 

s 

g 

o 
in 

§ 

a 

22 

§ 

o 
o 

§ 

o 
o 

g 

g 

a. 
CO 

E 

G 

s 

o 

§ 
E 

O 

B 

E^ 
■  ca 

0) 

a 
E 

e 

E 

E 

a 
E 

3 
0 

0 
0 

< 

s 

s 

e 

8 

3^ 

13 

00 

M 

0)00 

o 

«00 

o 

00« 

O 

00 

t~ 

1 

o 

<N 

oo 

O 

s 

g 

0 

gs 

g 

s 

oo 
oo 

o 
o 

oo 
n2 
o 

o 
o 

oo 
>co 

§ 

s 

g 

■6 

WE 

CD 

a 
E 

e 
E 

>-i 

3 
O 

!3 

p 
ftSE 

E 

00 
~-  X 

x=f 

o  > 

HO 
J. 

E 
Q 

<u 

0>H 

M 

-3 
0 
0 

1 

} 

c 

C 

c 
E- 

c 

c 

< 

i 

3 

1 
'3 

W 
a) 
oi 

S 

i 

d 

o 
O 
<u 

'3 

o 
1 

i 

C 

1 

ft 

1 

1 

j 
i 

1 

"3 
2 

O 

0) 

t 

o 
J3 

O 

> 

C 

c 
c 

& 
c 

c 

t 

i 
Ic 

C 

f 

-: 
e 

v: 

-a 

oi 

"  o 

ei 

=8 

"3 

-»^ 
m 

3  oj 
OS  P 

S-3 

O 

j 

< 

X 

c 
c 

t 

I 

>> 

OS 

■3 
»3 

0 

-§ 

3 

=8 

V 

ca 

M 

e 

01 

X: 
oJ 

1^ 

Q 

1 
C 

1 

0) 

C 
es 

C 

0 

o;.-3 
>  OS 
g« 

1  G 

1 

Ties    and    Wood    Preservation 


299 


« 


e 
s 

3^ 

"3 
O 

"3 

fc. 

i   0) 

1  1 

1 

1 

00 

■  es 
1     1 

2S 

M 

C>l 

__  0 

a 
0 

;c 

o 

° 

0 

0 

CO 

0 

0 

; 

'0 
■  in 

o  ■ 

2 

8 

"2 

g       ' 

; 

0 

0 
0 

0 

8S 

0 
0 

0 
0 

03 

o 

a 

E 

3 

0 

e 

E 

3 
0 

a 
E 

s' 
0 

E 

B 
E 

a) 
B 

E 

.3 

in 

00 

05  00 

"3 

3 

M 

00 

00 

-M 

00 

0 

ii 

oo 

?? 

000 

0 

0 

0 

3 

e 
e 

1 

e 

1 

a! 

0,- 

0 

m 

g 

59 

8 

S§ 

000 

d 

0 
10 

0 

0 

g 

§ 

c 

1 

■i.s 

OCL, 

1 

o 
O 

t^  a 

OP. 

(SOO 

1 

a 
E 

3 

c 
E 

i 

1> 
c 

E 

0 

a 
E 

a 
a 

E 

0] 

c 

B 

E 

3' 

0 

CO 

- 

B 

'% 

'C 

■3 
OS 

c 

0 

1 

0 

£ 

'5 

_o 

0 

C 

£ 

'5 

SJ 

1 

.ss 

0 

■0 
S 
■3 

i 

S. 
« 

•a 

1 

3 
•X. 

ii 

1 

1 

1 

.£ 

3 
0 

OS 

1 

s 
'3 

=8 

s 

•8 

•3 

2 
'5 
OS  >. 

ft-OS 

jl 

0 

_o 
'S 

a> 

IS 
"0 

s 

■3 

OS 

•3 
y 

1 

'3 
OS 

1 

•a 
y 

1 

■3 
OS 

i 

1 

■3 
1 

y. 

300 


Ties    and    Wood   Preservation 


n 


1 
1 

:3^ 

B3 

00 

= 

CI 

19.57 
10.21 

0 

N 

M      er 

1 

11; 

3-^ 

0 
f 

?5 

0 

CO 

0 

Is 

g 

ss 

0  ^ 

§8 

0 

0 

§ 

0 

§ 

ss 

§ 

0 
0 

E 

S3 

01 

e 

0 

G 

E 

3 

0 

0 

E^ 
4 

EE 

13 

E 
>> 

>> 

0 

E 

d 

E 

E    E 
d   d 

J- 

s 

3 

-a 
e 

1 

;3^ 

M 

C»00 

i^ 

00 

0 

10 

06 

V. 

00 

t^ 

0   .-H 

0^ 

0     i 

0 

0 
CO 

0 

0 

TO 

0 
10 

000 

0 
■o 

\ 

0  " 

s 

00 

^0 

i 

0 
1^ 

0 
0 

000 

CCMiO 

i 

0 

0 

2 

c 

a. 
=>3 

cij 

E 

3 

0 

d 

0 

Sat; 

0 
S 

E 
Q 

E 

E 
d 

E 

ca 

0 

L.            I.. 

E    E 

d   d 

g 

5 

0 

a 

•z 
S 

■3 

a 
t) 

0 

2: 

6 

0 
0, 

g 
g       1 

d 

(2 

3 

•Eg 

_-  tJ 

0   S 

a 
E 

c 

§ 

'3 

« 

a 
E 
0 
0 

32        1 

Southern  Pacific  Transportation  Co./ 
St.  Louis  Southwestern  Railway 

6 

(3 

_o 

0 

a 

'i 

c 

I.- 
0; 

3 
0 

"3 

0 
0 

a 

03 

03 

1 

'3 
0 

-a 
0 

■3 

1' 

(S 

a 
0 

"a 

■3 

oi 

c 
_^ 

03 

a 
.2 

1 

T5 
0 

■3 

y3 
1 

B 
0) 

Ties    and    Wood    Preservation 301 

Report  on  Assignment  5 
Service  records  of  forest  products 

J.  T.  Slocomb  (chairman,  subcommittee),  W.  F.  Arksey,  A.  B.  Baker,  K.  C. 
Edscorn,  F.  J.  Fudge,  R.  P.  Hughes,  H.  C.  Martin,  R.  B.  Radkey,  G.  H.  Way, 
J.  L.  Williams. 

ANNUAL    TIE    RENEWAL    STATISTICS    AS    FURNISHED    BY    THE    ECONOMICS 
AND   FINANCE   DEPARTMENT,   AAR 

The  full  report  on  this  subject,  including  statistics  for  individual  Class  I  Rail- 
roads, may  be  found  in  Bulletin  628,  June-July  1970. 

MARINE    ORGANISMS 

The  following  paragraphs,  which  summarize  an  article  entitled  "Creosoted 
Wood  Piles  in  Biscayne  Bay  Are  Sound  After  Eleven  Years  of  Service — Progress 
Report,"  by  C.  W.  Leach,  United  States  Steel  Corporation,  are  reprinted  by  per- 
mission of  the  author  and  the  American  Wood-Preservers'  Associatioa 

"As  a  result  of  the  cooperative  effort  of  creosote  suppliers,  the  Forest 
Products  Laboratory,  and  the  University  of  Miami  Marine  Science  Institute, 
an  in-service  exposure  test  of  20  southern  pine  marine  piles  was  begun  in 
1956.  Twenty  exceptionally  well-seasoned  air-dried  pine  piles,  each  26  feet 
long,  were  treated  with  about  25  pcf  of  wood  with  a  70/30  creosote-coal  tar 
solution.  The  piles  were  installed  in  the  docking  and  mooring  facilities  for 
small  craft  at  the  Marine  Science  Institute  on  Virginia  Key  in  Bisca\ne  Bay 
at  Miami,  Florida.  Underwater  diving  inspections,  the  latest  11  years  after 
installation,  have  not  revealed  attack  by  marine  borers.  Treated  wood  piles 
elsewhere  in  tlie  waterways  of  Miami,  however,  have  failed  within  ten  years 
as  a  result  of  deterioration  caused  by  shipwomis,  pholads,  and  Limnoria. 

"Some  of  the  test  piles  have  been  lost  in  severe  storms.  The  remaining 
piles  will  continue  to  test  the  effectiveness  of  the  creosote-coal  tar  treatment 
at  the  Virginia  Key  installation.  It  can  be  concluded  that  southern  pine  piles, 
tlioroughly  treated  with  a  high-residue  creosote-coal  tar  solution  will  sene 
well  in  certain  locations  that  are  within  the  geographic  area  commonly  con- 
sidered to  harbor  a  destructive  host  of  marine  borers.  We  beliexe  that  tlie 
infonnation  usually  compiled  about  the  local  environment,  (temperature, 
salinity,  and  oxygen  content,)  should  be  expanded  to  include  the  rate  of  flow 
or  current,  a  survey  of  borer  populations  in  the  area  and  of  potential  foci  of 
infestation,  and  possibly  of  other  factors  as  yet  unidentified,  to  provide  a 
more  sound  basis  of  judgment  in  deciding  the  preservative  treatment  that  is 
necessary." 

SERVICE  TEST  RECORDS  OF  FOREST  PRODUCTS   USED   IN  RAILROAD 
CONSTRUCTION   AND    MAINTENANCE 

Under  this  assignment  your  committee  presents  as  information  a  progress  report 
on  a  tie  test  on  the  Baltimore  &  Ohio  Railroad,  at  Mt.  Air>',  Md. 


302 Ties    and    Wood    Preservation  

Tie  Test 

Baltimore  &  Ohio  Railroad 

Old  Main  Line  at  Mt.  Amv,  Md. 

Pentachlorophenol  in  Heavy  Petroleum  Oil 

Treated,   1954   (fall);  Inserted,   1957 

Purpose 

According  to  chemical  suppliers  and  also  the  U.  S.  Forest  Service  Stake  tests 
in  the  South,  pentachlorophenol  in  oil  is  one  of  the  most  effective  preservatives  for 
wood.  It  is  belie\ed  that  this  fact  is  recognized  by  most  users  of  treated  wood 
products. 

The  average  life  expectancy  of  "penta"  treated  cross  ties  is  unknown.  The  con- 
ditions of  use  differ  from  fence  posts.  Ties  lie  with  one  full  face  and  two  sides  in 
continuous  ground  contact.  The  upper  surface  is  exposed  to  extremes  of  weadiering. 
The  rail  bearing  surfaces  of  cross  ties  are  subject  to  severe  compression  under  fre- 
quent loading.  Spikes  are  driven  into  areas  of  untreated  wood. 

Pentachlorophenol's  toxicity  is  recognized.  Questions  arise  as  to  a  proper  carrier 
for  penta  which  will  afford  the  sealing  and  lubricating  effects  so  well  provided  by 
tar  in  combination  with  creosote.  The  Baltimore  &  Ohio  Railroad  has  a  test  of  oaks 
and  hardwoods  in  Ohio  treated  with  creosote  and  heavy  petroleum  oil.  These  ties 
are  experiencing  a  service  life  equal  to  other  test  panels  treated  with  creosote  tar 
(B&O  standard). 

It  is  for  the  purpose  of  measuring  the  service  life  of  mixed  oak  ties  treated 
with  pentachlorophenol  in  heavy  petroleum  oil  that  the  following  test  was  designed. 

During  the  fall  of  1954,  some  30,000  oak  ties  were  treated  at  the  Green  Spring 
Tie  Plant  with  a  5%  solution  of  pentachlorophenol  in  petroleum  oil,  7  lb  per  cu  ft. 

These  ties  were  dead  piled  at  the  plant  for  two  years  and  dien  shipped  to 
\arious  locations  to  be  inserted  in  tracks.  A  mile  of  double  track  just  east  of  Mount 
Airy,  Md.,  was  selected  as  a  test  section.  The  ties  were  not  inserted  out-of-face,  but 
insertions  were  heavy.  They  were  marked  with  nails  two  years  later,  at  which  time 
the  book  record  was  started. 

Treating  sheets,  copies  of  which  are  filed  at  Green  Spring,  W.  Va.,  reveal  the 
following  data: 

Seasoning  prior  to  treatment — 16  months. 

Species — Red  and  white  oak,  No.  4  and  No.  5. 

Retention — Averaged    7    lb    per    cu    ft   of   5%    solution    pentachlorophenol    in 

heavy  petroleum  oil. 
Maximum  pressure — 175  lb. 
Average  time  of  treatment — 10  hours. 
Maximum  temperature  during  treatment — 192  F. 
Splitting  protection — Ties   showing  a  definite   split  at  the  time  of  tramming 

for  treatment  were  dowelled   ("selective   doweling"). 
Adzing,  boring,  incising — None. 
Carrier — High  residue,  heavy  black  petroleum  oil,  sp.  gr.  1.001. 

During  the  year  1957,  1409  of  these  ties  were  inserted  between  Mile  Posts  42 
and  43,  about  VA  miles  west  of  the  Mt.  Airy  tower.  The  ties  were  placed  under  both 
tracks,  657  in  No.  3  (westbound)  and  752  in  No.  4  (eastbound).  The  test  actually 
starts  at  pole  45/30  at  an  iron  rail  post  marked  B46  at  the  east  end  of  a  cut. 


Ties    and    Wood    Preservation 


303 


The  removal  of  a  siding  soon  reduced  the  number  of  test  ties  on  the  south 
track  to  566. 

\''arious  other  conditions  affecting  the  hfe  expectancy  of  the  test  ties  are  as 
follows: 

Slope — /2  percent  grade,  downhill  westbound. 

Ciuve — 3  deg  near  center  of  test. 

Ballast — Clean  limestone. 

Rail — 131  lb,  plates   8  x  14  inches,  four  holed. 

Minimum  and  maximtmi  temperatures — 8  to  105  deg  F. 

Rainfall — 42.06  inches. 

Ele\'ation — 625  ft. 

Latitude — 39  deg  23  min;  longitude — 76  deg  50  min. 

Tonnage — 26  MM  tons,  main. 

8  MM  tons,  passing. 


After  14  years  of  service,  the  record  stands  as  follows: 


Track 

Ties 
Placed 

In  Test 
Now 

Removed 

Average 

Life  to 

Date 

Years 

Indicated 
Total 

Avg.  Life 
Years 

No. 

% 

Xorth  Side  (Passing) 

South  Side  (Main) 

752 
566 

690 

428 

62 
138 

8.2 
22.4 

13.6 
12.9 

32 

21 

During    the    course    of    these    service    years,    two    events    occurred    which    will 
materially  affect  the  outcome  of  this  test: 

a.  In  1962,  after  6  years  of  main  line  senice,  the  north  track  became  a  pass- 
ing track  only.  Tonnage  was  reduced  to  under  8  MM  per  year.  Speeds  are 
slow.  Tonnage  on  the  south  main  line  track  has  increased  to  26  MM  per 
year. 

b.  During  the  9th  year  of  service,  a  derailment  from  the  main  track  (south 
side)  dragged  cars  over  the  entire  test  section.  All  ties  were  cut  to  depths 
varying  from  )'*  inch  to  152  inches.  Most  of  the  ties  were  cut  at  four  loca- 
tions. Thirty  test  ties  were  damaged  to  the  extent  that  they  had  to  be 
removed. 


Conclusions    to    Dato 

1.  Although  the  tics  in  this  test  have  only  been  in  place  14  years,  average  total 
life  can  now  be  predicted  from  alignment  charts  based  on  removals — 32  \ears  for 
the  passing  track  ties,  21  years  for  the  main  track  ties. 

2.  Wheel  cutting  at  the  time  of  the  derailment  will  reduce  nonnal  a\orage 
tie  life.  In  fact,  the  removal  of  138  ties  from  under  the  main  track  has  already 
done  so. 


304 


Ties    and    Wood    Preservation 


■Wy>ir  ,  V, 


Penta    treated,    no    dowels, 
south    side    (main    track). 


Penta    treated    and    doweled, 
nor^h    side    (passing    track). 


3.  To  date,  the  penta  treated  ties  under  the  main  track  are  standing  up  as  well 
as  B&O  standard  creosote-tar  ties  under  similar  circumstances  and  at  the  same  age — 
plate  cutting  to  %  inch,  surface  checking  to  %  inch  wide  x  2  inches  deep,  surface 
coating  nearly  gone,  no  surface  decay,  grain  not  raised,  spikes  and  plates  holding 
gage. 

4.  On  the  passing  track,  the  low  tonnage  has  been  easy  on  the  ties.  Plates  have 
not  settled  into  the  wood  fibers.  Except  for  normal  checking  to  M  inch  ^^'ide  x  1  inch 
deep,  many  of  the  ties  look  new. 

5.  In  all  cases,  the  dowels  have  held  fast.  The  splits  in  the  selectively  doweled 
ties  ha\"e  neither  widened  nor  lengthened.  Of  the  ties  which  were  not  split  at  the 
end  of  the  seasoning  period  and  tlierefore  not  doweled,  10%  show  a  definite  split, 
gradually  lengthening  into  the  plate  zone. 

6.  Final  conclusions  regarding  the  reliability  of  oak  ties  treated  with  a  7  lb 
retention  of  a  5%  solution  of  pentachlorophenol  in  heavy  black  petroleiun  oil  cannot 
be  drawn  vmtil  at  least  another  ten  years  have  elapsed. 


Report  of  Committee  4 — Rail 


T.     B.    HUTCHESOX, 

Chairman 

V.  E.  Hall, 
Vice  Chairman 

A.  B.  Merritt,  Jr. 

Secretary 
R.  F.  BvsH 

R.    C.    POSTELS 

K.  H.  Kannowski 
R.  M.  Brown 
S.  H.  Barlow 
C.  F.  Parvin 


E.  H.  Waring 
W.  T.  Hammond 

B.  G.  Anderson 
G.  T.  Bonner 
A.  N.  Brauer 

R.  E.  Catlett,  Jr. 
G.  P.  Chandler 
R.  D.  Claborn 
M.  W.  Clark 

J.    T.    COLLINSON 

L.  S.  Crane 

P.  K.  Cruckshank 

\V.  T-  Cruse 

A.  R.  DeRosa 

D.  T.  Faries* 
N.  E.  Field 
O.  E.  Fort 

E.  T.  Franzen 
W.  H.  Freeman 
R.  G.  Garland 
R.  E.  Gorsuch 

J.  H.  Greason,  Jr. 
R.  E.  Haacke 

C.  E.  R.  Haight 
C.  C.  Herrick 
W.  H.  Huffman 
A.  V.  Johnston 
R.  R.  Lawton 

L.    A.    LOGSDON 

W.  S.  Lovelace 
J.  F.  Lyle 


Ray  McBrian  (E) 
L.  H.  Martin 
J.  L.  Merritt 

B.  R.  Meyers   (E) 
J.  B.  Miller 

C.  E.  Morgan  (E) 

B.  J.  Murphy 
Embert  Osland 
b.  f.  overbey 
J.  S.  Parsons 

R.  H.  Patterson 

C.  O.  Penney 

G.  L.  P.  Plow  (E) 

F.  W.  Potter 
J.  M.  Rankin 
I.  A.  Reiner 
R.  B.  Rhode 
H.  L.  Rose 

D.  H.  Shoemaker 
R.  F.  Silbaugh 
W.  A.  Smith 

B.  D.  Sorrels 

C.  L.  Stanford 

W.  G.  Stubblefield 
Emil  Szaks 
Erich  Thomsen 

G.  S.  Triebel 
John  H.  Watts 

C.  E.  Weller 

D.  J.  White 

H.  M.  Williamson 

Committee 


(  E  )   Member  Emeritus. 
"  Died  August  1,  1970. 

Those   whose  names   are   shown   in  boldface,   in   addition  to  the  chairman,   vice   chairman   and 
secretary,  are  the  subcommittee  chairmen. 


To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

B.    Rexision  of  Manual. 

Progress  report  presented  as  information    page  308 

2.  Collaborate  with   AISI  Technical   Committee  on  Rail  and  Joint   Bars 
in  research  and  other  matters  of  mutual  interest. 

(a)  Study  the  subject  of  obtaining  rails  longer  than  39  ft,  brief  prog- 
ress report  presented  as  information    p;ige  308 

(b)  Visits  to  rail  producing  mills,  progress  report  presented  as  infor- 
mation        page  309 

(c)  AAR  Research  and  Test  Department  report  on  "Investigation  of 
Rails  Made  by  the  Australian  Iron  and  Steel  Company,"  presented 

as    information     page  310 

Note — Discussion   on    subcommittee  reports   herein   closes   on   May   1,    1971. 

305 


306 Rail 

(d)  AAR  Research  and  Test  Department  report  on  "Inxestigation  of 
140  Lb/Yd  Rail  Made  from  Vacuum  Degassed  Steel,"  presented 
as    information    pa^t*  335 

3.  Rail  failure  statistics  covering  (a)  all  failures,   (b)  transverse  fissures, 
(c)   performance  of  control-cooled  rail. 

Progress  report  presented  as  information    page  372 

4.  Rail  end  batter,  causes  and  remedies. 

Report  on  "How  One  Railroad  Took  Care  of  Rail  End  Batter  by  Use 

of  the  Semi-Automatic  Wire  Feed  Weld,  presented  as  information   .  .    page  392 

5.  Rail  chemistry. 
No  report. 

6.  Joint    bars:    design,    specifications,    service    tests,    including    insulated 
joints  and  compromise  joints. 

No  report. 

7.  Metallurgical  effect  of  rail  cropping  methods. 
No  report. 

8.  Causes   of  shelly  spots   and  head  checks  in  rail;    methods   for  their 
prevention. 

No  report. 

9.  Standardization  of  rail  sections. 

Progress  report  presented  as  information   page  399 

10.  Effect  of  heavy  wheel  loads  on  rail. 
No  report. 

The  Committee  on  Rail, 
T.  B.  HuTCHESON,  Chairman. 


AREA  Bulletin  631,  January-February  1971. 


Rail  307 


Babili  ^obb  Jfarieg 
1912=1970 

Da\id  Todd  Faries,  born  September  29,  1912  to  Robert  and  Mary  Zandt 
Faries  at  Trenton,  \.  J.,  passed  away  on  August  1,  1970,  at  the  age  of  57,  following 
a  six-mondi  illness. 

Mr.  Faries  graduated  from  Virginia  Military  Institute  with  a  bachelor  of  science 
degree  in  civil  engineering  in  1935,  and  completed  the  management  training  pro- 
gram at  the  graduate  School  of  Industrial  Administration,  Carnegie  Institute  of  Tech- 
nology, in  1957. 

Mr.  Faries  began  his  railroad  career  with  the  Wabash  Railroad  in  1935.  He  then 
worked  in  \arious  engineering  capacities  for  both  the  Wabash  and  Ann  Arbor  Rail- 
roads until  1942,  when  he  joined  the  Bessemer  &  Lake  Erie  Railroad  as  assistant 
super\isor  track.  He  later  was  appointed  supervisor  track,  assistant  engineer,  engineer 
track,  assistant  superintendent,  principal  assistant  engineer  and  chief  engineer.  In 
addition  to  being  chief  engineer  of  the  Bessemer,  he  also  was  chief  engineer  of  the 
Youngstown  and  Northern  Railroad,  The  Lake  Terminal  Railroad,  The  Newburgh  & 
South  Shore  Railway,  and  Northampton  &  Bath  Railroad. 

Mr.  Faries  became  a  member  of  the  American  Railway  Engineering  Association 
in  1955,  and  was  a  member  of  Committee  31  from  1956  to  1962,  being  vice  chair- 
man in  1962.  He  was,  also,  a  member  of  Committee  4  from  1959  until  the  time  of 
his  death.  In  addition  to  these  committees,  Mr.  Faries  was  a  member  of  the  Engi- 
neering Division  of  the  Association  of  American  Railroads,  National  Defense  Trans- 
portation Association,  Roadmasters  and  Maintenance  of  Way  Association,  Railway 
Clubs  of  Greenxille  and  Pittsburgh,  Railway  Tie  Association,  American  Society  for 
Testing  and  Materials,  American  Management  Association,  American  Wood-Preserxers' 
.\ssociation.  Railway  Systems  and  Procedures  Association,  Joint  Contact  Committee 
of  American  Iron  and  Steel  Institute  and  the  Bessemer  &  Lake  Erie  Railroad  Com- 
pany \'eteran  Employes  Association. 

Surxiving  Mr.  Faries  are  his  wife,  Phyllis  (nee  Nye);  his  daughters.  Miss  Molly 
.A.  Faries  of  Swarthmore,  Pa.  and  Mrs.  Ronald  A.  (Jane)  Aisenbrey  of  Chicago; 
and  one  nephew,  Robert  P.  Faries  of  Charleston,  S.  C. 

Mr.  Faries  gave  generously  of  his  time  to  Committee  work  and  was  admired 
by  all  of  his  associates  who  had  the  privilege  of  working  with  him.  He  will  be 
greatlv  missed. 

W.  J.  Cruse 

R.     C.     POSTELS 

R.  F.  Bush 
Committee  on  Memoir 


308  Rail 


Report   on   Assignment   B 
Revision   of  Manual 

y.  E.  Hall  I  chairman,  subcommittee},  R.  E.  Catlctt,  Jr.,  J.  T.  Collinson,  \V.  J.  Cruse, 
E.  T.  Franzen,  R.  C.  Cahlano,  T.  B.  Hutcheson,  A.  V.  Johnstox,  R.  R. 
Lawtox,  a.  B.  Mehhitt,  Jr.,  R.  B.  Rhode,  IL  M.  Williamson. 

During  coinniittee  nieeting.s  held  in  1969  it  was  recommended  and  approved 
that  the  CF&I  119-lb  rail  section  be  adopted  as  an  AREA  recommended  rail  section. 
This  matter  was  \'oted  on  by  letter  ballot  dated  April  24,  1970,  was  approved  for 
adoption  and  printing  in  the  Manual  and  appears  as  a  Manual  Recommendation 
on  page  160  of  Bulletin  630,  November-December  1970. 

A  Special  Subcommittee  from  Subcommittee  B  members,  consisting  of  W.  J. 
Cruse  (chairman)  E.  T.  Franzen  and  V.  E.  Hall,  held  a  meeting  during  Xo\ ember 
1970  to  progress  the  updating  and  re-writing  of  the  remainder  of  Manual  Chapter 
4-Rail,  a  portion  of  which  was  revised  and  approved  for  adoption,  and  now  appears 
on  pages  4-2-1  to  4-2-6.1  of  the  Manual.  This  group  will  hold  further  meetings 
dming  1971,  and  collaborate  with  representatives  of  the  AISI  Technical  Committee 
in  progressing  this  assignment. 

Another  Special  Subcommittee,  consisting  of  representatixes  from  Committee 
4-Rail,  and  Committee  31-Continuous  Welded  Rail,  and  of  representatixes  from 
the  AISI  Technical  Committee  and  of  welding  contractors,  will  visit  welding  plants 
and  concern  itself  with  problems  relating  to  rail  straightness,  twist  and  end  condi- 
tion as  they  affect  the  welding  process.  The  Rail  Committee  representati\es  are 
V.  E.  Hall  (chaimian),  W.  J.  Cruse,  E.  T.  Franzen,  and  K.  H.  Kannowski,  and 
results  of  these  visits  may  indicate  a  need  for  possible  changes  in  the  rail  specifica- 
tions now  in  the  Manual. 


Report   on   Assignment   2 

Collaborate  with  AISI  Technical  Committee  on  Rail  and  Joint 
Bars  in  research  and  other  matters  of  mutual  interest 

T.  B.  Hutcheson  {chairman,  subcommittee),  B.  C  Anuerson,  G.  T.  Bonner,  R.  E. 
Catlett,  Jr.,  J.  T.  Collinson,  L.  S.  Crane,  W.  J.  Cruse,  O.  E.  Fort,  E.  T. 
Franzen,  W.  H.  Freeman,  V.  E.  Hall,  W.  T.  Hammond,  C.  C.  Herrick,  K.  H. 
Kannowski,  A.  B.  Merritt,  Jr.,  E.  H.  Waring,  II.  M.  Williamson. 

Under  this  assignment  your  committee  presents  as  information  a  brief  progress 
report  on  its  study  of  obtaining  rails  longer  than  39  ft,  an  account  of  its  \isit  to  the 
Steelton  Plant  of  the  Bethlehem  Steel  Corporation,  and  two  reports  on  rail  investi- 
gations conducted  at  the  Research  Center  of  die  Association  of  American  Railroads, 
one  entitled  "Investigation  of  Rails  made  by  the  Australian  Iron  and  Steel  Com- 
pany" (see  page  310),  and  the  other,  "Investigation  of  140  Lb/Yd  Rail  Made  from 
Vacuum  Degassed  Steel"  (see  page  335) 


Rail  309 


STUDY  THE  SUBJECT  OF  OBTAINING  RAILS  LONGER  THAN  39  FT,  LOOKING  TO  DEVELOPING 

THE   OPTIMUM   LENGTH   OF  RAIL  THAT  WILL   BE   ACCEPTABLE,   BASED   ON   HANDLING 

METHODS,    SUPPLY   OF   CARS   FOR   SHIPPING,   THE   NUMBER   OF   RAILS   WHICH 

CAN    BE    OBTAINED    FROM    STEEL    COMPANY    INGOT    MOLDS, 

AND    OTHER    NECESSARY    CONSIDERATIONS 

The  questionnaire  which  was  sent  to  chief  engineers  of  Member  Roads  on 
XoNeniber  5,  1968,  to  determine  the  demand  for  rails  longer  than  39  ft,  was  further 
considered.  It  was  concluded  that  the  infonnation  obtained  as  a  result  of  the  ques- 
tionnaire required  refinement.  During  the  current  year  the  committee  resubmitted 
tlie  questionnaire  to  chief  engineers  of  Member  Roads  for  additional  information, 
including  a  request  for  authorization  to  release  the  information  by  name  of  road  to 
the  steel  industry  members  of  the  AREA-AISI  Joint  Contact  Committee. 

VISITS    TO    RAIL    PRODUCING    MILLS 

In  continuation  of  its  adopted  plan  to  visit  rail  production  facilities  of  major 
steel  companies,  the  Rail  Committee,  under  the  auspices  of  the  Joint  Contact  Com- 
mittee, \isited  the  facilities  of  the  Bethlehem  Steel  Corporation  at  its  Steelton,  (Pa.) 
mill  on  April  20,  1970.  A  comprehensive  tour  of  the  rail  mill  was  arranged  by 
Bethlehem  Steel.  Prior  to  the  mill  inspection,  D.  E.  Dorney,  engineer  with  Bethlehem 
Steel,  presented  an  interesting  and  infonnative  report  on  steel  making  processes, 
including  open  hearth,  basic  oxygen,  and  electric  furnace  methods.  His  talk  was 
well  ilhistrated  with  slides  and  a  motion  picture.  The  presentation  was  extremely 
helpful  to  the  committee  in  its  subsequent  inspection  of  the  mill.  A.lso,  prior  to  the 
inspection,  members  of  the  Joint  Contact  Committee  joined  in  a  discussion  of  rail 
end  straightness,  including  sweep,  kinks  and  twists,  as  well  as  problems  associated 
with  rail  for  welding  purposes.  As  a  result  of  this  discussion,  arrangements  were 
made  for  members  of  Committee  4,  jointly  with  members  of  Committee  31  and 
steel  industry  members  of  the  Joint  Contact  Committee,  to  visit  rail  welding  plants 
for  first  hand  study  of  the  problem.  Subsequently,  arrangements  were  set  in  motion 
for  such  inspection  to  be  made  during  the  first  half  of  1971. 

Following  inspection  of  the  rail  mill  facilities,  R.  J.  Henry,  engineer  with  Beth- 
lehem Steel,  on  the  morning  of  April  21  presented  a  talk  well  illustrated  with  slides 
on  rail  steel  characteristics.  This  talk  will  be  enlarged  upon  and  presented  as  a 
special  feature  at  the  March  1971  convention  of  the  Association. 

The  committee  wishes  to  acknowledge  with  grateful  appreciation  tlie  assistance 
rendered  to  it  by  steel  industry  members  of  the  Joint  Contact  Committee,  AREA- 
AISI,  in  the  recent  redrafting  of  the  specifications  in  Part  2,  Chapter  4-Rail,  AREA 
Manual. 


310 Rail 

INVESTIGATION    OF    RAILS    MADE    BY   THE   AUSTRALIAN    IRON    AND    STEEL   COMPANY* 

INTRODUCTION 

At  the  request  of  the  Southern  Pacific  Transportation  Company  an  investiga- 
tion was  conducted  to  determine  whether  the  quahty  of  rails  rolled  in  Port  Kembla, 
Australia,  by  the  Australian  Iron  and  Steel  Company,  a  division  of  Broken  Hill 
Properties,  is  comparable  to  that  manufactured  in  the  United  States.  To  make  this 
comparison  three  7-ft  lengths  of  I32-lb  RE  rail  sections  were  submitted  to  the 
Association  of  American  Railroads  Research  Center  for  an  evaluation.  This  evalua- 
tion was  based  on  the  results  obtained  from  a  rolling-load  test,  slow  bend  test, 
drop  test,  chemical  analysis,  physical  property  determination,  impact  properties, 
hardness  survey  and  a  metallurgical  macroscopic  and  microscopic  examination. 

ACKNOWLEDGMENTS 

This  study  was  made  under  the  general  direction  of  Michael  J.  Wisnowski, 
metallurgical  engineer,  who  also  prepared  this  report.  The  laboratory  work  was 
conducted  by  Homer  B.  Johnson,  assistant  metallurgical  engineer. 

DESCRIPTION  OF  MANUFACTURING  PRACTICE 

No  information  as  to  the  steel  making  process  or  control-cooling  practice  was 
furnished.    The  letters  CC  in  the  web  possibly  refer  to  control-cooled  rails. 

DESCRIPTION  OF  TEST  SPECIMENS 

Three  7-ft  lengdis  of  132-lb  RE  rail  sections  rolled  in  1968  were  submitted. 
The  following  identification  was  stamped  in  the  web  of  these  rail   specimens: 

Rail  Heat  No.  Ingot  No.  Cut  Letter 

1  276691  24  E 

2  277282  8  C 

3  280856  10  A 

These  rail  samples  were  assigned  AAR  metallurgical  investigation  Nos.  267A,  B  and 
C,  respectively. 

RESULTS  OF  EXAMINATIONS 

Following  is  an  outline  of  the  tests  conducted  at  the  AAR  Research  Center  on 
the  various  rail  specimens. 

Specimen  No.  Types  of  Tests  Conducted 

267A  SB,  P,  C,  MA(T),  MA(L),  MI(CL),  MI(GS),  H. 

267B  RL(12"),  RL(C),  P,  I,  C,  MA(T),  MA(L),  MI(CL),  MI(GS),  H. 

267C  D,  P,  C,  MA(T),  MA(L),  MI(CL),  MI(GS),  H. 

Key  to  Symbol  Designations 

RL(  12")— Rolling-Load  Test  ( 12-In.-Stroke  Machine) 

RL(C)— Rolling-Load  Test  (Cradle-Type  Machine) 

D — Drop  Test 

SB— Slow  Bend  Test 

P — Physical  Property  Determination 

H — Hardness  Survey 


AAR   Research    and   Test   Department   Report   No.    LT-221. 


Rail 311 

I — Charpy  Keyhole  Impact  Test 

C — Chemical  Analysis 

MA(L) — Macroetch  Test   (Longitudinal  section) 

MA(T) — Macroetch  Test  (Transverse  section) 

MI(CL) — Microscopic  Examination   (Cleanliness  determination) 

MI(GS) — Microscopic  Examination   (Grain  size  determination) 

Rolling-Load   Tests 

A  portion  of  specimen  267B  w  as  subjected  to  fatigue  testing  on  the  12-in.-stroke 
rolling-load  machine.  The  loading  arrangement  used  in  this  test  is  shown  in  Fig.  1. 
A  wheel  load  of  57,500  lb  was  used,  and  a  bending  moment  of  575,000  in-lb  was 
developed  at  a  point  2  in.  beyond  the  support  towards  tlie  free  end.  With  this 
cantilexer  arrangement  the  outer  longitudinal  fibers  of  the  rail  head  at  this  point 
(2  in.  beyond  the  support)  were  subjected  to  repeated  loadings  from  zero  to  25,555 
psi.  In  this  type  of  testing,  2,000,000  cycles  of  repeated  loadings  without  failure  is 
considered  a  runout.  This  specimen  withstood  the  2,000,000  cycles  of  repeated  load- 
ings without  failure.  A  summary  of  rolling-load  test  results  can  be  found  in  Table  lA. 

A  second  piece  of  rail  cut  from  specimen  267B  was  subjected  to  testing  in  the 
cradle-t\pe  rolling-load  machine.  This  machine  was  designed  to  study  the  resistance 
of  rails  to  shelling.  A  diagram  showing  the  loading  arrangement  of  the  cradle-type 
rolling-load  machine  is  shown  in  Fig.  2.  In  this  diagram  it  can  be  noted  that  the 
base  of  the  rail  is  placed  solid  on  the  cradle  attachment  and  this  cradle  rotates 
approximately  13  deg  from  the  vertical  during  testing.  As  the  cradle  rotates,  the 
wheel  passes  over  the  gage  corner  of  the  rail.  A  wheel  load  of  50,000  lb  was  applied. 
The  specimen  subjected  to  this  test  ran  to  completion,  which  is  5,000,000  cycles,  at 
which  time  one  small  horizontal  crack  was  noted  on  the  side  of  the  rail  head.  A 
summary  of  the  rolling-load  test  results  can  be  found  in  Table  IB. 

To  \erify  the  presence  and  extent  of  the  shell,  a  transverse  section  was  cut 
through  the  greatest  depressed  area  of  dris  test  specimen.  A  photograph  of  this 
transverse  section  can  be  seen  in  Fig.  3. 

Drop    Test 

Specimen  267C  was  subjected  to  a  drop  test.  This  test  was  conducted  in  ac- 
cordance with  AREA  specifications  which  state  that  rail  tested  head  upwards  on 
supports  4  ft  apart,  shall  withstand  one  blow  of  a  tup  dropped  from  a  height  of 
22  ft.  The  specimen  was  subjected  to  five  blows  of  the  tup  without  failing.  A  sum- 
mary of  the  drop  test  results  is  given  in  Table  2. 

Slow-Bend    Test 

Specimen  267 A  was  subjected  to  a  slow  bend  test.  This  test  was  made  on  sup- 
ports 4  ft  apart  with  a  two-point  loading  applied  6  in.  on  each  side  of  a  center  line 
drawn  midway  between  the  supports.  The  test  was  made  with  the  rail  base  down 
which  subjects  the  head  to  a  compressive  stress  and  the  base  to  a  tension  stress.  A 
diagram  showing  the  loading  arrangement  used  in  this  slow  bend  test  is  sliown  in 
Fig.  4.  This  specimen  was  taken  to  5  in.  of  deflection  under  a  505,000-lb  load  with- 
out breaking.  The  modulus  of  rupture  was  calculated  to  be  164,650  psi  for  this 
specimen.  A  summary  of  the  slow  bend  test  results  can  be  found  in  Table  3. 


312 Rail 

Physical    Property    Determination 

To  determine  the  physical  properties  of  Australian  rail,  two  tensile  bars  were 
obtained  from  the  head  of  each  rail.  The  areas  from  which  these  bars  were  taken 
represent  the  mean  location,  about  90  deg  apart,  in  the  ingot.  Tensile  tests  were 
made  on  a  Baldwin  Universal  Testing  Machine  having  a  120,000-lb  capacity.  The 
physical  properties  determined  included  ultimate  strength,  yield  strength,  reduction 
of  area,  elongation  and  BUN.  The  yield  strength  was  obtained  \\ith  an  extensometer 
and  a  0.2%  offset  on  the  stress-strain  curve.  A  summary  of  physical  properties  can 
be  found  in  Table  4. 

Hardness   Survey 

A  hardness  survey  was  made  over  the  cross  section  of  a  transverse  slice  cut 
from  rail  specimens  267A,  B  and  C.  Hardness  readings  were  obtained  with  a  Brinell 
Iiiudness  tester  using  a  3,000-kg  load.  The  range  of  hardness  readings  obtained  from 
these  specimens  is  as  follows: 

Hardness  Readings 
Specimen  No.  Range 

267A  235-274 

267B  226-262 

267C  248-275 

A   sketch    showing  the  location  checked   and  the   hardness   \alues   obtained  can  be 
found  in  Figs.  5,  6  and  7. 

Charpy    Impact  Test 

Standard  charpy  keyhole  specimens  were  cut  from  the  head  of  specimen  267B 
for  impact  testing.  These  specimens  were  cut  longitudinal  to  the  rail  which  is  in 
the  direction  of  rolling.  Two  samples  were  tested  at  40-deg  temperature  increments 
between  35  and  355  deg  F.  A  summary  of  the  impact  values  obtained  at  each  tem- 
perature and  the  average  impact  value  of  the  two  specimens  tested  are  reported  in 
Table  5.  The  fractured  faces  of  the  impact  specimens  and  their  fracture  ratings 
(percent  brittle  fracture)  can  be  found  in  Fig.  8.  These  tests  were  performed  on  a 
Riehle  impact  tester  which  had  been  recently  checked  against  standard  Watertown 
arsenal  impact  specimens  with  known  values. 

Chemical    Analysis 

Check  chemical  analyses  were  made  by  a  commercial  laboratory  on  samples 
taken  from  specimen  267A,  B  and  C.  These  samples  were  taken  from  a  mean  loca- 
tion in  the  rail  head.  Carbon,  manganese,  phosphorus,  sulfur  and  silicon  determina- 
tions were  made  on  drillings  obtained  with  a  ^s-in.  bit.  The  residual  elements  were 
detemiined  spectrographically  off  a  )2-in.-s(iuare  block.  An  examination  of  these  re- 
sults showed  that  the  composition  met  the  AREA  specification  requirement.  A  sum- 
mary of  the  results  from  this  check  analysis  can  be  found  in  Table  6. 

Macroscopic    Examination 

To  determine  the  soundness  of  these  steel  rails  transverse  sections  cut  from 
samples  267A,  B  and  C  were  macroetched  in  a  hot  50  percent  aqueous  solution 
of  hydrochloric  acid.  A  macroscopic  examination  of  section  267A  showed  a  normal 
ingot  pattern.  Also  noted  were  a  few  light  seams  on  the  top  and  side  of  the  head 
and  top  and  bottom  of  the  base  flange.  Section  267B  showed  sound  internal  quality. 


Rail 313 

A  few  light  seams  were  noted  on  tlie  top  and  side  of  the  head  and  on  the  bottom 
of  the  base  flange.  Section  267C  showed  segregation  and  pipe  in  the  web  and  heavy- 
subsurface  porosity.  Numerous  heavy  seams  on  the  top  and  side  of  the  head  and 
top  and  bottom  of  the  base  flanges  were  noted  in  this  section.  Photographs  of  these 
macroetched  trans\erse  sections  are  shown  in  Figs.  9,  10  and  11.  A  summary  of 
the  findings  from  this  macroscopic  examination  can  be  found  in  Table  7A. 

To  determine  whether  there  were  any  shatter  cracks  or  hot  torn  steel  in  these 
rail  specimens,  longitudinal  sections  were  cut  from  the  head  and  macroetched  in  a 
hot  50  percent  aqueous  solution  of  hydrochloric  acid.  An  examination  of  these 
macroetched  longitudinal  sections  showed  heavy  segregation  streaks  in  samples  267A 
and  C.  Sample  267B  showed  sound  steel  quality.  Photographs  of  these  macroetched 
longitudinal  sections  are  shown  in  Figs.  12,  13  and  14.  A  summary  of  the  findings 
from  this  macroscopic  examination  can  be  found  in  Table  7B. 

Microscopic    Examination 

To  \'iew  the  grain  structure  of  the  rail  steel,  specimens  were  cut  from  samples 
267A,  B  and  C  for  a  microscopic  examination.  These  specimens  were  taken  so  as  to 
examine  the  plane  transverse  to  the  direction  of  rolling.  The  specimens  were  etched 
with  a  1%  nital  solution  and  examined  at  a  magnification  of  lOOX.  In  examining 
these  specimens  it  was  noted  that  the  structure  consisted  of  only  pearlitic  grains 
which  is  a  structure  of  eutectoid  composition.  The  grain  size  of  this  product  was 
estimated  to  range  from  2  to  5  as  determined  by  comparing  the  actual  grains  noted 
against  an  ASTM  chart,  Designation  E  112,  Plate  1.  Photomicrographs  of  grain 
structures  are  shown  in  Figs.  15,  16  and  17.  A  summary  of  the  findings  from  the 
microscopic  examination  can  be  found  in  Table  8A. 

Steel  cleanliness  was  established  on  specimens  cut  from  samples  267A,  B  and  C. 
The  specimens  used  in  this  examination  were  taken  so  as  to  view  the  plane  in  the 
direction  of  rolling.  These  specimens  were  unetched  and  examined  at  a  magnifica- 
tion of  lOOX.  In  examining  these  specimens,  non-metallic  inclusions  of  the  sulfide 
and  silicate  types  were  found.  These  inclusions  were  rated  by  comparing  them 
against  an  ASTM  chart,  Designation  E  45,  Plate  1.  A  summary  of  these  cleanliness 
ratings  can  be  found  in  Table  8B.  Photomicrographs  showing  the  cleanliness  are 
shown  in  Figs.  18,  19  and  20. 

CONCLUSIONS 

This  evaluation  of  rails  that  were  manufactured  by  the  Australian  Iron  and 
Steel  Company  and  submitted  to  the  AAR  by  the  Southern  Pacific  Transportation 
Company,  resulted  in  the  following  conclusions: 

1.  The  rolling-load  test  that  was  conducted  in  the  12-in.-stroke  rolling-load 
machine  ran  2,000,000  cycles  of  repeated  loadings  without  failure. 

2.  The  rail  sample  subjected  to  the  cradle-type  rolling-load  test  ran  to  com- 
pletion, which  is  5,000,000  cycles,  at  which  time  a  horizontal  crack 
identified  as  a  shell  was  noted  on  the  side  of  the  rail  head. 

3.  The  sample  subjected  to  a  drop  test  withstood  fi\e  blows  of  the  tup  w  ith- 
out  failing.  This  meets  the  AREA  requirement  of  withstanding  one  blow 
of  the  tup. 

4.  The  sample  subjected  to  slow  bend  testing  was  taken  to  5  in.  of  deflection 
under  a  505,000-lb  load  without  breaking.  This  sample  de\eloped  ;i 
modulus  of  rupture  of  164,650  psi. 


314 Rail 

5.  The  physical  properties  of  the  Australian  rails  are  coinparahle  to  rails 
domestically  produced. 

6.  Hardness  values  obtained  from  these  three  rail  samples  were  between  226 
and  275  BHN. 

7.  Charpy  keyhole  impact  values  were  found  to  be  low,  especially  at  room 
temperatiue,  which  is  generally  characteristic.  The  transition  temperature 
for  a  50%  cleavage  fracture  was  found  to  be  approximately  275-deg  F, 
at  which  an  average  impact  value  of  7.6  ft-lb  was  established. 

8.  The  chemical  composition  conformed  to  AREA  specification  requirements. 

9.  A  macroscopic  examination  of  the  transverse  sections  showed  specimens 
267A  and  B  had  sound  internal  steel  quality.  The  segregation,  pipe  and 
subsurface  gas  porosity  noted  in  specimen  267C  could  have  a  major 
effect  on  the  quality  of  welds  when  performed  on  this  rail.  The  seams 
noted  on  these  sections,  especially  on  the  bottom  of  the  base  flange,  are 
in  a  zone  where  the  maximum  cyclic  tensile  stresses  occur  in  service. 

An  examination  of  the  macroetched  longitudinal  sections  showed  no 
evidence  of  shatter  cracks  or  hot  torn  steel.  The  heavy  segregation  streaks 
noted  in  these  sections  have  been  noted  in  other  work  to  act  as  nuclei 
from  which  shelly  spots  may  initiate. 
10.  A  microscopic  examination  of  the  structure  showed  that  this  steel  was 
of  an  eutectoid  composition  having  a  grain  size  ranging  from  2  to  5. 
An  examination  of  the  steel  cleanliness  showed  moderate  to  heavy  sulfide 
and  silicate  inclusion  concentrations  which  can  influence  shell  formation. 

Information    as    to    the    steel    making    and    control-cooling    practices    was    not 
furnished. 


Rail 


315 


TABLE  lA 
ROLLING  LOAD  TKST  RESULTS  (12  IN.   STROKE  MACHINE) 


Specimen  Rail  Section 

No.  (lb.    yd.) 


Rolling  Load 

Machine 

(Type) 


Wheel  Load 
(lb.) 


Number  of 
Cycles 


12  in.   stroke 
machine 


Rail  did  not  fail  (runout). 


TABLE  IB 
ROLLING  LOAD  TEST  RESULTS  (CRADLE  TYPE  MACHINE) 


Specimen  Rail  Section 

No.  (lb.,  yd.) 


Rolling  Load 

Machine 

(Type) 


Wheel  Load 
(lb.) 


Number  of 
Cycles 


Remarks 


One  small  horizontal  crack 
noted  on  side  of  rail  head 
after  completion  of  test 
(see  Figure  3). 


Specimen 
No. 


Rail  Section 
(lb. /yd.) 


Method  of 
Testing 


Head  up 


TABLE  2 

DROP  TEST  RESULTS 

Distance 

Between 

Height  of 

Number  of 

Supports 

Drop 

Blows 

Remarks 

4  ft. 

22  ft. 

Withstood 
5  blows 

Did  not  bre; 

nk. 

TABLE  3 
SLOW  BEND  TEST  RESULTS 


Rail  Section 
(lb. /yd.) 


Method  of 
Testing 


Head  up 


Ma.ximum       Energy  for 
Maximum      Deflection        Fracture 
Load  (lb.)  (in.)  (ft. -lb.) 


505,000 


5.0 


170,450 


Modulus  of 

Rupture 

(psi) 

164,650 


Remarks 
Did  not  break. 


316 


Rail 


TABLE  4 

PHYSICAL  PROPERTIES 

Ultimate 

Yield* 

Reduction 

Sample 

Strength 

Strength 

of  Area 

Elong, 

No. 

(psi) 

(psi) 

(%) 

(%) 

BHN 

267A-1 

137,700 

84,200 

16.6 

9.8 

262 

A-2 

136,900 

83,550 

16.0 

10.4 

262 

267B-1 

137,450 

84,900 

14.9 

10.3 

251 

B-2 

136,600 

84,550 

15.4 

9.5 

255 

267C-1 

135,000 

81,550 

16.1 

9.5 

255 

C-2 

134,500 

80,550 

16.1 

11.4 

255 

The  j'ield  strength  was  obtained  with  an  extensometer  and  a  0.2  percent 
offset  on  the  stress-strain  curve. 


Rail  317 


TABLE  5 

RESULTS  OF  CHARPY  IMPACT  TESTS 

(Keyhole  Notch) 


Rail 
Sample 

No. 

Location 

Testing 

Temp. 

(OF) 

Impact  Values  (Ft. 
Test                 Test 
Sample  1         Sample  2 

-Lb 

A 

■) 
verage 

267B 

Head 

35° 

1.7 

1.2 

1.4 

75O 

1.5 

1.5 

1.5 

115° 

1.9 

1.7 

1.8 

1550 

2.2 

2.6 

2.4 

195° 

3.4 

3.8 

3.6 

235° 

6.0 

5.7 

5.8 

2750 

7.4 

7.9 

7.6 

315° 

8.5 

8.6 

8.5 

3550 

7.8 

8.8 

8.3 

Hill.  K»l 


318 


Rail 


TABLE  6 
CHEMICAL  COMPOSITION 


AREA 

Specification 

Requirements 

Check  Analysis 

Elements 

(Percent) 

(Percent) 
Sample  Nos, 

267A 

267B 

267C 

Carbon 

0.69  -  0.82 

0.79 

0.80 

0.81 

Manganese 

0.70  -  1.00 

0.96 

0.94 

1.00 

Phosphorus,  Max. 

0.04 

0.019 

0.016 

0.019 

Sulfur 

0.022 

0.022 

0.031 

Silicon 

0.10  -  0.23 

0.13 

0.16 

0.16 

Nickel 

<  0.05 

<0.05 

<:o.o5 

Chromium 

0.06 

0.07 

0.05 

Molybdenum 

<0.05 

<0.05 

<0.05 

Copper 

<:o.o5 

<0.05 

<0.05 

Aluminum 

<0.01 

<.0.01 

<0.01 

The  above  analysis  was  made  by  a  commercial  laboratory. 


Rail 


319 


TABLE  7A 

RESULTS  OF  MACROSCOPIC  EXAMINATION 

(Transverse  Sections) 


Sample  No. 
267A 

267B 

267C 


Etchant 

Hot  50%  aqueous 
solution  of 
hydrochloric  acid. 

Hot  50%  aqueous 
solution  of 
hydrochloric  acid. 

Hot  50%  aqueous 
solution  of 
hydrochloric  acid. 


Visual  Observations 

Normal  ingot  pattern.  Few  light  seams  on 
top  and  side  of  head  also  top  and  bottom  of 
base  flange  (see  Figure  9). 

Sound  internal  quality.  Few  light  seams  on 
top  and  side  of  head  also  on  bottom  of  base 
flange  (see  Figure  10). 

Segregation  and  pipe  in  web.     Heavy  sub- 
surface porosity.     Numerous  heavy  seams 
on  top  and  side  of  head  also  top  and  bottom 
of  base  flange  (see  Figure  11). 


TABLE  7B 

RESULTS  OF  MACROSCOPIC  EXAMINATION 

(Longitudinal  Sections) 


Sample  No. 
267A 

267B 


267C 


Etchant 

Hot  50%  aqueous 
solution  of 
hydrochloric  acid. 

Hot  50%  aqueous 
solution  of 
hydrochloric  acid. 

Hot  50%  aqueous 
solution  of 
hydrochloric  acid. 


Visual  Observations 

Heavy  segregation  streaks 
(see  Figure  12). 


Sound  steel  (see  Figure  13). 


Heavy  segregarion  streaks 
(see  Figure  14). 


320 


Rail 


TABLE  8A 

RESULTS  OF  MICROSCOPIC  EXAMINATION 

(Specimens  Cut  Transverse  to  the  Direction  of  Rolling) 


ample 
No. 

Etchant 

267A 

2%  Nital 

B 

2%  Nital 

C 

2%  Nital 

Magnification  Grain  Size 

lOOX  2  1/2  to  5  (see  Figure  15). 

lOOX  2  to  4  (see  Figure  16). 

lOOX  3  to  5  (see  Figure  17). 


The  average  grain  size  was  determined  by  comparing  the  grains 
noted  at  a  magnification  of  lOOX  against  ASTM  Chart,  Designation 
E112,  Plate  1. 


TABLE  8B 

RESULTS  OF  MICROSCOPIC  EXAMINATION 

(Specimens  Cut  Longitudinal  to  the  Direction  of  Rolling) 


Sample 
No. 

267A 


267B 


267C 


Etchant  Mag.  Cleanliness  Ratings 

Unetched  lOOX  Sulfide  Type  (A)  -  No.   1  Thin  Series 

Silicate  Type  (C)  -  No.  3  Thin  Series 
(see  Figure  18). 

Unetched  lOOX  Sulfide  Type  (A)  -  No.  2  Heavy  Series 

Silicate  Type  (C)  -  No.   3  Heavy  Series 
(see  Figure  19). 

Unetched  lOOX  Sulfide  Type  (A)  -  No.  2  Heavy  Series 

(see  Figure  20). 


Cleanliness  determinations  were  made  by  comparing  the  steel  cleanliness 
at  a  magnification  of  lOOX  against  ASTM  Chart,  Designation  E45,  Plate  1. 


Rail 


321 


Wheel  Path 
12" 


14- 


19' 


Tie  Down 


Support 


Rail 


Support 


Bed 


14" 


27' 


Fig.    1 — Diagram    showing   the   loading    arrangement  of   the    1 2-in. -stroke 
rolling-load    machine. 


14  7/8" 


Cradle 
attachment. 


Uulates  approximately 
13°  from  vertical 
ai'oHnd  gage  curner. 


Fig.   2 — Diagram    showing    the   loading   arrangement   of  the  cradle-type   rolling-load   machine. 


322 


Rail 


Fig.    3 Transverse    section    cut    from    specimen    267B-2    after    the    specimen    had    been 

subjected    to    5,000,000    cycles    in    the    cradle-type    rolling-load    machine. 


Rail 


323 


Load 
Applied 


yrs 


„  12" — -^ 

**  6"  -^— — ^-  6" 

rr±T 


^ 


stationary 
base  fixture 


a 


Fig.    4 — Diagram    showing    the    loading    arrangement    of    the    slow    bend    test. 


324 


Rail 


BHN  READINGS 


Fig.  5 — Results  of  a  hardness  survey  made  on  a  transverse  section  cut  from  specimen  267A. 


Rail 


325 


BHN  READINGS 


Fig.   6 — Results  of  a  hardness  survey  made   on   a  transverse  section   cut  from  specimen   267B. 


326 


Rail 


BHN  READINGS 


o 


Fig-   7 — Results  of  a  hardness  survey  made  on  a  transverse  section  cut  from  specimen   267C. 


Rail 


327 


Temp.  Avg.  Impact 

Tested  at  Values  Rating 

(OF)  (ft. -lb.)  %  Silky 


350 


75^ 


115^ 


I550 


195^ 


235"- 


31 S'' 


1.4 


1.5 


2.4 


3.6 


5.8 


275°  7.6 


8.5 


mmmm^^m^ 


"SSSO  8.3 


100% 


100% 


100% 


95% 


90% 


50% 


30% 


10% 


Fig.  8 — Fractured  faces  of  impact  specimens  testecJ  at  different  temperatures.  The 
overage  impact  values  and  fracture  ratings  (percent  brittle  fracture)  for  each  group  of 
specimens    tested   are    shovvn    in    the    accompanying    table. 


328 


Rail 


f'9-    9 — Macroetched    transverse    section    cut   from    specimen    267A.    Etchant,    hot    50% 
aqueous    solution    of    hydrochloric   acid. 


Rail 


329 


Fig.    10 — Macroetched    transverse    section    cut    from    specimen    267B.    Etchant,    hot    50% 
aqueous    solution    of    hydrochloric    acid. 


.}.3() 


Rail 


Fig.    n- 


-Macroetched    transverse    section    cut    from    specimen    267C.    Etchant,    hot    50% 
aqueous    solution    of    hydrochloric    acid. 


Rail 


331 


Fig.    12 — Macroetched    longitudinal    section    cut    from    specimen    267A.    Etchant,    hot    50% 
aqueous    solution    of    hydrochloric    acid. 


-si 


Fig.    13 — Macroetched    longitudinal    section    cut    fro.-n    specimen    267B.    Etchant,    hot    50% 
aqueous   solution   of   hydrochloric   acid. 


Fig.    14 — Macroetched    longitudinal   section   cut  from   specimen   267C.   Etchant,   hot    50% 
aqueous    solution    of    hydrochloric    acid. 


332 


Rail 


Fig.    15 — Photomicrograph    showing    grain    structure    in    specimen    267A.    Etchant,    2% 

magnification,    100X- 


nital; 


Fig.    16 — Photomicrograph    showing    grain    structure    in    specimen    267B.    Etchant,    2% 

magnification,    lOOX- 


nital; 


Rail 


333 


Fig.    17 — Photomicrograph    showing    grain    structure    in    specimen    267C.    Etchant,    2% 

magnification,    100X- 


nital; 


Fig.    18 — Photomicrograph    showing    the    steel    cleanliness    of    specimen    267A. 
Unetched;    magnification,    100,'. 


334 


Rail 


Fig.    19 — Photomicrograph    showing    the    steel    cleanliness    of    specimen    267B. 
UnetchecJ;    magnification,    lOOX- 


Fig.    20 — Photomicrograph    showing    the    steel    cleanliness    of    specimen    267C. 
UnefchecJ;    magnification,    lOOX- 


R  ail 335 

INVESTIGATION    OF    140    LB/YO    RAIL    MADE    FROM     VACUUM    DEGASSED    STEEL* 

INTRODUCTION 

In  May  1968,  the  Penn  Central  Transportation  Company  placed  an  order  witli 
the  United  States  Steel  Corporation  for  one  heat  of  vacunni  degassed  steel  to  be 
rolled  into  140-lb  rail  sections.  This  heat  was  made  at  the  South  Works  plant  on 
May  15,  1968,  and  the  ingots  were  transported  to  the  Cary  Mill  where  they  were 
rolled  into  rail.  At  the  request  of  the  Penn  Central,  an  AAR  representative  witnessed 
the  making  of  this  heat  and  the  rolling  of  the  ingots  into  rails.  In  addition,  the  AAR 
Research  Department  was  requested  to  conduct  an  investigation  to  evaluate  rail 
made  by  this  process.  This  is  a  report  of  the  AAR  study  based  on  the  results  of 
rolling-load  tests,  slow  bend  tests,  drop  tests,  chemical  analysis,  physical  property 
detennination,  hardness  survey  and  a  metallurgical  macroscopic  and  microscopic 
examination. 

PURPOSE  OF  INVESTIGATION 
Presently,  rails  are  manufactured  in  39-ft  lengths.  The  desire  to  obtain  longer 
lengths  of  rail  has  been  e.xpressed  by  many  railroads  because  of  savings  anticipated 
from  a  reduction  in  the  number  of  welded  joints  required  in  continuous  welded  rail 
strings.  One  factor  inhibiting  the  production  of  rails  longer  than  39  ft  is  the  practice 
of  control  cooling  in  covered  containers.  Control  cooling  is  employed  to  prevent 
the  development  of  internal  flakes  or  shatter  cracks  that  have  been  causally  related 
to  the  level  of  hydrogen  absorbed  in  the  steel.  With  the  use  of  vacuum  degassing, 
h\drogen  content  is  controlled  by  a  different  technique;  therefore,  it  is  believed 
that  rails  made  of  xacuum  degassed  steel  can  be  air  cooled  without  shatter  cracks 
developing.  The  purpose  of  this  investigation  is  to  determine  whether  rails  made 
from  vacuum  degassed  steel  and  air  cooled  are  comparable  in  properties  with  rail 
steel  produced  by  currently  common  practices. 

ACKNOWLEDGMENT 
The  work  was  undertaken  at  the  request  of  W.  T.  Hammond,  engineer  of 
standards,  Penn  Central  ( now  retired ) .  The  investigation  was  under  the  general 
direction  of  J.  C.  Britton,  mechanical  engineer,  AAR  Research  Department,  assisted 
by  M.  J.  Wisnowski,  metallurgical  engineer,  and  H.  B.  Johnson,  assistant  metallurgical 
engineer.  This  report  was  prepared  by  Mr.  Wisnowski. 

DESCRIPTION  OF  MANUFACTURING  PROCESS 

On  May  15,  1968,  one  heat  of  vacuum  degassed  steel  was  made  by  the  United 
States  Steel  Corporation  at  its  South  Works  Plant  in  the  No.  2  electric  furnace  shop. 
A  100-ton  electric  furnace  and  an  all  scrap  metal  charge  was  used  in  the  production 
of  this  heat.  Also  used  was  a  single-slag  steel  making  practice  which  is  a  production 
heat.  The  chemical  composition  ordered  was  in  accordance  with  the  AREA  Specifi- 
cation for  steel  rails  of  121  11)  and  over.  This  heat  was  assigned  heat  number  8R2240. 

Vacuum  degassing  was  accomplished  by  stream  degassing  with  the  ladle  to 
ladle  (LL)  method.  In  this  case  the  tapping  ladle  had  a  2/4-in.  nozzle  whereas  the 
pouring  ladle  had  a  2J2-in.  nozzle.  Prior  to  tapping  the  heat  into  a  tapping  ladle  a 
pouring  ladle  was  placed  in  a  degassing  chamber  and  the  pressure  was  reduced  to 
200  microns  which  is  equivalent  to  0.2  mm  of  mercury.  To  meet  the  desired  teenniig 

•  AAR  Research  iind  Test  Department  Report  No.  H-IOI. 


336 Rail 

temperature  of  2730/2740  F  a  tap  temperature  of  2910/2930  F  was  suggested.  After 
tapping,  the  tapping  ladle  was  placed  on  top  of  the  degassing  chamber  and  an  air 
seal  was  formed  between  the  tapping  ladle  and  degassing  chamber.  The  molten 
steel  was  then  transferred  from  the  tapping  ladle  to  the  pouring  ladle.  During  this 
transfer  additions  of  deoxidants  such  as  Fe  Si  and  Fe  Ti  were  added  to  the  pouring 
ladle  in  the  degassing  chamber  by  means  of  a  chute.  While  making  these  additions 
the  pressure  surged  to  about  900  microns  and  when  completed  the  pressure  leveled 
off  at  about  400-450  microns. 

After  the  steel  transfer  was  completed,  the  tapping  ladle  and  the  cover  were 
removed  from  the  degassing  chamber.  The  pouring  ladle  was  then  taken  from  the 
degassing  chamber  and  positioned  at  the  pouring  platform  for  teeming  into  ingots. 
This  vacuum  degassed  heat  was  then  teemed  into  botli  big-end-up  hot  topped 
(C&D  type)  and  big-end-down  open  top  molds.  The  pouring  sequence  was  as 
follows: 

1.  Six  25-in.  x  25-in.  x  72-in.  hot  topped  ingots. 

2.  Six  24-in.  x  24-in.  x  90-in.  open  top  ingots.  When  6  in.  below  ordered 
pour  height,  five  pieces  of  Rey-Dox  (aluminum)  were  added,  then  the 
ingot  was  filled  up. 

3.  Balance  of  heat  was  poured  into  25-in.  x  25-in.  x  72-in.  hot  topped  ingots 
of  which  there  were  four  ingots. 

The  line  up  indicated  that  after  these  ingots  were  held  for  the  required  hold  time, 
they  were  sent  in  their  molds  to  the  No.  4  stripper  at  Gary  Steel  Works.  At  the 
stripper  the  molds  were  removed  from  the  ingots.  These  ingots  were  then  delivered 
and  charged  into  a  soaking  pit 

After  the  required  soaking  time  the  ingots  were  rolled  to  a  140.25-lb  section 
rail  on  the  rail  mill.  The  hot  topped  ingots  yielded  four  39-ft  rail  lengths  whereas 
the  open  top  ingots  produced  five  39-ft  rail  lengths.  All  rails  were  cooled  on  cooling 
beds  and  then  set  aside  for  an  incubation  period  of  about  12  days. 

Specimens  representing  the  top  end  of  the  top  rail  were  taken  by  the  producer 
from  each  ingot  and  subjected  to  either  the  drop  test  or  nick-and-break  test.  The 
specimens  cut  from  the  top  of  hot  topped  ingots  2,  15  and  16,  and  open  top  ingots 
7  and  12  were  used  for  drop  tests.  It  was  reported  that  all  specimens  withstood 
the  requirement  of  one  blow  without  failure  as  required  in  the  AREA  specificatioij. 
In  examining  the  fractvued  faces  resulting  from  the  nick  and  break  test  it  was  found 
that  the  specimens  cut  from  hot  topped  ingots  1,  3,  4,  5,  6,  13  and  14  all  showed 
sound  steel  quality.  In  examining  the  fractured  faces  of  the  nick-and-break  test 
specimens  from  the  open  top  ingots  8,  9,  10  and  11  it  was  found  that  9  and  11 
were  sound  and  8  and  10  had  a  pipe  in  the  web  area. 

After  the  incubation  period  these  rails  were  ultrasonically  tested  by  U.  S.  Steel 
to  determine  whether  any  internal  flakes  developed.  It  was  reported  that  no  shatter 
cracks  were  found  as  a  result  of  this  testing. 

DESCRIPTION  OF  TEST  SPECIMENS 

For  this   evaluation  samples   were  obtained  from    the  top   and  bottom   rails  of 

the  sixth    (big-end-up,   hot   topped)    and  seventh    (big-end-down,   open  top)    ingot. 

There   were   four  39-ft   lengths   obtained  from    the   sixth   ingot;   therefore  these  test 

specimens  were  taken  from  the  top  of  tlie  A  rail  and  bottom  of  the  D  rail.  Ingot 


Rail 337 

seven  yielded  five  39- ft  lengths;  therefore  the  test  specimens  were  cut  from  the  top 
of  the  A  rail  and  bottom  of  the  E  rail.  The  first  2/2  ft  cut  from  these  rails  was  sent 
to  the  U.  S.  Steel  Corporation  laboratory.  The  next  three  6-ft  pieces  were  sent  to 
the  AAR  Research  Center.  Specimens  cut  from  the  top  rail  of  the  sixth  ingot  were 
identified  as  6A-1,  6A-2  and  6A-3.  The  specimens  from  the  bottom  rail  of  this  ingot 
were  marked  6D-1,  6D-2  and  6D-3.  Specimens  cut  from  the  top  rail  of  the  seventh 
ingot  were  identified  as  7A-1,  7A-2  and  7A-3.  The  specimens  from  the  bottom  rail 
of  this  ingot  were  marked  7E-1,  7E-2  and  7E-3.  A  schematic  drawing  showing  the 
sample  procurement  is  shown  in  Fig.   1. 

RESULTS  OF  EXAMINATIONS 

Following  is  an  outline  of  the  tests  conducted  at  the  AAR  Research  Center  on 
the  various  rail  specimens. 

Specimen  No.  Types  of  Tests  Conducted 

6A-1  D,  MA(T),   MA(L),  H,  C,  MI(GS),  MI(CL). 

6A-2  SB. 

6A-3  RL(12"),  RL(C),  I,  P. 

6D-1  D,   MA(T),    MA(L),  H,  C,  MI(GS),  MI(CL). 

6D-2  SB. 

6D-3  RL(12"),  RL(C),  I,  P. 

7A-1  D,  MA(T),   MA(L),  H,  C,  MI(CS),  MI(CL). 

7A-2  SB. 

7A-3  RL(12"),  RL(C),  I,  P. 

7E-1  D,  MA(T),   MA(L),  H,  C,  MI(GS),  MI(CL). 

7E-2  SB. 

7E-3  RL(12"),  RL(C),  I,  P. 

Key  to  Symbol  Designations 

RL(  12")— Rolling-Load  Test  ( 12-In.-Stroke  Machine) 
RL(C)— Rolling-Load  Test  (Cradle-Type  Machine) 
D — Drop  Test 
SB— Slow  Bend  Test 
P — Physical  Property  Determination 
H — .Hardness  Survey 
I — .Charpy  Keyhole  Impact  Test 
C — Chemical  Analysis 
MA(L) — Macroetch  Test   (Longitudinal  Section) 
MA(T) — Macroetch  Test   (Transverse  Section) 
MI(CL) — Micro.scopic  Examination   (Cleanliness  Determination) 
MI(GS) — Microscopic  Examination   (Grain  Size  Detemiination ) 

Following  is  a  summary  of  the  results  of  these  studies. 

Rolling-Load   Tests 

Portions  of  specimens  6A-3,  6D-3,  7A-3  and  7E-3  were  subjected  to  fatigue 
testing  on  the  12-in. -stroke  rolling-load  machine.  The  loading  arrangement  used  in 
this  test  is  shown  in  Fig.  2.  A  wheel  load  of  61,500  lb  was  used  and  a  bending 
moment  of  615,000  in-lb  was  developed  at  a  point  2  in.  beyond  the  support  towards 
the  free  end.  With  this  cantilever  arrangement  the  outer  longitudinal  fibers  of  the 
rail  head  at  this  point  (2  in.  beyond  the  support)  were  subjected  to  repeated  loadings 
from  zero  to  24,600  psi.  In  this  type  of  testing,  2,000,000  cycles  of  repeated  loadings 


338 Ra_i_l 

without  failnrt^  is  considered  a  runout.  All  four  of  these  rails  withstood  the  2,000,000 
cycles  of  repeated  loadings  without  failure.  A  summary  of  the  rolling-load  tests  can 
be  found  in  Table  lA. 

A  second  piece  of  rail  cut  from  specimens  6A-3,  6D-3,  7A-3  and  7E-3  was 
subjected  to  testing  in  the  cradle-type  rolling-load  machine.  This  machine  is  designed 
io  study  the  resistance  of  rails  to  shelling.  A  diagram  showing  the  loading  arrange- 
ment of  this  cradle-type  rolling-load  machine  is  shown  in  Fig.  3.  In  this  diagram  it 
can  be  noted  that  the  base  of  the  rail  was  placed  solid  on  a  cradle  attachment  and 
ihis  cradle  rotates  approximately  13  deg  from  the  vertical  during  testing.  As  the 
cradle  rotates  the  wheel  passes  over  the  gage  corner  of  the  rail.  A  wheel  load  of 
50,000  lb  was  applied.  From  this  testing  the  rails  cut  from  specimens  6A-3  and 
7E-3  ran  5,000,200  and  5,003,700  cycles,  respectively,  without  developing  a  shell. 
Rails  cut  from  specimens  6D-3  and  7A-3  developed  a  shell  after  1,854,300  and 
1,087,000  cycles,  respectively.  Table  IB  is  a  summary  of  rolling-load  test  results.  To 
verify  the  presence  of  shells  a  transverse  section  was  cut  through  the  greatest  de- 
pressed area  from  each  of  the  rails  tested.  A  photograph  of  these  transverse  sections 
can  be  seen  in  Figs.  4  through  7. 

Drop   Tests 

Specimens  6A-1,  6D-1,  7A-1  and  7E-1  were  subjected  to  drop  tests.  This  test 
was  conducted  in  accordance  with  AREA  specifications  which  states  that  these  rails, 
tested  head  upwards  on  supports  4  ft  apart,  shall  withstand  one  blow  of  a  tup 
dropped  from  a  height  of  22  ft.  All  these  specimens  were  subjected  to  three  blows 
of  the  tup  without  failing.  A  summary  of  the  drop  test  results  is  shown  in  Table  2. 

Slow    Bend    Tests 

Specimens  6A-2,  6D-2,  7A-2  and  7E-2  were  subjected  to  slow  bend  testing. 
These  tests  were  made  on  supports  4  ft  apart  with  a  two-point  loading  applied  6  in. 
on  each  side  of  a  center  line  drawn  midway  between  the  supports.  The  tests  were 
made  with  the  rail  base  down  which  subjects  the  head  to  a  compressive  stress  and 
die  base  to  a  tension  stress.  A  diagram  showing  the  loading  arrangement  used  in 
this  slow  bend  tests  is  shown  in  Fig.  8.  All  these  specimens  were  taken  to  5  in.  of 
deflection  without  breaking.  The  modulus  of  ruptiue  for  these  specimens  ranged 
from  175,345  to  184,345  psi.  A  summary  of  the  slow  bend  test  results  can  be  found 
in  Table  3. 

Physical    Properly   Determination 

To  determine  the  physical  properties  of  this  vacuum  degassed  steel,  tensile  bars 
were  obtained  from  the  head  and  base  of  sections  cut  from  specimens  6A-3,  6D-3, 
7A-3  and  7E-3.  A  diagram  showing  tlie  locations  from  which  these  tensile  bars  were 
taken  is  shown  in  Fig.  9.  The  areas  from  which  these  bars  were  taken  represent 
the  mean  location,  about  180  deg  apart,  in  the  ingot.  These  tensile  tests  were  made 
on  a  Baldwin  Universal  Testing  Machine  having  a  120,000  lb  capacity.  The  physical 
properties  determined  include  ultimate  strength,  yield  strength,  reduction  of  area, 
elongation  and  BHN.  The  yield  strength  was  obtained  with  an  extensometer  based 
on  a  0.2%  offset  of  the  stress-strain  curve.  A  summary  of  these  physical  properties 
can  be  foimd  in  Table  4. 


Rail  339 


Hardness    Survey 

A  hardness  suixey  was  made  over  the  cross  section  of  a  transverse  slice  cut 
from  rail  specimens  6A-1,  6D-1,  7A-1  and  7E-1.  These  hardness  readings  were 
obtained  with  a  Brinell  Hardness  tester  using  a  3,()()0-kg  load.  The  range  of  hardness 
readings  obtained  from  these  specimens  was  as  follows: 

Specimen  No.  BHN  Readings — Range 

6A-1  269-284 

6D-1  268-300 

7A-1  266-284 

7E-1  263-286 

Figs.  10  through  13  are  sketches  showing  the  hardness  values  obtained  at  the 
locations  checked. 

Charpy    Impact   TesI 

Standard  Charpy  keyhole  specimens  were  cut  from  the  head  and  base  of  rails 
6A-3,  6D-3,  7A-3  and  7E-3  for  impact  testing.  These  specimens  were  cut  longi- 
tudinal to  the  rail,  which  is  in  the  direction  of  rolling.  The  tests  were  conducted  at 
room  temperature  which  was  74  F.  These  tests  were  performed  on  a  Riehle  impact 
tester  which  had  recently  been  checked  against  standard  Watertown  arsenal  impact 
specimens  with  known  values.  Average  impact  values  from  this  testing  were  as 
follows: 

Average  Impact  Values  (Ft-Lb) 
Specimen  No.  Head  Base 

6A-3  2.1  1.7 

6D-3  2.0  1.8 

7A-3  2.3  3.3 

7E-3  2.1  1.9 

A  summary  of  these  Charpy  impact  test  results  is  shown  in  Table  5. 

Chemical    Analysis 

Check  chemical  analyses  were  made  by  a  commercial  laboratory  on  samples 
taken  from  specimens  6A-1,  6D-1,  7A-1  and  7E-1.  These  samples  were  taken  from 
a  mean  location  in  the  rail  head.  Carbon,  manganese,  phosphorus,  sulfur  and  silicon 
determinations  were  made  on  drillings  obtained  with  a  %-m.  bit.  The  residual  ele- 
ments were  deternn'ned  spectrographically  off  a  /2-in. -square  block.  An  examination 
of  these  results  showed  that  the  composition  met  the  AREA  specifications  require- 
ment. A  smnniary  of  the  results  from  this  check  analysis  can  be  found  in  Table  6. 

Macroscopic   Examination 

To  determine  the  soundness  of  these  steel  rails,  transverse  sections  cut  from 
specimens  6A-1,  6D-1,  7A-1  and  7E-1  were  macroetched  in  a  hot  50'/^  aciueous  solu- 
tion of  hydrochloric  acid.  A  macroscope  e.\annnation  of  the  transverse  section  cut 
from  specimen  6A-1  (top  of  the  big-end-up  hot  topped  ingot)  showed  light  .segrega- 
tion in  the  center  of  the  web.  The  macioctched  trans\cMse  section  cut  from  specimen 
7A-1  (top  of  the  big-end-down  open  top  ingot)  showed  tiie  presence  of  primary 
pipe.  The  macroetched  transN  er.se  sections  cut  from  6D-1  and  7E-1  ( l)ottom  of  the 
hot  topped  and  open  top  ingots)  were  found  to  be  of  sound  steel  <iuality.  Photo- 
graphs of  these  macroetched  transverse  sections  are  shown  in  Figs.  14  through  17. 
A  sunnnary  of  tlic  macroscope  examination  findings  can  be  found  in  Table  7A. 


340 Rail 

To  determine  whether  shatter  cracks  had  developed  in  these  steel  rails,  longi- 
tudinal sections  were  cut  from  the  head  of  specimens  6A-1,  6D-1,  7A-1  and  7E-1 
and  macroetched  in  a  hot  50?  aqueous  solution  of  hydrochloric  acid.  A  macroscopic 
examination  of  these  longitudinal  sections  showed  normal  segregation  streaks  in 
specimens  6A-1  and  7A-1  (top  of  hot  topped  and  open  top  ingots).  Longitudinal 
sections  cut  from  specimens  6D-1  and  7E-1  (bottom  of  hot  topped  and  open  top 
ingots)  showed  sound  steel  quality.  No  shatter  cracks  were  noted  in  these  macro- 
etched  sections.  Photographs  of  these  macroetched  longitudinal  sections  are  shown 
in  Figs.  18  through  21.  A  summary  of  the  findings  from  this  macroscopic  examination 
is  given  in  Table   7B. 

Microscopic    Examination 

To  view  the  grain  structure  of  this  vacuum  degassed  steel,  specimens  were  cut 
from  rail  samples  6A-1,  6D-1,  7A-1  and  7E-1  for  a  microscopic  examination.  These 
specimens  were  taken  so  as  to  examine  the  plane  transverse  to  the  direction  of 
rolling.  The  specimens  were  etched  with  a  2%  nital  solution  and  examined  at  a 
magnification  of  lOOX-  In  examining  these  specimens  it  was  noted  that  the  struc- 
ture consisted  of  only  pearlitic  grains  which  is  a  structure  of  eutectoid  composition. 
The  grain  size  of  this  product  was  estimated  to  range  from  3/2  to  5/2  as  detemiined 
with  the  use  of  an  ASTM  chart.  Designation  E  112,  Plate  1.  Photomicrographs  of 
these  grain  structures  are  shown  in  Figs.  22  through  25.  A  summary  of  the  findings 
from  this  microscopic  examination  can  be  found  in  Table  8A. 

Steel  cleanliness  was  established  on  specimens  cut  from  rail  samples  6A-1,  6D-1, 
7A-1  and  7E-1.  The  specimens  used  in  this  examination  were  taken  so  as  to  view 
the  plane  in  the  direction  of  rolling.  These  specimens  were  unetched  and  examined 
at  a  magnification  of  lOOx.  In  examining  these  specimens  non-metallic  inclusions 
of  the  sulfide,  silicate  and  oxide  types  were  found.  These  inclusions  were  rated  with 
the  use  of  an  ASTM  chart.  Designation  E  45,  Plate  3,  which  is  designated  for  steels 
made  by  the  vacuum  degassing  process.  A  summary  of  these  cleanliness  ratings  can 
be  found  in  Table  SB.  Photomicrographs  showing  the  steel  cleanliness  of  these 
specimens  are  shown  in  Figs.  26  through  29. 

DISCUSSION 
The  physical  properties,  Brinell  hardness  readings,  and  Charpy  keyhole  impact 
values  of  these  vacuum  degassed  steel  rails  are  compared  to  standard  carbon  steel 
rails  in  the  following  table: 


Rail 


341 


Rail 

Tensile 

Yield 

Reduction 

Impact 

Section 

Strength 

Strength 

of  A  rea 

Elong. 

BHN 

Values 

{lb /yd) 

(psi) 

(psi) 

(%) 

(%) 

ift-lb) 

Vacuum  Degassed 

Steel  Rails  (aver- 

age values  of 

results  reported  in 

Tables  4  and  5) 

140 

140,700 

75,350 

16.9 

10.2 

265 

2.2 

Comparisons 

(References  AREA 

Proceedings ) 

Vol.  51,  page    604 

155 

133,000 

75,800 

15.6 

9.7 

264 

5.1 

Vol.  52,  page    670 

132 

132,700 

76,600 

15.7 

9.7 

267 

2.3 

Vol.  53,  page    903 

115 

135,000 

77,000 

16.5 

10.7 

271 

2.5 

Vol.  58,  page  1042 

115 

138,300 

73,550 

15.6 

10.3 

274 

4.0 

\o\.  65,  page    599 

115 

134,300 

75,400 

19.1 

8.7 

270 

1.9 

The  average  number  of  cycles  required  to  develop  a  shell  in  the  cradle-type 
rolling-load  machine  was  calculated  from  the  results  of  33  rolling-load  tests  on 
standard  rail  (all  sections)  reported  in  the  AREA  Proceedings  for  the  years  from 
1949  through  1965.  It  was  determined  that  an  average  of  1,402,493  cycles  was 
required  to  develop  a  shell  in  the  cradle-type  rolling-load  test  under  a  50,000-lb 
applied  load.  In  comparing  this  figure  with  the  results  of  the  samples  run  in  this 
investigation,  two  samples  shelled  at  1,067,600  and  1,854,300  cycles  and  two  samples 
ran  5,000,200  and  5,003,700  cycles  without  developing  a  shell. 

Slow  bend  test  results  of  two  140-lb  RE  rail  sections  that  were  induction 
hardened  are  presented  on  page  493  of  Vol.  66,  1965  AREA  Proceedings.  These 
results  were  as  follows: 


Maximum 

Deflection 

(inches) 

Maximum 
Load 

{lb) 

Energy  to 

Maximum 

Deflection 

(ft-lb) 

Modulus  of 

Rupture 

{psi) 

Remarks 

4 

4 

606,000 
603,000 

157,083 
165,416 

188,069 
187,138 

Did  not  break. 
Did  not  break. 

342 


Rail 


The  slow^  bond  test  results  of  the  \acnuin  degassed  rails  tested  in  this  investigation 
were: 


Maximum 

Deflection 

(inches) 

Maxitnuin 

Load 

(lb) 

Enerqii  to 

Maximum 

J)e  flection 

(Jt-lb) 

Moduluti  of 

Rupture 

(p.si) 

Retnarka 

5 
5 
5 
5 

589,000 
569,000 
594,000 
565,000 

202,000 
193,250 
201,333 
194,000 

182,793 
176,586 
184,345 
175,345 

Did  not  break. 
Did  not  break. 
Did  not  break. 
Did  not  break. 

Based  on  4-in.  deflection  of  the  \acuuni  degassed  rail,  slow  bend  data  are  as  follows: 


Maximum 

Deflection 

(inches) 

Maximum 

Load 

(lb) 

Energy  to 

Maximum. 

Deflection 

(ft-lb) 

Modulus  of 
Rupture 

(psi) 

Remarks 

4 
4 
4 
4 

578,000 
559,000 
583,000 
556,000 

153,583 
147,250 
152,500 
147,750 

179,379 
173,483 
180,931 
172,552 

Did  not  break. 
Did  not  break. 
Did  not  break. 
Did  not  break. 

CONCLUSIONS 

This  evaluation  of  rail  made  from  vacuum  degassed  steel  for  the  Penn  Central 
resulted  in  the  following  conclusions: 

1.  All  rolling-load  tests  conducted  in  the  12-in. -stroke  rolling-load  machine 
ran  2,000,000  cycles  of  repeated  loadings  without  failure. 

2.  Of  the  rail  samples  run  in  tlie  cradle-type  rolling-load  machine,  which 
was  designed  to  study  resistance  to  shelling,  two  samples  shelled  at 
1,067,600  and  1,854,300  cycles  and  two  samples  ran  5,000,200  and 
5,003,700  cycles  without  developing  a  shell. 

3.  All  samples  subjected  to  drop  testing  withstood  three  blows  of  the  tup 
without  failing.  This  meets  the  AREA  reciuirement  of  withstanding  one 
blow  of  the  tup. 

4.  The  samples  subjected  to  slow  bend  testing  were  all  taken  to  5  in.  of 
deflection.  These  samples  developed  a  modulus  of  rupture  that  ranged 
from   175,345  to   184,345  psi. 

5.  The  physical  properties  of  these  vacmuii  degassed  steel  rails  basically  are 
comparable  to  the  rails  made  by  the  standard  basic  open  hearth  or  basic 
oxygen  processes. 

6.  Hardness  values  obtained  from  the  hardness  survey  of  vacuum  degassed 
steel  rails  were  somewhat  higher  than  that  from  steel  rails  manufactured 
by  the  standard  basic  open  hearth  or  basic  oxygen  process. 

7.  Room  temperature  Charpy  keyhole  impact  \alues  were  foimd  to  be  rela- 
tively low. 


Rail 


343 


8.  The  chemical  composition  conformed  to  the  AREA  specification  ie(iuire- 
ments. 

9.  A  macroscopic  examination  of  the  trans\erse  sections  showed  that  the  top 
of  the  hot  topped  ingot  had  hght  segregation  and  the  open  top  ingot  had 
primary  pipe  in  the  center  of  the  web.  The  longitudinal  sections  showed 
no  evidence  of  shatter  cracks. 

10.  A  microscopic  examination  of  the  structure  showed  the  steel  was  of  an 
eutectoid  composition  having  a  grain  size  ranging  from  3/2  to  SM.  An 
examination  of  the  steel  cleanliness  showed  sulfide,  silicate  and  oxide 
inclusions. 

11.  As  measured  in  the  laboratory,  the  properties  of  this  vacuum  degassed 
heat,  without  controlled  cooling,  were  comparable  to  those  measured 
previously  for  steels  made  by  more  conventional  techniques  and  subjected 
to   controlled  cooling. 


TABLE  lA 
ROLLING  LOAD  TEST  RESULTS  (12  IN.   STROKE  MACHINE) 


Rolling 

Rail 

Load 

Wheel 

Number 

Specimen 

Section 

Machine 

Load 

of 

No. 

(lb. /yd.) 

(Type) 

(lb.) 

Cycles 

6  A- 3 

140  RE 

12  in.  stroke 
machine 

Gl,500 

2,000,000 

6D-3 

140  RE 

12  in.  stroke 
machine 

61,500 

2,000,000 

7A-3 

140  RE 

12  in.  stroke 
machine 

61,500 

2,000,000 

7E-3 

140  RE 

12  in.  stroke 
machine 

61,500 

2,000,100 

Remarks 

Rail  Did  Not  Fail  -  Runout 
Rail  Did  Not  Fail  -  Runout 
Rail  Did  Not  Fail  -  Runout 
Rail  Did  Not  Fail  -  Runout 


TABLE  IB 
ROLLING  LOAD  TEST  RESULTS  (CRADLE  TYPE  MACHINE) 


Specimen 
No. 

6A-3 
GD-3 
7  A- 3 
7E-3 


Rail 

Section 
(lb. /yd.) 

140  RE 
140  RE 
140  RE 
140  RE 


Rolling 

Load 
Machine 
(Type) 

Cradle  type 
machine 
Cradle  type 
machine 
Cradle  type 
machine 
Cradle  type 
machine 


Wheel 
Load 
(lb.) 

50,000 
50,000 
50,000 
50,000 


Number 

of 
Cycles 

5,000,200 
1,854,300 
1,067,600 
5,003,700 


Remarks 

Did  Not  Develop  Shell  (See  Figure  4)' 
Shell  Developed  (See  Figure  5) 
Shell  Developed  (See  Figure  6) 
Did  Not  Develop  Shell  (See  Figure  7) 


344 


Rail 


TABLE  2 

DROP  TEST  RESULTS 

Rail 

Method 

Distance 

Height 

Number 

Specimen 

Section 

of 

Between 

of 

of 

No. 

(lb. /yd.) 

Testing 

Supports 

Drop 

Blows 

Remarks 

6A-1 

140  RE 

Head  up 

4  ft. 

22  ft. 

Withstood 
3  blows 

Did  Not  Fail 

6D-1 

140  RE 

Head  up 

4  ft. 

22  ft. 

Withstood 
3  blows 

Did  Not  Fail 

7A-1 

140  RE 

Head  up 

4  ft. 

22  ft. 

Withstood 
3  blows 

Did  Not  Fail 

7E-1 

140  RE 

Head  up 

4  ft. 

22  ft. 

Withstood 
3  blows 

Did  Not  Fail 

TABLE  3 
SLOW  BEND  TEST  RESULTS 


Energy  to 

Modulus 

Rail 

Method 

Ma.ximum 

Maximum 

of 

Specimen 

Section 

of 

Ma.\imum 

Deflection 

Deflection 

Rupture 

No. 

(lb. /yd.) 

Testing 

Load  (lb.) 

(in.) 

(ft. -lb.) 

(psi) 

Remarks 

6A-2 

140  RE 

Head  up 

589,000 

5.0 

202,000 

182,793 

Did  Not  Break 

6D-2 

140  RE 

Head  up 

569,000 

5.0 

193,250 

176,586 

Did  Not  Break 

7A-2 

140  RE 

Head  up 

594,000 

5.0 

201,333 

184,345 

Did  Not  Break 

7E-2 

140  RE 

Head  up 

565,000 

5.0 

194,000 

175,345 

Did  Not  Break 

Rail 


345 


TABLE  4 
PHYSICAL  PROPERTIES 


Ultimate 

Yield 

Reduction 

Sample 

Strength 

Strength 

of  Area 

Elong. 

No. 

(psi) 

(psi) 

(%) 

(%) 

BHN 

6A-3  (Head) 

140,600 

75,700 

15.8 

1L3 

269 

6 A- 3  (Base) 

143,200 

78,200 

19.7 

9.7 

265 

6D-3  (Head) 

141,150 

76,200 

16.9 

ILO 

269 

6D-3  (Base) 

143,000 

74,650 

13.6 

7.9 

255 

7 A- 3  (Head) 

139,850 

74,350 

18.9 

10.0 

255 

7A-3  (Base) 

141,650 

75,600 

17.9 

10.9 

269 

7E-3  (Head) 

137,400 

72,450 

16.1 

10.5 

269 

7E-3  (Head) 

138,650 

75,750 

16.6 

10.1 

269 

*The  yield  strength  was  obtained  with  an  extensometer 
based  on  0.2  percent  offset  of  the  stress-strain  curve. 


346 


Rail 


TABLE  5 

RESULTS  OF  CHARPY  IMPACT  TESTS ^ 

(Keyhole  Notch) 


Impact 

Impact 

Sample 

Values 

Values 

No. 

Location 

(ft. -lb.) 

Location 

(ft. -lb.) 

Head  -1 

2.6 

Base  -1 

1.8 

6A-3 

-2 
-3 

1.9 

1.8 

-2 
-3 

1.7 
1.7 

Average 

2.1 

Average 

1.7 

Head  -1 

2.6 

Base  -1 

1.4 

6D-3 

-2 
-3 

1.6 
1.9 

-2 
-3 

1.8 
2.1 

Average 

2.0 

Average 

1.8 

Head  -1 

2.4 

Base  -1 

3.8 

7A-3 

-2 
-3 

2.0 

2.4 

-2 
-3 

3.2 

2.8 

Average 

2.3 

Average 

3.3 

Head  -1 

2.4 

Base  -1 

1.8 

7E-3 

-2 
-3 

2.1 
1.9 

-2 
-3 

1.7 
2.1 

Average 

2.1 

Average 

1.9 

Impact  tests  were  conducted  at  ambient  temperature  (74^F). 


Rail 


347 


TABLE  6 
CHEMICAL  COMPOSITION 


Elements 

AREA 

Specification 

Requirements 

(percent) 

6A-1 

Check  Analysis 

(percent) 

Sample  Nos. 

6D-1            7A-1 

7E-1 

Carbon 

0.69  -  0.82 

0.75 

0.75 

0.76 

0.74 

Manganese 

0.70  -  1.00 

0.86 

0.83 

0.85 

0.85 

Phosphorus,  Max. 

0.04 

0.012 

0.012 

0.013 

0.012 

Sulfur 

0.013 

0.011 

0.012 

0.011 

Silicon 

0.10  -  0.23 

0.21 

0.20 

0.20 

0.20 

Nickel 

0.05 

0.05 

0.05 

0.05 

Chromium 

0.11 

0.11 

0.11 

0.11 

Molybdenum 

0.05 

0.05 

0.05 

0.05 

Copper 

0.05 

0.05 

0.05 

0.05 

Aluminum 

*     0.005 

*     0.005 

0.01 

0.01 

Titanium 

0.01 

0.01 

0.01 

0.01 

Tin 

0.008 

0.008 

0.008 

0.008 

Trace 
The  above  analysis  was  made  by  a  commercial  laboratory. 


348 


Rail 


Sample 
No. 


6A-1 


6D-1 


7A-1 


7E-1 


TABLE  7A 
RESULTS  OF  MACROSCOPIC  EXAMINATION 
(Transverse  Sections) 


Etchant 

50%  Aqueous  Solution 
of  Hydrochloric  Acid 

50%  Aqueous  Solution 
of  Hydrochloric  Acid 

50%  Aqueous  Solution 
of  Hydrochloric  Acid 

50%  Aqueous  Solution 
of  Hydrochloric  Acid 


Visual  Observations 

Light  Segregation  in  Center 
of  Web  (See  Figure  14) 

Sound  Steel  Quality  (See 
Figure  15) 

Primary  Pipe  in  Web  (See 
Figure  16) 

Sound  Steel  Quality  (See 
Figure  17) 


Macrotest  conducted  to  show  presence  of  pipe  or  fish  tail. 


Sample 
No. 

6A-1 
6D-1 
7A-1 
7E-1 


TABLE  7B 

RESULTS  OF  MACROSCOPIC  EXAMINATION 

(Longitudinal  Sections)** 


Etchant 

50%  Aqueous  Solution 
of  Hydrochloric  Acid 

50%  Aqueous  Solution 
of  Hydrochloric  Acid 

50%  Aqueous  Solution 
of  Hydrochloric  Acid 


50%  Aqueous  Solution 
of  Hydrochloric  Acid 


Visual  Observations 

Normal  Segregation  Streaks 
Sound  Steel  (See  Figure  18) 

Sound  Steel  (See  Figure  19) 

Normal  Segregation  Streaks 
Sound  Steel  (See  Figure  20) 


Sound  Steel  (See  Figure  21) 
Macrotest  conducted  to  disclose  presence  of  shatter  cracks. 


Rail 


349 


TABLE  8A 

RESULTS  OF  MICROSCOPIC  EXAMINATION 

(Specimens  Cut  Transverse  to  the  Direction  of  Rolling) 


Sample  No.  Etchant  Magnification 

6A-I  2%  Nital                 lOOX 

6D-1  2%  Nital                lOOX 

7A-1  2%  Nital                 lOOX 

7E-1  2%  Nital                 lOOX 


Grain  Size 
3  1/2  to  5  1/2  predominant  4  (See  Figure  22) 
3  1/2  to  5  1/2  predominant  5  (See  Figure  23) 
3  1/2  to  5  1/2  predominant  5  (See  Figure  24) 
3  1/2  to  5  1/2  predominant  4  (See  Figure  25) 


*The  average  grain  size  was  determined  with  the  use  of  an  ASTM  chart,  Designa- 
tion E112,  Plate  1. 


TABLE  8B 

RESULTS  OF  MICROSCOPIC  EXAMINATION 

(Specimens  Cut  Longitudinal  to  the  Direction  of  Rolling) 


Sample 
No.  Etchant      Magnification 


6A-1 


6D-1 


7A-1 


7E-1 


Unetched 


Unetched 


Unetched 


Unetched 


lOOX 


lOOX 


lOOX 


lOOX 


Cleanliness  Ratings 

Sulfide  Type  (A)  -  Few  No.   1/2  to  2  Thin  Series 
Oxide  Type  (D)  -  Few  No.  1/2  to  1  1/2  Heavy  Series 
(See  Figure  26) 

Sulfide  Type  (A)  -  Few  1  1/2  Thin  Series 
Silicate  Type  (C)  -  Few  No.  2  1/2  Heavy  Series 
Oxide  Type  (D)  -  Very  Few  No.   1  Light  Series 
(See  Figure  27) 

Sulfide  Type  (A)  -  Few  No.   1  1/2  Heavy  Series 
Oxide  Type  (D)  -  No.   1/2  to  1  1/2  Light  Series,  also 
Heavy  Oxide  Stringer 
(See  Figure  28) 

Sulfide  Type  (A)  -  Few  No.   1  Light  Series 
Oxide  Type  (D)  -  Few  No.  1  Light  Series,  also 
Heavy  Oxide  Stringer 
(See  Figure  29) 


Cleanliness  determinations  were  made  with  the  use  of  an  ASTM  chart,  Designa- 
tion E45,  Plate  3  (for  use  on  vacuum  processed  or  other  special  quality  steel). 


II II I.  (CM 


350 


Rail 


6A-3 


TOP  OF  RAILS   6A  AND  7A 


6D-3 

OR 

6D-2 

-7E-3 

OR 

51 

r7E-2 

7E-I 


Fig.     1 — Schematic    drawing    showing    sample    procurement    of    140-lb    rail    from 
vacuum  degassed  heat  8R2240. 


Rail 


351 


14' 


H-- 


Wheel  Path    -*" 
12" 


19' 


Tie  Down 


Support 


Rail 


Support 


2"--^ 


Bed 


^ 


14" >- 


27' 


Fig.    2 — Diagram    showing    the    loading    arrangement   of   the    1 2-ln. -stroke 
rolling-load    machine. 


-14  7/8" 


L^       Wheel  P; 


Cradle 

atlachmcnl. 


Rolalos  approximate 
13°  from  vcrlic-al 
around  gage  corm-r. 


Fig.    3 — Diagram    showing    the    loading    arrangement   of    the   cradle-type    rolling-load    machine. 


352 


Ra 


Fig.    4 — Transverse    section    cut   from    specimen    6A-3    after   the   specimen    had   been   subjected 
5,000,200    cycles    in    the    cradle-type    rolling-load    machine. 


Rail 


353 


t 


Fig.    5 Transverse    section    cut    from    specimen    6D-3    after   the    specimen    had    been    subjected 

to    1,854,300    cycles    in    the    cradle-type    rolling-load    machine. 


354 


Rail 


2431 


Fig.    6 — Transverse   secfion    cut   from    specimen    7A-3    after   the    specimen    had    been   subjected 
to    1,067,600    cycles    In    the    cradle-type    rolling-load    machine. 


243L 

Fig.    7 — Transverse    section    cut   from    specimen    7E-3    after   the   specimen    had    been    subjected 
to    5,003,700    cycles    in    the    cradle-type    rolling-load    machine. 


356 


Rail 


Load 
Applied 


^- -   12" H 

'•»  6"  -■ ■   6"  -1 


-'■■  Head  fixture 


r~~rt 


r 


Stationary 
base  fixture 


Fig.    8 — Diagram    showing    the    loading    arrangement    of   the    slow    bend    lest. 


Rail 


357 


Fig.    9 — Diagram    showing    the    locations    where    tensile    specimens    were    taken. 


358 


Rail 


BUN  RKADINCS 


279 


a 


2G9 

o 


271 

o 


284 


Fig.   10 — Results  of  a  hardness  survey  made  on  a  transverse  section  cut  from  specimen  6A-1. 


Rail 


359 


BHN  READINGS 


274 


269 

o 

269 

o 

268 


269 


Fig.    11 — Results  of  a  hardness  survey  made  on  a  transverse  section  cut  from  specimen  6D-1. 


360 


Rail 


BUN  RKADINGS 


2()(i 

o 


2G.S 

o 


271 

o 


Fig.   12 — Results  of  a  hardness  survey  made  on  a  transverse  secHon  cut  from  specimen  7A-1. 


Rail 


361 


BHN  READINGS 


Fig.   13 — Results  of  a  hardness  survey  made  on  a  transverse  section  cut  from  specimen  7E-1. 


Fig.    14 — Macroetched    transverse    section    cot   from    specimen    6A-1.    Etchant,    hot   50% 
aqueous    solution    of    hydrochloric    acid. 


Rail 


363 


243D 

Fig      1  5— Macroetched    transverse    section    cut    from    specimen    6D-1 .    Etchant,    ho. 
aqueous    solution    of    hydrochloric    acid. 


50' 


364 


Rail 


Fig.    16 — Macroetched    transverse    section    cut   from    specimen    7A-1. 
aqueous    solution    of    hydrochloric   acid. 


Etchant,    hot    50% 


Rail 


365 


243J 


Fig.     17 — Macroetched    transverse    section    cut    from    specimen    7E-1.    Etchant,    hot    50% 
aqueous    solution    of    hydrochloric    acid. 


366 


Rail 


Fig.    18 — Macroetched    longitudinal    section   cut   from   specimen    6A-1.    Etchant,    hot   50% 
aqueous    solution    of    hydrochloric   acid. 


Fig.    19 — Macroetched    longitudinal   section   cut  from   specimen    6D-1.    Etchant,   hot   50% 
aqueous    solution    of   hydrochloric   acid. 


Fig.    20 — Macroetched   longitudinal   section   cut  from  specimen   7A-1.   Etchant,   hot  50% 

aqueous    solution    of    hydrochloric    acid. 


Fig.    21 — Macroetched    longitudinal    section    cut    from    specimen    7E-1.    Etchant,    hot    50% 
aqueous    solution    of    hydrochloric    acid. 


368 


Rail 


Fig.    22 — Photomicrograph   showing   the   grain   structure   in   specimen    6A-1.   Etchant, 
2%     nital;    magnification,    lOOX- 


Fig.    23 — Photomicrograph    showing   the   grain   structure   in   specimen   6D-1.    Etchant, 
2%    nital;    magnification,    lOOX- 


Rail 


369 


Fig.    24 — PhoJomicrograph   showing   the   grain   structure   in   specimen   7A-1.   Etchant, 
2%     nital;    magnification,    100X- 


Fig.    25 — Photomicrograph    showing    the    groin    structure    in    specimen    7E-1.    Etchant, 
2%     nital;    magnification,    1 00  \ . 


370 


Rail 


Fig.    26 — Photomicrograph    showing    the    steel    cleanliness    of    specimen    6A-1. 
Unetched;    magnification,    100X- 


Fig.    27 — Photomicrograph    showing    the    steel    cleanliness    of    specimen    6D-1. 
Unetched;    magnification,    100X- 


Rail 


371 


Fig.    28 — Photomicrograph    showing    the    steel    cleanliness    of    specimen    7A-1. 
Unetched;    magnification,    100X- 


Fig.    29 — Photomicrograph    showing    the    steel    cleanliness    of    specimen    7E-1, 
Unetched;    magnification,    100X- 


372 Rail 

Report   on   Assignment   3 

Rail  failure  statistics,  covering  (a)  all  failures,  (b)  transverse 
fissures,  (c)  performance  of  control-cooled  rail 

R.  F.  Bush  (chaiinian,  suhcommittee),  B.  G.  Anderson,  S.  H.  Baklovv,  R.  D.  Cla- 
i5()HN,  L.  S.  Crane,  R.  E.  Gorsuch,  C.  E.  R.  Haight,  V.  E.  Hall,  T.  B. 
IluTCHEsoN,  A.  V.  Johnston,  J.  F.  Lyle,  A.  B.  Mehritt,  C.  F.  Parvin,  H.  L. 
Rose,  Emil  Szaks. 

This  report  is  a  tonipilation  of  data  on  rail  failurt'  reported  to  December  31, 
1969,  by  railroads  that  are  responsible  for  approximately  90%  of  the  main  track 
mileage  of  Class  I  Roads.  The  reports  are  furnished  on  a  \oluntary  iiasis  by  railroads. 
However,  given  the  fact  that  most  failures  are  reported  by  a  small  number  of  rail- 
roads, it  is  evident  that  there  is  little  uniformity  in  reporting  failure  data.  Therefore, 
it  is  not  feasible  to  draw  definitive  conclusions,  e.xcept  on  the  assumption  that  each 
railroad  has  been  consistent  in  its  reporting  practice.  In  that  case,  trends  can  be 
examined.  Howe\er,  absolute  comparisons  and  total  failure  rates  cannot  be  derived 
from  the  data. 

This  report  is  a  technical  service  of  the  Research  and  Test  Department  of  the 
Association  of  American  Railroads  in  response  to  a  continuing  request  for  this  com- 
pilation from  the  Rail  Committee. 

Data  on  service  transverse  fissure  failures  and  detected  transxerse  defects  are 
given  in  Table  1  and  Fig.  1.  It  will  be  noted  from  Fig.  1  that  the  service  transverse 
fissures  (Line  "A")  decreased  during  1969,  and  that  there  was  also  a  decrease  in 
detected  transverse  defects    (Line  "B"). 

The  number  of  track  miles  tested  by  detector  cars  as  reported  for  1968  and 
1969  is  as  follows: 

Year  No.  of  Roads  Track  Miles  Tested 

Tested  Reporting  by  Detector  Car 

1968  43  220,139 

1969  42  222,297 

Since  1958  the  number  of  track  miles  reported  tested  by  detector  cars  has 
ranged  from  a  low  of  193,516  in  1961  to  a  high  of  222,297  in  1969,  as  .shown  in 
this  year's  report. 

Mill    Performance 

The  number  of  service  and  detected  rail  failures  that  occur  during  the  first  five 
years  of  service  has  been  considered  to  be  a  good  criterion  of  mill  performance  and 
the  quality  of  rail  as  manufactured.  Fig.  2  shows  these  failures  for  rollings  from 
1908  to  1963,  incl.  An  explanation  of  the  large  decrease  in  the  number  of  failures 
throughout  this  period  can  be  formd  in  the  AREA  Proceedings,  Vol.  64,  page  509. 

There  is  a  slightly  increasing  trend  from  the  1955  low,  accentuated  somewhat 
in  the  1963  rollings,  and  Table  3  indicates  this  is  continuing  in  tlie  rollings  from 
1964  to  1968,  incl.  Although  the  five-year  failure  rate  is  still  at  a  relatively  low  level, 
a  review  of  mill  practices,  consideration  of  innovations  in  rail  manufacture,  and 
study  of  possible  effects  of  increa.sed  wheel  loadings  seems  desirable  in  an  endeavor 
to  reverse  this  trend. 

Fig.  3  shows  the  control-cooled  rail  failure  rates  cumulatively  for  the  rollings 
from  1959  to  1968,  incl.,  by  the  difterent  inills.  In  making  comparisons  between  mills 


Rail 373 

as  reflected  in  this  figure,  it  is  important  to  recognize  that  because  of  ser\ice  condi- 
tions on  roads  serxed  by  the  \arious  mills,  these  failures  data  should  not  be  taken 
as  necessarily  indicatixe  of  the  rail  (juality.  A  detailed  explanation  of  the  reasons  for 
the  difference  in  failure  rates  for  the  difl:"erent  mills  and  different  year's  rollings  was 
given  in  the  1963  report  for  rollings  up  to  and  including  the  1960  rollings.  The  fol- 
lowing comments  are  explanatory  of  the  significant  differences  between  Fig.  3  in 
this  year's  report  and  last  year's  report. 

Algoma:  There  were  decreases  in  failures  reported  in  1969  in  the  1966  rollings 
to   18.9  failures  per  100  track  mile  years,  down  from  24.3  reported  in  1968. 

Carnegie:  This  will  be  the  last  reporting  year  in  the  ten-year  reporting  period; 
2.3  miles  were  still  reported  laid  in  1959. 

There  was  no  appreciable  difference  in  the  reported  failure  pattern  of  any  of  the 
other  mills. 

Table  2  shows  the  tons  of  new  rail  rolled  for  the  reporting  roads  and  the  cor- 
responding track  miles  by  years.  There  was  a  substantial  increase  from  the  512,295 
net  tons  reported  in  1967  rollings  to  605,278  net  tons  reported  in  the  1968  rollings. 
Rollings  for  any  railroad  from  one  mill  of  less  than  500  tons  are  not  included. 

Fig.  4  and  Table  3  from  which  the  figvu-e  is  derived,  shows  the  effect  of  years 
of  service  on  rail  failures;  also  a  comparison  of  the  reduction  in  failure  rates  effective 
with  the  new  rail  sections  introduced  in  1947.  For  the  ninth  and  tenth  years  of  serv- 
ice, the  difference  between  tlie  failure  rates  for  the  old  sections  and  new  sections  is 
more  than  indicated  by  Fig.  4  because  nnich  of  the  tonnage  of  the  old  sections 
having  the  highest  failure  rates  was  replaced  and  therefore  no  longer  reported. 

Table  4  shows  the  total  amount  of  track  miles  of  rail  (all  sections  in  rollings 
between  1959  and  1968)  segregated  by  mill  and  railroad.  Also  shown  in  this  table 
is  the  total  number  of  failures  (excluding  EBF's)  and  the  engine  burn  failures  tliat 
occurred  on  each  railroad  in  1969  in  these  rollings.  A  comparison  of  Table  4  in  this 
year's  report  .shows  an  increase  in  total  track  miles  from  22,786  to  23,118,  in  faihrres 
during  the  year,  excluding  EBF's,  from  1,847  to  1,549  and  in  EBF's  only,  from 
54  to  25. 

Types   of   Failures 

Table  5  shows  the  accumulated  service  failures  and  detected  defects  in  number 
and  per  100  track  miles  in  the  rollings  from  1959  to  1968,  incl.,  that  have  been 
reported  to  December  31,  1969,  classified  by  mill  and  type  of  defect.  Comparing  this 
table  with  last  year's  corresponding  table,  the  total  number  of  defects  of  all  types 
decreased  from  5,808  to  5,331;  and  with  a  slight  increase  in  the  total  track  miles 
as  shown  in  Table  4,  the  failures  per  100  track  miles  decreased  from  4.68  to  4.54. 

The  predominant  types  of  failures  continue  to  be  CF  &  DF  which  represents 
17  percent  of  the  total  failures  per  100  track  miles;  Other  Head  which  represents 
25  percent;  and  Web-in-Joint  which  represents  28  percent. 

The  extent  to  which  the  "New  Rail  Sections"  adopted  in  1947  have  affected 
the  number  of  failures  of  each  type  is  indicated  in  the  following  tabulation  which 
shows  the  accumulated  failures  in  the  "Old  Sections"  in  the  1938  to  1947  Rollings, 
inch,  which  include  mostly  control-cooled  rail;  in  the  1959  to  1968  rollings,  inch, 
which  include  mostly  new  but  some  of  the  old  sections;  and  in  the  1958  to  1967 
rollings,  incl.,  which  include  the  new  sections  ouly,  as  shown  in  Table  5A. 


374 


Rail 


Accumulated  Failures  Per  100  Track  Mile  Years 

Old  Section 
{1938-19/f7) 

A  U  Sections 
{1. 9.59-1. 96S) 

New  Sections 
{19.')9-1968) 

TF— Verified 

CFaiid  DF 

0.02 
1.73 
0.58 
0.53 
0.52 
0.75 
3.34 
1.47 
0.30 

0.001 

0.77 

0.40 

0.24 

I.IG 

0.31 

1.28 

0.13 

0.24 

0.001 
0  83 

VSH 

0   10 

HSH 

Other  Head 

0.19 
1  .09 

Broken 

Web-in-Joint 

Web  Other 

0.18 
0.05 
0.12 

Base 

0.18 

All  Types 

9.24 

4.54 

3.48 

Comparing  the  failure  rates  in  the  "New  Section"  with  tho.se  in  the  "Old  Sec- 
tion", a  larger  decrease  is  shown  this  year  in  the  CF  &  DF  category  than  last  year. 
This  type  of  failure  is  attributed  primarily  to  heavy  traffic  and  sharp  curvature  service 
condition.  The  large  increase  in  Other  Head  failures  in  the  "New  Sections"  is 
attributed  to  the  addition  of  the  Canadian  National  reporting  to  the  "New  Section" 
whereas  this  was  not  included  in  the  "Old  Section."  Out  of  the  1,420  Other  Head 
failures,  Canadian  National  reported  987,  or  70  percent  of  them.  The  large  reduction 
in  the  Web-in-Joint  and  Web-Other  categories  is  attributed  to  the  new  rail  designs 
and  bolt  hole  spacing  adopted  in  1947.  The  reductions  in  the  other  categories  are 
considered  to  be  due  to  the  same  causes  as  explained  in  die  1967  report.  It  should 
also  be  noted  that  this  comparison  favors  the  number  of  failures  reported  in  the 
"Old  Section"  somewhat  because  of  the  tonnage  of  rail  having  the  highest  failure 
rate  being  removed  before  the  ten  years'  service  was  completed  as  explained  in  the 
discussion  of  Fig.  4. 

Table  6  shows  tlie  acciunulated  failures  and  detected  defects  in  the  rollings 
from  1959  to  1968,  incl.,  by  mills,  roads,  and  types  of  failures.  The  data  .shown  in 
this  table  are  particularly  helpful  in  determining  whether  rail  failures  and  detected 
defects  reported  are  due  to  mill  quality,  rail  design  or  service  condition.  Four  roads 
reported  70%  of  the  CF  &  DF's;  three  roads  reported  86^  of  the  total  Other  Head; 
and  three  roads  reported  85%  of  the  total  Web-in-Joint  failures  and  detected  defects. 

These  statistics  serve  to  draw  the  attention  of  Member  Roads  to  an  unusually 
large  number  of  defects  of  any  one  type  occurring  on  their  road  so  appropriate  action 
can  be  taken  where  justified  or  practical. 

Table  7  shows  the  detected  defects  and  service  failures  in  the  rail  web  within 
joint  bar  limits  reported  during  1969  in  rail  of  100  lb  and  heavier.  Comparing  these 
results  with  tliose  reported  during  the  last  year,  the  number  of  joints  reported 
inspected  with  defect-detecting  instruments  increased  from  35,581,062  in  1968  to 
35,684,609  in  1969.  There  was  a  slight  increase  in  tlie  number  of  detected  web 
defects  from  35,460  in  1968  to  38^,521  in  1969;  and  an  increase  in  the  number  of 
service  web  failures  from  16,122  in  1968  to  17,610  in  1969. 

Transverse  fissures  examined  at  the  AAR  Research  Center  are  reported  in  Table 
8.  There  were  two  additional  transverse  fissure  faihues  in  control-cooled  rail  reported 


Rail 


375 


in  1969.  Both  rails  were  rolled  in  1953,  one  by  Dominion  and  the  other  by  Steelton. 
Both  failed  from  hot  torn  steel.  It  should  be  pointed  out  that  no  transverse  fissures 
have  developed  as  a  result  of  hot  torn  steel  in  the  rollings  sinee  1955,  shatter  cracks 
since  1956  or  inclusions  sinee  1951.  This  shows  that  good  quality  control  and  mill 
practices  haxe  been  followed  in  the  manufacture  of  this  rail  to  avoid  shatter  cracks. 
Table  9  gives  the  number  of  welded  engine  burns  in  track  and  the  number  of 
failed  welded  engine  bums  during  1969  as  reported  by  a  few  roads  that  keep  a 
record  of  this  information.  Of  tlie  seven  roads  that  were  able  to  repoit  both  the 
numbers  in  track  and  failures,  out  of  a  total  of  353,498  welded  engine  burns  in 
track,  54  rail  failures  from  welded  engine  burns  were  reported  dming  1969,  or  a 
rate  of  one  rail  failure  per  6,546  welded  engine  burns.  This  low  incidence  of  failure 
indicates  that  the  practice  of  welding  engine  burns  is  showing  good  service  per- 
formance. Extensive  laboratory  tests  made  in  the  rolling-load  machines  several  years 
ago  indicated  that  a  welded  engine  bum  was  less  likely  to  develop  a  progressive 
fracture  under  the  repeated  loading  than  an  engine  bum  which  had  not  been  welded. 
The  use  of  care  and  good  procedure  in  welding  engine  bums  is,  of  course, 
an  important  factor  in  obtaining  good  service  perfomiances. 


All    Rail    Failures 

In  1961,  die  Rail  Committee  decided  tliat  it  would  be  helpful  to  initiate  a 
report  of  all  rail  failures  in  main  track.  Data  were  compiled  for  the  year  1969  with 
respect  to  rail  section,  type  of  failure,  service  or  detected,  and  track  miles  as  reported 
on  Form  402B,  and  are  shown  in  Table  10.  The  number  of  track  miles  reported 
increased  from  227,875  in  1968  to  228,037  in  1969.  The  total  number  of  service 
failures  and  detected  defects,  including  engine  bum  fractures,  increased  from  150,484 
in  1968  to  163,738  in  1969.  The  following  tabulation  shows  these  results  on  a  track 
mile  basis  from  1962  to  1969,  inch 


Year 

Failures  Per  Track  Mile 

All  Sections 

100  Lb  and  Less 

1962  

0.52 
0.54 
0.65 
0.55 
0.57 
0.64 
0.66 
0.71 

0.68 

1963     

0.70 

1964                -                      ...      

0.80 

1965                                                             

0.72 

1966                                                                   -    

0.73 

1967 

0.84 

1968   

0.82 

19G9 

0.93 

The  failure  rate  on  this  basis  has  increased  36^  from   1962  to  1969  for  all  sec- 
tions, and  37%  for  sections  100  lb  and  less. 


376 


Rail 


REPORTED    SY  ALL  RAILROADS 


Rail 


377 


\ 

/ 

> 

/ 

< 

> 

^ 

} 

_^ 

^-'^ 

Q96I 


0961 


Q96I 


0Q6I 


Qfr6l 


ot^ei 


< 

< 

< 
o 

Q 

z 
< 

LU 

»- 
< 

Q     UJ 


S£6I  a:    ^ 


0261 


QZ6 


0261 


9161 


0161 


<  =; 

UJ     < 


o 

UJ 


o 

< 

UJ 

o 

> 
cr 

UJ 
CO 

I 

CM 


o 

o 


o 
o 
ro 


o 

o 

CVJ 


o 
o 


30IAa3S  SdV3A  Q  HOA  IVIOI 

S3niiN  Movdi  001  a3d  S3annivj 


378 


Rail 


«„, 

,_;,;;^„  - 

vr^US  ■  ALL  TYPtS  KXCEPT  ENdINK  MIHK  FAILIHS^ 

H1>LLKI) 

lOXniOL  CmiLH)  IIAIL  KAll.l  Kl>  ITIl   lu..  FIIACK  Mill 
VKAIIS      ALL  r>PtS  IXCEl'T  ENiJINt:  niTIN  PAll  1  IU> 

...,.,„. 

ii 

1-  ■■ 

— J 

;:E 

1 

— 1 

1 

^ 

CARNECIE 

iS 

B 

=, 

r3 
1 

.„.„„.,., 

iS 

:i 

-  1 

1 

s,M.M... 

B 

J-J 

[             1 

1 

=1 

3 

IXIMINION 

B 

1 

.K.^.s.. 

19S3 

»■" 

3 
3 

1 

=1 

,.,.v. 

19CG 

\-i 

iS 

1  :i 

j 1 

1 1 

5 

;INK  [intN  FAILIIRES  -  SERVICE  AND  DtTECTED 


Rail 


379 


VKAHS  si:k\  ick 


^ 

Olil  S.i-tlci 

;^ 

^, 

/ 
/ 

,  -  "           \ 
1                 \ 
\ 
\ 

\, 

/                                    \ 

/                ,             - 

!           i 

1        ^,-^\ 

_- — k' 

,^- 

^/^T" 

.^^ 

1 

Sniv.r  (  lid  Si'Cll()ll>. 

YKAH  KOM.K'I) 

Kin-    i  -  Cimlrol  Ccmk'il  Kail   Failure's  i.i  l).ci'nilj.-r  M.    i:)(;9.   Prr  U)U  Track  Miles 
All  T\i.i-s   KNiludinu   Kni^iiif  Burn   l-rarluri'S  -  Srr\  i'.-.-  iind  DcUTtcrl. 


XOTK:       n.'i-lirir  in  liTii.l  iif  lailur.-  I'alr  iii  .ild  srrli.ms  ocivnM-d  diirins;  Hill  aiitl  lUth 
vi-ars  of  scr\'iiT  diu'  lo  i-iillin};s  ha\  inn  ■'  lar^i'  nuniluT  .il  I'aihiri's  bcinn 
rcmovc-d  and  mi  Kuv^i-r  mrliidcd  m  tin-  i'r|ioi'l.s. 


380 


Rail 


>H 

PQ 

03 

H 

O 

W  w 

h  w 

M     W 

qS 

w  u 

M  o 

W    Oh 

<  < 

Q  w 

W  O 

H  2 

«3 

m9 

Q  « 

l-( 

c«     ' 

u 

w  -„' 

P3     02 

< 

u 

^^ 

> 

CO 

^ 

< 

u 

g 

?! 

K 

o 

H 

g 

^ 

ro 

t< 

U 

rn 

B 

Q 

H-l 

O 

< 

s 

w 

< 

o 

« 

"5       X'^ 

■Z     (U 

o    s- 

0)      3 

Oi 

OO 

•* 

in 

Ol 

t^    00 

C5     !» 

lO 

CO 

>-( 

.-( 

CO 

O) 

OJ 

M< 

"* 

00    Irt    to    to      1 

<"     M 

to 

•* 

t—i 

(M 

!M 

•H     to 

C^ 

o 

'^ 

c- 

in 

to 

o 

to 

"* 

rH 

Ift    t-    05    •^       1 

Q  ■- 

^ 

a> 

-f 

CO 

•— <    t— ( 

t— t 

CO 

(M 

in 

Ol 

CO 

.-( 

CO 

r-(    ■*    05 

t, 

3 

1—t 

r— 4 

IM 

(M 

.—4 

1) 

u 

^    c 

tU      3 
>      0 

t! 

tfl    a. 

:;: 

2  § 

iS 

Q 

-C      '3^ 

T3 

» 

eg 

t~- 

o 

en 

CO    ■* 

X.    o 

to 

cq 

LO 

c- 

^^ 

OO 

X 

r-< 

CO 

<J3    03     to     O       1 

«      = 

o 

rH 

C2 

CJ 

n 

Ol    I-- 

30    CO 

t:~ 

« 

Cl 

,— ( 

o 

o 

en 

GO 

OJ 

^    CO    to    to      1 

o  'V, 

C 

C3 

t- 

f— < 

Ci 

IN 

'^ 

a: 

CO 

CO 

^    CO    to 

CM 

0)   ^ 

"5  "o 

Q  S, 

M 

aj 

tn 

3 

OT 

o 

to 

l> 

T-l 

1 

1      1 

-*   ^ 

1 

Ol 

CO 

o 

CO 

I 

1 

1 

1 

CO    00     1     ffs     1 

d) 

OT 

OT 

1 

1      1 

<M 

1 

eg 

r-4 

c^ 

t 

1 

1 

1 

1             1 

3 

M 

r-l 

'3 

fa 

fe 

CD 
CO 

OJ 

;-i 

_o 

a; 

> 

> 

OT 

00 

3 

oi 

to 

C5 

00 

CO 

1 
1 

1 
1 

lO       1 

OJ       1 

1 

1 

to 

f- 

CO 

to 
eg 

1 
1 

1 

^ 

1 
1 

^    CO    t-    00       1 

^                  1 

o 

JM 

O 

cd 

A 

o3 

p 

0) 

fa 

o 

G 

3 

_2 

C 

OJ 

c 

0) 

3 

M 

o3 

tn 

0) 

;-i 

M 

'r* 

0) 

o3 

•D 

0) 

s        g.> 

c3 

a 
o 

^ 

fa 

cu 

c 

01 

C 

c 

TJ 

u 

T3 

o 

O 

O 

0) 

o 
o 

to 

o 

o 

< 

13 
a;    c 

§  2 

o 

o 
0* 

O 

O 
=3 

o3 

o 
to 

s 

3 
« 

3 

CO 

o 

o 

S-i 

0) 

x: 

3 
0 
i/1 

c 
o 
tn 

o3 

C 

o 

o 

> 

c 

0) 

p 

=3 

^     1^ 

^                     3     S 

^  S  ^  1  s 

^    a)  i3  "^  "S 

3   tj    «   :t=   >^ 

c 

^ 

c3 

cu 

o3    C 

c 

CO 

» 

^ 

„ 

o 

0) 

q3 

■^    tn    tn  _c 

C    oj    2    CO   -ir 
cj    OJ    S    fi   J= 

o 
en 

o 

S 

o 

C 

S 

en 

en 

If 

CO     C 

.2   u 

a 

ni 
to 

ni 
U 

o 

o 

bJD 

O 

oJ 

0) 

> 

c 

O 

rt 

rt 

0) 

o    a 

03     rt 

4= 

i 

jC 

J3 

!c 

"o 

Ij 

(U 

■*-> 

(j       ^H     ^       C!J       (U 

< 

tt 

pq 

CQ 

m  u 

u  o 

O 

O 

U 

O 

O 

u 

Q 

Q 

fa 

O  O  ^  >d  h-l 

Rail 


381 


Detected  Transverse  Defects 

Including  Compound  Fissures 

and  Detail  Fractures 

to 

05 

too5inir305coaot>«ocoMiNcg<naoaooo^OM 

to            CO'*'            05.HM                     r-l            tOi-ltnt-m 

IM 

CD 
05 

«OO^Ot:~OOt>.,-l<35(MCOt>OOOCDcX>lOOCD-:t" 

in 

00 

CO 

1    "2 

3     CO 

'Si 

C5 
OS 

1      io>Tj<tr)toc^]i      icol      it-'S'-^oiir-ioi 
1100               cj           iicoii                co^ico— II 

(M 

CD 
LO 

00 

O 

T5 
01 
O 
U 

« 

OS 

Lehigh  Valley 

Long  Island 

Louisville  &  Nashville 

Maine  Central 

Missouri,  Kansas  &  Texas 

Missouri  Pacific 

Monon 

Norfolk  &  Western 

Northern  Pacific 

Penn  Central 

Pittsburgh  &  Lake  Erie 

Quebec ,  North  Shore  &  Labrador 

Reading 

Richmond,  Fredericksburg,  &  Potomac 

Seaboard  Coast  Line 

Soo  Line 

St.  Louis,  San  Francisco 

Southern  Pacific 

Union  Pacific 

Western  Maryland 

(0 

O 

< 
in 

s 

o 

Mill,  ft:: I 


382 


Rail 


TABLE  2 

TONS  OF  RAILS  AND  TRACK  MILES  OF  EACH  YEAR'S  ROLLINGS  1959  TO  1968,  INCL. 

REPORTED  BY  42  RAILROADS 


Year 
Rolled 

OH  CONTROL  COOLED  ONLY 

NET  TONS 

TRACK  MILES 

1959 
1960 
1961 
1962 
1963 
1964 
1965 
1966 
1967 
196S 

458,260 
364,097 
290,210 
273,944 
408,904 
450,081 
496,691 
635 , 207 
512,295 
605,278 

2,131.10 
1,674.60 
1,339.50 
1,252.60 
1 ,876.90 
2,167.90 
2,303.00 
2,913.80 
2,378.90 
2.730.90 

TOTAL 

4,494,967 

20,769.20 

TABLE  3 
SERVICE  FAILURES  AND  DEFECTS  OF  ALL  TYPES  EXCEPT  ENGINE  BURN  FAILLfRES 
ACCUMULATED  FROM  DATE  ROLLED  TO  DECEMBER  31,   1969,   PER  100  AVERAGE 
TRACK  MILES,   BASIC  OXYGEN  AND  OPEN  HEARTH  CONTROL  COOLED. 


YEARS  OF  SERVICE 

YEAR 

ROLLED 

1 

2 

^ 

■1 

- 

i) 

' 

,s 

9 

10 

1959 

2.0 

2.  S 

4.3 

7 .  2 

;i.  ."< 

16.3 

24.5 

40.6 

53.  6 

58.6 

1960 

0.  5 

1.6 

3.0 

4.7 

9.6 

15.  6 

24.4 

25.8 

44.3 

1961 

O.H 

2.0 

2.0 

5.9 

10.6 

17.5 

25.6 

41.4 

1962 

0.6 

1.0 

3.1 

5.5 

U.  1 

20.  6 

36.2 

1963 

0.  4 

l.s 

3.8 

8.6 

14.  6 

2  3   3 

1964 

1.5 

6.5 

4.5 

12.0 

1M.4 

1965 

1.3 

3.0 

8.2 

13.6 

1966 

1.6 

7.9 

11. 0 

1967 

1.7 

5.4 

196S 

1.3 

Rail 


383 


TRACK  MILES.  IN  UOLLINGS  lUSit  TO  ISbH  OPtN  HE 


I  FAILimES.  ALL  TYPES 


RAILROAD 

1909  FAILLHES 

TRACK  MILES  BY  MILL 

EBF'S 

EBF'S 

A  Lr, 

CARN 

COLO 

DOM 

GARY 

INLD 

LACK 

STLTN 

TENN 

TOTAL 

EXCL. 

ONLY 

Alchison,   Topeka  &  SanU  Fi- 
Baltimore  L  Ohio 
Bangor  &  Aroostook 
Bessemer  &-  Lakt-  Erie 

'"" 

43 

141 

"-- 

99 

1»71 
43 

30 

Boston  k  Maine 
Canadian  National 
Canadian  Pacific 
Cartier 

IS26 

-- 

"i 

152 

"['' 

5133 
2411 
ISO 

406 
600 
13 

11 

Chesapeake  &  Ohio 
Chicago  ti  North  Western 
Chicago.  Burlington  ii  Qutnc\ 
Chicago,  Milwaukee  St.  Paul  &  Pacific- 

':,<. 

26C-. 

s 

16 

Chicago,  Rock  Island  &  Pacific 
Colorado  &  Southern 
Delaware  &  Hudson 
Denver  &  Rio  Grande  Western 

166 
U 

"39 

211 

Ft.  Worth  L  Denver 
Grand  Trunk  &  Western 
Great  Northern 
Illinois  Central 

224 

241 

117 

31 

442 

98 
613 

587 

20 
2 

1 

Kansas  City  Southern 
Lehigh  &  Hudson 
Lehigh  Valley 
Long  Island 

12 

54 
12 

" 

Louisville  b  Nashville 
Maine  Central 
Missouri.  Kansas,  Texas 
Missouri  Pacific 

13 

"» 

11 

14 

59s 
65» 

596 
11 
33 

23 

Monon 

Norfolk  i  Western 
Northern  Pacific 
Penn  Central 

SO 

" 

147 
339 
537 

61 

250 

310 

J" 

19 

814 
1099 

10 
64 

6 

Pittsburgh,  Lake  Erie 

Quebec,   North  Shore  &  Labrador 

Reading 

Richmond.  Fredericksburg  &  Potomac 

"'" 

6 

"';": 

64 

128 
109 

" 

Seaboard  Coast  Line 
Soo  Line 

St.  Louis  -  San  Francisco 
Southern  Pacific 

y 

1 

51 

5!l 

10 

7» 

772 

I 

2 

l^nion  Pacific 
Western  Maryland 

1003 

4U 

123 

141~ 

9S 

TOTAL 

3611 

5297 

3895 

4877 

^12 

913 

1228 

3253 

23118          1549 

25 

384 


Rail 


Yi  w 


a 

H-1 

O 

a. 

s 

J 

in 

>- 

< 

ffl 

« 

fc; 

en 

Q 

kJ 

to 

Ul 

< 

'^ 

o 

kb 

J^ 

o 

Q 

n 

!_> 

Z 

« 

,-i 

m 

<, 

W 

o 

M 

« 

cs 

f- 

H 

? 

H 

O 

H 

Ui 

w 

f) 

o 

Ln 

W 

u 

Q 

Q 

o 

n 

OJ 

U 

H 

Q 

r) 

Q 

< 

w 

X 

H 

i-l 

o 

Q 

<  < 


CO 

1 

-   O   W   K 
^   <   J   < 

—         i.o  -r    -JO   —  02   o   i.'^ 

M             CM     O     I-     1-     t-     O     0-. 

•4> 

ire 

J 

2  K  s  w 

C!        ino  —   ori  —  o 

-T 

< 

^  H  **  >< 

u. 

fl "-:  s 

„  ^  „__,_,-   ,_   ,, 

05 

O  CM     05     O    CC     —    CM     T     IfS 

^  -  < 
:S  s  w 

n        c-jocgTcosocM 
-T       in   -.'  oc         LO  in  'S" 

f-     "^ 

CM           M    :^i    Ol                         — 

u:  a: 

—  c^)   ;o   ire  1^   CM  CM  o   CM 

—             Oi     OT     I-     -i"     —     IM     m 

XD            C-l    X     X            C-.     M    C^l 

! 

~  "- 

"             '~     "     ~                      "     "^ 

ro 

T         ^   •*   i-   c:   cj    -r    I.-7 

T 

X         :o   1-    o         o   o;   « 

C5             CS     CM     1/:             CM             -^ 

ire 

1.. 

i 

•^   H 

-      — . 

ire 

•* 

u 

n 

-r 

< 

Oi                     CM                     lO 

CM 

03 

o 

K 

~, 

ll; 

•^         —    o   [^          y    —    — 

-T 

^-< 

X 

.-          ri    ri   T 

fa 

o 

1 

H 

CO             CC     05     O     CO     Oi     X     O 

00 

00 

UJ 

2 

tS             O     -1     CO             t~     CM     •3' 

ire 

^^ 

z 

X 

H 

— 

o 

05             .-0     to     CO             CM     -1 

c~ 

o 

o^ 

<A 

m 

CQ 

-: 

o  = 

-t"             CM     O     — '             ire              X' 

-r         ^1   ■-! 

^ 

- 

u 

•X. 

^           —    l-^    ^]           I-    "^1    — ' 

[^ 

-J* 

Q 

— •          -.    r*:   r-;                      ^ 

05 

CM 

C) 

H 
en 

w 

•X. 
tn 
> 

-^         0   =  05         LO   t-   ;o 

O             CC     05     -1 

X 

o 

D 

< 

Uh 

t^ 

> 

fa  =a  fa 

-H             C.     CM     —             05     05     l- 

X 

l~ 

Q        Q 

CO 

o 

< 

-1 

^  >  < 

_ 

-H 

o 
o 

?> 

13 

< 

-1 

MA 
EGIE 
RADO 
NION 

AWANNA 
LTON 

ESSEE 

cc 

J 
,-1 

s 

JRES  PER 
RACK 
YEARS 

■s 

FAIL 
100  T 
MILE 

.J 

< 

r  -S  •- 


tti     o 


Rail 


385 


w 

AILURE 

PER  100 

TRACK 

MILE 

YEARS 

i^   in   t^   i^   30 

■fj 

Tf         lo  00   to  ;o 

■*'             CO     O     CM     00 

^     CO     O     t~     05 

CO  t-'   in  ■*'  o 

CO 

b. 

112 

820 

30,685 

12,907 

2,801 

440 

rf   o  o   c:^   in  ^   o 

o 

TRACK 

MILE 

YEAI^S 

O     03     t-     CM     ^     CD     CM 

03 

t~     CO     C5     IT-     CO     CO 
<35     CO     Tj<     CM     ^ 

CM 

co" 

■ 

^   o  t_  in  00  ^ 

OO     O     CO     CJ3     O     GO     CM 
t-    O    CD    03    tr-    -^ 

in 

o  " 

<  d 

in  <M 

CO    —1    CO 

00 

t^ 

M 

in   CO    CO    c^i   CO 

-1    ^ 

00    — 1   c-   n 

o   ^ 

CO   in   t-   — 1 

<    ^ 

^^ 

CO 

CO 

H 

-T   CO   -r   ^ 

M 

•^ 

< 

^H 

.— < 

cq 

o 

g 

X     CM     O 

-t"    C~    00     CO     — ' 

CO 

C^l 

IT 

a: 

CM     CM     —1 

^ 

o 

k^ 

o 

a 

K 

1-3 

t-     C^i     C2     C-l 

C-I    03    02    CO    o 

^ 

Ol 

CM 

CO 

o 

u 

z 

a 

02 

■■^ 

X 

o>          —1 

C^I              CO 

o 

^-* 

n 

«  Q 

w  < 

CM    -f    O    CO 

C-     Tt>     O     CM     CM 

•* 

K  w 

C^l     C-     CO 

H  K 

LO 

C-I     —1 

O 

-' 

-' 

a 

c 

X 

in  o  CM   —1 

CO     ^     Cj3     — I     -J 

CM 

o 

CO 

-f     CM     CO 

d 

a 

? 

M 

Ol              0-.     C^l     — 1     — 1 

C^J     l^     CO     .-1     O 

CO     ^    CO 

CO 
CO 

:2 

-1 

> 

^^ 

o 

< 

Q 

ck  oa  fc. 

O    -f    -1"     uO    CO 

o 

X 

O         Q 

C^l     CO     -J 

oo  m   c>] 

-1     C^^      CO 

GO 

o 

< 

^  >  < 

r^ 

- 

o 
o 

d 

< 

4, 

TOTAL  PER 
100  TRACK 
MILES  YEARS 

^2 

a  K  u  c^  w  >H 

PS   W   U   W   >H   W   w 

O  H  K  O  O  Z 

H  K  K  «  Z  OS  0, 

en  CM  CO  CO  CO  o  in 

o 

M 

O    -H    -^    -H    C^    CM 

H 

1 

386 


Rail 


TABLE  6 

ACCUMIII^TIVE  SERVICE  AND  DETECTED  FAILimfS  OK  ALL  TYPES  FOR  OH  AND  BO  CONTROL  COOLED  RAIL  ONLY, 

IN  ROLUNIW  1959  lo  196«,  INC.  ,  ACCl'Ml'LATED  TO  DECEMBER  31 ,  1969,  SEOREOATED  BY  ROADS  AND  MILI^ 


ROADi  MILL 

TF 
VER 
AAR 

CF 
DF 

VSH 

HSIl 

OTHER 
HEAD 

BRO- 
KEN 

BASE 

FAILLKE 

TOTA  IJi 

EBF'B    Excl. 

EBF'S    Only 

w 

;b 

Accum. 
Total 

l,r.9 

A.-cum 
Total 

1969 

IN  JT. 

OTHER 

ALGOMA 

Canadian  National 
Canadian  Pacific 
Soo  Line 

0 

,;■ 

39 

262 

0 

U 

108 

0 

402 

82 
0 

20 
2 

•;49 
0 

35 
0 

119 

73 
0 

682 

1,300 

2 

515 

'I 

0 

TOTAL 

0 

71 

301 

119 

484 

98 

663 

56 

192 

1,984 

604 

51 

0 

CARNECIE 
Penn  Central 

1, 

^j 

„ 

0 

0 

0 

0 

0 

0 

0 

0 

0 

0 

TOTAL 

0 

0 

0 

0 

0 

0 

0 

0 

0 

0 

0 

0 

0 

COLORADO 

Atchison,  Topeka  &  Santa  Fe 

Chicago,  Hurlington  &  (Juincy 

Chicago.  Rock  Island  &  Pacific 

Colorado  &  Southern 

Denver  &  Rio  Grande  Western 

<;reat  Northern 

Missouri.  Kansas.  Texas 

Missouri  Pacific 

Northern  Pacific 

Southern  Pacific 

Union  Pacific 

0 

59 

1 
1 

292 
229 

3 

0 

27 
IC 

1 
I 
0 

1 

OH 
14 

2 

03 
153 

0 

0 
0 
0 

32 
0 

15 

1 

4 

2ir, 
14 

1 
11 

4 

0 
0 
0 
0 

0 
0 

1 

3 
2 

0 
12 
0 

34 
5 
I 
24 
706 
432 

20 
0 
0 
0 

10 

1 
0 

147 

78 

0 

0 
0 

23 
3 

0 
0 

0 

1 

0 
2 
2 
0 

TOTAL 

0 

619 

60 

91 

232 

37 

266 

21 

8 

1,334 

270 

29 

5 

DOMINION 

Canadian  National 

Canadian  Pacific 

Cartler 

Quebec  North  Shore 

0 
0 

I 

71 
13 
(1 

14 
3 
0 

18 

5»5 

1 
14 

154 
0 

0 
5 

2 
0 

1 

21 
5 
0 

1 

979 
225 
10 
60 

268 
91 
4 
24 

176 

0 
0 

11 
0 

0 

TOTAL 

0 

90 

GOO 

161 

319 

20 

27 

1,274 

386 

176 

11 

i;ary 

Atchison,  Topeka  &  Santa  Fe 
Ilaltimore  4  Ohio 
Bessemer  &  Lake  Erie 
Canadian  National 

Chesapeake  &  Ohio 

Chicago  &  North  Western 

Chicago,  Burlington  &  Qulncy 

Chicago,  MHuaukee  8i  St.  Paul  &  Pacific 

Chicago,  Rock  Island  4  Pacific 

Grand  Trunk  Western 

Great  Northern 

Illinois  Central 

Kansas  City  Southern 

Missouri,  Kansas,  Texas 

Missouri  Pacific 

Monon 

Norfolk  Western 

Northern  Paciric 

Penn  Central 

Pittaburgh  Lake  Erie 

St.  Louis,  San  Franeisco 
Union  Pacific 

0 
0 

0 

0 
0 

1 

11 
111 

n 
e, 

0 

1 

25 

0 

1 
3 

1 

0 

1 

0 
12 

0 

0 

0 

0 
0 
0 

0 
0 
10 

0 

10 
0 

1 

0 

0 
0 
0 
21 

4 

2 
11 

3 

5 

3 
0 
0 

1 

1 
0 

4 

0 

10 

75 

10 

0 

0 
4 

2 

0 
0 

0 
0 
0 

1 

0 

1 

32 

4 

1 
44 
56 

0 
12 

5 
20 
6 

10 

1 

11 

1 
70 

7 

0 

11 
0 
0 

0 

5 

3 

20 

0 
0 

0 
0 

0 
0 
0 
0 

(1 

0 
0 

0 

0 

0 

TOTAL 

" 

Ml 

19 

32 

61 

39 

160 

47 

c 

505 

114 

4 

3 

INIJ\ND 

Chesapeake  L  Ohio 
Missouri,  Kansas,  Texas 

0 

0 

0 

0 

0 

0 

3 

0 

0 
0 

0 

1 
0 

0 

C 

TOTAL 

0 

0 

0 

0 

» 

0 

3 

0 

0 

3 

1 

0 

" 

Rail 


387 


TABLE  6  (CONTINUED) 

■^^^  o'l';V^^^'^  SERVICE  AND  DETTRCTED  FAILL'UES  OF  ALL  TYPES  FOR  OH  AND  BO  CONTROL  COOLED  RAM   ONLY 

IN  ROLLINGS  1959  TO  IOUh.   incl.  .  ACCl'MrUVTED  TO  DECEMBER  31 .   1969.  SEGREGATED  BV  ROADS  AND  MILKS    ' 


ROAD  t  MILL 

"lackawanna 

Baltimore  &  Ohio 
Canadian  National 
Chesapeake  L  Ohio 
Great  Northern 
Lehigh  Vailey 
Maine  Central 
Norfolk  &  Western 
Northern  Pacific 
Penn  Central 
Pittsburgh,  Lake  Erie 

Soo  Line 

TOTAL  ' 

ST E ELTON 
Baltimore  l  Ohio 
Bangor  t  Aroostook 
Chesapeake  t  Ohio 
Delaware  &  Hudson 

eat  Northern 

ssouri  Pacific 

rfolk  s.  Western 
Penn  Central 
Reading 

Richmond,  Fredericksburg  &  Potomac 
Seaboard  Coast  Line 

Eern  Maryland ^^^__^^^ 

TOTAL  "  ' 

TENNESSEE 

Atchison.  Topeka.  Santa  Fe 
Illinois  Central 
Louisville  L  Nashville 

louri,  Kansas,  Texas 
Missouri  Pacific 
Norfolk  £  Western 
St.  Louis,  San  Franolsco 
Seaboard  Coast  Line 
Southern  Pacific 

Soo  Line    

TOTAL 


FAILL^RE    TOTA  LS 


TOTAL  ALL  MILLS 


388 


Rail 


TABLE  7 
HAIL  FAlLlfRES  IN  THK  WEB  WITHIN  JOINT  HAH  LIMITS  FOUND  IN  IftCa  ON  HAIL  OK  100  LB.  AND  ALL  IIEAVIKK  SECTIONS 


Joints 
Inspected 

Railroud 

RAIL  ROLLED  I'HEVIOIS  TO  193" 

HAIL  ROLLED  IN  1937  AND  AFTER           1 

with  Defect 

Detecllng 

Instruments 

Detected  Failures    1 

Service  F 

allures 

Detected  Failures 

Service  F 

illures 

Bolt  Hole 

Other 

Bolt  Hole 

Other 

Bolt  Hole 

Other 

Bolt  Hole 

Other 

Atchison.  To|>eka  &  Santa  Ft" 

\2:\ 

130 

22 

22 

315 

306 

107 

32 

5,346,580 

Baltimori'  <i  Ohio 

942 

lOU 

982 

81 

209 

67 

102 

47 

1 .570.500 

Bangor  ii  Aroostook 

10 

3 

2 

8 

1 

2 

97.740 

Bissi-miT  ii  Laki-  Eric 

,'•, 

2 

2 

71,340 

Boston  &  Maine 

20't 

37 

26 

U 

59 

20 

30 

14 

494,000 

Canadian  National 

r.42 

156 

287 

58 

1039 

132 

695 

183 

750,000 

Canadian  Pacitir 

19N 

4H 

95 

38 

1305 

572 

689 

382 

1,471.174 

Cartier 

— 

1 

— 

190 

Chesapeake  b  Ohio 

186 

12S 

77 

25 

157 

21 

39 

32 

1.376.400 

Chicago  &  North  Western 

1554 

334 

429 

31 

360 

485 

243 

180 

1,827,900 

Chicago.  Burlington  &  Quinev 

36 

253 

34 

12 

3 

346 

169 

451.682 

Chicago.  Milwaukee,  St.  Paul  &  Pacific 

407 

8 

257 

119 

126 

3 

45 

18 

887,051 

Chicago,  Hock  Island  &  Pacific 

775 

1023 

220 

275 

471 

534 

315 

313 

1,520,640 

Colorado  &  Southern 

4 

-- 

-- 

-- 

-- 

125,558 

Delaware  &  HucV^on 

36 

38 

5 

26 

12 

11 

279,393 

Denver  i  Rio  Grande  Western 

17 

24 

9 

14 

64 

103 

5 

17 

229,708 

Ft.  Worth  &  Denver 

-- 

-- 

-- 

... 

Grand  Trunk  Western 

M 

26 

40 

23 

171 

32 

153 

54 

262,686 

Great  Northern 

9 

26 

14 

39 

92 

51 

55 

536,913 

Illinois  Central 

446 

17 

807 

7 

95 

3 

... 

Kansas  Citv  Southern 

4 

15 

48 

14 

218,000 

Lehigh  &  Hudson 

1 

1 

1 

1 

9 

2 

2 

I 

19,500 

Lehigh  Valley 

S9 

12 

62 

20 

-- 

— 

6 

4 

209,170 

Long  Island 

S3 

1 

44 

— 

25 

24 

— 

211,259 

Louisville  &  Nashville 

S20 

837 

276 

170 

564 

5U 

199 

63 

1,083,880 

Maine  Central 

46 

2h 

2tl 

16 

7 

10 

10 

4 

210.000 

Missouri  Pacific 

159 

234 

87 

105 

133 

165 

75 

101 

1.300.000 

Missouri,  Kansas.  Texas 

75 

286 

6 

13 

191,055 

Monon 

16 

23 

4 

3 

8 

8 

72,000 

Norfolk  &  Western 

581 

275 

460 

32 

403 

125 

178 

71 

1,800,000 

Northern  Pacific 

39 

5 

89 

7 

62 

90 

161 

127 

350,173 

Penn  Central 

2833 

2311 

2492 

543 

2398 

1751 

998 

822 

4,367,000 

Pittsburgh  &  Lake  Erie 

3 

9 

70,900 

Quebec,   North  Shore  &  Labrador 

10 

1 

-- 

190,784 

Reading 

60 

41 

48 

2 

3 

3 

3 

-- 

555,193 

Richmond.   Fredericksburg  &  Potomac 

12 

13 

1 

1 

44,715 

Seaboard  Coast  Line 

326 

818 

170 

231 

137 

272 

128 

107 

1,125,000 

Soo  Line 

8H 

a 

60 

11 

256 

25 

214 

23 

215,000 

St.   Louis  -  San  Francisco 

341 

522 

7 

184 

306 

413 

22 

186 

1 ,220,100 

Southern  Pacific 

127 

48 

22 

2817 

— 

458 

256 

1,245,854 

Union  Pacific 

140 

40 

5 

4 

1220 

74 

17 

4 

3,378,211 

Western  Maryland 

44 

1 

89 

19 

30 

307,360 

TOTALS 

11,474 

7 ,  1  80 

G,673 

2,104 

13,701 

6,166 

5,518 

3.315 

35,684,609 

Rail 


389 


J   CO 

<  s 


QO 


^g 


Q  < 

a  cs 
f-  o 

Is 

O 


i 

O 

- 

^, 

.. 

I 

a: 

?i 

CO 

-- 

c^ 

c 

c. 

- 

- 

c 

1 

1 

1 

- 

- 

1 

a 

- 

2 

i 

^ 

:l 

s 

-r 

> 

1 

1 
•          1 

- 

- 

1 

rt   ^ 

<s 

i 
1 

2 

s 

- 

0, 

c 

o 

^    o 

1 

^ 

S 

2 

'1 

1 

n  XJ 

- 

^ 

.1 

t* 

1 

XI 

1 

n 

5 

- 

T 

t- 

n  X 

1 

1 

^ 

?, 

- 

1 

d   J2 

! 

■        i 

s 

- 

F 

1 

s 

^ 

,. 

B 

-r 

" 

rt   j:; 

S 

2 

'5 

-r 

- 

?, 

- 

s 

5 

.". 

-^ 

I 

1 

5 

3 

2^ 

?. 

I 

i 

?5 

^ 

1     s 

3 

- 

2 

o 

s 

^ 

2- 

a 

s 

-C 

n 

^i 

5 

:^ 

i 

v3 

5 

;2 

:: 

:^ 

" 

- 

f^ 

3 

n 

;; 

5 

J3 

^ 

- 

r: 

2 

- 

- 

:l 

- 

^ 

"<■ 

P 

c 

r. 

i 

T3 

c 

c 

1 

C 

c 
55 

e 

-I 
< 

!- 

Sr 


s: 


_  E 


I 


390 


Rail 


TABLE  9 
WELDED  ENGINE  BURNS  AND  FAILURES 


Engine  Burns 

Burns 

Failed  Welded 

Welded  Prior 

Welded 

Engine  Burns 

Railroad 

To  1968 

In  1968 

During  1968 

Atchison,  Topeka  &  Santa  Fe 

131,587 

1,953 

0 

Baltimore  &  Ohio 

9,995 

* 

« 

Chesapeake  &  Ohio 

52,146 

* 

* 

Chicago  &  North  Western 

26,828 

1,006 

** 

Delaware  &  Hudson 

8,590 

169 

5 

Elgin,  Joliet  &  Eastern 

121,453 

3,097 

0 

Illinois  Central 

66,823 

* 

* 

Penn  Central 

526,407 

* 

♦ 

Richmond,  Fredericksburg  &  Potomac 

18,033 

28 

0 

St.  Louis  -  San  Francisco 

6,948 

562 

0 

Seaboard  Coast  Line 

40 , 059 

1,204 

49 

Southern  (Western  Division) 

145,591 

* 

* 

Southern  Pacific 

2,109 

♦ 

* 

TOTAL 

1,156,569 

8,019 

54 

*  Discontinued  keeping  this  information 
♦♦Not  Available 


Rail 


391 


SECTION  L 
LB.    PER  YD. 

TRACK 
MILES 

TRANS 
FISS. 

COMP. 

FISS. 
& 

DET. 
FRACT. 

HSH 

OTHER 
HEAD 

BRO- 
KEN 

WEB 

BASE 

ALL 
TYPES 

ENGINE 
BURN 
FRACT. 

IN  JT. 

OTHER 

100  and  Less 

109,922 

iS) 

463 

296 

3,016 

452 

1,763 

2,569 

15,737 

1,137 

974 

26.407 

482 

ID) 

7,032 

1,551 

20,089 

2,813 

327 

953 

36.593 

3,65- 

225 

73.740 

i,1U 

105  -  NYC 

3.66s 

(«l 

7 

47 

75 

7 

22 

22 

149 

5 

9 

343 

55 

(Dl 

2 

278 

1,335 

46 

4 

1 

981 

24                 73 

2.744 

ii 

106-  CF  L  I 

30 

(«) 

0 

1 

0 

(Dl 

0 

0 

1 

0 

0 

0 

1 

n       1         0 

0 

107  -  NH 

520 

(S) 

2 

4 

10 

2 

1 

10 

101 

1    !     0 

131 

(D) 

0 

18 

91 

0 

0 

0 

126 

0 

0 

235 

4 

110  -  RE 

3,366 

IS) 

57 

26 

125 

36 

199 

65 

703 

155 

23 

1.389 

42 

ID) 

50H 

460 

437 

125 

89 

25 

1,371 

771 

4 

3.790 

133 

110  -  HF 

154 

IS) 

u 

4 

2 

0 

0 

10 

0 

0 

64 

0 

ID) 

0 

141 

127 

34 

0 

2 

317 

2 

0 

623 

110  -  GN 

522 

|S) 

0 

23 

26 

6 

6 

0 

39 

0 

2 

102 

1 

ID) 

91 

11 

90 

11 

10 

0 

11 

0 

0 

224 

26 

112  -  RE 

19,382 

IS) 

71 

105 

105 

49 

129 

162 

2,079 

486 

18 

3.207 

121 

ID) 

717 

649 

580 

202 

326 

66 

4,439 

1,051 

12 

3.042 

508 

112  -  TR 

2.092 

IS) 

0 

1 

0 

0 

0 

0 

41 

1 

0 

43 

0 

ID) 

1 

40 

3 

0 

0 

0 

6 

0 

0 

50 

1 

113-  HF 

2.605 

IS) 

0 

12 

11 

15 

20 

711 

13 

n 

359 

21 

ID) 

1 

200 

121 

76 

1 

! 

3.106 

10 

0 

3.516 

35 

115  -  RE 

22.315 

iS) 

9 

67 

44 

23 

312 

114 

231 

29 

64 

893 

64 

ID) 

60 

241 

51 

49 

78 

57 

542 

30 

1 

1,109 

101 

119-  CF  4  I 

2.221 

IS) 

0 

4 

4 

0 

3 

0 

24 

13 

6 

59 

1 

(D) 

0 

21 

5 

3 

0 

7 

15 

0 

0 

51 

0 

122  -  CB 

921 

(S) 

0 

3 

0 

0 

4 

7 

5 

2 

4 

25 

0 

(D) 

0 

0 

0 

0 

0 

22 

7 

8 

0 

37 

0 

127  -  NYC 

5.290 

(S) 

17 

129 

73 

12 

58 

48 

1.154 

31 

11 

1,533 

103 

ID) 

40 

719 

572 

49 

13 

1 

2,702 

54 

21 

4,175 

212 

129-  TR 

664 

IS) 

1 

0 

0 

0 

0 

6 

1 

0 

10 

1 

ID) 

0 

4 

0 

0 

0 

0 

0 

0 

0 

4 

2 

1 30  -  R  E 

2,686 

IS) 

5 

54 

34 

14 

28 

76 

282 

40 

1 

13 

ID) 

291 

425 

291 

40 

28 

12 

414 

63 

3 

1,567 

113 

130-  HF 

2.077 

IS) 

6 

8 

55 

13 

48 

37 

137 

5 

4 

313 

4 

ID) 

414 

100 

206 

14 

0 

37 

165 

23 

3 

962 

39 

1 30  -  PS 

3,007 

(S) 

6 

21 

75 

17 

16 

47 

319 

18 

12 

1,031 

99 

ID) 

22 

283 

354 

45 

15 

6 

944 

41 

2 

1,712 

131   -  RE 

13.241 

IS) 

12 

150 

37 

14 

45 

134 

364 

104 

23 

1,383 

453 

ID) 

177 

2,058 

184 

114 

533 

33 

4,612 

230 

7,946 

862 

132  -  RE 

16,374 

IS) 

4 

133 

63 

37 

203 

71 

254 

39 

16 

120 

30 

ID) 

2a 

2,3H4 

152 

238 

159 

2 

737 

39 

7 

3,746 

96 

133-  RE 

5.120 

(S) 

0 

33 

2 

0 

1 

4 

33 

0 

1 

74 

69 

ID) 

0 

918 

17 

50 

1,126 

0 

280 

1 

136  -  RE 

4.766 

(S) 

0 

31 

13 

10 

28 

29 

49 

1 

0 

161 

2 

m 

0 

137 

6 

11 

0 

8 

78 

2 

1 

243 

2 

136  -  NYC 

544 

(S) 

0 

1 

0 

0 

1 

0 

18 

0 

0 

20 

0 

ID) 

0 

0 

1 

1 

1 

0 

28 

0 

0 

136  -   1  V 

791 

(S) 

1 

0 

5 

0 

0 

0 

70 

24 

0 

100 

13 

(D) 

0 

36 

52 

3 

0 

3 

90 

12 

0 

196 

126 

1  40  -HE 

3,617 

<S) 

0 

12 

9 

2 

0 

0 

70 

(D) 

2 

28 

5 

10 

9 

12 

80 

9 

3 

158 

47 

152  -  PS 

75, 

IS) 

0 

9 

20 

6 

38 

9 

40 

3 

1 

126 

54 

ID) 

0 

77 

7 

9 

9 

1 

123 

2 

0 

228 

32 

155  -   1>S 

594 

IS) 

1 

1 

0 

11 

2 

3 

0 

0 

18 

13 

(D) 

0 

36 

2 

7 

4 

0 

14 

1 

0 

64 

32 

T'lTAI. 

22'., 037 

IS) 
ID) 

661 
9,396 

1,230 
10,815 

3,809 
24,779 

711 
3.949 

2,944 
3,237 

3,452 
1,249 

23,621 
57.782 

2,108 
6,032 

1.180 

39,716 
117,598 

4.692 

392 Rail 

Report   on   Assignment  4 
Rail  end  batter;  causes  and  remedies 

R.  C.  PosTKLs  (chairman,  suhcommittee),  R.  E.  Catlett,  Jh.,  M.  W.  Clark,  P.  K. 
Cruckshank,  a.  R.  DeRosa,  J.  H.  Greason,  Jr.,  R.  E.  Haacke,  V.  E.  Hall, 
T.  B  HuTCHESON,  W.  S.  Lovelace,  J.  F.  Lyle,  A.  B.  Merritt,  Jr.,  B.  J.  Mur- 
phy, Embert  Oslanu,  J.  S.  Parsons,  J.  M.  Rankin,  R.  B.  Rhode,  C.  L.  Stan- 
ford, W.  G.  Stuublefield,  John  H.  Watts,  D.  J.  White. 

The  following  report  on  how  one  railroad  took  care  of  rail  end  batter  by  use 
of  the  semi-automatic  wire  feed  weld  is  presented  as  information. 

HOW    ONE    RAILROAD   TOOK   CARE    OF    RAIL   END   BATTER   BY    USE   OF   THE 
SEMI-AUTOMATIC   WIRE    FEED   WELD 

This  program  was  started  on  August  5,  1968,  at  Mile  Post  935,  and  was 
progressed  until  July  18,  1969,  covering  a  total  distance  of  89.3  miles.  An  average 
of  13.75  inches  of  rail  per  joint  was  welded  at  25,135  rail  joints.  The  cost  per  joint 
of  this  work  was  $3.43,  or  $0.24945  per  inch. 

Equipment  used  in  this  operation  included  a  bolt  machine  with  one  operator 
and  one  trackman  changing  out  cracked  angle  bars  and  tightening  bolts,  and  a  spot 
tamper  with  one  operator  and  a  foreman  spotting  joints  ahead  of  the  welding.  The 
actual  welding  force  consisted  of  one  lead  welder,  two  welders,  two  trackmen  with 
preheaters,  and  two  men  running  the  rail  grinders  and  the  slotter.  Additional  equip- 
ment, in  the  sequence  in  which  the  items  were  worked  on  the  job,  was  as  follows: 
four  lightweight  push  cars  upon  each  of  which  was  mounted  one  double-end  heater 
for  rail  end  pre-heating  along  with  a  100-lb  propane  tank  with  propane  regulator 
and  hose;  and  one  6000-lb  capacity  push  car  with  brakes  upon  which  was  mounted 
a  400-amp  gas-engine-driven  electric  welder.  Also  on  each  of  tlie  lightweight  push 
cars  was  the  following  equipment  attached  to  the  welder  and  tlie  push  car  to  use 
the  semi-automatic  wire  feed  for  rail  end  build-up:  one  wire  feed  unit,  one  torch 
and  10  ft  of  conduit  assembly,  3/32-inch  replacement  tips  for  torch,  125  ft  of  4/0 
welding  power  cable,  one  plug  shell,  one  8-pole  female  contact,  and  one  115-v  DC 
to  AC  converter.  Following  the  welders  were  two  rail  grinders,  and  one  slotting 
machine. 

The  gang  was  organized  with  one  experienced  welder,  the  rest  of  tlie  personnel 
being  completely  unaccustomed  to  any  welding  whatsoever.  The  welding  foreman, 
using  a  straight  edge,  outlined  those  areas  at  the  joints  to  be  welded,  and  niunbered 
them.  The  two  men  with  the  pre-heaters  (which  had  timers  on  them)  with  the  four 
lightweight  push  cars,  placed  the  pre-heaters  oxer  the  joints.  Through  trial  and  error 
and  experimentation,  it  had  been  determined  that  heating  to  900  F  was  necessary, 
and  the  pre-heaters  were  set  to  time  out  at  this  temperature.  The  heater  was  left  on 
the  joint  until  the  welder  moved  up,  riding  on  the  corner  of  a  lightweight  push  car, 
immediately  to  start  welding  the  joint  after  first  testing  with  a  tempel  stick  to  be 
sure  that  the  joint  retained  the  necessary  amount  of  heat.  Following  the  welding, 
after  the  joint  had  cooled  sufficiently,  a  rail  grinder  and  a  slotter  were  used.  This 
work  was  performed  by  two  men  working  alternately  with  the  two  grinders  and 
the  slotter.  Since  the  welding  was  arranged  to  be  done  when  the  rail  was  naturally 
warm  because  of  climatic  conditions,  no  post-heating  was  done.  This  was  accom- 
plished by  working  on  the  northern  part  of  the  railroad  in  the  summer  and  on  the 
southern  part  in  the  winter. 


J 


Rail 


393 


The  gang  originally  was  set  up  to  have  the  following  men:  one  welding  fore- 
man, two  pre-heater  men,  two  welders,  two  grinders,  and  one  slotter.  After  several 
weeks  of  operation  the  gang  was  reformed  and  is  now  being  operated  with  two 
welders,  two  pre-heat  men,  two  slotters  (or  two  grinders),  for  a  total  of  six  men. 
With  these  six  men,  for  the  month  of  March  1970,  a  total  of  135  joints  per  day  was 
welded. 

The  welding  foreman,  or  lead  welder,  who  numbers  and  measures  the  joints 
using  a  straight  edge  and  taper  gage  to  mark  oft  the  area  to  be  welded  also  doubles 
as  a  welder  on  one  of  the  welding  machines.  The  work  of  numbering  the  joints,  and 
marking  the  area  to  be  welded  is  done  while  the  gang  is  necessarily  off-track  during 
working  hours,  in  the  evenings  when  the  gang  shuts  down  to  let  the  slotter  and 
grinders  complete  their  work,  and  in  the  mornings  when  the  gang  is  being  made 
ready  to  do  its  work. 

For  the  welding,  tliis  railroad  is  using  a  strip  weld  approximately  1/2  inches 
wide  and  this  weld  is  put  on  in  the  center  of  the  rail.  This  program  was  originally 
set  up  to  strip  weld  90-lb  rail  laid  in  1927  and  1928  which  had  become  badly  bat- 
tered due  to  bad  ties,  lack  of  drainage  and  maintenance  of  bolts,  bars,  etc.  With  the 
good  results  achieved  on  the  90-lb  rail,  however,  112-lb  rail  laid  in  1945-46  is  now 
being  strip  welded.  It  was  decided  that  joints  with  0.010  inch  or  less  batter  would 
not  be  welded,  but  the  batter  in  all  the  90-lb  rail  exceeded  this  amount,  making  it 
necessary  to  weld  each  joint. 


Fig.   1 — Tamping  up  joints  to  good  surface. 


394 


Rail 


fig-   2 — Derrick  sets  equipment  on  track. 


Fig.  3 — Preheat  unit  heats  joint  to  900  F. 


Rail 


395 


Fig.  4 — Welder  works  in  sitting  position. 


Fig.   5 — Welding   machine  ond  wire  feed  on  push  cars. 


396 


Rail 


M.    "V. ,' 


Fig.   6 — Finished  weld   before  grinding. 


F'9-  7 — Grinding  weld  with  surface  grinder. 


Rail 


397 


Fig.   8 — Weld  after  grinding. 


Fig.  9 — Using  slotler  to  open  the  joint. 


398 


Rail 


Fig.  10 — Finished  joint. 


IT." 


-if  - 


Fig.   11 — Joint  after  traffic. 


R  ji  i  1 399 

Report   on   Assignment  9 
Standardization  of  rail   sections 

E.  H.  Waring  (chairman,  subcommittee),  S.  H.  Barlow,  A.  N.  Brauer,  R.  D.  Cla- 
BORN,  M.  W.  Clark,  O.  E.  Fort,  C.  E.  R.  Haight,  V.  E.  Hall,  T.  B.  Hutche- 
soN,  B.  R.  Meyers,  C.  E.  Morgan,  G.  L.  P.  Plow,  R.  C.  Postels,  J.  M.  Rankin, 
I.  A.  Reiner,  D.  H.  Shoemaker. 

During  the  past  year  Subcommittee  9  has  secured  from  Canadian  and  United 
States  rail  mills  a  summary  of  the  tonnage  rolled  and  tonnage  shipped  in  each  rail 
section.  A  tabulation  of  that  information  is  included  herewith   (see  next  page). 

It  is  noted  that  848,830  tons  or  76.34%  of  the  total  rail  rolled  in  1969  was  in 
the  sections  to  which  it  is  recommended  that  purchases  of  new  rail  be  limited,  while 
734,551  or  77.45%  of  the  total  rail  shipped  directly  to  North  American  member  roads 
was  in  recommended  sections. 

This  report  is  submitted  as  information. 


400 

Rail 

Rail  Rolled  and 

Shipped  by 

Weight  ane 

>  Sections 

S('(iii>N 

1.969 

Wrighl 

Tons 

Rolled 

Tons  & 

hipped 

Tons 

%  of  Total 

Tons 

%  of  Total 

140* 

AREA 

42,748 

3.84 

38,625 

4.07 

13G 
130* 

NYC 

AREA 

3,295 
14(),577 

0.30 
13.18 

3,295 
115,839 

0.35 
12.21 

133 

132* 

131 

AREA 

AREA 

AREA 

8(),(J7<) 

274,21)4 

209 

7.20 

24.07 

0.02 

01,897 

254,023 

151 

6.53 

26.78 

0.02 

130 
130 

AREA 

PS 

4,575 
592 

0.41 
0.05 

4,000 
300 

0.42 
0.04 

122 

CB 

22,354 

2.01 

22,150 

2.34 

119* 
115* 
112 

CF&I 

AREA 

AREA 

81,000 

274,384 

3,018 

7.28 

24.08 

0.27 

03,447 

240,252 

1,019 

6.69 

25.33 

0.11 

105 
105 

Dudlej^ 

DL 

628 
1,815 

0.00 
0.10 

500 
1,815 

0.05 
0.19 

100 

ARA-A 

123,031 

9,182 

555 

5,75G 

1,503 

1 1 .  00 
0.83 
0.05 
0.52 
0.14 

112,906 

6,269 

266 

11.91 

100* 

100 

100 

AREA 

PS 

ASCE 

REHF 

0.66 
0.03 

100 

1,503 

0.16 

90* 
90 

ARA-A 

ASCE 

20,075 
3,005 

1.86 
0.27 

16,096 
791 

1.70 
0.08 

85 
85 
80 

ASCE 

CPR 

ASCE 

8,020 

054 

3,349 

0.72 
0.00 
0.30 

2,150 
150 

883 

0.22 
0.02 
0.09 

*Sections  listed  on  page  4-M-2  of  the  .\REA  Manual  as  tlio.se  to  which  it  i.s  reoomniended  that  pur- 
chases of  new  rail  be  limited. 


Report  of  Committee  5 — Track 


V.    M.    SCHWING, 

Chairman 

L.  A.  Pelton, 
Vice  Chairman 

B.  E.  Pearson, 
Secretary 

C.  D.  Archibald 

T.    L.    BiGGAR 

R.  E.  KusTON 

£.   C.    HONATH 

C.   J.   McCONAUGHY 

C.  L.  Gatton 
L.  D.  Freeman 
A.  B.  HiLLMAN,  Jr. 

A.  R.  Anthony 

W.    E.    BiLLINGSLEY 
W.    R.    BjORKLUND 

E.  H.  Blank 


C..    B.    BOGGS 

J.  O.  Born 

J.  R.  Bowman 

S.  W.  Brunner 

R.  E.  Bunker 

M.  E.  Byrne 

K.  L.  Clark 

J.  W.  Clarke 

J.  P.  Collins 

W.  E.  Cornell  (E) 

E.    D.    COWLIN 

W.  J.  Crone 

R.  V.  Dangremond 

W.    B.    DWINNEL 

A.  G.  Ellefson 
E.  E.  Fellin 
G.  E.  Fischer 
E.  E.  Frank 

C.  H.  Gaut 
S.  W.  George 

B.  T-  Gordon 
H.  D.  Hahn 
L.  R.  Hall 

V.  C.  Hankins 

R.  J.  Hardenbergh 

J.  R.  Harris 

C.  N.  Harrub,  Jr. 

A.  F.  Huber  (E) 
J.  H.  Hughes 

L.  H.  Jentoft  (E) 

D.  L.  Jerman 

B.  J.  Johnson 
R.  J.  Jones 

R.  A.  Kelso 

C.  N.  King 

L.  T.  Klauder 
G.  G.  Knupp 


E.  J.  LisY,  Jr. 
L.  Masforroll 
J.  R.  Masters 
P.  R.  Matthews 
G.  H.  Maxwell 

A.  E.   MOONEY 

M.  P.  Moore 
C.  W.  Morrison 
T.  C.  Netherton 

B.  W.  Nyland 
W.  B.  O'Sullivan 

C.  A.  Peebles 
G.  H.  Perkins 
George  Perko 
C.  E.  Peterson 
E.  F.  Pittman 
J.  A.  Pollard 

S.  H.  POORE  (E) 
W.  P.  Pope 
L.  E.  Porter 
Bernard  Post 
L.  L.  Rekuch 

R.   P.    RODEN 

J.  M.  Salmon,  Jr.  (E) 
J.  A.  Saunders 

A.    J.    SCHAVET 

R.  N.  Schmidt 

R.  D.  Simpson 

R.  E.  Tew 

J.  E.  Thompson 

R.  W.  Tipper 

A.  C.  Trimble 

J.  J.  Vereen,  Jr. 

K.  H.  VON  Kampen 

W.  J.  Wanamaker 

J.  F.  Warrenfells,  Jr. 

I.  V.  Wiley 

Committee 


( E )  Member  Emeritus. 

Those  whose   names   are   shown   in  boldface,  in  addition  to  the  chairman,  vice  chairman  and 
secretary,  are  the  subcommittee  chairmen. 


To  the  American  Railway  Engineering  Association: 

Your  comniittee  reports  on  the  following  subjects: 

B.  Revision  of  Manual. 
No  report. 

2.  Track  tools. 

Brief  progress  report,  submitted  as  information page  403 

3.  Revision  of  Portfolio  of  Trackwork  Plans  and  Specifications,  collaborat- 
ing as  necessary  or  desirable  with  the  AAR  Mechanical  Division  and 
Communications  and  Signal  Section. 

No  report. 


Note — Discussion  on  subcommittee  reports  herein  closes  on  May    1,   1971. 

401 


402 Track 

4.  Track  design,  collaborating  as  necessary  or  desira])le  witli   Committees 
1,  3  and  4. 

(a)   Bridge  expansion  joints — type,  location  and  necessity. 
( h )   Tie  plates,  inclnding  pads  under  plates. 

(1)    Evaluate  canted  tie  plate  design  relative  to  1:20  cant  vs.   1:40  cant  vs. 
1:14  cant. 

(c)  Hold-down  fastenings: 

( 1 )  Wood  ties 

(2)  Concrete  ties 

( d )  Support  of  track,  including  tie  dimensions  and  spacings. 

Progress  report,  submitted  as   information    page  403 

5.  Turnout   and   crossing   design,   collaborating    as   necessary   or   desirable 
with  Committee  1,  3  and  4. 

(a)  Proper  use  of  various  types  of  tiunout  and  crossing  frogs  related 
to  speed,  tonnage,  etc. 

(b)  Review  guard  rails  opposite   frogs  related  to  speed,  longer  turn- 
outs, longer  cars,  etc. 

(c)  Re-evaluate  explosive  hardening  of  frogs  to  determine  procedures 
and  economics. 

( d )  Evaluate  prestressed  concrete  crossing  support. 

(e)  Improvements  to  manganese  insert  frog  design. 

Progress  report,  submitted  as   information    page  404 

6.  Track  construction,   collaborating  as  necessary  or  desirable  with  Com- 
mittees 1,  3,  4  and  22. 

( a )   Procedure    and    specifications    for,    and   economies    to   be    derived 
from,  building  track  by  the  Panel  Method: 

( 1 )  To  remain  as  paneled  after  relocation. 

(2)  To  have  its  joints  restaggered  after  relocation. 

(3)  Specifications,   plans   and  procedures   for  prefabricating   turn- 
outs in  a  central  shop. 

(4)  Methods    of    moving    prefabricated    turnouts    from    a    central 
shop  to  point  of  use. 

(5)  Methods    of    handling    a    prefabricated    turnout    at    point    of 
renewal  or  installation. 

No  report. 

7.  Track  maintenance,  collaborating  as  necessary  or  desirable  with  Com- 
mittees 1,  3,  4,  22  and  31. 

(a)  Effect  of  lubrication  in  preventing  frozen  rail  joints  and  retarding 
corrosion  of  rail  and  fastenings. 

(b)  Modern    methods    of    heat    treating    carbon    steel    trackwork    and 
repairing  such  trackwork  by  welding. 

(c)  Switch  plate  lubrication. 

Progress  report,  including  report  on  AAR  investigation  of  switch  plate 
lubricating  materials,  submitted  as  information   page  405 


Track 403 

Criteria   for   track   geometry   design   as   related   to   modern   equipment, 
collaborating  as  necessary  or  desirable  with  other  AREA  technical  com- 
mittees,   and  with   the   Engineering,   Mechanical   and   Operating-Trans- 
portation Divisions,  AAR. 
(a)   Special   requirements   of   track   construction   and  maintenance   due 

to  operation  of  equipment  with  high  centers  of  gravity. 
Progress   report,   presented  as   information    page  414 

Special  Subject:  Develop  the  minimum  tangent  distance  between 
reverse  points  of  various  degrees  of  curves  to  permit  negotiation  of 
these  curves  by  89-ft  0-inch  box  cars  having  68- ft  0-inch  truck  centers. 
Progress  report,   presented  as   infonnation    page  414 

The  Committee  on  Track, 

V.  M.  ScHwiNG,  Chairman. 


AREA  Bulletin  631,  January-February  1971. 


Report  on   Assignment   2 
Track  tools 

T.  L.  BiGGAR  (chairman,  siihcommittee),  W.  E.  Billingsley,  G.  B.  Boggs,  S.  W. 
Brunner,  R.  V.  Dangremond,  G.  E.  Fischer,  L.  D.  Freeman,  M.  P.  Moore, 
C.  W.  Morrison,  T.  C.  Netherton,  L.  A.  Pelton,  G.  Perko,  E.  F.  Pittman, 
L.  L.  Rekuch,  V.  M.  Schwing,  R.  W.  Tipper. 

This  is  a  progress  report  submitted  as  information. 

Specifications  and  a  drawing  covering  a  rail  thermometer  were  published  in 
Part  1  of  Bulletin  630,  November-December  1970,  with  the  recommendation  that 
they  be  adopted  and  published  in  Chapter  5  of  the  Manual. 


Report   on   Assignment  4 
Track  design 

E.  C.  HoNATH  (chairman,  subcommittee),  A.  R.  Anthony,  T.  L.  Biggar,  E.  H. 
Blank,  S.  W.  Brunner,  M.  E.  Byrne,  E.  E.  Fellin,  L.  R.  Hall,  R.  J.  Harden- 
BEHGH,  B.  W.  Nylano,  L.  A.  Pelton,  W.  P.  Pope,  R.  N.  Schmidt,  V.  M. 
Schwing,  K.  H.  von  Kampen,  J.  F.  Warkeniells,  Jr. 

Your  committee   submits  the   following  report  as  information. 

During  the  past  year  your  counnittce'  has  coudncd  its  activities  to  participation 
in  the  work  of  the  Special  Comnnttee  on  Concrete  Ties.  During  the  course  of  this 
work  the  committee  developed  certain  information  pertaining  to  its  assignment  on 
"Support  of  Track,  Inchiding  Tie  Dimensions  and  Spacing,"  and  expects  to  prepare 
a  report  on  this  subject  in  1971,  after  completion  of  its  function  with  the  Special 
Committee  on  Concrete  Ties. 


404  Track 


Report   on   Assignment   5 
Turnout  and   crossing  design 

J.  McCoNAuGHY  (charinian,  suhcommittce),  G.  B.  Boggs,  W.  G.  Crone,  A.  G. 
Ellefson,  E.  E.  Fhank,  V.  C.  Hankins,  D.  L.  Jehman,  R.  J.  Jones,  C.  N. 
King,  G.  G.  Knupp,  R.  E.  Kuston,  J.  R.  Masters,  M.  P.  Moore,  L.  A.  Pelton, 
G.  H.  Perkins,  G.  JPerko,  C.  E.  Peterson,  L.  E.  Porter,  A.  J.  Schavet,  \^  M. 
ScHwiNG,  K.  H.  VON  Kampen,  J.  F.  Warrenfells,  Jr. 

Your  committee  submits  the  following  report  as  information: 


PROPER   USE    OF    VARIOUS   TYPES   OF  TURNOUT   AND   CROSSING   FROGS 
RELATED   TO   SPEED,    TONNAGE,    ETC. 

This  assignment  is  still  under  study.  Difficult  inquiries  received  from  various 
railroads  prevent  making  a  satisfactory  recommendation  at  this  time.  Furthennore, 
the  Portfolio  of  Trackwork  Plans  does  not  have  a  plan  for  a  manganese  track  crossing 
covering  angles  from  45  to  90  degrees,  nor  does  it  have  a  track  crossing  plan  cover- 
ing reversible  manganese  inserts.  It  is  the  committee's  desire  to  have  such  plans 
prepared  and  adopted  before  submitting  any  recommendations  under  this  assigmiient. 


REVIEW    GUARD    RAILS    OPPOSITE    FROGS   AS    RELATED   TO   SPEED,    LONGER   TURNOUTS, 

LONGER    CARS,    ETC. 

A  review  was  conducted  and  it  was  resohed  that  the  taper  approaches  on  the 
guard  rails.  Plan  No.  504-55,  should  be  lengthened.  This  was  approved  by  letter 
ballot,  and  a  revised  plan,  submitted  for  adoption  and  inclusion  in  the  Portfolio  of 
Trackwork  Plans,  was  published  in  Part  1  of  Bulletin  630,  November-December  1970. 


RE-EVALUATE    EXPLOSIVE    HARDENING    OF    FROGS    TO    DETERMINE 
PROCEDURES   AND    ECONOMICS 

It  was  approved  by  letter  ballot  to  reword  the  first  paragraph  of  Art.  410, 
Depth  Hardening,  in  the  Specifications  for  Special  Trackwork,  Appendix  A,  page  4, 
of  the  Portfolio  of  Trackwork  Plans,  to  make  it  include  explosive  hardening  as  one 
of  the  methods  that  may  be  employed  to  depth  harden  the  impact  areas  of  frogs. 
Accordingly,  the  revised  version  of  that  part  of  Art.  410  was  published  in  Part  1 
of  Bulletin  630,  November-December  1970,  with  the  recommendation  that  it  be 
adopted  and  published  in  the  Portfolio. 


EVALUATE    PRESTRESSED   CONCRETE    CROSSING   SUPPORT 

The  AAR  Research  Center  has  completed  its  final  report  on  tliis  subject,  which 
will  be  forthcoming. 

IMPROVEMENTS   TO   MANGANESE    STEEL   INSERT   FROG    DESIGN 

This  subject  is  still  under  study. 


Track 405 

Report   on   Assignment   7 

Track  maintenance 

L.  D.  Freeman  (chairman,  sitbcoiniuittee),  J.  O.  Born,  E.  D.  Cowlin,  G.  E. 
Fischer,  C.  H.  Gaut,  S.  W.  George,  B.  J.  Gordon,  C.  N.  Harrub,  Jr.,  J.  H. 
Hughes,  G.  G.  Knupp,  L.  Masforroll,  G.  H.  Maxwell,  C.  W.  Morrison, 
T.  C.  Netherton,  L.  a.  Pelton,  V.  M.  Schwing,  A.  C.  Trimble. 

EFFECT   OF   LUBRICATION    IN   PREVENTING  FROZEN   RAIL   JOINTS   AND   RETARDING 
CORROSION  OF  RAIL  AND   FASTENINGS 

No  further  progress  has  been  made  on  this  assignment,  and  it  is  felt  that  no 
further  knowledge  is  to  be  gained  by  continuing  it.  The  report  published  in  Bulletin 
612,  February  1968,  is,  therefore,  considered  to  be  the  final  report  on  this 
assignment. 

MODERN    METHODS    OF    HEAT    TREATING    CARBON    STEEL    TRACKWORK 
AND    REPAIRING    SUCH   TRACKWORK    BY   WELDING 

A  questionnaire  has  been  circulated  to  approximately  50  railroads  for  the  pur- 
pose of  learning  whetlier  or  not  there  is  anything  new  to  be  learned  on  the  subject 
since  the  report  which  appeared  in  Bulletin  612,  February  1968.  After  the  replies 
to  the  questionnaire  have  been  evaluated,  a  further  report  will  be  made  on  this 
assignment. 

SWITCH    PLATE    LUBRICATION 

Some  further  work  on  this  assignment  is  being  progressed  by  the  AAR  Research 
and  Test  Department.  The  latest  report  of  the  AAR  Research  Center  on  this  subject 
is  presented  below  as  information.  Activity  on  the  assignment  will  be  continued. 

INVESTIGATION    OF     SWITCH    PLATE     LUBRICATING    MATERIALS — PROGRESS    REPORT 
BY   AAR    RESEARCH    CENTER 

Through  an  initial  request  to  the  AREA  by  the  AAR  Communication  and  Signal 
Section  to  develop  information  concerning  the  operation  of  switches,  a  further  request 
was  made  to  the  AAR  Research  Center  by  AREA  Committee  5 — Track,  to  initiate 
an  investigation  relati\e  to  the  merits  of  quick-drying  switch  plate  lubricating 
materials. 

Since  early  1963,  36  separate  tests  of  dry-type  lubricants,  most  of  them  having 
a  graphite  base,  have  been  conducted  at  the  Research  Center  in  a  specially  designed 
switch  plate  slippage  machine.  This  machine  is  actually  a  portion  of  a  switch  assem- 
bly and  is  designed  to  evaluate  the  lubricating  and  endurance  qualities  of  the 
lubricant  applied  to  the  switch  plates  (Figs.  1  and  2). 

Tests  1  through  17  were  reported  on  in  1966  and  the  results  published  in  AREA 
Bulletin  605,  February  1967.  Five  tests,  Nos.  18  through  22,  on  newer  products  were 
reported  on  in  August  1968.  Tests  23  through  36  lia\e  been  conducted  since  then, 
and  a  summary  of  all  tests  conducted  to  date  is  included  herein.  The  sununary  of 
the  switch  plate  lubrication  tests  shows  the  lubricants  tested  and  the  qualities  of 
each,  such  as  drying  time,  average  force  required  to  throw  the  switch  rails  and  the 
condition  of  the  material  after  15,000  cycles  of  switch  point  movement. 


406 Track 

Tests  1  throiijuh  20  were  conducted  on  materials  that  were  applied  to  the  switch 
plates  of  the  switch  plate  slippage  machine  at  the  Research  Center  either  by  brush- 
ing on  or  spraying  on.  Tests  21  and  22  were  conducted  with  plates  furnished  by  the 
manufacturer  with  the  lubricant  already  applied  to  the  plates  at  the  factory.  Dixon 
No.  53  Permanent  (test  21)  was  applied  to  the  slide  surfaces  of  the  switch  plates  by 
the  bru.sh  or  .spray  method  and  the  Dixon  Plastic  C.raphite  Casting  (test  22)  was  a 
/H-in. -thick  plate  of  the  lubricant  material  affixed  to  a  standard  switch  plate  at  the 
factory  by  an  adhesion   method   (Figs.  3  and  4). 

The  Union  Carbide  Stellite  No.  6  weld  material  applied  to  new  .switch  plates 
as  ribs  (test  No.  23)  was  considerably  harder  than  the  switch  points,  causing  wear 
as  indicated  in  the  table.  These  plates  were  prepared  and  furnished  by  Linde  Divi- 
sion, Union  Carbide   (Figs.  5  and  6). 

Tests  24  through  28  were  on  materials  produced  in  Canada,  and  evaluations 
on  these  were  requested  by  the  Canadian  National  Railways.  The  Susgra  Methcol 
B.S.  1407  remained  tacky  and  could  not  be  properly  used  on  switch  plates.  The 
Molub  Alloy  greases  produced  low  force  values  after  15,000  cycles  of  operation, 
but  as  greases  they  would  not  dry. 

The  Research  Center  has  been  interested  for  some  time  as  to  how  Teflon  would 
perform  as  a  lubricant,  and  one  application  now  under  test  is  its  use  as  a  liner  on 
the  interior  of  brake  cylinders  for  freight  service.  Teflon  and  a  Teflon  base  material 
have  now  been  tested  as  switch  plate  lubricants,  tests  29,  30  and  34.  The  Fluorocar- 
bon  Company  furnished  the  Reinforced  Teflon  Slide  Bearing  Material  known  as 
Fluorogold  in  strips  for  application  to  switch  plates  (Figs.  7  and  8).  This  material 
is  used  widely  as  structural  slide  bearing  plates.  The  testing  on  the  switch  plates 
indicates  a  low  force  required  for  switch  point  throw  and  negligible  wear  after 
15,000  cycles  of  switch  point  movement.  The  Teflon  "S"  applied  to  plates  and 
mounted  in  the  test  machine  did  not  perform  as  well  as  the  Fluorogold  because 
the  Teflon  scraped  ofl  readily  as  the  switch  points  moved  across  the  plates,  with  the 
result  that  a  higher  force  was  recorded  to  move  the  switch  point  assembly. 

Tests  31  through  33  were  of  materials  furnished  by  Electrofilm,  Inc.,  namely 
Lubri  Bond  "A"  and  Lubri  Bond  "J",  which  are  spray-on  types  of  graphite  material, 
and  L.  P.  X34908,  which  is  a  brush-on  graphite  base  material.  All  are  quick  drying. 
The  Electrofilm  Phos — 66C  and  77S,  tests  35  and  36,  are  new  experimental  materials 
and  were  applied  to  the  steel  plates  by  a  high-heat  baking  process. 


Track 


407 


B       3        >, 


a  —         r^ 


S         C         G 


C         -i         C         C         C 


in        ^ 


I 


(^ 


CO  'H  ^ 


o         o         o 


_ i  —  -^  ^ 


^      «      3: 


6     3 


K 

■n 

03 
X 

'H 

J 

3 

« 

^^ 

n 

.^ 

_■ 

t^^ 

3 

— 

C^ 

U 

'R 

u 

CO 

■^ 

Q  n 

1^ 
OT   IS 

'3 

M 

0 

n 

in 

-3     3 


,-; 

.-; 

o 

o 

c 

c 

CJ 

a 

:j 

a 

'J^ 

'>i 

-r        a, 


a    3 


az 


408 


Track 


9-  C 


a  ._  >2 


S  < 


<U    ^     QJ  —     _ 


-^         T.         T. 


^ 

0) 

o 

^4 

^ 

tn 

M 

m 

> 

w 

< 

H 

2; 

CO 

O 

o 

H 

a> 

o 

< 

c 

O 

Ul 

oj  O 

ho 

'^ 

o 

Q 

<: 

1-1 

PM 

O     <B 

K 

.   o 

O 

o    >, 

H 

Z  u 

^ 

CQ 

>^ 

pe; 

<; 

g 

o 

X       M 


.^  ^~.  7i 


a       ^        m 


c        -::        -; 


M  -r    T3 


-;;        "t;         <u 


H  2 


iH  r-<  W 


Track 


-^         -n         -n 


aj  t:        ^ 


^9         5-  K 


409 


■i   H   -J 


be    C 


Z  U 


tc  S- 


rJ     u    =£    en 


— .  a: 


410 


Track 


Fig.    1 — Switch   plate   lubrication   test    machine. 


f^'g-    2 — Switch    driving    mechanism,    showng    load    cell    and    strain    gage    indicator. 


Track 


411 


Fig.    3 — Dixon    plastic    graphite    casting. 


Fig.    4 — Dixon    plastic    gtaphitc    casting 


412 


Track 


Fig.    5 — Union   Carbide  Stellite  No.    6  welded  ribs  on   standard   plates. 


Fig.   6 — Union   Carbide  Stellite  No.   6  welded  ribs  on   standard   plates. 


Track 


413 


Fig.    7 — Fluorocarbon    (Teflon)    plates    mounted    on    switch    plates. 


Fig.    8 Detail   of   tack   welded   fluorocarbon    plates   and  wear   pattern   of   Teflon   motcri.il 


liiii.  6:u 


414 Track 

Report   on   Assignment   8 

Criteria  for  track  geometry  design  as  related  to 
modern   equipment 

A.  B.  HiLLMAN  (chairman,  suhcoinmittee),  W.  R.  Bjorklund,  J.  R.  Bowman,  R.  E. 
BuNKEK,  W.  B.  DwiNNELL,  B.  J.  JoHNsoN,  R.  A.  Kelso,  L.  T.  Klauder,  W.  B. 
O'SuLLivAN,  B.  E.  Pearson,  L.  A.  Pelton,  B.  Post,  L.  L.  Rekuch,  V.  M. 
ScHAviNc;,  R.  E.  Tew,  J.  E.  Thompson,  W.  J.  Wanamaker. 

SPECIAL   REQUIREMENTS   OF   TRACK    CONSTRUCTION   AND   MAINTENANCE   DUE   TO 
OPERATION    OF   EQUIPMENT   WITH    HIGH    CENTERS    OF   GRAVITY 

On  page  620  of  Bulletin  626  for  February  1970  your  committee  reported  that 
subcommittee  reports  on  this  subject  as  presented  in  Bulletins  621  and  605  would  be 
presented  to  the  Board  Committee  on  Manual  for  review  to  see  what  might  be  pub- 
lished in  the  Manual.  The  Board  Committee  on  Manual  did  review  the  Bulletin  621 
and  605  reports  and  has  returned  the  assignment  to  the  subcommittee  with  the 
request   that  the  subcommittee  present   their  recommendations   in   a  different   form. 

SPECIAL    SUBJECT:    DEVELOP    THE    MINIMUM    TANGENT    DISTANCE    BETWEEN    REVERSE 

POINTS   OF  VARIOUS   DEGREES   OF  CURVES  TO   PERMIT  NEGOTIATION   OF  THESE 

CURVES   BY   890"   BOX   CARS    HAVING   680"   TRUCK   CENTERS 

Using  information  obtained  from  tests  made  at  the  AAR  Research  Center  with 
a  track  and  car  model  system,  your  subcommittee  proposes  that  the  following  rule 
be  adopted  for  design  of  industry  tracks  and  tracks  where  high  coupler  force  would 
not  be  experienced: 

"A  length  of  tangent  should  be  placed  between  the  two  portions  of  a 
reverse  curve  to  afford  satisfactory  movement  of  coupled  cars  of  any  com- 
bination of  lengths  for  curvatures  of  8  degrees  and  over,  unless  spirals  have 
been  provided.  The  following  table  gives  minimum  lengths  of  tangents  which 
should  be  provided: 

Degree  of  Curvature  Length  of  Tangent  in  Feet 
Under  8  degrees  0 

8  "  10 

9  "  20 

10  "  30 

11  "  40 

12  "  50 

13  "  60 

14  "  70 

15  70  (end  of  quote) 

The  tangent  distances  shown  in  the  tabic  will  permit  negotiation  of  the  cor- 
responding reverse  curves  by  long  cars  now  in  service  without  exceedings  the  maxi- 
mum coupler  angles  permitted  by  the  striker  opening.  The  rule  is  of  no  use  where 
high  coupler  force  (200,000  lb)  would  be  experienced  because  wheel  lift  would 
impend  at  a  smaller  coupler  angle  than  would  be  obtained  in  negotiating  an  8-degree 
curve.  (See  AAR  Research  Center  report  on  Tracking  Characteristics  of  Long  Cars 
on  Crossovers,  April  14,  1969) 

The  above  rule  will  be  put  before  the  full  committee  to  determine  if  it  should 
be  presented  for  adoption  as  Manual  material. 


Report  of  Committee  31 — Continuous  Welded   Rail 


B.  J.  Johnson, 
Chairman 

B.  J.  Gordon, 
Vice  Chairman 

E.    M.    CUMMINGS, 

Secretary 
J.  D.  Case 

E.   ESKENGHEN 
J.    T.    HiNER 

R.  E.  GoRsucH 

H.    F.    LONGHELT 

K.  H.  Kannowski 

C.  E.  Akidakis 
R.  M.  Ansel 


S.  H.  Barlow 
W.  P.  Beesley 
C.  M.  Bowman 
R.  M.  Brown 
M.  E.  Byrne 
J.  E.  Campbell 
L.  S.  Crane 

A.  R.  DeRosa 
R.  E.  Dove 

B.  R.  Forcier 
O.  E.  Fort  (E) 
R.  E.  Frame 

L.  D.  Freeman 
G.  R.  Fuller 
A.  H.  Galbraith 
R.  G.  Garland 
W.  J.  Gilbert 

C.  W.  Grater 
G.  J.  Harlock 
J.  W.  Harper 
C.  R.  Harrell 
R.  R.  Hart 

L.  R.  Henderson 

R.  S.  Henry 

M.  C.  Holowaty 

F.  E.  Hxjddleston 
r.  a.  hunziker 
t.  b.  hutcheson 
W.  D.  Hutchison 
W.  J.  Jones 

G.  G.  Knupp 
W.  S.  Lovelace 

K.   J.    LUDWIG 


|.  F.  Lvle 
j.  A.  MacNab 
L.  H.  Martin 
G.  H.  Maxwell 
C.  E.  McEntee 

A.  S.  McRae 

C.  R.  Mehriman 

M.    MiCHAUD 

R.  H.  Miller 

C.  E.  Morgan  (E) 

J.  P.  Morrissey 

"S.  H.  POORE   (E) 

B.  R.  Prus.\k 

F.  L.  Rees 
M.  S.  Reid 

W.  E.  Roberts' 
R.  P.  Roden 
R.  Rotter 
E.  C.  Rudolph 
J.  R.  Rymer 

C.  N.  Scott 
T.  C.  Shedd 

I.  M.  Simmons 
C.  R.  Sthutz 
V.  R.  Terrill 

G.  R.  Thurston 
R.  H.  Uhrich 
H.  J.  Vale 

C.  W.  Wagner 
M.  S.  Wakely 
E.  H.  Waring 
C.  E.  Weller 

Comviittee 


(  E )  Member  Emeritus. 
"  Deceased. 

Those  whose  names   are  shown  in  boldface,   in  addition  to  the   chairman,  vice  chairman  and 
secretary,   are  the  subcommittee  chairmen. 

To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 


1.  Fabrication. 

Statistics  on  butt  weld  failures,  presented  as  infonnation 


page  417 


2.  Laying. 

Statistics  showing  track  miles  of  CWR  laid  by  years  since  1933, 
presented   as   infonnation    page  418 

3.  Fastenings. 
No  report. 

4.  Maintenance. 

Subcommittee  4  is  preparing  a  report  on  the  subject  of  Repairs  to  Weld 
Failures  in  the  Field.  A  report  on  this  assignment  will  be  presented 
next  year. 


415 


416 Continuous    Welded    Rail 

5.   Layout  of  fixed  and  portable  weldinj^  plants, 

A  report  on  this  assignment  will  be  presented  next  year. 

7.   Field  welding. 

Material  on  Thermite  Welding — Rail  Joints,  recommended  as  Manual 
material,  was  published  in  Part  1  of  Bulletin  630,  November-December 
1970. 

The  Committee  on  Continuous  Welueu  Rail, 

B.  J.  Johnson,  Chairman. 


AREA   Bulletin   631,   January-February   1971. 


aMiUiam  Cbtoarb  laobcrtsi.  3ft. 
1922=1970 

William  Edward  Roberts,  Jr.,  supervisor  rail  and  welding,  Chicago,  Rock  Island 
&  Pacific  Railroad,  Chicago,  passed  away  on  July  9,  1970,  at  the  age  of  47.  Born 
and  raised  in  Weston,  Mo.,  he  attended  Weston  Public  Schools  and  continued  his 
education  at  the  University  of  Missouri,  Wni.  Jewell  College,  and  Nebraska  State 
College.  He  enlisted  in  the  United  States  Navy  on  February  30,  1946,  and  entered 
acti\'e  duty  on  August  22,  1950,  shortly  thereafter  going  to  Korea.  Mr.  Roberts  was 
decorated  with  the  Korean  Service  Medal  and  the  United  Nations  Medal,  returning 
to  civilian  life  on  January  27,  1952. 

Mr.  Roberts  joined  the  Rock  Island  in  January  1953  as  an  electrical  technician, 
became  welding  supei-visor  on  October  5,  1960,  and  was  promoted  to  engineer  of 
track  on  January  1,  1966.  He  was  promoted  to  supervisor  rail  and  welding  on 
December  1,  1968. 

Mr.  Roberts  became  a  member  of  the  AREA  in  1961  and  a  member  of  Com- 
mittee 31  in  1965.  During  this  period,  he  gave  of  his  time  and  energy  and  in  1967 
was  duh-  appointed  chainnan  of  Subcommittee  6,  presiding  in  this  position  through 
1969.  Committee  31  joins  in  mourning  tlie  loss  of  our  fellow  committeeman  and  will 
sorely   miss  the  many  valuable  services  performed  by  him  during  his  membership. 

Sur\i\ing  Mr.  Roberts  are  his  wife,  Marjorie  (nee  Gleason)  of  Tampa,  Fla.,  his 
mother,  Mrs.  Mary  Jane  Collins  Roberts  of  Weston;  tliree  sisters,  Mrs.  Lenora  Bailey 
of  Kansas  City,  Kan.,  Mrs.  Elizabeth  Suttles  of  Overland  Park,  Kan.,  Mrs.  Ceraldine 
Skinner  of  Camden  Point,  Mo.;  and  a  brother,  Mitchell  Roberts  of  Weston.  Place  of 
interment  is  Pleasant  Ridge  Cemetery,  Weston. 

A  \'oid  now  exists  with  this  man's  passing  and  only  a  fond  memory  remains. 
He  was  a  man  of  courage,  character  and  humility,  all  of  which  made  him  a  man 
to  be  lo\ed  and  respected  by  those  who  knew  and  will  long  remember  him. 


Continuous    Welded    Rail 


417 


Report  on   Assignment    1 
Fabrication 

J.  D.  Case  (chairman,  subcommittee),  S.  H.  Barlow,  A.  R.  DeRosa,  G.  R.  Fuller, 
A.  H.  Galbhaith,  B.  J.  fiORDON,  G.  W.  Grater,  B.  J.  Johnson,  A.  S.  McRae, 
M.  MiCHAUD,  R.  H.  NIiller,  G.  W.  Wagner. 

BUTT   WELD    FAILURES 

In  1962,  it  was  decided  that  it  would  be  desirable  to  have  a  record  of  failures 
in  the  different  types  of  butt  welds.  Table  1  shows  the  accumulated  failures  to 
December  31,  1969,  as  reported  on  Form  402E.  This  record  is  part  of  a  compilation 
of  data  on  rail  failures  of  all  types  reported  to  December  31,  1969,  by  railroads  that 
are  responsible  for  approximately  90%  of  the  main  track  mileage  of  Glass  I  Roads. 
The  reports  are  furnished  on  a  voluntary  basis  by  railroads.  Howexer,  given  the  fact 
that  most  failures  are  reported  by  a  small  number  of  railroads,  it  is  exident  that  there 
is  little  unifomiity  in  reporting  failure  data.  Therefore,  it  is  not  feasible  to  draw 
definitive  conclusions,  except  on  the  assumption  that  each  railroad  has  been  con- 
sistent in  its  reporting  practice.  In  that  case,  trends  can  be  examined.  However, 
absolute  comparisons  and  total  failure  rates  cannot  be  derived  from  the  data. 

This  report  is  a  technical  ser\'ice  of  the  Research  and  Test  Department  of  the 
Association  of  American  Railroads  in  response  to  a  continuing  request  for  this 
information. 


table    1 

ACCLTHULATED  butt  weld  FAlLlTtES  TO  DECEMBER  31,   1969 


Number 

of 
Welds 

Weld 
Years 

FAILURES 

Failures 

per  100 

Weld  Years 

Average 

Weld  Age 

Years 

Service 

Detected 

Total 

2 

■c   CO 

S.  ^ 

1   « 

z  « 

2,696.305 

13,266,585 

407 

94 

501 

0.0038 

4.92 

1,078,631 

4,031,545 

372 

53 

425 

0.0105 

3.74 

01 

~-  S. 

V  S) 

>.    3 

o 

Z  S                993.138 

6,779,182 

323 

253 

576 

0.0085 

6.83 

546.169 

2,168,849 

433 

158 

591 

0.0270 

4.01 

2 

1 

11 

13,448 

56,957 

209 

47 

256 

0.4494 

4.24 

>.  — 

15.938 

39,557 

64 

63 

127 

0.3210 

2.4« 

418 


Continuous    Welded    Rail 


Report  on   Assignment  2 
Laying 

E.  EsKENGREN  (chairman,  subcommittee),  R.  M.  Brown,  M.  E.  Byrne,  J.  E.  Camp- 
bell, R.  E.  Dove,  B.  J.  Gordon,  J.  W.  Harper,  L.  R.  Henderson,  W.  D. 
Hutchison,  B.  J-  Johnson,  F.  L.  Rees,  M.  S.  Wakely,  E.  H.  Waring. 

Your    committee    submits    as    information    the   following   statistics    showing    the 
number  of  track  miles  of  CWR  laid,  by  years,  since  1933. 


Track  Miles   of  Continuous  Welded  Rail  Laid  by  Years,   1933-1970 


1933 0 .  Ifi 

1934 0.95 

1935 4.06 

1936 1..52 

1937 31.23 

1939 6.04 

1942 5.48 

1943 6.29 

1944 12.88 

1945 4.81 

1946 3.91 

1947 18.70 

1948 29.93 

1949 33.05 

1950 50 .  25 

1951 37.25 

1952 40.00 

1953 80.00 

1954 87.00 


0X2/- 

Electric 

acetylene 

Flash 

Total 

1955 

194.50 

72 

266.50 

1956 

372.33 

89.10 

461.43 

1957 

390.47 

159.65 

550.12 

1958 

148.11 

312.13 

460.24 

1959 

378.65 

691.92 

1070.57 

1960 

299.42 

961.20 

1260.62 

1961 

94.13 

926.50 

1020.63 

1962 

310.59 

1183.34 

1493.93 

1963 

497.52 

1300.48 

1858.00 

1964 

586.76 

1796.74 

2383.50 

1965 

700.59 

1655.74 

2356.33 

1966 

746.61 

1984.71 

2731.32 

1967 

784.28 

1800.27 

2584.55 

1968 

643.10 

2543.61 

3186.71 

1969 

674.35 

2930.01 

3604.36 

1970 

800.30 

5378.32 

6178.62 
31920.94 

Breajk-Down  of  Continuous  Welded  Rail  Laid  in  1970 — Track  Miles 


Oxyacetylene 

Electric  Flash 

Totals 

New 

Second- 
Hand 

New 

Second- 
Hand 

Main  Track 

Sidings  and  Yard 
Tracks  .     _     

304.10 

466.70 
29.50 

2375.22 
0.50 

2941.12 
61.48 

6087.14 
91.48 

304.10 

496.20 

2375.72 

3002.60 

6178.62 

EVELLING,  LINING,  TAMPING... 

I  ONE  OPERATION,  with  ONE  OPERATOR 


.£LECTRONIC 
REFERENCE 


. FEELER 
detects  position 
of  track  in  spiral 
or  curve  at  every 
tie  and  feeds 
Intormation  to 
"AutO'Control" 


WORKING 
SHADOW  BOARD 
controls  lining  at 
point  where 
lining,  levelling 
and  tamping^ 
la  done. 

RECEIVER 
BUGGY 
"Auto-Control" 
continuously 
positions 
receivers 
electronically  to 
satialy  ideal  curve 
requirements  and 
establishes 
required  amount 
0/  track 
correction. 


The  Autojack  Electromatic 
with  Autoliner  leads  the  way 
through  these  advantages: 

•  Gives  the  highest  possible  degree  of  accuracy  by  electronic 
beams  projected  100  feet  in  advance  of  where  levelling, 
lining  and  tamping  are  taking  place. 

•  Automatic,  continuous  operation  for  both  tangent  and 
curve  track.* 

•  No  plotting  of  spirals  or  curves  required.  Machine  computes 
as  it  runs  for  the  best  transition. 

•  No  disturbing  or  humping  of  track  —  lining  takes  place 
simultaneously  with  lifting  and  tamping  ahead  of  tamping 
tools. 

•  With  the  Autoliner,  it  is  possible  to  make  a  minute  throw 
and  have  it  stay  there  because  tamping  is  done  in  correct 
alignment. 

"Model  ALT  for  Tangent  track  and  Model  ALC  (or  Tangent 
and  Curve  Track,  both  available  as  attachments  for 
existing  AUTOJACK  ELECTROMATICS. 


i   Head  Office  &  Plant  — 240i   Ed- 

;   mund   Rd.,  West  Columbia,  S.  C. 

;    29169     •    803/794-9160 
Plant — 160   St.   Joseph   Blvd., 
Lachlne  (IVlontreal),  Que.,  Canada 
•   514/637-5531 
Paris   Depot  — 1902    University 

■  Ave.,  St.  Paul,  Minn.  55115  • 
612/645-5055 

:  Sales,  Service  &  Parts  —  Tamper 
(Australia)  Pty.  Ltd.,  34  Mcin- 
tosh St.,  Airport  West,  G.P.O. 
Melbourne,    Victoria    3042,    Aus- 

i   tralia    •    379-8441 


418-2  Advertisement 


^ 


WOODINGS-VERONA  TOOL  WORKS 


Pioneer  Manufacturers 

ol 

HIGH  GRADE  TRACK  TOOLS 

and 

SPRING  WASHERS  FOR  TRACK 

Since  1873 

VERONA,  PA.  CHICAGO,  ILL. 


WOODINGS  FORGE  &  TOOL  COMPANY 

Makers 

of 

WOODINGS  RAIL  ANCHORS 

VERONA,  PA.  CHICAGO,  ILL 


Assure  lower  maintenance  costs,  better  performance  with 

Texaco 

Railroad  Lubricants 

and  Systematic 

Engineering 

Service 

New  York  •  Atlanta  •  Chicago  •  Minneapolis  •  St.  Louis  •  San  Francisco 


LAYING  WELDED  RAIL 


MODEL  441 

Developed  and  Built 
for  Railroad  Maintenance 

180°  BOOM  SWING 

dOiS  ALL  JOBSi 


72  fASl  CHANGE  ATTACHMENTS 


Forks 

1U  Cu.  Yd.  Bucket 

Tote  Hook 

18'  Boom  Extension 

Fork  Tie  Baler 

Track  Cleaning   Bucket 

Optional  AttochmenI 
Flanged   Wheels,   Hydraulicolly  Co'ilrolled 


Back   Hoe 

Clamshell 

Bock  Filler  Blade 

Pull   Drag   Bucket 

4  Cu.  Yd.  Snow  Bucktt 

Pile  Hommer 


PETTIBONE  MULLIKEN  CORPORATIOI 


RAILROAD 


mM" 


DIVISION 

141    W.   JACKSON        \7.^^  CHICAGO  *,  III 

80  Years  of  Service 
to  the  Railroad  Indusfry 


WIDE  TRACK  CLEANING  BUCKET 


Advertisement 


KEEPING  TRACK 
IS  OUR  BUSINESS! 


r 

•  ABRASIVE  RAIL 
CUTTER 

•  RAIL  WELDING     ^^H 
^^;  SYSTEMS     ^^H 

•  WELDED  RAIL  LAYING     ^^H 
SYSTEM     ^^H 

•  6-HOLE  RAIL  DRILL 

WELDED  RAIL  TRANSPORT    ^^H 

•  STRUCTURAL 

CLEARANCE  RECORDERS 

ORGOTHERM  INC.  SALES        ^^^| 

^1 

k      ©1969  CHEMETRON  CORPORATION 

CHEMETRON  CORPORATION 
RAILWAY  PRODUCTS  DIVISION 


2  NORTH  RIVERSIDE  PLAZA,  CHICAGO,  ILLINOIS  60606 

jchemetron] 


TRADEMARK 


Report  of  Committee  6 — Buildings 


D.  A.  Bessey,  Chairman 

C.  R.  Madeley, 
Vice  Chairman 

O.  C.  Denz,  Secretary 


W.  C.  Sturm 
G.  J.  Chamraz 
J.  A.  Penner 

A.    R.    GUALTIERI 

T.  H.  Seep 
J.  H.  Adams,  Jr. 
W.  F.  Armstrong 
F.  R.  Bartlett 
C.  I.  Bleul 

E.  P.    BOHN 

W.  L.  Burgess 
R.  R.  Cahal 
A.  C.  Cayou 
A.  W.  Charvat" 

F.  D.  Day 
C.  M.  Diehl 
I.  G.  Forbes 

J.  D.  Giallombardo 

C.  S.  Graves 
R.   Hale 

W.  G.  Harding  (E) 
J.  W.  Hayes 
H.  R.  Helker 

D.  K.  Hennessy 


S.  B.  Holt 
K.  E.  Hornung 
W.  G.   Humphreys 
G.  R.  Hunt 

J.    R.    HURSH 

D.  F.  Logan 
R.  J.  Martens 
W.  K.  McFarling 
G.  H.  McMillan 
L.  S.  Newman 
L.  J.  Nichols 
L.  A.  Palagi 
P.  W.  Peterson 

R.    D.    POWRIE 

J.  G.  Robertson 

J.    B.    SCHAUB    (E) 

H.  A.  Shannon,  Jr. 

J.    S.  Smith 

R.  C.  Smith 

S.  G.  Urban 

O.  G.  Wilbur  (E) 

T.  S.  Williams  (E) 

C.   B.  Zimmerman 

Committee 


"  Died  June  21,  1970. 
(  E  )  Member  Emeritus. 

Those  whose   names   are  shown  in   boldface,    in   addition  to  the   chairman,  vice  chairman   and 
secretar>%   are  the   subcomniittee  chairmen. 

To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

B.  Revision  of  Manual. 

New  material  on  design  criteria  for  railway  office  buildings,  recom- 
mended for  adoption  and  publication  in  the  Manual,  was  published  in 
Part  1  of  Bulletin  630,  Xon  ember-December  1970. 

1.  Building,    platfoniis,    ramps,    p:i\iug,    lighting    and    other    facilities    for 
piggyback  terminals. 

No  report. 

2.  Computer  uses  for  railway  building  design,  collaborating  as  necessary 
or  desirable  w  ith  Gounnittee  32. 

No  report. 

3.  Design  criteria  for  diesel  service  and  repair  shop.s. 
No  report. 

4.  Design  criteria  for  spot  car  repair  facilities. 

No  report. 

The  CoMMirTEE  on  Buiiding-s, 

D    A.  Rkssiv    Chaiiman. 


AREA   Bulletin   631.  January-February    1971. 

419 


420 Buildings 


laintfjonj)  m.  Cfjarbat 

1908=1970 

Anthony  W.  Cliai\at,  a  member  of  AREA  and  Committee  6  since  1962,  and 
a  subcommittee  chairman  in  1967,  died  on  June  21,  1970.  At  the  time  of  his  death 
he  was  engineer  of  buildings  for  the  Chicago,  Rock  Island  &  Pacific  Railroad.  Sur- 
vivors include  his  widow,  Eleanor;  and  two  sons,  Anthony  and  John. 

A  native  of  Chicago,  Mr.  Charvat  was  born  on  November  13,  1908.  He 
attended  Chicago  public  schools  and  was  a  graduate  of  Armour  Institute  of  Tech- 
nology. He  was  registered  in  the  State  of  Illinois  as  an  architect  and  as  a  professional 
engineer. 

Mr.  Charvat  began  his  engineering  career  with  the  City  of  Chicago.  He  began 
his  railroad  career  on  March  30,  1943,  with  the  Rock  Island  in  Chicago,  as  an 
inspector  draftsman  in  the  building  department.  He  progressed  through  the  depart- 
ment, holding  titles  of  draftsman,  system  building  inspector,  assistant  engineer  of 
buildings,  engineer-architect,  and  engineer  of  buildings. 

"Tony",  as  he  was  known  by  his  many  friends,  was  respected  for  his  integrity 
and  high  standards  of  engineering  performance.  One  of  Tony's  prime  interests  was 
training  and  coaching  young  architectural  and  engineering  graduates  who  worked 
under  his  direction.  To  them  he  imparted  his  own  desire  for  excellence. 

Tony  Charvat  was  a  devoted  family  man,  and  a  good  and  loyal  friend. 

W.  C.  Humphreys 
L.  A.  Palagi 
Memorialists 


Report  of  Committee  7 — Timber  Structures* 


W.  A.  Thompson, 
Chairman 

J.    J.    RiDGEWAY, 

Vj'ce  Chairman 
J.  W.  Chambers, 
Secretary 


J.    BUDZILENI 

R.  E.  Anderson 
W.  S.  Stokley 
G.  N.  Sells 

J.    A.    GUSTAFSON 
L.    R.    KUBACKI 

C.  V.  Lund 

D.  L.  Walker 
F.  E.  Schneider 

W.  L.  Anderson 
B.  Bohannon 
N.  D.  Bryant 
T.  P.  Burgess 

F.  H.  Cramer  (E; 
B.  E.  Daniels 

K.  L.  DeBlois  (E; 

D.  J.  Engle 

G.  Gabel,  Jr. 
S.  L.  Goldberg 

E.  S.  Gordon 
D.  C.  Gould 

S.  F.  Grear  (E) 
R.  W.  Gunther 
J.  A.  Hawley 


J.    F.    HOLMHERG 

J.  E.  Hutto 
J.  H.  HuzY 

B.  J.  King 

D.  I.  Kjellman 

R.   E.    KUEHNER 

M.  J.  Marhjw 
T.  K.  May 

J.  W.  N.  Mays 

D.   II.   McKlBBEN 

C.  H.  Newlin 
W.  A.  Oliver 
J.  A.  Peterson 

N.    I.   PiNSON 

M.  J.  Rhude 

D.  V.  Sartore 
J.  G.  Shope 
N.  E.  Smith 
H.  R.  Stokes 
J.  W.  Storer 
I.  W.  Thomas 
N.  E.  Whitney 
S.  J.  Zajchowski 

Committee 


( E )  Member  Emeritus. 

Those  whose  names   are   shown  in  boldface,    in   addition  to  the   chairman,  vice  chairman  and 
secretary,   are  the  subcommittee  chairmen. 

To  the  American  Railway  Eii^.incciin^  Association: 

Your  coniinittee  reports  on  the  followinjf  subjects: 

B.  Revision  of  Manual. 

It  was  anticipated  that  work  on  con\erting  Chapter  7  to  the  decimal 
system  format  would  be  completed  by  now.  However,  it  developed 
into  a  larger  job  than  originally  contemplated,  and  we  now  propose 
to  have  this  work  completed  by  September  1971. 

2.  Grading  rules  and  classification  of  limber  for  railway  uses;  .specifica- 
tions for  structural  timber,  collaborating  with  otiier  organizations 
interested. 

\ew  industry  grading  rules  were  scheduled  for  publication  in  the  Fall 
of  1970.  Subcouunittee  2  will  evaluate  these  new  industry  standards 
prior  to  revising  otu-  grading  rules. 

3.  Specifications  for  design  of  wood  bridges  and  trestles. 
Subcommittee  3  is  currently  studying  effects  of  longitudinal  forces  on 
timber   structures    and   re-evaluating   design   criterion   u.sed    by   Com- 
mittee 7  as  opposed  to  designing  for  E  80  loadnii' 


"  Attention  is  directed  to  the  fact  that  Committee  7's  njinie  ii  i 
Bridijes  and  Trestles"  to  "Timber  Structures."  The  chance  was  made 
of  the   committee   and  was   approved   by   the   Board  of  Direction  on   Nc 


appioval 


421 


Hill.  (i-M 


422  Timber    Structures 


4.  Methods     of     fircproofiiiy     wood    hiid^es    and    trestles,    ineliiding   fire 
retardant  paints. 

Nothing  significant  has  been  dewloped  in  the  study  to  date;  liow- 
ever,  your  committee  continues  to  search  for  new  products  which 
nnght  offer  possibilities. 

5.  Design   of  structural   glued-laminated  wood  bridges  and  trestles. 
Work  by  this   committee  is  held  up  pending  results  of  tests  being 
made    by    the    AAR    Research    Center    on    full-size    glued    laminated 
stringers. 

6.  Evaluation  of  cost  of  \  arious  sizes  of  bridge  timbers. 

Evaluation  of  data  collected  from  many  railroads  and  siipjiliers  is  now 
under  way. 

7.  Repeated  loading  of  timber  structures. 

Progress  report,  presented  as  information    page  422 

9.   Study  of  in-place  preserxatixe  treatment  of  timber  trestles. 

Nothing  significant  has  happened  since  the  publication  in  1969  of 
AAR  Engineering  Report  86.  Additional  tests  are  scheduled  for  the 
future  to  develop  the  retentive  characteristics  of  penta  solution  in 
timber. 

10.  Non-destructive  testing  of  wood. 

The  subcommittee  is  continuing  to  search  for  new^  procedures  to  test 
for  internal  defects. 

The  Committee  on   Timber  Structures, 

W.  A.  Thompson,  Chairman. 


AREA  Bulletin   631,  Jaiiuary-Febniary   1971. 


Report   on   Assignment   7 
Repeated   loading  of  timber  structures 

C.  V.  Lund  (chairman,  subcommittee),  W.  L.  Anderson,  R.  E.  Anderson,  Billy 
BoHANNAN,  N.  D.  Bryant,  James  Budzileni,  D.  J.  Engle,  J.  F.  Holmberg, 
L.  R.  KuBACKi,  T.  K.  May,  W.  A.  Oliver,  J.  E.  Peterson,  M.  J.  Rhude,  F.  E. 
Schneider,  N.  E.  Smith,  W.  S.  Stokely,  I.  W.  Thomas,  N.  E.  Whitney, 
S.  J-  Zajchowski. 

Your  conunittee  submits  as  information  the  following  status  report  with  respect 
to  the  series  of  tests  on  timber  stringers  currently  in  progress  at  the  AAR  Research 
Center. 

The  present  series  consists  of  24  southern  pine  glued  laminated  stringers  7  in. 
X  16/4  in.  in  dimension,  14  ft  long.  This  series  was  designed  to  develop  in  particular 
the  effects  of  slopes  of  grain  and  of  preservative  treatment  on  the  repeated-load 
strength.  Twelve  of  the  test  stringers  are  untreated,  six  of  which  were  fabricated 
with  interior  laminations  having  1  in  16  slope  of  grain  and  the  other  six  with  interior 
laminations  having  1  in  10  slope  of  grain.  The  remaining  twelve  stringers  are  treated, 


Timber    Structures  423 


six  with  an  8-lb  standard  treatment  and  six  with  a  16-lb  treatment.  The  hnnber  from 
which  all  stringers  were  fabricated  conformed  to  the  grading  rules  of  Par.  253, 
Southern  Pine  Inspection  Bureau. 

As  in  previous  tests  of  both  glued  laminated  and  solid  sawn  stringers,  the  string- 
ers are  tested  in  repeated  loading  to  develop  the  strength  at  two-million  cycles.  In 
addition  one  stringer  of  each  group  of  six  is  tested  statically.  Whereas  in  prior  tests 
the  hvo  test  loads  were  so  located  as  to  develop  in  particular  the  horizontal  shear 
strength,  the  loads  in  this  series  were  applied  equidistant  from  the  center  line  of  the 
stringers. 

The  beams  were  fabricated  by  the  Forest  Products  Division  of  Koppers  Com- 
pany at  its  plant  in  Peshtigo,  Wis.,  and  after  treatment  were  delixered  to  the  AAR 
Research  Center  early  in  1968.  Becavise  of  lack  of  staff,  and  administratixe  problems 
confronting  the  Research  Center  at  tliat  time,  the  test  beams  were  stockpiled  outside 
the  test  laboratory,  and  it  was  not  until  September  1968  that  the  test  program  got 
under  way.  After  a  few  untreated  beams  had  been  tested,  the  results  suggested  the 
strength  may  ha\e  been  impaired  by  possible  decay  from  their  standing  unprotected 
in  water  intermittently  outside  the  laboratory,  resulting  in  investigations  which  further 
delayed  progress  for  se\'eral  months. 

Upon  completion  of  the  tests,  it  is  expected  the  AAR  research  stall  will  analyze 
the  results,  to  be  published  in  a  research  report,  and  your  committee  will  prepare 
a  synopsis  of  the  report  for  presentation  to  the  Association. 


Report  of  Committee   8 — Concrete   Structures  and   Foundation 


F.  A.  Kempe,  Chairman 
T.  L.  Fuller, 

Vice  Chairman 
R.  J.  Brueske 
R.  E.  Pearson 

G.  W.  Cooke 

J.  R.  Williams 
J.  M.  Williams 
W.  F.  Baker 
E.  R.  Blewitt 
W.  E.  Brakensiek 
H.  C.  Brown 


L.  Cheifetz 
\V.  B.  Cole 
M.  J.  Crespo 

C.  F.  Dalquist 
M.  T.  Davisson 
J.  W.  DeValle 

B.  M.    DOHNBLATT 
R.    A.    DORSCH 

D.  H.  DowE  (E) 

F.  C.  Edmonds 
T.  A.  Erskine 

G.  W.  Gabert 
W.  L.  Gamble 
R.  J.  Hallawell 

W.  A.  Hamilton,  Jr. 

C.  W.  Harman 
G.  P.  Hayes,  Jr." 
P.  Haven  II 

W.  P.  Hendrix 
H.  W.  Hopkins 
A.  K.  Howe 
W.  R.  Hyma 

J.    R.    IWINSKI 

T.  R.  Kealey 
R.  E.  Kuban 
L.  Lange,  Jr. 
H.  B.  Lewis 
G.  F.  Leyh 

E.  F.  Manley 
E.  C.  Mardorf 


L.  M.  Morris  (E) 

D.  NovicK 

J.  E.  Peterson 

\I.    PiKARSKY 

H.  D.  Reilly 

E.  D.  Ripple 

E.  E.  Runde 

F.  A.  Russ,  Jr. 

J.  H.  Sawyer,  Jr. 

M.    P.    SCHINDLER 

H.  H.  Schmidt"* 

E.  SCROGGIE 
J.    E.    SCROGGS 

J.  R.  Shafer 

R.  K.  Shortt 

L.  F.  Spaine 

C.  H.  Splitstone  (E) 

R.  G.  Stilling 

S.  A.  Stutes 

A.  Tedesko 

W.  C.  Teng 

M.    F.    TiGRAK 

G.  R.  Vanderpool 

F.  H.  Vines 

E.  Watson,  Jr. 
J.  W.  Weber 
W.  R.  Wilson  (E) 
J.  O.  Whitlock 

G.  A.  Wolf 

Committee 


"  Died  September  27,  1970. 
o"  Died  June  7.  1970. 
( E )  Member  Emeritus. 

Those  whose  names   are   shown  in  boldface,    in   addition  to  the   chairman,  vice  chairman  and 
secretary,   are  the  subcommittee  chairmen. 

To  the  Atuc'iican  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

B.  Revision  of  Manual. 

Manual    recommendations    submitted    for   adoption   were   published    in 
Part  1  of  Bulletin  630,  November-December  1970. 

1.  Design    of  masonry  structures,   collaborating  as  necessary  or  desirable 
with  Committees  1,  5,  6,  7,  15,  28  and  30. 

Brief  progress  report  submitted  as  information    •    page  427 

2.  Fotmdations  and  earth  pressures,  collaborating  as  necessary  or  devirnble 
with  Committees  1,  6,  7,  15,  and  30. 

Brief  progress  report  submitted  as  information   •    paRP  427 

3.  Prestres.sed  concrete   for    railway  structures,  collaboratintr  ris  nrcr";snr>' 
or  desirable  with  Committee  6. 

Brief  progress  report  submitted  as  informal  ion  page    iK 


425 


426 Concrete    Structures    and    Foundations 

4.   Waterproofing    for    railway    stnitturt-s,    collaborating    as    necessary    or 
desirable  with  Committees  6,  7  and  15. 
No  report. 

The   Committee  on   Concrete  Sthuctukes  anu  Foundations. 

F.  A.  Kempe,  Chairman. 


AREA   Bulletin   631.  January-February    1971. 


Albert  J^orman  Hairb 
1892=1969 

Albert  Norman  Laird,  engaged  in  pri\nte  engineering  practice  after  his  retire- 
ment in  1957  as  chief  engineer  of  the  Grand  Trunk  Western  Railroad,  died  on 
November  20,  1969,  at  the  age  of  77.  Survivors  include  his  widow,  Gladys;  three 
daughters,  Mrs.  Ellen  Brasko,  Mrs.  Virginia  Hor\ath,  and  Mrs.  Frances  \\arner;  one 
son,  James  Norman  Laird;  eleven  grandchildren  and  three  great  grandchildren. 

Mr.  Laird  was  bom  in  St.  Marys,  Ont.,  Can.,  on  March  6,  1892,  and  became 
a  natmalized  citizen  of  the  United  States  on  April  24,  1918.  He  received  his  higher 
education  at  the  Universities  of  Illinois  and  Michigan,  obtaining  the  degrees  of 
Bachelor  of  Civil  Engineering  at  the  former  in  1914  and  Master  of  Science  in  Ci\il 
Engineering  at  the  latter  in  1916. 

As  a  young  man,  Mr.  Laird  gained  meaningful  experience  working  as  a  chain- 
man  for  a  construction  engineering  firm  in  Detroit,  Mich.,  as  a  teaching  assistant 
of  surveying  for  the  University  of  Michigan,  and  as  a  draftsman  for  the  Detroit  Belle 
Isle  Bridge  Commission. 

Upon  graduating,  Mr.  Laird  secured  a  position  with  Toledo  University  (Ohio) 
as  an  instructor  in  civil  engineering.  The  following  year  he  advanced  to  assistant 
professor  and  shortly  thereafter  became  superintendent  of  buildings  in  charge  of 
construction  for  Toledo  University. 

Mr.  Laird  joined  the  Grand  Trunk  Western  Railroad  in  1919  and  served  as 
chief  draftsman  for  bridges,  buildings  and  new  projects,  assistant  engineer  in  the 
chief  engineer's  office,  and  was  bridge  engineer  prior  to  his  appointment  as  chief 
engineer  in  1947. 

Mr.  Laird  was  a  member  of  tlie  American  Railway  Engineering  Association 
since  1923,  sened  as  director  of  the  Association  in  1951-1953,  and  was  accorded 
a  Life  Membership  upon  his  retirement  in  1957.  He  ser\'ed  on  AREA  Committee 
8 — Masonry  (now  Concrete  Structures  and  Foundations),  from  1924  until  the  time 
of  his  death,  having  been  elected  Member  Emeritus  in  1959.  He  was  \  ice  chairman 
of  Committee  8,  1938-1942,  and  chairman.  1942-1946.  He  also  .serxed  (m  Com- 
mittee 30 — Impact  and  Bridge  Stresses,  1936-1955,  and  Committee  28 — Clearances, 
1942-1946. 

A.  Norman  Laird,  a  truly  dedicated  and  resourceful  educator  and  engineer,  will 
forever  be  remembered  by  his  family,  friends,  former  students,  and  professional 
associates. 

Milton  Pikarsky, 
Memorialist. 


Concrete    Structures    and    Foundations  427 


Report   on   Assignment    1 
Design  of   masonry  structures 

R.  E.  Pearson  (cliaiiiuun,  subcoiuniittec),  W.  E.  Brakexsiek,  L.  Cheiktez,  M.  |. 
Crespo,  R.  a.  Dorsch,  J.  A.  Erskine,  W.  L.  Gamble,  C.  W.  Harman,  G.  P. 
Hayes,  Jr.,  R.  E.  Kuban,  H.  B.  Lewis,  G.  F.  Leyh,  F.  A.  Russ,  Jr.,  J.  H. 
Sawyer,  Jr.,  E.  Scroggie,  A.  Tedesko,  F.  H.  \'ines,  J.  W.  Weber,  G.  A.  Wole. 

Your  committee  prepared  a  number  of  revisions  to  the  Manual  which  were 
published  separately  in  Part   1   of  Bulletin  630,  November-December  1970. 

Your  committee  is  also  preparing  specifications  for  lightweight  concrete  aggre- 
gates and  studying  proposed  revisions  to  the  concrete  tunnel  lining  drawing  currently 
in  the  Manual. 


Report   on   Assignment   2 
Foundations  and  earth   pressures 

C.  W.  Cooke  (chairman,  subcommittee),  W.  B.  Cole,  G.  F.  Dalquist,  M.  T.  Da\is- 
soN,  B.  M.  DoRNBLATT,  D.  H.  DowE,  R.  J.  Hallawell,  p.  Haven  H,  T.  R. 
Kealey,  E.  F.  Manley,  E.  C.  Mardorf,  D.  Novick,  M.  P.  Schindler,  S.  \. 
Stlites,  W.  C.  Teng. 

Your  subcommittee  is  at  present  involved  in  the  development  of  a  specification 
go\eniing  the  design  and  construction  of  foundation  columns  (drilled  caissons).  This 
work  is  imder  preparation  and  we  hope  to  present  the  completed  specifications  within 
the  next  >ear. 

Having  completed  two  major  specifications  last  year  (Tied  Sheet  Pile  Bulkheads, 
and  Embedment  of  Poles)  we  are  at  present  concerned  with  updating  our  present 
material  in  the  Manual.  Your  committee  reports  progress  on  these  assignments. 


Report   on   Assignment   3 
Prestressed  concrete  for  railway  structures 

J.  R.  Willl^ms  (chairman,  subcommittee),  W.  F.  B.\ker,  J.  VV.  Ue\  ai  i.v;,  r.  C. 
Edmonds,  T.  L.  Fuller,  W.  A.  Hamilton,  W.  R.  Hyma,  G.  W.  Gaim :ut,  C.  W. 
H.A.RM.\N,  G.  F.  Leyh,  J.  E.  Peterson,  E.  D.  Ripple,  J.  E.  Scnot;GS,  R.  K. 
Shortt,  L.  F.  Spaine,  M.  F.  Tigrak,  G.  R.  Vanderpool,  J.  O.  Whitlooc,  W.  R. 
Wilson. 

Your   committee  lias  currently  completed  the  design  of  a  prestres«Pf1  ronrrftc 
bridge  tie.  Ten  test  specimens  of  the  tie  and  one  special  tie  for  test'  ig 

pull  out  forces  were  fabricated  by  the  Vulcan  Materials  Company  and  (!■■:  ''»• 

Committee.  The  ties  are  at  the  AAR  Research  Center  and  will  be  tested  tliere  both 
staticalK-  and  under  repeated  load. 


Report  of   Committee    15 — Steel   Structures 


M.    L.    KOEHLER, 

Chairman 
L.  F.  Currier, 

Vice  Chairman 
J.  M.  Hayes,  Secretary 
D.  V.  Messman 
W.  C.  Howe 
J.  G.  Clark 

R.    I.    SiMKINS 

H.  T.  Alexander 
H.  A.  Balke 
D.  S.  Bechly 


L.  S.  Beedle 

A.  B.  Belfield 

J.  Berger 

E.  S.  Birkenwald  ( E ) 

H.    F.    BOBER 

E.  Bond 

T.  J.  Boyle 

J.  C.  Bridgefarmer 

H.  L.  Chamberlain 

J.  S.  Cooper 

A.   G.   CUDWORTH 
H.    B.    CUNDIFF 

E.  J.  Daily 
A.  C.  Danks 

J.  W.  Davidson 
R.  P.  Davis  (E) 
H.  E.  Dearing 
W.  E.  Dowling 

F.  P.  Drew 
J.  L.  Durkee 
N.  E.  Ekrem 
J.  J.  Fl^la 

G.  F.  Fox 

E.  F.  Garland 

G.    K.    GiLLAN 

J.  W.  Hartmann 
R.  A.  Hartselle 
A.  Redefine 
G.  E.  Henry 
C.  A.  Hughes 
E.  A.  Johnson 

E.    W.    KlECKERS 


T.  Lassen 

K.  H.  Lenzen 

Snu-TiEN  Li 

T.  J.  Mearsheimeh 

J.  Mich  A  LOS 

G.  E.  Morris,  Jr. 

W.H.     MUNSE 

D.  L.  Nord 

R.    D.    NORDSTORM 
A.    L.    PlEPMElER 

J.  H.  Powers 
D.  D.  Rosen 
G.  W.  Salmon 
W.  W.  Sanders,  Jr. 

M.  SCHIFALACQUA 

A.  E.  Schmidt 

F.  D.  Sears 

G.  R.  Shay 

H.  SOLARTE 
A.  P.  SOUSA 

R.  D.  Spellman 
J.  E.  Stallmeyer 

Z.   L.   SZELISKI 

J.  D.  Tapp 

W.  M.  Thatcher 

R.  N.  Wagnon 

C.  R.  Wahlen 

R.  IL  Wengenroth 

W.  Wilbur 

A.  J.  Wood 

M.  O.  Woxland 

Committee 


( E )  Member  Emeritus.  , 

Those   whose   names   are   shown   in   boldface,    in   addition   to   the   chairman,   vice  chairman   and 
secretar\-,    are   the   subcommittee   chaimien. 

To  the  American  Railway  Eu^ineeiiun  Association: 

Your  committt'f  reports  on  tlic  follow  iiiu  subjects: 

B.  Revision  of  Manual. 

Revision  of  specifications  submitted  for  adoption  were  publislied  in 
Part  1  of  Bulletin  630,  Xo\ember-Deceiuber  1970. 

3.  Protection  of  steel  surfaces. 

Field  tests  are  being  continued  to  cxaluate  .several  protective  systems 
other  than  paint.  .\n  inspection  of  tlic  test  applications  is  to  be  made 
in  1972. 

7.   Bibliography    and    technical    explanation    of    various    requirements    in 
AREA  Specifications  relating  to  iron  and  .steel  structures. 
Sections  9.3  and  9.5  of  Part  9,  Chapter  15  of  the  Manual,  submitted 
for  adoption,   were  published  in  Part   1   of  Bulletin  630,   Novemljer- 
December   1970. 


429 


It II I.  o:ti 


430  Steel    Structures 


JO.  Continuous  wilck-cl  rail  on  bridges,  collaborating  as  necessary  or  desir- 
able with  Committee  31. 

Your  committee  is  reviewing  installation  practices  of  xarious  railroads 
and  will  continue  actively  to  progress  this  assignment. 

The  Committee  on  Steel  Structures, 

M.  L.  KoEHLER,  Chairman. 


AREA   Bulli-tiii   631,   January-February   1971. 


Report  of  Committee  30 — Impact  and  Bridge   Stresses 


p.  L.  Montgomery, 
Chairman 

M.    NOYSZEWSKI, 

Vice  Chairman 


M.  E,  Weller 
E.  D.  Ripple 

L.    R.    KUBACKI 

E.  R.  Andrlik 
J.  A.  Ebskine 

D.  S.  Bechly 

E.  S.    BiRKENWALD    (E) 

L.  N.  BiGELOw 
A.  J.  S.  Carr 
G.  F.  Dalquist 
J.  W.  Davidson 
b.  H.  DeSplinter 

C.  E.  Ekberg,  Jr. 
N.  E.  Ekrem 

D.  J.  Engle 
R.  J.  Fisher 

J.  F.  Hoss,  Jr. 
K.  H.  Lenzen 
A.  D.  M.  Lewis 
G.  F.  Leyh 

C.  V.  Lund 

D.  F.  Lyons 


H.  L.  Machicao 
J.  F.  Marsh 
J.  Michalos 

W.   H.   MUNSE 

D.  W.    MUSSER 

C.  H.  Newlin 

A.    L.    PlEPMEIER 

M.  J.  Plumb 
C.  R.  Sanders 
W.  W.  Sanders 
M.  B.  Scott 
R.  L.  Shipley 
C.  B.  Smith 
H.  Sol arte 
J.  D.  Tapp,  Jr. 
M.  Velebit 
P.  F.  Viehweg 
W.  H.  Walker 

C.  T.  Webster 
J.  R.  Williams 

E.  N.  Wilson 

D.  R.  Wright 

Committee 


( E )  Member  Emeritus. 

Those  whose  names  are  shown  in  boldface,  in  addition  to  the  chainnan  and  vice  chairman, 
are   the    subcommittee   chairmen. 

To  the  American  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 

L  Steel,  collaborating  with  Committee  15. 

Progress   report,  presented  as   information    page  432 

2.  Concrete,  collaborating  with  Committee  8. 

No  progress  to  report,  as  funds  were  not  allocated  and  research  per- 
sonnel was  not  available  at  the  AAR  Research  Center. 

3.  Timber,  collaborating  with  Committee  7. 

No  progress  to  report  as  funds  were  not  allocated  and  research  per- 
sonnel was  not  available  at  the  AAR  Research  Center. 

4.  Electronic  computers,  collaborating  with  Committees  15,  16  and  32. 
Progress  report,  presented  as  information    page  432 

5.  Study  leading  toward  the  establishment  of  a  consistent  design  loading 
for  all  structures  supporting  railway  loading,  collaborating  wi'li  Cmu- 
mittees  1,  7,  8  and  15. 

Progress   report,   presented  as  infonnation    page  433 

The  Committee  on  Impact  and  Bridge  Stresses, 

P.  L.  Montgomery,  Chairman. 


AREA  Bulletin   631.   Januiir\ -February    1971. 

431 


432  Impact    and    Bridge    Stresses 

Report   on   Assignment   1 

Steel 

Collaborating   with    Committee    15 

M.  E.  Weller  (chairman,  suhconimitfcc),  L.  N.  Bic;elom%  E.  S.  Bihkenwald,  C.  E. 
Ekberg,  Jr.,  N.  E.  Ekrem,  L.  R.  Kuhac:ki,  K.  H.  Lenzen,  II.  L.  Machicao, 
J.  F.  Marsh,  James  Michalos,  W.  H.  Munse,  A.  L.  Piepmeier,  M.  J.  Plumb, 
E.  D.  Ripple,  C.  R.  Sanders,  W.  W.  Sanders,  Ir.,  M.  B.  Scott,  R.  L.  Shipley, 
C.  B.  Smith,  Hernan  Solarte,  J.  D.  Tapp,  Jr.,  M.  Velebit,  P.  F.  ViEmvEG, 
C.  T.  Webster. 

A  report,  with  conclusions,  summarizing  the  field  inxestigation  of  four  through 
truss  spans — two  spans  on  the  Southern  Pacific  Transportation  Company,  one  span 
on  the  former  Great  Northern  Railway  (now  part  of  Burlington  Northern  Inc.)  and 
one  span  on  the  former  Chicago,  Burlington  &  Quincy  Railroad  (also  now  part  of 
Burlington  Northern  Inc.)   was  approved  for  publication  during  1970. 

Additional  testing  is  needed.  From  the  information  on  hand,  future  testing 
should  provide  more  data  on  ( 1 )  magnitude  of  stresses  at  stringer  connections  due 
to  direct  tension,  tension  from  negative  moment  and  shear  stress,  (2)  effect  of 
stringer  span  lengths  on  impact,  and  (3)  magnitude  of  impacts  in  various  length 
trusses. 


Report   on   Assignment  4 

Electronic   Computers 

Collaborating   with    Committees    15,    16   and   32 

E.  R.  Andrlik  (chairman,  subcommittee),  A.  J.  S.  Carr,  J.  W.  Davidson,  D.  J. 
Engle,  J.  A.  Erskine,  R.  J.  Fisher,  J.  F.  Hoss,  Jr.,  A.  D.  M.  Lewis,  D.  F. 
Lyons,  J.  F.  Marsh,  C.  H.  Newlin,  M.  Noyszewski,  M.  Velebit,  W.  H. 
Walker,  M.  E.  Weller,  E.  N.  Wilson,  D.  R.  Wright. 

A  program  for  the  analysis  and  rating  of  railway  bridge  floor  systems  was  pre- 
pared this  year.  The  program  was  written  in  FORTRAN  by  Dr.  E.  N.  Wilson,  a 
member  of  Committee  30,  with  funds  provided  by  the  AAR. 

Ratings  provided  by  the  new  program  are  in  accordance  with  the  1969  AREA 
specifications.  Any  combination  of  five  types  of  floor  systems,  seven  diff^erent  cross 
sections  of  members,  and  eight  classes  of  steel  may  be  selected.  A  maxinnmi  of  ten 
points  along  the  member  can  be  either  analyzed  or  rated. 

The  normal  imput  includes  member  span  lengths  and  section  properties,  uni- 
form dead  load,  spacing,  track  location  and  weight,  and  any  other  dead  loads.  The 
engineer  must  also  imput  the  live  loads,  impact,  and  wind  force.  Output  includes 
a  listing  of  member  sections  entered  and  a  listing  of  dead  load  shears  and  moments. 
The  output  for  both  rating  and  analysis  gi\'es  computed  live  load  values,  with  and 
without  impact,  as  well  as  values  for  E  80  loading. 

A  revised  set  of  "Moment  and  Shear  Tables  for  Heavy  Duty  Cars  on  Bridges" 
has  been  published  and  is  available  from  the  AAR  Research  Center  at  nominal  cost. 
The  publication  has  205  moment  and  shear  tables  covering  ratings  for  190  cars  and 
15    locomotives.   This   compilation  of  tables  comprises   all   information   contained  in 


Impact    and    Bridge    Stresses 433 

the  original  1960  publication  plus  many  additional  tables  developed  since  that  time. 
The  numbering  of  the  tables  is  unique  in  that  a  scheme  has  been  followed  in  which 
the  page  number  indicates  the  number  of  axles,  gross  weight  and  coupled  length  of 
equipment. 

The  moment  and  shear  tables  were  computed  from  the  first  program  written  for 
the  committee  b>'  Dr.  Wilson.  Since  that  time,  Program  No.  2 — Analysis  of  Railway 
Truss  Bridges,  Program  No.  3 — Analysis  of  Pratt,  Howe  and  Warren  Type  Railway 
Truss  Bridges,  Program  No.  4 — Rating  of  Railway  Truss  Bridges,  Program  No.  5 — 
Analysis  and  Rating  of  Plate  Girder  Railway  Bridges  and  the  last,  Program  No.  6 — ■ 
Analysis  and  Rating  of  Railway  Bridge  Floor  Systems,  have  been  developed  and 
are  a\'ailable  through  the  AAR  Research  Center,  3140  S.  Federal  Street,  Chicago, 
111.  60616. 


Report   on   Assignment   5 

Study  leading  toward  the  establishment  of  a  consistent  design 
loading  for  all   structures  supporting   railway  loading 

Collaborating   with    Committees    1 ,   7,   8   and    15 

J.  A.  Erskine  (chairman,  subcommittee),  E.  R.  Andrlik,  D.  S.  Bechly,  L.  N.  Bige- 
Low,  E.  S.  BiRKENWALD,  G.  F.  Dalquist,  J.  W.  DAVIDSON,  N.  E.  Ekrem, 
K.  H.  Lenzen,  a.  D.  M.  Lewis,  G.  F.  Leyh.  C.  V.  Lund,  D.  F.  Lyons,  H.  L. 
Machicao,  J.  F.  Marsh,  James  Michalos,  W.  H.  Munse,  D.  W.  Musser, 
A.  L.  PiEPMEiER,  M.  J.  Plumb,  C.  R.  Sanders,  W.  W.  Sanders,  Jr.,  C.  B. 
Smith,  Hernan  Solarte,  J.  D.  Tapp,  Jr.,  J.  R.  Williams. 

A  preliminary  consistent  loading  specification  has  been  prepared  from  what  is 
believed  to  be  the  best  features  of  Chapters  1,  7,  8  and  15  of  the  AREA  Manual 
for  Railway  Engineering.  This  draft  has  been  reviewed  by  Comnuttee  30  and  is 
being  submitted  to  the  collaborating  couunittees  for  approval  and/or  comments. 
Suggestions  are  also  solicited  from  other  interested  members.  Copies  of  the  draft 
will  be  furnished  upon  request  to  either  the  subcommittee  chairman  or  Association 
Headquarters. 

After  taking  into  account  conunents  received,  the  committee  propo.ses  to  sub- 
mit a  uniform  loading  specification  to  the  appropriate  committees  next  year  \Nith 
a  recommendation  that  each  committee  approxe  its  applicable  portion  for  inclusion 
in  the  Manual,  thereby  eliminating  the  inconsistencies  which  now  exist. 


Report  of  Committee  32 — Systems   Engineering 


H.  L.  Chamberlain, 

Chairman 
H.  R.  Williams, 

Vice  Chairman 
R.  W.  Holt,  Secretary 

W.    E.    DOWLING 

R.  H.  Knittel 

J.    R.    BOYER 

L.  F.  Grabowski 

J.   E.   COSKY 


R.  E.  Ahlf 
R.  S.  Allen 

E.  R.  Andrlik 
R.  W.  Bailey 
S.  H.  Bari^iger 

D.  R.  Behgmann 

F.  T.  Berry 
R.  J.  Berti 

W.    R.    BjORKLUND 

E.  Bond 

A.  P.  Campbell,  Jr. 
R.  D.  Combs 

K.    COTTEN 

A.  V.  Dasburg 
f.  F.  Davison 
L.  P.  Diamond 

R.    DiRVONIS 

R.  L.  Ealy 

F.  C.  Edmonds 

E.  H.  Fisher 

F.  D.  Free 

A.  J.  Cellman 
R.  C.  Gilbert 
D.  L.  Glickstein 

A.  M.  Handwerker 
D.  M.  Harlan 

M.  Horn 

R.  P.  Howell 

B.  W.  H.  Jaeger 
S.  M.  Jones 


M.  H.  Krug 
H.  N.  Laden 
R.  H.  Lee 
A.  D.  M.  Lewis 
J.  F.  Lynch,  Jr. 
VV.  J.  Mariluch 

A.  B.  Merhitt,  Jr. 
G.  F.  McGlumphy 
H.  L.  Murphy 

D.  G.  Newnan 
K.  S.  Niemonu 

M.    NOYSZEWSKI 

J.  R.  Nutter 

B.  F.   OVERBEY 

J.  A.  Penner 

A.  W.  Polich 

B.  H.  Price,  Jr. 
B.  R.  Rischling 
R.  E.  Robinson 

F.   G.   SCHURMAN 

T.  H.  Seep 
R.  B.  Sliepka 

R.   M.   SOBERMAN 

R.  A.  Stane 
J.  J.  Stark,  Jr. 
H.  E.  Storey 

E.  G.  Talley 
T.  W.  Toal 
E.  N.  Wilson 
T.  P.  Woll 

Committee 


Those  whose  names   are   shown   in  boldface,    in   addition  to  the   chairman,  vice  chainnan   and 
secretary,    are  the  subcommittee  chairmen. 

To  the  American  Railway  Engineering  Association: 

Your  coniiuittee  reports  on  the  following  subjects: 

L   Define  and  illustrate  systems  engineering  concepts,  developing  a  manual 
of  specifications  for  their  application  to  railway  engineering. 
The   committee    is    actively    pursuing   the   defining   and   illustrating   of 
systems  concepts.   It   is   anticipated  that   Manual  material  will  be  pre- 
sented for  approval  and  adoption   in  197L 

2.  Document  present  computer  assignments  of  all  AREA  Committees — 
indicating  their  relationships  in  overall  systems — with  identification  of 
potential  for  expansion. 

Progress  report,   submitted  as  information    P-ige  437 

3.  Develop  specifications  for  engineering  admini.strative  systems,  such  as 
PERT,  CPM  Time  and  Cost. 

The  committee  is  engaged  in  assembling  information  concerning  appli- 
cations within   the   railroad  industry,  together  with  documentation. 


435 


436 Systems    Engineering 

4.  Define  and  specify  all  elements  in  the  enj^ineei-coiiipiiter  interaction, 
promoting  simplified  and  expeditions  computer  usage  by  the  engineer 
in  all  his  functions. 

No  report. 

5.  Promote  computer  usage  by  railway  engineers  through  demonstrations, 
seminars,  and  programs  of  instruction  by  leaders  in  the  field. 

The  committee  is  arranging  for  a  discussion  of  systems  engineering 
applications  and  a  demonstration  of  computer  applications  within  an 
engineering  department  en\'ironment,  to  l)e  presented  at  the  1971 
Convention. 

6.  Formulate  a  railway  engineering  data  base  suitable  for  computer  proc- 
essing, collaborating  as  necessary  or  desirable  with  Committees  11, 
16  and  22,  the  AAR  Data  Systems  Division  and  the  Cost  Analysis 
Organization  of  the  AAR  Economics  and  Finance  Department. 

(a)  Specify  the  degree  of  detail  for  reporting  maintenance  of  way  and 
structures  costs. 

(b)  Identify  all  significant  cost-associated  physical  factors,  such  as 
track  and  roadway  construction  and  geometry,  and  structure  de- 
sign and  construction,  and  specifying  the  necessary  elements  in 
their  file  assembly. 

(c)  Assist  in   modeling,   analysis  and  processing  of  available  data. 
No  report. 

7.  Design  and  develop  in  full  scope  a  clearance  system  for  both  excess 
weight  and  dimensions  of  vehicles   and  loads, 

(a)  specifying  all  tlie  system  elements  involved  and  their  logical  inter- 
relationships, and 

(b)  coordinating  the  interests  and  requirements  of  all  involved  AREA- 
AAR  Engineering  Division  committees  with  those  of  the  AAR 
Mechanical  and  Operating-Transportation  Divisions  and  the  AAR 
Management  Systems  Department. 

No  report. 

The  Committee  on  Systems  Engineering, 

H.  L.  Chamberlain,  Chairman. 


AREA   Bulletin   631,  January-February   1971. 


Systems    Engineering 437 

Report  on   Assignment  2 

Document    present    computer    assignments    of   all   AREA 

committees — indicating  their  relationships  in  overall  systems 

— with    identification    of    potential   for   expansion 

H.  R.  Williams  (chairman,  subcommiitee),  E.  R.  Andhlik,  R.  W.  Bailey,  S.  H. 
Barriger,  F.  T.  Berry,  R.  J.  Berti,  E.  Bond,  J.  F.  Davison,  L.  P.  Diamond, 
R.  L.  Ealy,  F.  C.  Edmonds,  L.  F.  Grabowski,  D.  M.  Harlan,  M.  Horn, 
R.  P.  Howell,  M.  VV.  Krug,  J.  A.  Penner,  T.  H.  Seep,  T.  W.  Toal. 

Your  committee  submits  as  information  the  following  progress  report  on  the 
activities  of  the  \arious  AREA  committees  having  computer  assignments. 

Committee    11 — Engineering    Records    and    Property    Accounting 

Committee  lis  Subcommittee  on  Office  and  Drafting  Practices  presented  a 
report  in  the  December  1969  Bulletin,  No.  624,  on  the  general  application  of 
computer-generated  images  on   microfilm,  microfiche,  or  cathode  ray  tube. 

The  committee's  Subcommittee  on  Application  of  Data  Processing  has  under 
study  a  computerized  track  record.  The  data  base  for  this  record  includes  location, 
physical  characteristics,  usage,  designation  track  mileage  and  trackage  rights.  This 
record  has  unlimited  potential  in  both  the  engineering  and  property  accounting 
areas. 

Committee    30 — Impact   and    Bridge    Stresses 

This  committee  has  an  assignment  on  the  use  of  electronic  computers  for  rail- 
road bridge  problems,  collaborating  as  necessary  or  desirable  with  Conunittees  15, 
16  and  32.  During  1970  a  computer  program  for  analysis  and  rating  of  railway 
bridge  floor  systems  was  prepared  under  the  guidance  of  the  committee.  This  pro- 
gram complements  previous  programs  for  the  analysis  and  rating  of  trusses  and 
girders.  Also  a  new,  more  extensive  set  of  moment  and  shear  tables  for  heavy-duty 
equipment  on  bridges  was  prepared  by  the  AAR  Research  Center  according  to  the 
committee's  recommendations.  Committee  30's  report  in  this  Bulletin  includes  a 
description  of  the  six  computer  programs  that  have  been  developed  to  date  and 
which  are  a\ailable  from  the  AAR  Research  Center  at  a  nominal  cost. 


Report  of  Committee  28 — Clearances 


M.    E.    VOSSELLER, 

Chairman 
F.  B.  Persels, 
Vice  Chairman 


R.  L.  Williams, 

Secretary 
J.  A.  Crawford 

J.   E.   COSKY 

R.  D.  Erhardt 

W.    S.    TUSTIN 

M.  E.  Dust 
G.  E.  Henry 
J.  E.  Reran 

C.  H.  Stephenson 
G.  J.  Adams 

M.  Van  Kuiken 

L.  R.  Beattie 

E.  S.  Birkenwald 

D.  H.  Brown 
S.  M.  Dahl 

C.  W.  Farrell 
J.  H.  Fitzpatrick 

E.  F.  Crecco 
J.  C.  Greenlee 
R.  P.  Grue 

W.  F.  Hart  ( E ) 

J.   C.   HOBBS 


C.  A.  Hughes 
G.  P.  Huhlein 
C.  F. Intlekofer 
O.  H.  Jensen 
J.  L.  Kampwirth 
L.  C.  Kerns 

A.  J.  Kozak 
E.  C.  Lawson 
G.  W.  Martyn 

B.  W.  McCurdy 

C.  A.  Meadows 
E.  E.  Mills 

J.  R.  Moore 
M.  D.  Murphy 
C.  E.  Peterson 
M.  L.  Power 
R.  T.  Pritchett 
P.  T.  Sarris 

E.  G.  Smith 
R.  R.  Snyder 

F.  A.  Svec 

E.   W.   WOTIPKA 

Committee 


( E )  Member  Emeritus. 

Those  whose  names  are  shown  in  boldface,   in   addition  to  the   chairman,  vice  chairman   and 
secretary,   are  the  subcommittee   chainnen. 

To  the  Atnerican  Railway  Engineering  Association: 

Your  committee  reports  on  the  following  subjects: 
B.  Revision  of  Manual. 

Chapter  28  of  the  Manual  is  being  reviewed  for  renumbering  and 
indexing  in  the  decimal  format. 

1.  Investigate  the  practicability  of  using  disposable  coded  placards  for  iden- 
tifying shipments  of  excessive  dimension  and/or  weight  tliat  could  be 
used  in  conjunction  with  the  Automatic  Car  Identification  System. 

To  further  progress  on  this  assignment,  the  subcommittee  chairman  has 
written  a  letter  to  the  chairman  of  the  AAR  ACI  Committee  request- 
ing guidance  on  how  to  proceed  and  its  assistance.  At  report  time  no 
answer  had  been  received. 

2.  Compilation  of  the  railroad  clearance  requirements  of  the  \arious  states. 

The  "Legal  Clearance  Requirements"  chart  is  being  revised  and  refined 
to  reflect  the  latest  information  furnished  the  subcommittee  and  the 
chart  will  be  submitted  for  publication  when  the  work  is  completed. 
In  the  interim  any  one  desiring  a  copy  may  oijtain  one  directly  from 
R.  D.  Erhardt,  a.ssistant  engineer,  Gulf,  Mobile  &  Ohio  Railroad,  P.  O, 
Box  1828,  Mobile,  Ala.  36601. 


439 


440 Clearances 

3.  New  methods  and  electronic  de\  ices  for  lecordiny  ineasnienients  of 
clearances  of  strnctuies  alon^  right-of-way  and  o\erall  dimensions  of 
cars  and  loads  in  yards  and  at  interchange  points,  looking  to  the  pos- 
sihle  nse  of  a  compnter  program  for  routing  high  and  wide  loads. 

No  report. 

4.  A  study  of  the  restrictions  that  the  clearance  personnel  in  the  engineer- 
ing departments  of  the  various  railroads  furnish  their  transportation 
and/or  operating  departments  for  the  handling  of  loads  of  excessive 
sizes  and  weights. 

Assignment  completed. 

5.  Clearance  allowances  to  provide  for  \ertical  and  horizontal  movements 
of  equipment  due  to  lateral  play,  wear  and  spring  deflection,  collaborat- 
ing as  necessary  or  desirable  with  the  Mechanical  Division,  AAR. 

No  report. 

6.  Feasibility  of  formulating  a  more  complete  method,  for  use  of  Trans- 
portation Departments,  in  reporting  loads  of  excessive  dimensions  to 
minimize  necessity  for  requesting  additional  information,  collaborating 
as  necessary  or  desirable  with  the  Mechanical  Division,  AAR. 

Assignment  completed  with  publication  of  new  Manual  material  in  the 
1970  Manual  Supplement. 

7.  Investigate  the  feasibility  and  cost  of  developing  equipment  and  a  con- 
tract service  arrangement  to  be  made  available  to  any  railroad  desiring 
to  make  a  clearance  survey  of  its  system. 

No  report. 

8.  Extend  "Table  for  Computing  Curve  Oftsets  on  Overhanging  Loads," 
now  in  the  Manual,  to  accommodate  longer  loads  and  longer  truck 
centers,   collaborating  as  necessary  or  desirable  with  Committee  32. 

Computations  have  been  completed  and  table  is  being  revised  for  sub- 
mitting to  members  of  the  committee  for  their  consideration  and  even- 
tual publication. 

9.  Investigate  the  possibility  of  including  the  truck  center  dimensions  of 
all  cars  in  the  Official  Railway  Equipment  Register,  collaborating  as 
necessary  or  desirable  with  the  Mechanical   Division,  AAR. 

No  report. 

The  Committee  on  Clearances, 

M.  E.  VossELLER,  Chairman. 

AREA  Bulletin  631,  January-February   1971. 


Report  of   Committee   25 — Waterways  and   Harbors 


J.  C.  Fenno,  Chairman 
L.  H.  McCuRRY, 
Vice  Chairman 
R.  V.  Gilbert,  Secretary 


R.  L.  BosTiAN,  Jr. 

E. 

C.  Lawson 

John  Gressitt 

J. 

P.  Layer 

R.  C.  Rankin 

S. 

T.  Li  (E) 

J.  E.  Foreman,  Jr. 

F. 

J.  Olsen 

E.  S.  Laws 

A. 

C.  Parker,  Jr. 

J.  M.  Bates 

M 

.  S.  Patterson 

G.  W.  Becker  (E) 
G.  R.  Collier 

R. 
J- 

L.  Pettegrew,  Jr. 
F.  Piper 

W.  E.  Corbet 

G. 

A.  Stenstrom 

B.  M.  Dornblatt 

C. 

A.  Still 

P.    P.    DUNAVANT 

R. 

A.  Ullery 

W.    H.    ESCHWIG 

B. 

H.  VooR 

J.  H.  Fitzpatrick 

R. 

F.  Weir 

C.    E.    GiLLEY 

S. 

G.    WiNTONIAK 

R.  T.  Haggerstrom 

A.  O.  Kruse 

Committee 

( E )  Member  Emeritus. 

Those   whose   names   are   shown   in  boldface,   in   addition  to  the  chairman,   vice   chairman   and 
secretary,  are  the  subcommittee  chairmen. 

To  the  American  Railway  Engineering  Association: 

Your    committee    reports    on    the   following   subjects: 

B.  Revision    of    Manual. 

No   report.   Progress   is   being   made   on  complete   revision   of  Chapter 
25.    A   progress    report    is    anticipated   late   in    1971. 

2.  Current  policies,  practices  and  developments  dealing  with  flood  con- 
trol, water  conservation,  waterways  and  water  navigation  projects. 

Progress   report,  submitted   as  information    page  442 

3.  Bibliography  relating  to  benefits  and  costs  of  water  resource  projects 
of  interest  to  railroads  in  the  areas  of  flood  control,  storage,  drainage 
and  navigation. 

No  report;   subcommittee   is  concentrating  on  rc\  ision  of  Manual. 

6.  Planning,  construction  and  inaiulcnancc  of  rail-water  transfer  facilities. 
No  report;  eilorts  are  being  directed  to  Manual  revision. 

7.  Relative  merits  and  economics  of  construction  materials  used  in  water- 
front facilities,  collaborating  with  Couuuittees  7,  8  and   15. 

No  report  due  to  consideration  of  Mauiial   revision. 

The  Committee  on  Waterways  anu  IIahrors, 

J.  C.  Ffnno,  Chairman. 


AREA  Bulletin   631,   Jannar>'-Februar>-   1971. 

Note — Discussion    on    subcommittee    reports    herein    closes    on    .M.i\     1.    UJTl. 

441 


442 Waterways    and    Harbors 


Report   on   Assignment  2 

Current  policies,  practices  and  developments  dealing  with  flood 

control,  water  conservation,  waterways  and  water 

navigation   projects 

John  Gressitt  (cJiainnan,  subcommittee),  J.  M.  Bates,  G.  R.  Collier,  W.  E. 
Corbet,  J.  H.  Fitzpatrick,  R.  V.  Gilbert,  C.  E.  Gilley,  R.  T.  Haggerstrom, 
A.  O.  Kruse,  J.  P.  Layer,  M.  S.  Patterson,  J.  F.  Piper,  R.  C.  Rankin,  C.  A. 
Still,  R.  F.  Weir. 

REPORT  BY  L.  H.  McCURRY 
Your  committee  submits  as  information  the  following  progress  report  on  the 
National  Water  Commission.  Related  reports  previously  f)resented  by  the  committee 
include  one  on  the  Water  Resources  Planning  Act  of  1965  (Proceedings,  Vol.  70, 
1969,  pages  558  through  577)  and  an  address  by  Henry  P.  Caulfield,  Jr.,  tlien  execu- 
tive director.  Water  Resources  Council,  U.S.A.,  given  as  a  special  feature  during  the 
1969  AREA  Convention  (Proceedings,  Vol.  70,  1969,  pages  907-922).  In  his  address 
Mr.  Caulfield  commented  on  the  Water  Resources  Planning  Act,  the  Water  Resources 
Council,  the  1968  First  National  Assessment  of  the  Water  Resources  Council  and 
the  new  National  Water  Commission  with  its  possible  involvement  in  a  long-range 
study  of  the  Inland  Navigation  System  and  its  relation  to  regional  and  national 
transportation  requirements. 

NATIONAL  WATER   COMMISSION 

The  National  Water  Commission  was  established  by  Public  Law  90-515,  Sep- 
tember 26,  1968.  There  are  seven  members,  including  the  chairman,  all  appointed 
by  the  President.  In  addition,  the  Commission  has  a  small  professional  staff  directed 
by  an  executive  director.  The  National  Water  Commission  is  directed  to: 

( 1 )  Review  present  and  anticipated  national  water  resources  problems,  mak- 
ing projections  of  water  requirements  as  necessary  and  identifying  alter- 
nate ways  of  meeting  these  requirements; 

(2)  Consider  the  economic  and  social  consequences  of  water  resources  devel- 
opment, including  the  impact  on  regional  economic  growth,  on  institu- 
tional arrangements,  and  on  esthetic  values;  and 

(3)  Advise  on  such  specific  water  resources  matters  as  may  be  referred  by 
the  President  and  the  Water  Resources  Council. 

Public  Law  90-515  also  requires  the  Conunission  to  consult  with  the  Water 
Resources  Council,  and  to  furnish  its  reports  to  that  body  for  review  and  comment 
prior  to  their  submittal  to  the  President  and  the  Congress.  The  Commission  is 
required  by  law  to  complete  its  work  by  September  1973  and  has  been  holding 
hearings   to  accomplish  its  directives. 

One  such  hearing  was  held  on  November  9,  1969,  in  Washington,  D.  C,  where 
the  Association  of  American  Railroads  presented  an  oral  statement  of  the  railroad 
industry's  position  concerning  management  of  water  and  related  land  resources, 
which  indicated  the  railroads  were  principally  concerned  with  two  critical  problems, 
both  essentially  policy  matters,  relating  to  inland  navigation  projects  and  navigation 
features  of  multiple-purpose  water  resources  projects — these  problems  being  the  sub- 


Waterways    and    Harbors 443 

sidies  to  inland  navigation  and  procedures  used  to  evaluate  naxigatiou  benefits  (see 
AREA  Proceedings,  Vol.  69,  1968,  pages  254  througb  266).  The  railroads'  statement 
was  first  presented  to  the  chairman  of  the  National  Water  Commission  by  AAR 
letter  dated  October  28,    1969,  and  is  essentially  as  follows: 

SUBSIDIES   TO    BARGE   TRANSPORTATION 

The  National  Water  Commission  asked  if  direct  beneficiaries  of  Federal  Water 
Projects  pay  a  sufficient  part  of  the  cost  of  such  projects  and  if  the  States  should 
assume  a  greater  share  of  water  resources  projects. 

The  Federal  Go\ernment  constructs,  operates,  and  maintains  inland  navigation 
projects  and  no  attempt  is  made  to  recover  any  of  these  costs  from  beneficiaries. 
Since  direct  beneficiaries  of  inland  navigation  projects  pay  nothing  towards  the  costs 
of  such  projects,  the  ob\ious  answer  to  the  first  part  of  the  (luestion  is  "no."  The 
answer  to  the  second  part  of  the  question  is  that  direct  beneficiaries  should  pay  for 
the  costs  of  inland  naxigation  projects. 

Sound  economic  principles  support  the  collection  of  fair  and  eciiiitable  charges 
from  direct  beneficiaries  of  publicly  financed  navigation  projects.  It  is  basically  unfair 
to  make  the  general  taxpayer  bear  the  costs  of  constructing,  maintaining  and  operat- 
ing inland  navigation  projects.  Direct  beneficiaries  of  inland  navigation  projects 
should  pay  the  cost  of  the  special  serv'ices  they  receive  as  a  matter  of  eciuity. 

Subsidies  to  barge  transportation  do  not  promote  sound  national  transportation 
policies  since  the  practice  precludes  shippers  from  selecting  the  most  economical 
mode  of  transportation,  all  relevant  costs  considered. 

Because  the  costs  of  constructing,  maintaining,  and  operating  inland  navigation 
projects  need  not  be  reflected  in  barge  rates,  alternate  modes  of  transportation,  par- 
ticularly the  railroads,  are  discriminated  against.  This  discrimination  continues  to 
create  unwarranted  competitive  handicaps  for  the  railroads. 

Inland  navigation  projects  are  considered  economically  justified  if  annual  bene- 
fits equal  or  exceed  annual  project  costs.  Project  evaluation  studies  do  not  consider 
the  effects  of  appropriate  user  charges  on  the  demand  for  barge  transpoiiation.  This 
results  in  a  built-in  bias  and  in  turn  leads  to  the  construction  of  (uieconouucal  proj- 
ects, the  over-design  of  projects,  and  the  early  replacement  of  projects. 

Several  studies  have  been  made  of  subsidized  transportation,  and  without  excep- 
tion they  have  reconnnended  that  waterway  users  .should  pay  tolls  or  user  charges 
for  Federally  financed  facilities.  The  railroad  industry  particularly  invites  the  atten- 
tion of  the  National  Water  Commission  to  the  studies  listed  below: 

1.  Federal  Coordination  of  Transportation.  Public  Aids  to  Transportalion. 
1939  (4  volumes). 

2.  Board  of  Investigation  and  Research.  Public  Aids  to  Domestic  Tran.sporta- 
tion.  Hou.se  Document  No.  159,  79th  Congress,  1st  Session,  1945. 

3.  Dearing,  C.  L.,  and  Owen,  Wilfred,  National  Transportation  Policy.  Brook- 
ings Institution,  Washington,   1949. 

4.  Issues  Involved  in  a  United  and  Coordinated  l-'ederal  Program  for  Trans- 
portation. A  report  to  tlie  President  from  the  Secretnr>  of  Conunerce. 
December  1,  1949. 

5.  The  President's  Water  Resoiuces  Policy  Coniniission.  N'oiunie  I.  A  Water 
Policv  for  the  American  People,  1950. 


444 Waterways    and    Harbors 

6.  U.  S.  Department  of  Coniiiierce,  Charges  for  Pri\ate  Use  of  Federally 
Provided  Transportation  Senices  and  Facilities,  July  1953. 

7.  Task  Force  on  Water  Resources  and  Power,  Commission  on  Organization 
of  the  Executive  Branch  of  the  Government,  Report  on  Water  Resources 
and  Power,  June  1955  (3  Volumes). 

8.  U.  S.  Department  of  Commerce,  Federal  Transportation  Policy  and  Pro- 
gram, March  1960. 

9.  U.  S.  Senate  Committee  on  Interstate  and  Foreign  Commerce,  87th  Con- 
gress, 1st  Session.  Special  Study  Croup  on  Transportation  Policies  in  the 
United  States,  Preliminary  Draft  of  a  report.  National  Transportation  Pol- 
icy, January  1961   (Doyle  Report). 

The  principal  advantages  of  adopting  fair  and  equitable  user  charges  on  inland 
na\'igation  projects  are  briefly  sununarized  as  follo\\'s: 

1.  The  cost  of  constructing,  maintaining,  and  operating  inland  waterways 
would  be  shifted  from  the  general  taxpayers  to  direct  project  beneficiaries. 

2.  Adequate  user  charges  would  promote  sound  national  transportation  pol- 
icies as  shippers  could  select  the  least  costly  mode  of  transportation,  all 
costs  included. 

3.  Adequate  cost-sharing  principles  and  user  charges  would  eliminate  dis- 
crimination against  competing  or  alternative  carriers. 

4.  The  adoption  of  cost-sharing  principles  and  user  charges  would  result  in 
improving  the  quality  of  studies  of  navigation  projects  and  na\igation 
features  of  multiple-purpose  projects 

5.  Adoption  of  user  charges  would  reduce  the  pressure  of  promotional  groups 
for  more  and  larger  navigation  projects  since  users  would  be  required  to 
pay  for  such  projects. 

6.  User  charges  would  promote  the  more  efficient  use  of  the  Nation's 
resources  by  precluding  the  construction  of  uneconomic  projects,  the  over- 
design  of  projects,  and  the  early  replacement  of  projects. 

Evaluation   of   Navigation    Benefits 

Historically,  the  Corps  of  Engineers  has  computed  navigation  benefits  as  the 
difference  in  estimated  barge  rates  and  published  rates  of  alternative  carriers.  This 
procedure  was  followed  even  though  Bureau  of  the  Budget  Circular  No.  A-47, 
December  31,  1952  (Reports  and  Budget  Estimates  Relating  to  Federal  Programs 
and  Projects  for  Construction,  Development,  or  Use  of  Water  and  Related  Land 
Resources)  and  Senate  Document  No.  97,  87th  Congress,  2nd  Session,  May  29, 
1962  (Policies,  Standards,  and  Procedures  in  the  Formulation,  Evaluation,  and  Re- 
view of  Plans  for  Use  and  Development  of  Water  and  Related  Land  Resources) 
required  navigation  benefits  be  computed  as  the  difference  in  carrier  incremental 
costs.  Computing  navigation  benefits  as  the  difference  in  carrier  rates  does  not  and 
cannot  measure  national  income  gains  or  the  real  worth  of  navigation  projects.  At 
best,  it  can  only  hope  to  measure  the  income  transferred  from  the  Nation's  taxpayers 
and  alternative  caniers  to  barge  line  operators  and  shippers. 

Notwithstanding  the  obvious  defects  in  evaluating  navigation  benefits  as  differ- 
ences in  carrier  rates.  Section  7  of  the  Department  of  Transportation  Act  requires 
the  use  of  this  procedure. 


Waterways    and    Harbors 445 

Section  7  of  the  Department  of  Transportation  Act  is  as  follows: 

(a)  The  Secretary,  subject  to  the  provisions  of  Section  4  of  this  Act,  shall 
develop  and  from  time  to  time  in  the  light  of  experience  revise  standards 
and  criteria  consistent  with  national  transportation  policies,  for  the 
formulation  and  economic  evaluation  of  all  proposals  for  the  in\estment 
of  Federal  f\mds  in  transportation  facilities  or  eciuipment,  except  such 
proposals  as  are  concerned  with  ( 1 )  the  acquisition  of  transportation 
facilities  or  equipment  by  Federal  agencies  in  providing  transportation 
services  for  their  own  use;  (2)  an  interoceanic  canal  located  outside  the 
contiguous  United  States;  (3)  defense  features  included  at  the  direction 
of  the  Department  of  Defense  in  the  design  and  construction  of  civil  air, 
sea  and  land  transportation;  (4)  programs  of  foreign  assistance;  (5) 
water  resources  projects;  or  (6)  grant-in-aid  programs  authorized  by  law. 
The  standards  or  criteria  for  economic  evaluation  of  water  resources 
projects  shall  be  developed  by  the  Water  Resources  Council  established 
by  Public  Law  89-80.  For  the  purpose  of  such  standards  and  criteria, 
the  primary  direct  navigation  benefits  of  a  water  resources  project  are 
defined  as  the  product  of  the  savings  to  shippers  using  the  waterway 
and  the  estimated  traffic  that  would  use  the  waterway;  where  the  savings 
to  shippers  shall  be  construed  to  mean  the  difference  between  (a)  freight 
rates  or  charges  prevailing  at  the  time  of  the  study  for  the  movenuMit 
by  the  alternative  means  and  (b)  those  which  would  be  charged  on  the 
proposed  waterway;  and  where  the  estimate  of  traffic  that  would  use 
the  waterway  will  be  based  on  such  freight  rates,  taking  into  account 
projections  of  the  economic  growth  of  the  area. 

The  Water  Resources  Council  established  under  Section  101  Public 
Law  89-80  is  hereby  expanded  to  include  the  Secretary  of  Transporta- 
tion on  matters  pertaining  to  navigation  features  of  water  resources 
projects. 

(b)  Every  survey,  plan,  or  report  formulated  by  a  Federal  agencv'  which 
includes  a  proposal  as  to  which  the  Secretary  has  promulgated  standards 
and  criteria  pursuant  to  subsection  ( a )  shall  be  ( 1 )  prepared  in  accord 
with  such  standards  and  criteria  and  upon  tlie  basis  of  information  fur- 
nished by  the  Secretary  with  respect  to  projected  growth  of  transporta- 
tion needs  and  traffic  in  the  affected  area,  the  relative  efficiency  of  vari- 
ous modes  of  transport,  the  a\  ailable  transportation  services  in  the  area, 
and  the  general  effect  of  the  proposed  investment  on  existing  uiodes, 
and  on  the  regional  and  national  economy;  (2)  coordinated  by  ihe  pro- 
posing agency  with  the  Secretary  and,  as  appropriate,  with  other  Federal 
agencies.  States  and  local  units  of  government  for  inclusion  of  his  and 
their  views  and  connnents;  and  (3)  transnntted  thereafter  by  the  pro- 
posing agency  to  the  President  for  disposition  in  accord  with  law  :ui'l 
procedures  establi.shed  by  hiui. 

Although  the  railroads  are  not  (luestioning  the  right  of  Congress  to  leRisIate  .such 
a  procedure,  they  also  recognize  that  Congress  cannot  change  sovuid  economic  theory 
by  legislation  any  inore  than  it  can  change  the  law  of  gravity.  Tliere  is  general  c«)n- 
sensus  that  navigation  benefits  computed  in  accordance  with  Section  7  cannot  meas- 
ure the  real  econonnc  benefits  of  navigation  projects  and  therefore  vjol.itcs  sound 
economic  evaluation  procedures. 


446 Waterways    and    Harbors 

Section  7  of  the  Department  of  Transportation  Act  practically  prohibits  the 
development  of  sound  criteria  for  use  in  evaluating  inland  naxigation  projects.  This 
contradicts  one  of  the  principal  reasons  for  establishing  the  Department  of  Trans- 
portation which  was  to  ".  .  .  revise  standards  and  criteria  consistent  with  national 
transportation  policies,  for  the  formulation  and  economic  evaluation  of  all  proposals 
for  the  investment  of  Federal  funds  in  transportation  facilities  .  .  ."  Consequently, 
the  Department  of  Transportation  Act  not  only  imposes  a  legislative  constraint  on 
the  soinid  evaluation  of  navigation  projects  but  impedes  the  development  of  sound 
evaluation  criteria. 

There  is  an  urgent  need  for  a  comprehensive  review  of  the  adequacy  of  proce- 
dures used  to  evaluate  navigation  benefits.  The  railroads'  study  of  the  problem 
demonstrates  the  proper  measure  of  navigation  benefits  is  the  difference  in  carriers' 
incremental  or  marginal  costs. 

Recommendations 

The  railroads  industry  urges  and  recommends  that  the  National  Water  Com- 
mission carefully  review  the  need  for  fair  and  equitable  user  charges  to  recover  the 
costs  of  constructing,  maintaining,  and  operating  inland  navigation  projects.  The 
present  and  the  four  preceding  Presidential  Administrations  have  each  recommended 
a  very  modest  tax  on  fuel  used  by  towboats  operating  on  inland  waterways.  The 
current  recommendation  of  a  tax  of  2  cents  per  gallon  would  recover  about  10  per- 
cent of  the  cost  of  operating  and  maintaining  inland  waterways.  It  would  not  recover 
any  costs  associated  with  the  amortization  of  and  interest  on  the  substantial  inx'est- 
ments  in  inland  naxigation  projects.  Although  the  recommendation  of  the  present 
Administration  is  extremely  modest,  it  represents  a  first  step  in  the  right  direction. 
The  ultimate  objective  of  user  charges  should  be  the  recovery  of  all  costs  associated 
with  inland  navigation  projects  recognizing,  however,  that  because  of  substantial 
"sunk  costs"  the  minimum  objectixe  should  be  the  recovery  of  operating  and  main- 
tenance costs.  Future  in\estment  costs  in  inland  navigation  projects  should,  of  course, 
be  recovered  by  appropriate  user  charges. 

The  railroad  industry  also  urges  and  recommends  diat  the  National  Water 
Commission  carefully  review  the  adequacy  of  the  current  procedure  used  to  eval- 
uate navigation  benefits.  Since  there  is  general  consensus  that  navigation  benefits  be 
measured  as  the  difference  in  long-run  marginal  costs  of  carriers,  we  recommend  the 
adoption  of  this  procedure.  This  procediue  will  reflect  the  real  economic  worth  of 
inland  navigation  projects. 

As  previously  stated,  the  above  is  essentially  as  presented  by  the  AAR  as  an 
oral  statement  before  the  National  Water  Commission  on  November  9,  1968. 

COSTLY    BARGE    TRAFFIC 

The  public  should  be  better  informed  of  the  taxpayers'  money  being  spent  on 
inland  waterways  and  one  such  source  of  information  is  local  editorials  such  as  the 
following  that  appeared  in  the  Lawrence  (Kansas)  Journal  which  reveals  an  inter- 
testing  viewpoint  that  is  general  in  its  application: 

"While  our  nation  flounders  in  financial  difficulties,  the  government  con- 
tinues to  spend  money  with  reckless  abandon,  and  numerous  goxernment 
agencies  keep  looking  for  new  ways  to  try  and  drain  the  treasury  dry. 

"Recently,  the  U.  S.  Engineers  have  been  talking  about  digging  a  deeper 
channel   on  the   Missouri    River  between  St.   Louis    and   Sioux  City,   la.,  to 


Waterways    a  n  d    Harbors 447 

proN'ide  easier  passage  for  present  barges  and  tugs,  and  to  allow  larger 
vessels  to  go  up  and  down  the  river.  They  toss  off  figures  of  expense  as  if 
the  proposal   is  a  somewhat  minor  project  at  a  bargain  cost. 

"Already  die  Missouri  River  has  cost  the  taxpayers  hundreds  of  nnllions 
of  dollars,  maybe  billions,  all  of  questionable  \alue  to  the  people  who  pay 
the  bills. 

"Railroads  finance  all  tPieir  o\\  n  operations,  including  purchase  of  rights- 
of-way  and  equipment,  and  on  top  of  that  they  pay  huge  taxes  for  operation 
of  state  and  local  governments  and  public  schools.  The  river  barge  people 
have  their  'right  of  way'  provided  free;  the  government  pays  nearly  all  main- 
tenance and  the  taxes  paid  are  negligible. 

"The  engineers  say  the  Missouri  channel  can  be  deepened  from  6  feet, 
6  inches  to  a  full  9  feet  for  only  $413,110,000. 

"Let's  see  how  much  that  amounts  to. 

"Based  upon  interest  rates  now  paid  by  the  government  on  new  issues, 
the  annual  interest  bill  alone  would  be  approximately  $24,780,000.  This  in- 
cludes nothing  for  debt  reduction  or  the  costly  overhead  which  government 
always  adds  to  the  expense. 

"Just  for  the  sake  of  making  comparisons,  how  far  would  this  annual 
interest  bill  go  toward  justifying  freight  mo\'ed  on  the  Missouri? 

"Here  is  one  way  to  draw  a  comparison: 

"If  existing,  tax-paying  railroads  would  send  eight  freight  trains  each 
day  from  St.  Louis  to  Sioux  City,  and  if  from  the  other  end  of  the  line  they 
would  start  eight  additional  freight  trains  toward  St.  Louis,  it  would  make 
a  total  of  16  long  freight  trains  making  the  run  each  day. 

"Tonnage  hauled  on  the  Missouri  River  in  a  year  is  only  a  small  fraction 
of  what  these   16  trains  could  carry. 

"Uncle  Sam  could  pay  the  railroads  $4,200  for  each  of  these  16  trains, 
every  day  in  the  year,  for  what  the  interest  alone  would  cost  for  the  dredging 
of  the  channel  an  extra  two  and  one-half  feet  in  depth. 

"This  doesn't  include  a  penny  for  the  original  investment  of  $413,110,000 
nor  a  single  penny  for  costly  maintenance  and  overhead. 

"Barge  enthusiasts  point  a  finger  of  scorn  at  anyone  who  (luestions  the 
huge  outlays  spent  in  providing  free  riglit-of-way  for  the  bait  builders  i)ut 
the  day  will  come  when  taxpayers  will  realize  more  clearly  how  they  ha\e 
been  duped  in  .spending  billions  to  finance  the  so-called  cheap  ri\er  traffic. ' 

CONCLUSION 

In  closing,  it  is  the  hope  that  the  National  Water  Commission  will  reali/.c  its 
true  objectives  and  will  abide  by  the  Declaration  of  Purpose  of  the  Department  cf 
Tran.sportation  Act  which  reads  in  part: 

"Sec.  2(a)  The  Congress  declares  that  the  general  welfare.  [\u-  ctdnomn 
growth  and  stability  of  the  Nation  and  its  security  require  the  dcNelopinent 
of  national  transportation  policies  and  programs  conducive  to  the  provisions 
of  fast,  safe,  efficic-nt  and  con\enient  transportation  at  the  lowest  cost  con- 
sistent therewith  and  with  other  National  objectives,  including  the  efficient 
utilization  and  conservation  of  the   Nation's  resources.   .  .  ." 


Report  of  Committee   24 — Engineering   Education 


V.   J.   ROGGEVEEN, 

Chairman 

H.  M.  Williamson, 
Vice  Chairman 

T.  G.  ScHULTZ,  Secretary 


A.  V.    TOHNSTON 

R.  H.  Lee 
W.  A.  Oliver 
H.  E.  Hurst 
W.  T.  Hammond 
J.  F.  Davison 
T.  M.  Adams 

B.  G.  Anderson 
W.  S.  Autre Y 

J.  B.  Baucock  (E) 
R.  H.  Beeder 
J.  H.  Brown 
R.  M.  Brown 
W.  R.  Catching 
J.  B.  Clark 

A.  W.  Cooper 

D.    N.    CORTRIGHT 

T.  P.  Cunningham 

B.  M.  Davidson 
R.  P.  Davis  (E) 

D.  G.  Elack 
J.  T.  Evans 
R.  J.  Fisher 

E.  T.  Franzen 
L.  C.  Gilbert 


C.  E.  R.  Haight 
W.  W.  Hay 
C.  L.  Heimbach 
L.  J.  Hoffman 
W.  P.  HouwEN,  Jr. 
E.  Y.  Huang 
W.  H.  Huffman 

E.  Q.  Johnson 

F.  O.  Johnson 
C.  Johnston 
T.  D.  Kern 
W.  S.  Kerr 

B.  B.  Lewis 

R.  G.  Michael 
J.  F.  Pearce 

C.  T.    POPMA 

G.  B.  Pruden 
R.  B.  Rice 

L.  P.  Rossi 
A.  L.  Sams 
P.  S.  Settle 
G.  Reed  Shaw 

R.   M.   SOBERMAN 

W.  D.  Taylor 
C.  T.  Yarbrouc;h 

Committee 


(E)  Member  Emeritus. 

Those  whose  names  are  shown  in  boldface,  in  addition  to  the  chairman,  vice  chairman  and 
secretary,  were  the  subcommittee  chairmen  jirior  to  the  complete  reorganization  of  the  com- 
mittee, which  is   discussed  below. 

To  the  American  Railway  Engineering  Association: 

Yom-  committee  reports  on  its  reorjranization,  and  on  the  one  assignment — 
summer  employment — that  continued  without  interruption. 

COMMITTEE    REORGANIZATION 

The  committees  of  AREA  have  been  asked  by  the  Board  of  Direction  to  re- 
examine  their  scope   and   activities,   and   to   modernize   them   wherever  appropriate. 

During  1970  your  Committee  24  continued  the  major  effort,  the  start  of  which 
was  reported  brieHy  hist  year,  to  reappraise  itself.  Fundamental  changes  were 
developed. 

A  change  of  name  and  a  new  set  of  assignments  were  appro\ed  b\'  the  AHK.A 
Board  of  Direction  at  its  meeting  on  November  20,  1970.  New  chairmen  have 
agreed  to  lead  the  .subcommittees  responsible  for  the  new  assignments,  and  so  your 
Committee  24  enters   1971   completely  reorganized  to  start  its  new  work. 

Further  details  follow. 


COMMITTEE    NAME 

The  new  name  is  Engineering  Education. 

This  was  developed  and  discussed  at  the  October  1969  and  March  1970  com- 
mittee meetings.  It  was  then  submitted  to  a  letter  ballot  of  the  entire  committee 
in  September  1970.  Of  the  51  members  (not  including  asswiate-s),  34  returned  bal- 
lots. There  were  32  "ye.s"  and  only  2  "no"  votes. 


AREA  Bvilletin   6.31.   January-February   1971. 

Note — Discussion   on   the   Committee   24   report   closes  on   May    I.    1971. 

449 


450 Engineering    Education __^_ 

As  already  noted,  the  change  was  approved  by  tlie  Board  of  Direction  in 
November  1970. 

The  members  bcHeve  that  this  new  name,  though  much  shorter,  gives  the  com- 
mittee much  greater  scope  for  useful  assignments  than  the  previous  one,  Cooperative 
Relations  with  Universities.  In  addition  it  was  felt  that  AREA,  railroads,  or  railroad 
engineers  do  not  "cooperate"  in  "relations"  with  universities,  but  rather  that  the 
interactions  that  do  exist  are  largely  with  individual  professors.  The  previous  name 
has  had  little  meaning  or  status  in  the  academic  world,  while  "Engineering  Educa- 
tion" is  in  line  with  the  usage  of  the  American  Society  for  Engineering  Education, 
and  resembles  tlie  even  shorter  title,  "Education,"  of  the  American  Road  Builders 
Association  committee  with  somewhat  similar  industry-faculty  activities. 

SCOPE 

The  Board  of  Direction  of  AREA  has  asked  all  committees  to  develop  state- 
ments of  scope.  This  was  a  particularly  useful  task  for  Committee  24  as  the  task 
of  drafting,  revising,  and  editing  helped  to  guide  it  in  the  directions  towards  which 
its  new  assignments  should  be  pointed. 

A  first  draft  was  started  in  October  1969,  and  lengthy  attention  was  given  to  it 
at  both  the  March  and  October  1970  meetings.  A  final  statement  has  been  sub- 
mitted to  the  Board  for  its  approval. 

In  general,  the  suggested  scope  is  visualized  as  being  that  the  committee  serves 
as  a  link  between  the  railway  engineering  profession  and  engineering  education  and 
that  it  serves  to  help  people  in  each  group  to  become  more  familiar  with  the  inter- 
ests of  and  activities  in  the  other.  It  also  outlines  the  major  areas  of  interest  of  the 
committee. 

ASSIGNMENTS 

With  a  new  name  and  statement  of  scope,  the  committee  then  asked  itself 
what  assignments  would  lead  to  the  most  useful  results.  There  was  general  agree- 
ment that  most  of  the  previous  ones  were  no  longer  relevant.  The  new  assignments 
that  developed  from  this  analysis  were  approved  by  the  Board  of  Direction  of  AREA 
at  its  November  meeting. 

The  new  assignments  follow.  They  are  accompanied  by  brief  comments;  details 
will  be  developed  by  the  new  subcommittees  responsible  for  them. 

A.  Recommendations  for  further  study  and  research 

A  continuing  re-examination  of  what  the  committee  should  best  be  doing. 

1.  Recruiting 

How  railroad  managements,  working  with  university  staffs,  can  do  the  best 
possible  job  of  finding  and  attiacting  graduating  engineers  to  their  engineering 
departments. 

2.  Summer  employment 

Assist  railroad  engineering  officials  and  engineering  students  to  get  in  touch 
with  each  other  about  summer  employment  opportunities. 

3.  Student  internships 

Encourage  railroad  engineering  departments  to  participate  actively  with  tho.se 
colleges  and  universities  offering  student  internship  programs. 


Engineering    Education  451 


4.  Student  affiliates 


Revitalize  this  existing  AREA  program  by  re-examining  all  aspects  of  it  and 
developing  improvements. 

5.  Speakers 

Act  as  a  clearinghouse  and  report  on  what  activities  took  place  during  the 
academic  year  in  which  people  from  railroads  made  speeches,  showed  slides  and 
movies,  conducted  field  trips,  and  participated  in  other  activities  designed  to 
acquaint  engineering  students  with  railway  engineering. 

6.  Project  case  studies 


Develop  detailed  documentation  about  actual  current  railroad  engineering  proj- 
ects to  use  as  examples  in  transportation  engineering  courses. 

7.  Continuing  education 

How  can  engineering  educators  assist  in  providing  part-time  education,  short 
courses,  lectures  at  railroad  offices,  or  other  programs  to  bring  new  develop- 
ments in  engineering  education  to  engineers  already  employed  by  railroads. 

8.  Exchange  of  professional  staffs 

Try  to  develop  arrangements  whereby  engineering  educators  could  spend 
periods  of  time  working  in  railway  engineering  departments,  and  railway  engi- 
neering officials  could  participate  in  college  and  university  classroom  instruc- 
tion about  railway  engineering. 

9.  Research  resource  a\ailabilit\- 


Many  graduate  students  in  universities  become  familiar  with  specific  fields  of 
engineering  primarily  by  working  on  research  sponsored  by  outside  funds,  ])nt 
there  have  been  only  a  few  such  opportunities  at  a  very  few  schools  that  ha\c 
been  railroad-engineering  oriented.  This  assignment  will  focus  on  how  such 
opportunities  can  be  increased. 

SUBCOMMITTEE    CHAIRMANSHIPS 

The  new  assignments  have  provided  an  appropriate  opportunity  to  reassign 
responsibilities  within  Committee  24.  Most  suljconimittee  chairmen,  having  workctl 
loyally  for  many  years,  needed  a  rest.  Two,  W.  A.  Oliver  and  R.  H.  Lee,  agreed 
to  continue  in  essentially  the  same  responsibilities  that  they  had  before.  Other  mem- 
bers have  volunteered  for  all  the  new  assignments. 

New  chairmen  of  subcommittees  are: 

A.  Recommendations  for  further  study  and   research 
(H.   M.  Williamson) 

1.  Recruiting 

(W.  R.  Catching) 

2.  Summer  employment 

(W.  A.  Oliver) 
.3.  Student  internships 

(C.  T.  Yarbrough) 
4.  Student  affiliates 

(T.  G.  Schultz) 


452 Engineering    Education 

5.  Continuing  education 

(A.  L.  Sams) 

6.  Speakers 

(R.   H.   Lee) 

7.  Project  case  studies 

(D.  N.  Cortright) 

8.  Exchange  of  professional  staffs 

(C.  T.  Popma  and  B.  M.  Davidson) 

9.  Research  resource  availabihty 

(V.  J.  Roggeveen) 

FURTHER   WORK 

The  final  steps  are  now  underway. 

The  remaining  committee  memliers  are  being  assigned  to  work  with  the  new 
subcommittee  chairmen,  in  the  best  possible  correlations  of  indi\iduals  ar.d  their 
areas  of  interest. 

The  April  1971  meeting  of  Committee  24  will  provide  the  initial  opportunity 
to  discuss  these  new  assignments  in  detail;  work  by  correspondence  is  underw-ay  on 
several  of  them. 

The  1971  committee  report  to  members  will  describe  how  this  new  program 
develops. 


Report   on    New  Assignment   2 
(Former  Assignment   3) 

Summer  Employment 

(Formerly:    The    Cooperafive    System    of    Education,    Including     Summer    Employment 

in    Railway    Service) 

W.  A.  Oliver  (chairman,  sithcommittce),  T.  M.  Adams,  W.  S.  Autrey,  J.  B.  Bab- 
cock,  R.  H.  Beeder,  T.  p.  Cunningham,  R.  J.  Fisher,  L.  C.  Cilbert,  Claude 
Johnston,  T.  D.  Kern,  R.  H.  Lee,  B.  B.  Lewis,  R.  B.  Rice,  V.  J-  Roggeveen. 

In  accordance  with  its  practice  since  1959,  Committee  24  canvassed  the  rail- 
roads during  December  1969  concerning  their  employment  opportunities  for  engi- 
neering students  for  the  summer  of  1970.  A  questionnaire  was  sent  to  tlie  chief 
engineering  and  maintenance  officers  and  chief  personnel  officer^s  of  the  railroads 
of  the  United  States  and  Canada.  It  requested  information  about  their  requirements 
for  the  coming  summer,  as  well  as  about  their  program  of  the  preceding  one.  Posi- 
tions to  be  available  were  tabulated,  and  sent  by  the  Association  to  the  deans  and 
department  heads  of  some  125  engineering  colleges  with  the  request  that  they  bring 
these  opportunities  for  summer  employment  with  the  railroads  to  the  attention  of 
their  students. 

Employment   Opportunities 

The  number  of  railroads  offering  summer  employment  in  1970  v\as  down  com- 
pared to  1969,  a  not  unexpected  development.  The  results  obtained  from  the  1970 
questionnaire   and,    for   comparison,   the   1969  figures,   were: 


Engineering    Education  453 

SuMMKK  Employment 

Number  of  Railroads 

1969  (for 
1970     Comparison) 

Offering  employment  throvitih  Committee  24    17  25 

Offering  employment,  liut  not  through  Committee  24    23  20 

Number  of  railroads  offering  employment   40  45 

No  employment  available    11  8 

Total   return   of   questionnaires    51  53 

Employment   Experience 

Information  about  actual  1969  summer  employment  by  the  railroads  was  also 
requested  in  the  questionnaire.  It  is  a  well  known  fact  that  the  railroads  have  for 
many  years  been  employing  many  hundreds  of  college  students  during  the  summer 
vacation  months.  The  following  figures  are  only  an  indication  of  the  total  numl^ers 
employed  in  1969,  as  companies  that  did  noi  answer  the  questionnaire  probably  also 
employed  college  students. 

Summer  Employment  in  1969 

Engineering  and  other  college  students  employed  in  1969 3,299 

Number  of  repeats  from  the  summer  of  1968   1,010 

Number  from  those  employed  during  summer  months  who  became  permanent 

employees    159 

Committee  24  takes  this  opportunity  to  thank  the  railroads  for  the  support  they 
have  gi\'en  tliis  project  and  requests  their  continuing  cooperation.  It  plans  to  con- 
tinue this  acti\  ity  in  the  coming  year. 


REGIONAL   MEETING 

October   20,    1970 
Royal    York    Hotel,   Toronto,   Ont. 


Luncheon   Address — 
Planning  and   control 

By    J.    H.    SPICER 

Vice    President,    Transportation    and    Maintenance* 

Canadian    National    Railways 

I  want  to  say  a  few  words  about  Planning  and  Control  and  touch  briefly  on 
some  of  the  implications  for  railway  engineers. 

Ever  since  our  early  ancestors  ambled  out  of  a  cave  and  decided,  with  their 
neighbors,  how  to  tackle  a  dinosaur,  planning  and  control  have  been  an  essential 
element  in  the  progress  of  man.  Unfortunately,  preparing  meaningful  long-range 
plans  for  a  railway  has  always  been  extremely  difficult  because  of  the  complexity 
of  market  forecasting,  production  forecasting,  and  the  close  inter-dependence  of  these 
elements. 

A  number  of  years  ago  we  reached  the  not  novel  conclusion  that,  to  ensure 
continued  corporate  health,  we  needed  more  complete  plans  for  the  future.  It  was 
obvious  that  in  developing  a  meaningful  plan  the  following  factors  should  be  taken 
into  account:  economic  environment,  the  total  transportation  market,  the  likely 
effects  of  difi^erent  levels  of  rates,  speed  and  reliability  on  market  share,  the  operat- 
ing and  capital  cost  implications  of  the  various  service  and  volume  possibilities, 
the  effects  on  personnel  of  each  alternative,  and  the  assessment  of  the  physical  and 
financial  ability  to  undertake  each  of  possible  courses  of  action. 

It  became  apparent  rather  quickly  that,  if  basically  manual  methods  were  used, 
preparing  only  a  few  alternatives  for  each  major  element  independently  would  be  a 
formidable  task;  but  if  we  tried  to  interrelate  the  many  elements,  each  having  a 
wide  range  of  variables,  to  produce  an  optimum  solution  for  the  system  as  a  whole 
we  would  have  to  employ  a  significant  portion  of  the  Canadian  population  for  a 
number  of  years.  Although  this  would  do  wonders  for  Canada's  unemployment 
statistics,  it  would  play  havoc  with  our  operating  budget.  Two  decisions  were  made. 
The  first  was  to  start  modestly,  and,  the  second,  to  see  how  computers  might  be 
used. 

Environmental    Factors 

The  starting  point  is  the  environment  in  which  the  railroad  will  be  expected  to 
operate,  and  in  the  CN  we  begin  with  a  general  projection  extending  approximately 
20  years  into  the  future.  We  then  start  a  detailed  review  covering  the  next  five 
years.  We  feel  it  important  to  develop  the  five-year  program  against  the  background 
of  a  20-year  outlook  as  we  have  found  tliat  it  is  possible  to  anticipate  significant 
changes  beyond  the  five-year  period  which  should  not  be  ignored  in  preparing  the 
shorter  term  plan.   The  review  is  essentially  an  attempt  to   assess  the  market   over 


*  Subsequent   to   the    Regional   Meeting,   Mr.   Spicer   was   promoted  to    vice  president,   Prairie 
Region. 

454 


Address    by    J.    H.    Spicer 455 

the  next  five  years  taking  account  of  past  history,  future  changes  expected  in  the 
social  and  economic  environment,  the  activities  of  competitors,  technological  changes 
and  the  changing  needs  of  the  market. 

From  this  review  we  obtain  commodity  volume  forecasts  of  known  or  antici- 
pated business,  market  areas  which  appear  exploitable  or  vulnerable,  pricing  policies 
and  revenue  potential  and  projection.  A  specially  developed  computer  program  is 
used  to  convert  volume  forecasts  into  expected  work  loads  and  demands  on  our 
production  resources.  This  takes  the  five-year  projections  for  the  65  different  com- 
modity groups  used  in  our  economic  forecasts  and  provides  a  comprehensive  break- 
down of  expected  car  movements  between  174  stations.  The  program  also  divides 
the  total  car  movements  between  any  two  of  these  centers  into  three  classifications: 

1.  Preference  traffic  which  requires  fast,  highly  reliable  service. 

2.  Bulk  and  other  traffic  requiring  primarily  reliable  service. 

3.  Heavy  axle  load  traffic  which  places  maximum  structural  demands  on  the 
track. 

Resource   Factors 

The  appraisal  of  the  market  and  the  resulting  marketing  proposals  indicate 
where  we  can  go  or  where  we  would  like  to  go.  They  are  stated  in  specific  work- 
load terms  and  with  this  information  we  have  been  able  to  simulate  future  train 
and  yard  operations,  compare  capacity  requirements  with  existing  capabilities  and 
reach  conclusions  on  the  specific  programs  required  to  provide  the  capacities  indi- 
cated. The  next  step  is  to  decide  between  the  alternatives  before  us.  It  is  in  this 
area  that  the  computer  models  are  extensively  used.  Over  a  period  of  years  we  have 
developed  a  library  of  programs  which  allow  us  to  assess  the  impact  of  traffic  changes 
on  our  plant  capacity  and  experiment  with  alternatives  relatively  easily  and  (luickK. 
As  a  result,  we  now  have  a  good  picture  of  our  signal,  siding  extension,  and  rail 
program  requirements  by  subdivision  for  the  System  over  the  next  five  years  and 
beyond.  We  also  have  been  able  to  assess  the  marshalling  and  industrial  work  loads 
at  all  significant  terminals  and  design  the  terminal  changes  required  to  meet  tlie 
new  pattern.  We  have  been  able  to  make  detailed  comparisons  between  our  existing 
freight  and  locomotive  fleet  and  that  which  will  be  required  in  tiie  planning  period. 
In  short,  the  work-load  forecast  has  permitted  us  to  prepare  quite  specific  plans 
for  required  changes  in  signalling,  siding  extension  programs,  terminal  designs, 
locomotive  and  car  inventories,  rail  programs  and  track  quality  requirements,  etc. 

This  then  becomes  the  basis  for  more  detailed  analysis  of  the  impact  on  financial, 
material  and  human  resources.  This  detailed  analysis  may  indicate  areas  which  are 
unacceptable  from  a  resource  \  iewpoint  and,  if  need  be,  the  cycle  will  be  repeated 
and  other  possibilities  exannned  until  an  acceptable  plan  e\oI\es.  The  marketing 
plan,  together  with  its  resulting  production,  financial  and  manpower  counteriiarts, 
form  the  company's  "corporate  plan"  and  after  re\  iew  and  approN'al  by  top  manage- 
ment and  the  Board  of  Directors  becomes  the  authority  for  future  action  and 
developments. 

Cybernetic   Elements 

The  plans  and  strategies  which  develop  are  the  result  of  continuous  interaction 
between  all  levels  of  management  and  all  functions.  As  the  proposals  evolve  and 
are  considered,  they  undergo  continuous  adjustment,  and  alternatives  are  reviewed 
and   assessed   before   the    final    product   emerges.   The   approach   is   a   total   sy.stenis 


456 Address    by    J.    H.    Spicer 

one  in\()l\iiig  analysis  of  the  impact  and  implications  of  cacli  proposal  or  possibility 
on  available  production,  financial  and  manpower  resources  and  on  the  company's 
profitability.  If  need  be,  partial  or  complete  recycling  of  the  different  stages  is 
carried  out  until  an  acceptable  and  realistic  plan  for  the  company's  future  is  reached. 
While  we  have  described  the  various  stages  secjuentially,  information  and  re- 
sults arc  fed  forward  or  back  and  steps  retraced  and  recycled  when  difficulties  arise 
or  new  opportunities  develop. 

Decision    Models 

Most  physical  elements  of  a  railway  are  expensive,  have  a  relatively  long  life 
and  cannot  be  modified  quickly.  For  example,  to  increase  significantly  the  capability 
of  a  major  traffic  route  is  both  extremely  expensive  and  time  consuming.  To  ensure 
that  the  plant  capability  reasonably  matches  plant  requirement,  decisions  to  proceed 
with  expansion  programs  must  be  based  on  forecasts  of  the  future.  Even  the  more 
expensive  crystal  balls  fail  to  dispel  all  uncertainties. 

Deciding  between  alternati\es  and  finding  the  "optimum"  decision  is  a  com- 
plex task.  Optimization  is  in  fact  rarely  a  practical  reality  and  at  best  all  we  can 
hope  to  achieve  is  the  optimum  compromise  between  two  or  more  conflicting  pos- 
sibilities. Some  of  the  factors  involved  are,  moreover,  very  difficult  to  quantify, 
and  subjective  criteria  based  on  experience  and  judgment  have  in  the  past  been 
tile  main  means  of  resolving  conflicts.  The  penalty  for  being  wrong  is  increasing 
and  all  possible  help  must  be  made  available  to  railroad  decision  makers. 

It  is  in  this  area  of  decision  making  under  uncertainty  that  many  of  the  tech- 
niques of  management  science  are  proving  very  useful.  Application  of  the  techniques 
would  in  many  cases  not  be  possible  without  the  parallel  developments  \\'hich  ha\e 
taken  place  in  computers  and  computer  science.  Together  they  are  producing  more 
objective  measures  to  help   management. 

Probably  the  most  useful  is  a  network  model  we  have  developed.  This  is,  in 
effect,  a  model  railroad  in  which  we  can  move  cars  from  origin  to  destination 
through  the  CN  rail  network  and  examine  the  effect  of  changes  in  traffic  mix  and 
volume,  changes  in  facilities  and  changes  in  operating  procedures,  practices  and 
schedules.  Because  of  the  complex  interactions  between  the  many  different  elements 
of  a  railroad  system,  a  computer-based  model  of  this  kind  is  essential  if  a  reliable 
picture  of  the  inipact  of  any  change  on  die  total  system  is  to  be  obtained.  The 
network  model  is  our  "look-before-you-leap"  tool  and  is  applied  to  such  problems  as: 

(a)  Capabilities  of  existing  resources  to  handle  the  increased  volumes  which 
we  anticipate  and  the  efl^ect  on  the   level  of  service  being  pro\'ided. 

(b)  The  ability  to  reroute  traffic  over  less  densely  travelled  sections  and  the 
effect  on  service  of  so  doing. 

(c)  The  eftect   of  changes  in  traffic  mix,   including  the  impact  of  container 
trains,  unit  trains,  etc.,  on  other  traffic. 

(d)  The  service  changes  and  resources  required  to  meet  market  requirements. 

The  experience  and  judgment  of  the  human  decision  maker,  however,  is  still 
and  will  remain  the  most  important  element  in  the  decision  process.  The  computer 
and  the  techniques  can  undoubtedly  assist,  but  without  human  values  we  can  only 
hope  at  best  for  mechanistic  solutions. 

Control   Aspects 

Once  a  plan  of  action  has  been  developed,  and  decisions  taken,  it  is  necessary 
to   control   the   many  processes   involved  in  performing  our  transportation  business. 


Address    by    Dr.    R.    S.    Thorn  an 457 

With  modern  computer  and  conuniinication  technology,  the  information  require- 
ments can  be  met  without  too  much  difficulty.  Meeting  the  control  requirements, 
however,  is  a  much  more  difficult  task  since  it  has  to  be  able  to  ensure  reliable 
and  predictable  performance  over  a  wide  range  of  service  requirements.  The  com- 
plexity of  tlie  basic  rail  freight  product — the  movement  of  goods  in  carload  lots 
between  any  combination  of  industry  sidings  along  a  vast  network  of  lines — together 
with  the  interactive  nature  of  the  elements  which  make  up  a  railroad,  combine  to 
make  the  achievement  of  an  adequate  control  system  a  major  problem. 

Central  to  any  control  system  is  access  to  timely  and  accurate  information  and 
in  the  CN  we  are  in  the  process  of  installing  an  on-line  real-time  information  system 
to  fill  this  need.  The  specifications  for  this  have  been  determined  by  the  type  of 
control  we  believe  is  needed. 

Our  approach  has  been  first  to  determine  and  test  our  control  concepts  and 
then  develop  an  appropriate  data  base  to  satisfy  these.  I  think  our  concept  of  the 
eventual  control  system  leads  the  field,  though  a  few  others  have  progressed  further 
in  establishing  the  data  base.  We  hope  to  be  able  to  go  on-line  immediately  with 
the  control  system  once  the  data  base  becomes  available.  Development  has  been 
underway  now  for  about  three  years. 

We  call  our  system  TRACS,  which  is  an  acronym  for  Traffic  Reporting  and 
Control  System.  Many  other  railroads  are  developing  similar  systems  and  they,  too, 
have  created  names  based  on  this  current  acronym  fad.  As  an  aside,  I  was  interested 
to  read  about  a  program  of  a  railway  to  reduce  expenses — a  part  of  the  plan  called 
for  Retiring  Aged  Personnel  Early.  As  you  might  expect,  the  program  was  called 
RAPE.  I  gather  the  employees  thought  this  name  more  of  a  synonym  than  an 
acronym. 

In  transportation,  the  control  requirements  are  probably  most  acute  and  de- 
manding in  the  case  of  loaded  and  empty  car  movements  since  we  require  a  system 
which  will  respond  in  real  time  to  any  deviation  from  the  desired  service.  The  heart 
of  the  CN  control  system  is  a  "trip  plan"  or  expected  pattern  of  movement  of  a  car 
which  can  be  used  to  plan  the  handling  and  as  a  standard  against  which  the  progress 
of  the  car  can  be  measured  and  e\aluated.  The  plan  will  be  automatically  produced 
by  a  computer  as  soon  as  a  car  is  accepted  for  loading  and  shipper's  requirements 
for  its  move  are  known.  Each  schedule  will  be  individual  to  each  car  and  gives  a 
complete  siding-to-siding  record  of  the  planned  move,  connections  to  be  made,  etc., 
and  the  expected  time  of  placement  of  the  car. 

As  the  car  moves,  its  performance  is  monitored  against  the  standard,  and  as 
long  as  the  car  adheres  to  its  planned  schedule  no  report  is  made  and  no  action  is 
taken.  Should,  however,  any  deviation  occur,  such  as  a  missed  connection,  becoming 
bad  order,  etc.,  this  information  is  fed  automatically  to  a  control  plant.  Since  the 
original  trip  plan  is  no  longer  valid,  a  new  trip  plan  is  created  giving  the  new  con- 
nections and  the  new  time  of  placement.  A  decision  is  then  taken  on  the  action 
required.  This  could  be  simply  to  inform  the  shipper  of  the  new  placement  time, 
or  it  could  be  to  change  the  priority  of  the  car  to  gi\e  it  preferred  handling  for  the 
rest  of  its  journey  in  order  to  minimize  delay,  or  even  in  extreme  ca.ses  provide 
.special  handling  at  additional  cost  to  put  the  car  back  on  its  originally  planned 
schedule.  We  envisage  at  the  present  time  that  this  decision  would  be  made  by 
a  responsible  officer  with  adequate  authority  to  override  normal  operating  con- 
straints; we  doubt  if  it  will  ever  be  possible  to  delegate  it  to  a  computer.  The  deci- 
sion would  be  based  on  the  railroad's  knowledi'r  <'f  ilw  slnpjier's  requirements,  the 


458 Address    by    Dr.    R.    S.    Thorn  an 

priority  attached  to  the  car  and  with  full  cognizance  of  the  railroad's  o\erall  market- 
ing objectives. 

Since  the  movements  and  service  recjuirements  of  all  cars  are  known  in  ad- 
vance and  arrival  times  at  different  points  enroute  are  predictable,  work  loads  at 
terminals  and  intemiediate  points  can  be  preplanned.  The  predicted  placement  time 
together  with  the  previously  established  unloading  pattern  of  the  shipper,  also 
allows  future  moves  of  the  car  to  be  planned  ahead,  the  car  to  be  reassigned  through 
the  empty  car  management  system,  and  the  cvcle  repeated.  Empty  cars  will  be 
controlled  in  much  the  same  fashion  as  loaded  cars  and  each  move  will  be  con- 
trolled by  means  of  a  trip  plan. 

It  will  be  appreciated  that  the  design  of  a  control  system  capable  of  accepting 
the  permutations  of  the  many  origin /destination  pairs  and  the  varying  service  pat- 
terns which  exist  on  a  major  railroad  network,  and  which  has  the  ability  to  monitor 
simultaneously  the  progress  of  tens  of  thousands  of  individual  cars,  is  a  demanding 
task  and  a  real  challenge  in  cybernetic  control.  It  would  be  impossible  without  the 
latest  in  computer  and  communications  technology. 

Although  I  have  dealt  mainly  with  the  transportation  aspects  of  the  planning 
and  control  process,  the  involvement  of  the  mechanical  and  engineering  depart- 
ments is  critical.  Obviously,  decision  must  be  taken  regarding  train  lengths,  car 
capacities  and  train  speeds.  These  decisions  cannot  be  made  until  their  implications 
on  track  structure,  alignment,  grade  and  maintenance  have  been  assessed.  Standards 
that  were  acceptable  for  the  shorter,  slower  trains  of  lighter  cars  require  careful 
re-examination.  Although  much  work  is  now  being  done  to  determine  what  forces 
are  in  play,  our  knowledge  is  still  quite  inadequate.  The  empirical  short-term  solu- 
tions being  employed  are  expensive  to  the  extent  that  they  could  more  than  offset 
the  improvements  in  the  railways'  marketing  and  transportation  capability.  We  must 
learn  quickly  what  dynamic  forces  are  being  created  and  what  physical  changes 
are  indeed  required  to  safely  accommodate  the  modern  train.  I  commend  to  you  a 
paper  presented  bv  R.  M.  Brown,  chief  engineer  of  the  Union  Pacific  Railroad,  to 
the  R.S.M.A.  [Railway  Systems  and  Management  Association]  in  February  1970. 
This  paper  dealt  at  some  length  with  the  impact  of  new  traffic  concepts  on  the  track 
structure. 

The  industry  is  dependent  on  organizations  such  as  yours  to  provide  leadership 
in  this  important  field.  We  nuist  find  the  proper  solutions  if  railroads  are  to  survive 
and  meet  the  challenges  and  opportunities  of  the  future. 


Ontario  Program  of  Regional  Development 

By    Dr.    R.    S.    THOMAN 

Director,    Regional    Development    Branch,    Department    of    Treasury    and    Economics 

Government   of    Ontario 

In  the  past  five  years  the  Province  of  Ontario  has  made  substantial  progress 
towards  an  efl^ective  regional  development  program.  In  January  1965,  the  Federal 
Governnient  and  the  Province  jointly  sponsored  a  Conference  on  Areas  of  Economic 
Stress  in  Canada  at  Queen's  University,  Kingston.  One  month  later,  the  Province  was 
host  to  a  major  International  Conference  on  Regional  Development  and  Economic 
Change.  In  the  spring  of  1966,   a  Wliite  Paper,  Design  for  Development  was  pub- 


Address    by    Dr.    R.    S.    Thorn  an 459 

lished,  setting  down  the  olijeetives  and  adniinistrati\e  machinery.  In  DeceniluT  1968, 
a  second  White  Paper,  Design  for  Development,  Phase  II,  indicated  important  rela- 
tionships between  the  regional  development  objectives  and  those  of  a  parallel  move- 
ment known  as  regional  government,  in  which  the  existing  structure  of  local  goxern- 
ment  is  being  reorganized  into  larger  and  more  effective  units. 

The    major    objectives    of    the    Regional    Development    Program    are    threefold: 

(1)  encouragement  of  each  region  towards  its  recognized  socio-economic  potential; 

(2)  conservation  of  the  natural  environment  (wise  use  in  our  time  and  for  the  pre- 
dictable  future,    emphasizing    changing   technological    and   related   conditions)    and 

(3)  impro\ed  coordination  of  both  provincial  ser\'ices  and  provincial-local  relation- 
ships. 

Administrative  machinery  includes  a  Cabinet  Committee  on  Policy  Develop- 
ment, chaired  by  the  Premier;  an  Interdepartmental  Advisory  Committee  on  Re- 
gional Development,  chaired  by  die  Deputy  Treasurer  and  Chief  Economist;  Re- 
gional Adxisory  Boards  comprised  of  provincial  field  staff,  and  Regional  Develop- 
ment Councils  with  membership  from  local  jurisdictions  and  private  groups.  A  Re- 
gional Development  Branch  serves  as  catalyst  among  these  groups,  with  specific 
responsibility  for  preparing  plans  for  the  Advisory  and  Cabinet  Committees. 

At  this  time,  the  Province  is  divided  into  the  Camu-Weeks-Sametz  system  of 
ten  planning  regions,  urban-centered  where  possible  but  adjusted,  with  certain  ex- 
ceptions, to  county  boundaries.^  These  boundaries  will  be  changed  when  necessary, 
particularly  so  that  development  regions  will  become  aggregations  of  two  or  more 
units  of  regional  government. 

In  January  1967,  Dr.  Richard  S.  Thoman  became  the  first  director  of  the  Re- 
gional Development  Branch.  He  continues  in  this  position,  and  also  as  professor  of 
geography  at  Queen's  University,  on  leave  of  absence.  In  tlie  January  1967-Januar\ 
1970  period,  the  staff  of  the  Branch  increased  from  seven  to  55,  with  a  1970-71 
complement  of  60. 

The  Program  has  three  stages.  The  Inventory  Stage,  completed  in  1967,  was 
an  assessment  of  all  existing  information,  projects,  and  policies  of  Ontario  depart- 
ments which  would  be  useful  for  the  emerging  Program.  An  active  program  of  uni- 
versity research  in  regional  development,  also  initiated  that  year,  continues  to  be 
important. 

The  Evaluation  Stage,  completed  in  1968,  was  in  two  parts.  One  part  in\()I\fd 
qualitative  input  from  Regional  Development  Councils  and  Regional  Adxi.sory  Boards 
as  to  the  nature  of  problems  in  their  respective  regions.  The  other  part,  carried  out 
by  the  Branch,  was  a  trend  assessment  of  6.3  indicators  of  socio-economic  changi- 
over  the  1951-1966  period.  From  these  trends,  in  which  performance  of  the  smallest 
geographical  unit  of  data  axailability  was  compared  with  a  pro\  incial  average  for 
each  indicator  and  then  for  all  63,  fi\e  ]e\els  of  performance  were  aggregated  for 
the  entire  Province.  Results  of  this  work  will  be  published  in  1970  as  a  Regional 
Development  Atlas. 

The  third  stage,  plan  creation,  was  begun  in  1969  and  will  be  completed  in  first 
draft  by  early  1971.  In  this  stage,  .specific  plans  are  being  prepared  for  each  t>pe  of 
performance  area  as  aggregated  in  the  Evaluation  Stage,  and  in  view  of  the  nni<|ue 
conditions  of  each  planning  region,  especially  as  reported  by  the  Regional  Dcvclop- 


1  Pierre  Camu,  E.   P.   Weeks,  and  Z.   W.   Sametz,  Economic  Geography  of  Cniwdu    (TortmJo, 
MacMillan  of  Canada,  1964),  pp.  2.59-374. 


460 Address    by    Dr.    R.    S.    Thorn  an 

inciit    Councils    and    Regional    Ad\i.soi>    Hoards.    TwcKc   steps   arc    invoked    in    the 
entire  process  for  each  planning  region.  Tliese  are: 

1.  Refinement  of  provincial  goals. 

2.  Assessment  of  h]\aluation  Stage  for  (a)  patterns  and  (h)  problems. 

3.  Preparation  of  a  .socio-economic  base  study. 

4.  Preparation  of  land  use  maps  involving  (a)  current  laud  use,  (b)  in- 
herent capability,  especialK'  as  shown  by  the  Canada  Land  hiventory 
and  (c)  urban  impact. 

5.  Assessment  of  impact  of  technological  and  related  change. 

6.  Examination  of  possible  growth  points. 

7.  Establishment  of  regional  objectives. 

8.  Formulation  of  urban-oriented  policies  and  selection  of  growth  points. 

9.  Formulation  of  non-urban  policies  and  identification  of  relationships  with 
urban  policies. 

10.  Liaison  with  other  jDrovincial  departments.   (This  is  a  continuing  process, 

but  a  specific  review  is  provided  for  here.) 
IL   Isolation  of  alternative  plans. 

12.   Recommendation  of  a  best  set  from   point   11,  above. 
At  the  end  of  step  7,  and  again  at  tiie  end  of  step  12,  the  plans  are  to  be  sent 
to   the  Regional  Development  Councils  and   the  Regional  Advisory  Boards  for  de- 
tailed review.  Work  currently  is  continuing  "on  time"  according  to  a  schedule  estab- 
lished in  1967. 

Interest  in  the  Regional  Development  Program  has  been  intensifying,  partly 
because  the  Program  has  been  encoiu'aged  by  Premier  Robarts  as  basic  to  policy. 
Draft  plans  for  six  of  the  ten  regions  will  be  forwarded  to  respective  Regional  Devel- 
opment Councils  and  Regional  Advisory  Boards  in  1970,  and  for  the  remaining  re- 
gions in  1971. 


Canadian  Saies  RepmentaUve:  lEC-MOLDEN  LTD.,  614  Sc  . 
St.  W.,  Montreal  3,  Quebec,  C«iada     PhHW:  514  9W-9131 


Hl^l 

M 

■Mi 

'^^r 

B^K^:                                    ,;.'•■  '™ 

.--r-^--^^^ : 

jUlEg;^ 

ll^^ 

1 

^H^^^^^^^^ 

•.i5i£^" 

^i^^lki^M^^^^^I 

^^^ 

«ffi 

1 

fe£s3igiMiBaifeffli-y^J^vM0aiB::«'.^:.'lv-a^.ai 

>^K^ 

THE  TRASCO  CAR   RETARDER 

HUNDREDS  IN  SERVICE 
IN  aASS  YARD  TRACK 


TRACK  SPECIALTIES  COMPANY 

P.O.  BOX  729  WESTPORT,  CONNECTICUT 


/w  n 


American  Railway 

Engineering  Association— Bulletin 


Bulletin  633  June-July  1971 

Proceedings  Vol.  72* 


CONVENTION   REPORT  ISSUE 
CONTENTS 

Opening  Session   Features 471 

Annual   Luncheon   Address 485 

Special  Features 491 

Remarks  by  Chairmen  of  Technical  Committees 609 

Memoir — H.    S.    LoeflFler 635 

Memoir — E.   G.   Gehrke 637 

Report   of    Executive    Manager    639 

Report   of  Treasurer    653 

Constitution    659 

ADVANCE  COMMITTEE   REPORT 

Tie   Renewals  and   Costs    (Committee  3 — Ties  and   Wood   Preservation)    —  677 


'  The  contents  of  this  Bulletin  and  the  other  Bulletins  of  the  Association  from  Bulletin 
629,  Septernber-October  1970  (except  the  tjlue-covered  Directory  Issue,  Bulletin  632, 
April-May    1971)    constitute   the    Annual    Proceedings   of   the   Association,   Vol.    72. 


Copyrlgttl   1971,    by   American   Railway   Engineering   Aiiocialion 


BOARD  OF  DIRECTION 

1971-1972 

President 
\..  L.  Sams,  Vice  President  and  Chief  Engineer,  Illinois  Central  Railroad,  135  E.  11th 
Place,  Chicago,  III.  60605 

Vice  Presidents 
i.  M.  Brown,  Chief  Engineer,  Union  Pacific  Railroad,  1416  Dodge  St.,  Omaha,  Neb. 
68102 

).  V.  Sartore,  Chief  Engineer— Design,  Burlington  Northern,  Inc.,  176  E.  5th  St.,  St. 
Paul,  Minn.  55101 

Past  Presidents 

1.  M.  WiLHAMSON,  Chief  Engineer  System,  Southern  Pacific  Transportation  Company, 

1  Market  St.,  San  Francisco,  Calif.  94105 

2.  Q.  Johnson,  Assistant  General  Manager  Maintenance,  Chesapeake  &  Ohio  Railway- 

Baltimore  &  Ohio  Railroad,  2  N.  Charles  St.,  Baltimore,  Md.  21201 

Directors 

',  W.  Wagner,  Industrial  Engineering  Officer,  Canadian  National  Railways,  P.  0.  Box 
8100,  Montreal,  101,  Que. 

{..  F.  Bush,  Chief  Engineer,  Erie  Lackawanna  Railway,  Midland  Building,  Cleveland, 
Ohio  44115 

L  W.  Carlson,  Chief  Engineer,  Western  Pacific  Railroad,  525  Mission  St.,  San  Fran- 
cisco, Calif.  94105 

2.  T.  Franzen,  Chief  Engineer,  Missouri  Pacific  Railroad,  210  N.  13th  St.,  St.  Louis, 
Mo.  63103 

.  T.  Ward,  Senior  Assistant  Chief  Engineer,  Seaboard  Coast  Line  Railroad,  500  Water 

St.,  Jacksonville,  Fla.  32202 
!.  M.  Hastings,  Jr.,  Utility  Engineer,  Chesapeake  &  Ohio  Railway-Baltimore  &  Ohio 

Railroad,  P,  O.  Box  1800,  Huntington,  W.  Va.  25718 
\.  J.  WoRLEY,  Vice  President-Chief  Engineer,  Chicago,  Milwaukee,  St.  Paul  &  Pacific 

Railroad,  Union  Station,  Room  898,  Chicago,  111.  60606 
V.  J.  Jones,  Engineer  Maintenance  of  Way  and  Structures,  System,  Southern  Pacific 

Transportation  Company,  1  Market  St.,  San  Francisco,  Calif.  94105 
V.  S.  AuTREY,  Chief  Engineer  System,  Atchison,  Topeka  &  Santa  Fe  Railway,  80  E. 

Jackson  Blvd.,  Chicago,  111.  60604 
4.   A.    Durham,    Chief    Engineer,    Norfolk    &    Western    Railway,    8   N.    Jefferson    St., 

Roanoke,  Va.  24011 

l.  A.  Kelso,  Chief  Engineer,  Line  Maintenance,  Southern  Railway  System,  99  Spring 
St.,  S.  W.,  Atlanta,  Ga.  30303 

,.  D.  Freeman,  Chief  Maintenance  of  Way  Officer,  Reading  Company,  Reading  Ter- 
minal, Philadelphia,  Pa.  19107 

Treasurer 

i.  B.  Hillman,  Jr.,  Chief  Engineer,  Belt  Railway  of  Chicago,  6900  S.  Central  Ave., 
Chicago,  HI.  60638 

Executive  Manager 
;arl  W.  Hodgkins,  59  East  Van  Buren  Street,  Chicago,  111.  60605 

Administrative  Secretary 
;.  L.  Abbott,  59  East  Van  Buren  Street,  Chicago,  111.  60605 

Technical  Secretary 
L  V.  Encman,  59  East  Van  Buren  Street,  Chicago,  111.  60605 

'ublished   by    the    American    Railway    Engineering   Association,    Bi-Monthly,   January-February,   April- 
May,    June-July,    September-October    and   November-December,    at 
59  East  Van  Buren  Street,  Chicago,  111.  6060S 
Second  class  postage  at  Chicago,  111.,  and  at   additional  mailing  office*. 
Subscription  $15  per  annum. 


PROCEEDINGS 

SEVENTIETH  ANNUAL  CONVENTION 

American  Railv\^ay  Engineering 
Association 


March   15-17,   1971 
SHERMAN   HOUSE,  CHICAGO 


VOLUME  72 


Copyright,    1971 

AMERICAN    RAILWAY    ENGINEERING   ASSOCIATION 

59    East    Van    Buren    Street 

Chicago,    Illinois    60605 


461 


OFFICERS,    1970-1971 


E.  Q.  Johnson 
President 

"Chief  Enjir. 
N.&W.  Rv. 


A.  L.  Sams 
Sr.  Vice  President 

V.  I'res.  &  Chief  Engr. 
I.e.  RR. 


R.  M.  Brown 
Jr.  Vice  President 

Chief  Engr. 
U.P.  RR. 


H.  E.  Wilson 
Past  President 

Asst.  Chief  Engr.  Sys. 
A.T.&S.F.   Ry. 


H.    M.    WlLLI.'^MSON 

Past  President 

Chief  Enur.  S\s. 
S.P.T.  Co.  ' 


A.   B.  HiLLMAN,  Jr 
Treasurer 

Chief  Engr. 
Belt  Ry.  of  Chicago 


Earl  W.  Hodgkins 

Executive  Manager 

and  Secretary 

AREA 


"  Mr.   johiisdii   is   now    Assistant   CJem'ral   Manager  Maiiileiiaiiee,  (;he.sai)eakc  &  ()hi( 
Haltiinore  6i  Ohio  Railroad. 

462 


DIRECTORS,   1970-1971 


D.  V.  Sartore 

1968-71 
Chief  Engr.-Design 

B.N.    Inc. 


S.  A.  Cooper 
1968-71 

Chief  Engr. 
G.M.&.O.  RR. 


J.  F.  Piper 

1968-71 

Chief  Engr. 

I'.-R.  S.S.  Lines 


C.  T.  POPMA 

1968-71 

Chief  Engrg.  OfRcei 
P.C.T.   Co. 


C.  W.  Wagner 

1969-72 
Ind.   Engrg.   Officer 

C.N.   Rys. 


A.  W.  Carlson 
1969-72 

Chief  Engr. 
W.P.   RR. 


E.  T.  Franzen 

1969-72 

Chief  Engr. 

M.P.  RR. 


J.  T.  Ward 
1970-73 

Sr.  Asst.  Chf.  Engr. 
S.C.L.  RR. 


^iW 


E.  M.  Hastings,  Jr. 
1970-73 

Utility  Engr. 
C.&O.   Ry— B.&O.   RR. 


B.    j.    WOKLEV 
1970-73 

Vice-Pres.-Chf.  Engr. 
C.M.St.  P.&P.  RR. 

463 


W.  J.   Jones 
1970-73 

Engr.  M.W.&S.  Svs. 
.S.P.T.  Co. 


CONTENTS 

Officers,     1970-1971     462 

Convention     Program     465 

Nominating    Committee    and   Tellers    Committee,    1971    Election 469 

Successful    CandicJates    in    1971     Election    470 

Opening    Session    Features: 

Address   by    President    E.    O.    Johnson 473 

Remarks   by    Executive   Manager  Earl   W.    Hodgkins 475 

Address — Safety   in    the   70's,    by   John   H.    Reed 477 

Address — Collisions    and     Derailments     Involving     Dangerous    Articles,    by    Eugene 

R.    Schlaf    482 

Annual   Luncheon   Address  by   John   P.    Flshvi^ick 487 

Special    Features: 

Address — Development    of    a    Highway-Railroad    Grade    Crossing    Protection    Pro- 
gram,   by    Harold    L.    Michael 493 

Address — Wheel   and   Rail   Loadings   from   Diesel   Locomotives,   by  L.   F.   Koci 500 

Panel     Discussion — Glued     Laminated     Timber — A     Reliable     Engineering     Material, 
by    Billy    Bohannan,    T.    G.    Williamson,    M.    J.    Rhude,    G.    R.    Birkemeier,    and 

Dan    O'Bryn 529 

Paper — Design    of    Pavements    for    Container    Handling    Areas,    by    F.    L.    Peckover 

and    W.    W.    Wong    536 

Panel    Discussion — Practical    Applications    of    Systems    Engineering: 

Track   Charts,   by   David   L.    Glickstein 562 

Systems    Engineering    on    a    Small    Railroad,    by    R.    B.    Sliepka 566 

Address — A    Railroad    Statement  for   Pollution   Abatement,    by   C.    F.   Muelder 568 

Panel    Discussion — Continuous    Welded    Rail    on    Bridges: 

Principles,    by    D.    V.    Messman 572 

Problems,    by    L.    F.    Currier 580 

Practices,   by   R.    I.   Simkins 582 

Address,   Data   Processing    for  Work   Equipment,   by  E.   H.   Fisher 584 

Address,    Some    Aspects    of    Service    Developments    in    Rail— Head    Metal,    by    R.    J. 

Henry      586 

Address — Repair  of  Concrete  Structures  with  Epoxy  Compounds,  by  J.  A.  Heinen  _  599 

Remarks    by    Chairmen    of    Technical    Committees    61 1 

Memoir — H.    S.    Loeffler 635 

Memoir — E.  G.  Gehrke 637 

Report  of  Executive   Manager  Earl   W.   Hodgkins 639 

Report  of  Treasurer  A.   B.   Hillman,   Jr. 653 

Constitution 659 

Advance   Committee   Report: 

Committee   3 — Ties   and   Wood   Preservation,  Tie   Renewals  and  Cost5 677 

464 


American  Railway  Engineering  Association 
Seventieth  Annual   Convention 


Engineering  Division 
Association  of  American   Railroads 
1971    Annual  Meeting 

March   15-17,   1971 
Sherman   House,  Chicago 


PROGRAM 

Monday,  March    15 

Opening    Session — Grand   Ballroom — 9:30  am   to    12:00   noon 

Invocation — Dr.   Kenneth   Hildebrand,   Pastor,  Central  Church  of  Chicago. 

Recognition  of  speakers  table  guests. 

Presidential    Address— Edward    Q.    Johnson,    Chief    Engineer,    Norfolk    &    Western 

Railway.* 
Report  of  Treasurer— Arthur  B.  Hillman,  Jr.,  Chief  Engineer,  Belt  Railway  Company 

of  Chicago. 
Report  of  E.xecutive  Manager — Earl  W.   Hodgkins. 
Creetings  from  Railway  Engineering — ^Maintenance  Suppliers  Association — Floyd  O. 

Johnson,  President. 
Address  by  John   H.   Reed,  Chairman,   National  Transportation  Safety  Board,  U.  S, 

Department    of    Transportation — Rail   Safety    in   the   Seventies. 
Address   by   Eugene   R.   Schlaf,   Superintendent  of   Fire  Prevention,   Illinois   Central 

Railroad — Collisions  and  Derailments  Involving  Dangerous  Articles  (Illustrated). 

**AAR    Engineering    Division    Session — Grand    Ballroom — 1:00    pm    \o    3:15    pm 

Recognition  of  speakers  table  guests. 
Remarks  by  Chairman  Edward  Q.  Jolinson. 

Report  of   General  Committee — Executive  Director  Earl  W.   Hodgkins.. 
Remarks   by  R.   Rex   Manion,   Vice  President,  Operations  and   Maintenance  Depart- 
ment, AAR. 
Address  by  Stephen  Ailes,  President,  AAR. 


"  Mr.  Johnson  was  subsequently  appointed  Assistant  General  Manager  Maintenance,  Chesa- 
peake  &   Ohio    Railway-Baltimore   &   Ohio    Hailroad. 

o"  The  addresses  and  committee  reports  presented  durinu  the  AAR  EnKineerin«  Division 
Session   are   published   separately   in   the    1971    Proceedin«s   of  the   AAR   Enyineerinu    Division. 

465 


466 Convention    Program 

Address  by  Mac  E.  Rogers,  Director,  Bureau  of  Railway  Safety,  Federal  Railroad 
Administration,  U.  S.  Department  of  Transportation — Sane  Safety  Standards 
for  Seventy-One. 

Address  by  Dr.  William  J.  Harris,  Jr.,  Vice  President,  Research  and  Test  Depart- 
ment,   AAR — Research    and    Devclopnu-nt   on    Railroad    Problems    ( Illuslrated ) 

Reports  of  ED  Committees: 

ROADWAY  AND  TRACK 

BRIDGE  STRUCTURES 

ELECTRICAL  FACILITIES— FIXED  PROPERTIES 

General    Session — 3:15    pm   to    5:00    pm 

Bulletin 
Reports  of  AREA-ED  Committees  Numbers 

9— HIGHWAYS    630 

Address  by  H.  L.  Michael,  Associate  Director,  Joint  Highway 
Research  Project,  Purdue  University — Development  of  a 
Grade  Crossing  Protection  Program    (Illustrated). 

22— ECONOMICS  OF  RAILWAY  CONSTRUCTION  AND  MAINTE- 
NANCE     630 

5— TRACK   630  &  631 

Address — Ludvik  F.  Koci,  Chief  Locomotive  Development 
Engineer,  Electro-Motive  Division,  General  Motors  Cor- 
poration— Wheel  and  Rail  Loadings  from  Diesel  Locomo- 
tives  ( Illustrated ) . 

Tuesday,  March    16 

General    Session — Bal    Tabarin — 8:30    am    to    11:30    am 

Motion  Picture — Construction  of  Canadian  National's  Vertical  Lift  Bridge  over 
Burrard   Narrows  at  Vancouver,   B.   C. 

Bulletin 

Reports  of  Committees  Numbers 

30— IMPACT  AND  BRIDGE  STRESSES    631 

28— CLEARANCES    631 

7— TIMBER   STRUCTURES    631 

Panel  Discussion — ^Glued-Laminated  Tinilier — A  Reliable  Engi- 
neering Material. 

PANEL  MEMBERS 

Billy  Bohannan  (Moderator),  Engineer,  U.  S.  Forest  Products 
Laboratory. 

T.  G.  Williamson,  Manager  Engineering  Services,  American  In- 
stitute  of   Timber   Construction. 


Convention    Program 467 

M.  J.  Rhude,  Manager,  Timber  Engineering,  Product  Develop- 
ment Department,  Forest  Products  Division,  Koppers  Co., 
Inc. 

C.  R.  Birkemeir,  Vice  President  Engineering,  Timber  Structures, 

Inc. 
Dan    O'Byrn,    Technical    Director    &    Zone    Engineer,    Weyer- 
haeuser Co. 

Bulletin 
Reports  of  Committees  Numbers 

11— ENGINEERING  RECORDS  AND  PROPERTY  ACCOUNTING  ..   630 

16— ECONOMICS  OF  RAILWAY  LOCATION  AND  OPERATION   .  .   629  &  630 

20— CONTRACT  FORMS 630 

6— BUILDINGS   630  &  631 

Address  by  F.  L.  Peckover,  Engineer  of  Geotechnical  Services, 
Canadian  National  Railways — Design  of  Paved  Areas  for 
Container   Handling    (Illustrated) 

ANNUAL   LUNCHEON — GRAND   BALLROOM — 12:00    noon 

Presentation  of  those  at  speakers  table. 

Presentation  of  those  at  chairmen's  table. 

.Announcement  of  results  of  election  of  ofRcersi 

Address   by  J.   P.   Fishwick,   President,   Norfolk   &   Western   Railway 

General    Session — Bal   Tabarin — 2:00    pm    to    5:00    pm 

Bulletin 
Reports  of  Committees  Numbers 

32— SYSTEMS  ENGINEERING    631 

Panel  Discussion — Practical  Applications  of  Systems  Engineer- 
ing on  Railroads. 

PANEL  MEMBERS 

H.  L.  Chamberlain  (Moderator),  Engineer-Bridge  Rating,  Penn 
Central  Transportation  Company. 

D.  L.  Glickstein,  Manager — Engineering  Systems  Development, 

Penn    Central   Transportation   Company. 
R.   B.  Sliepka,  Designer,  Elgin,  Joliet  &  Eastern  Railway. 

Bulletin 
Reports  of  Committees  Numbers 

24— ENGINEERING  EDUCATION   631 

25— WATERWAYS  AND  HARBORS   631 

13— ENVIRONMENTAL  ENGINEERING    630 

Address  by  C.  F.  Muelder — Methods  and  Equipment  for  Waste 
Water  Control  at  Railroad  Yards  and  Terminals  ( Illus- 
trated). 


468 Convention    Program 

15— STEEL  STRUCTURES   630  &  631 

Panel  Discussion — VVclded   Rail  on  Bridges   (Illustrated). 

PANEL  MEMBERS 

M.  L.  Koehler  (Moderator),  Engineer-Strueture.s,  Penn  Cen- 
tral Transportation  Company. 

D.  V.  Messman,  Assistant  to  Chief  Engineer,  Southern  Railway 
System. 

R.  I.  Simkins,  Assistant  Engineer  of  Bridges,  Seaboard  Coast 
Line  Railroad. 

L.  F.  Currier,  Engineer,  Structures,  Louisville  &  Nashville  Rail- 
road. 

8— CONCRETE  STRUCTURES  AND  FOUNDATIONS   630  &  631 

Address  by  J.  A.  Heinen,  Manager  of  Materials  Technology  and 
Product  Development,  Sika  Chemical  Corporation — Repair 
of  Concrete  Structures  with  Epoxy  Compounds  ( Illus- 
trated). 

Wednesday,   March    17 

General    Session — Bal    Tabarin — 8:30   am    to    12:00    noon 

Bulletin 
Reports  of  Committees  Numbers 

31— CONTINUOUS  WELDED  RAIL  630  &  631 

Motion  Picture — Transposing  Welded  Rail,  witli  introductory 
remarks  by  B.  D.  Sorrels,  Engineer  of  Track,  Atchison, 
Topeka  &  Santa  Fe  Railway. 

3— TIES  AND  WOOD  PRESERVATION   631 

SPECIAL  COMMITTEE  ON  CONCRETE  TIES 

14— YARDS  AND  TERMINALS   630 

Motion  Picture — The  Argentine  Yard — A  Design  for  Tomorrow. 

1— ROADWAY  AND   BALLAST    630  &  631 

27— MAINTENANCE  OF  WAY  WORK  EQUIPMENT 630 

Address  by  E.  H.  Fisher,  Engineer  of  Work  Equipment,  Cana- 
dian National  Railways — Data  Processing  for  Work  Equip- 
ment (Illustrated). 

4— RAIL    630  &  631 

Address  by  R.  J.  Henry,  Engineer  Alloy  Development,  Homer 
Laboratory,  Bethlehem  Steel  Corporation,  and  G.  G. 
Knupp,  Assistant  Metallurgical  Engineer,  Bethlehem  Steel 
Coiporation — ^Some  Aspects  of  Service  Developments  in 
the   Rail  Head   Metal    (Illustrated) 

Closing    Business    Session 

Installation  of  officers. 


Nominating  Committee,    1971    Election 


Pdit  Presidents 
A.  V.  Johnston,  Chairman 

Gen.  Mgr.,  Intl.  Cons.  Div.,  CNR 
J.  M.  Trissal 

Retired  Vice  Pres.  Real  Estate, 
IC  RR. 

T.   B.   HUTCHESON 

Asst.  Vice  Pres.,  Engrg.  &  M.  of  W., 
SCL  RR. 
H.  E.  Wilson 

Asst.  Chf.  Engr.  Sys.,  AT&SF  Ry. 
H.  M.  Williamson 

Chf.  Engr.  Sys.,  SPT  Co. 


Elected  Members 
R.  C.  Tench  (East) 

Chf.  Engr.  Sys.,  C&O  Ry.-B&O  RR. 
R.  A.  Kelso  (South) 

Chf.  Engr.  Line  Maint.,  Sou.  Ry. 
Sys. 
G.  R.  Collier  (West) 

Proj.  Engr.,  AT&SF  Ry. 
T.  J.  Boyle  (Canada) 

Engr.  of  Brdgs.  &  Structs.,  CPR 
L.  A.  Durham  (At  Large) 

Chf.  Engr.,  N&W  Ry. 


The  foregoing  committee  formulated  its  official  slate  of  nominations  at  a 
meeting  in  Chicago  on  September  28,  1970,  which  nominations  were  presented  to 
letter  ballot  vote  of  the  membership  with  the  Fall  1970  issue  of  the  AREA  News. 


Committee  of  Tellers,   1971    Election 


The  following  committee  was  appointed  to  canvass  the  ballots  for  officers  and 
directors  and  for  members  of  the  Nominating  Committee,  tlie  count  being  made  on 
March  16,  1971. 


R.  E.  Pearson,  Chairman      P.  Haven 


R.  W.  Tipper, 
Vice  Chairman 

L.    AXELL 

L.  R.  Beattle 
A.  H.  Galbraith 


D.  C.  Johnson 
R.  E.  Kuston 
T.  Lassen 
G.  W.  Mahn,  Jr. 
L.  E.  Rekuch 


F.  H.  Smith 
W.  H.  Spinks 
W.  S.  Stokeley 

W.  S.  TUINSTRA 

N.  E.  Whitney,  Jr. 
P.  Williams 


469 


Successful  candidates  in   1971    election 


For  President: 


A.    L.    Sams,    Vice    President    and    Chief    Enji;iiieer,    Illinois    Central    Railroad, 
Chicago 

I'\>r  Senior  Vice  President:" 

R.   M.   Brown,  Chief  En^'ineer,   Union   Paeifie  Railroad,  Omaha,  Neb. 

For  Junior  Vice  President: 

D.    V.    Sartore,    Chief   Engineer-Design,    Burlington    Northern,    Inc.,   St.    Paul, 
Minn. 

For  Directors: 
East: 

L.  A.  Durham,  Chief  Engineer,  Norfolk  &  Western  Railway,  Roanoke,  Va. 
L.  D.  Freeman,  Chief  Maintenance  of  Way  Officer,  Reading  Company,  Phila- 
delphia, Pa. 

South: 

R.  A.  Kelso,  Chief  Engineer,  Southern  Railway  System,  Atlanta,  Ga. 

West: 

W.   S.  AuTREY,  Chief  Engineer  System,  Atchison,  Topeka  &  Santa  Ee  Railway, 
Chicago 

For  Members  of  the  1971  Noniinating  Committee: 
East: 

J.   J.   DwYER,   Engineer   Environmental   Control,   Chesapeake  &   Ohio   Railway- 
Baltimore  &  Ohio  Railroad,   Huntington,  W.  Va. 

South: 

D.    S.    Bechly,   Assistant   Chief   Engineer   Structures,   Illinois   Central   Railroad, 
Chicago 

West: 

F.   E.   Schneider,   Assistant  Engineer,   Atchison,   Topeka  &   Santa   Fe   Railway, 
Chicago 

Caruida: 

R.   L.   Gray,   Regional  Engineer,  Canadian  National  Railways,  Toronto,  Out. 

At  Large: 

C.  E.  Stoecker,  Engineer  Planning  and  Design,  Louisville  &  Nasliville  Railroad, 
Louisville,  Ky. 


'  Under    the     i^rovisions    of    the    Constitution,     R.     M.     Brown    advances    automatically    from 
Junior    Vice    President    to    Senior    Vice    President. 

470 


OPENING  SESSION   FEATURES 

Address   by   President  E.   Q.   Johnson 473 

Report  of  Treasurer  A.   B.   Hillman 653 

Remarks   by    Executive    Manager    Earl    W.    Hodgkins 475 

Address   by   John    H.    Reed    477 

Address   by   Eugene    R.    Schlaf 482 


471 
Uul.  ii'M 


Address  by  President   E.   Q.   Johnson* 

It  is  the  obligation  and  tlie  privilege  of  your  President  to  present  a  review  of 
the  activities  of  your  Association  during  the  past  year. 

The  many  problems  of  the  railroad  industry  during  1971  reflected  upon  the 
activities  of  your  Association,  and  your  officers,  directors  and  headquarters  staff 
were  kept  well  occupied  in  meeting  these  problems.  The  principal  challenges  were 
in  the  area  of  controlling  Association  costs,  promoting  membership,  maintaining 
member  interest,  and  attempting  to  continue  a  high  level  of  committee  activity 
consistent  with  the  ability  of  members  to  attend  meetings,  and  the  limited  capability 
to  conduct  the  research  that  some  committees  so  badly  need. 

Your  Association  from  a  financial  and  membership  standpoint  has  had  a  success- 
ful year.  Financially,  our  receipts  exceeded  our  expenditures  and  our  membership 
now  stands  at  3341,  an  increase  of  8  over  a  year  ago.  Our  most  capable  Executive 
Manager,  E.  W.  Hodgkins,  and  Treasurer,  A.  B.  Hillman,  Jr.,  will  report  in  more 
detail  on  these  matters. 

Tlie  enthusiastic  response  to  the  revised  1970  convention  format,  wherein  com- 
mittee reporting  was  streamlined  and  the  emphasis  placed  on  the  presentation  of 
special  features  highlighting  the  general  work  of  committees,  along  with  a  session 
sponsored  by  the  Engineering  Division  of  the  Association  of  American  Railroads, 
clearly  indicated  the  desire  of  our  members  to  continue  such  a  format;  and  this 
convention,  as  you  have  imdoubtedly  noted,  has  been  so  arranged. 

The  major  portion  of  this  afternoon's  session  will  present  features  specificallv 
oriented  to\\'ard  the  AAR  and  the  activities  of  its  Engineering  Division,  and  I  will 
have  the  opportimity  to  dwell  in  more  detail  on  the  activities  of  that  organization 
at  that  time.  All  members  of  AREA  and  others  registered  into  this  convention  are 
most  cordially  invited  to  attend  the  Engineering  Division  session  as  well  as  the 
AREA  sessions. 

Following  a  policy  established  in  1965,  an  AREA  Regional  Meeting  was  held 
on  October  20  in  Toronto,  Ont. — the  first  AREA  Regional  Meeting  to  be  held  in 
Canada.  Tliis  meeting  \\'as  under  the  most  capable  direction  of  C.  W.  Wagner, 
industrial  engineering  officer,  Canadian  National  Railways,  Montreal,  Q'le.,  and  a 
director  of  the  AREA.  Local  arrangements  were  handled  by  R.  L.  Gray,  regional 
engineer,  Canadian  National,  Toronto.  Members  and  guests  attending  totaled  219, 
which  compares  favorably  with  the  attendance  at  prior  Regional  Meetings  and  cer- 
tainly attests  to  the  excellent  job  of  programming  and  organizing  by  the  committee 
in  charge. 

In  line  with  our  policy  of  a  continuing  review  of  committee  functions  and 
activities,  Comnu'ttee  7  has  changed  its  name  from  "Wood  Bridges  and  Trestles" 
to  "Timber  Structines",  Committee  11  from  "Engineering  and  \'aluation  Records" 
to  "Engineering  Records  and  Property  Accounting"  and  Committee  24  from  "Coop- 
erative Relations  with  Universities"  to  "Engineering  Education".  These  committees, 
along  with  your  Board  of  Direction,  feel  that  these  new  titles  are  more  descriptive 
of  the  scope  of  work  being  undertaken. 

AREA  has  continued  its  cooperation  with  oilier  related  societies,  particularly 
with  the  American  Society  of  Civil  Engineers.  Under  the  direction  of  C.  T.  Popnia, 
chief    engineering    officer,    Penn    Central    Transportation    Company,    and    an    AREA 


'  Chief    Engineer     Norfolk    &    Western    Railway,    Romoke,    Va.,    now    Assistant    Cicncral    Man- 
iiRer,    Maintenanco,    Cniesapeake    &•   Oli'o    Railway-Baltiniorc    &■    Ohio    Rai]ro:'d. 

473 


474 Opening    Session    Features 

director,  the  AREA  sponsored  one  session  at  tlie  1970  ASCE  National  Meeting  on 
Transportation  Engineering  held  in  Boston,  Mass.,  last  July.  The  AREA-spousored 
program  ineluded  talks  by  J.  W.  Diflenderfer,  assistant  vice  president — special  serv- 
ices, Penn  Central;  Harold  Wanaselja,  chief  of  project  management,  New  York 
Metropolitan  Transportation  Authority;  H.  J.  McNally,  assistant  vice  president — real 
estate,  Penn  Central,  and  R.  K.  Sloan,  manager  research  for  planning  and  construc- 
tion, Directorate,  Massachusetts  Bay  Transportation  Authority. 

During  the  past  year,  as  in  the  past  couple  of  years,  a  great  deal  of  conunittee 
effort  was  devoted  to  reviewing  their  chapter  in  the  AREA  Manual  for  Railway 
Engineering  and  making  or  preparing  to  make  revisions  to  update  the  material. 
This  effort  includes  organizing  the  revised  material  in  the  decimal  format. 

I  would  like  to  express  the  appreciation  of  our  Association  to  ovu  many  good 
friends  in  the  supply  industry  here  today  for  their  cooperation  during  the  past  year 
and  their  help  in  advancing  the  cause  of  the  railroad  industry  and  this  Association, 
and  to  our  members  for  their  efforts  on  behalf  of  AREA  during  the  year. 

In  the  interest  of  making  this  convention  as  meaningful  as  possible  to  all  mem- 
bers, your  Board  of  Direction  has  requested  REMSA  to  ask  their  meml^er  com- 
panies to  keep  the  hospitality  rooms  closed  during  the  periods  we  are  holding  our 
business  sessions,  as  well  as  during  the  period  of  the  Annual  Luncheon  tomorrow. 
The  REMSA  Board  of  Directors  and  various  supply  people  have  assured  us  that 
they  would  be  most  happy  to  cooperate  in  this  request.  We  haxe  also  requested 
that  our  committees  not  schedule  meetings  during  business  sessions  but  schedule 
them  immediately  prior  to  or  following  this  convention,  or  at  night. 

Outwardly,  it  always  appears  that  AREA  conventions  are  smooth  running  affairs 
and,  indeed,  they  are;  but  this  is  accomplished  only  through  a  tremendous  amount 
of  hard  work  on  the  part  of  many,  many  people.  Our  Arrangements  Committee 
handling  this  convention  under  the  capable  direction  of  its  manager,  Bruce  Miller, 
engineer — high  speed  ground  transportation,  Penn  Central  Transportation  Company, 
is  doing  its  usual  outstanding  job,  and  I  would  like  to  express  to  all  concerned  my 
deep  personal  appreciation. 

To  the  ladies  attending  our  convention,  I  extend  very  warm  greetings  from  all 
of  us;  you  do,  indeed,  add  a  very  lovely  setting  to  this  convention.  I  particularly 
want  to  express  appreciation  to  my  wife,  Betty,  and  especially  to  Ruth  Hodgkins 
and  to  the  other  ladies  who  have  assisted  her  so  capably  in  arranging  and  carrying 
out  the  ladies  program.  It  has  been  a  most  rewarding  experience  for  Betty  and  me 
to  work  together  in  our  respective  duties  preparing  for  this  very  important  occasion. 

To  the  members,  to  the  officers  and  directors,  and  to  Earl  Hodgkins  and  his 
entire  staff,  I  would  like  to  extend  my  sincere  appreciation  for  their  outstanding 
assistance  to  me  during  my  tenure  in  office. 


Remarks  by  Executive  Manager   Earl   W.   Hodgkins 

President  Johnson,   Members,  Guests,  and  Ladies: 

It  doesn't  seem  possible,  but  this  is  the  seventh  annual  report  that  I  have  de- 
livered to  the  membership  of  the  American  Railway  Engineering  Association  as  its 
executive   officer,   executive   manager  and  secretary. 

My  feelings  about  1970  are  mixed.  The  AREA,  I  feel,  had  an  outstanding  and 
productive  year.  However,  during  the  year,  the  Association  lost  one  of  its  most 
dedicated  staff  members,  one  whose  50  years  of  service  on  the  staff  is  unparalleled, 
so  far  as  I  know.  I  speak,  of  course,  of  Ed  Gehrke,  who  retired  on  May  31,  1970, 
at  65  years  of  age  and  who  died  very  suddenly  of  a  massive  heart  attack  on  No- 
vember 5,  1970.  I  know  I  speak  for  my  t\vo  living  predecessors,  Walter  Lacher 
and  Neal  Howard,  when  I  say  that  the  Association  and  we  personally  have  lost  a 
close  friend  and  associate  who  had  earned  many  happy  and  healthy  years  in  his 
retirement. 

However,  in  spi"^e  of  this,  it  is  a  great  pleasure  for  me  to  deliver  this  report 
because  of  the  highly  successful  year  we  have  just  completed.  As  President  John- 
son reported,  in  1970  we  re\'ersed  the  general  trend  of  the  past  eight  years  of 
decreasing  membership  \\'hen  considered  year  by  year.  Only  in  1967  did  the  Asso- 
ciation experience  an  increase  in  membership,  when  it  reached  an  all-time  high  of 
3421  members.  Furthennore,  we  have  in  the  works  at  the  present  time  about 
twice  as  many  applications  as  we  have  had  for  the  last  two  years.  You  might  be 
interested  in  knowing  that  about  30  percent  of  AREA  membership  live  within  500 
miles  of  Chicago,  and  that  our  membership  dues  account  for  over  50  percent  of 
AREA  operating  funds.  Another  30  percent  comes  from  the  sale  of  AREA  publica- 
tions, which  remains  at  the  very  high  level  attained  about  five  years  ago. 

Treasurer  Hillman  has  just  reported  to  you  that  we  also  finished  calendar  1970 
in  the  black — by  nearly  $5000.  I  assure  you  this  is  not  an  easy  task  when  you 
consider  the  inflationary  forces  acting  on  virtually  all  facets  of  AREA  operations 
and  activities.  For  instance,  our  printing  costs  would  have  increased  more  than 
60  percent  in  the  past  seven  years  had  not  economies  and  control  procedures  been 
established  to  reduce  the  effect  of  these  increases  to  a  minimum.  And,  we  all  know 
of  the  increases  in  postal  rates  in  recent  years  and  being  talked  about  in  Washing- 
ton at  the  present  time. 

As  President  Johnson  pointed  out,  three  AREA  committees  changed  their 
names  to  more  accurately  reflect  the  thrust  of  their  activity  in  today's  technology, 
and  on  Saturday  the  Board  approved  the  request  of  Committee  16  to  change  its 
name  from  "Economics  of  Railway  Location  and  Operation"  to  "Economics  of 
Plant,  Equipment  and  Operations"  and  changed  the  name  of  the  "General  Con- 
vention   Arrangements    Committee"    to    "Convention    Operating    Committee." 

As  has  previously  been  announced  in  the  AREA  News,  the  Association  world- 
renowned  Manual  is  now  known  as  the  "AREA  Manual  for  Railway  Engineering 
(Fixed  Properties)".  Although  the  contents  are  still  recommended  practices,  the 
new  name  emphasizes  the  engineering  nature  of  the  publication.  In  addition,  the 
November  and  December  issues  of  the  AREA  Bulletin  have  been  consolidated  into 
a  single  issue,  as  has  the  January  and  February  issues,  and  the  AREA  News  has 
been  placed  on  a  quarterly  basis.  The  purpose  of  these  changes,  as  mentioned 
before,  are  printing  and  mailing  economies  to  offset  the  rai.ses  in  those  items. 

Membership  on   A1^E.\   technical   coinmitfccs  remains  at  a  high  lc\cl  and  those 

475 


476 Opening    Session    Features 


committees  spoiisoriiij^  Manual  eliapters  continue  to  review  them  for  updatinji  and 
addinjj  pertinent  and  useful  data  and  information,  and  to  place  them  in  the  decimal 
format.  Prime  examples  are  a  completely  revised  Chapter  13 — Environmental  Engi- 
neering,  and  Chapter  15 — Steel  Structures.  Other  chapters  are  in  various  stages  of 
revision. 

By  Board  action,  our  comnn'ttec  chairmen  have  been  requested  to  hold  only 
two  meetings  during  1971,  to  the  maximum  extent  possible  and  to  hold  tliose  meet- 
ings at  central  locations,  taking  into  consideration  the  geographical  distribution  of 
their  active  members. 

There  are  a  niunber  of  items  of  information  in  which  most  of  you  will  be 
interested: 

1.  For  your  information  and  guidance,  the  Board  of  Direction  at  its  meeting 
on  Saturday  approved  all  of  the  Manual  Recommendations  published  in  AREA 
Bulletins  631  and  632,  November-December  1970  and  January-February  1971, 
respectively,   with   only   minor   changes   and   editorial   corrections. 

2.  The  1972  Convention  will  be  held  on  Tuesday-Thursday,  March  7-9,  with 
an  exhibit  sponsored  by  the  Railway  Engineering-Maintenance  Suppliers  Associa- 
tion at  the  International  Amphitheatre  starting  on  Monday,  the  6th.  The  AREA 
Convention   again  will  be  held  at   the   Sherman   House, 

3.  The  1973  Convention  has  been  switched  from  Monday-Wednesday,  March 
19-21,  one  week  earlier — March  12-14.  This  is  for  the  con\'enience  of  the  Palmer 
House  in  the  scramble  to  book  exhibits  into  the  new  McCormick  Place. 

4.  The  1971  AREA  Regional  meeting  has  been  scheduled  for  Thursday,  October 
21,  at  the  Sheraton-Jefferson  Hotel  in  St.  Louis,  Missouri.  AREA  Director  Earl  T 
Franzen,  Chief  Engineer  of  the  Missouri  Pacific  Railroad,  is  ramrodding  this  meet- 
ing. I  am  sure  he  would  be  delighted  to  receive  suggestions  for  program  features, 
in   addition   to   the   ones   presently   planned. 

5.  A  feature  of  tliis  Convention  that  was  finalized  too  late  to  be  included  in 
tlie  Convention  issue  of  the  News  is  a  series  of  Computer  Demonstrations  com- 
mencing at  four  o'clock  this  afternoon  and  continuing  more  or  less  at  the  con- 
venience of  interested  people  through  Wednesday  afternoon.  An  IBM  1130  com- 
puter system  has  been  installed  in  Parlors  "M"  and  "O"  on  the  Mezzanine  tlirough 
the  courtesy  of  the  International  Business  Machines  Corporation  and  tlie  Penn 
Central  Transportation  Company.  The  demonstrations  are  being  sponsored  by  Com- 
mittee 32 — Systems  Engineering,  to  augment  its  panel  discussion  on  Tuesday  after- 
noon on  "Practical  Applications  of  Systems  Engineering  on  Large  and  Small  Rail- 
roads." Announcements  on  the  demonstrations  have  been  placed  on  the  several 
registration  tables. 

6.  The  General  Sessions  of  the  Conxention  on  both  Tuesday  and  Wednesday 
will  be  held  in  the  Bal  Tabarin  Room  on  the  sixth  floor  of  this  hotel.  The  Annua] 
Limcheon  tomorrow  will  be  held  in  this   Grand   Ballroom. 

In  railroad  engineering  and  maintenance  today,  there  are  new  problems  and 
challenges,  and  we  urge  you  to  support  the  AREA  Board  of  Direction,  the  techni- 
cal committees  and  the  staff  in  helping  our  Association  to  uphold  its  long  tradition 
of  achievement.  The  problems  nuist  be  solved  and  the  challenges  met  head  on  and 
conquered  to  permit  the  railroad  industry  to  successfully  continue  its  service  to  on; 
great  nations  and  their  people.  This  is  the  AREA's  only  reason  for  being  and  how 
we  help  it  to  react,  innovate  and  achieve  will  determine  whether  or  not  it  will 
have  another  72  years  of  service  to  the  railroad  industry  and  the  engineering 
profession. 


Safety  in   the  70's 

By   JOHN    H.    REED 

Chairman 

Notional    Transportation    Safety    Board 

I  bring  you  greetings  on  belialf  of  the  National  Transportation  Safety  Board 
and  thank  you  for  the  honor  and  privilege  of  addressing  the  opening  session  of  the 
American  Railway  Engineering  Association's  1971  annual  meeting.  After  the  very 
pleasant  visit  from  Ed  Johnson  and  Earl  Hodgkins  last  fall  I  found  that  there  is  a 
noticeable  similarity  between  the  AREA  and  the  Safety  Board  regarding  their 
objectives. 

Of  course,  the  visit  f.om  your  president  and  executive  manager  was  not  the 
Safety  Board's  first  awareness  of  AREA.  Two  of  our  professional  staff  in  the  Rail- 
road Safety  Di\'ision  are  members  of  A.REA:  Tom  Styles,  a  member  since  1961  and 
Richard  Peterson,  a  member  since   1962. 

We  know  that  the  objective  of  AREA,  as  stated  in  your  constitution,  is  "the 
advancement  of  knowledge  pertaining  to  the  scientific  and  economic  location,  con- 
struction, operation,  and  maintenance  of  railways."  The  attainment  of  such  an 
objective  can  be  realized  only  through  the  dedicated  service  of  competent  profes- 
sionals. I  believe  the  engineers  in  AREA  are  such  people.  I  also  believe  that  all  of 
you  are  as  interested  as  the  Board  is  in  "Safety  in  the  70's." 

It  would  not  be  a  great  surprise  to  me  if  some  of  you  do  not  fully  understand 
what  the  Safety  Board  does.  Even  though  the  Board  was  created  in  1966  by  the 
DOT  Act  I  am  not  disturbed  when  asked,  and  rather  frequently,  too:  What  does 
the  National  Transportation  Safety  Board  do?  Is  it  part  of  the  Department  of 
Transportation?  How  does  it  relate  to  the  Federal  Railroad  Administration? 

It  is  gratifying  to  note  that  many  more  people  now  are  beginning  to  under- 
stand our  mission.  But  I  am  always  happy  to  explain  ourselves — in  this  case,  oiu" 
railroad  safety  functions. 

It  might  be  useful  first  to  quote  from  House  Committee  Report  No.  1701, 
which  reported  out  the  legislation  creating  the  Department  of  Transportation,  on  the 
"Role  of  the  National  Transportation  Safety  Board:" 

"The  Board's  function  in  the  process  of  the  accident  investigation  is  to  provide 
an  independent  tribunal  which,  unrestricted  by  departmental  or  other  loyalty  or 
partiality,  can  examine  the  extent  to  which  accident  investigations  fairly  state  the  cir- 
cumstances of  an  accident.  In  other  words,  the  Board,  with  its  independent  status, 
provides  a  mechanism  whereby  the  record  of  accident  investigation  made  by  the 
Department  will  be  re\'iewed  to  determine  the  cause  or  probable  cause  of  an  acci- 
dent. In  carrying  out  this  function  the  NTSB  will  be  able  to  judge  whether  the 
Department  is  functioning  properly  in  enhancing  and  furthering  transportation  safety 
tlirough  the  procedures,  methods,  and  practices  employed  by  components  of  the 
Department." 

Our  relationships  with  F'RA  are  good  considering  that  one  of  our  primary  func- 
tions is  to  take  a  look  at  wliat  they  do  and,  on  occasion,  tell  them  how  we  think 
they  can  do  it  better.  Such  advice,  particularly  when  it  is  critical,  does  not  have  to 
\)e  given  through  clenched  teeth.  There  need  be  no  "safety  generation  gap.  "  Oiu' 
intent,   always,   is   that   Safety   Board  criticism  l)e  con.structive  evaluation. 

Because  FRA  is  responsible  for  Railroad  Safety  Regulations,  it  cannot  be 
expected  to  review  with  complete  objectivity  its  own  involvenu'nt  in  railroad  acci- 
dent   acti\i(ies.    Those    who    created    the    Safety    Board    felt    that    there    should    be    an 

477 


478 Opening    Session    Features 

agency  to  take  an  independent  look  at  rail  systems,  regulations,  and  operations. 
WTiile  all  of  these  areas  have  not  been  regulated  in  the  past,  FRA  now  has  tlie 
authority  to  establish  regulations  in  all  areas  of  railroad  safety. 

Safety  Board  special  studies  or  accident  investigations  are  required  to  determine 
whether  FRA  regulatory  activities  are  effective  and  appropriate.  To  do  this,  the 
Board  nnist  have  its  own  resources,  its  own  staff,  and  its  independence.  Only  in  this 
way  can  the  Board,  with  all  possible  objectivity,  analyze  the  causes  of  accidents 
and  recommend  actions  to  prevent  recurrences. 

In  making  recommendations,  the  Board  bears  some  resemblance  to  the  AREA. 
I  notice  that  your  constitution  states:  "The  conclusions  adopted  by  the  Association 
shall  be  recommendatory."  The  Board's  safety  recommendations,  accident  reports, 
and  special  studies  independently  point  out  what  might  be  wrong  widi  the  results 
achieved  by  railroad  operators  and  the  FRA,  and  what  could  be  done  more  effec- 
tively. Our  safety  recommendations  are  not  mandatory  but,  by  law,  they  must  be 
made  public.  We  have  no  regulatory  or  enforcement  authority.  We  desire  none. 
In  short,  we  depend  on  sound,  practical  publicly  stated  recommendations  to  prompt 
others  to  take  corrective  safety  actions. 

The  Board  also  always  has  felt  that  its  role,  in  addition  to  investigation,  is  one 
of  stimulating  and  encouraging  others  to  do  the  safety  jobs  which  need  to  be  done. 
We  accomplish  one  of  our  prime  objectives  when  we  con\'ince  or  prompt  some  other 
organization — governmental  or  private — to  imdertake  the  specific  accident  preven- 
tion task  we  may  have  identified. 

I  must  stress  the  uniquely  objective  status  of  the  Board's  investigators.  They 
are  not  organizationally  aligned  with  their  counterparts  who  promulgate  or  enforce 
regulations.  Consequently,  our  investigators  enjoy  open  communications  with  mem- 
bers of  the  transportation  industry. 

In  addition  to  deriving  accident  prevention  recommendations  from  our  inves- 
tigations, we  conduct  special  studies  where  safety  improvements  might  be  found. 
These  special  studies  may  or  may  not  be  clearly  separate  from  our  continuing  acci- 
dent investigation  work;  they  may  be  outgrowths  of  those  investigations.  Almost 
constantly,  the  FRA  is  furnishing  us  with  information  from  its  accident  investiga- 
tions which  is  useful  in  our  special  studies.  Because  of  our  small  staff,  the  number 
of  special   railroad  safety  study  reports  necessarily  has  been  limited. 

There  is  plenty  of  room  for  all  accident  prevention  activities.  It  is  quite 
appropriate  for  the  FRA  and  others  in  the  Department  to  conduct  accident  preven- 
tion activities.  Similarly,  in  carrying  out  vast  and  exceedingly  complex  transportation 
programs,  the  Department  and  the  FRA  must  make  policy  decisions — set  standards 
— write  regulations  and  conduct  enforcement  activities — all  these  with  proper  con- 
sideration of  a  broad  range  of  criteria — transportation  service,  system  capabilities, 
economics,  environment,  public  comfort. 

The  Safety  Board's  entire  orientation  and  primary  consideration,  on  the  other 
hand,  is  safety — always  remembering,  however,  that  our  recommendations  must  be 
reasonable  and  sound  to  be  accepted.  Our  function  in  the  accident  prevention  area, 
then,  is  to  determine  how  safety  can  be  enhanced  without  altogether  disrupting  the 
broader  Federal  transportation  policies  which  are  the  proper  province  of  the 
Department. 

In  a  sense,  the  Board  serves  as  a  catalyst  to  the  DOT.  The  Board  presses  for 
correction  of  evident  errors  and  for  new  or  redirected  safety  efforts.  As  a  part  of 
such  activities.  FRA  safety  regulation  necessarily  is  involved.  However,  in  a  number 


Address    by   John    H.    Reed 479 


of  its  accident  in\e.stigations,  the  Board  has  directed  its  recommendations  outside 
of  the  DOT.  Some  recommendations  have  been  made  to  the  management  of  trans- 
portation industries,  urging  assessment  of  adnn"nistrati\'e,  operational,  and  training 
procedures  as  they  affect  safety.  Some  recommendations  have  been  directed  to  Fed- 
eral agencies  outside  DOT.  Some  have  been  sent  to  State  governments. 

The  Board's  unique  organizational  independence  makes  possible  a  freer 
exchange  of  communications  on  safety  matters  with  all  participants  in  the  railroad 
safety  effort.  Many  agencies  and  indixiduals  have  contributions  to  make  in  defining 
and  controlling  railroad  hazards — manufacturers,  railroads,  trade  associations,  operat- 
ing and  maintenance  personnel,  as  well  as  Federal  and  some  State  agencies.  It  is  a 
complex  interaction. 

The  Safety  Board,  in  a  coordinating  role,  can  and  does  originate  and  facilitate 
a  greater  exchange  of  accident  prevention  information.  This  communication  channel 
is  free  of  the  constraints  of  regulatory  power,  enforcement  authority,  or  economic 
or  operational  sanctions.  We  believe  this  permits  the  greatest  possible  attention  to 
railroad  safety  by  those  in  the  industry  and,  in  turn,  helps  the  Board  fulfill  its 
responsibility  to  exercise  continuing  vigilance  of  the  status  of  transportation  safety 
and  to  report  to  the  Congress  annually. 

In  its  short  life  the  Safety  Board  has  delved  into  many  areas  of  railroad  safety 
in  its  in\estigations  of  railroad  accidents.  The  first  was  the  stubborn  problem  of 
collisions  at  grade  crossings. 

At  a  grade  crossing  in  Everett,  Mass.,  in  December  1966,  a  railway  diesel  car 
with  28  passengers  and  a  crew  of  three  struck  a  stalled  fuel-oil  truck  which  ruptured 
on  impact,  covering  the  head  end  of  the  car  with  flaming  oil.  Eleven  passengers 
and  two  crew  members  died  from  burns  and  smoke  inhalation  because  they  could 
not  get  out  of  an  inward-swinging  door  that  was  jammed  closed  by  persons 
attempting  to  escape. 

At  Sacramento,  Calif.,  on  February  22,  1967,  a  man  with  his  wife  and  seven 
children  drove  his  station  wagon  past  flashing  red  lights  into  the  path  of  a  fast 
freight  train.  Tlie  station  wagon  was  demolished  and  all  its  occupants  were  killed. 
More  recently,  just  90  miles  south  of  here,  in  January  1970,  a  local  gasoline 
delivery  truck  drove  past  an  operating  crossing  warning  device  and  was  struck  by 
a  79-mph  passenger  train.  The  tank  ruptured  and  enveloped  the  locomotive  in  burn- 
ing gasoline.  The  truck  driver  and  three  men  in  the  locomotive  cab  were  burned 
fatally. 

These  are  only  three  of  the  more  than  14.000  grade  crossing  accidents  which 
killed  more  than  6,000  persons  in  the  last  four  years.  In  spite  of  the  slidit  improve- 
ment during  the  past  four  years,  grade  crossing  accidents  will  accoimt  for  irore  than 
65%  of  all  railroad  casualties.  The  Safety  Board  recognizes  that  it  is  not  feasible  to 
separate  the  grades  at  all  rail-highway  crossings.  However,  we  believe  that  much 
can  be  done  to  sharpen  the  downward  trend  in  the  number  of  grade  crossing 
fatalities. 

In  the  past  the  Safety  Board  has  made  a  number  of  grade  crossing  recommen- 
dations. They  ranged  from  improved  gates  and  warning  de\ices  to  a  reconunenda- 
tion  that  law  enforcement  officers  consider  adequate  enforcement  at  grade  crossings 
to  be  as  important  as  at  highway  intersections.  Have  you  ever  noticed  that  a  motorist 
will  stop  for  an  isolated  highway  traffic  signal  at  two  o'clock  in  the  morning  when 
no  one  is  around,  but  will  disregard  a  railroad  crossing  warning  sign  under  the  same 
circumstances? 


480 Opening    Sess  ion    Features 

TIk'  ['"c'deral  Railroad  Safety  Act  of  1970  iccojini/cs  the  Kiadt-  crossing  problem 
and  refiuires  llial  tlic  Secretary  transmit  to  the  Congress  within  one  year  from 
October  16,  1970,  a  comprehensive  study  of  the  problem  of  eliminating  and  pro- 
tecting railroad  grade  crossings.  This  Act  also  reqnires  the  Secretary,  within  prac- 
tical limits,  to  undertake  a  coordinated  edort  toward  dexcloping  and  implementing 
solutions  to  the  grade  crossing  problem. 

The  same  section  of  the  Act  also  recognizes  the  major  source  of  fatalities  from 
purely  railroad  operations.  The  largest  loss  of  human  life  associated  with  railroad 
operations  occurs  in  grade-crossing  accident.s — the  joint  effect  of  two  modes  of 
transportation.  If  we  consider  the  railroad  transportation  mode  only,  pedestrians 
on  the  railroad  rights-of-way  are  the  major  source  of  fatalities.  Typically,  about 
two-thirds  of  the  total  fatalities — excluding  those  at  grade  crossings — are  persons 
struck  by  trains  while  walking,  running,  sitting,  or  otherwise  being  on  the  track  or 
right-of-way.  The  railroad  pedestrian  fatality  problem  is,  in  perspective,  more  severe 
than  all  the  remaining  sources  of  fatality  under  railroad  control,  and  much  more 
severe  than  the  fatality  losses  being  inciured  in  commercial  aviation.  These  accumu- 
lations of  railroad  pedestrian  fatalities  usually  occur  one  or  two  at  a  time  at  scat- 
tered locations.  They  recei\'e  far  less  public  attention  than  the  more  .spectacular 
aviation  accidents. 

During  the  week  of  April  6,  1970,  three  boys,  aged  10  to  11  years,  were  killed 
by  a  high-speed  Metroliner  while  apparently  playing  on  a  trestle  over  a  creek  north 
of  Wilmington,  Del.  Examination  of  the  site  revealed  an  area  that  is  especially 
attractive  to  youngsters — wide  open  spaces  to  run  and  play,  trestles  from  which  to 
drop  stones  into  the  water,  and  oceangoing  ships  moving  up  and  down  the  Dela- 
ware River  just  beyond  the  tracks.  There  was  no  fencing,  no  warning  signs,  and 
only  occasional  surveillance  by  either  local  or  railroad  police.  During  that  same 
week  three  otlier  boys  were  killed  on  two  different  railroads  in  the  Philadelphia- 
Wilmington  area.  Six  boys  in  one  week — part  of  a  total  of  475  to  500  pedestrians 
killed  on  the  railroads  every  year!  Certainly  something  can  be  done  to  improve  this 
situation,  particularly  in  areas  of  high-speed  train  serxice. 

Still  with  us  is  the  problem  of  handling  by  rail  the  hazardous  materials  which 
have  been  increasing  both  in  num!)er  and  in  total  volume.  About  two  years  ago  we 
became  aware  of  a  phenomenon  in  railroad  accidents  involving  hazardous  materials 
— a  new  safety  problem  that  was  receiving  little  attention.  The  Board  investigated 
a  derailment  at  Laurel,  Miss,  where  15  tank  cars  of  propane  were  involved  in  fires 
and  explosions  resulting  from  the  initial  derailment.  For  about  40  minutes  after  the 
derailment  there  were  continued  explosions  which  set  fire  to  many  dwellings  and 
did  extensive  damage  by  concussion.  Pieces  of  tank  cars  ranging  in  size  from  small 
parts  up  to  three-fourths  of  a  30,()00-gal  tank  were  hurled  up  to  1,600  ft  from  the 
wreck.  These  large  pieces  of  tank  literally  rocketed  o\er  long  distances,  leaxing 
trails  of  fiery  destruction. 

Fifty-four  residences  were  substantially  destroyed  and  over  1,350  residences 
suffered  some  degree  of  damage.  Several  local  businesses  were  totally  destroyed  or 
badly  damaged.  Six  public  schools  and  five  churches  were  damaged.  There  have 
been  a  number  of  serious  accidents  invoKing  hazardous  materials  since  Laurel,  the 
latest  at  Crescent  City,  111.,  last  June. 

The  Safety  Board  has  made  a  number  of  recommendations  to  the  industry,  to 
the  manufacturers  and  shippers,  and  to  government  agencies,  aimed  at  safer  trans- 
liortation  of  hazardous  materials  by  rail.  The  latest  of  these  recommendations  was 


Address    by    John    H.    Reed 481 


to  the  Federal  Raihoad  Adininistratiou  iiruing  a  regulation  restricting  the  speed 
of  tank  cars  carrying  over  25,000  gal  of  liciuefied  flammable  gasses  through  densely 
populated  areas.  This  is  intended  as  an  interim  action.  Hopefully,  a  better  permanent 
solution  will  be  disco\'ered  which  will  allow  both  safe  and  high-speed  transportation 
of  these  hazardous  commodities. 

Derailments  due  to  defectixe  or  improper  maintenance  of  way  and  structures 
continue  at  a  high  rate.  Track  is  such  a  basic  and  integral  part  of  the  railroad  opera- 
tion that  often  it  is  in\'ol\ed  in  derailments  as  a  contributing  causal  factor  even 
though  it  is  not  the  primary  cause.  It  is  encouraging  to  see  some  proposals  for 
study  of  train  and  track  as  a  system. 

We  feel  that  tlie  railroad  industry  needs  a  set  of  realistic,  enforceable,  objective 
standards  for  track  maintenance.  In  the  early  days  of  the  Safety  Board  we  thought 
that  the  industry  should  establish  and  enforce  these  rules.  But  the  number  of  train 
accidents  continued  to  increase  until  legislation  was  passed  giving  the  Secretary 
authority  to  do  this.  We  felt — and  still  feel — that  the  expertise  in  the  maintenance 
of  way  and  structures  is  concentrated  in  the  members  of  the  AREA. 

I  see  that  my  good  friend,  Mr.  Mac  E.  Rogers,  director  of  the  Bureau  of  Rail- 
road Safety  of  the  Federal  Railroad  Administration,  will  speak  in  some  detail  about 
the  Federal  Railroad  Safety  Act  of  1970.  Therefore,  I'll  not  belabor  the  point. 

I  will  say,  howexer,  that  the  development,  promulgation,  and  enforcement  of 
Federal  regulations  covering  track  represents  a  unique  opportunity  for  professional 
engineers  such  as  you  to  see  that  the  regulations  are  truly  practical,  objective  stand- 
ards which  will  lead  to  an  efficient  railroad  system.  A  system  cannot  be  efficient 
without  being  safe! 

There  is  much  to  be  done  in  railroad  safety.  Let's  start  with  these: 

1.  Reduce  the  opportunities  for  accidents  at  grade  crossings. 

2.  Eliminate   needless    fatalities    to    so-called   trespassers,   most   of   whom    are 
pedestrians. 

3.  ProN'ide  safe,  efficient  rail  transportation  of  hazardous  materials. 

4.  Prox'ide   track    and   structures   that    will   support   safely   the   transportation 
of  all  loads  oftered. 

We  at  the  Safety  Board  are  very  much  aware  of  the  distressing  financial  condi- 
tion of  some  of  the  carriers  and  of  the  railroad  industry  in  general.  We  feel,  how- 
ever, that  we  are  entering  an  era  in  which  the  railroad  industry  and  government 
will  achie\e  unprecedented  cooperation  in  soKing  some  of  the  ills  of  a  badly  needed 
industry.  But  this  will  recjuire  the  dedication  of  professionals  such  as  you. 

As  I  have  explained,  the  Safety  Board  does  not  limit  its  mission  solely  to  sifting 
through  accident  wreckage  to  the  exclusion  of  seeking  out  safety  lessons.  Such  les- 
sons, which  might  be  applied  before  an  accident,  can  be  awaiting  discovery  as  a 
result  of  other  related  safety  activities,  from  our  own  files  and  records,  or  from  the 
files,  records  or  experiences  of  others.  We  need — and  earnestly  invite — the  help  of 
the  AREA  and,  indeed,  the  entire  railroad  industry. 

We  believe  we  have  certain  skills  and  attitudes  which  place  the  Board  in  a 
vital  role  in  the  railroad  safety  system.  Accident  investigation  combined  with  general 
studies  can  be  effective  in  preventing  accidents. 


482 Opening    Session    Features 

To  this  end,  I  closed  a  recent  speedi  with  a  few  lines  winch  we  all  might  well 
consider  as  our  creed  for  safety  in  the  70's.  I  quote: 

"To  look  is  one  thing, 
To  see  what  you  look  at  is  another. 
To  understand  what  you  see  is  a   third, 

To  learn   from   what   you   understand   is   still   souiething  else, 
But  to  act  on  what  you  learn  is  all  that  really  matters." 

(McNair) 

Collisions  and  Derailments   Involving   Dangerous  Articles 
72-633- J 

By    EUGENE    R.    SCHLAF 

Superintendent   of    Fire    Prevention 

Illinois    Central    Railroad 

When  Earl  Hodgkins  invited  me  to  appear  on  this  program,  I  didn't  hesitate 
for  a  moment  to  accept,  because  I  feel  that  all  of  us  should  know  as  much  as  pos- 
sible about  the  behavior  of  hazardous  chemicals  when  involved  in  derailment  spills 
and  fires.  Furthermore,  I  consider  it  a  great  honor  to  appear  on  the  same  program 
with  these  illustrious  gentlemen.  I  overheard  one  fellow  in  the  audience  saying  to 
another,  "I  don't  know  if  this  guy  is  any  good,  but  there  sure  is  a  hell  of  a  lot  of 
him."  I  may  have  height,  but  the  other  speakers  have  stature,  and  that's  what  counts. 

In  order  to  set  your  mind  at  ease,  I  will  confine  this  discussion  to  tlie  effects 
of  derailments,  rather  than  their  causes.  The  slides  and  film  clips  you  will  see  were 
taken  on  our  railroad  and  other  railroads.  The  purpose  is  to  show  the  problems 
with  which  you  may  be  faced  and  perhaps  some  of  the  solutions. 

When  a  hazardous  spill  occurs,  you  ought  to  know,  among  other  things,  if  the 
product  is  toxic  or  non-toxic,  flammable  or  non-flammable,  reactive  or  non-reactive, 
and  whether  the  vapors  are  lighter  or  heavier  than  air.  You  should  know  what  to  do 
and  what  not  to  do  in  case  of  fire.  Sometimes  the  products  of  combustion  are  toxic 
while  the  lading  is  fairly  non-toxic.  An  example  is  vinyl  chloride.  On  the  other  hand, 
hydrocyanic  acid  is  quite  the  reverse. 

Sound  confusing?  It  is,  unless  you  have  some  sort  of  ready  reference  at  hand. 
You  could  not  possibly  memorize  all  the  do's  and  don'ts  for  each  chemical  without 
such  a  reference.  Fortunately  there  are  many  reference  sources.  The  AAR  Bureau 
of  Explosives  has  for  many  years  published  its  Pamphlet  7  which  contains  general 
infonnation  relating  to  explosives  and  other  dangerous  articles.  The  cost  is  $2.00. 
Last  year  the  Bureau  published  Pamphlet  7A  entitled  "Dangerous  Articles  Emer- 
gency Guide."  It  gives  specific  information  on  all  commodities  listed  in  Paragraph 
172  of  the  Tariff.  A  few  commodities  were  puiposely  omitted  because  they  do  not 
present  a  hazard  different  from  ordinary  materials  under  accident  conditions,  or  else 
because  they  are  shipped  in  such  limited  quantities  that  the  method  of  packing 
reduces  the  hazard  to  a  minimum.  Certain  items  (such  as  sulfur)  are  included 
because  they  are  so  susceptible  to  ignition  from  external  sources  that  fires  in  the 
course  of  their  transportation  are  relatively  frequent.  The  cost  of  this  pamphlet 
ranges  from   $2.00  to  $3.00  per  copy,  depending  on  quantity  purchased. 

The  Bureau's  Pamphlet  22  entitled  "Handling  Collisions  and  Derailments 
Involving  Explosives,  Gasoline  and  Other  Dangerous  Articles"  should  be  text  book 
material  for  all  concerned  with  derailment  spills — fire  departments,  police,  civil 
defense,  environmental  protection  agencies,  division  superintendents,  division  engi- 


AddreJis    by    Eugene  R.    Schlaf 483 

neers,   traimiiasteis,   master  mechanics,   wrecker  foremen,  and  freight  claim  preven- 
tion men.  Some  of  the  items  listed  in  the  index  are: 

Tank  Cars  in  Tunnels 

Poison  Gas 

Radioactive    Materials — Poisons — Class   D 

Hydrocyanic  Acid 

The  cost  of  Pamphlet  22  is  $1.50.  The  Bureau  publishes  many  other  pamphlets, 
but  the  ones  I  have  given  are  those  of  greatest  interest  to  you. 

The  Manufacturing  Chemists  Association  has  published  its  Chem-Card  Manual 
which  is  excellent  for  the  85  chemicals  listed.  The  cost  is  $1.00.  The  National 
Safet>'  Council  sells  a  pocket  chemical  slide  rule  for  $1.00  each  in  lots  of  100  or 
more.  The  Railway  Systems  and  Management  Association  has  published  a  similar 
slide  rule  entitled  "Chemical  Transportation  Safety  Index"  listing  more  chemicals  and 
costing  $3.00  each  in  quantity  lots.  In  the  development  stage  is  its  "Commodity 
Safety  System"  which  will  be  designed  to  bring  together  at  one  point  the  informa- 
tion required  to  intelligently  manage  disasters  involving  hazardous  materials,  includ- 
ing  a  computerized  safety  information  retrieval  system. 

The  National  Fire  Protection  Association's  "Fire  Protection  Guide  on  Hazardous 
Materials"  costs  $5.50  and  is  wortli  every  penny  of  it.  It  is  really  five  books  in  one. 
It  lists  the  properties  of  flammable  liquids  and  hazardous  materials.  It  gives  a  list 
of  some,  but  by  no  means  all,  of  hazardous  chemical  reactions.  It  also  features  a 
diamond  marking  system  which  enables  you  at  a  glance  to  note  its  health  hazard, 
its  flammability  hazard,  its  reactivity  hazard  and  whether  water  may  be  safely 
applied.  The  fire  services  want  this  information  on  our  car  placards,  but  under  fire 
conditions,  it  would  be  impractical.  We  recommend  that  until  you  know  what  is  in 
the  car,  stay  away  from  the  car.  The  waybill  in  the  caboose  will  give  the  description 
of  die  chemical,  and  the  firefighter  can  then  refer  to  the  diamond  system  in  his 
own  NFPA  guide. 

If  you  acquire  this  literature,  you  will  not  become  an  instant  expert,  any  more 
than  buying  a  cookbook  will  make  you  an  instant  chef.  Reference  is  made  to  such 
terms  as  "flash  point,"  "explosive  range,"  and  "ignition  temperature."  What  is 
"flash  point?"  It  is  the  temperature  at  which  a  flammable  liqmd  begins  to  gixe  ofl^ 
ignitable  vapors.  The  higher  the  flash  point,  tlie  safer  the  liquid.  Gasoline,  having 
a  flash  point  50  deg  or  so  below  zero  is  always  giving  off  dangerous  vapors.  Lube 
oil  and  cottonseed  oil  have  high  flash  points,  but  will  burn  with  great  intensity 
under  proper  conditions. 

"Explosive  range,"  or  flammable  limits,  is  the  percentage  of  flanunable  vapors 
in  air  that  will  ignite.  If  confined,  an  explosion  results  if  the  proper  amount  of  heat 
is  added.  Even  gasoline  will  not  explode  in  the  engine  of  your  car  if  the  carburetor 
floods,  making  the  mixture  too  rich  to  burn.  Wlien  an  empty  tank  car  last  contain- 
ing a  flammable  liquid  ruptures  at  a  derailment,  the  vapors  witiiin  the  tank  may 
be  too  rich  to  burn.  However,  if  the  hole  in  the  tank  is  near  the  ground,  sufficient 
vapors  may  leave  the  tank  and  be  replaced  with  air  to  form  an  explosive  mixture 
in  it.  A  welder's  spark  traveling  into  or  by  the  opening  may  cause  a  terrific  explosion. 
A  combustible  gas  indicator,  in  experienced  hands,  can  do  nmch  to  head  ofl^  trouble 
of  this  nature. 

The  presence  of  toxic  quantities  of  some  commodities  is  not  indicated  by  the 
combustible  gas  indicator.   For  example,  hydrocyanic  acid  is  absorbed  through   tlie 


484 Op  cuing    S  ess  ion    Features 

skin  in  concvn trillions  iil)o\e  100  ppm,  which  is  way  below  its  lower  e.\plosi\c  limit 
of  6%.  Furtiicrniore,  it  does  not  have  a  strong?,  telltale  odor  like  anhydrons  ammonia. 
In  the  case  of  the  latter,  >()ii  simply  cannot  voltnitaiiltj  stay  in  an  ammonia  atmos- 
phere that  will  be  permanently  harmful  to  you.  The  least  detectable  odor  of  annnonia 
is  50  ppm,  which  you  can  tolerate  for  an  8-hour  working  exposure.  A  concentration 
of  /2  to  1%  is  rapidly  fatal  for  an  unproteeted  worker.  Anhydrous  annnonia  will  burn 
within  a  concentration  of  16-25%  with  an  ignition  temperature  of  a  high  1204  F. 
Because  of  this,  it  is  classified  as  a  non-flannnable  compressed  gas.  Although  its 
vapor  is  only  60%  the  weight  of  air,  you  would  naturally  conclude  that  it  would  rise 
upon  release.  However  it  has  such  a  high  affinity  for  water,  it  will  seek  out  any 
moisture  in  the  air,  or  on  your  skin  or  in  yom-  eyes  or  lungs  to  form  anunonium 
hydroxide,  a  caustic  liquid.  Liquid  anhydrous  annnonia  can  burn  by  freezing;  if  some 
is  spilled  on  the  skin,  you  will  also  suffer  frostbite  since  its  boiling  point  is  28  deg 
below  zero. 

Right  about  now,  you're  hoping  that  others  at  a  derailment  are  aware  of  tlie 
hazards  involved  and  will  take  the  necessary  precautionary  measures.  The  most 
comforting  sight  I  can  see  at  a  derailment  involving  hazardous  commodities  is  a 
Bureau  of  Explosives  inspector.  These  men  are  on  24  hour  call  and  do  a  fantastic 
job  of  getting  to  the  scene  quickly.  I  recall  one  instance  where  the  response  was 
so  fast,  the  inspector  must  have  broken  the  highway  speed  limits.  In  checking  it 
out,  I  found  that  he  sped  just  enough  to  attract  a  speed  cop,  and,  after  explaining 
the  situation,  he  got  an  escort  at  still  higher  speeds.  These  inspectors  help  the 
division  superintendent  in  many  ways,  while  conducting  their  own  investigation 
as  to  whether  there  were  any  violations  of  the  tariff. 

We  have  found  that  the  shipper  has  been  very  responsi\'e  to  our  calls  for 
assistance.  Many  times  two  of  their  representatives  will  fly  in  from  different  parts 
of   the   country.   "Go   teams"   arrange   for   transport   trucks   and   transfer  equipment. 

We  have  found  that  fire  departments,  civil  defense  groups,  police,  and  even 
environmental  protection  agencies  are  interested  in  learning  more  about  their  role 
in  case  of  chemical  spills.  They  have  appealed  to  us  for  help. 

Alan  S.  Boyd  [President  of  the  Illinois  Central  Railroad],  formerly  head  of  the 
DOT,  has  arranged  for  the  distribution  of  appropriate  literature  to  the  hundreds  of 
fire  departments  serving  the  IC.  In  addition,  we  offer  instruction  to  fire  schools  at 
local,  coimty,  and  state  levels.  The  sessions  are  from  30  minutes  to  30  hours  in 
length.  We  augment  the  "book  learning"  with  authoritative  films  such  as  "Handling 
LP-Gas  Emergencies,"  and  "Tank  Vehicle  Fire  Fighting,"  and  slides  of  actual 
derailments  involving  vinyl  chloride,  propane,  anhydrous  ammonia  and  other 
chemicals. 

Our  audio-visual  services  department  has  i^ublished  a  fire  film  list  containing 
30  fire  training  films.  These  are  offered  at  no  cost  to  fire  departments,  industrial 
fire  brigades,  civil  defense  and  other  organizations  along  oin-  line.  The  demand  for 
our  films  has  been  so  great  that  some  duplicate  prints  have  been  purchased.  If  any 
of  you  would  like  to  preview  any  of  them,  widi  the  view  of  possible  purchase,  it 
probably  could  be  arranged  on  an  open  date  basis.  A  supply  of  the  lists  is  on  a 
table  at  the  rear  of  the  room. 

If  any  of  you  would  like  to  attend  or  be  represented  at  one  of  the  state  fire 
schools  this  year,  you  would  be  most  welcome.  Schools  are  scheduled  in  Kentucky, 
Mississippi,  Tennessee,  Louisiana  in  one  or  more  sessions.  You  may  contact  me 
later  for  locations  and  dates  if  you  are  interested. 

And  now  for  the  slides   [none  of  which  is  reproduced  herein]. 


ANNUAL  LUNCHEON  ADDRESS 


485 


Annual   Luncheon  Address 

By   JOHN   P.    FISHWICK 

President   and    Chief    Executive    Officer 

Norfolk   &   Western    Railway 

I  was  pleased  to  accept  your  invitation  to  take  part  in  this  program.  Any 
organization  in  this  country  that  is  older  than  most  of  its  members  is  a  unique  group. 
This  is  the  70th  Annual  Convention  of  tlie  AREA.  Your  roots  extend  back  to  the 
19th  Century  and  today  we  look  ahead  as  a  matter  of  course  to  the  21st  Century. 
I  have  looked  forward  to  this  session  because  I  have  hoped  that  the  thoughts  of  a 
non-engineer  about  some  of  our  problems  might  be  of  interest  to  you  who  make 
engineering  a  profession.  The  field  of  engineering  has  been  at  the  core  of  railroad 
progress  for  more  than  a  century  and  we  know  that  its  contributions  in  the  future 
will  be  just  as  necessary  and  just  as  vital. 

I  do  not  have  to  tell  you  that  our  industry  is  in  peril.  Even  those  not  immersed 
in  the  day-to-day  work  of  railroading  know  from  the  newspapers  and  from  television 
that  the  railroad  industry  is  walking  a  tightrope  of  solvency.  Nor  do  I  have  to 
describe  tlie  lag  in  our  national  economy  and  continuing  inflation.  These  trends 
combine  to  produce  the  most  dangerous  times  for  railroads  they  have  yet  seen.  Our 
ancient  problems  of  regulation,  inadequate  rates  and  tax  inequities  have  merged 
with  rampant  inflation  and  declining  traffic  to  produce  an  economic  vise  that  is  well 
on  its  way  to  destroying  the  \'iability  of  America's  railroads. 

AH  these  factors  have  also  affected  the  many  phases  of  engineering  work  on 
every  railroad.  For  the  past  12  years  tie  and  rail  installations  have  remained  at  low 
levels  despite  the  fact  that  we  have  purchased  longer  and  heavier  cars  and  are 
operating  heavier  trains.  Our  rates  have  not  risen  as  quickly  as  our  costs  and  we 
ha\e  not  been  able  to  make  up  the  difference  with  increased  volume.  And  we  have 
been  forced  to  maintain  tliousands  of  miles  of  branch  lines  and  many  other  losing 
ser\"ices,  including  passenger  operations. 

Declining  revenues  and  inflation  have  a  devastating  effect  on  every  aspect  of 
engineering.  Basic  standards  are  difficult  to  maintain;  grade  and  line  improvement 
projects  must  be  postponed;  and  the  economic  feasibility  of  such  things  as  traffic 
control  additions  becomes  questionable  when  costs  are  vastly  increased.  The  ripple 
effect  of  continuously  postponed  and  cancelled  maintenance  and  improvement 
projects  touches  our  business,  finally,  where  it  hurts  us  worst:  our  ability  to  provide 
a  competitive  service. 

Fortunately,  the  catalogue  of  problems  must  also  include  our  prospects  and 
the  steps  we  are  taking  to  help  solve  them.  For  the  industry  as  a  whole  both  the 
legislative  and  regulatory  climate  is  slowly  improving  as  the  scope  of  our  problems 
is  recognized.  The  passage  of  the  Railpax  measure  plus  tlie  prospects  for  passage 
of  other  bills  which  would  help  equalize  treatment  of  railroads  vis-a-vis  other 
modes  are  encouraging  signs.  If  these  trends  continue,  tliere  is  the  prospect  that 
we  can  concentrate  increasingly  on  essential  and  profitable  ser\'ice.  And  for  the 
long  run  the  economy  should  continue  to  grow  and  the  rail  industry's  share  should 
grow  with  it. 

As  Lord  Keynes  said,  however,  in  the  long  iiin  we  are  all  dead.  And  in  any 
case,  if  our  industry  cannot  impro\e  itself  in  the  short  run,  the  long  run  may  well 
be  academic.  So,  let  us  look  at  the  short  run. 

487 


488  Annual    Luncheon 


There  are  three  general  areas  in  which  action  is  needed.  One  of  these,  tlie 
generation  of  cash,  requires  legislative  action  and  administrative  approval.  The  other 
two,  control  of  costs  and  inipro\  ing  efficiency,  can  be  undertaken  within  our  com- 
panies at  our  own  initiative.  This  is  particularly  true  in  our  engineering  departments. 

The  most  logical  source  for  the  infusion  of  cash  ,so  badly  needed  is  a  rate 
increase.  The  industry  is  attempting  to  secure  approval  of  a  1%  increase,  or  the 
difference  between  the  15%  we  refjuested  last  fall  and  the  8%  subsequently  granted. 
The  generation  of  cash  also  includes  the  elimination  of  cash  drains.  In  this  category 
are  legislation  such  as  the  recently  passed  Railpax  bill,  proposals  to  establish  a 
government-owned  freight  car  pool  and  pending  bills  on  ensuring  equitable  state 
and  local  taxes. 

While  more  cash  is  urgently  required  by  many  railroads,  all  railroads,  I  believe, 
must  be  constantly  at  work  on  the  problems  of  cost  control,  research  and  develop- 
ment and  innovation.  Cost  control  includes  the  use  of  the  computer  to  monitor 
purchase  and  use  of  materials.  Welded  rail  and  vapor-dried  ties  are  the  products 
of  research  and  development.  All  of  these  are  steps  forward,  but  we  have  not 
moved  far  enough. 

It  is  true  that  maintenance  of  way  has  shown  great  pro'iress  in  past  years, 
possibly  more  than  anv  other  department  of  most  railroads.  There  has  been  a 
dramatic  reduction  in  the  number  of  maintenance  of  way  employees,  from  177.000 
in  1956  to  94,000  last  year,  for  example.  Productivity  has  clearly  increased.  Yet 
despite  this,  the  railroads  are  still  .spending  as  much  as  ever  in  maintenance  of  way. 
And,  of  course,  we  still  have  huge  amounts  of  deferred  maintenance. 

We  still  lay  only  one  mile  of  rail  per  day  with  the  average  rail  gang  although 
the  number  of  men  has  been  reduced  from  about  125  prior  to  mechanization  to 
about  65  to  70  today.  On  the  average,  a  tie  gang  lays  about  four  times  as  man\- 
ties  per  man-hour  now  as  it  did  prior  to  mechanization  in  1950 — 1.25  ties  per  man 
per  hour  20  years  ago  and  about  4.6  now^  We  are  assuming  these  gangs  are  work- 
ing under  detour  and  have  an  uninterrupted  shot  at  a  day's  work.  But  we  have 
barely  kept  pace  with  costs. 

In  addition,  each  railroad  has  its  own  pet  standards  for  fittings,  sizes,  gauges 
and  types  of  track  equipment.  On  the  Norfolk  &  Western  for  track  maintenance 
alone,  we  carry  an  inventory  of  .3,930  different  items.  These  include  six  types  of  ties 
in  189  sizes,  24  items  of  ballast  material,  243  different  bolts,  screws  and  spikes, 
64  types  of  rail  anchors,  clamps  and  strips  and  26  types  of  frogs,  turnouts,  pads  and 
plates  in  a  total  of  3,002  items.  Much  of  this  is  seldom  used.  Much  has  been 
unchanged  in  design  for  a  century,  and  some  of  it  is  installed  in  the  same  way  it 
was  decades  ago. 

In  the  same  way,  there  has  been  a  lack  of  coordination  and  conununication 
between  our  sales  and  marketing  people  and  our  engineers.  Many  of  the  larger  cars 
are  too  large  for  the  track  facilities.  Their  centers  of  gravity  are  too  high  and  the 
loads  are  often  too  heavy.  One  result  has  been  more  and  bigger  derailments.  The 
challenge  before  both  management  and  engineers  now  is  to  see  the  forest  instead 
of  the  trees.  We  need  to  look  at  the  railroad  and  its  work  as  a  system  of  interre- 
lated parts  and  jobs  rather  than  a  series  of  rigidly  compartmented  pigeon  holes. 
In  track  maintenance,  we  need  new  thinking  not  on  how  we  do  things,  but  on  what 
we  do.  Railroads  cannot  afford  to  spend  a  larger  portion  of  their  re\'enues  on  track. 
Engineers,  therefore,  must  come  up  with  better  track  for  less  money.  An  obvious 
beginning  would  be   to  reduce  the  variety  of  anchors,  ties  and  fittings  now  used 


Address    by    John    P.    Fishwick 489 

in  the  industry.  Specifications  for  turnouts  and  loconiotixcs  and  cais  can  he  more 
standardized,  at  some  sacrifice  in  pride  and  trachtion  perhaps,  hut  also  at  great 
savings  in  dolhirs.  Beyond  inventory  and  maintenance  work  methods,  there  are 
other  areas  of  cost  control  which  can  be  applied  in  all  departments. 

Last  January  1,  we  began  a  Responsibility  Accounting  System  which  enables  us 
to  go  a  step  beyond  normal  ICC  reporting  procedures  and  pinpoint  the  responsi- 
bility for  expenditures,  especially  in  our  mechanical  and  engineering  departments. 
We  believe  this  system  will  enable  us  to  determine  the  unit  costs  of  our  mainte- 
nance program  work  both  in  the  shoj)  and  on  the  rights-of-way. 

Other  areas  for  savings  are  a  rechiction  in  trackage  of  little-used  branch  lines 
that  are  uneconomical  to  operate  and  elimination  of  track  or  reduced  maintenance 
on  track  which  has  been  duplicated  through  merger  or  traffic  diversion  through 
trackage-rights   agreements. 

No  area  of  railroading  should  be  immune  from  a  new  look  at  costs.  Last  Decem- 
ber on  tire  Norfolk  &  Western  we  found  that  more  than  5,000  reports  were  being 
prepared  monthly.  Our  paper  bill  was  $2.5  million  a  year  for  reports  alone,  and 
one  form  prepared  daily  by  our  computer  ran  to  3,000  pages.  After  a  comprehensive 
campaign,  we  have  eliminated  10%  of  the  regular  reports  prepared  and  25%  of  those 
received. 

In  the  Engineering  Department  we  eliminated  16%  of  the  reports  used,  but 
this  was  second-rate  compared  to  the  work  of  oiu-  Auditor  of  Station  Accounts. 
Through  his  studies  and  efforts,  we  will  eliminate  completely  2.6  million  pages  of 
computer  output  on  an  annual  basis.  We  will  do  away  with  another  million  sheets 
through  the  use  of  a  special  camera.  These  3.6  million  sheets  represent  a  68%  reduc- 
tion in  the  volume  of  computer  reports  received  by  our  Station  Accounts  Department. 

No  cost-control  program  will  be  effective,  however,  unless  every  responsible 
employee  is  cost  conscious.  I'his  is  particularly  so  in  our  industry  where  many 
people  who  are  vital  to  the  cost  control  effort  are  isolated  in  widely  spread 
geographical  areas. 

I  am  suggesting  diat,  while  this  is  a  dark  hour  for  the  railroads,  there  is  great 
potential  in  the  efforts  we  ourselves  can  make  to  improve  our  revenues,  our  efficiency 
and  control  our  costs.  In  many  areas,  especially  in  the  use  of  facilities  and  equip- 
ment, railroads  have  been  very  wasteful  in  years  gone  by.  Far  more  intensive  use 
will  be  required  in  the  future.  We  need  to  devise  systems  that  will  increase  the 
utility  of  maintenance  of  way  machines  and  similar  equipment  by  the  same  multiple 
we  are  seeking  for  freight  cars.  Where  the  freight  car  now  moves  only  10,000  to 
20,000  miles  per  year,  a  competing  truck  travels  100,000  miles  per  year.  Some  way 
nuist  be  found  to  close  that  gap.  These  are  matters  that  do  not  require  filing  of 
motions  or  liearings  in  Washington.  This  can  be  an  intra-industry  endeaNor.  Because 
our  companies  are  almost  identical  in  organization  and  scope  of  work,  ideas  and 
programs  that  work  on  one  railroad  will  usually  work  as  well  on  another.  We  should 
maintain,  dierefore,  a  continuous  cross-fertilization  of  these  ideas  and  practices. 
Beyond  the  immediate  benefits  of  helping  ourselves,  the  knowledge  that  we  are  not 
depending  solely  on  outside  assistance  cannot  help  but  make  our  requests  for  such 
outside  help  more  convincing  and  more  probable  of  success. 


SPECIAL  FEATURES 

Page 

Address — Development    of    a    Highway— Railroad    Grade    Crossing     Protection    Program, 

by    Harold    L.    Michael 493 

Address — Wheel   and   Rail   Loadings  from  Diesel   Locomotives,   by  L.   F.  Koci 500 

Panel  Discussion — Glued  Laminated  Timber — A  Reliable  Engineering  Material,  by 
Billy  Bohannan,  T.  G.  Williamson,  M.  J.  Rhude,  G.  R.  Birkemeier,  and  Dan 
O'Bryn     529 

Paper — Design    of    Pavements    for    Container    Handling    Areas,    by    F.    L.    Peckover    and 

W.    W.    Wong    536 

Panel    Discussion — Practical    Applications    of    Systems   Engineering: 

Track   Charts,   by   David   L.    Glickstein 562 

Systems   Engineering   on   a   Small   Railroad,  by  R.   B.  Sliepka 566 

Address — A   Railroad   Statement   for  Pollution   Abatement,   by   C.   F.   Muelder 568 

Panel    Discussion — Continuous    Welded    Rail    on    Bridges: 

Principles,    by   D.   V.    Messman 572 

Problems,   by  L.   F.   Currier 580 

Practices,    by    R.    I.    Simkins 582 

Address — Data    Processing   for  Work   Equipment,   by   E.   H.   Fisher 584 

Address — Some  Aspects  of  Service  Developments  in  Rail-Head  Metal,  by  R.  J.   Henry  _  586 

Address — Repair   of   Concrete   Structures  with   Epoxy  Compounds,   by  J.   A.   Heinen 599 


491 


Development  of  a   Highway— Railroad   Grade 
Crossing  Protection   Program 
72-633-2 

By   HAROLD   L.    MICHAEL* 

INTRODUCTION 

Minimization  of  rail-highway  grade  crossing  accidents  has  been  an  oljjective 
of  highway  and  railroad  officials  and  the  public  for  many  years.  Many  efforts  have 
been  directed  toward  the  development  of  new  legislation,  toward  stricter  enforce- 
ment of  traffic  regulations  at  rail-highway  grade  crossings,  toward  the  education  of 
drivers  as  to  the  dangers  existing  at  such  crossings,  toward  the  degree  of  responsi- 
bility which  dri\'ers  must  assume,  and  toward  increased  engineering  application  of 
standard  means  of  protection  at  grade  crossings.  In  addition  much  research  on  new 
techniques  for  impro\  ed  grade  crossing  safety  has  developed. 

The  problem  of  accidents  at  rail-highway  grade  crossings  is  a  dramatic  one 
in  the  public  eye  because  of  the  severity  of  accidents  between  a  train  and  a  vehicle. 
Although  less  than  1%  of  all  traffic  accidents  occur  at  grade  crossings,  these  accidents 
account  for  approximately  3%  of  all  highway  deaths.  Although  this  is  not  a  large 
percentage,  the  high  probability  of  a  fatality  or  even  destruction  of  an  entire  family 
in  such  an  accident  often  results  in  localized  public  arousal  which  creates  tremendous 
difficulties  for  the  railroad  and  highway  officials  responsible  for  grade  crossing  safety 
or  an  overall  highway  safety  program.  In  the  atmosphere  of  emotional  tension  and 
sympathetic  public  pressure  which  typically  follows  a  fatal  accident  at  a  grade 
crossing,  the  decision  as  to  safety  improvements  is  often  not  wisely  made  unless 
the  agencies  with  responsibility  for  the  crossing  have  a  complete  and  carefully 
documented  crossing  protection  program.  The  safety  official  with  such  a  program 
can  recommend  impro\'ements  which  will  be  of  the  greatest  benefit,  and  he  can 
achieve  his  objecti\e  of  maximizing  benefit  with  the  money  available.  The  official 
without  such  a  program  will  be  forced  to  fund  improvements  that  do  not  provide 
optimiun  benefits. 

NATURE    OF   THE    PROBLEM 

The  development  of  a  sound  grade  crossing  safety  program  must  recognize 
the  nature  of  the  problem  and  the  several  difficulties  associated  with  analyses  of  it. 
Much  research  on  many  of  these  difficulties  has  been  conducted  in  the  past  several 
decades  and  many  aspects  of  the  problems  are  becoming  clearer  each  year.  Several 
such  basic  conditions  generally  recognized  today  are  as  follows: 

1.  For  good  reasons,  the  train  must  be  accorded  the  right-of-way  at  highway- 
railroad  grade  crossings. 

2.  The  typical  motor  vehicle  operator  lias  little  respect  for  the  dangers  at  a 
grade  crossing  and  makes  very  little  or  no  effort  in  deternuning  the 
proximity  of  a  train. 


"  Associate  director,  joint  llitihwav  Research  Proiect,  Piirilne  University,  and  iliairinan. 
Subcommittee  on  "Merits  of  Various  Types  of  HiHh\vay-Rail\va\  Grade  Orossiny  Protection," 
Committee    9 — ni«h%vays,     An-eri  ■;;n     R   ilw:".-     En-iineerinji    Association. 

Note — Discussion   open    until   October    1.5,    1971 

493 


494 Special    Features 


3.  Tin-  ficqiK'iicy  of  tiain-iiuolxed  accidents  at  a  grade  crossing  is  small, 
making  statistical   analysis   and  prediction  of  such  accidents  difficult. 

4.  The  factors  which  affect  the  numher  of  accidents  at  a  grade  crossing  are 
many,  but  the  major  ones  are  usually  daily  traffic  volume  on  the  highway, 
the  daily  train  volume  and  the  type  of  grade  crossing  protection. 

5.  The  relative  protection  offered  by  the  several  types  of  grade  crossing  pro- 
tection devices  is  as  follows   (expressed  as  hazard  values): 

Crossbuck    1.00 

Stop    Signs    0..5-0.6 

Flashing   Lights    0.2-0.4 

Automatic   Gates    0.1-0.2 

6.  Sufficient  funds  will  be  available  annually  to  impro\'e  the  protection  at 
only  a  fraction  of  the  existing  crossings. 

The  acceptance  of  the  first  of  the  above  conditions  is  unixersal — every  driver 
understands  the  train  has  the  right-of-way.  Understanding  of  the  second  condition, 
the  fact  that  most  drivers  have  little  respect  for  the  dangers  at  grade  crossings,  is  not 
as  clear.  Most  of  us  recognize  the  truth  of  the  fact,  but  many  of  us  are  still  willing 
to  accept  it  as  a  sound  reason  for  grade  crossing  accidents.  The  result  is  that  we  do 
not  include  due  consideration  of  it  in  our  safety  programs.  As  this  lack  of  respect 
for  the  danger  is  a  characteristic  of  many  motorists,  the  safety  official  must  aggres- 
sively seek  means  of  bringing  to  the  motorist's  attention  with  more  certainty  knowl- 
edge about  approaching  trains.  "He  never  saw  the  train  until  it  was  too  late  even 
though  all  warning  devices  were  working  perfectly"  is  not  a  good  reason  for  an 
accident. 

The  third  condition  listed,  the  low  frecjuency  of  train-invohed  accidents,  is 
clearly  documented  in  much  research.  Annually  about  14,000  such  accidents  occur 
at  over  220,000  grade  crossings  ( 15 ) .  Obviously  many  crossings  will  be  accident- 
free  for  10  or  more  years.  This  low  frequency  rate  makes  it  very  difficult  to  analyze 
statistically  the  effectiveness  of  protection  devices. 

As  pointed  out  by  numerous  researchers  (8,  9),  the  reduction  of  accidents  at  a 
"high"  accident  location  during  the  first  year  or  years  after  installation  of  a  new 
protective  device  could  well  be  just  a  matter  of  chance.  In  order  to  make  a  sound 
statistical  statement  it  would  be  desirable  for  a  crossing  to  have  a  substantial  num- 
ber of  accidents,  say  20  or  more,  in  a  year,  but  obviously  the  official  would  not 
want  to,  nor  should  he,  wait  for  such  a  rate  to  occur  before  making  improvements. 

As  a  result  of  the  low  level  of  "occurrences"  and  the  vast  number  of  factors 
contributing  to  such  accidents — factors  related  to  the  vehicle,  to  the  environment 
and  to  the  human  operator — no  predictive  equation  can  claim  to  explain  a  large 
portion  of  the  variability  in  the  accident  numbers  at  grade  crossings.  This  variability 
combined  with  a  typically  inadequate  data  base  makes  it  very  understandable  that 
a  completely  accepted  riuantitative  method  of  accident  prediction  has  not  been 
developed  to  date. 

IMPORTANT   FACTORS   AFFECTING   GRADE    CROSSING   HAZARD 

Nevertheless,  conclusions  of  research  generally  agree  that  the  three  major  con- 
tributing variables  in  a  hazard  rating  or  accident  predicting  equation  are  the  average 
daily  traffic  on  the  highway  (V),  the  number  of  trains  per  day  (T),  and  the  type 
of   protection   at  the   crossing    (P).   Other  factors   which   some  have  found  to  con- 


Address    by    Harold    L.    Michael 495 

tribute  to  hazard  at  a  crossing  are  numerous  and  include  sight  distance,  develop- 
ment near  the  crossing,  number  of  tracks,  etc.  Many  hazard  index  formulas  have 
been  developed  and  are  being  used.  Considerable  research  indicates  that  most  if  not 
all  of  them  will  provide  similar  relative  ratings  for  a  group  of  grade  crossings  (1,  2). 
Hence,  complete  agreement  on  one  hazard  formula  is  not  absolutely  essential  to 
detennining  die  relative  hazard  of  all  crossings  which  are  the  responsibility  of  a 
railroad  or  highway  official.  All  that  is  necessary  is  for  the  official  to  use  one  of  the 
several  such  models  \\hich  have  been  developed  and  are  being  used.  One  often 
used  (1)  is 

HI  =  VTP 
where 

HI  =  hazard  index 

V  =^  average  24-hour  daily  traffic   ( AADT ) 

r  =  average  24-hour  train  volume 

P  =  protection  factor   ( expressed  as  a  hazard  value ) 

SAFETY   MERITS   OF   PROTECTION    DEVICES 

Four  major  types  of  grade  crossing  protection  are  used:  the  standard  crossbuck, 
stop  signs,  flashing  lights  and  flashing  lights  with  automatic  gates.  The  first  two  of 
these  types  are  passive  in  nature  and  only  warn  the  motorist  of  the  location  of  a 
railroad  crossing.  The  latter  two  are  active  and  in  addition  to  providing  warning 
of  the  location  of  the  crossing,  attempt  to  tell  the  motorist  of  the  absence  or  presence 
of  a  train  in  or  approaching  the  crossing. 

It  is  clear  that  die  types  of  active  protection  provide  greater  protection  to  the 
motorist  than  the  passive  types.  Aldiough  exact  agreement  as  to  the  relative  value 
afforded  to  the  motorist  by  each  of  the  four  types  of  protection  does  not  exist,  most 
research  studies  agree  that  if  the  hazard  value  of  crossbuck  protection  is  unit  value 
of  1.00,  the  relative  hazard  value  of  each  of  the  four  types  is  as  follows  (1,15): 

Crossbuck    1.00 

Stop    Signs    0.5-0.6 

Flashing  Lights    0.2-0.4 

Automatic   Gates    0.1-0.2 

Much  disagreement,  however,  exists  relative  to  the  use  of  stop  signs  at  railroad- 
highway  grade  crossings.  Although  they  are  more  efl^ective  in  reducing  train-involved 
accidents  than  just  the  crossbuck,  they  result  in  much  delay  to  motorists,  an  increase 
in  rear-end  vehicular  accidents  on  high  volume  roads,  and  are  claimed  by  many  to 
result  in  increasing  disrespect  for  the  stop-sign  method  of  vehicular  control.  If  one 
places  a  value  on  the  time  lost  by  motorists  in  stopping  at  stop-sign-controlled 
grade  crossings,  very  few  grade  crossings  would  warrant  this  type  of  control   (16). 

The  type  of  protection  to  be  installed  at  a  crossing,  however,  should  not  be 
based  solely  on  the  probability  of  accident  reduction.  The  costs  of  installation  and 
maintenance  of  flashing  lights  and  automatic  gates  are  considerable  and  limited 
funds  are  available  for  upgrading  crossing  protection.  The.se  facts  require  that  a 
decision  to  change  the  type  of  protection  at  a  railroad  highway  grade  crossing  must 
l>e  based  on  a  total  analysis  of  the  economics  of  such  an  action.  Such  an  analysis 
requires  an  estimation  of  the  benefits  to  be  expected  from  the  improvement  and  an 
evaluation  of  the  costs  of  installing  and  maintaining  the  higher  types  of  protection. 


496  Special    Features 


BENEFITS   AND    COSTS    OF    A   GRADE    CROSSING    PROGRAM 

The  major  In'iK'fits  from  a  yradc  crossing  saft-ty  program  are  usually  a  reduc- 
tion in  the  costs  associated  with  accidents  at  crossings  where  improvements  are 
made.  The  costs  of  such  a  program  are  the  costs  of  construction,  operation  and 
maintenance  of  the  devices  installed  and  the  costs  of  possible  increased  vehicular 
delays.  Evaluation  of  the  costs  as  an  annual  rate  are  straightforward  and  data  for 
such  a  determination  can  be  readily  collected  or  determined.  Evaluating  the  costs 
of  accidents,  however,  is  a  more  difficult  and  contr()\'ersial  subject.  Cost  allocation 
in  fatality  accidents  is  especially  difficult  becau.se  of  human  and  social  losses  to 
which  it  i,s  difficult  to  assign  a  satisfactory  dollar  value. 

The  two  basic  accident  cost  groupings  are  direct,  or  out-of-pocket  costs,  and 
indirect  costs.  Direct  costs  are  the  money  value  of  damage  to  property;  temporary 
wage  losses;  hospitalization;  services  of  physicians,  dentists,  and  nurses;  ambulance 
use;  medicine;  damages  awarded  in  excess  of  other  direct  costs;  attorneys  services; 
court  fees;  and  other  lesser  items.  Indirect  costs  may  include  loss  of  future  earnings 
as  a  result  of  injuries  causing  death  or  permanent  disability,  overhead  cost  of  motor 
vehicle  accident  insurance,  property  damage  indirectly  incurred  from  an  accident, 
illness  or  death  of  a  person  not  involved  in  an  accident  but  traceable  to  one,  public 
aid  for  care  of  indigent  persons  injured  in  motor  vehicle  accidents,  and  some  of  the 
expenditures   for  driver  training  and  other  accident  pre\'ention  activities. 

As  might  be  expected,  agreement  does  not  exist  on  the  costs  associated  with 
an  accident,  especially  a  fatal  one.  Several  studies  conducted  in  recent  years,  how- 
ever, have  calculated  direct  costs  (3,5,13)  (for  which  there  is  little  argument)  and 
some  have  estimated  indirect  costs  (5).  Information  needed  for  an  evaluation  of 
the  benefits  from  reducing  accidents  at  grade  crossings  is  available  from  these 
studies  or  the  safety  official  can  produce  a  realistic  cost  of  such  accidents  by  eval- 
uating the  several  cost  items  involved.  The  important  point  to  note  is  that  realistic 
cost  evaluations   of  grade   crossing  accidents   can  be  made  without  great  difficulty. 

With  proper  cost  and  benefit  data  available,  one  of  several  standard  economic 
analysis  methods  should  be  used.  The  Rate  of  Return  or  Benefit-Cost  Ratio  Methods 
are  in  use  for  many  engineering  project  analyses  and  are  applicable  to  the  grade 
crossing  problem.  Examples  of  such  analyses,  including  difficulties  encountered  and 
advantages  resulting,  are  presented  in  detail  in  many  economics  textbooks  and  in 
several  papers  and  reports   (10,11,16)   relative  to  grade  crossings. 

SUMMARY   OF   DEVELOPMENT   OF   A    PROGRAM 

Officials  who  are  charged  with  the  responsibifity  for  rail-highway  grade  cross- 
ing safety  programs  are  faced  with  a  complicated  and  difficult  task.  They  must 
provide  a  feasilile  program  which  returns  the  maximum  benefit  for  the  dollars  spent 
and  this  must  be  done  under  many  other  social,  political,  and  environmental  influ- 
ences. Research  has  contributed  greatly  to  the  determination  of  factors  which  cause 
accidents,  to  the  evaluation  of  the  risk  at  hazardous  locations,  and  to  methods  of 
analysis  which  allow  systematic  selection  of  locations  which,  from  an  economic 
standpoint,  should  be  included  in  a  safety  program. 

The  quantitative  analysis  portion  of  a  program  to  determine  the  proper  type 
of  protection  device  and  a  proper  priority  for  its  installation  at  each  location  can 
be  outlined  in  simplified  form  as  follows: 

1.  Develop  or  select  an  existing  hazard  rating  or  probable  accident  frequency 
model. 


Address    by    Harold    L.    Michael 497 

2.  Rate    all    crossings   under    the    jurisdiction    of    the    agency   by   the    model 
selected. 

3.  Compute  the  cost  of  accidents  at  grade  crossings  using  the  best  available 
cost  data. 

4.  Compute   the   costs   of   maintaining   existing   equipment   and   the   costs   of 
improvement — capital    investment    and    operation    and    maintenance    costs. 

5.  Use   an   economic   analysis   technique   to   indicate  justification   for  possible 
improvements. 

6.  Establish   the  priority   and  type   of  improvements  based   on   the  economic 
analysis. 

OTHER   CONSIDERATIONS    IN    A    PROTECTION    PROGRAM 

Economic  analysis  is  an  essential  tool  in  determining  the  benefits  to  be  obtained 
by  revising  protective  devices,  such  as  installing  flashing  lights  and/or  automatic 
gates,  and  will  result  in  sound  priorities  for  improvement,  but  it  cannot  suggest  the 
total  solution  for  increasing  safety  at  all  grade  crossings.  In  many  cases  the  condi- 
tions at  a  crossing  do  not  warrant  the  costs  of  improved  protection.  Should  nothing 
then  be  done  at  these  locations?  Cases  may  also  exist  where  expenditures  for  active 
devices  appear  warranted  but  where  some  new  type  of  passive  device  would  pro- 
vide the  necessary  safety  at  the  crossing  with  a  minimum  of  expense.  What  resource 
does  the  safety  program  administrator  have  to  provide  clues  and  answers  to  these 
problems? 

The  Department  of  Transportation  has  asked  all  states  to  establish  diagnostic 
teams  composed  of  specialists  from  the  concerned  State  agencies  (e.g.,  highway, 
police  and  public  utility ) ,  the  Federal  Administration  and  the  railroads  ( 14 ) .  Diag- 
nostic teams  in  many  states  have  visited  many  crossings  and,  from  their  expertise 
and  experience  background,  have  suggested  many  valuable  on-the-spot  safety  meas- 
ures, such  as  the  relocation  of  signs  and  signals,  upgrading  of  pavement  markings, 
relocation  of  hazardous  public  or  railroad  property,  adjustment  of  posted  speed 
limits  or  otlier  corrections  which  require  a  minimum  of  capital  expenditures  (12). 
When  automatic  devices  or  other  major  expenditures  are  suggested,  they  should  be 
submitted  to  a  complete  economic  analysis,  as  discussed  previously.  The  diagnostic 
team  approach,  however,  has  proven  to  be  a  successful  procedure  in  identifying 
and  isolating  factors  that  contribute  to  unsafe  conditions  at  grade  crossings,  estab- 
lishing an  interdisciplinary  approach  to  the  solution  of  grade  crossing  problems,  and 
establishing  a  line  of  communication  between  groups  and  indi\iduals  who  are 
responsible   for  the  safe  operation  of  rail-highway  grade  crossings   (12). 

Other  methods  of  improving  grade  crossing  safety  should  also  be  kept  in  mind 
as  possible  solutions.  As  one  example,  a  short-line  switching  railroad  in  California 
had  heavy  night-time  operation  and  in  a  two-year  period  had  experienced  seven 
accidents  and  one  fatality  at  three  crossings.  The  conditions  at  the  ItKations  did 
not  appear  to  justify  the  expense  of  automatic  efjuipment  but  as  the  niglit  factor 
appeared  important,  illumination  of  the  crossings  was  undertaken.  Two  20, ()()()- 
lumen  Type  II  mercury  vapor  lamps  were  placed  at  each  crossing  and  tin-  after- 
accident  experience  was  excellent — the  cost  of  the  project,  $8()()/cr()ssiiig  (4).  A 
detailed  engineering  analysis  of  each  high-accident  crossing  nuist  always  be  inclu(l(>d 


498  Special    Features 


in  every  grade  crossing  protection  program  to  determine  those  uni(iue  factors  which 
may  be  causing  a  high  accident  rate. 

FINANCING   A   GRADE    CROSSING   SAFETY    PROGRAM 

Although  railroad  officials,  highway  officials,  and  the  public  in  general  have 
an  interest  in  rail-highway  grade  crossing  safety,  a  coordinated  program  of  improve- 
ment has  not  always  been  evident.  In  discussing  interagency  relations  between 
public  and  private  agencies,  Williamson  has  pointed  out  that  "cooperation  is 
required  in  the  initiation,  design  and  scheduling  of  improvement  projects;  coopera- 
tion is  required  in  educating  the  public  in  the  necessity  for  proper  obedience  to 
the  grade  crossing  signals;  and  perhaps  most  significantly,  cooperation  is  required 
in  financing  the  cost  of  constructing  and  maintaining  protective  devices"  (9) 

Traditionally,  the  entire  cost  of  maintenance  of  any  protective  device  has 
usually  rested  with  the  railroads.  The  portion  of  installation  cost  carried  by  the 
railroad  in  recent  years  has  varied  depending  upon  the  public  agency  involved  and 
the  class  of  highway  crossing  the  railroad,  but  often  the  railroad  has  been  required 
to  assume  major  responsibility  for  construction  and  maintenance.  This  situation, 
it  should  be  noted,  exists  today  even  though  many  individuals  and  governmental 
agencies  have  encouraged  greater  sharing  of  financial  responsibility. 

For  example,  a  report  issued  in  1963  by  the  Interstate  Commerce  Commission 
contained  several  suggestions  for  improved  financing  of  the  rail-highway  grade 
crossing  program  (7).  A  recommendation  dealing  with  financial  responsibility  stated 
that  ".  .  .  highway  users  are  the  principal  recipients  of  the  benefits  flowing  from 
rail-highway  grade  separations  and  from  special  protection  at  rail-highway  grade 
crossings.  For  this  reason  the  cost  of  installing  and  maintaining  such  separations 
and  protective  devices  is  a  public  responsibility  and  should  be  financed  with  public 
funds  the  same  as  highway  traffic  devices." 

A  recent  study  indicated  that  30,000  railroad  grade  crossings  justify  immediate 
improvements  (16).  Obviously  those  improvements  which  are  economically  justi- 
fiable and  which  result  in  the  saving  of  human  lives  and  injuries  should  be  made. 
Just  as  obviously  they  must  be  primarily  financed  by  those  who  receive  the  major 
benefits,  and  those  are  clearly  the  motorists. 

AREAS    OF   CONTINUING    RESEARCH 

Improvement  of  railroad  crossing  protection  devices  is,  of  course,  still  a  very 
fruitful  area  for  research,  and  research  in  this  area  is  continuing.  A  Task  Group  of 
the  Highway  Research  Board's  Committee  on  Traffic  Control  Devices  explored  this 
area  in  1969  and  in  January  1970  prepared  an  unpublished  report  on  areas  for 
further  research  and  development.  This  group  concluded  that  present  protection 
devices,  by  making  use  of  the  visual  channel  of  communications  only,  have  serious 
limitations.  They  note  that  the  tasks  of  driving  are  demanding;  that  communication 
via  the  visual  channel  must  compete  with  many  other  signs,  signals  and  tasks;  that 
environmental  conditions  of  fog,  rain  and  snow  cause  further  communication  difficul- 
ties; and  that  fogged  windows  and  headlight  glare  furtlier  compound  the  problem. 

The  group  noted  recent  progress  in  electronic  highway-motorist  communica- 
tion systems  and  the  trend  in  research  to  the  use  of  displays  within  the  vehicle  of 


Address    by    Harold    L.    Michael 499 

information  required  for  electronic  route  guidance  (ERGS),  passing  assistance,  and 
other  applications.  The  concluding  paragraph  of  their  brief  report  is  as  follows: 

"The  on-board,  in-vehicle  display  of  information  relative  to  railroad  crossings 
would  overcome  most,  if  not  all,  of  the  objections  raised  earlier  in  this  report  con- 
cerning present  railroad  crossing  protection  devices.  Research  is  needed  to  inves- 
tigate the  possible  application  of  electronic  highway-motorist  communications  for 
railroad  crossing  protection.  Such  a  research  project  should  include  a  determination 
of  the  information  to  be  displayed,  the  type  of  display  to  be  used,  and  the  method 
of  operating  die  communications  system.  A  variety  of  messages  could  be  communi- 
cated depending  on  conditions  at  the  railroad  crossing.  Considerably  more  flexibil- 
ity and  effectiveness  would  e.xist  with  such  a  system  than  presently  exists  with 
current  railroad  crossing  protection  devices." 

Research  in  this  area  is  currently  being  conducted  at  the  Transportation  Sys- 
tems  Center   of  the   Department  of  Transportation  and  elsewhere. 

It  is  also  overwhelmingly  clear  tliat  many  thousands  of  low  volume  crossings 
can  never  be  protected  with  active  devices  because  of  the  high  cost  unless  a  more 
economical  device  is  developed.  Research  on  the  development  of  such  devices  is  in 
progress  and  hopefully  will  be  successful.  Improved  warning  at  high-volume  crossings 
which  already  have  flashing  lights  and/or  gates  is  also  needed.  Research  here  cur- 
rently is  involved  with  developing  devices  to  supplement  existing  ones  and  to  more 
effectively  warn  motorists  of  approaching  trains.  Changeable  message  signs  over  the 
roadway  in  advance  of  the  crossing  is  one  technique  under  development. 

Certainly  such  research  should  continue  and  have  our  full  support.  Undoubt- 
edly improvements  in  grade  crossing  safety  will  result.  But  we  must  not  wait  for 
such  improvements  to  develop  a  grade  crossing  protection  program.  We  must  use 
the  funds  available  to  obtain  the  greatest  benefits.  The  best  answer  now  is  for  each 
responsible  agency  to  establish  a  complete  program  of  evaluation  of  the  hazard 
and  the  benefits  of  improvements  at  all  crossings  under  its  jurisdiction.  The  tools 
are  available  to  develop  such  programs.  It  only  requires  doing. 

REFERENCES 

1.  Automotive  Safety  Foundation,  Traffic  Control  and  Roadiaay  Elements:  Their 
Relationship  to  Highway  Safety,  U.  S.  Bureau  of  PubHc  Roads,  1963.  Revision: 
Chapter  1 — Railroad  Grade  Crossings,  1968. 

2.  Bezkorovainy,  G.  and  Holsinger,  R.,  "Optimum  Hazard  Index  Formula  for  Rail- 
road Crossing  Protection  for  Lincoln,  Nebraska,"  Traffic  Engineering  Depart- 
ment, Lincoln,   Nebraska,   1967. 

3.  Billingsley,  C.  M.  and  Jorgeson,  D.  P.,  "Analysis  of  Direct  Costs  and  Frequen- 
cies of  Ilhnois  Motor  Vehicle  Accidents,  1958,"  Public  Roads,  U.  S.  Bureau  of 
Public  Roads,  Aug.  1963. 

4.  Carmody,  Douglas  J.,  "Lighted  Crossings  Are  Safe,"  Rural  and  Urban  Roads, 
Sept.  1966. 

5.  Drake,  G.  L.,  and  Kraft,  M.,  "Motor  Vehicle  Accident  Costs  in  the  Washington, 
D.  C.  Metropolitan  Area,"  HRB  Record  No.  188,  Traffic  Accident  Research, 
1967. 

6.  Hays,  Joseph  A.,  "Government  Role  in  Curtailing  Grade  Cro.ssing  Deaths," 
Tram-actions,  National  Safety  Council,  1963. 

7.  Interstate  Commerce  Commission,  "Prevention  of  Rail-Highway  Grade  Crossing 
Accidents  Invobing  Railway  Trains  and  Motor-Veliiclcs,"  Final  Report  of  ICC 
Docket  33440,  322-IC.C.,  1963. 

8.  Morin,  D.  A.,  "Application  of  Statistical  Concepts  to  Accident  Data,"  Public 
Roads,  U.  S.  Bureau  of  Public  Roads,  April  1967 

9.  National  Conference  on  Rail-Highway  Grade  Crossing  Safety,  Proccedinfis, 
University  of  Illinois   Highway  Traffic  Safety  Center,   1969 


500 S  pe  c  i  a  I    F  e  a  t  u  r  e  s 


10.  Ncwnaii,  Donald  C,  "An  Economic  Analysis  of  Railway  Crade  Crossings  on 
tile  California  State  Highway  Systt'in,"  Rc])ort  EEP-I6,  Institute  in  Engineering- 
Economie    Systems,    Stanford    l^niversity,   Jnne,    1965. 

11.  Xewnan,  Donald  C.,  "A  Preliminary  Eeononne  Analysis  of  123  Railway  Grade 
Crossings  losing  EEP-16  and  NCHRP  50  Techniques,"  National  Conference  on 
Rail-Highwav  Grade  Crossing  Safety,  Urhana,  Illinois,  University  of  Illinois, 
Fe]iruar\'  1969. 

12.  Richards,  Hov  A.  and  Rowan,  Neilon  T-,  "The  Diagnostic  Team  Approach  to 
Ra'1-Highway  Grade  Crossing — Safety"  Evaluation,"  IIRB  Record  No.  272, 
Safety  and  Accident  Research,  1969. 

13.  Smith,  R.  N.,  and  Jamhurri,  T.  N.,  "Direct  Costs  of  California  State  Highway 
Accidents,"  HRB  Record  No.  225,  Traffic  Safety  and  Accident  Research,  1968. 

14.  IT.  S.  Depu-tment  of  Transportation,  "Rail-Highway  Grade  Crossing  Program," 
Instructional  Memorandum  21-1-68,  January  5,  1968. 

15.  Vnorhees  and  Associates,  "Factors  Influencing  Safety  at  Highway  Rail  Grade 
Crossings,"  Highway  Research  Board,  NCnRP-50  Report,   1967 

16.  V^oorhees  and  Associates,  "A  Program  Definition  Study  for  Rail-Highway  Grade 
Crossing  Improvement,"  Federal  Railroad  Administration,  IT.  S.  Department  of 
Transportation,   October,   1969. 

Whee!  and  Rail  Loadings  from  Diesel  Locomotives 
72-633-3 

By   L.   F.    KOCI 

Chief   Locomotive    Engineer 

Electro-Motive   Division,    General   Motors    Corporation 

We,  at  Electro-Motive,  understandably  deal  primarily  with  the  railroad 
Mechanical  Departments.  In  recent  years  as  axle  loads,  the  number  of  axles  com- 
monly used  on  a  locomotive,  locomotive  weights,  and  operating  conditions  moved 
in  the  direction  of  representing  more  demanding  applications,  we  found  it  neces- 
sary to  be  certain  of  just  what  the  wheel-rail  loadings  were  not  only  from  the 
standpoint  of  locomotive  equipment  but  also  from  the  standpoint  of  the  effect  on 
the  rail,  since  the  "tracking"  capability  of  the  locomotive  is  one  of  our  concerns. 
Over  the  last  dozen  years  or  so  we  have  become  involved  in  a  number  of  tests  run 
by  our  customers  or  cooperative  tests  between  particular  railroads  and  Electi-o- 
Motive.  Consequently,  the  data  presented  in  parts  of  this  review,  will  certainly  be 
recognized  by  people  on  the  various  railroads  on  which  the  tests  have  taken  place. 

The  following  report  represents  a  brief  review  of  some  of  the  data  accumulated 
in  these  various  tests.  It  is  certainly  not  all  inclusive  nor  is  all  of  it  new.  It  is  clear, 
however,  that  when  studying  the  tracking  of  railroad  vehicles  and  such  aspects  as 
derailments,  it  is  impossible  to  separate  the  effect  of  the  Mechanical,  Engineering, 
or  Operating  functions  of  a  railroad  operation.  The  following  information  does  try 
to  "bring  together"  some  of  the  information  developed  in  each  of  these  various  areas. 

This  review  is  divided  into  the  following  six  areas: 

1.  Sample  Derailment  Data 

2.  Basic  Cui've  Negotiation  Mechanics 

3.  Experimentally  Determined  Wlieel-to-Rail  Forces 

4.  Rail  Profile  Data 

5.  The  Effect  of  Dynamic  Brake  Levels 

6.  Mechanical  Considerations 


Following  these  there  is  a  brief  summary. 


Note — Discussion    opon    until    OctolnT    15,    197J 


Address    by    L.    F.    Koci 501 

I.    SAMPLE    DERAILMENT   DATA 

In  prepariiijj;  for  one  of  the  eooperative  tests  run  with  one  of  our  major  rail- 
road customers,  a  brief  summary  was  made  of  ten  derailments  the  railroad  had 
experienced  which  either  reflected  no  clear  cause,  or  for  which  the  cause  seemed 
questionable.  This  would  include  such  things  as  a  rail  break  in  which  there  did 
not  appear  to  be  sufficient  old  break  to  explain  the  derailment  entirely.  In  examining 
this  summary  we  were  looking  for  guidance  to  the  types  of  things  which  should 
be  investigated  to  provide  most  meaningful  results.  Figs.  1  and  2  summarize  this 
information.  It  should  be  made  clear  that  there  was  additional,  detailed  data  avail- 
able in  many  cases,  including  crew  comments;  however,  what  is  summarized  in 
these  figures  is  the  rail  weight,  curve  condition,  locomotive  consist,  and  the  location 
of  derailment.  For  example,  in  the  first  situation  listed  the  locomotive  consist  con- 
sisted of  an  SD-45  (one  of  EMD's  6-axle  locomotives),  a  second  SD-45,  a  GP-35 
(which  is  an  EMD  4-axle  unit),  and  a  U-25B  (which  is  a  competitive  4-axle  unit). 
The  x's  in  the  illustration  indicate  what  units  or  cars  were  derailed  in  the  incident. 
The  data  represented  as  well  as  some  of  the  details  not  indicated  in  the  illustrations 
may  be  summarized  as  follows: 

1.  Either  by  crew  comment,  spectator  comment,  or  locomotive  speed  tapes, 
change  in  train  speed  was  indicaLed  in  almost  all  cases.  In  many  cases 
locomotive  braking  was  indicated.  In  one  particular  case  the  crew  com- 
ment indicated  that  the  train  was  being  switched  to  a  siding  and  the 
locomotive  dynamic  brakes  were  applied  immediately  after  the  locomo- 
tive consist  crossed  over  the  switch.  As  discussed  in  more  detail  later, 
this  situation,  in  which  the  cars  immediately  behind  the  locomotive 
(which  do  not  have  the  vertical  load  always  present  which  a  locomotive 
does)  are  subjected  to  the  maximum  buff  loads  available  in  locomotive 
braking  while  crossing  over  a  switch  or  crossover  or  on  curved  track, 
can  carry  wiLh  it  the  ri.sk  of  derailment.  The  application  of  heavy  buff 
coupler  loads  can  result  in  substantial  lateral  wheel-to-rail  reaction.  The 
lighter  the  vertical  \\'heel  load  present,  the  more  "unstable"  the  condition 
may  be.  As  noted,  this  is  discussed  further  later.  In  most  of  the  situations 
summarized  the  speeds  were  in  the  range  of  35  to  50  mph. 

2.  The  curve  size  involved  was  generally  about  3  to  4  deg.  As  will  also  be 
discussed  later,  the  basic  curve  negotiation  forces  present  on  curves  of 
this  size  are  far  lower  than  they  are  on  tighter  curves,  such  as  tho.se  of  <S 
to   10  deg. 

3.  Transient  drawbar  conditions  were  indicated  throughout  the  train.  An 
example  of  this  is  the  fourth  situation  noted  in  which  three  dilfcrent 
groups  of  cars  ended  up  derailed  in  various  locations  in  the  train. 

4.  In  some  cases  empty  "TTX"  type  cars  were  placed  immediately  next  to 
the  locomotive  consist  in  operation  involving  locomotive  braking.  Placing 
any  empty  cars  adjacent  to  the  locomotive  in  heavy  locomotive  braking 
conditions  involves  the  risk  of  developing  unsatisfactory  wheel-to-rail 
conditions.  However,  the  long-overhang-type  cars  such  as  the  TTX  cars 
are  particularly  vulnerable  to  this,  and  this  type  of  operation  if  combined 
with  a  chance  occurrence  of  a  low  joint,  or  bad  track  alignment,  or  train 
handling  gi\  ing  substantial  dynamic'  bull  "run-in",  increases  the  risk  of  a 
problem. 


502 Special    Features 


TYPE   TRACK/ CURVE  SIZE 


I.     119"  JOINTED   /  3° 30'    CURVE 

I  so- 48 1    |»-4Bl    1 8PM I    |^^2(^^8|    ■■■I 


derailed:    3    TRAILING   UNITS,  40  CARS 
2.    136'  JOINTED  /  4°  CURVE 

W^  [1E13  ISfT]  [spTI  [^^  fi|^  W^^ 


derailed:   5TH  a  6TH    UNITS  a  35  CARS 


3.    136"  CWR/4''   CURVE 


derailed:  last  unit  a  48  cars 

4.    136"   CWR  /    straight 


ISP-451   lu-3a<;|    ISD-451    ■■■■■■i 

derailed:  cars  33 


'mm 

-42,50-52,56 


5.   136'    CWR/ 2°   curve 

derailed;  5  CARS  a  caboose 

Fig.   1 


loo      own  /  c       i^unvc 

lio^  HiMi  f^^  (io^  WKtMKtKttKKKt^^  }/k 


TYPE  TRACK/  CURVE  SIZE 


6.   132    jointed  /  3"   CURVE 

W^S]    [JP^    I6P-35I    ■■■■■■■■■■■ 


derailed:  cars    9-41 


7.    136   CWR  /  4"    CURVE 


derailed:   FOUR  CARS 
8.  115     /  4' 05'   CURVE 


fJFiil  W^  MM  MM}  ^p  f^w\  ■^^■■^■■■■■■i  l|i 

derailed:    trailing  truck   5TH  unit,  6TH  unit  35CARS 

a    136    JOINTED  /  2'  CURVE 

1"^^^  riiM6l  [sPiol  ■■■■■■■■■■■■■■■■■^^  IBP 

derailed:   CARS    74-95 


10.  136    LOW,  132   CWR  HIGH   /  4°  CURVE 

m 


DERAILED:  ONE   WHEEL  LEAD  UNIT  TWO  TRAILING  UNITS  a  35  CARS 
Fig.    2 


Address    by    L.    F.    Koci 503 

5.  In  a  number  of  cases  the  crew  comment  indicated  that  buckled  rail 
occurred,  sometimes  ahead  of  the  locomotive.  The  comments  ix)inted  to 
the  possibility  of  track  thermal  strains  perhaps  being  a  factor.  While  con- 
siderable investigation  of  the  effect  of  thermal  strains  on  track  stability 
has  taken  place,  little  seems  to  be  known  about  how  thermal  strains  below 
the  threshold  of  instability  themselves  affect  the  ability  of  the  track  to 
withstand  the  not  insignificant  service  loads  applied  to  it  during  opera- 
tion on  curves.  In  other  words,  if  occasionally  the  track  thermal  strains 
become  great  enough  to  be  of  concern  from  their  own  account,  how  is 
the  ability  of  the  track  to  withstand  lateral  loads  in  the  area  of  10,000  to 
15,000  lb  reduced  when  those  thermal  strains  are  half  as  high  or  M  as 
high? 

6.  Of  the  ten  derailments  noted: 

a.  Five  occurred  within  the  train  only,  involving  no  locomotives 

b.  Two  involved  EMD  6-axle  locomotives 

c.  One  involved  a  competitive  6-axle  locomotive 

d.  Three  involved  4-axle  locomotives. 

Altliough  this  summary  involves  one  particular  railroad,  a  number  of  similar 
summaries  have  been  made  on  other  railroads  and  in  many  ways  they  are  not  unlike. 
Similarities  are  particularly  common  from  the  standpoints  of  involving  curve  sizes 
in  which  lateral  loads  are  not  as  high  as  elsewhere;  involving  braking  conditions; 
and  involving  a  variety  of  vehicles  including  cars  and  both  4-  and  6-axle  locomotives. 

II.    BASIC    CURVE   NEGOTIATION    MECHANICS 

What  is  intended  here  is  a  brief  review  of  what  may  be  termed  the  "basic" 
lateral  loading  which  occurs  due  to  normal  curve  negotiation  of  a  railway  vehicle 
truck  around  a  cur\e.  The  forces  resulting  from  this  normal  negotiation  are  among 
the  predominant  forces  involved,  at  least  in  the  tighter  curves.  To  fully  understand 
how  some  of  die  lateral  loads  developed  by  various  operating,  track,  and  mechanical 
conditions  discussed  later  combine,  it  is  necessary  to  appreciate  what  causes  the 
basic  curve-negotiation  forces.  The  following  is  a  brief  review  of  this;  for  further 
explanation,  ASME  paper  No.  6o-WA/RR-4  may  be  helpful. 

These  curve-negotiation  forces  are  not  related  in  any  manner  to  centrifugal 
force.  They  are  the  forces  which  would  be  present  if  the  operating  speed  involved 
were  exactly  balanced  by  the  superelevation  of  the  track.  Perhaps  the  best  way  to 
make  this  clear  is  to  state  that  these  are  the  forces  which  would  occur  if  the  locomo- 
tive or  railroad  car  were  standing  still  and  the  track  were  on  a  giant  turntable 
moving  around   underneath   it. 

It  should  also  be  noted  that  these  forces  are  the  forces  present  with  no  driving 
or  braking  taking  place.  They  result  strictly  from  the  frictional  forces  between 
wheel  and  rail  and  are  the  result  of  the  fact  that  all  wheels  of  the  truck  do  not 
line  up  perfectly  tangent  to  the  rail,  nor  do  they  have  a  differential  which  would 
allow  the  inner  and  outer  wheels  to  roll  the  different  distances  involved  on  the 
inner  and  outer  rail  of  the  curve. 

Fig.  3  illustrates  schematically  a  3-axle  truck  position  while  traveling  around 
a  curve.  This  position  is  typical  in  that  the  truck  assumes  an  "angle  of  attack" 
between  the  leading  axle  and  the  rail,  tending  to  skew  within  the  clearances  allowed 
between  wheel  flanges  and  rail.  The  curve  size  and  the  clearances  involved  were 

Bui.  633 


504 


Special    Features 


3- AXLE   TRUCK  ON   CURVE 


Fig.  3 


WHEEL   TREAD   FRICTIONAL 
FORCES  DUE  TO  CURVE   NEGOTIATION; 

Fig.  4 


Address    by    L.    F.    Koci 505 

obviously  exaggerated  in  this  illustration;  actually  on  curve  sizes  down  to  approx- 
imately 300  ft  radius  the  No.  3  or  trailing  axle  of  an  EMD  6-wheel  truck  tends  to 
be  disposed  toward  or  against  the  inner  rail  of  the  curve  with  the  middle  axle 
further  away  from  the  iimer  rail. 

Fig.  4  helps  illustrate  why  this  position  results  when  a  railroad  truck  negotiates 
a  curve.  As  previously  noted  there  are  two  separate  circumstances  which  cause  the 
wheel-to-rail  frictional  forces  resulting  in  this  curve  negotiation  action.  First  of  all, 
the  outer  rail  of  the  curve  represents  a  longer  distance  to  travel  than  the  inner  rail 
of  the  curve.  Since  the  wheels  are  rigidly  mounted  on  a  common  axle  some  longi- 
tudinal slip  between  the  wheels  and  the  rail  must  and  does  result.  The  arrows  in 
the  direction  of  the  wheels  on  Fig.  4  represent  slip  taking  place  in  this  direction; 
as  can  be  shown,  without  driving  or  braking  taking  place,  this  results  in  equal  and 
opposite  slips  on  the  inner  and  outer  wheels  of  a  given  axle.  (Wheel  taper  cannot 
provide  the  differential  required  both  because  it  would  be  correct  for  only  a  given 
size  curve  and  because  the  three  axles  do  not  position  themselves  such  that  taper 
can  serve  this  function.) 

Secondly,  since  all  three  axles  are  held  parallel  to  one  another  within  the  truck, 
it  is  clear  that  all  three  of  them  cannot  be  "aligned"  with  the  track  such  that  the 
wheels  would  be  tangent  to  the  direction  of  the  rail  at  the  point  of  contact  rathet 
than  at  an  angle  making  it  necessary  to  slip  sideways.  Since  all  three  axles  cannot 
be  aligned  with  the  rail,  at  least  two  of  them  must  be  at  an  angle  either  "running 
into  or  away"  from  the  rail  and,  therefore,  "dragging  sideways"  resulting  in  lateral 
slip  between  wheel  and  rail.  In  truth  the  equilibrium  position  which  finally  occurs 
results  in  neither  of  the  three  axles  being  aUgned  with  the  rail;  the  arrows  shown 
on  Fig.  4  at  right  angles  to  tlie  wheels  reflect  the  lateral  slip  which  takes  place  at 
the  point  of  contact  between  wheel  and  rail. 

These  two  slip  components  at  right  angles  to  one  another  combine  to  give  a 
resultant  direction  of  slip  between  wheel  and  rail  as  shown  in  the  diagonal  arrows 
on  Fig.  4.  With  this  relative  motion  or  slip  present,  of  course,  frictional  force  from 
rail  onto  wheel  results  in  the  direction  of  the  arrows  shown.  (These  slip  magnitudes 
are  small  and  generally  referred  to  as  "creep"  or  microslip;  however,  for  the  pur- 
poses of  this  discussion  it  can  be  considered  as  slip  or  relative  movement  between 
rail  and  wheel.)  As  the  truck  passes  through  the  curve  these  forces  represented 
by  the  diagonal  arrows  cause  the  truck  to  turn  or  skew  within  the  rails  until  flange 
forces  at  the  leading  outer  wheel  and  sometimes  at  wheels  of  the  second  and  third 
axle,  balance  these  frictional  forces  and  an  equilibrium  position  results.  The  next 
illustration,  Fig.  5,  shows  these  frictional  tread  forces  balanced  by  the  one  or  more 
flange  forces  which  may  be  present.  With  the  lateral  clearances  within  the  axles 
and  the  truck  available  on  an  SD-type  3-axle  truck  the  equilibrium  position  attained 
for  curve  sizes  down  to  approximately  2100  ft  radius,  consists  of  the  leading  outer 
wheel  obtaining  a  flange  reaction  from  the  outer  rail,  the  trailing  axle  disposed 
toward  the  inner  rail  but  without  the  flange  contacting,  and  the  second  axle, 
dependent  on  curve  size,  sometimes  against  the  outer  rail  or  between  rails.  On 
curves  between  2100  ft  radius  and  down  to  extremely  tight  curves  (approximately 
280  ft  radius)  with  sufficient  lateral  clearance  designed  into  the  truck  between 
axles  and  truck  frame,  the  trailing  axle  is  actually  against  the  inner  rail.  This  is  a 
desirable  operating  mode  since  it  tends  to  reduce  or  limit  the  amount  of  angle  of 
attack  and  related  forces  which  may  be  present  otherwise.  It  should  be  noted  that 
consequently,  additional  gauge  widening  between   the  rails  merely  allows  tlie  trutk 


506 


Special    Features 


WHEEL  TO   RAIL 
FRICTIONAL  AND  GUIDING    FORCES  DUE 
TO  CURVE   NEGOTIATION 


Fig.    5 


to  skew  or  cock  to  a  greater  extent  and  increases  the  angle  present  between  wheels 
and  rail.  It  also  increases  the  resultant  lateral  forces.  Therefore,  if  there  is  sufficient 
lateral  within  a  truck  for  curve  negotiation  without  demanding  that  tlie  axles  "bind" 
in  the  rail  (that  is,  with  the  center  axle  against  the  inner  rail),  unnecessary  gauge 
widening  is  undesirable.  Similarly,  placing  the  wheel  Hanges  closer  together  to  pro- 
\ide  more  wheel-to-rail  clearance  can  have  an  undesirable  effect,  although  this  is  a 
much  smaller  factor  merely  because  of  the  dimensions  involved  generally  in  gauge 
widening. 

There  are  a  number  of  specific  factors  associated  with  curve  negotiation  which 
may  be  considered  important  from  the  standpoint  of  tracking  or  wheel-rail  operating 
conditions.  The  flange  reaction  itself  is  important  from  tlie  standpoint  of  wheel 
and  rail  wear  since  it  represents  the  force  pressing  the  flange  surface  and  the  inside 
rail  surface  together  while  they  have  relative  sliding  taking  place;  and  it  is  also 
of  interest  from  the  standpoint  of  contact  stresses  and  local  forces  on  the  wheel 
flange  and  the  rail.  The  angle  between  the  leading  outer  wheel  and  the  rail  is  com- 
monly referred  to  as  the  angle  of  attack.  This  is  important  not  only  because  the 
greater  the  angle  the  greater  the  resultant  lateral  creep  and  frictional  forces,  but  also 
because  the  greater  the  angle  the  more  "scuffing"  there  is  between  wheel  flange  and 
rail  and,  therefore,  the  increased  amount  of  wear.  Generally,  it  is  accepted  that 
wheel  flange-rail  wear  is  a  function  of  the  flange  force  and  the  angle  of  attack, 
although  the  manner  in  which  they  combine  is  not  clearly  defined. 

The  "net  lateral  load"  between  wheel  and  rail  at  any  given  wheel  is  the  differ- 
ence between  the  flange  force  and  the  lateral  component  of  the  tread  frictional 
force.  This  net  lateral  load  is  what  is  important  from  tlie  standpoint  of  tracking;  that 


Address    by    L.    F  ■    Koci 


507 


LATERAL   FORCES    ON  LEADING 
AXLE-WHEEL   SET 


Fig.    6 


is,  the  likelihood  of  either  wheel  climbing  the  rail  or  the  rail  rolling  over  depends 
on  the  level  of  this  net  lateral  load.  In  following  discussion  where  lateral  load  or 
the  ratio  of  lateral  load  to  vertical  load  is  involved,  it  is  this  net  lateral  load  that 
is  referred  to.  This  load  is  also  of  interest  from  the  standpoint  of  wheel  stress  or 
axle  stress  resulting  or  lateral  bending  stresses  produced  in  the  rail.  The  net  lateral 
load  at  the  entire  axle  instead  of  at  a  particular  wheel  is  the  result,  or  difference 
between,  the  flange  force  at  one  wheel  of  the  axle  and  the  two  lateral  components 
of  the  tread  frictional  force  at  both  wheels  of  the  axle.  This  then  represents  the 
total  net  lateral  load  on  both  rails  at  a  given  axle  location  and  is  primarily  of  inter- 
est from  the  standpoint  of  shifting  the  entire  track  structure  within  the  ballast. 

Fig.  6  helps  to  clarify  these  forces  as  they  act  on  the  leading  wheel  axle  set 
of  a  truck  in  passing  through  a  curve. 

The  important  relations  and  limits  of  these  various  forces  considered  from  the 
standpoint  of  the  effect  on  the  rail  and  influence  on  possible  derailments  are  gen- 
erally as  follows: 

1.  Wheel  Climbing  the  Rail;   Lateral-to-vertical  wheel  load  ratio,  L/V,  ecjual 
to  or  greater  than   0.9  at  the  leading  outer  wheel. 

2.  Rail  RolioNcr:  L/V  for  one  side  of  an  cutiic  truck  I  .^     -     "  j^tT'  I 
equal  to  or  greater  than  0.5 

3.  Track  Shifting:    Net  lateral  axle  load  e(iual   to  or  greater  than  40'/  of  the 
\ertical  axle  load  on  poor  track  conditions 


508  Special    Features 


The  L/V  limit  of  0.9  is  a  value  which  is  considered  a  minimum  or  lower  limit 
for  the  possibility  of  wheel  climbing  to  be  considered  likely.  Most  analytical  or 
experimental  work  which  has  been  done  would  tend  to  indicate  this  is  probably  in 
most  cases  required  to  be  over  1.0,  and  with  the  flange  configuration  used  in  the 
United  States  as  high  as  1.5  before  actual  wheel  climbing  will  occur.  Also,  in  many 
specific  operations  it  is  known  that  ratios  of  approximately  0.9  do  occur  not  uncom- 
monly without  derailment.  However,  because  of  the  number  of  variables  which  can 
be  and  are  involved  in  any  derailment  situation,  the  0.9  figure  seems  a  reasonable  one 
to  consider  for  the  lower  limit  and  for  an  indication  of  those  load  combinations  at 
which  this  should  start  being  of  concern. 

The  ratio  of  0.5  for  total  lateral  load  on  one  side  of  a  truck  to  total  vertical 
load  on  that  side  of  the  truck  for  rail  rollover  is  merely  tlie  ratio  of  loads  required 
to  cause  the  resultant  load  on  rail  to  fall  outside  of  the  edge  of  the  rail  base.  On 
many  common  United  States  sections  this  occurs  at  a  ratio  of  approximately  0.5  to 
0.55.  Obviously,  this  ratio  can  be  exceeded  at  a  single  wheel  without  rollover  occur- 
ring because  the  adjacent  wheels  provide  vertical  load  which  "holds"  the  rail  down. 
The  choice  here  of  using  the  total  for  one  side  of  a  truck,  whether  it  be  a  locomo- 
tive or  a  freight  car  truck,  assumes  no  tiedowns  or  effective  spikes,  and  a  rail  joint 
between  the  rail  under  that  truck  and  tlie  rail  under  adjacent  trucks  which  provides 
no  torsional  restraint  whatsoever. 

The  limit  of  40%  indicated  for  tlie  entire  axle  relative  to  shifting  of  tlie  track 
structure  is  taken  from  work  performed  in  France  some  years  ago  indicating  that 
this  was  the  lowest  value  on  poor  track  which  could  cause  this  to  occur. 

III.   EXPERIMENTALLY   DETERMINED   WHEEL-TO-RAIL   FORCES 

A  number  of  tests  have  been  nm  in  recent  years  determining  the  actual  lateral 
wheel-to-rail  reactions  which  occur  in  operation  on  U.  S.  railroads.  This  data  is 
discussed  below  as  related  to  four  general  areas  of  interest:  due  to  basic  curve- 
negotiation  mechanics,  as  influenced  by  speed,  as  influenced  by  sanding,  and  as 
influenced  by  coupler  reaction. 

A  few  years  ago,  EMD  manufactured  its  first  road  locomotives  using  4-axle 
trucks.  While  a  considerable  amount  of  analytical  and  laboratory  work  had  been 
done  previous  to  this  time  related  to  lateral  wheel-to-rail  reaction  during  curve 
negotiation,  it  was  felt  necessary  with  the  first  use  of  a  4-axle  truck  (with  all  four 
axles  in  a  common  frame)  to  determine  experimentally  specifically  what  wheel-to-rail 
loads  existed  in  actual  operating  conditions  and  how  the  wheel-to-rail  loads  which 
would  occur  with  the  4-axle  truck  would  compare  to  them.  Loads  had  been  meas- 
ured under  certain  specific  conditions,  as  with  the  use  of  instrumented  rail  sections 
and  roller  bearing  tie  platen.  This,  however,  had  the  disadvantage  of  measuring 
only  one  condition  at  one  specific  location  and  not  reflecting  the  types  of  dynamic 
loading  typical   with   normally  found  track   irregularities. 

Shortly  prior  to  that  time,  tests  had  been  run  in  Europe  in  which  the  wheel 
plates  of  a  wheel-axle  set  were  instrumented  to  provide  a  measure  of  lateral  load 
on  a  continuous  basis.  Fig.  7  shows  the  three  EMD  road  locomotive  trucks  including 
the  2  and  3-axle  in  service  and  the  4-axle  which  was  being  tested  at  that  time. 
Since  all  used  a  common  wheel-axle-traction  motor  assembly,  the  use  of  an  instru- 
mented wheel-axle  ,set  would  provide  the  opportimity  to  place  it  in  three  different 
trucks  of  widely  varying  wheel  ba.ses  to  obtain  a  good  measure  of  what  was  desired. 


Address    bv    L.    F.    Koci 


509 


Fig.   7 


Therefore,  it  was  decided  to  develop  an  instrumented  wheel-axle  set  providing 
a  continuous  record  of  net  lateral  load  between  wheel  and  rail.  While  this  instru- 
mentation gave  a  continuous  record  of  lateral  wheel-to-rail  reaction  it  was  also 
applied  such  to  give  an  indication  of  vertical  load  once  per  revolution. 

The  experimental  results  are  summarized  in  Fig.  8.  These  curves  show  tlie 
net  lateral  load  in  thousands  of  pounds  along  the  bottom  scale  versus  the  radius  of 
curvature  along  the  vertical  scale.  Degrees  of  curvature  are  shown  for  reference. 
The  three  curves  indicate  the  loads  measured  for  the  2-axle,  3-axle,  and  4-axle  truck 
noted  previously.  It  should  be  noted  this  data  is  based  on  coasting  conditions;  that 
is,  there  is  no  significant  tractive  effort  or  braking  taking  place,  and  little  or  no 
centrifugal  force  not  balanced  by  track  elevation.  In  other  words  this  data  reflects 
that  loading  occurring  strictly  from  the  curve-negotiation  mechanics  and  the  wheel 
tread  frictional  forces  discussed  previously.  Also,  these  curves  reflect  the  net  lateral 
load  between  the  leading  outer  wheel  in  the  curve  and  tlie  outer  rail;  the  flange 
force   itself  would  be  higher. 

There  are  a  number  of  factors  of  interest  apparent  in  examining  these  curves. 
For  one,  the  loads  are  substantial,  reflecting,  for  example,  approximately  10,000  lb, 
14,000  lb,  and  16,000  lb  for  a  10-deg  cur\'e  with  the  2-axle,  3-axle,  and  4-axle 
truck,  respectively.  As  would  be  expected  the  loads  increase  substantially  with  curva- 
ture;  however,  the  loads  at  the  3-  and  4-deg  curve  size  area,  where  most  of  the 


510 


Special    Features 


EXPERIMENTAL  RESULTS  FOR  THE 
NET  LATERAL  LOAD   BETWEEN    THE    LEADING 
OUTER  WHEEL   AND   RAIL 


2°-r 


13  ■ 
16° 
20°- 


-2500 


2000 


1500 


-1000 


-500 


65,000  LBS.  PER  AXLE    VERT.| 
40"  DIAM    WHEELS 

DATA  BASED  ON  COASTING  CONDITIONS. 
AND  LOW  DRAWBAR  > 


10  15  20  25 

NET  LATERAL  LOAD -(xl0' LBS  ) 


30 


35 


Fig.    8 


ON  EMD  TWO 

WHEEL- 

-RAIL 

LOADS 

TRUCKS  ^^ 

.THREE, 

AND 

FOUR   AXLE 

TRACK  CURVE 

DUE 

TO  CURVE  NEGOTIATION 

4-AXLE  TRUCK 

2-AXLE  TRUCK 

3-AXLE  TRUCK 

19    (305' R) 

14,000  LBS. 

18,500  LBS. 

19,500  LBS. 

t3''(440'R) 

11,500 

16,000 

17.500       ^ 

10"  {573' R) 

10,000 

14.000 

16.000     -'9 

6"{955'R) 

6,500 

10,000 

12,000     M 

4''(l43tfR) 

5,500 

8,000 

10.000 

2   (2860' R) 

4,000 

6,000 

8.000      , 

Fig.    9 


Address    by    L.    F.    Koci 511 

derailments  discussed  previously  take  place,  are  far  lower  than  they  are  on  other 
tighter  but   commonly  found  curves. 

As  die  cuives  show,  the  same  basic  phenomena  and  same  relationship  of  wheel- 
rail  loads  occur  with  either  the  2,  3,  or  4-axle  truck,  although  the  "degree"  of  load- 
ing increases  as  the  number  of  axles  or  the  amount  of  tractive  weight  supported 
increases.  As  mentioned,  tliese  are  the  reactions  from  the  wheel  tread-to-rail  friction 
and,  therefore,  the  size  of  these  forces  depends  on  the  adhesion  conditions  involved. 
These  curves  represent  the  average  of  many  data  points  over  a  great  deal  of  opera- 
tion picked  to  represent  average  dry  rail  conditions.  Under  conditions  which  involve 
wet  weather  the  adhesion  and  consequently  the  forces  are  lower,  while  under  con- 
ditions which  increase  adhesion,  .such  as  sanding,  the  frictional  loads  and  cor- 
respondingly the  lateral  reactions  are  higher.  These  forces  are  always  present  during 
curve  negotiation  due  merely  to  negotiating  the  curve,  and  other  factors  which 
affect  rail  reactions  add  over-and- above  this.  These  would  include  such  things  as 
centerplate  reaction  resulting  from  a  high  coupler  force  acting  at  an  angle,  or 
centrifugal  force. 

Fig.  9  is  a  table  showing  some  of  the  values  taken  from  the  curves  in  Fig.  8. 
It  shows,  for  example,  that  a  2-axle  truck  has  a  net  lateral  load  reaction  on  a  10-deg 
curve  the  same  as  a  3-axle  truck  has  on  a  6-deg  curve  or  a  4-axle  truck  has  on  a 
4-deg  curve.  In  making  this  comparison  and  evaluating  different  applications  for 
different  types  of  service,  it  should  be  remembered  that  to  pull  a  certain  trainload 
a  similar  number  of  axles  must  be  involved.  In  other  words,  providing  the  same 
operation  could  be  considered  to  require  either  six  2-axle  trucks  under  a  locomotive 
consist,  or  four  3-axle  trucks. 

The  data  summarized  above  represents  the  steady-state  load;  that  is,  it  does 
not  reflect  the  dynamic  forces  which  occur  at  rail  irregularities  or  at  rail  joints. 
Since  the  wheel  and  rail  are  being  forced  together  with  substantial  loads,  whenever 
a  rail  joint  occurs  it  represents  a  change  in  path  and  dynamic  loading  over  and 
above  the  base  loads  discussed  occurs.  The  dynamic  loads  measured  in  typical 
operation  are  summarized  in  Fig.  10.  The  sample  lateral-load  trace  shown  across  tlie 
bottom  of  the  illustration  is  typical,  with  the  lateral  reaction  increasing  as  the  vehicle 
travels  through  the  spiralling  into  the  curve,  developing  a  "more-or-less"  steady  state 
level  throughout  the  curve,  and  theri  decreasing  in  passing  from  the  curve  to  tangent 
track.  As  is  apparent,  the  dynamic  loads  occur  fairly  continuously  over  and  abo\'e 
the  steady-state  load.  On  curves  these  dynamic  impacts  are  commonly  6,000  to 
8,000  lb  additional  load  occasionally  reaching  12,000  to  15,000  lb.  On  tangent 
track,  as  indicated,  they  are  somewhat  higher  at  the  test  speeds  of  65  mph.  These 
dynamic  loads  are  very  short  in  duration,  mostly  below  0.1  second  long.  Therefore, 
while  they  are  of  interest  from  the  standpoint  of  rail  "batter"  and  shock  loads  locally 
affecting  the  wheel  and  the  rail,  they  are  not  of  primary  interest  from  the  standpoint 
of  tracking  or  derailments  since  they  are  not  long-lived  enough  for  any  significant 
displacement  or  change  in  location  to  take  place. 

It  is  also  of  interest  to  note  that  the  dynamic  loads  measured  were  quite  sinnlaif 
with  either  the  2-axle,  3-axlc,  or  4-axle  trucks,  thus  indicating  that  they  are  pri- 
marily the  result  of  the  unsprung  mass  dynamics  and  represent  too  small  a  displace- 
ment to  depend  on  the  truck  frame  or  the  length  of  truck  invoked. 

The  next  six  illustrations  show  the  effect  of  sour-  other  cxlerna]  loadings  on 
these  wheel-to-rail  forces.  Fig.  11  shows  the  same  curve  previously  shown  for  the 
6-wheel   truck   indicating   net   lateral  load  versus   degree  of  curvature.   In  addition 


512 


Special    Features 


DYNAMIC   TRANSIENT   LOADS  (TO   0.1  SEC.  DURATION) 
ON  A   TYPICAL    U.S.    RAILROAD    TRACK 


A.   ON  curves: 


GENERALLY     6,000-8.000  LBS.    ADDITIONAL 
OCCASIONALLY     12,000-15,000  LBS.    ADDITIONAL 


B.     ON   TANGENT     TRACK    ( AT  ABOUT  65  MPH )  : 


GENERALLY     10,000-12,000  LBS. 
OCCASIONALLY    15,000-20,000   LBS. 


STEADY  STATE 
1 


I .  OUTER  WHEEL   LOAD 
"  AT  LEADING  AXLE '• 


> 

3*- 

IT 

3 

O 

U. 

o 

4'- 

lU 

UJ 

cc 

<- 

v> 

lit 

o 

6*- 

8' 

10*- 

(3*- 

16'- 

20"- 

-2500 


■2000 


1500 


1000 


-500 


UlVI 

tea 

52 


SO  TRUCK 

EXPECTED  RANGE  OF  LOADING 
UNDER  COASTING  CONDITIONS 
AND  NO  SIGNIFICANT  LATERAL" 
CENTERPLATE    LOAD 


0  5  10  15  20  .25  30  35 

NET  LATERAL    LOAD   AT   LEADING   OUTER   WHEEL  (xlO^LBS) 


Fig.   11 


Address    by    L.    F.    Koci 


513 


INFLUENCE  OF    SPEED 
ON  THE  NET  LATERAL  LOAD 


-2500 


2000 


1500 


6'-- 


8'- 
I0°- 

20'- 


1000 


-500 


o      8-12  MPH 
X   20-25    " 
+   30-35    " 


EXPECTED  RANGE  OF  LOADING 
UNDER  COASTING  CONDITIONS 
AND  NO  SIGNIFICANT  LATERAL 
CENTER  PLATE  LOAD.  ■ — , 


MEDIAN 


5  iO  15  20  25  30  35 

NET  LATERAL   LOAD  AT  LEADING  OUTER  WHEEL  {xIO'lSS.) 


Fig.  12 


to  showing  the  average  values,  it  also  shows  in  the  shaded  area  the  range  of  loadings 
found  under  the  considerable  variables  which  exist  in  day-in  and  day-out  operating 
practice.  The  following  illustrations  show  the  effect  of  speed,  sanding,  and  different 
levels  of  coupler  reaction  upon  these  load  levels. 

Fig.  12  illustrates  the  effect  of  speed  in  a  given  group  of  curves.  The  same 
median  curve  and  range  previously  discussed  are  shown.  In  addition  to  that,  actual 
data  points  are  shown,  obtained  while  operating  at  three  different  speed  ranges 
over  a  given  series  of  curves.  The  x's  indicate  values  obtained  while  operating  at 
approximately  the  speed  to  balance  track  superelevation;  therefore,  there  is  little  or 
no  effect  of  centrifugal  force  in  these  data  points.  The  small  circles  represent  data 
obtained  while  operating  at  about  10  to  15  mph  under  the  balanced  condition.  As 
may  be  noted  on  this  group  of  curves,  the  net  lateral  loading  is  reduced  slightly 
but  not  to  a  major  extent.  Similarly,  the  crosses  reflect  data  obtained  while  operating 
at  10  to  15  mph  over  the  balanced  condition  and  again,  while  these  show  a  slight 
increase,  it  is  not  a  major  change  in  the  load  levels  present.  Speed,  then,  does  not 
make  a  major  change  in  the  load  levels  which  occur.  Traveling  at  reduced  speeds 
over  restricted  areas  or  temporary  track  does,  of  course,  reduce  the  risk  involved  if  a 
derailment  occurs  but  does  not  substantially  reduce  the  load  to  which  the  track 
is  subjected. 

As  noted  previously  the  lateral  reactions  result  from  the  frictional  forces 
between  rail  tread  and  rail  and,  therefore,  are  a  function  of  the  amount  of  friction 
present.  Fig.  13  shows  some  representative  data  points  and  a  shaded  range  of  data 
obtained  on  various  size  curves  while  continuous  sanding  was  taking  place  on  the 


514 


Special    Features 


0      5      10      15      20     25     30     35 
NET  LATERAL  LOAD  AT  LEADING  OUTER  WHEEL  (xiO'LBS) 

Fig.  13 


locomotive.  As  might  be  expected  the  increased  friction  level  resulting  from  sanding 
increases  the  lateral  reaction  substantially.  For  example,  it  increases  from  a  value 
of  approximately  14,000  lb  to  one  of  about  18,000  lb  for  a  10-deg  curve.  In  gen- 
eral, the  actual  friction  coefficient  measured  under  conditions  of  continuous  sand- 
ing, was  found  to  be  approximately  0.40,  although  it  should  be  remembered  that 
not  all  of  this  available  frictional  force  goes  into  either  driving  or  lateral  reactions 
but  a  combination  of  both. 

The  next  three  illustrations  ilhustrate  the  added  effect  of  varying  coupler  buff 
reactions  applied  to  the  locomotive  through  the  angle  involved  when  ciuves  are 
negotiated.  This  particular  data  is  taken  from  tests  run  in  a  "pusher"  operation; 
however,  tlie  reactions  resulting  would  be  present  if  this  coupler  reaction  occurred 
due  to  braking  or  train  "run-in"  also.  Fig.  14  shows  some  data  points  and  tlie  range 
of  data  measured  under  conditions  of  moderate  buff  load  (approximately  100,000 
lb)  while  operating  over  the  curve  sizes  indicated.  This  data  also  included  continu- 
ous sanding  and,  therefore,  shows  the  increased  effect  of  the  coupler  reaction.  Fig. 
15  is  similar  except  the  butt  load  coming  through  the  coupler  is  still  higher  (in  tlie 
range  of  250,000  to  300,000  lb)  and  correspondingly  the  net  lateral  wheel-to-rail 
loads  are  seen  to  increase.  Fig.  16  .shows  all  these  variables  superimposed  on  the 
same  curve.  The  cumulative  effect  of  these  external  loads  acting  over  and  above  the 
basic  curving  forces  is  apparent.  It  may  be  noted  that  lateral  loads  in  the  range 
of  25,000  to  27,000  lb  for  a  wheel  with  average  static  loading  of  32,000  lb  occur 
here  regularly.  Under  these  particular  conditions  wheel  and  rail  wear  are  quite  high. 


Address    by    L.    F.    Koci 


515 


o     40.: 


^    6'-: 


5  10  15  20  25  30  35 

NET    LATERAL    LOAD   AT   LEADING   OUTER    WHEEL  (xIO'LBS.) 

Fig.    14 


0  5  10  15  20  25  30  35 

NET    LATERAL     LOAD    AT    LEADING    OUTER    WHEEL  (x  lO' LBS) 

Fig.    15 


516 


Special    Features 


INFLUENCE    OF    SANDING    AND 
MODERATE    OR  HIGH    BUFF    LOADS 


0  5  iO  15  20  25  30  35 

NET   LATERAL    LOAD    AT    LEADING     OUTER     WHEEL  {x|0' LBS) 


Fig.   16 


In  many  of  the  tests  which  have  been  run,  freight  car  wheel-axle  sets  on  the 
cars  immediately  adjacent  to  the  locomotive  have  also  been  insti'umented.  Primarily 
because  of  less  vertical  load  available  to  "stabilize"  the  wheel  and  rail,  it  is  gen- 
erally found  that  the  most  vulnerable  area  for  tracking  difficulties  or  derailment  is 
on  the  cars  immediately  adjacent  to  the  locomotive.  This  is  particularly  so  with 
some  of  the  newer  long-overhang  cars. 

Because  the  side  frames  of  most  freight  car  trucks  are  independent  (that  is, 
they  are  not  held  rigidly  relative  to  one  another)  the  basic  frictional  forces  which 
occiu'  in  curve  negotiation  also  tend  to  skew  the  freight  car  truck  side  frames, 
producing  a  greater  angle  of  attack  than  would  be  present  for  a  truck  of  similar 
wheel  base  otherwise.  Consequently,  the  wheel-axle  position  that  develops  is  as 
shown  in  Fig.  17.  The  axles  shift  relative  to  one  another  and  after  the  trailing  axle 
comes  against  the  outer  rail,  the  remaining  frictional  moment  shifts  the  side  frames 
and  allows  the  axles  to  skew  further,  attaining  a  higher  angle  of  attack  and  cor- 
respondingly somewhat  increased  lateral  forces  and  reactions.  Fig.  18  shows  what 
the  predicted  net  lateral  load  on  rail  would  be  at  the  leading  outer  wheel  of  a 
freight  car  truck  with  65,000  lb  vertical  axle  load.  This  illustration  shows  this  curve 
overlayed  on  the  2-axle,  3-axle,  and  4-axle  locomotive  truck  data  discussed  previ- 
ously. In  addition,  tlie  circles  and  x's  represent  actual  data  points  measured  in  rail- 
road tests. 


Address    by    L.    F.    Koci 


517 


CONVENTIONAL   FREIGHT 

CAR   TRUCK   POSITION    ON 

TRACK  CURVE 


Fig.   17 


EXPERIMENTAL    RESULTS   FOR   THE 
NET  LATERAL  LOAD  AT   LEADING   OUTER    WHEEL 
AS  A  FUNCTION  OF  RAIL   CURVATURE 


-2500 --+- 


-2000 


£      3*-- 


H H 


PR-.LMCTP. 


1600  --1 -, 


-1000 


-500 


65,000   LBS   VERT.  LOAD  PER  AXLE 
!   o-HI  CUBE   CAR  TESTS 
K- 100- TON    HOPPER  TESTS 


DATA  BASED  CW  COASTING   CONDITIONS 
AND   LOW   DRAWBAR 


lf% 


^<^  V 


V 


0  5  10  15  20  25  30  35 

NET  LATERAL  LOAD  AT  LEADING  OUTER  WHEEL,  k  ,  (x  10^  LBS.) 


Fig.   18 


518 Special    Features 


IV.    RAIL   PROFILE   DATA 

Since  it  is  the  ratio  of  lateral  to  vertical  load  present  between  a  wheel  and 
the  rail  which  is  of  interest,  the  vertical  load  present  at  any  given  time  is  important. 
This  vertical  load  changes  continuously  as  the  wheel  follows  rail  irregularities.  To 
determine  what  vertical  load  was  present  during  operation,  it  was  considered  man- 
datory to  determine  what  rail  profile  the  wheel  followed  in  operation.  That  is,  it 
was  important  to  know  what  the  "loaded"  profile  of  the  rail  was  when  the  wheel 
load  was  upon  it,  not  what  position  the  rail  was  in  when  there  was  no  load  present. 
The  loaded  profile  can  be  and  is  substantially  different  from  the  unloaded  shape 
of  the  rail.  The  instrumentation  developed  to  obtain  this,  sample  profiles  obtained 
on  U.  S.  railroads,  and  a  summary  of  the  data  is  discussed  below. 

Fig.  19  illustrates  tlie  change  in  wheel  load  which  results  when  the  particular 
wheels  indicated  are  subjected  to  a  track  irregularity  of  the  size  indicated.  This 
track  irregularity  is  defined  as  vertical  rail  profile  which  is  intended  to  represent  the 
change  in  profile  from  the  middle  of  a  particular  rail  length  (that  is,  approximately 
halfway  between  the  rail  joints)  to  the  lowest  point  encountered  at  die  joint.  This 
will  be  more  clear  after  viewing  the  subsequent  illustrations.  As  can  be  seen,  the 
changes  in  wheel  load  which  occur  are  substantial.  A  not  unusual  rail  profile  of 
1/2  inches  can  cause  a  change  in  wheel  load  of  approximately  10,000  lb  out  of 
total  nominal  static  wheel  load  of  about  32,000  lb.  The  effect  on  adhesion  is  obvious 
as  well  as  the  effect  on  wheel-rail  stresses;  also  apparent  should  be  the  effect  on 
tracking  performance  and  possibility  of  derailments.  Since  this  can  be  such  a  major 
factor,  it  must  be  taken  into  account  in  considering  the  relationship  of  lateral-to- 
vertical  loads  present  and  what  type  of  tracking  condition  is  inxoKed. 

To  determine  the  loaded  rail  profile,  new  instrumentation  was  developed  which 
did  not  depend  on  relative  displacements  between  different  points  of  the  rail  but 
rather  gave  an  indication  of  the  absolute  path  "in  space"  the  wheel  has  to  follow 
in  passing  over  the  rail.  General  Motors  Research  had  developed  such  instrumenta- 
tion for  use  on  highways  in  1962;  it  was  first  used  in  conjunction  with  ]ocomoti\'es 
and  railroad  track  in  1985.  The  following  four  illustrations  show  some  typical  traces 
of  rail  profile  wliich  have  been  accumulated  in  recent  years. 

The  first  sample  trace.  Fig.  20,  shows  a  typical  main  line  section  on  one  rail- 
road. What  is  reproduced  here  is  tlie  exact  i^rofile  tliat  the  wheel  follows  in  passing 
over  the  rail,  or  correspondingly,  the  exact  shape  of  the  rail  when  tlie  wheel  load 
is  applied  to  it  except  for  the  scale  changes.  The  horizontal  scale  is  condensed  as 
shown  by  the  39-ft  distances  shown  in  Fig.  20  representing  adjacent  rail  joints; 
the  vertical  scale  is  expanded  relatively,  as  indicated  by  the  2.1-inch  peak-to- valley 
displacement  shown.  The  uniform  rail  joint  pattern  is  apparent,  and  it  is  of  interest 
that  compared  to  the  commonly  considered  unloaded  rail  profile,  the  irregularities 
under  the  condition  shown  are  substantial. 

Fig.  21  is  a  similar  trace  taken  on  a  section  of  yard  track.  It  is  labelled 
"through"  track  to  distinguish  it  from  such  facility  tracks  as  sanding  tracks  or  fuel- 
ing tracks;  that  is,  this  represents  track  on  which  trains  are  made  up  and  started, 
where  demand  for  adhesion  is  often  greatest.  As  can  be  seen  and  as  may  be 
expected,  the  unifonnity  of  the  rail  joint  pattern  is  not  present  because  of  the  varia- 
tions in  rail  pieces  in\ol\t'd  in  the  >ar(l.  Also  of  interest  are  the  areas  of  immediate 
mismatch  where  adjacent  rail  sections  were  placed  without  shimming.  For  compari- 
son purposes  a  6-wheel  SD  truck  is  shown  to  the  same  scales,  indicating  that  in 


Address    by    L.    F.    Koci 


519 


CHANGE   IN   WHEEL   LOAD     DUE    TO   VERTICAL    PEAK 
TO    VALLEY    RAIL    PROFILE    FOR    THE     SD    TRUCK 

(LOW  SPEED) 


VERTICAL     RAIL     PROFILE 
Fig.    19 


DYNAMIC    MEASUREMENT   OF  RAIL 
VERTICAL  PROFILE  " 

SPEED   30  MPH 

TIME  -^ 


39' -t-  39'-+^  39'  -^  39'^r-  39'-^  39'  —  39'  4-  39'- 


Fig.    20 


520 


Special    Features 


T#iCAL'"THRU''  VSR^r 


Fig.  21 


rj.VERY  SEVERE 
VERTICAL  JOLT 


Fig.  22 


Address    by    L.    F  .    K  o  c  i 


521 


WELDED    TO    JOINTED    RAIL 
67  M.PH.   TRAIN   SPEED 


TIME- 


WELDED  RAIL 


■JOINTED  RAIL 
1,14" 


Fig.   23 


passing  over  the  rail  lengths  with  1.48-inch  peak-to-valley  displacements,  the  middle 
axle  of  the  truck  "feels"  0.91  inches  of  tliat  displacement. 

Fig.  22  shows  an  additional  sample  taken  on  main-line  track  at  64  mph.  Because 
of  the  higher  speed  the  horizontal  scale  is  "squeezed  down"  somewhat  further,  as 
indicated  by  the  39-ft  dimension  shown.  Again,  the  rail  joint  pattern  is  apparent, 
but  in  addition  this  sample  includes  passage  over  a  highway  grade  crossing  and 
reflects  a  4-inch  displacement  within  about  a  20-ft  length. 

The  last  sample  trace  indicated,  Fig.  23,  shows  passage  from  welded  rail  onto 
jointed  rail.  As  may  be  expected,  the  welded  rail  irregularities  are  far  smaller  than 
those  found  on  the  jointed  track;  however,  it  is  interesting  that  to  some  extent  the 
39-ft  pattern  is  still  present.  This  appears  to  be  the  result  of  the  "memory"  of  the 
ballast  and  substructure  due  to  the  "pounding  out"  which  took  place  when  the  joints 
were  present. 

As  a  summary  of  some  of  the  rail  profile  data  which  has  been  accumulated, 
Fig.  24  shows  the  peak-to-peak  vertical  displacement  plotted  against  tlie  number 
of  times  a  displacement  of  that  level  occurs  per  thousand  miles  of  operation.  Data 
accumulated  on  four  different  railroads  is  shown.  For  example,  on  Railroad  D 
a  IJz-inch  peak-to-peak  irregularity  would  occur  3500  times  per  thousand  miles  or 
about  3/2  times  every  mile.  The  rather  substantial  difference  between  data  obtained 
on  different  railroads  (or  sometimes  between  difl^erent  areas  of  a  railroad)  is 
apparent. 


522 


Special    Features 


lUtUUU 

9 

8 
7 
6 

5 
4 

3 
E              2 

*  1,000 

P          7 

^          6 

BL          4 
?»           3 

e 

iii            2 

itt: 

L> 
U 

P    too 

9 

I             8 
7 

■^            6 

^            5 
4 

c             3 
I            2 

% 

% 

\ 

V 

\ 

RAIL  VERTICAL  PROFILE 

\ 

MAINLINE  TRACK  SEGMENTS 
OF  FOUR- RAILROADS 

\ 

\ 

\ 

\ 

u. 

-a 

|\o. 

C3 

^* 

^ 

\ 

\ 

\ 

J 

PEAK  T 

i              1 

3  PEAK 
0            t 

VERTICAL 
5            2 

RAIL    P 
0           g 

ROFILE 
6            3 

0 

Fig.   24 


Address    by    L.    F.    Koci 


523 


V.    THE    EFFECT    OF    DYNAMIC    BRAKE    LEVELS 

There  are  indications  that  loconi()ti\"e  hrakinji  practice  and,  in  particular, 
d>naniic  brakinji,  often  may  be  involved  in  some  of  the  tracking  problems  which 
Iia\'e  been  investigated.  In  some  cases  it  appears  that  personnel  may  not  realize 
how  "potent"  a  tool  the  dynamic  brake  level  available  to  them  today  is.  There  are 
two  aspects  to  this:  the  steady-state  dynamic  brake  level  available,  and  the  dynamic 
reactions  (run-ins)  which  can  often  be  involved  in  locomotive  braking  practice. 

Fig.  25  summarizes  the  braking  effort  available  in  pounds  in  dynamic  braking 
a  4-unit  consist  of  6-axle  units.  The  lower  curve  shows  the  braking  available  from 
four  SD-7  units  which  are  6-a.\le  units  of  approximately  1954  vintage.  Use  of  the 
same  number  of  axles,  24,  in  dynamic  brake  provides  an  increase  as  shown  by  the 
lighter  intermediate  shaded  area  on  four  units  produced  subsequently;  the  top  curve 
shows  the  amount  of  braking  effort  available  from  tlie  same  24  axles  in  dynamic 
brake  on  current  locomoti\e  units.  This  illustration  reflects  the  significant  increase 
in  braking  level  available,  an  increase  not  apparent  when  the  operator  considers 
only  the  number  of  axles  imolved.  In  addition,  the  current  models  have  available 
what  is  referred  to  as  "extended  range"  dynamic  brake  which  makes  available  the 
maximum  level  of  braking  down  through  the  lower  speeds  which  are  normallji 
in\olved  in  traveling  oxer  such  areas  as  turnouts,  crossovers,  tight  curvature,  oi 
temporary  or  poor  track  conditions. 

In  addition  to  these  two  factors  ( the  approximate  40%  increase  in  braking  effort 
available  with  the  same  number  of  axles,  and  the  availability  of  the  extended 
range  braking),  changes  in  the  electrical  control  of  the  dynamic  brake  also  make 
it  possible  to  obtain  increasing  braking  levels  from  what  was  available  in  the  past 


LBS.-8.E. 

DYNAMIC    BRAKE   CURVE 

240000  - 

fl| 

200000  - 

iivm                   fl 

160000  - 

■^^L                1 

20000  - 

■B^^_^^^^         H 

80000  - 

n^^^^^^^^ 

4-SD40  umT^ 

i^^^^^^^^^^^^^^^^^k^i 

4-SD9  UNITS 

40000  - 

H^^^^^^^^^^^^^^^^fe^l 

4-SD  7  UNITS 

i 

c 

)            10         20         30         40         50         60         70 

1                                      MILES    PER    HOUR 

Fig.    25 


524 Special    Features 


when  iiiiiltiplf-unit  consists  of  nioiv  than  fonr  nnits  are  used.  Initially,  what  is 
referred  to  as  a  "field  loop"  type  control  was  used  with  which  it  was  unable  to 
provide  increased  braking  effort  if  more  than  four  units  were  used  in  luultiple; 
the  "potential  trainline"  type  of  control  available  today  makes  it  possible  that 
multiple  units  beyond  four  in  number  will  add  directly.  On  a  6-unit  consist,  this 
alone  can  represent  a  14%  increase  in  the  amount  of  braking  available  for  the  same 
number  of  axles.  For  all  these  reasons,  it  is  possible,  as  mentioned  earlier,  that  this 
does  represent  a  greater  "tool"  than  is  realized  by  some  operating  personnel. 
In  regard  to  the  dynamic  aspects,  the  following  points  are  of  importance: 

1.  Relatively  high  run-ins  can  \ye  commonly  measured,  in  the  range  of 
250,000  to  300,000  lb,  in  locomotive  braking  practice  today,  and  there 
is  little  or  no  reaction  felt  in  the  lead  cab  where  the  crew  is  located.  The 
reason  for  this  is  that  a  6-unit  consist  can  represent  almost  2^/^  million 
pounds  of  mass,  and  the  300,000-lb  buff  or  run-in  occurring  between 
the  trailing  locomotive  and  the  first  cars  in  the  train  do  not  give  much 
reaction  to  the  lead  cab  when  acting  through  that  much  mass  and  the  11 
intermediate  locomotive  draft  gears.  Thus,  it  is  impossible  to  determine 
whether  braking  practice  is  satisfactory  by  the  "feel"  in  the  lead  cab. 

2.  It  has  not  been  possible  to  develop  a  universal  dynamic  brake  handling 
procedure  which  would  always  be  best.  This  is  because  it  depends  on 
the  train  makeup  involved,  and  the  terrain  being  travelled  over.  There  are 
some  procedures,  however,  which   are  very  undesirable: 

a.  It  has  been  found  that  some  personnel  fail  to  provide  the  recommended 
10-second  delay  in  switching  the  selector  handle  from  power  to  brake. 
If  this  switch  is  made  rapidly,  the  residual  magnetism  in  the  generator 
can  serve  to  give  a  high  peak  dynamic  braking  level  immediately  with- 
out any  throttle  motion  made  by  tlie  operating  personnel.  This  has 
been  confirmed  in  tests  with  substantial  run-ins  measured. 

b.  Rapid  buildup  of  the  brake  or  "wiping  out"  of  the  handle  can  give 
high  run-ins. 

c.  Applying  or  maintaining  high  braking  levels  at  turnouts,  curves  oi 
crossovers  where  there  is  reason  to  consider  conditions  may  be  less 
than  desirable  can  result  in  unsatisfactory  conditions. 

3.  In  almost  all  tests,  the  worst  conditions  have  consistently  been  found  to 
be  on  cars  near  the  locomotive  consist.  This  is  particularly  so  with  empty 
cars,  and  it  is  further  exaggerated  when  the  long-overhang  TTX-type 
cars  are  placed  adjacent  to  the  locomotive.  This  is  because  cars  in  this 
position  are  subjected  to  the  maximum  drawbar  values,  often  without 
having  the  substantial  vertical  load  of  the  locomotive  present  helping  to 
stabilize  the  wheel  on  the  rail  or  the  rail  on  the  tie. 

VI.   MECHANICAL   CONSIDERATIONS 

There  are  a  number  of  mechanical  areas  involved  in  the  locomotive  which  can 
and  do  affect  the  wheel-rail  loading.  Among  these  (although  there  are  many  others) 
are:  the  alignment  control  draft  gear,  matching  wheel  sizes,  and  maintenance  of 
truck  bolster  stops  where  necessary. 

A  number  of  years  ago,  when  multiple-unit  consist  operation  first  became 
used     it   was    found   that    under   conditions    of   significant    locomotive   buff,    either 


Address    by   L.    F.    Koci 


525 


braking  or  pushing,  a  phenomena  occurred  referred  to  as  "jackknifing."  This  is 
simply  the  condition  in  which  the  locomotives  skew  relative  to  one  another  within 
the  clearances  available  between  the  locomotive  carbody  and  the  track.  This  in- 
cludes wheel-rail  clearances,  axle  clearances,  and  the  lateral  clearances  between 
the  truck  bolster  and  the  truck  frame.  As  a  result  of  this  the  couplers  between 
adjacent  units  are  at  an  angle  to  the  unit  and,  therefore,  the  buff  load  develops 
a  lateral  force  component  reacted  at  the  truck  centerplate  and  subsequently  at 
the  rail.  At  that  time  the  best  manner  determined  to  control  this  jackknifing  effect 
was  to  substantially  reduce  the  lateral  clearance  between  truck  frame  and  truck 
bolster  from  the  approximate  2%  inch  per  side  dimension  present  on  the  4-axle 
trucks  involved,  to  V2  inch  per  side  by  applying  what  is  referred  to  as  "bolster 
stops."  By  reducing  the  amount  of  shifting  and  skewing  possible,  these  stops  re- 
duced the  lateral  component  which  could  be  developed  and  successfully  limited 
the  jackknifing  forces  involved,  although  they  can  increase  the  roughness  of  the 
ride  laterally  in  higher  speed  operation. 

In  more  recent  years  a  coupler  arrangement  kno\\Ti  as  the  "alignment  con- 
trol" draft  gear  has  been  used  on  road  locomotives.  This  coupler  arrangement  pro- 
vides a  resistance  to  coupler  angling  in  heavy  buff  conditions,  which  more  success- 
fully combats  the  jackknifing  efliect  which  can  occur  in  heavy  buff  whether  on 
tangent  or  curved  track.  Under  common  operating  conditions  today,  the  use  of  the 
alignment  control  draft  gear,  maintained  in  satisfactory  operating  condition,  is 
mandatory  to  prevent  significant  lateral  rail  reactions.  Fig.  26  illustrates  a  locomo- 
tive consist  and  the  first  two  cars  of  a  train  actually  involved  in  a  derailment  which 
\\'as    investigated.    The   consist   is   three   6-axle   locomotives   and  three  4-axle   loco- 

INFLUENCE   OF  ALIGNMENT  CONTROL   a   GAGE  WIDENING 
ON  CONSIST  INVOLVED  IN  DERAILMENT  ON  A  4*    CURVE 


SO-45 
40  UPH  -  NO  GAG£ 


0       0  0      5000       0      6600      0      6800      0      11400  23100         13000 

iO-4^       ^0^^     ^F"?^      «'P-3^     ^'^l^ 
S£   WIDENING  -WITH   AL  CONTROL  \ 


17400  2700 

8100  15600  26700  34500  40600         23100         12900 

>sssss 

4200  9700  16700  27800  35600  25100  2700 

40  MPH  -  NO  GAGE    WIDENING   -  NO   AL.  CONTROL 


10000  19100  32300  44700  48500       27200  15800 

sSSSSS 

5500         12600  21400  34200  43600  31300         5700  4200 

40  MPH  -  /"  GAGE    WIDENING  -  NO  AL.  CONTROL 


Fig.   26 


526 


Special    Features 


motives  with  TTX  cars  immediately  behind  the  locomotive.  The  numbers  indicated 
in  the  illustration  are  the  lateral  reactions  icsiiltinj?  at  the  truck  centcrplate  due  to 
the  skewing  effect  which  takes  place  under  the  huff  loading  involved  in  this  particu- 
lar derailment.  This  centerplate  loading  combines  with  the  curve  negotiation  loads 
to  effect  the  wheel-to-rail  reaction.  In  tliis  particular  ccmsist  and  on  this  size  curve, 
the  imit  with  the  highest  centeiplate  reaction  is  the  trailing  locomotive  miit,  and 
of  primary  interest  is  the  fact  that  this  maximum  loading  increases  from  17,400  lb 
at  the  point  of  maximum  load  to  a  \alue  of  40,600  lb  if  alignment  control  were 
either  not  present  or  not  maintained  to  engage  properly.  Also  of  interest  is  tlie 
fact,  as  illustrated  in  the  bottom  portion  of  the  illustration,  that  1  inch  of  gage 
widening  allows   tliis  maxinuun   load  to  additionally  increase  approximately  20%. 

As  noted  previously,  prior  to  the  use  of  alignment  control  draft  gears,  it  was 
necessary  to  apply  bolster  stops  to  4-wheel  locomotive  trucks  used  in  multiple-imit 
locomoti\e  braking  conditions.  Fig.  27  illustrates  another  actual  derailment  con- 
dition which  was  investigated.  In  this  case  the  three  leading  units  were  equipped 
with  alignment  control  draft  gear  and  the  three  trailing  units,  of  older  vintage, 
were  not.  The  top  portion  of  the  illustration  shows  what  centerplate  reactions  would 
be  expected  if  all  three  of  the  trailing  4-axle  units  were  equipped  with  bolster 
stops  limiting  the  clearance  to  V2  inch  per  side.  As  may  be  noted  the  maximum 
reaction  invobed  is  approximately  30,000  lb.  After  the  derailment  occurred,  actual 
measurements  of  the  bolster  lateral  clearances  present  were  made,  and  it  was  found 
that  the  fifdi  unit  in  the  consist  did  not  have  bolster  stops  applied  while  the  fourth 
and  sixth  units  did  have  bolster  stojDs;  but  tliese  had  become  worn  over  the  inter- 
vening years  since  application  and  resulted  in  lateral  clearances  per  side  of  up  to 
about  1%  inch  instead  of  %  inch.  The  result  of  these  actual  lateral  clearances 
involved    was    sufficient    to    increase    centerplate    reactions    to    67,000    lb,    certainly 


INFLUENCE  OF  TRUCK  BOLSTER   STOPS  ON  GP  a F  UNITS 
IN  CONSIST   INVOLVED  IN   DERAILMENT  ON    3**  CURVE 


3800  5820  7950  26800  29600  32500 


830  1300  10550  23300  27600  2200    3300  0 

22  MPH    GP   a  -F   UNITS     WITH    BOLSTER    STOPS 


3800  5820      1300  6440         35950  67000  62700         300       3700  0  • 


S^S 


830  8030  56500  61100  20800 

22  MPH    GP   a  F    ACTUAL    BOLSTER    LATERAL 


Fig.   27 


Address    by    L.    F.    Koci 


527 


.CHANGE   IN  AXLE  LOAD  DUE   TO  RADIAL   MISMAK 
OF  WHEELS   BETWEEN  AXLES  OR  VERTICAL 
DISPLACEMENT  OF  TWO   WHEELS   ON 
AN  AXLE   FOR  THE    SD  TRUCK 


20000 


16000 


12000 


8000 


4000 


0 


0  0.5  i  !.5 

VERTICAL    DISPLACEMENT   OF  AN  AXLE  OR    RAOJAL   MISMATCH 
OF  WHEELS  BETWEEN  AXLES  (IN.),, 


Fig.    28 


.sufficient  to  be  of  concern  as  a  possible  cause  for  the  derailment.  Two  additional 
points  may  be  noted  about  this  situation:  The  three  trailing  units  were  being 
shipped  "dead"  in  the  train  and  there  was  some  misunderstanding  that  they  there- 
fore did  not  require  the  same  consideration  as  if  powered.  However,  as  long  as 
they  are  sul)jected  to  the  locomotive  braking  buff  loads  developed  by  the  leading 
powered  units,  whether  the  units  in  question  are  dead  or  powered,  does  not  affect 
the  center  bearing  reactions.  Secondly,  because  some  railroads  have  understandably 
chosen  to  keep  4-wheel  trucks  interchangeable  imder  locomotives  of  difierent  vin- 
tages, it  has  been  found  that  in  .some  ca,ses  trucks  without  bolster  stops  from  imits 
with  alignment  control  have  become  applied  to  older  units  without  alignment  con- 
trol  without  the  bolster  stops  being  added. 

Wheel  size  matching  witliin  a  truck  and  within  the  locomotive  can  be  very 
important,  as  illustrated  in  Fig.  28.  It  is  not  uncommon  to  find  6-axle  locomotives 
operating  today  in  which  wheel  sizes  within  one  of  the  trucks  are  mismatched  well 
beyond  recommended  limits.  This  can  and  does  make  substantial  change  in  the 
wheel  loads  present  affecting  the  locomotive  tracking  conditions,  l^'ig.  28,  for  ex- 
ample, indicates  that  wheels  mismatched  by  1  inch  in  radius  or  2  inches  in  diameter 
on  the  middle  axle  can  cause  a  change  in  axle  load  of  approximately  12,()()()  lb.  In 
addition,  this  mismatch  affects  motor  tractive  effort  distribution  and  axle  load  dis- 
tribution,   both    of    which    influence    attainable    tractive    effort    the    locomotive    can 


528 Sp  e  c  i  a  I    F  e  atures 


develop.  It  seems  largely  since  the  advent  of  wheel  truing  machines  that  difficulties 
in  wheel  size  measurement  and  matching  have  become  common  and  that  this  area 
deserves  greater  attention. 

CONCLUSION 

It  is  difficult  to  summarize  all  the  factors  discussed  above.  Considering  what 
areas  seem  to  deserve  the  most  attention  would  indicate  the  following: 

1.  Locomotive  Braking  Practice: 

a.  Delay  in  power-to-brake  transfer. 

b.  Gradual  buildup  of  braking  level. 

c.  Control  of  braking  level  over  conditions  such  as  crossovers,  turnouts, 
and  curves. 

2.  Track: 

a.  Gage  widening  not  excessive. 

b.  Level  of  rail  irregularities. 

c.  Possible  thermal  strain  investigations. 

3.  Mechanical: 

a.  A  6- wheel  locomotive  truck  supporting  195,000  lb  adhesive  weight 
has  lateral  loads  40  to  45%  higher  than  a  4-wheel  truck  supporting 
130,000  lb. 

b.  Freight  truck  forces  measured  due  to  curving  are  of  similar  magnitude 
to  a  6-wheel  locomotive  truck. 

0.   Proper  alignment  control  in  draft  gears. 

d.  Proper  bolster  stops  on  units  without  alignment  control. 

e.  Long-overhang  cars,  especially  empty  cars,  should  not  be  near  the 
locomotive  consist  in  braking  operation. 

f.  Wheel  size  matching. 


Panel  Discussion — 
Glued  Laminated  Timber — A  Reliable  Engineering  Material 
72-633-4 

PANEL   MEMBERS: 

BILLY   BOHANNAN    (Moderator) 

Engineer 
U.    S.    Forest.  Products    Laboratory 

r.    G.    WILLIAMSON 

Manager   Engineering    Services 

American    institute   of  TimbeV  Construction 

M.    J.    RHUDE 

Manager,   Timber   Engineering 

Product   Development   Department,    Forest   Products   Division,   Koppers   Co.,    Inc. 

G.    R.    BIRKEMEIER 

Vice   President   Engineering 

Timber  Structures,    Inc. 

DAN    O'BYRN 

Technical    Director   and   Zone    Engineer 

Weyerhaeuser  Co. 

Billy  Bohannan:  What  we  are  going  to  do  this  morning  is  give  you  some 
general  information  on  the  engineering  properties  of  glued  laminated  timber.  We 
will  also  show  a  short  movie  on  some  of  the  testing  that  we  have  done  in  the  past 
couple  of  years  on  large  members,  and  then  we  are  going  to  try  to  answer  your 
questions.  Our  panel  includes  four  of  the  most  qualified  people  in  the  United  States 
to  answer  questions  on  glued  laminated  timber. 

We  like  to  think  that  glued  laminated  timber  is  now  recognized  as  one  of  tlie 
major  engineering  materials  of  construction.  This  material  was  first  introduced  in 
Europe  as  early  as  1900.  It  wasn't  introduced  in  the  United  States  until  about 
1934.  We  claim  the  first  major  building  built  of  glued  laminated  lumber  is  at  the 
Forest  Products  Laboratory.  It  was  built  in  1934.  Two  other  buildings  were  built 
in  Wisconsin  about  the  same  time,  one  a  high  school  auditorium  and  the  other  a 
night  club  dining  hall.  All  three  of  these  buildings  are  still  giving  very  good 
service. 

We  started  glued  laminated  timber  research  at  Forest  Products  Laboratory  in 
the  early  30's,  including  studies  on  manufacturing  and  design  criteria.  This  research 
actually  forms  the  basis  of  the  glued  laminated  timber  industry  in  tlie  United 
States.  We  have  continued  research  at  the  Laboratory  throughout  tlie  years;  major 
extensive  research  has  been  done  since  1960,  particularly  in  regard  to  large  glued 
laminated  timbers. 

Members  of  almost  any  size  and  shape  now  can  be  and  are  l^eing  built.  Today 
we  have  many  buildings  with  simple  spans,  straight  beams,  over  100  ft  in  length. 
There  is  one  building  near  Chicago  that  has  a  138-ft  clear  span.  A  building  in 
California  has  a  center  ridge  beam  tliat  is  10  ft  deep  and  130  ft  long.  These  are 
big  members. 


Note — Discussion    open    \mlil    October    15,    197L 

529 


530  Special    Features 


\r;iny  curved  douie  structures  have  clear  spans  in  excess  of  200  ft.  The  first 
I)ii:  wood  dome  structiue  has  a  3()8-ft  span.  This  is  on  the  Montana  State  University 
campus  in  Bozeman,  Mont.  The  largest  one  I  know  of  that  has  been  built  recently 
is  a  344-ft  clear  span  dome  structure  at  the  University  of  Utah.  So  big  buildings 
are  possible  with  glued  laminated  wood.  But  glued  laminated  wood  is  not  restricted 
to  buildings.  It  can  be  used  in  bridges.  Th<>  use  in  bridges  dates  back  to  1944.  One 
railroad — the  Texas  &  Pacific — placed  11  glued  laminated  stringers  in  a  bridge  in 
1944.  In  1945  the  Southern  Railway  used  glued  laminated  stringers  in  Alexandria, 
Va.  In  1948  a  l()3-ft  highway  bridge  was  built  in  Oregon  with  glued  laminated 
arches.  Also  in  1949  a  117-ft  2-hinged-arch  railroad  bridge  was  built  in  Oregon. 
Very  recently  a  major  three-level  interchange  was  built  in  South  Dakota  with 
laminated  timbers.  The  top  level  of  this  interchange  is  288  ft  long.  The  center 
portion  of  this  is  supported  on  arches  spanning  155  ft.  So,  these  are  just  a  few 
examples  to  indicate  that  glued  laminated  timbers  are  u.sed  in  buildings  and  also 
used   in  exterior  exposure  such   as  bridges. 

We  should  talk  about  the  advantages  and  disadvantages  of  glued  laminated 
wood.  Some  of  the  advantages:  we  can  make  the  large  members  out  of  standard 
size  dimension  stock;  from  small  pieces  we  can  make  up  very  large  pieces.  As  I 
have  .said,  members  of  any  size  and  any  shape  can  be  built.  About  the  only  diing 
that  limits  their  dimensions  is  transportation.  We  can  built  almost  anything  we 
can  move.  The  small  pieces  are  very  thin.  We  can  dry  them  and  then  we  can 
manufacture  the  laminated  product  and  end  up  with  a  member  that  will  be  rela- 
tively uniform  in  moisture  content  and  will  not  check  excessively  in  service.  We 
can  vary  the  cross  section  of  the  structural  members  to  meet  tlie  engineering  de- 
sign. They  don't  have  to  be  uniform  throughout.  Arches,  for  example,  usually  have 
a  varied  cross  section.  We  like  to  think  that  we  make  more  efficient  use  of  ouv 
timber  resources  tlirough  use  of  this  glued  laminated  process.  We  can  take  the  bet- 
ter material  and  put  it  where  it  will  best  be  utilized — put  the  higher  strength  pieces 
on  the  outside  and  the  lesser  strength  pieces  on  tlie  inside,  thus  providing  a  better 
balanced  construction. 

Glued  laminated  timbers  can  be  preservatively  treated  tlie  same  as  solid-sawn 
timber.  Also,  we  can  treat  the  thin  laminations  prior  to  manufacture  if  we  want  to. 
We  can  treat  them  and  then  manufacture  them  into  a  finished  product  that  has 
almost  imiform  100  percent  treatment  throughout 

I  could  go  on  with  the  advantages.  I  have  mentioned  only  a  few.  Naturally, 
however,  there  are  some  things  we  have  to  call  disadvantages:  The  large  timbers 
are  awkward  to  handle  and  awkward  to  transport.  The  manufacturing  of  the  large 
glued  laminated  timbers  requires  controls,  special  equipment  and  transportation 
facilities  that  are  not  required  for  solid-sawn  timber  construction.  With  this  there 
is  an  increase  in  cost.  The  first  cost  of  glued  laminated  timber  usually  is  more 
than  solid-sawn  timber.  However,  when  we  start  thinking  of  glued  laminated  timbei 
we  should  think  of  the  in-place  cost  of  the  finished  product,  not  initial  material 
costs.  Part  of  the  first  cost  will  be  offset  by  die  advantages  of  glued  laminated 
timber. 

The  American  Institute  of  Timber  Construction  was  organized  in  early  1950. 
This  is  a  non-profit  technical  association  of  manufacturers  who  design,  laminate, 
fabricate,  assemble  and  erect  load-carrying,  solid-sawn  and  glued  laminated  timber. 
With  the  development  of  this  organization,  some  uniformity  was  afforded  in  the 
manufacture  of  glued  lanunated  timbers.  This  group  was  mainly  responsible  for  the 


Panel    Discussion  531 


development  of  the  U.  S.  Commercial  Standard  CS-253  for  structural  glued  lami- 
nated timbers.  We  at  the  Laboratory  served  as  advisors  on  this  standard  but  !he 
industry  primarily  prepared  it.  The  purpose  of  this  standard  is  to  provide  a  common 
basis  of  imderstanding  regarding  sound  practices  in  the  production,  testing,  inspec- 
tion, identification  and  certification  of  structural  glued  laminated  timber;  and  to 
encourage  production  of  a  dependable  product  that  will  meet  the  needs  of  engi- 
neers. With  the  development  of  this  standard  and  the  accompanying  manufacturing 
quality  control  requirements,  glued  laminated  timber,  we  think,  has  achieved  greater 
acceptance  as  a  reliable  engineering  material. 

During  the  preparation  of  this  standard,  in  about  1960,  the  industry,  we  at 
the  Laboratory,  and  tlie  users  of  glued  laminated  products  became  concerned  about 
the  design  criteria  we  applied  to  very  large  members.  So  this  really  started  some 
new  research  on   glued  laminated  timbers. 

We  like  to  think  the  reliability  of  any  engineering  product  is  dependent  on 
how  much  it  has  been  researched.  The  current  specifications  that  came  out  in  July 
1970  for  glued  laminated  timbers  are  based  on  tests  of  more  than  600  structural 
beams.  The  first  series  of  these  beams  was  tested  in  the  mid  forties;  these  were 
only  about  12  inches  deep  and  18  ft  long.  This  may  or  may  not  be  considered 
structural  size,  we  like  to  think  it  is,  but  beams  of  this  size  are  very  small  compared 
to  the  beams  that  are  now  being  manufactured.  Thus,  we  started  re-evaluating 
criteria  for  large  beams.  In  the  late  1950's  three  60-ft-long  beams  were  evaluated, 
one  of  them  at  the  AAR  Research  Center  here  in  Chicago.  Two  others  were  evalu- 
ated at  a  university  laboratory. 

Starting  in  the  early  60's  we  tested  75  smaller  beams  at  the  Forest  Products 
Lab.  The  data  obtained  prompted  some  additional  research.  In  1966  we  tested  six 
50-ft-long,  2/2-ft-deep  beams  at  the  AAR  lab  here  in  Chicago.  Since  1968  more  tlian 
200  large  beams,  40  and  50  ft  long,  have  been  tested,  about  60  of  them  at  the 
Forest  Products  Laboratory.  The  rest  of  them  have  been  tested  by  the  AITC  and 
by  individual  laminators.  Also  during  this  time  tliere  has  been  major  research  in 
Canada  on  glued  laminated  structures.  The  Canadian  Forest  Products  Laboratory, 
I  know,  has  tested  more  than  100  beams.  In  addition  to  these  beam  tests,  approxi- 
mately 150  beams  have  been  tested  at  the  AAR  lab  in  Chicago.  This  work  is  spon- 
sored by  Committee  7  in  connection  with  its  studies  on  the  fatigue  strength  of  full- 
size  bridge  stringers. 

Much  of  the  research  data  we  have  obtained,  particularly  in  the  last  five  years, 
has  been  used  in  the  development  of  the  standard  specification  for  structural  glued 
laminated  timbers  that  was  developed  by  the  American  Institute  of  Timber  Con- 
struction and  became  effective  in  July  1970.  This  specification  recognizes  the  im- 
portance of  very  carefully  selected  laminations,  and  requirements  for  these  lamina- 
tions are  written  into  the  standards.  I  have  said  glued  laminated  timber  was  finst 
introduced  in  1934  and  it  has  developed  into  a  major  engineering  material.  There 
are  many  new  things  on  the  horizon  as  far  as  grading  of  material  is  concerned,  and 
we  believe  these  can  only  lead  to  making  the  properties  of  glued  laininated  timbers 
more  predictable.  We  have  strong  and  durable  glues  now.  Modem  preservati\e  treat- 
ments are  available  to  insure  long  life,  outdoors  as  well  as  in.  With  the  constantly 
improving  technology  in  the  u.se  of  wood,  we  expect  that  botli  glued  laminated  tim- 
ber and  solid-sawn  materials  will  be  increasingly  used  in  stnictiual  applications  for 
a  long  (inic. 


532 Special    Features 


Research,  such  as  has  been  conducted  in  the  last  10  years  at  the  Forest  Products 
Laboratory  and  in  other  laboratories,  has  resulted  in  more  reliable  design  criteria 
for  large  glued  laminated  timbers.  As  new  research  data  become  available,  it  will 
be  carefully  analyzed  and  appropriately  used  in  the  development  of  new  specifications 
for  structural  glued  lannnated  timbers. 

Mr.  Bohannan  (continuing):  I  would  like  at  this  time  to  show  a  6-minute 
movie  of  one  of  our  big  beam  tests.  A  similar  test  was  conducted  for  Committee  7 
members  when  they  met  at  the  Lab.  We  actually  broke  a  beam  for  them.  They  felt 
they  learned  a  lot  from  seeing  a  beam  tested.  We  feel  that  you  will  also  learn  some- 
thing from  seeing  one  of  our  50-ft  beam  tests.  [The  movie  was  shown.] 

Mr.  Bohannan:  I  would  now  like  to  open  the  meeting  for  any  questions  you 
might  have. 

Question:  What  are  the  relative  strength  properties  between  what  we  might 
call  old  growth  or  virgin  timber  and  second  growth  timber? 

Mr.  Bohannan:  There  are  some  differences  in  strengtli  because  the  materials 
are  different.  Second  growth  timber  has  had  faster  growth,  has  wider  rings,  possibly 
less  summer  wood,  and  less  of  the  dense  material  in  it.  If  it  came  from  the  smaller 
trees,  it  could  have  more  knots  in  it.  All  these  factors  do  affect  strength.  However, 
they  are  all  reflected  in  the  grading  of  the  material  so  I  will  say  if  properly  graded, 
old  growth  and  new  growth  timber  would  have  essentially  the  same  strength  proper- 
ties. The  factors  that  affect  strength  are  considered  in  the  grading  of  the  material. 

Question:  There  has  been  a  strength-size  relationship  developed  for  wood  and 
this  strength-size  relationship  is  based  on  ultimate  load,  not  on  design  factors. 
Should  this   apply  to  stresses  well  below  the  proportional  limit? 

Mr.  Bohannan:  I  guess  we  can't  say  definitely  that  it  does  apply,  but  I  feel 
diat  it  does.  The  design  strength  of  timber  is  based  on  ultimate  strengtli  and  tlien 
reduced  for  certain  factors  to  get  back  to  a  design  strength.  This  is  the  way  his- 
torically that  wood  stresses  have  been  developed,  on  the  ultimate  strengtii  concept. 
If  that  is  the  way  we  will  continue  to  do  it,  then  tlie  size  effect  relationsliip  should 
apply  because  we  need  to  know  the  ultimate  strength  of  the  little  piece  as  well  as 
the  large  piece  before  we  can  start  applying  strength  factors  to  it  to  get  to  a  working 
stress  in  structures.  Therefore,  I  feel  tlie  size  effect  that  has  been  developed  should 
apply  to  design  factors. 

Question:  How  does  glued  laminated  timber  compare  in  cost  with  solid-sawn 
timber? 

G.  R.  BmKEMEiER:  I  am  with  Timber  Structures,  Inc.,  in  Portland,  Ore.  We 
don't  have  our  own  source  of  timber  supply  so  we  have  to  purchase  bodi  our 
laminating  stock  and  our  sawn  timber  on  the  open  market.  The  price  figures  I  will 
give  you  are  the  prices  as  of  last  week  in  Oregon.  We  find  that  mills  that  will 
custom-cut  large  solid-sawn  timbers  are  becoming  more  scarce  all  the  time.  It  is 
becoming  more  and  more  difficult  to  find  mills  diat  will  furnish  tliese  large  timbers. 
I  checked  with  a  few  mills  last  week  and  here  are  some  cost  comparisons:  Timbers 
in  the  sizes  of  10  by  10  inches  to  12  by  16  inches,  in  lengths  up  to  40  ft  in  select 
structural  grade,  f.o.b.  mill,  were  last  week  $200  to  $225  per  tliousand;  in  40-  to 
50-ft  lengths,  $250  a  thousand;  in  50-  to  60-ft  lengths,  $300  to  $325  per  thousand; 
and  60  ft  up  to  85  ft  were  $425  per  thousand.  I  did  find  one  mill  last  week  in 
Oregon  that  was  cutting  some  85  ft  sticks. 


Panel    Discussion  533 


Now  another  factor  to  consider  in  the  cost  of  solid-sawn  timbers  is  the  surfacing 
that  is  necessary.  Very  few  mills  can  surface  timbers  that  are  over  40  ft  in  length. 
So  another  cost  factor  in  these  large  solid-sawn  timbers  is  their  transportation  to  a 
facility  tliat  can  siuface  them. 

Now  let's  compare  this  to  the  cost  of  glued  laminated  timber.  Again,  for  select 
structural  industrial  grade  glued  laminated  timbers,  in  a  glue-lam  plant  in  Oregon 
(this  is  for  industrial  grade  with  waterproof  adhesive)  the  cost  last  week,  or  the 
selling  price,  ran  between  $175  per  thousand  and  $225  per  thousand.  Now  this 
was  for  any  size  of  timber  up  to,  say,  150  ft  in  length. 

Dan  O'Byrn:  Weyerhaeuser  Co.  is  one  of  the  major  laminators.  We  produce 
a  lot  of  our  own  stock  and  sell  a  lot  of  solid-sawn  as  well  as  glued  laminated  timber 
We  feel  that  glued  laminated  timber  is  very  competitive  with  our  solid-sawn  stock, 
especially  if  the  comparison  is  made  on  the  basis  of  working  stresses.  In  glue-lam 
you  are  getting  2400  psi  vs.  1200  psi,  so  we  feel  it  is  very  competitive.  In  order  to 
remain  competitive  we  actually  have  three  laminating  plants,  and  we  are  producing 
around  300,000  ft  a  day  or  we  have  the  capacity  to  do  that.  We  feel  in  order  to 
stay  in  the  wood  business  we  have  to  do  laminating. 

Question:   What  is  the  availability  of  glued  laminated  material? 

T.  G.  Wn^LiAMSON:  I  would  like  to  say  very  simply  that  glued  laminated  tim- 
bers are  available  wherever  you  need  them.  AITC  has  some  33  member-plants 
throughout  the  United  States — from  the  West  Coast,  California,  Washington,  Ore- 
gon, across  the  United  States  into  the  South  East  and  New  England.  It's  not  the 
location  of  the  plant  that  is  so  important,  but  tlie  cost  of  the  product  delivered  to 
the  project  site.  In  many  cases  a  plant  in  Oregon  will  get  the  bid  on  a  job  in  Con- 
necticut, let's  say,  when  there  is  a  laminator  in  Massachusetts,  and  transportation 
costs  become  a  factor  togetlier  with  the  basic  cost  for  the  lamination  to  produce  the 
member.  Laminated  timber  is  available,  though,  wherever  and  whenever  you  need 
it,  and  as  I  said,  our  member  plants  are  located  throughout  the  country. 

Question:  How  much  lead  time  do  you  have  to  have  to  get  glued  laminated 
timbers? 

M.  J.  Rhude:  Laminated  wood  is  made  primarily  of  nominal  1-inch  or  2-inch 
laminations;  this  material  is  axailable  in  inventory,  and  if  anyone  wants  a  laminated 
railroad  tie,  bridge  stringer  or  cap,  it  is  obvious  that  little  or  no  lead  time  is  required. 
It  is  just  a  question  of  taking  tlie  wood,  possibly  end  scarfing  it,  horizontally 
laminating  it,  and  you  have  a  member  going  to  the  finishing  end.  When  we  talk 
about  curved  members  and  members  that  provide  a  200-  or  300-ft  clear  span,  with 
moment  connections,  the  lead  time  required  would  be  different.  Now  there  must  be 
tlie  engineering  of  the  product  and  the  making  of  shop  drawings.  This  could  involve 
6  weeks  or  12  weeks;  but  the  actual  time  from  starting  the  members  through  the 
plant  until  they  come  off  tlie  finishing  end  seldom  is  more  than  two  or  three  days 
or  a  week  at  the  most. 

Question:  Can  you  replace  a  solid-sawn  timber  with  a  glued  laminated  timber 
of  a  smaller  cross  section? 

Mil.  Rhude:  Let's  talk  about  a  short-span  stringer  where  shear  is  going  to  gov- 
ern the  design.  In  a  solid-sawn  stringer  the  shear  stresses  vary  with  the  species 
but  they  are  roughly  one-half  the  value  for  a  laminated  stringer.  So  you  could  use 
a  smaller  cross  section. 


534 Special    F  c  a  t  n  i  c  s 


It  was  just  inentioned  that  hendiiiK  stresses  in  solid-sawn  tinil)er  may  be  1200 
psi  and  in  laminated  timber,  2400  psi,  so  it  is  obvious  that  the  sizes  ean  be  different. 
But  you  have  to  talk  about  a  specifie  member;  the  Ko\'erning  stresses  determine 
the  size. 

Question:  What  is  the  expected  service  life  span  of  a  treated  glued  laminated 
member? 

Mr.  Williamson:  AITC  does  not  represent  the  treating  industry,  but  we  do 
have  a  treating  standard  in  the  AITC  Timber  Conditioning  Standards  Series.  It  is 
our  belief  that  if  you  select  the  right  treatment  and  get  die  proper  retention  and 
penetration,  the  service  life  of  a  treated  timber  is  indefinite.  As  long  as  it  is  given 
some  care  during  storage  and  erection,  it  should  last  indefinitely. 

Question:    Can   railroads   treat   glued   laminated   timbers   in   their   own   plants? 

Mr.  Bohannan:  There  is  no  reason  why  you  can't  buy  the  timbers  and  treat 
them  in  your  own  plant.  If  you  can  treat  solid-sawn  timbers,  you  can  treat  glued 
laminated  timbers. 

Question:  How  effective  is  preservative  treatment  to  prevent  decay? 

Mr.  Rhude:  Back  about  1900  this  Committee  on  Wood  Bridges  indicated  they 
didn't  know  whether  wood  could  continue  to  be  used  in  bridges.  Of  course,  tliere 
was  no  treatment  then.  So  it  looked  like  there  was  a  sad  period  aliead. 

However,  treating  came  into  existence  and  has  been  used  extensiv-ely,  starting 
about  1920.  Some  50  years  have  elapsed  and  many  of  these  treated  timbers  are  still 
performing  excellently. 

Then  we  have  laminated  wood  that  was  treated  and  placed  in  service  as  early 
as  1944,  so  we  have  a  lot  of  experience  in  that  area  also  about  the  effectiveness 
of  the  treatment. 

It  was  mentioned  this  morning  in  connection  with  tlie  discussion  of  the  current 
AAR  bridge  stringer  tests  that  tliere  was  a  decay  problem  in  some  of  the  untreated 
materials  that  were  stored  outside.  Timbers,  of  course,  were  never  meant  to  stay 
outside  if  tiiey  are  untreated.  The  untreated  stringers  were  made  of  kiln-dried  mate- 
rial, had  a  low  moisture  content  (in  the  11  and  12  percent  range),  and  were  wrapped 
in  a  polyethelene  container  and  overwrapped  with  some  furniture  wrapping  paper. 
But  being  stored  outside  and  having  the  paper  torn,  water  entered  to  a  depth  of 
several  inches  in  the  wrapping.  After  one  year  of  outside  storage,  some  incipient 
decay  existed.  There  were  also  12  preservatively  treated  stringers  and  tliey  were 
stored  in  the  same  manner.  Their  containers  also  became  completely  filled  witii 
water,  but  there  was  no  sign  of  decay.  This  was  just  for  a  year,  so,  of  course,  you 
could  not  say  this  is  an  indication  of  the  effectiveness  of  the  treatment.  I  just  use 
this  as  an  example.  You  wouldn't  be  using  timbers  on  the  railroads  if  it  were  not 
for  the  treatments.  With  your  own  50  years  of  experience  with  treated  wood  backed 
by  the  experience  in  other  fields  where  laminated  wood  or  solid  wood  treatment 
has  been  used,  you  can  certainly  have  assurance  it  will  last. 

Mr.  Bohannan:  At  the  Laboratory  we  have  had  treated  wood  as  tlie  fomida- 
tion  under  a  house.  Now  this  application  is  a  little  different  than  in  bridges,  maybe, 
but  not  too  much.  This  house  was  on  treated  6-  by  6-inch  sawn  members  for  .30 
years.  About  2  years  ago  we  moved  the  building  to  a  new  site.  We  took  up  the 
posts — they  were  buried  in  the  ground  to  a  dejitli  of  6  ft — and  we  evaluated  the 


Panel    Discussion  535 


posts.  Basically  they  had  the  same  properties  as  they  had  30  years  ago  when  tlaey 
were  put  in.  We  know  treating  practices  in  the  last  30  years  have  greatly  improved, 
so  tliis  is  one  indication  of  the  effectiveness  of  preservative  treatment.  We  are  pro- 
moting wood  posts  for  houses,  nowadays,  at  tlie  Laboratory.  We  think  it  is  a  very 
inexpensive  way  to  put  down  a  foundation.  We  wouldn't  be  promoting  this  prac- 
tice unless  we  thought  the  timbers  were  going  to  last  50,  60  or  70  years,  or  more. 

Mr.  Rhude:  I  might  also  mention  that  in  tlie  early  50's  a  large  number  of 
mine-sweepers  were  built  at  the  time  of  the  problem  in  Korea.  This  material,  of 
course,  is  in  and  out  of  the  water;  it  performed  excellently. 

Question:  What  about  the  durability  of  the  glues  that  are  used  in  glued 
laminated  timbers,  both  in  treated  and  untreated  members,  and  how  are  the  glues 
affected  by  the  different  climates  we  put  our  glued  laminated  timbers  in? 

Mr.  Birkemeier:  It  is  my  feeling  that  the  modem-day  adhesives,  both  the 
resorcinol,  the  phenolic  resorcinols,  and  tlie  phenolic  resin  adhesives  are  as  durable 
as  the  material  itself  for  practically  any  environment  the  timber  is  suited  for,  and 
tliat  applies  to  both  the  treated  and  untreated  material. 

Mr.  Retode:  The  perfonnance  of  the  waterproof  adhesives  applied  to  mine- 
sweepers and  aircraft  carrier  decking  in  the  early  50's — 20  to  25  years  ago — cer- 
tainly indicates  that  they  can  withstand  severe  service.  In  the  last  several  years, 
many  of  the  laminators  have  furnished  laminated  wood  for  large  bulk  storage  build- 
ings for  various  chemicals  and  fertilizers.  We  at  Koppers  have,  widi  the  fullest  of 
confidence,  placed  laminated  wood  with  the  various  waterproof  adliesives  in  tliat 
type  of  environment.  As  a  further  check  we  have  a  large  number  of  smaller  samples 
in  such  buildings  exposed  not  only  to  the  atmosphere  tlierein  but  also  buried  in 
tlie  chemicals  themselves.  We  have  been  making  a  series  of  tests  every  6  months 
or  12  months,  to  learn  more  about  this  particular  application. 

Mr.  Bohannan:  I  tliink  glues  are  available  that  are  very  durable.  This  is  the 
secret:  when  you  order  glued  laminated  timbers  for  an  out-of-doors  application, 
request  a  durable  glue — a  waterproof  glue.  You  will  get  it  from  the  laminators. 

Question:  Have  fatigue  tests  been  run  on  large  members? 

Mr.  Bohannan:  We  have  not  at  the  Forest  Products  Laboratory  run  any 
d>Tiamic  tests,  fatigue  type,  on  full-size  members.  We  have  run  a  lot  of  fatigue  type 
tests  on  the  wood  itself,  i.e.,  on  solid  wood,  small  clear  specimens,  not  structural 
lumber.  At  30  million  cycles  the  fatigue  strengtli  was  about  50  percent  of  the  static 
strength. 

Question:  Are  there  any  places  on  the  railroads  where  glue-lam  timber  cannot 
be  used  in  place  of  solid-sawn  timber? 

Mr.  Bohannan:  I  would  say  that  tliere  is  no  place.  Glue-lam  timber  has  tlie 
same  properties  as  solid-sawn  timber.  I  don't  see  any  reason  why  you  couldn't  use 
glue-lam  material  any  place  that  you  are  now  using  solid-sawn  material. 

Mr.  Rhude:  Being  practical,  I  can  think  of  an  example.  If  tlie  cross  section 
desired  is  small  enough  and  the  length  is  short  enough,  you  are  going  to  use  solid- 
sawn  material  for  economic  reasons. 

Mr.  Bohannan:  I  think  the  question  had  to  do  with  durability  and  environ- 
mental factors  rather  than  cost  factors. 

Bui.  633 


536 Special    Features 


Design  of  Pavements  for  Container  IHandling  Areas 

72-633-5 

By 

F.    L.    PECKOVER 

Engineer   of    Geotechnical    Services 

and 

W.   W.    WONG 

Senior  Geotechnical   Engineer 

Canadian     National     Railways 

INTRODUCTION 

Many  railways  today  are  involved  with  the  handling  of  containers  and  trailers, 
some  on  a  considerable  scale.  Although  the  degree  of  involvement  varies  widely, 
facilities  for  container  handling  are  absorbing  greater  amounts  of  railway  capital 
every  year.  For  example,  the  import-export  container  volume  handled  by  Canadian 
National  is  expected  to  increase  by  133%  during  1971. 

Container-handling  terminal  facilities  include  storage,  traffic  areas  for  both 
handling  and  rolling  stock,  and  the  handling  equipment  itself.  In  AREA  Bulletin 
625  of  January  1970,  Committee  6 — Buildings,  has  already  given  information  to  help 
in  planning  COFC/TOFC  terminals  and  selection  of  equipment.  The  infonnation 
includes  criteria  for  terminal  efficiency,  general  considerations  in  choosing  and 
equipping  mechanical  handhng  machines,  discussion  of  various  loading  methods 
and  equipment,  and  recommendations  on  terminal  design  requirements. 

The  planning  of  terminal  space  and  choice  of  equipment  to  transfer  con- 
tainers between  any  two  of  ships,  rail  cars,  trucks  and  storage  areas  is  a  study  to 
which  Committee  6  plans  to  devote  continuing  attention. 

The  design  of  structures  and  services  for  terminals  is  a  job  which  most  rail- 
ways carry  out  either  through  their  own  engineering  staff  or  through  consultants. 
The  design  of  pavements  for  container  handling,  on  tlie  otlier  hand,  presents  a 
problem  which  is  new  to  some  degree  to  railway  and  consulting  engineers  alike. 
This  is  because  the  loads  carried  are  unlike  those  for  any  other  engineered  struc- 
ture. Loads  may  be  as  high  as  113,000  lb  per  tire,  a  figure  not  exceeded  by  to- 
day's heaviest  aircraft.  In  addition,  the  frequency  of  loading  along  certain  patlis 
of  travel,  as  between  stacked  containers,  is  very  high  for  such  heavy  loads,  and 
beyond  that  for  which  airport  runways  are  designed. 

At  the  same  time  the  present  competitive  nature  of  the  container  business  and 
the  possible  short  effective  life  of  facilities  due  to  changing  intermodal  concepts 
make  it  essential  to  keep  both  capital  and  maintenance  costs  down.  These  conflicting 
requirements  of  heavy  traffic  intensity  and  low  cost,  combined  with  lack  of  design 
information,  have  resulted  in  failures  of  pavements  on  one  hand  and  probable  over- 
design  on  tlie  other. 

The  purpose  of  tliis  paper  is  to  assemble  for  reference  the  design  procedures 
for  pavements  for  container  and  trailer  terminals.  Some  construction  requirements 
are  included. 

The  recommendations  are  adapted  from  standard  practices  from  the  autliors' 
experience,  necessarily  limited,  as  the  need  for  such  designs  on  CN  projects  only 
developed  in  1968.  It  is  hoped  that  tlie  contributions  of  discussers  will  broaden 
the  information  given. 


Note — Discussion  open  until  October   15,   1971. 


Paper    by    F.    L.    Peckover    and    W.    W.    Wong  537 


MOBILE    HANDLING   EQUIPMENT 

Container  handling  equipment  is  chosen  for  a  particular  type  of  terminal  op- 
eration. Before  total  costs  can  be  assessed,  load-carrying  capacity  and  operating 
characteristics  must  be  considered  in  choosing  the  type  and  thickness  of  pavement 
stnicture  to  be  provided.  The  characteristics  of  equipment  which  will  have  the 
most  influence   on  jpavement  design  are: 

•  distribution  of  maxinnnn  loads  on  single  or  dual  wheels; 

•  operation  of  equipment,  whether  on  fixed  paths  or  in  a  random  pattern 
which  will  affect  the  frequency  of  load  application  and  the  fatigue  life  of  pavement; 

•  scrubbing  and  tearing  action  on  the  pavement  surface  during  pivoting  and 
turning  of  wheels  while  stationary  or  moving  slowly. 

A  great  variety  of  handling  equipment  is  available  at  present  to  suit  any  par- 
ticular terminal  operation.  Types  of  equipment  now  in  use  include: 

Front  loading,  vehicle  (Photo  1) — Wheels  may  be  in  tricycle  or  four-corner 
arrangement  with  front  axle  very  heavily  loaded,  up  to  113,000  lb  per  wheel  during 
transfer  operation.  Traffic  pattern  will  be  random  or  concentrated  depending  on 
whether  stored  containers  and  parked  rail  ears  are  spotted  in  random  or  fixed 
positions. 

Side  loading  vehicle  (Photo  2) — Dual  tires  on  each  corner  with  side  wheels 
taking  maximinn  load  of  up  to  50,000  lb  during  transfer  operation.  Wlieels  normally 
turn  without  pivoting.  Extendable  side  jacks  may  exert  a  pad  pressure  of  up  to  85 
psi.  Traffic  pattern  will  be  concentrated  beside  rail  cars  or  container  stockpiles. 

Mobile  straddle  crane  (Photo  3) — One  tire  on  each  corner  with  maximum  load 
of  up  to  95,000  lb  per  wheel.  Operates  on  fixed  path  so  traffic  is  very  concentrated. 
Some  models  can  move  sideways  by  pivoting  wheels  through  90  deg. 

Straddle  carrier  (Photo  4) — One  wheel  on  each  corner,  sometimes  tandem 
wheels  at  one  or  both  ends.  Maximum  load  26,000  lb  per  wheel.  Traffic  pattern 
is  random  or  very  concentrated  depending  on  whether  containers  are  stored  in 
random   positions   or  stacked   in   rows. 

Wharf  crane  (Photo  5) — Usually  runs  on  rails,  with  load  depending  on  num- 
ber of  wheels.  Design  for  rail  loads  on  groimd  and  against  wharf  face  can  be 
made  according  to  normal  practice  and  is  not  covered  in  this  paper. 

BASIS    OF   PAVEMENT   DESIGN 

The  approach  to  the  design  of  pavement  structures  to  support  container 
handling  equipment  is  based  on  design  methods  for  airport  runways  which  support 
loads  up  to  the  same  order  of  magnitude.  Information  required  for  design  includes 
the  magnitude,  distribution  and  frequency  of  wheel  loads  applied,  and  soil,  drain- 
age and  environmental  conditions  which  control  the  supporting  \'alue  of  the  ground 
at  the  site.  Lack  of  adequate  knowledge  of  these  factors  can  lead  to  costly  failures. 

Design  of  a  pavement  structure  primarily  inxoKes  finding  the  thickness  of  sur- 
face course,  base  and  subbase  courses  of  imported  materials  which  must  l)c  placed 
over  the  native  soil  to  carry  the  magnitude  and  frequency  of  loads  applied  without 
distress.  As  the  strength  of  a  pavement  structure  depends  on  the  load  distribution 
characteristics  of  a  layered  system,  each  layer  must  be  thick  and  strong  enough  to 
prevent   .shear   deformation   of    the    underlying    layer.    The   problem    is   to   estal)lish 


538 


Special    Features 


Phofo    1 — Front    loading    type   of   container   handling    vehicle. 


Photo   2 — Side   loading   container  vehicle. 


Paper   by   F.    L.    Peckover    and   W.    W.    W  o  n  g  539 


Photo  3 — Mobile  straddle   crane   for  containers. 


Photo    4 — Straddle    carrier    for    containers. 


540 


Special   Features 


Photo    5 — Wharf    crane. 


what  combinations  of  layer  thickness  will  be  the  most  economical  to  give  the  ex- 
pected  life    and   sei-vice   performance. 

There  are  two  basic  methods  of  pavement  design.  These  are  known  as  the 
California  Bearing  Ratio  (or  CBR)  method,  most  commonly  used  for  the  design  of 
flexible  (bituminous)  types  of  pavement,  and  the  Plate  Bearing  (or  k  value) 
metliod,   generally  used  for  the  design  of  rigid   (concrete)   types  of  pavement. 

In  container-handling  facilities,  concrete  pavement  should  be  used  for  runways 
on  which  fixed-path  vehicles  such  as  mobile  straddle  cranes  operate  continuously, 
and  elsewhere  when  its  use  results  in  a  minimum  construction  cost.  Bituminous 
pavement  should  be  used  for  economy  in  construction  cost  and  where  concrete 
paving  is  not  required.  The  loads  carried  by  eidier  type  of  pavement  are  such  that 
the  quality  of  pavement,  base  and  subbase  must  be  strictly  controlled.  Details  are 
given  in  tlie  section  on  construction  requirements. 

If,  as  often  happens,  an  intermodal  terminal  is  planned  as  a  temporary  facility 
for  future  expansion,  planners  often  ask  if  a  temporary  pavement  can  be  pro\'ided 
at  minimum  cost.  They  may  not  realize  that  a  pavement  which  is  underdesigned 
for  the  loads  it  carries  is  like  an  engine  subjected  constantly  to  a  load  beyond  its 
rated  capacity.  It  will  soon  fail.  A  heavily  travelled  container-handling  area  must  be 
designed  to  reliable  standards  to  survive  even  a  few  weeks. 

This  was  shown  in  a  container  yard  which  was  served  by  a  mobile  straddle 
crane  travelling  along  a  fixed  path  and  therefore  applying  a  high  frequency  of 
loads.  Based  on  an  evaluation  of  site  conditions,  the  design  thickness  of  the  pave- 
ment structure  was  recommended  as  24  in.  Funds  for  the  project  were  very  restricted 
and  it  was  decided,  over  the  protests  of  the  designer,  to  reduce  the  thickness  to 
15  in. 

The  result  is  shown  in  Photo  6.  The  failure  was  so  serious  that  the  crane 
bogged  down  several  times  and  gravel  was  used  to  fill  the  ruts  formed  by  the  tires. 


Paper   by    F.    L.    Peckover   and    W.    W.    Wong 


541 


Photo    6 — Failure   of   runway   for   straddle   crane   due   to   insufficient  thickness   of   base. 


In  such  cases  it  would  surely  be  better  to  consider  reducing  the  area  rather  than 
tlie  thickness  of  pavement. 


WHEEL   LOADS 

Equipment  wheel  loads  are  distributed  to  pavements  by  tires,  and  tlius  tire 
pressure  is  a  factor  in  pavement  design.  As  the  nature  of  tlie  distribution  of  load 
under  a  tire  is  only  generally  known,  the  average  contact  pressure  over  the  area 
of  contact  is  used  for  design.  Load,  pressure  and  contact  area  are  considered  to  be 
interrelated  by  the  equation: 

P  =  pa 

where  P^  maximum  wheel  load  (pounds) 
))  =  average  tire  pressure  ( pounds ) 
a  =  average  contact  area   ( square  inches ) 

The  values  of  P  and  a  are  usually  estimated  from  manufacturers'  information  relat- 
ing to  load  capacity  and  size  of  tires.  With  P  and  a  known,  the  axerage  tire  pressure 
p  can  be  calculated. 

If  the  ma,\imum  load  is  applied  through  dual  tires,  the  appro.ximatc  equivalent 
single  wheel  load  for  pavement  design  may  be  CvStimated  from  the  equation: 


Pr  =  q  +  q 


d'  +  b' 


542 


Special    Features 


TAPIS  1 — Classification  and  '">esign  Cliaracteristice  of  Soil  Types 


from  referenos  (17) 


where  F«  ^  equivalent  single  wheel  load  ( pounds ) 
q  =  load  on  each  dual  wheel    ( pounds ) 
(Z  z=  total  depth  of  pavement  structure   (inches) 
h  =  clear  distance  between  wheels   ( inches ) 


Major  Divisiom 
(I)                    (2) 

Subdivisions 
(J) 

Value  as  Subgrade 

When  Not  Subject  to 

Ftost  Action 

(4) 

Value  as  Suhbaie 
When  Not  Subirct 
to  Ftost  Action 

(5) 

Value  as  Ba 
»hen  Not  Sub 
to  Frost  Act 

ect 

COARSE- 
GRAINED 
SOILS 

GRAVEL 

AND 

GRAVELLY 

SOILS 

Well-graded  gravels  or  gravel-sand  mix- 
tutes.  little  or  no  Fines 

Excellent 

Excellent 

Good 

Poorly  graded  gravels  or  gravel-sand  mit- 

Good  to  excellent 

Good 

Fair  to  good 

Silty  gravels,  gtavel-sandsilt  miitutes 

Good  to  excellent 

Good 

Fair  to  good 

Good 

F«ir 

Poor  to  not  su 

tabic 

Clayey  gtavels,  gtavel-sand-clay  mixtures 

Good 

Fair 

Poot  to  not  su 

liable 

SAND 

AND 

SANDY 

SOILS 

Tell-graded  sands  or  gravelly  sands, 
little  or  no  Fines 

Good 

Fair  to  good 

Poor 

Poorly  graded  sands  or  gravelly  sands, 
little  or  no  fines 

Fair  to  good 

Fair 

Poor  to  not  su 

liable 

Silty  sands,   sand-silt  mixtures 

F.ir  to  good 

F.ir  to  good 

Poot 

Fair 

Poor  to  fair 

Not  suitable 

Clayey  sands,  sand-clay  mixtures 

Poor  to  fair 

Poor 

Not  suitable 

FINE 

GRAINED 

SOILS 

SILTS 
AND 
CLAYS 
LL   IS 
LESS 
THAN  50 

Inorganic  silts  and  vety  Fine  sands,  rock 
flour,   silty  or  clayey  fine  sands  or  clayey 
silts  with  slight  plasticity 

Poor  to  fair 

Not  suitable 

Not  suitable 

Inorganic  clays  of  low  to  medium  plasticity 
gravelly  clays,  sandy  clays,  silty  clays,  lean 
clays 

Poor  to  fair 

Not  suitable 

Not   suitable 

Organic  silts  and  organic  silt-clays  of 
low  plasticity 

Poor 

Not  suitable 

Not  suitable 

SILTS 
AND 
CLAYS 
LL  IS 
GREATER 
THAN  50 

Inorganic   silts,  micaceous  of  dialomaceous 
fine  sandy  ot  silty  soils,  elastic  silts 

Poor 

Not  suitable 

Not  suitable 

Inorganic  clays  of  high  plasticity,  fat 
clay. 

Poor  to  fair 

Not  suitable 

Not  suitable 

Organic  clays  of  medium  to  high  plasticity. 
Ofganic  silts 

Poor  to  very  poor 

Not   suitable 

Not  suitable 

HIGHLY 
ORGANIC  SOILS 

Peat  and  other  highly  organic  soils 

Not  suitable 

Not  suitable 

Not  suitable 

CALIFORNIA    BEARING    RATIO   TEST 

The  CBR  test  was  developed  as  a  method  of  classifying  soils  and  base  mate- 
rials for  the  support  of  flexible  pavements.  It  is  now  used  as  a  standard  design 
method  by  various  agencies. 

The  test  measures  die  strength  of  a  soil  by  finding  die  unit  load  required  to 
force  a  standard  piston  into  a  prepared  saturated  sample  a  given  distance,  com- 
pared with  a  standard  unit  load  of  1000  psi,  expressed  as  a  percentage  (1).*  CBR 
values  for  all  materials  to  be  placed  under  a  pavement  may  be  found  by  actual 
test  or  estimated  from  an  accurate  classification  of  the  material  (see  Column  12 
of  Table  1). 


"  Numbers   in  brackets   refer  to   references   at   the   end  of  the  paper. 


Paper    by    F.    L.    Peckover    and    W .    W .    Wong 


543 


PoKrnti.l 
Ftosi 
Action 

(7) 

Comptesibility 

•nd 

Expansion 

Drainage 
Characteristics 

(9) 

Compaction  Equipment 
(10^ 

Unit  Dry 

Weigh. 

lb.  per  cu.  ft. 

•  II) 

Typic 

il  Design  Values 

CBR 

(12) 

Subgrade  Modulus 

k 

lb.  per  OI.  in. 

(13) 

None  to 
very  slight 

AIntost  none 

Eicellent 

Oawler-type  tractor,  rubber-tire 
Sleel-.heeled  roller 

d  roller,- 

125-140 

40-80 

300-500 

None  to 
very  slight 

Almost  none 

Eacellent 

Cra*lcr-r>pe  uactor.  rubber-tire 
steel-. heeled  rolle, 

d  roller. 

110-140 

30-60 

300-500 

Slight  to 
medium 

Vety  slight 

Fair  to  poor 

Rubber-tired  roller,   sheepsfoot 
close  control  of  moisture 

roller. 

125145 

40-60 

300-500 

Slight  to 
medium 

Slight 

Poo,  to  prac.i- 
caJly  iropervious 

Rubber-tired  roller,  sheepsfoot 

roller 

115-135 

20-30 

200-500 

Slight  to 
medium 

Slight 

Poo,  to  practi- 
cally  impervious 

Rubber-tired  roller,   sheepsfoot 

roller 

130-145 

20-40 

200-500 

None  to 
very  slight 

Almost  none 

Eicellent 

Cta»lcr-t>pe  tractor,  rubber-tir 

d  roller 

110-130 

20-40 

200-400 

None  to 
»ery  slight 

Almost  none 

Eicellent 

Crawler-type  tractor,  rubber-tlr 

■d  roller 

105-135 

10-40 

150-400 

Slight  to 
high 

Slight  to 
high 

Very  slight 

Fair  to  poo. 

Rubber-tired  roller,  sheepsfoot 
close  control  of  moisture 

roller; 

120-135 

15-40 

150-400 

Slight  to  medium 

Poor  to  practi- 
cally  iropervious 

Rubber-tired  roller,  sheepsfoot 

roller 

100-130 

10-20 

100-300 

Slight  to 
high 

Slight  to  medium 

Poor  to  practi- 
cally impervious 

Rubber-tired  roller,   sheepsfoot 

roller 

100-135 

5-20 

100-300 

Medium  to 
very  high 

Slight  to  medium 

Fair  to  poor 

Rubbel-tired  roller,  sheepsfoot 
close  control  of  moisture 

roller; 

90-130 

15  or 
less 

100-200 

Medium  to 
high 

Medium 

Praciically 
impervious 

Rubber-tired  roller,  sheepsfoot 

roller 

90-130 

15  or 
less 

50-150 

Medium  to 
high 

Medium  to  high 

Poor 

Rubber-tired  rotter,  sheepsfoot 

roller 

90-105 

5  or 
less 

50-100 

Medium  to 
»ery  high 

High 

Fair  ro  poor 

Sheepsfoot  toller,  rubber-tired 

roller 

80-105 

10  oi 
less 

50-100 

Medium 

High 

Practically 
impervious 

Sheepsfoot  roller,  rubber-tired 

roller 

90-115 

15  or 
less 

50-150 

Medium 

High 

PracticaUy 
impervious 

Sheepsfoot  roller.  lubber-tired 

roller 

80-110 

5  or 
less 

25-100 

Slight 

Very  high 

Fair  to  poor 

Compaction  not  practical 

- 

- 

- 

Note:     Coluren  11,  unit  dry  weights  are  for  compacted  soil  at  optimura. 
moisture  content  for  rrodified  AASHO  compaction  effort. 

PLATE    BEARING  TEST 

The  plate  bearing  test  is  used  to  find  k,  modulus  of  subgrade  reaction,  for  the 
design  of  rigid  pavements.  The  test  is  done  using  a  system  of  circular  plates  to 
apply  known  unit  pressures  to  the  subgrade  at  a  predetermined  rate  of  loading  (2). 
The  value  of  k  may  be  calculated  from  the  test  results  for  all  materials  to  be  placed 
under  a  pavement  or  estimated  from  classification  of  tlie  material  (see  Column  13 
of  Table  1). 


SITE   CONDITIONS 

Evaluation  of  ground  conditions  is  an  essential  part  of  the  planning  and  design 
of  pavements.  The  program  of  investigation  depends  on  the  nature  of  the  site,  the 
type  of  pavement  structure  required  and  the  layout  and  size  of  the  project.  Most 
sites  to  be  developed  are  usually  located  in  or  near  an  existing  railway  terminal.  If 
information  from  previous  construction  is  available  and  reliable  it  .should  be  used 
and  supplemented  by  additional  in\t'stigation  as  rcfuiirod.  A  review  of  site  explora- 
tion and  testing  methods  with  lists  of  sources  of  published  information  is  given  in 
reference   ( 3 ) . 


544  Special    Features 


All  materials  should  bo  identified  down  to  a  depth  of  about  10  ft  below  final 
Srade  or  to  dense,  competent  K'ound  above  this  level,  using  test  pits,  auger  borings 
or  other  exploration  methods  (4).  The  level  of  ground  water  should  be  read  in 
each  hole  after  it  has  stabilized.  Spacing  of  holes  may  range  from  100  to  300  ft 
depending  on  the  size  of  project  and  variability  of  ground  conditions.  The  extent 
of  unsvu'table  subsoils  such  as  soft  or  highly  plastic  clay  or  silt,  and  organic  or 
otiier  compressible  layers,  should  be  found.  Table  1  will  help  to  identify  such 
materials. 

It  is  most  important  that  all  soils  materials  be  identified  (5)  and  classified 
according  to  the  unified  soil  classification  system  (6),  as  estimation  of  values  and 
other  important  characteristics  may  depend  on  such  classification.  The  organization 
of  this  classification  system  is  given  in  Columns  1,  2  and  3  of  Table  1.  Moisture 
contents,  plasticity  indices  and  unconfined  compressive  strengths  or  field  vane 
strengths  of  silt  or  clay  soils  may  be  needed  to  help  in  accurate  classification. 

As  the  site  study  proceeds,  longitudinal  and  transverse  soil  profiles  should  be 
prepared  showing  the  zones  of  materials  found  and  ground  water  lexels.  These  pro- 
files are  useful  in  planning  for  grading  and  drainage. 

In  freezing  climates,  frost  depths  may  be  found  from  city  street  departments  ot 
local  utilities. 

DRAINAGE 

Container  terminals  generally  require  wide  and  extensive  areas  with  flat  grades 
Good  surface  drainage  is  obviously  important  to  maintain  good  working  conditions 
and  avoid  deterioration  of  pavement  from  freezing  and  thawing  of  water.  Good  sub- 
surface drainage  is  equally  important  to  minimize  frost  action  and  prevent  satura- 
tion of  the  base  and  subbase  materials.  The  drainage  characteristics  of  various  soil 
types  are  shown  in  Column  9  of  Table  1. 

Saturated  silts  and  fine  sands  create  a  particular  drainage  problem  as,  when 
subjected  to  frequent  traffic  loads,  they  tend  to  become  "quick"  and  lose  strength 
substantially.  A  case  is  known  where  a  runway  designed  for  heavy  aircraft  loadings 
failed  a  few  days  after  it  was  made  available  to  a  contractor  to  haul  gravel  to  a 
nearby  construction  site.  Investigation  showed  that  the  saturated  silt  supporting 
the  pavement  had  failed  due  to  the  high  repetition  of  loads,  even  though  they  were 
relatively  light. 

In  general,  subsurface  drainage  should  be  designed  to  control  the  ground  watel 
level  to  a  depth  well  below  the  bottom  of  pavement  base  and  low  enough  to  avoid 
frost  action  in  the  subgrade  and  subbase. 

Design  of  drainage  systems  for  paved  areas  is  reviewed  in  literature   (7) 

COMPOSITION    OF   PAVEMENT   STRUCTURES 

A  typical  cross  section  of  pavement  structure  is  shown  in  Fig.  1.  The  function 
and  choice  of  materials  for  each  of  the  elements  is  discussed  below. 

Subgrade   Material 

The  subgrade  or  natural  ground  is  the  foundation  of  the  pavement  structure. 
The  comi^etence  of  subgrade  soil  types  and  their  tendency  to  compression  or  swell- 
ing imder  pavements  are  given  in  Colunms  4  and  8  of  Table  1.  Their  tendency  to 
frost  action  is  shown  in  Column  7. 


Paper    by    F.    L.    Peckover    and    W.    W .    Wong 


545 


Surface  Course 


Total  thickness 

of  pavement 

structure 


^   ^-^o    ^fO.-    ^^"^ 


Base  Course  -  select  material, 
compacted 


Subbase  Course  -  less  select 
material, 
connoted 


^-^N^^'-^'v^^^^'vVV^^s^Vj^S.S/^^ 


Subgrade  -  natural  soil  or  fill 


Typical  Cross-Section  of  a  Pavement  Structure 

FIGURE  1 


Soft,  organic  or  other  unsuitable  layers  may  require  excavation  or  the  thick- 
ness of  pavement  structure  must  be  increased  to  compensate  for  their  low  strength. 
The  supporting  strength  of  some  subgrade  soils  may  be  improved  economically  by 
stabilization.  In  any  case,  uniformity  of  tiie  subgrade  bearing  surface  will  be  im- 
proved by  scarifying,  disking  and  thorough  compaction  before  any  overlying  fill  is 
placed.  After  regular  compaction,  proof  rolling  witli  heavy  rubber-tired  rollers  can 
be  used  to  further  increase  the  density  of  subgrade  and  show  tlie  location  of  any 
remaining  unstable  areas    (8). 

Materials  considered  for  fills  between  subgrade  and  subbase  may  be  evaluated 
in  the  same  way  as  subgrade  materials. 

Subbase    Material 

Material  of  a  higher  quality  than  tlie  subgrade  should  be  used  for  a  subbase 
course.  Subbases  are  used  to  replace  imdesirable  subgrade  soils,  provide  a  uniform 
bearing  area  for  rigid  pavements,  prevent  pumping  of  subgrades,  and  give  a  run- 
ning surface  for  construction  equipment. 

Subbase  material  should  have  a  CBR  value  of  at  least  30  when  compacted. 
It  is  often  an  ine.\pensi\e  local  material  such  as  pit-run  gra\el  or  crusher-run  rock. 
In  general  it  should  be  free-draining  and  well  graded.  Colunm  5  in  Table  1  may 
i)e  used  as  a  guide  to  evaluate  subbase  material.  Specifications  of  the  local  city 
roads   or  .state  highway  departments  should  be  used  wherever  practical. 

Design  for  possible  frost  effects  on  subgrade  and  subbase  materials  should  also 
be  based  on  the  practices  of  these  organizations  also. 

Base    Material 

-As  rigid  pavements  distribute  wheel  loads  over  relatively  large  areas  and  re- 
duce the  intensity  of  subgrade  loading,  bases  are  normally  not  used  with  such 
pavements  or  where  a  subbase  meets  base  requirements.  (The  layer  directK-  be- 
neath  a  concrete  pa\XMuent   is   termed   "subbase".) 

Bases  are  composed  of  high  quality  materials.  For  flexible  pavements  tliey 
must    provide   high    structural    strength   to   distribute   wheel    loads.    For   this    reason 


546 


Special    Features 


Photo    7 — Flexible    pavement   failure   due    to   inadequate   base. 

bases  usually  consist  of  well  graded  crushed  gravel,  rock,  slag  or  other  hard,  durable 
materials.  CBR  values  for  bases  should  be  80  to  100.  The  value  of  natural  mate- 
rials as  bases  is  shown  in  Column  6  of  Table  1.  Specifications  for  base  materials 
of  local  road  or  highway  authorities  should  be  used  wherever  practical. 

Use  of  poor  quality  or  insufficient  thickness  of  base  or  subbase  will  result  in 
lack  of  support  which  no  flexible  pavement  can  tolerate.  An  example  of  failure 
from   such    a   cause   is   shown   in   Photo   7. 

If  good  base  materials  are  not  available,  a  full-depth  asphalt  pavement  may 
be   used   instead  of  the  normal   surface   and  base  courses    (9). 

Improved    Materials 

Compaction  requirements  to  achieve  best  strength  for  subgrades,  subbases  and 
bases  are  given  in  the  section  on  construction  re(]uirements. 

Stabilization  by  blending  to  improve  gradation  or  by  the  addition  of  bitumen 
or  cement  to  increase  strength  may  be  economical  to  iniproxe  available  materials 
and  reduce  the  required  thickness  of  pavement  components.  Procedures  are  found 
in  the  literature. 

Surface   Materials 

Surface  courses  are  either  bituminous  or  concrete.  Design  for  the  thickness  of 
surface  courses  with   the   imdcrlying  bases   and  subbases  is  given  below. 


THICKNESS   DESIGN    OF   FLEXIBLE   PAVEMENT   STRUCTURE 

Flexible    pavements    are    designed   by    the    following   procedure.    Examples   are 
given  to  illustrate  use  of  the  design  charts. 


Paper  by  F.  L.  Pecko\'er  and  W.  W.  Wong 


547 


California  Rearing  Ratio  (GBR) 

2                3          4        5      6      7    8    9  10              15         20      25    30        40      50    60  70  80,90  100     | 

n 

r^O-       Minimum  Thickness       ~^ 

-87 

9" 

.«-v  '■', 

k-"""^  ^.^ 

o^i<^ 

^^— 

1  5 

1 

^ 

^ 

■^ 

"^ 

^ 

^ 

^^^ 

^^"^y^^^ 

^ 

^ 

1'°  5 

20  - 

-      oO°^ 

r^ 

^ 

^ 
/■ 

^ 

b^ 

r/ 

^-^ 

^ 

/^ 

/ 

A 

^ 

y" 

:           -P 
0 

-p 

9^ 

> 

^^ 

^ 

/ 

30  - 

'^ 

[>i 

A 

/ 

k 

y. 

^ 

\^ 

;/ 

35  : 

^y] 

y. 

^< 

K 

^ 

'A 

/ 

y 

-  ■'^  i 

r40      ^ 
:            O. 

-45      ch 
:           0 

0 

''  60  :d 

:            E-< 

:           +3 

0 

:   70     Eh 

:  75 

// 

:/ 

Z 

/ 

/ 

>X 

// 

/^ 

/ 

/ 

<.r. 

^'^^ 

// 

/ 

-1 

50  : 

M^ 

y 

/ 

\ 

100  psi  Tire  Inflation 
Pressure 

for 

/W/ 

/ 

Jote  -  Chart  may  be  used 

^ 

tire  pressures  from  80  to 
140  psi. 

J 

70 

80  - 

Flexible  Pavement  Thickness  Design  Chart 
from  reference  (10) 
FIGURE  2 


(a)  From  tests  or  soil  classification,  choose  the  appropriate  CBR  \aliic  for 
the  subgrade  soil  or  fill  on  which  the  pavement  is  to  be  built. 

(b)  Find  the  maximum  single  wheel  load,  or  equi\alent  single  wheel  load 
in  the  case  of  dual  wheel  assemblies,  and  corresponding  tire  pressure  for  the  equip- 
ment considered. 

(c)  For  the  subgrade  CBR  value  and  single  wheel  load,  find  the  required 
total    thickness   of  pavement   structure   from   Fig.   2. 

Example:   Single  wheel  load  =  60,000  lb 
Subgrade  CBR        =  10 
Tire  pressure  =  100  psi 

From  Fig.  2,  total  thickness  of  pavement  structure  =:  23  in. 


548  Special    Features 


(d)  Find  tlu'  c()iiil)iiK'd  thickness  ot  snifacc  and  base  courses  rcciuired  from 
Fig.  2  iisinfj;  an  assumed  or  esliniated  C]\U\  \alue  for  the  subbase  material  to  be 
used. 

Example:   Single  wheel  load  =60,000  lb 

Compacted   subbase   CBR  =  30 
Tire  pressure  =100  psi 

From    Fig.    2,    combined    thickness    of   surface    and   base    courses 
=  11  in. 

The  thickness  of  base  course  alone  usually  varies  from  6  to  9  in  depending  on 
load  conditions  and  the  quality  of  the  base  material.  The  surface  course  for  flexible 
pavements  is  normally  asphaltic  concrete,  design  requirements  for  which  are  given 
in  reference  (11).  In  the  example,  the  surface  course  should  be  of  5  in  thickness 
if  the  load  application  is  concentrated  and  the  CBR  value  of  the  base  material  is  60. 

(e)  Find  the  daickness  of  subbase  required  by  subtracting  the  total  thickness 
of  pavement  structure  from  step  (c)  from  the  combined  thickness  of  surface  and 
base  courses  from  step  (d). 

Example:   Thickness  of  subbase  ^  23  in  —  11  in  :=  12  in. 

(f)  Pavement  structure  required  for  the  example  chosen  will  therefore  con- 
sist of: 

Asphaltic  concrete 
Base  course 
Subbase  course 

Total   thickness   of  pavement  structure  23  in 

The  designer  should  repeat  steps  (d)  to  (f)  for  available  base  and  subbase  ma- 
terials to  achieve  the  most  economical  combination  of  thicknesses. 

Major  changes  in  CBR  values  of  subgrade  soils  over  the  site  may  call  for 
varying  the  design  thickness  of  the  jDavement  structure.  However,  it  is  usually  more 
practical  to  assume  a  single  CBR  value  throughout.  Where  differences  in  loading 
occur  over  short  distances,  all  the  pavement  area  must  be  built  to  die  standard 
required  for  the  heaviest  loads  if  an  irregular  surface  is  to  be  avoided.  This  condi- 
tion occurs,  for  instance,  where  containers  are  stacked  in  rows  and  the  handling 
vehicles  follow  paths  between  them  as  in  Photo  8. 

The  selection  of  design  thickness  should  be  checked  against  requirements  for 
frost  action.  The  consequences  of  frost  action  are  deformation  or  heave,  and  reduced 
subgrade  bearing  strength  during  spring  breakup.  The  pavement  thickness  require- 
ments for  tliese  conditions  are  given  in  reference  ( 12 ) .  Requirements  for  die  worst 
condition  should  be  adopted  as  the  final  design.  However,  the  assumptions  of  the 
design  charts  should  be  studied  to  avoid  overdesigning. 

When  terminals  are  planned  as  temporary  facilities  with  future  expansion  and 
development  to  be  taken  into  account,  the  flexible  pavement  structure  may  be 
designed  so  that  a  permanent  surface  course  may  be  added  later  when  required. 
A  layer  of  2  to  4  in  of  fine  crusher-run  material  of  good  durability  or  stabilized 
soil  cement  may  be  used  for  temporary  surfacing.  This  type  of  surface  cannot  be 
considered,  of  course,  where  loads  are  applied  on  concentrated  paths  or  where 
storage  of  containers  in  fixed  locations  requires  markings  on  a  pavement.  An  ex- 
ample of  a  successful  application  of  diis  kind  is  shown  in  Photo  9.   Maintenance 


5 

in 

6 

m 

12 

in 

Paper    by   F.    L.    Peckover    and    W.    W.    Wong  549 


I  ( 


Photo   8 — DifFerential   loading  conditions  on  pavements  where  containers  are  stacked. 


Photo    9 — Temporary    surfacing    of   well    compacted    graded    crushed    stone    in    container   yard. 


550  Special    Features 


is  required  with  temporary  surfaces.  Dust  control  and  surface  conditioning  by 
periodic  applications  of  road  oil,  and  yradinji  to  keep  a  flat  operating  surface  are 
both  advisable. 

THICKNESS    DESIGN    OF   RIGID    PAVEMENT   STRUCTURE 

Concrete  slabs  are  used  for  rigid  pa\euients,  designed  by  the  following  proce- 
dure. Examples  are  shown  to  illustrate  the  use  of  design  charts. 

(a)  From  field  bearing  tests  or  soil  classification,  find  the  appropriate  k  value 
of  the  subgrade  soil  or  fill  on  which  the  pavement  is  to  be  built. 

(b)  Find  the  maximum  single  wheel  load  and  corresponding  tire  pressure  as 
in  step  (b)  for  the  design  of  flexible  pavements. 

(c)  Assume  a  concrete  28-day  flexural  strength.  Increase  this  strength  by  10 
percent  to  represent  a  3-month  strength  increase  in  the  concrete  before  use.  Apply 
a  factor  of  safety  of  1.5  to  obtain  the  design  strength. 

Example:   Concrete,  28  day  flexural  strength  =  520  psi 

3-month  flexural  strengtli  =  570  psi 

Design  flexural  strength  with  F.S.  of  1.5    =  380  psi 

(d)  Find  the  approximate  k  value  for  tlie  surface  of  subbase  material,  having 
regard  for  the  influence  of  subgrade  support.  This  may  be  done  by  plate-bearing 
tests  on  a  prepared  base  of  approximately  tlie  design  thickness  laid  on  subgrade, 
or  by  estimating  approximately  from  the  k  value  for  subgrade  by  Fig.  3. 

Example:  Thickness  of  subbase        =  10  in  (assmned) 
Subgrade  k  value  =  140  lb  per  cu  in 

Top  of  subbase  k  value  =  200  lb  per  cu  in 

(e)  Find  the  thickness  of  concrete  slab  required  from  Fig.  4,  entering  with 
the  concrete  flexural  strength  and  applying  in  succession  the  k  value  for  subbase, 
wheel  load  and  tire  pressure. 

Example:   Design  concrete  flexural  strength       =380  psi 

Compacted  subbase  k  value  =  200  lb  per  cu  in 

Maximum  single  wheel  load  =  60,000  lb 

Tire  pressure  =  100  psi 

Thickness  of  concrete  slab  required  =  12.6  in,  say  13  in 

(f)  Pavement  structure  required  for  the  example  chosen  will  therefore  con- 
sist of: 

Concrete  slab  =  13  in 

Subbase  course  =  10  in   (assumed) 


Total  thickness  of  pavement  structure  =  23  in 

Alternate  designs  should  be  compared.  The  designer  must  balance  out  die 
thicknesses  of  concrete  slab  and  subbase  to  achieve  the  most  economical  section. 
If  there  are  major  variations  in  k  values  for  the  subgrade  soils  over  the  site,  it  may 
be  advantageous  to  increase  the  depth  or  quality  of  subbase  material  to  achieve 
the  minimum  thickness  of  concrete  slab  required.  It  is  sometimes  advisable  to  as- 
sume a  thickness  of  concrete  slab  and  design  in  the  reverse  order  to  find  the  strength 
of  concrete  needed.  Where  frost  action  is  a  design  factor,  the  approach  should  be 
similar  to  that  described  for  flexible  pavements. 


Paper    by   F.    L.    Feckover   and    W.    W.    Wong 551 


.£      200 


a. 


«       100 


o 
Xi 

Z3 


4  6  8 

Thickness  of  subbQse,(in.) 


Effect  of  Subbase  Thickness  On  k  Value 
from  reference  (13  ) 

FIGURE  3 


552 


Special    Features 


Rigid  Pavement  Thickness  Design  Chart 

£=  4,000,000  psi. 

.yU,   =0.15 
from  reference  (13) 
FIGURE  4 


Paper   by    F.    L.    Peckover    and    W.    W .    Wong 553 

The  structural  design  of  concrete  slabs,  including  concrete  mix,  reinforcing, 
contraction  joints  and  other  details  should  be  done  according  to  standard  practice 
(14).   Keyed  and  dowelled  joints  should  always  be  used. 

PAVEMENT   SURFACES 

The  surface  of  rigid  pavement  is  generally  not  affected  by  concentrated  appli- 
cations of  load  from  tires  and  containers.  However,  depending  on  the  type  and 
compactness  of  asphalt  concrete,  flexible  pavement  can  be  locally  damaged  by  load 
concentrations.  Sources  of  such  damage  and  means  of  avoiding  it  are  discussed 
below. 

Tire    Imprinting    and   Tearing 

In  hot  weatlier  tire  imprints  can  develop  in  a  bituminous  surface  as  shown  in 
Photo  10.  Heavily  loaded  lugged  tires  can  also  damage  flexible  surfaces  if  pivoted 
while  stationary,  tearing  the  pavement  as  in  Photo  11. 

An  obvious  way  to  avoid  damage  by  tearing  is  to  specify  the  use  of  relatively 
smooth  aircraft-type  tires  on  all  vehicle  wheels  which  turn  sharply.  However,  both 
types  of  damage  can  be  avoided  by  using  asphalt  concrete  with  a  very  high  sta- 
bility and  densely  graded  aggregate.  The  type  of  pavement  surface  suited  to  the 
traffic  and  climatic  conditions  for  a  particular  location  should  be  chosen  with 
specialist  advice. 

Trailer   Dolly   Wheel    Imprints 

Steel  dolly  wheels  on  truck  trailers  (Photo  12)  exerts  a  very  high  unit  load 
on  pavements.  A  prohibitively  high  quality  of  bituminous  pavement  is  required  to 
resist  this  type  of  load  witliout  deformation.  Concrete  slabs  are  sometimes  built 
parallel  to  loading  platfonns  to  support  the  dolly  wheels.  As  Photo  13  shows  by 
the  damage  in  the  foreground,  this  is  not  always  a  successful  solution  to  the  prob- 
lem. A  better  long-term  solution  is  to  replace  all  dolly  wheels  with  steel  pads  as 
now  used  on  many  trailers  (Photo  14).  These  pads  distribute  loads  to  a  normal 
pavement  witiiout  damage. 

Punching    Damage    from    Container   Corner   Posts 

Another  source  of  local  damage  to  bituminous  pavements  is  from  corner  posts 
of  containers  which  protrude  about  1  in  below  die  bottom  sills  of  the  box  (Photo 
15).  In  stacks  of  loaded  containers,  as  much  as  20,000  lb  or  more  may  be  carried 
on  one  post  with  irresistible  punching  force  for  any  asphalt  pavement.  Damage 
caused  to  pavement  is  noticeable  (Photo  16)  but  has  little  actual  effect  on  tlie 
traffic  or  container.  Containers  resting  on  their  sills  are  not  banned  by  small 
irregularities  in  pavement  surface.  Pavement  damage  could  be  avoided  by  providing 
a  cotnplete  concrete  surface  or  concrete  pads  along  the  lines  of  imprints.  How- 
ever the  latter  alternative  is  not  recommended  as  it  would  result  in  a  composite 
pavement  surface  leading  to  roughness  under  traffic — a  problem  worse  than  the 
original. 

The  best  long-term  hope  is  that  containers  may  be  built  with  the  corner  posts 
extended  on  top  rather  than  on  the  bottom,  a  detail  which  should  be  brought  to 
the  attention  of  equipment  manufacturers. 

(Text  continued  on  page  557) 


554 


Special    Features 


Photo    10 — Tire   imprint   on   flexible   pavement  surface. 


Photo    11 — Tearing    of   flexible   pavement   by  pivoting   of  loaded  tires. 


Paper   by    F.    L.    Peckover    and    W .    W .    Wong 555 


Photo    1 2 — Steel    dolly  wheels   on   truck   trailer. 


Photo    13 — Damage   to   asphalt  due   to   dolly   wheels   on   trailers. 


556 


Special    Features 


Photo    14 — Pads   on    truck   trailer,    not   harmful   to   flexible   pavement. 


Photo    1  5 — Imprints    of    container   corner   posts    in   flexible   pavement. 


Paper  by  F.  L.  Peckover  and  W.  W.  Wong 


557 


Photo    1 6 — Damage   to   bituminous    pavement   from    rows   of  stacked   containers. 

Damage   to   Tires   from    Pavement   Roughness 

Concrete  paxements  can  cause  excessixe  wear  to  tlie  rubber  tires  of  container- 
handling  vehicles  if  two  precautions  are  not  observed: 

(a)  Concrete  paxement  through  trafficked  areas  should  have  a  smoothed  fin- 
ish;  and 

(b)  At  locations  where  mobile  straddle  cranes  and  similar  equipment  change 
direction  by  pi\oting  their  wheels,  concrete  slabs  with  a  polished  surface  should 
be  provided. 


CONSTRUCTION    REQUIREMENTS 

The  performance  of  a  pa\ement  structure  depends  to  a  great  extent  on  the 
quality  and  condition  of  the  materials  used  and  the  construction  procedures.  All 
materials  and  procedures  should  conform  in  all  respects  to  the  specified  require- 
ments. An  experienced  consulting  or  testing  firm  can  assist  in  ensuring  this  by 
control  inspection  and  testing  during  construction. 

Requirements  for  the  compaction  of  subgrades,  subbases  and  bases  are  gi\en 
in  Table  2. 

Bituminous  surfaces  should  be  compacted  to  a  miniuunn  of  100%  of  the  labora- 
tory Marshall  method  compaction.  The  quality  of  bituminous  surfacing  material  and 
the  placement  and  compaction  operations  must  be  strictly  controlled  to  good 
standards   (15). 

Concrete  surfacing  material  should  be  placed  and  cured  in  strict  accordance 
with  good  standards   (16) 


558  Special   Fea t ures 


Table  2 
Compaction  Requirements  for  3ubg;rades.  Subbases  and  Bases 


Pavement  Component   Required  Minimum   Notes 

%   of  Modified 
Proctor  Density 


Subgrade: 

coarse  grained 

100 

fine  grained 

95 

Subbase  and  base 

100 

courses 

95 

96 

:  -  98 

Compact  all  areas  to 
be  filled.   In  cut 
areas,  compact  surface 
exposed  after  excavation. 

For  flexible  pavements 
where  traffic  is  channelled 
as  in  stacked  container 
storage  areas. 

For  flexible  pavements 
where  traffic  is  random. 

For  rigid  pavements. 


Notes: 


-  Establish  water  content  for  compaction  from  moisture- 
density  tests  to  provide  highest  compacted  strength. 

-  Exercise  strict  control  of  lift  thickness,  water  content 
and  uniformity  of  rolling. 

-  Lift  thickness  is  generally  8  in  before  compaction. 

-  Use  compaction  rollers  of  type  depending  on  material. 
Refer  to  Column  10  of  Table' 1. 

-  As  layers  are  placed,  increase  compaction  load  and 
contact  pressure  up  to  those  expected  on  pavement  in 
service . 


Where  a  pavement  surface  is  rigidly  supported  locally  by  structural  or  utility 
components,  adjacent  areas  must  be  designed  with  transition  zones  so  that  an  ir- 
regular surface  will  not  form.  Photo  17  shows  how  the  stiff  foundation  for  a  crane 
rail  is  starting  to  cause  differential  levels  in  a  pavement  surface.  Photo  18  shows 
where  a  manhole  is  creating  a  bump,  aggravated  by  the  concentration  of  traffic. 

CONCLUSION 

The  steps  required  to  design  pavements  for  container  and  ti^ailer  handling 
areas  have  been  reviewed.  The  work  falls  into  two  phases:  (a)  site  and  material 
evaluation  and  recommendation  of  design  values,  and    (b)   the  actual  design. 

It  is  advisable  to  have  phase  (a)  done  with  the  help  of  a  consultant  experi- 
enced in  pavement  design  because  of  the  judgment  and  test  facilities  required. 
Phase  (b)  may  be  done  by  railway  engineers  using  tlie  information  and  references 
in  this  paper. 

Good  design,  specifications  and  quality  of  construction  in  all  details  are  essen- 
tial to  assure  that  performance  of  pavements  for  container  handling  areas  will  be 
satisfactory. 


P  a  p  e  r    by    F  .    L  .    P  e  c  k  o  \'  e  r    and    W.W.Wong  559 


Photo    17 — Cracking    due    to    ditferential    support    along    crane    rail. 


560 


Special   Features 


Photo    1 8 — Uneven    running    surface   due    to   differential    support. 


REFERENCES 

( 1 )  ASTM  D  1883,  Test  for  bearing  ratio  of  laboratory-compacted  soils. 

(2)  ASTM  D  1195,  Repetitive  static  plate  load  tests  of  soils  and  flexible  pave- 
ment components,  for  use  in  evaluation  and  design  of  airport  and  highway 
pavements. 

(3)  Roadbed,  revised  Part  1,  Chapter  1,  AREA  Manual,  published  for  comment 
in  AREA  Bulletin  631,  pp  253-290,  Jan-Feb  1971. 

(4)  ASTM  D  420T,  Recommended  practice  for  investigating  and  sampling  soils 
and  rock  for  engineering  purposes. 

(5)  ASTM  D  2488T,  Recommended  practice  for  description  of  soils  (visual- 
manual  procedure). 

(6)  ASTM   D   2487T,   Method  for  classification  of  soils  for  engineering  purposes. 

(7)  King,  H.  W.  and  E.  F.  Brater,  Handbook  of  hydraulics,  McGraw-Hill  Book 
Co  Inc,  New  York,  4di  ed,  1963. 

NAVFAC   Design  Manual  DM21,   Airfield  pavements,  Washington,   1963. 

(8)  Asphalt  pavements  for  airports.  Appendix  B,  Manual  Ser  No  11,  Asphalt  Inst, 
College  Park,  Md,   1st  ed,  June  1963. 

(9)  Thickness  design — Full-depth  asphalt  pavement  structures  for  highways  and 
streets.   Manual   Ser  No   1,   Asphalt  Inst,  College  Park,   Md,  Dec   1969. 

(10)  Asphalt    pavements    for    airports,    Manual    Ser    No    11,    Asphalt    Inst,    College 
Park,  Md,  1st  ed,  June  1963. 

(11)  Mix    design   methods   for   asphalt   concrete,    Manual   Ser   No   2,   Asphalt   Inst, 
College  Park,  Md,  2nd  ed.  May  1963. 

(12)  Yoder,   E.  J.,   Principles  of  pavement  design,  Wiley  &  Sons  Inc,  New  York, 
1959. 


Paper   by    F.    L.    Peckover    a^id^VV  7  W .    Wong 


561 


(13)  Design  of  concrete  airport  pavements,  Portland  Cement  Assoc    Chicago    1955 

(14)  Concrete  pavement  design,  Portland  Cement  Assoc,  Chicago. 

(15)  Specifications    and    construction    methods    for    asphalt    concrete     Specification 
Ser  No  1,  Asphalt  Inst,  College  Park,  Md,  3rd  ed,  June  1964. 

(16)  Concrete    pavement    construction:     Inspection    at    the    pax  ing    site     Portland 
Cement  Assoc,  Chicago,   1967, 

(17)  NAVFAC  Design  Manual  DM5,  Civil  engineering.  Chap.  4— Pavements   Wash- 
ington, Jan  1969. 


562  Special    Features 

PANEL  DISCUSSION- 
PRACTICAL  APPLICATIONS  OF  SYSTEMS  ENGINEERING 
ON  THE  RAILROADS 


Track  Charts 
72-633-6 

By   DAVID    L    GLICKSTEIN 

Manager — Engineering    Systems    Developmenl 

Penn    Central    Transportation    Company 

I  am  sure  that  you  are  all  faced  with  the  annual  problem  of  updating  your 
track  charts  to  reflect  last  years  program  work  and  the  work  proposed  for  the 
coming  maintenance  season.  On  Penn  Central  our  problem  was  complicated  by  two 
factors.  First,  the  size  of  our  system  makes  chart  preparation  and  updating  a  time- 
consuming  process.  Second,  the  track  charts  of  each  of  the  three  former  properties 
had  their  own  unique  foniiat.  We  decided  to  make  a  new  unifonn  track  chart 
using  the  best  of  the  three  former  charts.  At  tlie  same  time  we  decided  tliat  prepara- 
tion and  update  time  could  be  greatly  reduced  by  using  the  computer  to  prepare 
the  maintenance  portion  of  the  track  chart.  .,  1 1         i 

In  order  to  implement  tliis  system  we  had  to  collect  information  available  only 
from  the  field.  We  brought  in  the  office  engineers  to  acquaint  them  with  ^e  objec- 
tives of  the  project,  and  to  give  them  instruction  in  preparation  of  tlie  data  they 
would  be  required  to  furnish.  Upon  returning  to  their  respective  territories,  the  office 
engineers  put  their  track  condition  data  onto  the  coding  sheet  shown  m  fig.   1. 
These  coding  sheets  were  then  sent  to  Philadelphia  for  verification  and  keypunchmg. 
The  verified  data  in  punched  card  form  were  loaded  into  the  IBM  1130  computer 
along  with  the  proposed  work  for  tlie  coming  season.  The  bar  portion  of  the  track 
chart  was  drawn  complete  by  the  Calcomp  Plotter  which  we  have  attached  to  our 
1130    The  strip  map  portion  of  the  chart  is  attached  to  the  appropriate  computer 
drawn  page  and  the  resulting  complete  chart  is  sent  to  tlie  printer.  Our  track  charts 
are  drawn  to  a  scale  of  one  mile  to  the  inch.  Each  individual  chart     Fig.  2)  repre- 
sents a  ten-mile  section  of  railroad.  As  you  can  see,  the  track  condition  is  at  the 
top  of  the  page  with  each  track  shown.  The  strip  map  of  the  track  layout  for  that 
section  is  at  the  bottom  of  the  page.  The  title  box  at  the  right  shows  the  division 
and  tlie  territory  covered  by  the  chart.  Proposed  program  work  for  the  coming  sea- 
son is  indicated  by  a  dashed  line  in  tlie  appropriate  column.  We  presently  have 
this  type  of  track  maintenance  chart  for  all  Penn  Central  main  and  branch  line  track. 
Our  system  is  represented  by  2300  sheets  grouped  into  24  maintenance  divisions. 
Each  year  the  division  offices  need  only  to  submit  their  proposed  maintenance  pro- 
gram and  updated  strip  maps  to  the  system  office.  The  sheets  that  have  program 
work  and  the  sheets  that  have  completed  work  for  the  previous  year  are  predrawn 
by  the  computer.  The  process  in  system  headquarters  takes  about  3  man-months 
and  40  computer-hours  to  complete.  This  procedure  has  resulted  in  a  cost  sayings 
of  nearly  90%  over  what  it  would  have  cost  to  have  our  draftsmen  produce  these 
charts  manually. 

'         Note — Discussion    open    until    October    15,    1971. 


Remarks    by    David    L.    Glickstein 


563 


3000 

P! 

<>• 

r~  ^ 

M 

^v 

<^ 

rJ 

uaawnN 

j: 

ri 

M  n 

ro 

frt 

n 

rn 

r« 

2 

o 

^    «> 

>» 

o 

o 

o 

o 

$ 

o 

o 

o 

o 

o 

o 

o 

o 

3Nn 

a 

-^ 

^ 

^ 

^ 

- 

- 

~ 

- 

s 

0 

0 

o 

o 

o 

o 

0 

o 

NOISIAIQ 

l£ 

N 

(M 

N 

rx 

rJ 

rJ 

rJ 

rJ 

NOI93y 

S 

^ 

^ 

~ 

~ 

— 

- 

^ 

V 

o 

s 

o 

o 
d 

s 

\^ 

is 

■^ 

2 
O 
1- 
o 
z 
o 
o 

6 

0- 

!    1 

s 

>« 

o 

1- 

s 

1 

1 

- 

!  ■ 

- 

-^ 

- 

18 

UJ 

s 

K 

0 

o 

O 

K 

o 

1 

0» 

i  a 

o 
o 

S 

c^ 

1 

(M 

f^ 

s 

■~, 

I 

~. 

_ 

z 
o 
(- 
o 
z 
o 
o 

o 

r- 

•5 

V 

i/i 

rJ 

Q. 

o 
a: 
u. 

^ 

\fl 

5 

1 

- 

Tf 

o 

si- 

UJ 

^ 
^ 

o- 

o 

t^ 

O 

5 

oo 

o 

o» 

13- 

■^ 

rJ 

rt 

oi 

rO 

^ 

— 

•~-l  — 

— 

z 
o 

o 

z 
o 
o 

V 

^ 

UJ 

^ 

n 

— 

« 

.N. 

m 

v- 

r- 

^ 

h- 

in 

1 

s 

-^ 

o 

s 

<d- 

UJ 

-I 
2 

T 

\j\      ]  cT 

^ 

>/) 

k! 

•*!       .»- 

V* 

d- 

lo 

rJ         M 

^l 

rJ 

s 

-^        — 

z 
o 

1- 

Q 

2 

o 
o 

8 

-^1          0. 

0- 

-^ 

S 

-1      j  r~ 

NS 

>o 

o 

^^ 

\  ^-o 

v9 

■* 

O 

!y 

'     ] 

^ 

UJ 

-J 

5 

Oo 

n 

> 

rt 

o 

<r 

^      nO 

qI«^| 

(^ 

pJ      j  nI  o) 

r^ 

.vJ 

- 

z 
o 
(- 
o 
z 
o 
o 

j     i       w 

0- 

It 

_j 

r;; 

i^ 

J) 

«- 

— 

^ 

1 

1  * 

i! 

^ 

- 

UJ 

1 

■~ 

O^fft  l/> 

0-  — 

O 

0 

cO 

«i  «« T  o 

t^ 

O 

0 

j^J 

(0 

CO 

(v/i  M 

CO 

(^ 

(^ 

= 

—   ^ 

_.  _ 

— 

z 
o 

1- 

Q 

z 
o 
o 

o 

---,   !_*-i.v». 

? 

? 

^      r\^ 

^ 

■ 

Vj 

xS 

1 

1 

2 
O 
O 
UJ 

o 

^ 

s4^ 

UJ 

•<T 

o 

a 

« 

o 

O 

o 

o 

0 

n 

6i  o    o 

o 

Q 

(» 

O 

o 

~ 

OJ  rJ    rJ 

oJ 

<M 

csj    oi 

rJ 

_ 

- 

- 

— 

-~ 

—    ~ 

_ 

1 

564 


S  p  ecial    Features 


INOING 


esm 


nw 


^ — h-.7-|— — =^ 


^^ 


i^ 


5^      M'n  /  /  /  n  /  /  /  n  /  n  J  /  /  /  AQ-szJ  /  /  /  /  /  m 


^\ny'm^. 


^ 


-&4-U)-- 


CING 


g 


66  ,IS7E 


I     69      I 


[ffffs 


-46. 


ra-si      I  \ii-^i\ij / n / n / n / 1 n / / / n / / n / n / 1 


Ik 


WgF 


^ 


69P 


40-44C 


ai-^^  K31-69/I 


mz 


fr^T^ 


CLEBN 


Fig.    2 


Remarks    by    David    L.    Glickst  e  i  n 


565 


TTTTi 


67(11 


1       I 


S^ 


~r~s^ 


■  J  1  J  I  n  /  /  )  )\/  /  40-66/  \/  J  40-69^  /\/  J  J  J  n  )  J  //J  /  J  /  40-66/  U  U  /  /  /  JTT7-7 


35e: 


_fia_ 


_&a_ 


/ 1  /  n  /  n  /  Aii-'Xi/  n  n  n  n  n  /  n  n  /  n  /  /  /  /  n  /  n  n  n n  /  n  n  40-5g 


1 

1               1 

1 

1 

1 

64J         1 

68A 

-- 

62 

]   66   i 

1 

31-43 

1  40-65  1 

1 

1 

003 


002 


001 


o 

(NJ 


O 
CO 


Q- 

2= 

I 

O 


■y- 


i- 


4-         ?.'    . 


r^?i 


t 


<^  ^  <^  <*>  <^ 


)V 


Q_ 


en 
ex 


566  Special    Features 


Systems  Engineering  on  a   Small   Railroad 
72-633-7 

By   R.    B.    SLIEPKA 

Designer 

Elgin,    Joliet   &    Eastern    Railway 

Systems  techniques  are  characterized  by  breaking  down  a  problem  into  its  basic 
components — yes  or  no,  plus  or  minus — and  analyzing  each  yes  or  no  to  determine 
its  effect  on  its  neighbor  and  on  the  total  problem.  These  techniques  can  be  adapted 
to  a  small  railroad.  The  scope  of  ijroblems  on  a  small  railroad  is  certainly  of  less 
magnitude  than  on  a  large  road.  Therefore,  analyzing  the  problems  is  simplified  and 
the  techniques  are  even  more  effective. 

The  EJ&E  Railway  had  a  problem  on  which  a  systems  approach  was  taken. 
The  Gary  Division  track  forces  construct  and  maintain  track  facilities  in  Kirk  Yard, 
Gary  Mill,  and  South  Chicago  Mill.  This  represents  some  of  tlie  most  unusual  and 
difficult  track  locations  and  conditions  experienced  in  the  industry.  The  Kirk  Yard — 
Gary  Mill  area  has  over  3,000  switches  to  be  maintained  and  the  mill  itself  is  the 
largest  integrated  steel  plant  in  tlie  world. 

Mill  operations  are  entirely  dependent  upon  car  movement  and  a  rigorous 
schedule  must  be  met  in  spite  of  emergencies.  Derailments,  hot  metal  spills,  coke 
spills,  slag  spills,  burnouts,  dropped  molds,  dropped  ingots,  and  snow  storms  repre- 
sent some  of  the  emergencies  faced  in  both  mills.  Also,  tracks  must  be  constructed 
and  maintained  in  such  surroundings  as  high  lines,  blast  furnaces,  open  hearth  fur- 
naces, B.O.P.  shops,  strippers,  mold  yards,  soaking  pits,  finishing  mills,  and  the 
coke  plant.  The  Gary  Mill  has  approximately  800  road  crossings  and  the  track  is 
filled  to  the  top  of  tlie  rail  with  dirt  in  many  locations.  Clearances,  lighting,  drain- 
age, and  high  traffic  density  add  to  the  problems. 

New  track  construction  projects  also  put  a  heavy  load  on  track  department 
forces.  In  1971  a  new  basic  oxygen  steel  facility  project  is  starting,  including  37,000 
ft  of  new  track,  130  new  turnouts,  removal  of  29,000  ft  of  track  and  removal  of 
62  turnouts.  Mill  operations  also  require  minor  track  changes  on  a  continuous  basis. 
Such  work  as  installation  of  derails,  bumping  posts,  and  wheel  stops  is  common,  as 
well  as  track  shortening,  lengthening,  raising,  lowering  and  alignment  changes.  All 
of  these  unusual  operations  and  locations  require  a  capacity  for  quick  reaction  to 
emergencies  without  parallel  in  other  areas  of  the  railroad  industry.  Thus,  flexibility 
is  a  prime  consideration  in  all  phases  of  a  new  system  for  this  application. 

To  design  the  system,  the  chief  engineer  took  engineering  supervisory  personnel 
and  made  them  his  systems  team  with  the  responsibility  of  learning  basic  techniques 
and  leading  the  development  of  the  program. 

Wliere  do  you  start  on  a  program  of  tliis  type?  Where  there  is  an  obvious 
need  and  where  tangible  results  can  be  realistically  expected.  On  this  road  a  break- 
tlirough  project  was  developed,  using  the  systems  engineer  and  tlie  existing  super- 
visory team.  This  initial  project  involved  planning  and  scheduling  all  track  main- 
tenance and  construction  work  on  one  division.  It  was  necessary  to  analyze  the  exist- 
ing operation,  and  from  that:  establish  objectives  based  on  a  desirable  level  of  main- 
tenance; establish  quality  control  procedures  and  a  priority  system;  completely  inte- 


Note — Discussion  open  until   October   15,    1971. 


Remarks    by    R.    B.    Sliepka 567 

grate  work  and  gang  procedures  in  order  that  each  unit  could  consistently  work  at  an 
optimum  rate;  develop  a  simple  realistic  scheduling  system;  develop  a  material  man- 
agement system;  and  develop  simple  controls  based  on  exception  reporting.  The  sys- 
tem was  designed  to  streamline  and  modernize  all  phases  of  track  work  tlirough  a 
systems  approach  and  in  a  manner  consistent  with  company  and  department 
objectives. 

This  system  was  developed  and  was  operating  in  less  tlian  one  year  after  the 
idea  was  conceived  and  has  now  been  in  operation  for  three  years.  This  system  is 
manual,  yet  is  is  totally  integrated  and  adaptable  to  computerization  and  will  be 
computerized  in  stages.  At  this  time,  the  material  management  portion  is  computerized. 

The  people  who  developed  this  maintenance  of  way  system  are  now  operating 
it  very  effectively.  The  additional  benefits  derived  from  tlie  knowledge  gained  and 
discipline  imposed  through  development  of  the  system  are  difficult  to  measure. 

The  organization  which  has  been  designed  to  control  Track  Department  opera- 
tions has  the  advantages  of  both  specialization  and  flexibility.  The  Department  is 
divided  into  three  major  functions:  Quality  Control,  Mechanized  Operations,  and 
General  Maintenance.  The  Quality  Control  group  makes  and  documents  all  formal 
inspections  including  derailments,  long-term  maintenance,  current  maintenance, 
industry-owned  track,  and  quality  control  inspection  of  completed  work.  This  group 
also  makes  high-frequecy  inspections  of  all  turnouts  for  derailment  prevention.  The 
Quality  Control  group  also  schedules  and  supervises  the  work  of  the  scheduled 
current  maintenance  forces. 

The  Mechanized  Operations  section  is  responsible  for  the  supervision  of  mech- 
anized steel  gangs,  mechanized  tie  gangs,  surfacing  operations  and  cleaning  opera- 
tions. Normally  this  will  include  construction  forces,  except  where  large-scale  projects 
require  additional  supervision. 

The  General  Maintenance  section  supervises  the  repair  of  track  damage  and 
other  emergency  conditions  which  are  not  formally  scheduled  by  the  other  sections. 
This  includes  complaints  regarding  track  conditions  from  the  Transportation  Depart- 
ment and  customers. 

Scheduling  of  work  is  accomplished  in  two  major  areas:  long-term  maintenance 
(rail  turnout,  cross  tie,  and  switch  tie  renewals),  and  current  maintenance.  The  long- 
term  work  is  accomplished  by  the  Mechanized  Operations  section  of  the  organiza- 
tion and  the  Quality  Control  section  supervises  the  scheduled  current  maintenance 
work. 

Both  schedules  depend  upon  written  inspection  notes  from  the  Quality  Control 
section.  The  long-term  work  is  scheduled  by  the  calendar  month,  with  the  printed 
schedule  being  produced  approximately  two  weeks  prior  to  the  first  of  the  month 
being  scheduled.  All  mechanized  work  is  scheduled  on  a  "schedugraph  board" 
which  is  kept  in  the  control  center  at  Kirk  Yard.  The  mechanics  of  the  board  pro- 
vide for  a  visual  display  of  work  completions,  work  progress  of  the  current  month, 
status  of  scheduled  work  for  the  calendar  year,  work  remaining  for  the  calendar 
year,  and  inventory  of  major  material  items. 

Current  maintenance  work  is  scheduled  one  day  in  advance  and  in  one-man-day 
increments.  The  scheduling  is  done  on  a  magnetic  quick-change  display  board  which 
is  also  kept  in  the  control  center.  The  display  board  gives  a  visual  account  of  work 
completions  for  the  current  and  past  month. 

The  control  center  is  located  in  the  annex  building  at  Kirk  Yard.  The  center  is 
marmed  24  hours  a  day  by  a  clerical  staff  and  is  equipped  with  a  maintenance  of 
way  radio  console.  All  incoming  emergency  calls  are  directed  to  the  control  center 

Bui.  633 


568 Special    Features 


where  they  are  logged,  and  work  forces  are  dispatched  in  a  priority  order.  Seniority 
rosters  are  maintained  here  and  all  calls  for  overtime  work  are  controlled  in  the 
center.  Also  scheduling  boards  and  many  other  visual  displays  are  maintained  as  aids 
in  the  control  of  Track  Department  operations. 

Long-term  track  material  is  purchased  on  a  scheduled  basis  through  the  year 
with  overall  material  objectives  controlling  the  total  quantities.  Purchase  schedules 
are  set  so  as  to  accept  material  in  quantities  and  intervals  that  are  compatible  with 
production  standards.  Other  track  material  order  quantities  and  times  are  controlled 
by  a  cardex  material  control  system  located  in  the  chief  engineer's  office.  All  of  these 
systems  and  sub-systems  combine  to  give  an  overall  balance  and  flexibility  in  the 
control  of  Track  Department  operations. 

Systems  analysis  need  not  mean  great  outlays  of  money  for  sophisticated  equip- 
ment and  technicians.  To  be  efi^ective,  the  systems  techniques  must  become  a  man- 
agement philosophy,  a  necessary  discipline — almost  a  way  of  life.  This  management 
philosophy  cannot  be  integrated  into  a  company  by  having  a  few  systems  people. 
It  must  come  from  within,  through  involvement  with  the  whole  management  team. 


A  Railroad  Statement  for  Pollution  Abatement 
72-633-8 

By   C.    F.    MUELDER 

UfiliMes    Engineer,    Chicago    Region 

Burlington    Northern,    Inc. 

The  presentation  I'm  about  to  give  is  designed  to  show  how  the  total  environ- 
mental pollution  situation  has  evolved,  and  what  you  and  I  on  the  railroads  can  do 
about  it.  As  the  title  implies,  our  discussion  will  give  special  attention  to  the  role 
our  railroad  industry  plays  in  this  picture. 

First  of  all,  we  are  people.  Without  people  there  can  be  no  railroad  company. 
All  of  us  in  the  railroad  industry  are  normal  average  citizens.  Each  of  our  com- 
panies is  made  up  of  a  broad  spectrum  of  peoples  in  all  classes  of  labor:  skilled  and 
unskilled,  technicians,  engineers,  management  and  ownership.  We  all  have  families 
and  desires  for  ourselves.  We  are  concerned  about  our  community,  our  nation  and 
the  world.  During  our  leisure  we  are  fishermen,  hunters,  campers  and  vacationists. 
As   concerned  citizens  we  want  to  preserve  our  environment. 

We  are  concerned  about  air  pollution,  solid  waste  disposal  problems,  water 
pollution  and  increased  urbanization  problems.  As  this  presentation  unfolds,  I  think 
you'll  agree  that  the  railroads  are  a  small  factor  in  the  overall  pollution  picture, 
but  that  we  have  our  individual  responsibilities  and  areas  which  together  with 
others  make  up  the  total  picture  of  today's  conditions. 

When  I  was  a  boy  in  the  lower  grades  of  school,  I  never  heard  of  environ- 
mental pollution.  For  the  most  part,  neither  did  anyone  else.  I  am  sure  that  environ- 
mental pollution  existed  at  some  locations  and  facilities,  but  for  the  most  part,  it  did 
not  affect  very  many  people.  What  has  happened  in  the  short  span  of  50  years? 
First,  our  population  has  grown  tremendously.  There  are  now  so  many  of  us,  all 
creating  demands  for  housing,   automobiles,   clothing,   vacations,   and  other  things. 

Secondly,  we  have  changed  from  a  primarily  rural  population  to  an  urban 
population.   With  the  growth  of  the  nation  and  the  creation  of  wealth  which  we 


Note — Discussion   open  until  October   15,    1971. 


Address    by    C.    F.    Muelder 569 

have  all  shared  in,  our  expanding  population  with  the  ability  and  desire  to  pur- 
chase these  items  have  created  demands  for  new  products  and  services.  More 
people,  new  inventions,  increasing  desires  and  demands  for  services  have  resulted 
in  a  vast  number  of  automoliiles,  many  new  industries  and  business  establishments 
— many  times  more  numerous  than  when  I  was  a  boy.  Mere  numbers  alone  have 
contributed  to  an  increase  in  pollution  incidents  to  the  place  where  they  are  not 
acceptable.  The  few  automobiles  in  1916  didn't  create  any  smog.  Today,  with  mil- 
lions of  automobiles,  we  have  smog  in  our  cities. 

Well,  what  am  I  saying?  I  am  saying  that  when  there  were  fewer  people, 
considerably  fewer  industrial  plants  and  less  demands,  small  amounts  of  pollutants 
did  not  greatly  affect  us.  Today,  with  large  numbers  of  people  and  plants  we  can 
no  longer  tolerate  these  conditions.  Consequently,  we  must  all  take  steps  to  abate 
pollution. 

Railroads  have  a  water  pollution  prol^lem,  a  fact  that  comes  as  a  surprise  to 
some.  Railroads,  fortunately,  do  not  have  the  overwhelming  water  pollution  problem 
of  some  industries,  such  as  the  pulp  and  paper,  the  meatpacking,  or  the  hide  and 
leather  industries. 

The  railroad  water  pollution  problems  to  be  dealt  with  are  real.  They  do  not 
need  to  be  disasters  if  they  are  dealt  with  promptly  and  are  handled  as  the  engineer- 
ing problems  that  they  are. 

Public  demand  for  clean  streams  and  waterways  is  here  to  stay.  This  has 
resulted  in  the  strengthening  of  water  pollution  laws,  both  state  and  federal.  Court 
decisions,  in  water  pollution  cases,  are  going  almost  entirely  against  the  defendant. 
Newspapers  are  giving  an  almost  inordinate  amount  of  publicity,  complete  with 
devastating  pictures. 

This  afternoon,  I  am  going  to  devote  our  time  primarily  to  tlie  problems  of 
railroad  water  pollution,  methods  and  equipment  for  waste  water  control  at  railroad 
yards  and  terminals. 

Much  railroad  water  pollution  originates  at  these  locations:  Locomotive  wash 
racks,  yards,  shop  lye  cleaning  vats,  locomotive  fueling  facilities.  Waste  waters 
from  these  facilities  contain  oil,  grease,  dirt  and  detergent.  They  occur  from  spillages, 
leaks,  and  drippage.  Locomotive  repair  shop  waste  waters  can  also  contain  cutting 
oils,  coolants,  or  crankcase  lubricating  oils. 

Waste  waters  from  box  car  facilities  contain  a  wide  variety  of  solids:  settleable, 
floatable  and  dissolved.  These  will  vary  according  to  the  lading  of  the  cars  being 
cleaned. 

Railroad  industrial  parks  are  an  increasingly  important  traffic-generating  activ- 
ity. Many  industries  with  an  excellent  traffic  potential  also  are  industries  that  gen- 
erate significant  amounts  of  liquid  wastes.  The  industrial  waste  potential  of  an 
industry  being  invited  into  one  of  these  developments  should  be  considered  to 
avoid  instances  where  the  cost  of  treatment  required  affects  the  traffic  revenue 
generated. 

Wherever  there  are  workmen,  toilet,  shower,  and  locker  room  facilities  are 
required.  The  waste  waters  originating  here  is  usually  handled  in  a  sewer  separate 
from  the  industrial  waste,  and  piped  separately  to  the  city  sewer  or  to  a  separate 
treatment  unit.  Sanitary  sewage  is  not  normally  considered  an  industrial  pollution 
problem,  but  must  be  considered  in  outlying  railroad  operations  where  no  sanitary 
sewage  .systems  are  available. 

Your  Committee  13  has  long  advocated  an  engineered  systems  approach  to 
water  pollution  abatement  facilities.  No  two  disposal  problems  are  (|uite  alike.  Ini- 


570 Special    Features 


portant  variables  art":  proximity  of  habitation  and  industries,  availability  of  a  suit- 
alile  treatment  plant  site,  soil  conditions,  climatic  conditions,  rainfall  amounts  and 
distrilnition,  and  type  of  outlet  availalile,  whether  city  sewer  or  water  course.  It  is 
to  be  noted  there  will  freciuentK'  he  special  local  circumstances  which  need  to  be 
taken  into  account. 

In  order,  therefore,  to  provide  a  plant  that  will  do  the  job  required  at  the 
least  cost,  considering  first  cost  as  well  as  operating  and  maintenance  costs,  the 
required  equipment  and  components  are  put  together,  mindful  of  all  of  these  vari- 
ables. Accordingly,  no  two  systems  will  be  quite  alike.  A  systems  approach  has  to 
be  farsighted  and  anticipate  the  eventual  long-term  requirements,  such  as  possible 
expansion  of  the  facility,  and/or  increasing  severity  of  the  pollution  control  regula- 
tions. Then,  when  expansion  or  improvement  becomes  necessary,  room  is  available 
and  the  existing  plant  facility  can  be  expanded,  not  junked. 

In  speaking  of  the  systems  approach  to  railroad  water  pollution  problems,  we 
generally  think  of  systems  for  providing  either  the  primary  treatment,  or  the  primary 
and  secondary  treatment,  or  the  priiuary,  secondary  and  tertiary  treatment.  Prob- 
ably the  most  important  factor  in  determining  the  system  that  is  to  be  used  is  the 
receiving  outlet  of  the  waste  waters.  Where  waste  waters  can  be  discharged  into 
a  lagoon  or  city  sewer,  the  simpler,  less  costly  primary  system  can  usually  be  used. 
Primary  systems  are  designed  for  the  removal  of  free  floating  oils,  settleable  solids 
and  free  floating  solids.  These  systems  are  usually  adequate  where  the  final  treated 
waste  waters  contain  less  than  75  ppm  free  oils,  do  not  contain  emulsions,  and 
flow  into  a  city  sewer  system. 

Where  a  lagoon  or  a  city  sewer  outlet  can  be  used,  the  simpler,  primary  system 
for  the  removal  of  free  oils  and  settleable  solids  should  be  considered  for  almost 
all  but  very  large  terminals.  The  function  of  a  primary  system  is  to  remove  most 
of  the  oils  and  solids  from  the  waste  water,  to  the  degree  acceptable  by  a  city 
sewerage  treatment  plant.  When  emulsions  are  present,  or  pH  control  is  a  problem, 
or  quantities  of  suspended  solids  are  present,  primary  systems  alone  are  not 
adequate. 

If  a  stream  or  lake  is  the  only  possible  outlet  or  receiver  of  the  final  treated 
waste  water,  a  secondary  system  is  required  in  addition  to  the  primary  system. 
Water  purity  standards  for  dumping  waste  waters  into  streams  or  lakes  are  much 
more  stringent.  A  secondary  system  must  be  capable  of  removing  practically  all 
oils  and  greases,  properly  adjusting  pH,  and  removing  suspended  solids  and  any 
excesses  of  dissolved  solids  not  natural  to  public  waters.  A  secondary  system  not 
only  incorporates  mechanical  removal  of  the  pollutants  but  usually  involves  some 
chemical   treatment   and   limited   process  operations. 

When  waste  waters  must  be  discharged  into  public  streams  and  lakes  where 
extreme  purity  is  required  to  permit  human  body  contacts,  such  as  in  swimming 
and  boating,  tertiary  systems  must  be  installed.  A  system  of  this  nature  requires 
primary  treatment,  secondary  treatment  and  tertiary  treatment.  This  involves  the 
full  spectrum  of  mechanical  facilities,  chemical  treatment  and  process  operations, 
coupled  with  complex  equipment  and  specialized  personnel  for  operations  and  main- 
tenance. Generally  speaking,  this  type  of  system  is  not  required  for  most  railroad 
operations. 

For  railroad  operations  a  primary  system  in\olves  a  settling  tank  or  basin 
where  fuel  oil  floats  to  the  top  and  settleable  solids  sink  to  the  bottom.  Mechanical 
methods   of   skimming   floatal)le   oils    and/or   solids   and   bottom   solids   removal   are 


Address    by    C.    F.    M  u  e  I  d  e  r 571 

usually  used.  Unless  such  a  system  is  medianized  and  automated,  it  is  easy  to  neg- 
lect it.  As  a  result  it  will  fill  up,  fail,  and  be  useless.  Dependinj^  upon  the  volumes 
of  flow,  which  determine  the  size  of  a  facility,  costs  of  primary  systems  usually  vary 
between  $50,000  and  $150,000  at  most  terminals. 

For  railroad  operations  requiring  the  more  sophisticated  secondary  system, 
chemical  precipitator  tanks,  dissolved  air  flotation  cell,  pH  adjustment  and  sludge 
and  sediment  removal  equipment  is  necessary.  Secondary  treatment  normally 
involves  breaking  oil-water  emulsions,  followed  by  coagulating  the  resultant  fine 
oil  particles  by  chemical  precipitation  and  settling  or  by  polymer  coagulation  and 
dissolved  air  flotation.  "Breaking"  may  be  done  in  batch  tanks  that  also  serve  as 
equalizing  tanks.  This  is  done  by  adding  an  acid,  or  an  acid  salt,  that  lowers  the 
pH  to  a  6.3  to  6.8  range.  Where  large  flows  exist  and  considerable  pollution  occurs, 
multiple  systems  are  in  use.  Usually  three  batch  tanks  are  provided:  one  is  filling, 
one  is  treating,  and  the  other  is  emptying.  The  batch  tanks  also  serve  as  equalizing 
tanks,  so  that  the  "broken"  emulsion  can  be  fed  at  a  uniform  rate  to  the  chemical 
precipitation  unit  or  the  dissolved  air  flotation  cell,  for  removal  of  the  released  fine 
oil  particles.  Generally  speaking,  a  single,  large  equalizing  tank  with  a  plant  sized 
to  meet  normal  flows  is  sufficient  for  most  railroad  operations.  Secondary  treatment 
for  emulsion  breaking  would  be  required  where  the  oil  content  of  the  finished  waste 
has  to  be  10  miligrams  per  liter  or  less.  This  would  be  required  where  the  discharge 
is  to  a  surface  water  course.  The  operation  of  secondary  systems  of  this  kind  would 
require  the  supervision  of  a  trained  and  skilled  technician,  with  undivided  respon- 
sibility for  the  operations  of  this  plant.  Depending  on  the  size  of  the  facility  and 
the  pollutants  involved,  costs  of  a  secondary  system  will  vary  between  $200,000 
and  $350,000. 

Tertiary  treatment  involves  removal  of  residual  contaminants  normally  not 
removed  in  secondary  treatment.  This  would  be  needed  to  meet  an  effluent  oil 
content  of  5  miligrams  per  liter  or  less.  It  might  also  be  required  where  an  effluent 
requirement  of  one  miligram  per  liter  of  phosphorous  was  imposed.  A  tertiary  unil: 
for  a  5-miligram-per-liter  oil  limit  may  be  a  packed  bed  filter,  either  sand  or 
diatomite.  If  phosphorous  removal  do\\'n  to  1  miligram  per  liter  is  required,  a  min- 
eral reactant  such  as  ferric  chloride  or  sodium  aluminate  would  be  added  after  the 
emulsion  "breaking"  step,  together  with  an  anionic  polymer.  The  phosphorous  will 
precipitate  in  the  chemical  precipitation  unit  or  in  the  dissolved  air  flotation  cell. 
Some  of  the  precipitate  will  not  be  captured  there,  and  it  will  be  removed  in  the 
tertiary  unit. 

The  biological  secondary  treatments  depend  on  bacteria  to  remove  the  dis- 
solved or  suspended  organic  fractions  of  the  waste.  This  fraction  is  usually  referred 
to  as  5-day  B.O.D.  The  process  usually  is  known  as  an  activated  sludge  system. 
Fortunately,  there  is  very  little  of  this  material  in  railroad  waste.  The  only  railroad 
operation  producing  this  type  of  waste,  aside  from  a  railroad-operated  industrial 
park,  is  a  box  car  washing  facility.  Providing  biological  secondary  treatment  for 
box  car  washing  facilities  would  be  rather  expensive,  upwards  to  $500,000.  This 
type  of  treatment  process  must  be  continuous,  24  hours  per  day  and  365  days  per 
year.  Box  car  washing  is  intermittent  and  the  amount  of  waste  produced  varies 
widely.  Accordingly,  large  equalizing  ponds  or  tanks  are  usually  required,  together 
with  seldom-used  capacity  for  seasonal  peak  loads.  It  is,  therefore,  a  much  better 
arrangement  to  discharge  to  a  city  sewer  after  primary  treatment.  In  fact,  a\'ail- 
ability  of  a  city  sewer  connection  is  a  very  important  factor  in  locating  a  box  car 
washing  facility. 


572  Special    Features 


PANEL  DISCUSSION- 
CONTINUOUS  WELDED   RAIL  ON   BRIDGES 


Principles 
72-633-9 

By    D.   V.    MESSMAN 

Assistant   to    Chief   Engineer 

Southern    Railway    System 

I  will  review  with  you  some  principles  which  need  to  be  put  in  proper  per- 
spective for  this  discussion. 

First,    the    nature   of   the    materials   we    are   dealing   with 

The  body  of  a  steel  rail,  barring  any  permanent  set  from  excessive  stresses  or 
other  unusual  damaj^e,  remains  essentially  unchanged  for  centuries.  Surface  rusting 
has  no  interior  effect,  neither  does  the  thin  surface  working  from  wheels.  The  effect 
of  time  on  rail  length  is  shown  in  Fig.  1,  using  a  50-year  period  and  comparable 
beginning   and   end   conditions. 

The  wavy  lines   indicate   intermediate  variations  of  no  final   consequence. 

Steel  materials  supporting  rail  and  track  structure  act  similarly,  but  the  action 
of  timber,  ballast  and  earth  materials  under  the  rail  is  different  because  of  yielding 
with  time  and  because  elastic  limits  are  more  often  exceeded. 

Second,    resistance   can    be   developed    by   movement  only 

It  is  easy  to  see  the  bending  of  a  crosstie  under  a  wheel.  Impossible  for  the 
naked  eye  to  detect,  but  just  as  certain,  is  a  depressing  of  the  rail  surface  and  a 
flattening  of  the  wheel  where  they  are  in  contact.  Similarly,  there  can  be  no  devel- 
opment of  longitudinal  or  lateral  resistances  unless  there  are  movements  in  those 
directions.  There  is  no  truly  rigid  material  or  structure — some  are  merely  stiffer 
than  others  and  develop  resistances  with  lesser  movement.  If  there  are  several  places 
where  a  force  can  be  resisted,  it  will,  whether  we  like  it  or  not,  go  mostly  to  the 
stilfest  places.  Weakness  here  may  lead  to  undesiral:)le  failure  and  damage.  Stiffness 
should  be  accompanied  by  sufficient  strength.  Weakness  can  be  protected  by 
flexibility  or  freedom. 

Fig.  2  is  a  bridge  profile  with  three  bearing  points  capable  of  delivering  longi- 
tudinal force  to  the  substructure  and  thence  to  the  ground.  Each  approach  is  also 
available  for  resisting  longitudinal  force.  With  anchorage  applied  as  shown  on  the 
figure,  a  number  of  pertinent  questions  can  be  asked. 

•  How  does  the  stiffness  at  points  2  and  5  compare  with  stiffness  in  areas  1 
and  6?  In  other  words,  to  which  points  or  areas  will  most  of  the  force  go. 

•  Will  point  3  provide  any  appreciable  resistance  in  view  of  flexibility  of  the 
pier  shaft? 

•  If  points  2  and  5  are  stiff  enough  to  attract  a  large  part  of  any  force,  are 
they  strong  enough  to  transmit  it  or  will  there  be  shearing,  breaking,  tearing  oi' 
splitting   of  some  part   instead? 

•  Should   there  be  any  anchors  at  all   on   the  bridge? 


Note — Discussion   open    nntil   October    15,    1971. 


Remarks    by    D.    V.    Messman 


573 


RA/L    LLNCTH   ys.    T/ML 

Y^eatr  ~7emper6ffure  S/ress  Len^^h 

197/  ^O"  F  SOOO  psi        /OO   /y 


202/ 


/o'   C 


Fig.   1 


JS2  Xy  pet        30.  "^8  /r? 
jy    cm 


/? 


Fig.   2 


6 


^ 


Pj      +    a 


Fig.   3 


c 

■h  c 


=   /? 


These  questions  are  not  easy  to  answer,  but  I  again  point  out  the  importance 
of  relating  resistances  to  movement  and  strength  to  stiffness.  There  is  seldom  any 
logical  halfway  measure   of  anchorage. 

Third,    how    longitudinal    stress    in    a    rail    varies    from    one    point   to    another 

In  any  one  section  of  continuous  rail  the  stress  has  to  be  uniform  unless  fric- 
tional  forces  work  on  the  surfaces.  An  extreme  example  of  non-uniformity  is  the 
stress  changes  near  the  end  of  a  continuous  rail  where  it  is  not  held  by  a  joint 
or  does  not  butt  against  another  rail.  Anchorage  in  such  an  area  is  highly  stressed 
in   friction   against   the   rail. 

I  would  apologize  for  showing  such  an  elementary  concept  as  Fig.  3  except 
that  the  role  of  friction  in  causing  or  controlling  rail  movements  is  often  overlooked 


574 


Special    Features 


T£MP£R/ITU/?E   EFFECT 

L 


F^ 


/i 


© 


(D 

<?^ 

e 

^      ►—      n 

^ 

. 

® 

©^@^(D 

■^ 

z 

H 


Fig.  4 


Fourth,   temperature   effects 

Rail  may  or  may  not  be  restrained  in  length,  while  ballast,  underlying  earth, 
overall  bridge  lengths  between  abutments  and  the  like  are  generally  not  free  to 
change  horizontal  dimensions  with  temperature.  Individual  spans  of  bridges  usually 
approach  the  unrestrained  condition  and  thus  change  length  with  temperature. 

Fig.  4  illustrates  that  the  temperature  effect  on  a  rail  held  to  a  fixed  length  is 
the  summation  of  two  equal  and  opposite  length  changes — one  for  temperature 
and  one  for  stress.  The  figure  is  for  a  temperature  rise  and  resulting  compression. 

Fifth,   creep   of   rail   from   wheel   action 

Rail  travel  from  this  action  is  in  the  same  direction  as  the  wheel  travel.  The 
process  is  described  by  Fig.  5. 

In  the  upper  line  the  rail  is  represented  with  no  load  and  with  two  reference 
marks.  The  open  circle  is  a  point  on  the  web  and  the  black  dot  is  a  point  on  base 
of  rail.  On  the  next  line  the  wheel  has  come  close,  deflecting  the  rail  and  lengthen- 
ing the  base  of  rail  surface.  The  black  dot  has  moved  to  the  right  a  little  with  little 
friction  to  be  overcome.  As  the  wheel  approaches  the  position  shown  in  the  third 
line  the  black  dot  makes  firmer  and  firmer  contact  with  the  support  and  by  the 
time  the  load  is  in  the  third  line  position  the  reference  open  circle  is  moved  ahead 
by  a  distance  labeled  G.  This  effect  is  small  for  one  wheel  but  tlie  combined  effect 


Remarks    by    D.    V.    Messman 


575 


CREEP       OF 

RAIL 


Fig.  5 


of  many  wheels  can  be  great.  Compression  builds  up  ahead  of  a  train,  especially 
in  areas  of  light  anchorage,  and  cannot  l)e  easily  relieved  by  backward  movement 
of  the  rail  until  after  the  train  weight  is  gone.  The  ideal  anchorage  is  obviously 
uniformly  distributed  along  the  rail.  This  effect  is  more  pronounced  if  traffic  in  one 
direction  predominates. 

Sixth,    traction   and    braking    effects 

These  effects  are  generally  iminiportant  compared  to  others,  except  where  they 
repeat  often  and  are  in  a  direction  to  coml^ine  with  other  effects.  In  a  dip,  for 
example,  with  all  traffic  in  one  direction,  the  worst  comliination  is  on  the  approach 
to   the   dip. 

This  is  illustrated  in  Fig.  6.  Note  that  the  three  effects  on  the  left  side  are  all 
in  the  same  direction. 

Seventh,    effect   of   grade 

l<"or  the  upper  left  corner  of  Fig.  7  imagine  a  vertical  rail  one  mile  long,  with 
no  weight,  and  with  ends  fixed.  If  the  weight  is  added  the  upper  right  corner 
applies. 


576 


Special    Features 


COMB/NING    EFFECTS 


77-offF/c 


^"-^^Z^? 


Fig.   6 


(;P/^P£     EFFFCF 
^  F'xeJ ■ 


A'o   stt-ess 


9000  psi 
tension 


^.S'O 


9000  ps/ 
compress'/orr 


(j/'airjwe^  joreyenfea/J 


/-/^/><f</-? 


JOO  m'jles 


SOOO  ps/    /-ens/on 


t  p/xec/-^      ~Jo00ps/ 
comp. 


Fig.   7 


Remarks    by    D.    V.    Messman 577 

Now  imagine  a  rail  on  a  i'/i  frictionli-ss  slope,  100  miles  long,  again  with  no 
weight  as  in  the  lower  left  corner.  If  the  weight  is  added  the  lower  right  corner 
applies.  Notice  that  the  total  height,  measured  vertically,  not  the  length  of  rail, 
dictates  the  stress  and  \ertical  drop  of  the  midpoint.  There  is  an  increase,  however, 
in  the  horizontal  movement  of  the  midpoint  and  the  amount  of  resistance  working 
against  the  movement  as  the  grade  flattens.  This  extreme  example  shows  that  grade 
effects  from  actual  conditions  are  relatively  small,  although  they  may  be  in  a  direc- 
tion to  be  combined  with  other  effects 

Eighth,    estimating  internal    and    radial    forces 

The    stress    in    rail    held    to   constant   length   varies    directly   with    temperature 

With    expansion  coefficient    and    dimensional    units    taken    into    account,    the    total 

internal  force  in  one  track  of  two  rails  is  given  by  the  formula  at  the  top  of  Fig.  8. 

The  second  formula  is  for  radial  force  expressed  as  a  function  of  the  internal 

force  and  curve  radius.  The  third  formula  gives  radial  force  without  reference  to 
internal  force. 

The  terms  Xi  and  Vi  are  used  to  call  attention  to  the  need  to  remember  that 
the  other  terms  are  for  changes  only  and  are  not  valid  by  themselves,  unless  it  is 
known  for  certain  that  the  initial  forces  present  at  initial  temperature  can  properly 
be  assumed  to  be  zero. 

The  diagram  at  the  bottom  of  the  figure  illustrates  the  relationship  between 
the  internal  and  radial  forces.  Note  that  the  radial  component  per  foot  of  track 
needed  to  turn  the  internal  force  around  the  curve  forms  the  same  ratio  with  the 
internal  force  as  does  the  same  foot  of  track  with  the  radius. 

Ninth,   elastic   buckling   of   rails   under  compression 

The  action  of  curved  rail  under  compression  and  tlie  associated  radial  force  are 
closely  predictable.  Much  more  uncertain  is  the  action  of  a  straight  rail  in  a  track, 
because  of  the  difficulty  of  knowing  the  exact  length  subject  to  buckling  and  the 
exact  available  restraints  against  buckling.  For  any  situation,  however,  there  is  a 
definite  compression  at  which  a  very  slight  sideways  push  will  buckle  the  rail,  or 
more  important  to  us,  a  very  small  dependable  lateral  resistance  will  keep  the  rail 
completely  stable  for  that  compression. 

The  buckling  load  is  inversely  proportional  to  the  square  of  unsupported  length, 
i.e.,  if  the  midpoint  is  laterally  supported,  the  load  capacity  is  four  times  as  much. 
The  degree  of  rail  straightness  does  not  matter  much,  but  restraints  are  all-important. 

The  ordinary  buckling  occurrence  is  a  track  going  sideways  as  a  unit  because 
the  rails  are  less  stiff  in  that  direction  and  because  track  weight  is  of  less  benefit 
in  that  direction. 

Fig.  9  shows  the  buckling  load,  with  unit  factor  of  safety,  for  a  100-lb  rail 
10  ft  long  with  ideal  hinges  at  each  end.  The  80-ton  load  corresponds  to  a  tem- 
perature rise  of  84  F  above  the  temperature  associated  with  zero  stress. 

There  may  be  rare  cases  of  rail  stresses  approaching  the  yield  point  at  approx- 
imately 75,000  p.si,  in  which  event  buckling  would  occur,  but  it  would  be  of  a 
different  kind,  not  elastic. 

Buckling   is   an   important   consideration   when   bridge   ties   are   being   replaced. 

Tenth,   the   most   important   effect — traffic 

Trains  work  the  ties  up  and  down,  vibrate  the  whole  roadbed,  push  or  pull 
the  rails,  all  disturbing  resistance  points  both  laterally  and  longitudinally  and  allow- 


578 


Special    Feat  iires 


/NTERN/IL  AND  f?/^D/AL  FORCES 

ir    =     J8    WT    ^Xi      ,      J/?    Uj      pet'   f^crct^ 

R.E    =     EE    -h    /,-  in    Us    pet  //  of  i^ac/^ 

R 

RE     =   WDE   ^   Yi  ^     //7    J^s  per-  /r^  ^r  frc^r/f 

/JO 
I,E~  /nferna/    rorce   //7   £  ra/Zs  (corrjpr<?sS'on  Eol-  7^/75^.  Hse) 
Z?./^--  Pac//'cr/    Eorce    /r>    E.    /^er/7s  f/oy[/af£/  ou-Zs/c/e  o//^   co^t^e 

W^  ^Z  oE  /  z-^//,  Ms  />erj^^E 

7~-  E)e^/'ees    EaS/'enJ^e/i   Ze/ry/jeraT'-c'^e  cJ7a'/7ye 

D  =  Dejrree    oE    cut^e 

X(      anc/  y^-      are    Eorces  /present    /n/f/a//y 


R.E_   =_/. 
I.E         R 


LF\        \I./F 


R.P 


Fig.   8 


BUCKLING 


80  Ions 


/oojE  R<u  l_ 


/O  E/ 


^ SO   %nj 

(/6000  josj) 


Fig.  9 


Remarks    by    D  .    V  .    M  e  s  s  m  a  n 


579 


LO/iD    EFFECTS 


Fig.    10 


ing  unbalanced  internal  or  radial  forces  to  take  over.  Small  movements  may  not 
recover  after  load  passage  and  often  accumulate  to  a  large  dimension. 

The  items  I  have  listed  affect  bridges  as  well  as  track  in  general.  An  additional 
effect  comes  from  an  individual  span  in  a  bridge  having  its  stress-carrying  elements 
change  length  under  load.  Although  the  length  change  from  stress  is  generally  a 
minor  portion  of  the  total,  its  effect  can  be  damaging  because  surfaces  that  may 
ordinarily  slide  to  accommodate  differential  movements  of  rail  and  bridge  span 
are  at  least  partially  prevented  from  doing  so  because  of  bearing  between  the  sur- 
faces being  increased  while  the  load  is  present.  Under  load,  a  bridge  tie  may  split 
rather  than  slide. 

Fig.  10  shows  the  outline  of  a  simple  span  with  fixed  bearing  on  the  left. 
It  may  be  a  deck  girder,  a  deck  truss,  or  through  truss.  On  the  left  end  the  lower 
comer  is  not  moved  by  temperature  or  load,  while  the  upper  corner  is  moved  to 
the  right  by  load  only.  At  the  expansion  end  on  the  right,  Iwth  upper  and  lower 
points  move  the  same  amount  with  temiDerature  while  the  load  moves  tlie  lower 
comer  only. 

On  a  deck  span  the  rail  is  near  the  top  points.  If  rail  is  not  to  change  position 
or  length,  there  must  be  differential  movement  at  each  and  every  iDoint  on  the  span. 

On  a  through  span  the  rail  is  near  the  bottom  points.  If  the  same  rail  condition  is 
to  apply,  there  is  only  one  point,  at  the  fixed  end,  that  is  free  of  differential  move- 
ment. At  the  other  end  we  find  the  most  differential  movement  of  all. 

All  effects  on  bridge  spans  are  roughly  proportional  to  length  and  will  cause 
appreciable  differential  movements  on  longer  spans.  For  example,  the  gap  between 
the  expansion  ends  of  two  adjacent  through  spans  each  150  ft  long  will  decrease 
about  2  inches  from  cold  to  hot  weather  and  about  another  inch  under  live  load. 

Differential  movements  on  bridges  must  be  anticipated  and  handled  in  such 
way  tliat  damage  or  reduction  in  live  load  capacity  will  not  occur.  The  movenients 


580  Special    F  e  atures 


should  cither  be  adcHiiiatcly  picvcntt'd  or  he  allowed  as  freely  as  possible.  Anchorage 
and  freedom  each  have  their  place  and  each  should  be  kept  there.  Intermediate 
measures  seldom  make  any  sense  around  a  bridge. 


CWR  on  Bridges — Problems 

72-633-10 

By   L.   F.    CURRIER 

Engineer   Structures 

Louisville   &    Nashville    Railroad 

On  roadbed  sections  the  successful  use  of  continuous  welded  rail  depends,  for 
the  most  part,  on  making  adequate  provisions  for  prevention  of  buckled  track  and 
pull-aparts  which  could  result  from  temperature  stresses  and  creep  stresses  caused 
by  the  effects  of  train  movements.  The  same  can  be  said  for  conventional  jointed 
rail,  except  the  problems  are  not  so  critical  because  of  the  lengths  of  rail  involved 
and  the  allowances  made  for  movement  at  the  joints.  The  problems  could  be  very 
close  to  the  same  for  both  if  joints  of  conventional  rail  are  restrained  from  movement. 

Undesirable  track  conditions  are  usually  prevented  by  anchoring  the  welded 
rail  to  the  ties  and  providing  an  ample  ballast  section  to  keep  the  ties  in  place. 
Movement  from  temperature  changes  is  confined  to  the  200  to  300  ft  distance 
from  the  joints  of  each  string,  with  no  movement  in  the  center  section.  Field  weld- 
ing to  eliminate  joints  is  becoming  a  generally  accepted  practice. 

Movement  from  creep  stresses  due  to  train  effects  is  usually  restricted  by  the 
use  of  anchors  the  full  length  of  each  rail  string  to  distribute  the  stresses  along 
the  rail  and  keep  the  track  where  it  was  laid. 

Since  the  forces  from  the  rail  must  be  transferred  to  the  tie,  then  to  the  ballast 
and  roadbed,  an  adequate  ballast  section  is  as  important  as  proper  rail  anchorage. 

Bridges — General 

When  installing  continuous  welded  rail  on  bridges,  the  problems  from  tempera- 
ture stresses  and  creep  stresses  from  train  effects  still  remain.  There  are  additional 
problems  from  expansion  and  contraction  of  the  bridge  because  of  temperature 
changes,  and  movement  of  stress-carrying  elements  of  the  bridge  when  under  load. 
Unless  handled  correctly,  these  movements  can  add  stresses  to  the  bridge  that  can 
be  beyond  the  structure's  capacity. 

Ballasted-Deck   Bridges 

On  tangent  track  it  would  seem  that  the  main  problem  to  be  expected  with 
continuous  welded  rail  on  ballasted-deck  bridges  would  result  from  not  having 
sufficient  ballast  embedding  the  ties  to  resist  movement  of  the  rail. 

There  may  be  other  problems  that  would  be  worthy  of  investigation.  For 
example,  what  effect  would  the  combination  of  additional  friction  between  ballast 
and  deck  of  the  loaded  bridge  and  the  change  in  length  of  the  bridge  elements 
have  on  the  bridge?  What  effect  would  this  condition  have  on  the  rail? 

Ballasted-deck  bridges  are  subjected  to  radial  forces  from  temperature  stresses 
and  creep  stresses  in  curved  rail.  The  effect  of  these  forces  on  the  bridge  becomes 


Note — Discussion  open  until  October  15,  1971, 


Remarks    by    L.    F.    Currier 581 

a  problem  in  direct  ratio  to  the  degree  of  curve.  The  bridge  problem  is  affected 
further  by  the  height  of  structure  and  length  of  span.  Under  present  specifications 
our  bridges  are  not  designed  nor  rated  for  these  forces  or  any  other  forces  caused 
by  the  installation  of  welded  rail.  It  would  seem  that  they  should  be. 

Open-Deck   Bridges 

As  was  mentioned  earlier,  the  movement  of  continuous  welded  rail  due  to 
temperature  changes  is  confined  to  the  ends  of  each  string.  This  means  you  can 
expect  temperature  stresses  to  be  resisted  by  the  end  ties;  and  because  of  the  added 
forces  these  ties  are  required  to  take,  placing  a  joint  on  an  open-deck  bridge  can 
have   some   very    undesirable    results: 

1.  If  the  rail  is  not  anchored  on  the  bridge  we  can,  of  course,  expect  a 
pull-apart. 

2.  If  the  rail  is  anchored,  we  might  expect  failure  of  the  tie  fasteners,  fol- 
lowed by  a  pull-apart. 

3.  If  the  rail  is  anchored  and  tie  fasteners  are  adequate,  we  would  expect 
either  to  have  added  bridge  stresses  which  are  beyond  the  bridge's 
capacity  or  to  have  added  rail  stresses  which  are  beyond  the  rail's  capacity 
to  absorb. 

Bolted  joints  between  strings  of  welded  rail  should  be  used  only  with  extreme 
caution,   preferably  never,   on   an   open-deck  bridge. 

Problems  can  also  exist  with  joints  placed  so  as  to  have  tlie  rail  fully  anchored 
off  the  bridge: 

1.  If  anchors  are  used  on  the  bridge,  stresses  in  ties  and  fasteners  from 
temperature  expansion  or  contraction  of  the  bridge  while  the  rail  remains 
fixed  might  exceed  the  capacity  of  the  tie  or  fastener. 

2.  If  the  rail  is  anchored  to  the  ties  and  fasteners  hold,  the  stresses  added 
to  the  structure  could  exceed  the  capacity  of  the  structure.  There  is  also 
the  possibility  that  the  rail  could  be  over-stressed. 

3.  Unless  ties  are  adequately  anchored  to  the  bridge,  there  will  exist  the 
possibility  of  the  ties  and  rail  either  moving  transversely  or,  less  likely, 
up  from  the  support.  Ties  must  be  anchored  to  the  support,  but  at  the 
same  time  longitudinal  movement  of  the  bridge  in  relation  to  the  rail 
must  be  provided  so  that  the  effectiveness  of  the  anchorage  will  not  be 
harmed. 

A  solution  suggested  for  short  spans  is  to  eliminate  anchors  on  the  bridge 
and  permit  the  bridge  to  "float"  beneath  the  rail. 

The  elimination  of  too  many  anchors  from  between  joints  of  a  welded  string 
might  result  in  the  string  being  so  sparsely  anchored  that  its  resistance  to  creep 
from  train  effects  is  too  low  to  prevent  stress  build-ups  that  could  cause  buckling 
or  pull-aparts  in  the  rail. 

Leaving  off  too  many  anchors  would  also  leave  the  rail  in  danger  of  an  exces- 
sive pull-apart  in  the  e\ent  of  a  rail  failure  at  low  temperatures. 

In  discussing  open-deck  bridges  I  have,  so  far,  made  no  mention  of  the  effects 
of  the  stressed  elements  changing  length  under  load.  As  Mr.  Messman  mentioned 
to  you,  although  this  length  change  is  generally  a  minor  portion  of  the  movement, 
its    effect    can    be    the   more    damaging.    Increased    bearing   between    the    ties    and 


582  Special    Featu res 


lioarin^  surfaces  set  up  frictional  resistance  that  could  prevent  sliding  of  the  tie. 
If  shdinjj  is  prevented  and  the  tic  does  not  roll  or  split,  additional  stresses  could 
be  added  to  the  structure  element  supporting  the  tie  that  are  more  than  its  capacity 
to  absorb.  Movement  increases  with  length  so  that  the  longer  the  span,  the  more 
critical  is  the  condition. 

Open-deck  bridges  on  cur\es  are  subjected  to  the  same  radial  forces  from  rail 
stresses  as  ballasted-dcck  bridges.  It  is  extremely  important  that  the  ties  are  ade- 
quately anchored  to  the  bridge  to  prevent  these  forces  from  moving  the  track  out 
of  line. 

Bridge    Maintenance 

We  now  come  to  maintenance  of  bridges  on  which  there  is  welded  rail.  This 
could  become  a  problem  of  scheduling  maintenance  work  only  during  seasons  when 
there  is  little  likelihood  of  rail  buckling. 

Finally,  one  of  the  big  problems  we  are  up  against  is  having  a  complicated 
subject  with  very  little  information  as  to  the  behavior  of  bridges  and  welded  rail 
when  the  two  are  combined.  We  may  some  day  want  to  have  tests  run  on  bridges 
to  compare  the  effects  of  welded  rail  as  compared  to  jointed  rail,  or  tests  nm  to 
compare  the  effectiveness  of  various  types  of  connectors.  Until  we  have  more  field 
information  than  is  now  available,  the  practice  of  laying  welded  rail  on  bridges 
will  continue  to  be  a  combination  of  theory  and  trial  and  error. 


CWR  on  Bridges — Practices 
72-633-7 1 

By    R.    I.    SIMKINS 
Assistant   Engineer  of   Bridges 
Seaboard    Coast   Line   Railroad 

Because  of  certain  undesirable  results  which  are  possible,  such  as  damage 
to  bridge  structure,  buckling  of  rail  or  track,  and  separation  of  rail  as  a  result  of 
build-up  of  internal  stress,  it  is  thought  that  special  precautions  should  be  observed 
in  laying  continuous  welded  rail  on  bridges.  Damage  to  timber  trestles  from  forces 
imposed  liy  rail  has  been  observed,  as  evidenced  by  splitting  of  ties  and  caps, 
and  displacement  of  stringers.  Damage  to  steel  bridges  is  not  as  apparent  but  such 
forces  may  be  contributing  to  long-term  deterioration. 

As  to  buckling  of  rail  caused  by  internal  stress,  there  have  been  several  derail- 
ments over  the  country  on  roadbed  track  attributed  to  this  cause,  and  separation 
of  rail  at  bolted  joints  is  a  fairly  common  occurrence  where  rail  stress  is  high  and 
anchorage  insufficient.  These  problems  apply  to  rail  with  bolted  joints  as  well  as 
welded  rail  but  are  thought  to  be  relieved  somewhat  in  bolted  rail  by  slippage 
in  the  joints. 

General  measures  which  are  being  taken  to  minimize  the  above  listed  possi- 
bilities are  the  following  or  combination  of  the  following: 

1.  Installing  welded  rail  on  bridges  when  median  temperatures  prevail.  To 
accomplish  the  same  result,  when  prevailing  temperatures  are  low,  some 
railroads  are  experimenting  with  heating  or  stretching  the  rail;  although, 


Note — Discussion  open  until  October  15,  1971. 


Remarks    by    R.    I.    Simkins 583 

it  is  not  known  that  these  measures  ha\'c  been  used  for  laying  welded 
rail  on  bridges   specifically. 

2.  Anchoring  rail  sufficiently  to  ties  on  roadbed  approaches  and  on  bridges 
to  localize  movement  and  displacement  of  rail  in  case  of  separation,  and 
securing  rail  and  track  to  prevent  buckling. 

3.  Using  rail  expansion  joints  on  long  bridge  structures  to  prevent  build-up 
of  stress  in  the  rail. 

No.  2  above  is  the  measure  most  used  liy  railroads  when  laying  welded  rail 
on  bridges,  and  judging  by  known  results  must  be  considered  reasonably  effective. 
This  practice  is  simply  that  used  in  laying  welded  rail  generally.  Under  the  direc- 
tion of  a  former  chairman  of  the  Welded  Rail  Subcommittee  of  Committee  15,  a 
questionnaire  in  regard  to  welded  rail  on  bridges  was  sent  to  the  chief  engineers 
of  the  railroads.  The  results  of  this  questionnaire  indicate  that  few  untoward  events 
have  resulted  from  installation  of  welded  rail  on  bridges. 

Contacts  with  the  bridge  engineers  of  the  various  railroads  indicate  that  two 
major  complete  systems  of  practice  with  regard  to  installation  of  welded  rail  on 
open-deck  bridges  have  evolved. 

One  system  specifies  that  rail  be  heavily  anchored  to  ties  on  roadbed  approaches 
to  isolate  the  bridge  from  general  rail  movement  and  attendant  forces,  and  that 
welded  rail  be  continuous  without  bolted  joints  a  minimum  distance  of  200  ft  onto 
each  roadbed  approach.  This  system  further  specifies  that  the  rail  shall  be  anchored 
continuously  to  ties  of  the  bridge  where  spans  are  100  ft  in  length  or  less.  For 
spans  over  100  ft  the  rail  shall  be  anchored  to  ties  for  100  ft  at  the  fixed  end  of 
each  span.  Rail  expansion  joints  are  specified  for  placement  at  the  expansion  end 
of  all  spans  in  excess  of  300-ft  length  with  the  rail  anchored  for  100  ft  at  the  fixed 
end.  Rail  expansion  joints  are  also  specified  to  be  installed  near  each  end  of  draw- 
bridges  to  prevent  jamming  or  opening  of  the  drawbridge  rail  joints. 

This  system  gets  the  desired  results  by  preventing  running  of  rail  onto  bridges 
and  by  anchoring  the  rail  to  the  bridges  in  such  a  way  that  the  difference  in  bridge 
and  rail  temperature  exipansion  is  minimized. 

The  other  system  specifies  extensive  use  of  rail  expansion  joints  so  that  the  rail 
is  relieved  of  temperature  stresses  at  all  times  and  interaction  of  forces  between 
bridge  and  rail  is  eliminated.  Under  this  system  rail  anchors  are  used  on  bridges 
only  at  the  fixed  side  of  rail  expansion  joints  or  at  the  center  of  rail  strings  which 
terminate  at  each  end  in  the  sliding  portion  of  rail  expansion  joints.  This  system 
permits  the  use  of  bolted  joints  between  welded  strings  and  installation  on  bridges 
on  curves  since  internal  rail  stress  due  to  temperature  change  is  virtually  eliminated. 

In  addition  to  these  two  major  systems,  other  trends  and  recommendations 
gathered  in  correspondence  and  contact  with  bridge  engineers  are  as  follows: 

1.  One  railroad  limits  the  use  of  continuous  welded  rail  to  short  spans  and 
short  bridges  except  on  ballasted-deck  bridges  with  curvature  of  less  than 
1  deg. 

2.  It  is  the  consensus  that  problems  associated  with  welded  rail  are  less 
acute  for  ballasted-deck  bridges  than  for  open-deck  bridges.  In  fact,  some 
engineers  advocate  use  of  the  same  practice  for  installing  rail  on  short-span 
ballasted-deck  bridges  as  is  used  on  roadbed  track. 

3.  There  is  a  general  reluctance  to  install  welded  rail  on  bridges  on  curves, 
particularly  where  the  curvature  exceeds  2  deg.  This  practice  results  from 
uncertainties  as  to  the  effect  of  radial  forces. 


584 Special    Features 


4.  One  bridge  engineer  recommends  that  steel  guard  rails  be  anchored  and 
fastened  more  securely  than  normal  to  minimize  displacement  in  case  of 
rail  separation. 

5.  It  is  suggested  l^y  the  bridge  engineer  of  one  railroad  that  the  cost  of 
special  measures  required  for  successful  application  of  welded  rail  to 
bridges  may  outweigh  the  benefits  of  welded  rail  and  that  this  should 
be  considered  for  each  installation. 

In  addition  to  the  special  practices  observed  at  the  time  of  laying  welded  rail 
on  bridges,  precautions  are  also  lieing  observed  in  maintenance  operations  which 
involve  the  unfastening  of  rail  from  ties  or  ties  from  bridge  spans.  Some  of  the 
precautions  are: 

1.  Maintenance  operations  are  carried  out  with  temperature  near  or  lower 
than   that   prevailing   when   the   rail  was   installed. 

2.  Provisions  are  made  to  hold  track  and  rails  in  line  while  unfastened. 

3.  Where  possible  during  tie  renewals,  alternate  ties  should  be  replaced  and 
secured  first  with  remainder  changed  out  in  a  second  stage. 

In  spite  of  the  difficulties  involved,  many  railroads  are  presently  installing 
welded  rail  on  bridges,  employing  measures  that  suit  the  economic  and  specific 
location  conditions  of  their  lines,  and  in  general  these  installations  have  obtained 
satisfactory  results. 


Data  Processing  for  Work   Equipmeni 
72-633-72 

By    E.    H.    FISHER 
Engineer   of   Work    Equipment 
Canadian    National    Railways 

The   Reasons   for   Control 

The  tremendous  growth  in  complexity,  physical  size,  multi-million-dollar  invest- 
ments and  expenses  of  work  equipment  fleets  demand  more  effective  management 
controls.  Fleet  managers  have  long  been  aware  of  the  problems.  Many  have  taken 
the  initiative  to  do  something  about  them.  The  changing  conditions  have  resulted 
in  a  complex,  diversified  fleet  with  equally  complex  and  diversified  management 
problems.  All  this  prompts  us  to  search  for  faster,  more  effective  measurements 
and  controls. 

When  we  think  of  an  equipment  fleet  we  recognize  three  separate  and  distinct 
management  groups,  each  with  its  own  puriwse.  They  are: 

(a)  The  Executive  of  the  corporate  body  which  authorizes  the  funds  for  the 
equipment  enterprise. 

(b)  The  fleet  management  which  provides  an  equipment  service. 

(c)  The  users  of  equipment — maintenance  of  way 

Although  these  three  elements  of  nianagenient  have  separate  and  distinct  func- 
tions,   they    have    a    relationship    within    the   corporate   structure.    A   mutual    under- 


Note — Discussion  open  until  October  15,  1971. 


Address    by   E.    H.    Fisher 585 

staudiny  ot  these  Nt-paiatf  responsiliililics  and  an  awareness  ot  the  need  ior  finaneial 
accountabihty   are    required   to   foster   a   successful   business  enterprise   as   a   whole. 

In  the  early  days  work  equipment  was  a  comparatively  small  element  within 
the  larger  corporate  structure.  On  one  hand,  rapid  advancement  in  technology 
mushroomed  mechanization  into  multi-million  dollar  enterprises;  on  the  other  hand, 
this  growth  has  created  a  multi-million-dollar  expense  to  support  it.  Both  of  these 
factors  have  given  mechanization  a  status  where  it  can  no  longer  be  considered 
a  minor  entity  in  cor^xirate  planning  and  control. 

Executives  today  are  much  concerned  about  whether  or  not  they  are  getting 
full  value  for  the  company's  funds  required  for  mechanization. 

Work  equipment  fleet  managers  are  much  aware  of  the  cost  of  equipment 
ownership  and  operations  and  whether  or  not  the  all-inclusive  expenses  are  offset 
by  sufficient  savings   in  utilization. 

To  complete  the  picture,  the  users  of  equiiDment  are  concerned  about  produc- 
tion and  the  cost  of  getting  a  job  done. 

These  needs  must  be  the  guidelines  in  approaching  a  control  system  for  work 
equipment.  The  control  systems  much  be  designed  to  assist  in  direct  supervision 
to  quickly  identify  situations  that  require  attention.  They  should  also  generate 
managerial  decisions  and  action.  The  application  of  the  "management  by  exception" 
principle  should  be  used  where  possible — which  means,  of  course,  that  only  the 
exception  to  the  rule  is  brought  to  a  higher  management  level  for  action.  Operational 
research  techniques  must  also  be  used  in  a  modern  equipment  enterprise. 

Management   Tools 

What  are  the  objectives  for  management  tools  to  be  effective  in  an  environ- 
ment of  mechanization  and  frequent  technological  change?  Bearing  in  mind  that 
the  dollar  is  the  basic  element  of  economic  control  in  business,  administrative  tools 
must  be  based  upon  the  theme  of  financial  responsibility  and  accountability.  This 
implies  tliat  a  management  function  should  occur  at  the  levels  where  the  dollars 
are  being  spent  on  a  day-to-day  basis. 

The  next  level  of  the  management  function  within  work  equipment  is  respon- 
sible for  planning  and  the  overall  control  of  the  operation.  As  an  illustration,  some 
of  the  elements  to  be  accounted  for  at  this  level  are: 

•  General  overhead;   interest  and  depreciation 

•  Purchase   and   retirement  of  equipment; 

•  The  inventory  record  of  equipment; 

•  The  overall  budgets; 

•  Distribution  of  equipment; 

•  Utilization  of  equipment; 

•  Overall  repair  expense  and  its  relation  to  equipment  utilization; 

•  Operational  expense. 

We  must  also  remember  that  paperwork  is  essential.  It  is  a  means  of  com- 
munication. Let  us  not  lose  the  effect  of  good  communication  because  of  the 
prevalent  fear  of  paperwork.  Often  a  volume  of  paperwork  may  indicate  a  degree 
of  inefficiency.  It  has  been  noted  from  experience  that  paper  volume  decreases  in 
proportion  to  efFectieveness  of  the  management.  In  these  fast-moving  times,  man- 
agement nmst  have  reliable  records  that  will  aid  in  making  proper  decisions  quickly. 
Rehable  facts  must  be  available  for  .speedy  retrieval  on  a  basis  which  can  be  inter- 
preted quickly. 


586 Special    Features 


The  answer  is  a  carefully  desifined  integrated  management  information  system 
for  computer  application. 

A  picture  is  worth  a  thousand  words  and  I  will  now  illustrate  an  information 
system  which  has  been  specifically  designed  to  cover  a  work  eciuipmeut  function 
on  a  complete  financial  basis.  [Mr.  Fisher  then  presented  and  discussed  a  series  of 
slides,  none  of  which  is  reproduced  herein.] 


Some  Aspects  of  Service  Developments  in  Rail-Head  Metal 
72-633-13 

By    R.    J.    HENRY 

Engineer,    Alloy    Development   Section 

Homer     Research     Laboratories 

Bethlehem    Steel    Corporation 

ABSTRACT 

The  service  developments  in  rail-head  metal  described  and  micrographically 
illustrated  are:  (a)  the  surface  spalling  of  tangent  (straight)  track,  (b)  the  surface 
spalling  of  the  hoop  rail  on  a  car  dumper,  and  (c)  tlie  end  batter  of  bolted  rails. 
These  developments  are  characterized  by  the  presence  of  white-etching  regions. 
Previous  investigations  of  such  regions  as  they  occur  along  shell-type  cracks  indi- 
cated that  these  are  regions  where  the  normal  pearlitie  base  steel  has  been  trans- 
formed to  a  hard  martensite  by  a  combination  of  stress  and  heat. 

In  addition  to  a  discussion  of  the  white-etching  regions  associated  with  these 
service  developments,  the  paper  also  presents  data  on  the  life  of  crane  wheel  and 
railroad  rail  steels  showing  that  the  life  of  these  steels  decreases  with  increasing 
static  contact  stress. 

INTRODUCTION 

By  way  of  introduction,  I  would  like  to  give  a  little  of  the  background  leading 
to  the  present  paper  on  some  service  developments  in  rail-head  metal  that  are 
characterized  by  the  presence  of  white-etching  regions. 

In  January  of  this  year,  Mr.  Ken  Schoeneberg,  executive  research  engineer  for 
the  Association  of  American  Railroads  (AAR),  visited  in  Bethlehem  with  Mr.  G.  G. 
Knupp  and  me.  The  visit  was  an  outgrowth  of  Mr.  Knupp's  participation  in  the 
Joint  Contact  Committee  of  the  American  Railway  Engineering  Association  (AREA) 
and  the  American  Iron  and  Steel  Institute  (AISI)  as  well  as  Mr.  Schoeneberg's 
efforts  to  formulate  an  AAR  rail  research  program  designed  to  benefit  the  railroads. 
During  his  visit,  we  discussed  today's  topic,  particularly  emphasizing  some  of  the 
effects  of  heavy  wheel  loads  on  the  rail.  We  also  talked  about  the  observations 
made  by  Mr.  Mike  Wisnowski  during  his  AAR  investigation  of  white-etching  regions 
such  as  are  sometimes  seen  along  cracks  associated  with  rail-head  shelling.  At  the 
Rail  Committee  meeting  in  Harrisburg,  Pa.,  last  April,  I  discussed  the  results  of 
work  performed  to  identify  the  cause  of  white-etching  regions.  These  results,  which 
were  published  in  the  February  1970  issue  of  Bulletin  626,  Vol.  71,  of  the  AREA 
Proceedings,    showed    that    white-etching    regions    can    result    from    stress-induced 


Note — Discussion  open  until  October  15,  1971. 


Address    by    R.    J.    Henry 587 

changes  of  the  base  steel  under  conditions  of  rolhng-contact  fatigue  such  as  is 
created  by  a  heavily  loaded  wheel  traveling  on  a  rail  [1].**  In  today's  talk  I  will 
describe  white-etching  regions  that  develop  under  still  other  conditions,  in  particular 
those  created  by: 

•  Traction  and  adhesion  between  the  rail  and  the  wheel 

•  Impact  loads 

•  Repeated  loads  resulting  in  fatigue 

The  effects  of  the  traction  and  adhesion  situation  will  be  seen  in  photomicro- 
graphs of  a  hard  white-etching  layer  that  was  produced  on  the  surface  of  a  string 
of  13  tangent  136  lb/yd  rails.  The  spalling  of  crane  rails  used  on  a  car  dumper 
will  illustrate  the  effect  of  impact  loads,  and  the  end  batter  of  non-end-hardened 
bolted  rails  will  be  presented  as  an  example  of  the  effect  of  both  impact  and 
repeated  loads.  The  effect  of  repeated  loads  was  discussed  in  detail  at  last  April's 
Rail  Committee  meeting,  and  during  the  discussion  Dr.  Harris,  vice  president. 
Research  and  Test  Department,  AAR,  asked  whether  controlled  laboratory  experi- 
ments had  been  performed  to  support  the  view  that  heavy  loads  result  in  shorter 
rail  Iffe.  In  response  to  this  request,  I  have  also  summarized  data  from  the  literature 
on  this  questiou 

White-Etching    Regions   Resulting   from   Traction   and   Adhesion    Conditions 

Of  the  several  sites  where  the  white-etching  phenomenon  is  observed,  the  most 
obvious  are  the  surfaces  of  the  rails  subject  to  the  action  of  traction  and  adhesion. 
Under  these  conditions,  as  we  will  see  from  the  first  two  figures,  the  developing 
white-etching  regions  ultimately  give  rise  to  shallow  surface  spalling.  Thus,  in  Fig. 
1,  which  includes  the  cross-section  and  top  views  of  a  rail-head  taken  from  tangent 
track,  we  see  a  white-etching  region  extending  over  most  of  the  contact  surface 
and  a  central  area  of  spalling. 

Usually  white-etching  regions  are  clearly  observable  only  with  the  aid  of  micro- 
scope and  have,  therefore,  been  considered  by  metallurgists  to  be  a  microstructural 
feature.  However,  as  the  macrographs  in  Fig.  1  show,  such  regions  can  become 
extensive  enough  to  be  observed  with  the  naked  eye.  The  shiny,  white  appearance 
of  these  regions,  as  contrasted  with  the  gray  color  of  rail  steel,  is  a  manifestation 
of  the  pearlite-to-martensite  transformation  that,  in  this  case,  developed  under  the 
effects   of   traction    and   adhesion. 

This  phase  transformation  is  also  reflected  in  the  greater  hardness  of  the 
white-etching  regions  as  compared  with  that  of  original  rail  steel.  Thus,  the  white- 
etching  contact  layer  in  Fig.  1  showed  a  Brinell  hardness  of  653  (Re  60)  as 
contrasted  with  a  BHN  272   (Re  28)   for  the  adjacent  unaffected  metal. 

For  the  case  illustrated  in  Fig.  1,  the  area  of  the  rail-head  surface  affected  by 
white  etching,  including  the  spalling  in  the  central  area,  varied  in  width  from  IJa 
to  l'/4  inches.  The  maximum  depth  of  the  affected  layer,  as  measured  from  the 
suface  of  the  rail  to  the  beginning  of  the  pearlite,  is  0.0175  inch. 

Fig.  2a  is  a  photomacrograph  of  the  as-recei\cd  rail-head  between  the  spalled 
region  and  the  ruler  in  Fig.  lb.  The  typical  heat-check  cracking  and  the  scorch 
marks  (arrows)  in  this  unspalled  region  were  probably  caused  by  tlie  spinning  of 
locomotive  wheels  when  traction  was  poor. 


Brackets   indicate   references   listed   at   the  end   n(  this   paper. 


588 


Special   Features 


•2  .E 
^  • 


-0  2 


7  ■" 

01      Q 

u     V 
9>  JC 

tt:  ^ 


WMMWMMSWMIa 


% 


Address    by    R.    J.    Henry  589 


Fig.  2a — Rail  surface  befween  spoiled  region  and  ruler  in  Fig.  lb.  Heat  checks  and 
scorch  marl<s  (arrows)  probably  result  from  spinning  of  locomotive  wheels.  9X,  as-received, 
b)  Cross  section  illustrating  three  microstructural  zones  in  affected  region:  S,  featureless 
surface  zone,  about  0.008  inch  thick;  F,  featureless  plus  ferrite  network  zone,  about  0.009 
inch    thick;    P,    pearlitic    microstructure.    1 0OX,    picral    etch. 


The  photomicrograph  in  Fig.  2b  shows  three  different  microstructural  zones 
revealed  on  a  polished  and  picral-etched  microsample  cut  from  the  cross-section 
sample  seen  previously  in  Fig.  la.  The  surface  zone,  S,  is  the  featureless  white- 
etching  region  at  lOOX  magnification  and  is  about  0.008  inch  thick.  Zone  F,  just 
below  the  surface  zone,  contains  a  featureless  constituent  together  with  a  ferrite 
network  and  is  about  0.009  inch  thick.  The  third  zone,  P,  is  the  usual  pearlitic 
microstructure  typical  of  the  as-rolled  rail.  The  same  microstructural  features  were 
also  brought  out  by  etching  with  other  reagents  such  as  sodium  metabisulfite  and 
nital,  as  outlined  in  Reference  1. 

When  the  white-etching  surface  region  is  studied  under  the  electron  micro- 
scope, it  is  seen  that  this  region  does  have  certain  microstructural  features.  Thus, 
in  a  replica  of  a  polished  and  sodium-metabisulfite-etched  cross  section,  Fig.  3a, 
the  electron  microscope  reveals  a  pattern  with  some  aligned  precipitates  characteris- 
tic of  partially  tempered  martensite.  This  transformation  microstructure,  which 
appears  at  the  interface  (arrows)  of  the  white-etching  layer  and  the  pearlitic  base 
metal,  is  seen  in  greater  detail  at  10,000X  magnification  in  Fig.  3b.  The  micro- 
structure  shown  is  probably  massive  martensite  with  a  medium  carbon  content  [2]. 
As  a  matter  of  fact,  spectrographic  analyses  showed  the  carbon  content  in  the  white- 
etching  region  to  be  0.68%  as  compared  with  0.76%  for  the  base  steel,  0.68%  being 
in  the  range  required  to  produce  massive  martensite  when  quenching  from  above 
1300  F. 

If  the  white  etching  layer  was  indeed  massive  martensite,  it  would  respond  in 
the  following  ways  to  annealing,  i.e.,  heating  above  1330  F  followed  by  slow  cooling, 
and  to  tempering,  i.e.,  heating  to  temperatures  less  than  1330  F  for  a  half-hour: 
(a)  annealing  would  produce  a  pearhtic  microstructure,  and  (b)  additional  tem- 
pering in  a  furnace  would  complete  the  precipitation  process  already  begun.  As  seen 
in  Fig.  4a,  annealing  of  the  white-etching  region  at  1550  F  in  argon  did,  as  a  matter 
of  fact,  produce  a  pearlitic  microstructure.  In  Figs.  4b  and  4c  it  is  seen  that  tem- 
pering of  the  white-etching  region  completed  the  precipitation  process,  resulting  in 


590 


Special    F e atures 


Fig.  3 — Electron  photomicrographs  of  replicas  of  polished  and  sodium-metabisulfite- 
etched  cross  section  of  white-etching  region:  a)  Arrows  indicate  interface  of  pearli^e  base 
rail  and  hard,  white-etching  layer.  2,500X.  b)  Note  pattern  of  aligned  precipitates  charac- 
teristic   of    partially    tempered    martensite.    10,000X,    sodium    me)abisulflte    etch. 


US 


Fig.  4 — Photomicrographs  showing  white-etching  region  after:  a)  annealing  at  1550  F 
in  argon;  b)  and  c)  tempering  at  1000  F  in  argon.  Annealing  converts  region  to  pearlite 
plus  ferrite.  Tempering  converts  layer  to  spheroidized  structure  typical  of  tempered  mar- 
tensite.   a)     and    b)     100X,    picral    etch;    c)     750X,    picral    etch. 


ihe  more  uniformly  dispersed  spheroidization  typical  of  quenched  and  tempered 
steels.  These  two  results  provided  further  evidence  that  the  white-etching  region 
is  martensite. 

In  addition  to  the  responses  to  the  heat  treatments  shown  in  Figs.  4a  and  b, 
note  that  the  vertical  cracks  are  stopped  (Fig.  4a)  or  diverted  (Fig.  4b)  along  the 
horizontal.  This  stopping  and  diverting  of  the  cracks  occur  at  the  interface  of  the 
white-etching  layer  and  the  pearlite  and  indicate  that  the  pearlitic  rail  steel  is 
tougher  than  the  transformed  white-etching  region. 

Let  us  sum  up  the  key  facts  about  the  microstructure  of  white  etching  regions 
created  under  traction  and  adhesion  conditions:  the  precipitation  pattern,  the  0.68^ 
carbon  content,  and  the  heat-treatment  responses  provide  evidence  that  the  white- 
etching  structure  is  a  medium-carbon  massive  martensite. 

As  usual,  the  rail-head  contour  showed  e\  idencc  of  some  in-service  deformation, 
Fig.  la.  Although  the  amount  of  contour  deformation  is  small,  the  amount  of  distor- 
tion shown  by  the  ferrite  network  near  the  rail-head  field  side  in  the  photograph 
of   Fig.   5   could   not  have  occurred   after   the  white-etching  layer  formed  without 


Address    by    R.    J.    Henry 


591 


Fig.    5 — Photomicrograph    showing    extensive    distortion    of   ferrite    network     (arrows) 
compared   to   nearly  vertical   crack   near  field   side  of   rail.    100X,   picral   etch. 


spalling  of  the  layer  or  without  some  tilting  of  the  vertical  crack  in  the  layer.  Thus, 
it  is  apparent  that  the  deformation  contour  of  the  rail  occurred  over  tlie  years  subse- 
quent to  installation  and  before  the  recent  formation  of  the  white-etching  layer. 
Recent  white-etching  layer  formation  suggests  that  friction  heating  resulting  from 
spinning  of  the  locomotive  wheels  is  the  most  probable  cause  of  the  development 
of  such  layers. 

The  specific  steps  in  this  development  under  traction-adhesion  conditions  are 
probably: 

•  The  as-rolled  pearlitic  microstructure  at  the  very  surface  of  the  rail  is  cold- 
deformed  by  heavy  wheel  loads. 

•  Subsequently,   this   deformed   microstructure  is   subjected   to  heating  by   the 
spinning  of  the  locomotive  wheels  during  a  poor  traction  situatiou 

•  Quenching  by  the  surrounding  air  and  the  large  mass  of  the  remaining  rail- 
head  produces   quenched   massive  martensite 

•  At  some  later  time,  spalling  begins  as  a  result  of  trains  passing  repeatedly 
over  the  hard  and  increasingly  brittle  white-etching  regionSi 

Thus,  it  is  seen  that  the  transformation  microstructure,  mainly  massive  mar- 
tensite,  comprising  tlie  white-etching  layer  on  the  rail-head  surfaces  apparently 
results    from    a    combination    of   plastic    deformation    and   localized    friction-heating. 

Since  this  coml^ination  of  factors  is  responsible  for  the  transformation  micro- 
structure  comprising  such  layers,  complete  solution  of  the  problem  will  be  difficult 
under  current  conditions  of  ever-increasing  wheel  loads  and  the  tractive  forces  of 
increasingly  powerful  locomotives.  Of  course,  one  solution  that  has  been  tried  is 
grinding  off  the  spalled  layer  and  the  surrounding  white-etching  regions  to  expose 


592 Special    Features 


clean  pearlitic  rail  steel  aj^aiii.   Hut,  tliis   remedy  cannot  be  canied  on  indefinitely, 
since  the  basic  rail  contour  must  be  maintained. 

Before  we  leave  this  subject  of  hard,  white-etching  layers  on  the  surfaces  of 
rails,  we  ought  to  mention  the  phenomenon  of  engine  burns,  a  form  of  localized 
service  developments  whicli  are  familiar  to  all  of  you.  The  spalling  and  the  shine 
of  the  typical  engine  liurn  are  quite  similar  to  those  observed  for  the  traction- 
adhesion  case  just  described,  except  that  the  region  of  the  rail  affected  by  the 
engine  bum  is  generally  much  shorter  (several  inches  at  most)  and  deeper  than  that 
obser\'ed  on  the  13-rail-length  of  the  affected  region  noted  in  our  rail  spalling  case. 
However,  the  rail  spalling  case  might  be  considered  an  extended  engine  bum, 
because  the  extensive  spalling  case  and  engine  burns  are  both  caused  by  wheel 
slip  and  because  the  spalling  characteristics  and  the  shine  of  the  affected  surfaces 
of  the  rails  are  similar.  Thus,  rail  engine  burns  can  cause  the  same  kind  of  spalling 
but  to  a  lesser  extent. 

White-Etching    Regions   on   a   Car-Dumper   Hoop    Rail    Under   the    Effect   of   Impact   Loads 

Another  set  of  conditions  leading  to  the  development  of  white-etching  regions 
are  those  created  by  impact  loads.  Thus,  spalling  of  full-head-width  pieces  from 
crane  rails  used  to  form  a  car-dump  hoop  rail  has  also  been  observed.  This  example 
of  spalling  is  shown,  because  later  in  the  discussion  of  the  effect  of  stresses  on  rail 
and  wheel  steels  some  of  the  data  used  were  collected  from  experiments  employing 
crane  wheel  materials,  which  are  similar  in  composition  to  railroad  rails. 

The  photograph  in  Fig.  6  was  taken  at  the  car-dumper  site  and  shows  one  of 
ths  spalled  regions.  Note  that  the  spalling  extends  across  the  full  width  of  the  rail- 
head, as  contrasted  with  the  spalling  limited  to  the  middle  area  in  the  previous 
example  illustrating  traction-adhesion  effects.  This  difference  in  the  spalling  seen 
in  Fig.  6  probably  results  from  the  different  geometry  between  the  wheel  and  rail. 
To  be  specific,  in  the  car-dumper  rail,  the  rail-head  is  flat  rather  than  crowned  as 
is  the  case  with  railroad  rails,  and  the  guide-wheel  tread  is  cylindrical  rather  than 
tapered. 

Four  small  samples  that  spalled  from  the  rail  are  shown  in  Fig.  7.  Visual 
examination  of  the  small  samples  revealed  that  they  had  the  same  bright,  shiny 
appearance  observed  in  the  white-etching  regions  of  the  traction-adhesion  example. 
But  when  the  samples  were  polished  and  etched  in  nital,  a  duplex  microstructure 
emerged.  Fig.  8  shows  this  microstructiue  at  500 X-  The  continuous  phase  contain- 
ing the  acicular  pattern  is  high-carbon  as-quenclied  martensite,  and  the  discontinu- 
ous dark  nodules  are  pearlite  patches. 

The  metallographic  examination  showed  that  the  microstructure  in  the  spalled 
pieces  contained  as-quenched  martensite,  which  generally  is  thought  to  be  formed 
only  by  heating  of  the  affected  area  above  1300  F  followed  by  rapid  quenching. 
However,  it  was  reported  by  observers  who  visited  the  car-dumper  site  that  local- 
ized heating  could  not  have  occurred  during  the  rotating  operation  of  the  car- 
dumper.  On  the  other  hand,  these  spalled  regions  probably  resulted  from  impact 
during  loading  and  unloading  of  the  dumper,  because  the  regions  are  located  such 
that  they  were  in  contact  with  mating  guide  wheels  in  the  normal  load  and  unload 
positions  of  the  car-dumper. 

Repeated  lateral  thrust  and  repeated  impact  on  rails  from  nosing,  hunting, 
roadbed  irregularities,  and  rocking  cars  could  also  be  causes  of  similar  white-etching 
regions  on  rails. 


Address    by    R.    J.    Henry 


593 


Fig.    6 — Photograph    of   car-dumper   hoop    rail   showing    one   of   spalled   regions. 


t   I   I  i  I  i  JLi   f 


t       I      ii       » 


Fig.    7 — Photograph    of   four   samples    that    spalled    from    car-dumper   hoop    rail. 


594 


Special    Features 


Fig.  8 — Photomicrograph  of  duplex  microstructure  observed  in  spoiled  samples.  Light 
colored,  acicular  phase  is  as-quenched  martensite  and  dark  nodules  are  pearlite.  500X, 
nital   etch. 


White-Etching    Regions    Resulting    from    the   Effects   of   Repeated   Loads   on    Rail-Ends 

Our  third,  and  final,  category  of  conditions  that  also  produce  white-etching 
regions  are  those  created  by  repeated  loads  resulting  in  fatigue.  In  bolted  track, 
rails  are  installed  so  that  their  ends  are  separated  to  accommodate  expansion  from 
ambient  thermal  fluctuations.  As  a  result  of  this  gap,  two  groups  of  locations  at  the 
bolted  joint  are  susceptible  to  impact  by  repeated  loads  as  a  train  moves  along  the 
track.  Rail  surfaces  at  the  end  of  the  adjoining  rail-heads  comprise  one  of  these 
locations.  Repeated  impact  at  this  type  of  location  results  in  the  familiar  mush- 
rooming and  associated  spalling  and  chipping  often  observed,  known  as  end  batter. 
The  other  type  of  location  is  the  vertical  faces  of  the  two  adjoining  rails.  During 
the  vertical  movement  of  track  from  passing  wheels,  the  vertical  end  faces  of  the 
adjoining  rails  contact  each  other  under  impact  conditions.  The  consequence  of 
repeated  impact  on  these  vertical  faces  is  not  as  familiar  as  that  on  the  horizontal 


Address    by    R.    J.    Henry 


595 


Fig.  9a — Photograph  of  piece  of  rail  showing  end  batter 
and  spoiling,  b)  Photomicrograph  of  cross  section  along  ver- 
tical face  of  rail  shown  in  (a)  at  Va  inch  below  fracture  face. 
White-etching  region  is  0.01  inch  wide  at  top  of  photo  and 
is  as-quenched  martensite.  Arrow  points  to  large  crack  which 
penetrates    into    pearlitic    part    of    rail.    100  X,    nital    etch. 


596 Special    Features 


contact  surface.  Fig.  9a  shows  an  example  of  a  rail-cnd  problem  where  a  portion 
of  a  non-end-hardent'd  rail  has  spalled  away  as  a  result  of  impact  and  rubbing  of 
the  vertical  faces  of  the  rail  ends. 

Fig.  9b  shows  a  lOOX  photomicrograph  of  a  section  cut  from  the  end  of  the 
non-end  hardened  rail  piece  shown  in  Fig.  9a.  The  white-etching  region  shown  is 
about  0.01  inch  at  the  widest  place  and  is  located  on  the  vertical  end  about  /i  inch 
down  from  the  fracture  face. 

There  are  many  narrow  cracks  and  one  large  crack  (arrow)  in  the  white- 
etching  region.  Portions  of  the  large  open  crack  have  begun  to  penetrate  the 
pearlitic  base  steel.  Such  combinations  of  white-etching  regions  and  cracks  probably 
initiated  the  spall  seen  in  Fig.  9a  as  follows:  The  white-etching  region  was  formed 
by  a  combination  of  impact  and  friction  heating.  Then,  because  of  the  typical 
brittlcncss  of  this  type  of  region,  it  cracks  when  struck.  Eventually  propagation  of 
cracks  sidcwise  into  the  pearlitic  rail  resulted  in  spalling. 

In  the  last  section  of  this  paper  I  am  going  to  include  a  summary  dealing  with 
the  white-etching  phenomenon.  However,  at  this  point,  in  response  to  a  question 
raised  by  Dr.  Harris  at  last  April's  Rail  Committee  meeting,  I'd  like  briefly  to 
discuss  tlie  relation  between  rail  life  and  heavy  loads  or  stresses. 

Rolling-Contact   Life   as   a    Function   of  Stress 

Consideration  of  this  relationship  begins  with  the  basic  principle  that  we  are 
dealing  with  a  rolling-contact  phenomenon,  i.e.,  moving  train  wheels  in  contact  with 
rails.  Thus,  the  loads  and  stresses  applied  to  the  wheel-rail  contact  areas  can  be 
studied  using  typical  rolling-contact  fatigue  tests. 

Fig.  10  is  a  schematic  view  of  a  typical  rolling-contact  fatigue  rig,  sometimes 
referred  to  as  a  "nutcracker"  because  the  test  piece  is  squeezed  between  the  two 
arms.  In  the  simple  rig  shown  the  test  sample  of  wheel  or  rail  steel  on  top  is  rotated 
by  a  hardened  steel  drive  roller  on  the  bottom.  The  failure  criterion  used  is  surface 
spalling  of  the  metal  test  sample,  as  shown  in  Fig.  11. 

There  is  also  deformation  of  the  test  rollers,  which  results  from  the  rolling- 
contact  testing.  Before  testing,  the  contact  regions  of  the  rollers  are,  of  course, 
crowned,  but  after  testing  they  are  flattened,  as  shown  by  the  dark  center  region 
in  Fig.  11.  This  flattening  of  the  roller  test  samples  is  comparable  to  the  progressive 
change  of  contour  of  a  rail  that  has  been  in  service  for  some  time. 

Using  the  "nutcracker"  rig,  Ollerton  and  Morey  [3]  at  the  University  of  Not- 
tingham, England,  and  Bauling  and  Homan  [4]  at  the  University  of  Illinois  tested 
rail  steel  and  crane  wheel  steel,  respectively.  Fig.  12  summarizes  the  key  results 
of  these  two  studies  of  the  relation  of  rolling-contact  life  of  initially  crowned  rollers 
to  maximum  static  contact  stress.  It  is  clearly  seen  that  the  lower  the  maximum 
stress,  the  greater  the  life.  The  dashed  horizontal  line  at  115  ksi  is  the  calculated 
maximum  static  contact  stress  level  of  each  wheel  of  a  70-ton  car  on  eight  36-inch 
wheels,  and  has  been  added  to  this  figure  to  make  a  very  practical  point.  That  is, 
this  stress  level  for  the  70-ton  car  is  less  than  the  stress  levels  used  by  the  two 
groups  of  investigators  and  would  give  longer  life  than  they  achieved.  Yet,  even 
though  the  railroads  would  like  to  see  rail  life  extended  beyond  what  it  is  now, 
they  continue  to  go  to  heavier  and  heavier  cars  which  produce  higher  wheel  loads, 
a  tiend  wliich  is  in  basic  contradiction  to  the  goal  of  increased  rail  life.  To  take 
just  one  example,  a  lOO-ton  car  produces  a  calculated  maximum  static  contact  stress 
of  122  ksi  per  wheel,  i.e.,  7  ksi  more  per  wheel  than  a  70-ton  car. 


Address    by    R.    J.    Henry 


597 


Fig.    10 — Schematic   of   typical    rolling   contact  fatigue   rig   with   test 
roller   at   top   and   drive   roller  at  bottom. 


8 

Fig.  1 1 — Photograph  of  portion  of  rolling  contact  area  of  three  samples  illustrating 
typical  spalls  produced  during  rolling  contact  tests.  Flattened,  uniformly  darkened  central 
region    of   surfaces    results    from    deformation    of   originally   crowned   surface   of   the   rollers. 


598 


Special    F e  at  ures 


400 


350 


CO 

[j300 
(T 

(O 


o 

^250 

z 
o 
o 


•200 


o 
!5  150 


100 


BHN  345    CRANE    WHEEL    STEEL 


BHN  264     CARBON     RAIL    STEEL 


IOO__TON  ^AR 
50    TON    CAR 


10" 


10''  10'' 

CYCLES    TO    FAILURE 


10^ 


Fig.    12 — Rolling    contact    fatigue    life    of    crane    wheel    and    railroad    rail    steel    is    longer    at 
lower   calculated   maximum   contact   stress.    Data   obtained   from   References   3   and   4. 


But  this  still  is  not  the  whole  story,  because  in  these  examples  the  stresses 
are  calculated  for  static  contact  rather  than  for  the  far  more  destructive  conditions 
created  by  the  dynamic  stresses  of  the  real-life  situation.  Though  the  relation 
between  rail  life  and  dynamic  stresses  has  not  been  exhaustively  documented,  the 
repeated  vertical  and  lateral  impact  loads  characteristic  of  the  real-life  situation  are 
known  to  far  exceed  the  static  stresses  indicated  for  the  70-  or  100-ton  cars  and 
they  can  cause  the  white-etching  regions  described  previously. 


CONCLUSIONS 

To  sum  up,  we  have  discussed  white-etching  regions  resulting  from:  (a)  trac- 
tion-adhesion conditions  on  tangent  rail  surfaces,  (h)  impact  loads  on  the  surfaces 
of  crane  rails  used  as  car-dumper  lioop  rails,  and  (c)  repeated  loads  on  the  vertical 
face  of  a  non-end-hardened  bolted  rail.  The  white-etching  regions  described  are 
caused  by  various  combinations  of  high  compressive  or  impact  loads  and  heat. 
Whatever  the  particular  cause  or  causes,  the  white-etching  regions  and  the  resulting 
spalling  create  maintenance  problems  for  the  railroads. 


Address    by    J.    A.    Heine  n 599 

In  a  rolling-contact  fatigue  test,  rail  steels  have  longer  life  at  lower  maximum 
static  contact  stress  levels  than  at  higher  stress  levels. 

Although  the  trend  is  toward  larger  loads  and  more  powerful  locomotives,  in 
the  last  analysis  railroad  people  must  constantly  calculate  the  real  economic 
optimum  by  balancing  the  profit  gains  from  heavier  loads  against  the  increasing 
costs  of  greater  rail  maintenance  or  decreased  rail  life. 

REFERENCES 

1.  R.  J.  Henry,  "The  Cause  of  White  Etching  Material  Ou dining  Shell-Type  Cracks 
in  Rail  Heads,"  AREA  Bulletin  626,  Proc.  Vol.  71,  Feb.  1970,  pp.  682-688. 

2.  A.  R.  Marder  and  G.  Krauss,  "The  Morphology  of  Martensite  in  Iron-Carbon 
Alloys,"  Trans.  ASM,  Vol.  60,  No.  4,  Dec.  1967,  pp.  651-660. 

3.  E.  Ollerton  and  J.  W.  W.  Morey,  "Fatigue  Strength  of  Rail  Steel  in  Rolling 
Contact,"  Proc.  of  the  Symposium  on  Fatigue  in  Rolling  Contact,  InstituLion  of 
Mechanical  Engineers,  March  1963,  pp.   11-22. 

4.  F.  G.  Hauling  and  G.  G.  Homan,  "Evaluation  of  the  Pitting  Resistance  of  Three 
Crane  Wheel  Materials,"  Unpublished  project  sponsored  by  AISE,  conducted 
in   the  Dept.   of  Theoretical  and  Applied  Mechanics,   U.  of  111.,  February   1969. 


Repair  of  Concrete  Structures  with   Epoxy  Compounds 

By   J.    A.    HEINEN 

Manager  of  Materials  Technology  and   Product  Development 

Sika    Chemical    Corporation 

The  title  of  this  talk  is  "Repair  of  Concrete  Structures  With  Epo.xy  Compounds." 
If  space  permitted,  we  could  probably  add  the  words  "rehabilitation,"  "redesign," 
"reco\ery,"  and  "renoxation." 

On  the  theory  that  "pictures  are  worth  a  thousand  words"  and  are  much  more 
interesting,  I'm  going  to  limit  this  talk  really  to  showing  you  a  series  of  slides 
where  repairs  to  concrete  structures  have  been  made  using  epoxy  resins.  Now, 
unfortunately,  in  this  series  of  slides  you  will  notice  that,  with  one  exception,  none 
of  them  are  railroad  structures.  Now  I'm  not  prepared  to  say  whetlier  that's  testi- 
mony to  the  longevity  and  integrity  of  railroad  structures  or  whetlier  it  is  a  coinci- 
dence, but  in  any  event,  let's  take  a  look  at  some  slides. 

(Slide  1) — This  is  what  occasionally  happens  to  concrete  structures.  In  tliis 
case  it  happened  when  a  rusty  old  barge  ran  into  the  Chesapeake  Bay  Bridge  Tiui- 
nel  and  the  repair  procedure  decided  on  was  the  use  of  the  high-strength,  non- 
brittle  material  known  as  an  epoxy  mortar.  The  method  for  accomplishing  this  was 
to  build  some  small  steel  forms  which  would  accommodate  themseKes  to  the  con- 
figuration of  the  ends  of  the  beams,  to  line  those  with  polyethylene  as  a  bond- 
breaker  for  the  epoxy  and  then  to  design  an  epoxy  mortar  that  was  pourable  so  that 
it  could  be  poured  into  the  space  between  the  fractured  concrete  and  the  poly- 
ethylene-lined forms.  Here  (Slide  2)  you  .see  that  done.  Those  beams  which  were 
damaged  on  the  Chesapeake  Bay  Bridge  Tunnel  were  repaired  using  epoxy  mortar. 
A  little  later  on  you  will  see  that  there  were  also  some  cracks  which  additionalK' 
were  repaired  using  low-viscosity  epoxy  systems. 

liiii.  6:ta 


600  Special    Features 


(Slide  3) — Here  is  a  prestressed  beam  that  is  exhibiting  a  slight  amount  of 
distress — nothing  serious,  just  near  collapse — and  the  idea  here  is  how  do  you  go 
about  repairing  something  like  that.  What  do  you  replace  it  with?  After  all, 
this  is  5()0{)-6000-psi  concrete  that  is  failing  here — a  relatively  brittle  material.  It 
doesn't  st^m  to  make  much  sense  to  go  back  and  replace  it  with  some  more  5000— 
6000-psi  concrete.  Well,  we  decided  that  a  stronger,  less  brittle  and  tougher  mate- 
rial would  have  to  be  used,  and  the  material  selected  was  an  epoxy  resin  system  in 
mortar  form.  Procedure  (Slides  4,  5  and  6)  was  to  jack  the  beam  up  slightly  off 
the  support;  chip  out  all  loose  or  deteriorated  concrete;  clean  the  steel  off  thoroughly 
and  then  to  prime  the  existing  concrete  with  a  prime  coat  of  the  neat  epoxy  resin. 
Plywood  form  sections,  lined  with  polyethylene  were  used.  Polyethylene  is  an 
excellent  bondbreaker  for  the  epoxies.  Layers  of  epoxy  mortar  were  put  in  place, 
carefully  rodded  and  consolidated  up  against  the  existing  concrete  and  around  the 
reinforcing  steel.  This  was  done  in  sections  from  bottom  to  top,  and  with  some 
of  the  fast-curing  epoxy  resin  systems  these  forms  would  have  to  stay  in  place  for 
maybe  an  hour  and  a  half  to  two  hours.  They  can  then  be  stripped,  and  the  fol- 
lowing day  the  supports  could  be  removed  and  tlie  beam  could  be  allowed  to  come 
to  rest  on  the  pedestal  once  more.  An  additional  feature  of  this  particular  job  was 
that  the  deck  itself  had  to  be  beefed  up  and  they  added,  I  believe,  4  inches  of 
concrete  to  the  deck  to  the  existing  concrete,  again  using  an  epoxy  bonding  agent. 

(Slide  7) — This  is  something  else  that  occasionally  happens  to  concrete,  and, 
unfortunately,  it  always  happens  in  the  worse  places  to  try  to  get  to  or  to  try 
to  repair.  As  you  can  see  many  times  it  is  in  the  tension  side  of  a  piece  of  con- 
crete, which  makes  it  a  little  nastier  yet.  Well,  what  do  you  do  in  a  case  like  this. 
You  can  again  clean  out  your  deteriorated  material  to  sound  concrete,  go  in  there 
with  a  form  jack  and  a  temporary  form  lined  with  polyethylene  (Slide  8).  Make 
your  repair  by  grinding  the  existing  concrete  and  using  an  epoxy  mortar.  That  is  a 
dry  silica  aggregate  mixed  with  the  epoxy  resin  system.  It's  a  fast  method  of 
repair,  a  strong  method  of  repair,  and  it's  a  method  of  repair  using  a  material  with 
approximately   10  times  the  tensile  strength  of  the  concrete. 

(Slide  9) — Now  here  is  one  of  those  unusual  cases  that  people  don't  try  to 
explain.  This  is  a  bridge  that  for  some  reason  didn't  want  to  come  to  bear  on  its 
pier  or  pedestal.  And  for  reasons  unknown  to  me  the  owning  authority  did  not 
want  to  insert  a  thicker  bearing  pad  to  make  up  tlie  difference.  What  they  wanted 
was  a  very  high  strength  non-brittle  material  to  take  up  the  space  between  the 
bearing  pad  and  the  surface  of  the  concrete.  Their  method  was  to  jack  that  par- 
ticular portion  of  the  structure  up  and  to  take  an  epoxy  material  having  a  viscosity 
like  grease  and  using  a  caulking  gun  to  insert  that  material.  It  was  squirted  in 
under  the  bearing  pad,  and  while  the  material  was  still  in  the  uncured  state  to 
remove  the  jack  and  allow  the  entire  structure  to  come  down  on  die  epoxy,  seek  its 
own  level,  ooze  out  any  excess  epoxy  that  it  would,  and  then  the  excess  epoxy  was 
merely  removed  with  a  putty  knife  (Slide  10).  The  structure  now  bears  solidly  on 
a  cured  epoxy  resin  system  with  a  compressive  strengdi  somewhere  between  10,000 
and  15,000  psi,  non-brittle,  low  modulus,  resistant  to  gasoline,  salt  solutions  and 
whatever  else  might  drip  down  through  the  joint  (Slide  11). 

(Slide  12) — Now,  here's  a  different  kind  of  joint.  It  is  a  joint  tliat  God  has 
made.  However,  when  He  makes  them  we  call  them  cracks.  This  business  of  re- 
pairing cracks  in  concrete  can  be  very  complicated  or  it  can  be  made  somewhat 


Address    by    J.    A.    Heinen 601 

simple.  We  prefer  to  keep  it  pretty  simple.  There  are  basically  two  diings  you  can 
do  to  a  crack  in  concrete.  You  can  try  to  hide  it  or  you  can  fix  it.  By  fixing,  I  mean 
to  grout  or  weld  it  back  together.  I'm  assuming  now  diat  the  only  thing  that  will 
do  this  successfully  is  an  epoxy  resin  system.  Two  methods  are  available.  Those 
t\\'o  methods  can  be  classified  as  tlie  gravity  method  of  grouting  or  the  pressure 
method  of  grouting.  In  a  horizontal  surface,  of  course,  if  you  have  a  crack  with  a 
little  size  to  it  you  can  take  a  crack  router  and  open  the  surface  of  the  crack  until 
you  have  something  that  looks  like  this  (Slide  12),  then  by  hand  and  by  gravity 
you  can  simply  pour  in  a  low  viscosity  epoxy  system  to  fill  up  the  crack  ( Slide  13 ) . 
Now  you  have  to  seal  off  the  bottom  of  the  crack,  particularly  over  parking  spaces 
underneath,  otherwise  you'll  have  a  law  suit  on  your  hands.  Epoxy  resin  is  just  a 
little  bit  difficult  to  get  off  after  cure.  Assuming  that  the  cracks  are  considerably 
smaller  and  that  we  are  not  about  to  depend  on  gravity  alone,  we  can  then  do 
something  like  this:  You  can  seal  off  the  surface  of  the  crack  with  some  material, 
could  be  a  portland  cement  material,  could  be  a  gelled  epoxy  material,  could  be  a 
glue  or  something  of  that  nature,  and  at  intervals  along  that  crack  insert  some  type 
of  a  nipple,  some  type  of  an  entering  device.  Then  taking  a  relatively  simple  piece 
of  equipment,  a  hand-operated  caulking  gun,  we  can  actually  take  the  low  viscosity 
epoxy  material  and  pressure  grout  the  cracks.  A  standard  99-cent  hand-operated 
caulking  gun  will  do.  That  device,  believe  it  or  not,  will  build  up  about  80  lb  of 
pressure  and  will  drive  the  low  viscosity  epoxy  material  a  long  long  way  into  the 
crack.  There  are  going  to  be  times  and  instances  where,  because  of  the  location  of 
the  job  and  tlie  characteristics  of  the  labor,  you  have  to  keep  it  just  as  simple  as 
possible. 

Now  here  is  just  such  a  job  ( Shde  14).  This  happens  to  be  a  pier.  It's  in 
South  America.  A  three-year  project.  During  the  course  of  that  three-year  project 
there  was  a  period  of  about  three  montlis  when  this  particular  structure  was  vulner- 
able to  earthquake  damage.  I  know  you've  all  heard  of  Murphy's  Law.  That  is  when 
they  had  the  earthquake  3/2  years  ago  in  Peru.  On  this  particular  structure  the 
beams,  which  were  to  be  posttensioned,  also  sufl^ered  slight  distress:  4  to  8  of  these 
cracks  (Slide  15)  per  beam.  Now  there  already  had  been  a  lot  of  money  spent  on 
this  structure  and  the  engineers  definitely  wanted  to  salvage  it,  and  the  way  they 
selected  to  do  this  was  to  weld  those  beams  back  together  using  an  epoxy  resin 
system  and  posttensioning  the  beams  as  originally  planned.  The  method  used  there 
was  to  drill  holes  right  into  the  crack  at  anywhere  from  6  inches  to  2  ft  intervals, 
u.sing  an  electric  drill  and  a  carbide  drill  bit  (Slide  16),  and  then  to  .seal  off  the 
surface  of  the  crack,  in  this  case  with  a  gelled  epoxy  material  (Slide  17).  At  this 
point,  the  crack  was  ready  for  injection  of  the  low-viscosity  epoxy  grout.  However, 
e\'entually  these  beams  were  to  be  posttensioned  and  it  would  have  been  a  mess  if 
we  had  filled  up  that  duct  with  epoxy.  Well,  we  weren't  sure  whether  the  ducts 
were  going  to  leak  so  we  took  some  polyethylene  tubing  and  shoved  it  all  the  way 
through  the  duct  and  we  then  grouted  the  crack  (Slide  18).  It  turned  out  it  was 
a  good  thing  the  polyethylene  tubing  was  put  in  there  because  a  number  of  gal- 
lons of  tlie  epoxy  did  wind  up  in  the  duct.  The  method  cho-sen  here,  rather  than 
complicating  things  with  local  labor  and  a  4  or  5  thousand  dollar  metering,  mixing 
pumping  unit,  was  simply  to  u.se  a  hand-operated  caulking  gun.  The  theory  here 
was  that  such  a  device  is  almost  idiot-proof.  You  can't  build  up  so  much  pressure 
that  you  can  rupture  the  concrete  and  the  results  bore  out  the  fact  tliat  this  little 


602  Special    Features 


clc\ice  is  very  efficient.  Thirty-incli  sciuare  beams  were  completely  grouted  with 
just  one  entry  port. 

Here  is  the  same  type  of  thing  (Slide  19).  You  see  some  of  the  cracks  on  the 
Chesapeake  Bay  Bridge  that  ha\e  been  treated  in  exactly  the  same  way.  All  were 
drilled.  One-way  polyethylene  valves  were  inserted.  The  base  of  the  crack  was 
sealed  oil  with  the  epoxy  material.  And  again,  a  hand-operated  caulking  gun 
(Slide  20)  \\'as  used  to  inject  the  epoxy  grout  into  the  crack.  On  work  like  this 
other  devices  can  be  used  tliat  will  build  up  higher  pressure.  There  are  metering, 
mixing  pumps  on  the  market  which  will  do  this.  A  grease  gun  will  build  up  tre- 
mendous pressure. 

Now  this  job  (Slides  21,  22,  and  23)  falls  more  to  the  cla.ssification  of  re- 
design and  renovation.  This  is  a  bridge  structure  on  which  it  is  anticipated  that 
much  higher  loads  will  be  encountered  in  the  future,  and  a  redesign  indicates  that 
in  order  to  accommodate  those  loads,  6  inches  of  additional  concrete  will  have  to 
be  added  to  tlie  existing  deck.  For  that  to  be  successful  the  new  concrete  will 
have  to  be  bonded  to  the  existing  concrete  so  the  whole  thing  \\'ill  act  as  a  mono- 
lithic structure.  You  can  also  see  that  there  is  quite  a  bit  of  steel,  and  you  can 
imagine,  I  think,  that  there  is  no  way  to  get  a  bonding  agent  onto  tlie  existing 
concrete  other  than  to  spray  the  material;  and  in  tliis  case,  that's  exactly  what  was 
done.  A  liquid  epoxy  bonding  agent  was  sprayed  through  the  reinforcing  steel  onto 
the  existing  concrete.  Immediately  after  the  application  of  the  bonding  agent  a 
well-designed   concrete   mix   was   placed. 

Now  I  have  just  four  more  slides  that  I'd  like  to  show  you  (Slides  24,  25,  26, 
and  27)  that  are  not  repair,  not  rehabilitation,  not  redesign,  recovery  or  renovation. 
I  brought  these  along  for  one  reason  and  that  is  to  show  you  tliat  epoxy  resin 
systems  are  easily  used  in  new  construction  as  well  as  for  repairing  and  renovating. 
This  is  a  railroad  bridge  consisting  of  precast  concrete  box  beams  (Slide  24),  the 
keyways  of  which  are  going  to  be  filled  with  an  epoxy  grouting  system.  Each  key- 
way,  underneath  the  small  opening,  is  approximately  6  inches  high  and  ranges 
from  /2  inch  to  1/2  inches  in  width.  Here  you  see  the  method  of  sealing  those.  Low 
viscosity  epoxy  is  mixed  in  a  plastic  garbage  can.  Some  aggregate,  tlie  amount  pre- 
viously determined,  is  added  to  the  epoxy.  The  whole  thing  is  mixed  up  with  an 
electric  drill  in  the  garbage  bucket  ( Slide  25 ) .  Here  you  see  a  close-up  of  the  key- 
way  we  are  talking  about  ( Slide  26 ) ,  and  the  material  is  then  simply  poured  into 
the  keyways  using  the  pails  that  the  epoxy  originally  came  in  ( Slide  27 ) .  When 
cured,  we  are  talking  about  12,000  to  14,000  psi  material  tliat  is  non-brittle.  You're 
just  not  going  to  have  a  failure  of  the  keyway  material.  You  may  have  a  failure  of 
the  concrete,  but  not  the  keyway  material.  So  the  materials  are  being  used  in  new 
construction  as  well  as  existing  construction. 

Will  these  materials  perform  miracles?  No  they  won't.  Will  they  do  a  job  if 
used  intelligently,  recognizing  that  they,  like  all  other  inaterials,  have  linu'tations? 
Yes,  they  will. 


Address    by    J  .    A  .    H  e  i  n  e  n 


603 


Slide     2     (above) — Pouring     epoxy     grout 
into   form    to    repair   damaged    concrete. 

Slide    1     (left) — Concrete    brol<en    out 
to  rebars. 


Slide     3 — Cracked     prestressed    concrete 
bridge    beam. 


Slide    4 — Concrete    chipped    out    to    and 
behind   rebars. 


Slide    5 — Repair    being    made    with    epoxy 
mortar   behind    polyethylene-covered    form. 


Slide    6 — Repair    completed    with    series 
of    forms. 


604 


Special    Features 


Slide    8    (above) — Repair    made    with 
epoxy   mortar. 

Slide    7    (left) — Damaged    concrete    underside 
of   ftoorbeam. 


Slide     9     (above,     left) — Bearing     plate     not 
resting    completely    on    concrete. 

Slide     10     (above,     right) — Epoxy    gel    being 
forced   under  plate,   vi/hich   was  jacked  up. 


Slide    1  1     (right) — Full    bearing    after    repair. 


Address    by    J.    A.    Hei  ne  n 


605 


Slide    12 — Widening    and    cleaning    of   cracks 
by   routing    machine. 


Slide    13 — Pouring    epoxy    into    prepared 
crack. 


Slide    14 — View   of   pier  beams   under 
construction. 


Slide    1 5 — Crack    on    top    of   beam    caused 
by   earthquake. 


Slide     16 — Drilling     into     crack     on     side    of  Slide    17 — Sealing    of    crack    and    anchoring 

beam  for  insertion  of  polyethylene  valves.  of   valves    with    gel-type   epoxy. 


Slide  18  (right) — Grouting  into  valves 
using  low-viscosity  epoxy,  hand-operated 
caulking  gun  and  disposable  cardboard 
cartridge. 


606 


Special    Features 


n 

I 

-^■"^SLasL 

H^H 

^H 

f  ^.^dHhi 

^^■Hi^S^^^^^I 

^^B 

4B   i*  T^^I^^^^^^H 

^^^^^B 

^^|M 

WtM 

■ 

"'^SJ^HH 

r^ 

.   *»                        "^^s^ 

ik-^ 

Slide    19 — Sealed    cracks    and    polyethylene 
one-way   valves. 


Slide   20 — Grouting   into  valves,   using   hand- 
operated   caulking   gun. 


Slide  21  (above,  left) — Spraying  bonding 
compound  onto  existing  concrete  bridge  deck 
through    heavy    reinforcing    system. 

Slide    22    (above,    right) — Placing    concrete 
on    bridge   deck. 


Slide    23    (right)  —  Completed    deck, 
strengthened  to  carry   heavier  planes. 


Address    by    J.    A.    Heinen 


607 


II       I 


Slide   24 — View  of   beams  showing 
keyways. 


Slide    25 — Mixing    paddle    on    electric    dril 
to    mix    epoxy    and    sand. 


Slide    26 — Close-up    view    of    keyway. 


Slide   27 — Pouring   epoxy-sand   grout. 


It  11 1.  H-.l.l 


Ground  Rules  for  Discussion  Section 

Coiiinients  on  tlie  reports  and  papers  published  in  the  four  technical  issues  of  the 
AREA  Bulletin,  by  either  members  or  non-members,  are  invited.  These  comments 
will  be  printed  in  a  special  discussion  section  located  in  the  back  of  the  Bulletin 
and  in  accordance  with  the  procedures  outlined  below.  The  purpose  of  the  section 
is  to  stimulate  greater  interest  in  the  published  reports  and  papers  and  to  offer  to 
those  not  involved  in  their  preparation  the  opportunity  to  present  their  thoughts 
on  the  different  subjects,  whether  pro  or  con,  based  on  their  knowledge  and 
experience. 

For  the  information  and  guidance  of  all  concerned,  here  are  the  ground  rules 
adopted  by  the  Board  of  Direction  for  handling  and  publishing  comments  on  AREA 
published  papers  and  reports: 

•  Letter  containing  comments  must  be  addressed  to  executive  manager,  be 
received  by  the  deadline  published  with  paper,  contain  identification  number  of 
paper  or  report,  and  be  identified  witli  writer's  signature,  typed  or  printed  name, 
title,  company  and  full  address,  includmg  zip  code. 

•  Reader's  comments  will  be  forwarded  to  author  or  appropriate  committee 
for  further  comments  or  rebuttal. 

•  Both  reader's  comments  and  author's  reply  will  be  published  at  the  same 
time  and  in  the  earliest  Bulletin  having  space  available. 

•  All  comments  must  be  in  good  taste,  add  to  discussion  on  the  subject  of 
paper  or  report,  and  be  constructive  in  nature. 

•  Board  Committee  on  Publications  will  be  the  review  or  mediation  group 
should  some  problem  or  sometliing  questionable  arise. 

•  After  deadline,  no  furtlier  comments  on  a  particular  paper  or  report  will 
be  accepted  for  publication,  unless  extenuating  circumstances  exist. 

Identification  number  of  papers  open  to  discussion  will  be  located  near  the 
tide  and  must  be  used  in  comments  to  positively  identify  the  paper  to  which  they 
refer.  Comments  on  committee  reports  should  refer  to  tlie  proper  committee  and 
assignment  numbers. 

Deadline  for  comments  will  be  given  in  a  footnote  on  the  first  page  of  the 
paper  or  committee  report,  the  latter  covering  all  of  the  subcommittee  reports  of 
that  particular  committee.  In  general,  this  deadline  will  be  approximately  90  days 
after  date  of  issue.  However,  this  will  vary  to  some  extent  because  the  intervals 
between  issues  of  die  Bulletin  are  not  constant  throughout  the  Association's  publica- 
tion year,  which  extends  from  September  to  July,  inclusive. 

The  Board  of  Direction  feels  that,  with  the  cooperation  and  interest  of  all 
concerned,  discussions  on  papers  and  reports  published  by  die  Association  should 
prove  to  be  both  stimulating  and  informative. 


(JOiS 


Advertisement 


608-1 


f^RSHAW  Trackwork  Machines 


Weed  And  Brush  Cutter  (Track  Patrol) 

Designed,  Tested,  and  Proven 

on  America's  Railroads 

Kershaw 


MANUFACTURING  CO  ^ 


MONTGOMERY 


W 


ALABAMA 


'rackwork  Equipment  Developed  and  Proven  On  the  Job 

lavy  Duty  Ballast  Regulator,  Scarifier  and  Plow,  Standard  Ballast  Regulator,  Sacrifier  and  Plow, 
jck  Broom,  Super  Jack-All,  Standard  Jack-All  Kerstiaw  Kribber,  Two-Wheel  Kribber,  Tie  Bed  Sacrifier 
J  Inseter,  Track  Undercutter-Skeletonlzer,  Ballast  Cleaner,  Crib-Adze,  I^ocar  Crane,  Track  Crane  and 
B  Inserter,  Utility  Derrick,  Two-Ton  Rail  Derrick,  Tie  Replacer,  Dual  Tie  Saw,  Track  Liner,  Snow 
vitch  Cleaner,  Weed  and  Brush  Cutter  (Track  Patrol). 


608-2 


Advertisement 


^ 


NEW 

Stop  Clamp 
Fittings 

^^P^    Provide  easy  hand 
f;^;jl;        assembly  of  large 
;0  dy^    size  hydraulic  hose. 

Just  tighten  the  bolts  until 
clamp  halves  stop  drawing. 
No  torque  wrench  is  needed. 
Stop  Clamp  Fittings  elim- 
inate problems  of:  gap  be- 
tween halves,  hose  cutting 
and  cold  flow  of  rubber.  They 
provide  clamp  coverage  all 
the  way  around  the  hose. 
Aeroquip  Corporation,  In- 
dustrial Division,  Jackson, 
Michigan  49203,  a  subsid- 
iary of  Libbey-Owens-Ford 
Company. 

FREE!  For  more  informa- 
tion, Aeroquip  Industrial 
Bulletin  5101. 

^^eroquip 

INDUSTRIAL  DIVISION 


Advertisement 


608-3 


Subox®  covers  in  one  coat,  goes 
on  over  old  surfaces,  lasts 
indefinitely,  prevents  corrosion 
from  above  and  beneath  and  it 
won't  crack  or  peel.  It  even  pro- 
vides an  excellent  surface  for 
repainting  years  from  now. 

You  can  count  on  it  with  a  Subox 
system,  from  BASF  Wyandotte. 
We  provide  practical  on-the- 
site  help  in  surface  preparation 
learned  in  our  many  years  of 
experience  in  metal  cleaning 
and  treatment.  Plus  the  applica- 
tion techniques  needed  for  your 


particular  considerations. 

Let  us  convince  you  with  the 
proof  —  some  of  the  most  inter- 
esting case  histories  you'll  ever 
see.  Our  BASF  Wyandotte  Subox 
coating  representatives  are  itch- 
ing to  show  them  to  you. 

Don't  settle  for  less  than  Subox 
coatings.  Send  the  coupon  today! 


BASF  Wyandotte  Corporation 
Wyandotte,  Michigan  48192 


Our  Subox  one-coat 

anti-corrosive  coating 

system  really  works 

(send  coupon  for  proof!) 


BASF  Wyandotte  Corporation 
Chemical  Specialties  Division 
Railroad  Sales  Department 
Wyandotte,  Michigan  48192 

Gentlemen: 

O.K.   Prove   it!   I'd   lil<e  to   see  your   case   histories  on   Subox   system 

applications. 

Name 


Company 

Address 

City State. 


-Zip- 


60&-4 


Advertisement 


Advertisement 


608-5 


FOR  PERFORMANCE 

RELIABILITY 
1 


Wf^S"- 


of  77,500  pounds,"  is  typical 
service  report. 

Easier  To  Install— Bonded  and 
unitized  construction  cuts 
VulcaBond  components  by 
nearly  80%  over  ordinary  rail 
joint  packages,  reducing  instal- 
lation time  and  labor. 

No  wonder  the  VulcaBond  in» 
sulated  rail  joint  is  a  success. 
It  does  the  job  .  . .  and  does  it  for 
less  cost! 


VulcaBond  is  a  proven  success 
in  railroad  installations  coast- 
to-coast  because  it  delivers 
lower  maintenance  costs  and 
higher  operating  efficiency. 
Stronger  —  VulcaBond  was 
tested  with  crushing  22  ton  load 
(400,000  in. /lbs.  between  sup- 
ports). After  2  million  cycles  the 
joint  didn't  give  in.  It's  of  rugged 
durable  steel  construction. 
Lasts  Longer  —  VulcaBond's 
Buna-N  insulation  is  prepared 
to  endure  long,  heavy  use  and 
temperature-moisture  ex- 
tremes. And  it  resists  grease 
and  oil  while  maintaining 
10,000  megohms  resistance  or 
more. 

Needs   Less   IVIaintenance — 

"VulcaBond  required  no  main- 
tenance in  34  months  of  track 
yard  service  under  wheel  loads 


Write  for  VulcaBond  Literature  V-969-R. 


The  JOHNSON  RUBBER  COMPANY 

RAILROAD  PRODUCTS  DIVISION 
10625  JOHNSON  STREET*  MIDDLEFIELD.  OHIO  44062  •  Phone:  Area  Code  (216)  632-2111 


Pat.  No.  3,201,046 


608-6 


Advertisement 


JACKSON 

MODEL  4000  TAMPER 


The  Versatile  Maintenance  Tool 


We  call  our  popular  Model  4000  tamper  The 
Versatile  Maintenance  Tool,  because  that's  what 
it  is.  A  lot  of  people  agree  with  us  ...  on  trunk 
and  short  line  roads,  in  plants  £ind  among  railroad 
contractors.  The  Jackson  Model  4000,  you  see, 
delivers  high  quality  vibratory  tamping  in  any 
kind  of  Lift.  It  is  so  effective  at  tamping  low  joints 
because  of  its  ability  to  nip  ties  out  of  cemented 
or  mucky  ballast,  that  the  Jackson  Model  4000 
tamper  is  the  prefen-ed  machine  for  this  type  of 
service.  It's  equally  efficient  on  main  lines,  in 
yards  and  at  switches. 

The  Model  4000  is  loaded  with  features,  start- 
ing with  the  famous  Jackson  patented  vibratory 
system,  suspended  on  the  latest  rigid  work  head 
configuration  which  gives  more  tamping  force 
than  any  compau'able  unit.  It  is  equipped  with 


pnevunatic  tires  and  can  legally  travel  on  hard 
surface  roads,  at  up  to  23  MPH,  carrying  its  crew 
to  and  from  the  job  site.  It  is  easily  placed  on 
track  or  removed,  at  grade  crossings.  The  Model 
4000  is  the  only  tamping  machine  designed  as  an 
on  and  off  unit  from  the  wheels  up.  Of  course,  it's 
quaUty  built  throughout,  or  it  couldn't  wear  the 
Jackson  "J". 

With  rail  clamps  and  jacks  as  standard  equip- 
ment, the  Model  4000  can  be  used  with  a  hght 
beam  for  precise  electronic  control  of  surfacing. 

Here's  a  suggestion  . . .  contact  Jackson  today 
and  get  the  full  story  of  how  other  equipment- 
wise  men  are  getting  everything  they  want,  and 
more,  from  the  Model  4000.  A  demonstration  will 
convince  you,  as  it  did  them,  that  the  Jackson 
Model  4000  is  THE  Versatile  Maintenance  Tool. 


JACKSON  VIBRATORS,  INC. 

332  South  Michigan  Avenue,  Chicago,  Illinois  60604 
Telephone:  312-922-6604  •  CABLE:  JAKTAMP 


Advertisement 


60&-7 


Here's  the  Best-bf-Everything,  New, 
JACKSOIM  5000  SYSTEM 


NOW!    ONE  MACHINE  THAT  GIVES. 
■  Positive  placement  of  ballast 
■  Firm  positioning  with 


minimum  void 

No  destructive  pulverizing 


Jackson  has  developed  a  new,  automated,  tie  tamping 
machine  that  is  the  first  to  give  you  the  best  of  all  three 
types  of  tamping  .  .  .  vibratory,  squeeze  and  impact.  For 
over  forty  years  Jackson  has  proved  that  vibration  is  the 
most  positive  method  of  placing  ballast  under  ties  with 
a  minimum  of  void  and  no  destructive  pulverizing. 

Now,  without  sacrificing  the  effectiveness  of  vibratory 
tamping,  we  have  incorporated  a  new  double  squeeze 
system.  This  first  of  its  kind,  an>'where,  Jackson  5000 
System  is  the  first  major  improvement  in  tamping 
methods  in  years. 

The  command  module  features  all  solid  state  fingertip 
controls,  full  visibility  and  an  efficiency-designed  work- 
ing environment. 

The  automatic  surfacing,  lining  and  tamping  module, 
built  on  a  truss  beam  lifting  concept,  has  no  shoulder 
jacks  or  other  projections  to  interfere  with  close  clear- 
ance. The  Jackson  5000  System  clamps,  lifts  track  and 
tamps  by  simultaneous  vibratory,  squeeze  and  impact 
action  to  place  uniform,  high-density  ballast  compaction 


right  where  it's  wanted  .  .  .  under  the  ties  at  the  base  of 
the  rail.  Forget  about  center  bound  track  with  this  unit. 

The  combination  vibratory,  squeeze  and  impact  work- 
heads  simultaneously  direct  ballast  toward  the  tie  and 
toward  the  base  of  the  rail  at  pressures  adjustable  to  2000 
psi  in  each  direction.  This  double  squeeze  action  is  fur- 
ther enhanced  and  the  ballast  super-condensed  by 
Jackson's  famous  vibratory  action  at  4500  vpm.  Our 
tests  show  work  capability  of  1600  feet  per  hour,  with 
one  insertion  for  normal  raise. 

The  5000  System  is  designed  to  work  with  Jackson's 
patented  electro-optic  servo  control  for  surfacing  and 
lining. 

If  you're  looking  for  a  superb  quality,  precision  auto- 
mated tamping  workhorse  that  includes  the  latest  think- 
ing in  vibratory,  squeeze  and  impact  forces  electronically 
directed  and  applied  to  high  production  surfacing  and 
lining  operations,  the  new  Jackson  5000  System  has  it  all. 

Contact  us  for  a  full  description  and  a  demonstration. 


JACKSON  VIBRATORS,  INC. 


332  South  Michigan  Avefiue,  Chicago,  lllir 
CABLE:  JAKTAMP 


Telephone:  312-922-6604 


608-8 


Advertisement 


SAVE  $366.34  PER  MILE 

OF  DITCHING  AND  PROFILING.    HOW? 
WITH  A  JORDAN  DITCHER-SPREADER 


Figure  it 
out  for 
yourself 


View  from  top  of  Jordan  cab. 


USING  A  JORDAN  SPREADER 

1  Jordan  with  work  train 

(Including  fuel  and  rental) $300.00 

2  Operators:  $35.00  each 

per  8-hour  day 70.00 

370.00 
Work  on  track:  6-hours 

per  day  ($370  ^  6)  =  61.66  per  hour 

A  Jordan  can  do  one  mile  per 

hour*  profiling  and  ditching. 

Cost  per  mile 61.66  per  mile 

Number  of  miles  of  work  per 

6-hour  day 6 

*A  Jordan  works  both  sides  of  the  track  simultaneously. 


ng  material  from  c 


USING  OFF-TRACK  EQUIPMENT 

1  1 80  HP  crawler  tractor,  with  dozer 

blade,  per  day $155.00 

Operatorand  fuel 90.00 

1  Motor  Grader,  diesel 98.00 

Operator  and  fuel 85.00 

Cost  per  8-hour  day  $428.00 

This  off-track  equipment  can  profile  and 
ditch  both  sides  of  a  1-mile  stretch  of 
track  in  an  8-hour  day.** 

Cost  per  mile  $428.00 

Numberof  miles  of  work  per  8-hour  day 1 


Costs  and  figures  are  averages  and  will  vary  depending  upon  local  conditions  and  material  being  worked. 


Everybody  agrees  drainage  Is  important... and 
that's  v»/hat  a  Jordan  gives  you... the  profiling 
and  ditching  that  mean  good,  long-lasting 
drainage.  Off-track  equipment  can,  too, ...at 
one-sixth  the  speed  and  about  700%  more  cost. 
You  can  choose  between  $61.66  per  mile  and 
$428.00  per  mile. 

For  years  Jordans  have  been  acknov»^ledged  as 
the  most  efficient  and  economical  movers  of 
huge  amounts  of  material.  They're  for  the  big, 


tough,  expensive  jobs.  And  today  they're 
better-than-ever  because  of  new  instant-action 
hydraulic  controls  and  a  new  corps  of  service 
engineers  who  teach  improved  Jordan  opera- 
tion and  maintenance  techniques. 

If  you'll  contact  us  we'll  tell  you  about  the 
Jordan... as  a  super-ditcher/profiler,  a  massive 
mover  of  dirt,  and  a  snowplow's  snowplow. 

What  can  you  lose  except  $366.34  per  mile? 


0.  F.  JORDAN  COMPANY 


DIVISION  OF  JACKSON  VIBRATORS,  INC. 

332  South  Michigan  Avenue,  Chicago,  Illinois  60604    312-922-6604 
Cable:  JAKTAMP 


Advertisement 


608-9 


upgrading  Timber  Brtdges? 


%A 


can  help  your  timber  bridges 

carry  heavier  loads 

and  last  longer  with  minimum  repair 

This  professional  Osmose  team  is  cruising  one  of  202  timber  bridges  on  a 
subdivision  of  a  major  U.S.  Railroad.  On  completion,  specific  recommenda- 
tions were  given  the  chief  engineer  to  treat,  defer  or  replace,  backed  up  by 
detailed  boring  records.  This  is  one  more  way  Osmose  assures  you  that 

maintenance  dollars  are  spent  where  needed  most... 

without  cost  or  obligation  to  your  company. 

RAILROAD  DIVISION 


98  O  ELLICOTT  STREET  /  BUFFALO,  N.Y.  142  0  9 


608-10 


Advertisement 


1.  SELF-PROPELLED 
AD2ER 

2.  BALUST 
ROUTER 

3.  CRiBEX 

4.  DUN-RITE 
GAGING 
MACHINE 
AND  BRONCO 

5.  HYDRA-SPIKER 

6.  LINE  INDICATOR 

7.  PLATE  PUCER 

8.  POWER  JACK 

9.  POWER  WRENCH 

10.  RAIL  DRILL 

11.  RAIL  GANG 
SPIKER 


19.  SWITCHLINE{ 

20.  TIE-AXE 

21.  TIE  DRILL 

22.  TIE  HANDLER 

23.  TIE  SPACER 

24.  TRAKLINER*^ 
2S.TRAK-SURFACER 


25 

Nordberg' machines 
that  can 

CUT  MAINTENANCE  COSTS 

IN  1971 

■■■    IV#  I  Call  or  write  for  complete  information 

about  any  or  all  of  these  time  and 
money-saving  Mechanical  Muscles®.  .  . 
Nordberg  maintenance-of-way  machines. 


NORDBERG -DIVISION  OF  REX  CHAINBELT  INC. 
P.O.  Box  383,  Milwaukee,  Wis.  53201 
Phone  (414)  744-2345 

CI197I  NORDBERG  R17IR-S 


Advertisement 


608-11 


complete 
culvert 


Consider  for  a  moment  your  problem  culverts  —  if  you 
have  "pat"  solutions  you  may  be  substituting  for  the  best 
solutions. 

Let  us  inspect  and  make  our  recommendations  to  you 
without  obligations. 


EXPERIENCE  —  our  years  of 
experience  have  taught  us  not  to  jump 
to  conclusions  where  culverts  are 
concerned.  Experience  is  beneficial 
to  us  and  fo  our  customers  v^fhere 
railroading  is  concerned. 

COMPARATIVE  STUDY —  various 
alternatives  for  culvert  rehabilitation  is 
a  must.  After  a  thorough  check  the 
Restoration  Division  of  Penetryn  will  be 
able  to  determine  the  economical 
answer  to  the  alternatives.  Repair? 
Line?  Install  Pipe?  They  will  know 
the  proper  solution  for  individual 
culvert  restoration. 

ANALYZE  —  the  Restoration  Division 
of  Penetryn  will  provide  you  with  the 
solution  only  after  analyzing:  costs  . . . 
drainage  requirements  . . .  design 
restrictions  . . .  structural  conditions 
. . .  fill  changes  and  floor  requirements. 

You  might  feel  you  have  an  easy 
solution,  but  is  It  the  best  solution? 
Ask  us. 


MAIN  OFFICES: 


PENETRYN 


PENETRYN  SYSTEM,  INC. 
RESTORATION  DIVISION 

38399  PELTON  RD. 

WILLOUGHBY,  OHIO  44094 

PHONE  (216)  946-4450 

424  OLD  NISKAYUNA  RD. 

LATHAM,  NEW  YORK  12110 

518-785-6669 


NATIONWIDE  RAILROAD  CONTRACTING  SPECIALISTS  FOR  MORE  THAN  40  YEARS. 
Penetryn  also  specializes  in  tunnel  and  bridge  restoration  —  chemical  and  cement  grout  con- 
solidation and  waterproofing. 


Advertisement 


ESCO 

To  the  Railroads 
What  18  Carat  Is  to  Gold 


JIM  DICKEY 
TOM  GEHR 
TOM  KENNEDY 


St.  Louis  Chicago  Philadelphia 


Developed  and  Built 
for  Railroad  Maintenance 

180°  BOOiM  SWING 

PO£S  ALL  JOBS! 


ROOTS  AND  LOADS  TIES 


•       LAYING  STANDARD  RAIL 


LAYING  WELDED  RAIL 


CUTS     MAINTENANCE     COSTS 


12  ¥AS1  CHANGE  ATTACHMENTS 


•  Forks 

•  T/4  Cu.  Yd.  Bucket 

•  Tote  Hook 

•  18'  Boom  Extension 

•  Fork  Tie  Baler 

•  Track  Cleaning  Bucket 


•  Back  Hoe 

•  Clamshell 

•  Back  Filler  BlacJe 

•  Pull  Drag  Bucket 

•  4  Cu.  Yd.  Snow  Bucket 

•  Pile  Hammer 


Optional  Attachment 
Flanged  Wheels,  H/draulicoliy  Controlled 


PETTIBONE  MULLIKEN  CORPORATION 


RAILROAD 

141   W.  JACKSON 


DIVISION 

CHICAGO  4,  III. 


IDE  TRACK  CLEANING  BUCKET' 


80  Years  of  Service 
fo  the  Railroad  Industry 


608-14 


Advertisement 


PLASSER 


f  resents  ...^noth 
3ir5t      Witli 


The  laser  beam  provides  a  2,500-foot  foresight  or 
more  if  desired.  You  can  remove  swings  and  inter- 
mediate discrepancies  within  1/32  of  an  inch  of 
perfect  straight  line  in  that  length  segment  of  finished 
track. 


-pUASSc^- 
^ORMANSi^ 


"Cannon"  of  self-propelled  front  buggy 
generates  laser  beam  that  takes  the 
form  of  a  vertical  plane  %  jpch  thick. 
Loser  beam  is  projected  to  Plasser  Uni- 
versal 06-16  tamper-liner  approximately 
2500  feet  in  background. 


THE  PLASSER  TRADE-MARK  IDENTIFIES  PRODUCTS  WHICH 

YOU  CAN  BUY  WITH  COMPLETE  CONFIDENCE 

THAT  EACH  UNIT  IS  THE  FINEST  OF  ITS  KIND. 

ALL  OF  PLASSER'S  RESOURCES,  ITS  LONG  YEARS 

PLASSER  CANADIAN  CORPORATION 

2705  MARCEL  STREET 
MONTREAL,  QUEBEC,  CANADA  382 


Advertisement 


608-15 


Laser  Beam  Lining 


The  laser  beam  is  not  affected  by  wind,  dark,  light, 
heat  or  cold,  or  fog,  always  providing  a  true  source 
of  reference  so  that  large  or  small  corrections  can 
be  made,  producing  perfect  straight-line  track. 


IA-.       FOR         <.l 

^<5pormanS5^ 


Receiver-sensor,  mounted  on  front  end 
of  Plasser  Universal  tamper-liner,  acts 
to  cause  long-chord  wire  of  lining  de- 
vice to  be  brought  into  line  with  laser 
beam,  thereby  causing  corrections  in 
alignment  to  be  made  automatically. 


OF  EXPERIENCE,  THE  TECHNICAL  SKILLS  OF  ITS  COMPLETE 
LABORATORIES  AND  TEST  DEPARTMNTS  STAND  BEHIND 
THIS  PLEDGE.  YOU  CAN  EXPECT  INNOVATIONS 
FROM  PLASSER. 

PLASSER  AMERICAN  CORPORATION 

EXECUTIVE   OFFICE:   332   SO.   MICHIGAN   AVE.,   CHICAGO,   ILL   60604 
GENERAL   OFFICE   &   PLANT:   2001    MEYERS    ROAD,  CHESAPEAKE,   VA.   23324 


608-16  Advertisement 


THE  DOUBLE  U  RAIL  ANCHOR 

ACHUFF  RAILWAY  SUPPLY  CO. 
ST.  LOUIS,  MO. 


<lii^p> 

Du-Wel  Steel  Products  Co. 

RAILWAY   EXCHANGE    BUILDING 

TELEPHONE   HARRISON  7-8257 

Chicago  60604 

BOUTET  Process 

(IN-TRACK) 

Rail   Welding 

Advertisement 


608-17 


New-Universal 
Track  Machine 

maintains  track  right-of-way  faster, 
better  than  any  other  method 

This  new  concept  in  railway  maintenance  equipment  is  designed 
to  perform  all  functions  simultaneously  in  a  single-pass  operation 
to  provide  the  ultimate  in  railway  track  drainage  efficiency. 

It  is  the  only  equipment  available  that  performs  maintenance 
coupled  with  the  ability  to  utilize  highway  crossings  for  quick  track 
clearance  and  fast  movement  from  job  to  job. 

The  UTM,  with  a  single  operator  and  3-mph  production  rate, 
destroys  shoulder  and  tow  path  weed  growth  and  eliminates  mud 
pockets. 

The  "plus"  feature  of  this  machine  is  its  ability  to  move  quickly 
from  track  to  highway  operation.  It  can  be  removed  from  the  track 
in  15  to  20  seconds  and  placed  back  on  track  in  less  than  a  minute. 
Result:  More  "on-track"  work  time! 

The  Universal  Track  Machine  is  available  on  lease,  sale,  or  service 
contract  basis.  For  additional  information,  write  or  telephone: 

RAILNA/AY  PRODUCTS  CO. 
A  DIVISION  OF  THE  MARMON  GROUP,  INC. 

P.O.  Box  1511,  Knoxville.Tenn.  37901 
615  525-6224 


608-18  Advertisement 


HABCdj    Satisfaction  tlirougli  service 


Specialists   and   manufacturers    in  the   field   of  vegetation   control. 

SOIL  STERILANTS  CONTACT  CHEMICALS 

GRANULES— HABCO    HYCHLOR    .    .    .    HABCO  DACONATE    .    .    ,    DACAMINE    .    .    .    2,4-D's 

5H    .    .    .    HABCO    lOK    ...  OF  ALL  KINDS 

HABCO    lOT    .    .    . 

LIQUIDS     — CHLORATE-BORATE  .  .  .  HYVAR  BRUSH   CONTROL 

X    .    .    .    KARMEX    .    .    .    TELVAR  AMMATE   .    .    .    DYBAR   ...    ALL   COMBINA- 

.    .    .   ATRATOL   .    .    .    PRAMITOL  TIONS   OF   2,4-D   AND  2,4, 5-T 

YOUR  APPLICATION   OR  OURS 

Horne-Boatright  Chemical  Company,  Inc. 

Our  regional   representatives  are  as  close  as  your  telephone. 

Douglas  Boatright  Robert  E.   Lund 

Room   604,   Transportation    BIdg.  1040   Coulter 

Birmingham,   Ala.    35203  Winnipeg   3,   Manitoba 
205/252-6715  204/786-3421 

Donald  E.   Home  John  A.   Forderhase 

7301    West  Lake  St.  2251    Armour  Road 

Minneapolis,  Minn.  55426  North   Kansas   City,  Mo.  64116 
612/929-4689  816/421-1488 


Lefton  Iron  &  Metal  Co, 

ExecufiVe  Office:  205  So.   17th  St.  •   East  St.  Louis,  III. 

PHONE   (314)   241-7100 

Your    Best    Source 

for 

RELAYING    RAILS,    ACCESSORIES, 
TRACK    SPIKES    and    BOLTS 

NEW     and     RELAY 

TRY  US  FOR  REAL  SERVICE! 

and  SAVINGS 

ALL  INQUIRIES  PROMPTLY  HANDLED 


Advertisement 


608-19 


TIE  HANDLER  from  RTW... 


with  24'fooUreach 
articulating  boom! 

Lifting  capacity-1500  lbs.  at  12'6"to 
750  lbs.  fully  extended. 


•  New  rotating  decl(  design 
...no  adjustments  needed 

•  Thermostatic  controlled 
oil  temperature  in 
hydraulic  circuit 


•  Low  maintenance 

•  Hydrodynamic  plus 
mechanical  brakes, 
on  all  four  wheels 


Many  other  features  for  high  production,  low  maintenance.  Choice  of  two 
other  tubular-type  booms  (all  interchangeable):  Fixed  24-ft..  and  manually 
adjustable  18-24-ft.  From  RTW.  the  people  with  the  longest  experience  in 
tie  handling.  Get  full  details  today.  Call  (215)  739-4281. 


RTW 


OTHER  RTW  MAINTENANCE  EQUIPMENT  •  Switch  Grinders  ■  Cross  Grinders -Surlice  Grinders -Rail  Drills  •  Tie  Hindlers  MEMBER 

RAILWAY   TRACK-WORK    CO.    3207  Kensington   Ave  ,  PhiUidclphia,  Pa    19134  •  Afenli:  Chiogo  Af  f  ■ 

—  Collins    Equppmenl    Co.    •    Houston  -  Service    Equipment    S.    Supply    Compjny    .    Los    Angeles-  ^^»«« 

SImklns   Company  .   Louisville  —  T.    F.  Going  •   Omaha  ~  Dodge   engineering   Company  ■    St.   Louis  e.o."....    1 

I  Co.  •  Canada:  Montraal  —  WoodlngsCanada  Ltd.  •  Winnipeg  —  Harvey  Equipment  Co.  i.irnvn  ^^ 


-  R.  E.  Bell  I 


608-20 


Advertisement 


SEALTITE    HOOK   BOLT 

Fastens  timbers  and   ties  to  steel  beams.  Easy 
to    install,    long-life.     Fins    prevent    turning. 
I       Spring   lock    holds   tension. 


SEALTITE    SPRING    LOCK 

Maintains   tension   as   timber 
changes  by  weather  or  wear. 


SEALTITE    DOME    HEAD    DRIVE   SPIKE 

Fastens  timbers  and  plank  decking  on  grade  crossings, 
bridges  and  docks.  Wide,  smooth  head  seals  opening, 
wears  well. 


LEWIS   WASHER   HEAD   TIMBER    DRIVE   SPIKE 

Fastens  highway  crossing  planks,  bridge  guard  rails  and 
general  timber  construction.  One-piece  head.  Easy  to 
install   and   remove. 


e 


T  I'Fl^^AT'IS  BOLT  &  NUT  COMPANY 

504  MALCOLM  AVE.  S.E.,  MINNEAPOLIS,  MINN.  55414 


CUT  TIE  REPLACEMENT  COSTS 


Racine  Plate-Boy  cleans  ties,  lifts  rails 


Racine  Plate-Boy  quickly  pays  for  itself  by 
reducing  the  cost  of  cleaning  ballast  from 
ties  and  inserting  the  tie  plates. 

Used  behind  the  tie  inserter  and  tamper, 
Plate-Boy  sweeps  the  ties  on  both  sides  of 
each  rail,  and  lifts  both  rails  just  the  proper 
amount  to  insert  the  tie  plates.  Sensitive 
hydraulic  controls  prevent  excessive  "hump- 
ing" of  rails. 

Only  an  operator  and  one  laborer  are 
required,  saving  the  work  of  two  men.  Costs 
are  further  reduced  by  using  reclaimed  air 
hoses   for   broom    bristles. 


To  find  out  how  this  dual-purpose  ma- 
chine can  help  you  beat  the  labor  shortage 
and  high  M.W.  costs,  see  your  Racine  dis- 
tributor, or  write. 


RACINE  RAILROAD  PRODUCTS,  INC. 


1524  FREDERICK  STREET 
ANCHOR-FAST  •  ANCHOR-TIGHT 
OIL  PRESSOR   •  ANCHOR-MATIC 


•  RACINE,  WISCONSIN  53404 
PLATE-BOY  •  RAIL  SAW  •  RAIL  DRILL 
TRACK  GAUGER   •  BALLAST  CRIBBER 


VEILING,  LINING,  TAMPING... 

ONE  OPERATION,  with  ONE  OPERATOR 


PROJECTOR 


.ELECTRONIC 
REFERENCE 


, FEELER 
detects  position 
of  track  in  spiral 
or  curve  at  every 
tie  and  leads 
Inlormetion  to 
"Auto-Control" 


LINER  UNIT 


WORKING 
SHADOW  BOARD 
controls  lining  at 
point  wliere 
lilting,  levelling 
end  lamplng_ 
Is  done. 

RECEIVER 
BUGGY 

"Auto-Control" 
continuously 
positions 
receivers 
elficlronically  to 
satisfy  ideal  curve 
requirements  and 
establishes 
required  amount 
ol  track 
correction. 


The  Autojack  Electromatic 
with  Autoliner  leads  the  way 
through  these  advantages: 

#  Gives  the  highest  possible  degree  of  accuracy  by  electronic 
beams  projected  100  feet  in  advance  of  where  levelling, 
lining  and  tamping  are  taking  place. 

#  Automatic,  continuous  operation  for  both  tangent  and 
curve  track.* 

#  No  plotting  of  spirals  or  curves  required.  Machine  computes 
as  it  runs  for  the  best  transition. 

#  No  disturbing  or  humping  of  track  —  lining  takes  place 
simultaneously  with  lifting  and  tamping  ahead  of  tamping 
tools. 

#  With  the  Autoliner,  it  is  possible  to  make  a  minute  throw 
and  have  it  stay  there  because  tamping  is  done  in  correct 
alignment. 

'Model  ALT  for  Tangent  track  and  Model  ALC  for  Tangent 
and  Curve  Track,  both  available  as  attachments  for 
existing  AUTOJACK  ELECTROMATICS. 


Head  Office  &  Plant— 2401  Ed- 
mund Rd.,  West  Columbia,  S.  C. 
29169  .  8  03/794-9160 
Plant— 160  St.  Joseph  Blvd., 
Lachine  (Montreal),  Que.,  Canada 
•  514/637-5531 
Parts  Depot — 1902  University 
Ave.,  St.  Paul,  Minn.  55115  • 
612/645-5055 

Sales,  Service  &  Parts — Tamper 
(Australia)  Pty.  Ltd.,  34  Mcin- 
tosh St.,  Airport  West,  G.P.O. 
Melbourne,  Victoria  3042,  Aus- 
tralia   •    379-8441 


608-22 


Advertisement 


KERITE 
CABLE 


For  dependability  in  actual  use,  no  other  cable 
matches  Kerite.  We  believe  you  will  be  im- 
pressed by  the  evidence. 


THE  KERITE  COMPANY 

PRINCIPAL  OFFICES:  Boston;  Chicago;  New 
York;  Philadelphia;  San  Francisco;  and 
Seymour,  Connecticut  •  Sales  Representa- 
tion throughout  the  United  States.  A  sub- 
sidiary of  Harvey  Hubbell  Incorporated. 

RITE  insulation  that  makes  the  difference 


A 

tradition  of  service  .  .  . 

•   Water  Treatment  Chemicals  Protecting  Diese 
Systems  and  Steam  Generators 

Cooling 

•   Weed  and  Brush  Control  Chemicals 

•   Fuel  Oil  Additives 

•   Pollution   Control   Chemicals  and   Consulting 

Services 

•   Wheel   Flange  Lubricators 

NALCO    CHEMICAL   COMPANY 

ISO  N.  MICHIGAN  AVENUE    d    C  H  I  C  AG  O.  I  LLI  NOIS  BOBQI 

» 

NALCC 

Trademarks  of  Naico  Chemical  Company 

NALCO 

Advertisement 


608-23 


Channeloc 

works 

harder, 

longer. 


Talk  re-application  and  you're  bound  to  talk  Channeloc* 
For  test  after  test  has  proved  its  comparative  superi- 
ority in  maintaining  the  needed  reserve  strength  for 
time  after  time  reusage.  Not  that  plenty  more  can't 
be  said  about  Channeloc  holding  power,  its  ability  to 
do  the  job  without  rail  damage  during  application  or 
•••  while  in  service. 


and  so  do  vuel 


^  I  RUE  I  EM  PER. 

(SsSf      RAILWAY  APPLIANCE  DIVISION 


Channeloc  works  harder,  longer.  And  so  do  the 
track  maintenance  experts  of  our  Railway  Divi- 
sion field  service  team.  More  often  than  not 
you'll  see  them  present  when  Channclocs  are 
installed  and  they  make  repeated  checks  to 
advise  railroad  personnel  of  any  unusual  con- 
dition affecting  the  service  life  of  the  anchors. 

Very  practical  reasons  why  more  welded  rail 
is  restrained  by  True  Temper  Channeloc  rail 
anchors  than  by  any  rail  anchor  on  the  market. 

In  addition  to  Channeloc,  True  Temper  has  a 
new  concrete  rail  tie  clip  —  the  Cliploc*  —  now 
in  successful  service  on  several  major  railroads. 
Find  out  more  about  how  Cliploc  will  solve  your 
concrete  tie  installation  problems! 


608-24 


Advertisement 


(ROOO 


TRACK  MAINTENANCE 
MACHINES 


TRACK  MACHINES 

Tie  Spacer 

RAIL-LAYING  EQUIPMENT 

Auto-Spiker 

Tie  Unloader 

Dual  Welded  Rail 

Ballast  Distributor 

Tie  Plate  Broom 

Laying  Equipment 

—Distributor /Cleaner 

Gauging  Machine 

BoltMaster 

Plug  Setter 

Bridge  Tool  Machine 

TAMPERS 

Rail  Oiler 

Brush  Cutter 

Hydramatic-16 

Rail-Laying 

Electronic  Surfacing 

Hydraulic-16 

Auto-Spiker 

Devices 

Multi-Purpose-8 

Rail  Anchor  Cart 

LineMaster 

Hydraulic-S 

Scrap  Loader 

Rail  and  Joint 

Jack 

Spike  Distributor  Cart 

Straightener 

Switch  Spot 

Tie  Plate  Gauger 

Rail  Saw-Drill 

Spot  Switch 

SPOT  SYSTEMS 

Combination 

(For  Repair  and  Cleaning) 

SpikeMaster 

Car  and  Locomotive 

Spiker-Spacer 

SNOW  BLOWERS 

Pullers 

TieMaster 

Typhoons 

Jacks,  Jip  Cranes 

Track  Broom 

Hurricane  Jets 

Retarders 

RAILWAY  MAINTENANCE  CORPORATION 

Box  1888  •  Pittsburgh,  Pa.  15230  U.S.A. 

Export  Sales:  American  Export  Company  (AMECO) 
228  No.  LaSalle  St.,  Chicago,  Illinois  U.S.A. 


Assure  lower  maintenance  costs,  better  performance  with 

Texaco 

Railroad  Lubricants 

and  Systematic 

Engineering 

Service 

New  York  •  Atlanta  •  Chicago  •  Minneapolis  •  St.  Louis  •  San  Francisco 


Advertisement 


608-25 


WOODINGS 

CANADA 

LIMITED 


Canadian  Sales  Agents  for: 

WESTERN-CULLEN  DIVISION— "BURRO" 

JACKSON  VIBRATORS,   INC. 

RAILWAY  TRACKWORK  COMPANY 

THE  OHIO  LOCOMOTIVE  CRANE  COMPANY 

WOODINGS  ADVANCED  TYPE  RAIL  ANCHORS 

WOODING-VERONA  TOOL  WORKS 

WOOLERY  MACHINE  COMPANY 


5  PLACE  VILLE  MARIE 
SUITE  815     •     MONTREAL  113,  QUE. 


(514)878-1215 


608-26 


Advertisement 


EXPERIENCED  SPECIALISTS 

IN  THE  REPAIRS  OF 

RAILROAD  STRUCTURES 


HH^Hi  H  H  H  CORPORATION 

uizilb 


FOUNDATIONS,  UNDERPINNING  AND  INVESTIGATIONS 
AUGERCAST'"  Piles  (U.  S.  patent  protected) 

•  For  new  foundations  and  underpinning 

(placed  without  vibration) 

•  Cutoff  walls  —  Low-headroom  piles 

•  Tie  Backs  —  Tension  Pile  and  Anchors 

PRESSURE  GROUTING 

•  Arresting  settlement  of  structures 

•  Cutoff  curtains  —  Bearing  treatment 

•  Consolidation  of  loose  materials  —  Soil  stabilization 

•  Mine  shaft  grouting 

•  BAGPIPEtm  Grout  Method  (U.  S.  patent  protected) 

•  Cement  base  grouting 

•  Chemical  grouting  ("FIRM-UP")^m 


CONCRETE  AND  MASONRY  STRUCTURAL  REPAIRS 

•  Bridges,  dams,  powerplants.  drydocks 

•  Complete  modernization  dams  and  power  houses 

•  Scour  repairs  —  Cofferdam  seals 

•  Stone  masonry  &  concrete  repairs 

•  Industrial  maintenance  —  Tunnel  lining  repairs 

•  Repairs  to  precast  and  driven  concrete  piles 

•  Encasement  of  wood  and  steel  piles 

PREPLACED  AGGREGATE  CONCRETE 

•  Cofferdam  seals 

•  Encasement  of  scroll  cases 

•  High  density  concrete  for  shielding 

•  Concrete  and  masonry  structural  repairs 

•  Underwater  concrete  —  Diving  inspections 


9329  RIVERVIEW   ROAD    •    CLEVELAND,  OHIO   44141     .    TELEPHONE  216/526-4391 

ATLANTA*   BALTIMORE  •   CHICAGO'    DETROIT  •   FT.  LAUDERDALE  •    HOUSTOrj   .   JACKSONVILLE  -MINNEAPOLIS   •    MEMPHIS 

OMAHA -SEATTLE 
AFFILIATES:   LEE  TURZILLO  CONTRACTING  CO.  •  AUGERCAST  PILE  &  FOUNDATION  COMPANY 


Advertisement  608-27 


WOODINGS-VERONA  TOOL  WORKS 


Ir  Pioneer  Manufacturers 

oi 

fflGH  GRADE  TRACK  TOOLS 

and 

SPRING  WASHERS  FOR  TRACK 

Since  1873 

VERONA,  PA.  CHICAGO,  ILL. 


w 

WOODINGS  FORGE  &  TOOL  COMPANY 

Makers 

oi 

WOODINGS  RAIL  ANCHORS 

VERONA,  PA. 

CHICAGO.  ILL. 

608-28  Advertisement 


TELEWELD 


INC. 


M  E  M  B  E  R 


Rail  Maintenance  Service 

Rail  End  Welding 

Rail  End  Hardening  Upt 

CWR  Joint  Normalizing  ;;i^.v/..T 

^-^  msriTUT£  ^^^ 

Frog  and  Switch  Welding 

Rail  Maintenance  Equipment 

Custom  Manufacturing  and  Fabrication 

Joint  Bar  Shims 

Rail  Anchor  Shims 

Rail  End  and  Frog  and  Switch 

Welding  and  Grinding  Machines 
CWR  Heating  and  Cooling  Equipment 
Rail  Flaw  Testing  Equipment 
Telebrineller  Portable  Hardness  Tester 


SONIRAIL  MT:   Rail  Flaw  Detector 


TELEWELD  INC.,  416  NORTH  PARK  ST.,  STREATOR,  ILL.  61364 

Write  for  details  of  the  TELEWELD  process  for  restoring  rail  ends. 


REMARKS  BY  CHAIRMEN  OF  TECHNICAL  COMMITTEES 

Page 
Committee   1 — Roadway  and  Ballast    611 

Memoir,  L.  J.   Deno   612 

Committee     3 — Ties  and  Wood  Preservation   613 

Committee     4— Rail      613 

Committee     6 — Buildings     614 

Committee     8 — Concrete   Structmes   and  Foundations    617 

Committee     9 — Highways      617 

Committee   11 — Engineering  Records   and  Property  Accounting    618 

Committee   13 — En\'ironmental    Engineering     619 

Committee   14 — Yards   and  Terminals    619 

Committee   15 — Steel  Structures    620 

Committee  20 — Contract  Forms    620 

Committee  22 — Economics  of  Railway  Construction  and  Maintenance    621 

Committee  24 — Engineering    Education    621 

Committee  25 — Waterways   and   Harbors    625 

Committee  28 — Clearances    625 

Committee  30 — Impact  and  Bridge  Stresses   626 

Committee  31 — Continuous  Welded  Rail    627 

Committee  32 — Systems    Engineering    628 

Special  Committee  on  Concrete  Ties   629 


609 


Remarks    by    Chairmen    of    Technical    Committees       611 


Committee   1 — Roadway  and  Ballast 

Remarks   by   Chairman   M.    B.   Hansen 
Assistant    Engineer   Location    and    Construction,    Canadian    National    Railways 

During  the  past  year  Committee  1  held  two  meetings.  Its  annual  report  is 
published  in  the  January-February  Bulletin  No.  631,  pages  255  to  290,  incl.  Its 
Manual  Recommendations  are  published  in  the  November-December  Bulletin  No. 
630,  pages  107  to  119,  incl. 

The  objective  of  this  committee  is: 

1.  To   develop   specifications  for  and  to  report  on  scientific  and  engineering 
knowledge  of  design,  construction  and  maintenance  of  roadway  and  ballast. 

2.  To    initiate    research    projects    that    contribute    to    the    knowledge    of    the 
materials  used  in  roadway  and  ballast. 

3.  To  revise  and  update  tlie  AREA  Manual  for  Railway  Engineering  to  reflect 
current   and  sound  railway  engineering  practices. 

Under  Assignment  1,  the  Roadbed  Subcommittee  is  completely  revising  Part  1 
of  the  Manual.  The  first  stage,  on  Exploration,  Testing  and  Design,  is  published  in 
Bulletin  631.  The  committee  feels  that  this  is  complete,  but  the  revision  has  been 
so  drastic  that  it  was  published  as  information  first  in  order  to  get  some  reaction 
from  the  membership  at  large.  The  committee  solicits  your  comments  and  sugges- 
tions. Much  credit  is  due  to  F.  L.  Peckover  and  his  subcommittee  for  the  monu- 
mental task  that  they  have  undertaken.  The  second  stage,  on  Construction  and 
Maintenance,   is   now  being  prepared  by  this  subcommittee. 

Under  Assignment  2,  the  Ballast  Subcommittee  is  continuing  its  efforts  to  test 
the  comparative  qualities  of  ballast  materials.  It  is  also  endeavoring  to  set  up  a 
working  arrangement  with  the  Department  of  Transportation  for  testing  ballast 
materials. 

Under  Assignment  4,  the  Drainage  and  Culvert  Subcommittee  has  submitted 
height  of  cover  tables  for  pipe  and  pipe-arch  culverts  for  inclusion  in  the  Manual. 
This  subcommittee  is  presently  preparing  design  procedures  and  specifications  for 
tunnel  liner  plate  culverts. 

Under  Assignment  5,  the  Pipelines  Subcommittee  completely  revamped  Part  5 
to  make  it  conform  to  the  new  decimal  system,  and  submitted  this  for  inclusion 
in  the  Manual.  I  draw  your  attention  to  the  correction  appearing  on  page  253  of 
Bulletin  631.  The  nominal  thickness  of  pipe  under  14  inches  in  diameter  has  been 
corrected  to  read  0.188.  The  committee  is  presently  working  on  the  development 
of  specifications  for  various  types  of  wire  undercrossings. 

Under  Assignment  8,  the  Tunnel  Subcommittee  is  developing  inforuiation  on 
\arious  methods  to  increase  tunnel  clearance. 

On  these  and  all  the  other  assignments  your  connnittee  is  continuing  to  update 
the  Manual  and  to  revise  the  format  to  conform  with  the  decimal  system. 


It  is  with  regret  that  I  announce  the  sudden  death  on  February  11  of  Les  Deno, 
a  long-time  member  of  Committee  1.  A  Memoir  in  his  honor  follows. 


612       Remarks    by    Chairmen    of    Technical    Committees 


1915=1971 

Leslie  Joseph  Deno,  maintenance  engineer,  Chicago  &  North  Western  Railway, 
died  suddenly  on  February  11,  1971,  at  the  age  of  55.  Survivors  include  his  widow, 
Jeanne,  and  one  son,  Stephen. 

He  attended  public  schools  at  Green  Bay,  Wis.,  continuing  his  education  at 
the  University  of  Wisconsin,  from  which  he  graduated  in  1937  witli  a  Bachelor  of 
Science  degree  in  Civil  Engineering.  Prior  to  graduation,  Mr.  Deno  had  worked  in 
the  Bridge  and  Building  Department  of  the  North  Western  and  upon  graduation, 
joined  the  Engineering  staff  as  a  rodman. 

He  enlisted  in  the  United  States  Army  in  1941,  served  in  the  Asiatic-Pacific 
Theatre,  participated  in  the  occupation  of  Japan,  then  served  as  an  instructor  at  the 
Field  Artillery  School,  Fort  Sill,  Okla.  He  concluded  his  military  service  in  1946 
with  the  rank  of  major. 

Upon  his  return  from  military  service,  Mr.  Deno  continued  his  engineering 
career  with  the  North  Western,  being  in  the  Bridge  Department  until  1948,  after- 
wards serving  as  office  engineer,  Chicago,  1948-1950;  division  engineer,  Escanaba, 
Mich.,  1950-1953;  division  engineer,  Sioux  City,  Iowa,  1953-1956;  division  engineer, 
Creen  Bay,  1956-1960;  staff  engineer  of  maintenance  1960-1964;  and  maintenance 
engineer  1964  until  his  death. 

Mr.  Deno  joined  the  American  Railway  Engineering  Association  in  1947  and 
was  a  member  of  Committee  29  from  1948  to  1954,  being  \'ice  chairman  the  last 
two  years.  He  became  a  member  of  Committee  1  in  1954  and  was  vice  chairman 
1961-1964,  and  chairman  1964-1967.  He  continued  membership  in  this  committee 
until  his  untimely  passing. 

A  tremendous  void  now  exists  witli  this  man's  passing  and  only  a  fond  memory 
remains.  He  was  truly  a  dedicated,  loyal  and  resourceful  engineer  and  a  most  devoted 
family  man,  all  of  which  made  him  a  man  to  be  loved  and  respected  by  all  those 
who  knew  him. 


Remarks    by    Chairmen    of    Technical    Committees       613 

Committee  3 — Ties  and  Wood  Preservation 

Remarks   by   Chairman    W.    F.   Arksey 
Engineer   Environmental   Control,    Burlington   Northern,    Inc. 

Committee  3  is  charged  with  the  advancement  of  the  design  of  ties  and  the 
preservative  treatment  of  wood  products  primarily  used  in  ties  and  timber  struc- 
tures. It  reports  on  the  latest  developments  in  wood  preservation  and  presents 
standard  specifications  for  preservatives  and  their  use. 

During  the  past  year  your  committee  has  been  working  on  revision  of  the 
Manual,  combining  Chapters  3  and  17  into  one  chapter.  Committees  3  and  17  were 
combined  into  one  committee,  No.  3,  in  1962,  but  the  Manual  has  never  been  com- 
pletely revised.  Therefore,  we  will  now  bring  it  in  line  with  committee  designation 
and  at  the  same  time  publish  it  with  the  new  format  being  used  by  AREA.  The 
work  is  progressing  well  and  should  be  ready  for  publication  this  Fall. 

The  Annual  Tie  Renewal  Statistics  were  reported  in  Bulletin  628,  June-July 
1970,  and  regular  report  of  committee  is  in  Bulletin  631,  January-February  1971. 

The  committee  conducted  a  successful  field  trip  this  year  in  cooperation  with 
the  Research  and  Development  Committee  of  the  Railway  Tie  Association.  An 
inspection  was  made  of  a  test  section  of  track  on  the  Chicago  &  North  Western  near 
Des  Plaines,  111.  The  test  is  a  joint  effort  of  RTA  and  the  AAR  Research  Department 
and  consists  of  eight  different  combinations  of  ties  sizes  and  spacings.  The  follow- 
ing day  the  committee  visited  the  Forest  Products  Laboratory  at  Madison,  Wis.,  and 
were  given  an  interesting  tour  of  the  facilities. 

The  joint  inspection  trip  of  these  two  organizations  worked  out  well  this  year, 
as  there  are  about  15  of  our  members  on  the  RTA  committee.  Otlier  joint  meetings 
are  planned  in  the  future. 


Committee  4 — Rail 

Remarks    by   Chairman   T.    B.    Hutcheson 

Assistant   Vice    President,    Engineering    and   Maintenance   of   Way, 

Seaboard    Coast   Line    Railroad 

The  report  of  Committee  4 — Rail,  is  contained  in  Bulletin  631,  beginning  at 
page  305. 

In  1970  the  committee  approved  as  an  AREA-recommended  section  the  119-lb 
CF&I  rail  section.  The  new  section  is  shown  in  the  current  Manual  recommenda- 
tions in  Bulletin  630  at  page  160,  and  is  included  in  the  1971  Manual  Supplement. 

Subcommittee  B  is  continuing  its  study  to  update  and  re\^•rite  Chapter  4  of  tlie 
Manual.  This  work  was  begun  in  1968,  and  since  tliat  date,  the  committee  has  com- 
pleted revision  of  Part  2 — Specifications.  This  subcommittee,  in  cooperation  witli 
representatives  of  Committee  31  and  of  the  steel  industry  members  of  the  Joint 
Contact  Committee,  AREA-AISI,  has  developed  plans  for  inspection  of  welding 
processes  at  selected  rail  welding  plants  so  that  on-site  study  can  be  gi\'en  to  the 
problems  of  end  straightness  and  end  conditions  of  rail  for  welding.  The  subcom- 
mittee hopes  to  determine  if  it  is  desirable  or  practical  to  rexisc  the  present  spec- 
ifications for  straightness  and  end  condition. 

Bui.  6^3 


614       Remarks    by    Chairmen    of   Technical    Committees 

During  1970  Committee  4  visited  the  rail  mill  of  Bethlehem  Steel  Corporation 
at  Steelton,  Pa.,  in  continuation  of  its  adopted  program  to  visit  such  facilities  of  the 
major  rail  producers.  These  visits  have  proven  quite  beneficial  both  to  the  committee 
in  handling  its  assignments,  and  to  the  steel  industry  members  of  tlie  Joint  Contact 
Committee  AREA-AISI  in  the  understanding  of  problems  shared  in  common.  In 
1971  it  is  planned  to  visit  the  rail  mill  of  The  Algoma  Steel  Corporation  in  connec- 
tion with  the  regular  spring  meeting  of  Committee  4. 

The  1970  committee  report  contains  two  interesting  reports  on  rail  tests  pre- 
pared by  the  Research  Center,  Association  of  American  Railroads,  one  dealing  with 
the  investigation  of  rails  rolled  by  the  Australian  Iron  and  Steel  Company,  and  the 
other  dealing  with  the  investigation  of  140-lb  rail  rolled  by  the  United  States  Steel 
Corporation  from  vacuum-degassed  steel. 

During  1970  Subcommittee  3,  whose  assignment  is  Rail  Failure  Statistics,  has 
been  in  discussion  with  the  Research  Center,  which  has  in  the  past  compiled  these 
statistics  from  reports  submitted  on  a  voluntary  basis  by  railroads,  as  to  the  data 
base  from  which  these  statistics  are  drawn.  The  subcommittee  is  in  the  process  of 
making  a  study  of  the  manner  in  which  the  data  is  obtained  and  into  the  commit- 
ment of  the  railroads  to  furnish  the  required  data  base  in  an  accurate  and  meaning- 
ful form.  This  study  will  be  continued  in  197L 

Further  infonnation  was  requested  of  railroads  in  late  1970  on  the  subject  of 
obtaining  rails  longer  than  39  ft  with  the  view  to  developing  tlie  optimum  length 
of  rails  acceptable  to  both  railroads  and  the  steel  industry.  Hopefully,  a  report  on 
this  subject  can  be  prepared  for  the  1971  report 

A  progress  report  on  die  assignment  of  Subcommittee  4 — Rail  End  Batter, 
Causes  and  Remedies,  tells  of  the  experience  of  one  railroad  in  repair  of  rail  ends 
by  tlie  use  of  tlie  semi-automatic  wire  feed  weld. 

Subcommittees  5,  6,  7,  8,  and  10  have  no  report  for  tlie  current  year. 

Subcommittee  9 — Standardization  of  Rail  Sections,  published  with  the  commit- 
tee report  a  tabulation  of  rail  rolled  and  shipped  in  1969.  This  report  indicates  tliat 
77.45%  of  total  rail  shipped  directly  to  North  American  roads  was  in  the  AREA- 
recommended  sections. 

Committee  4  records,  in  an  appropriate  Memoir,  its  deep  sense  of  loss  in  the 
death  on  August  1,  1970,  of  David  Todd  Faries,  formerly  chief  engineer  of  the 
Bessemer  &  Lake  Erie  Railroad. 

This  concludes  the  review  of  work  of  the  committee  during  tlie  past  Associa- 
tion year. 


Committee  6 — Buildings 

Remarks   by   Chairman   D.    A.    Bessey 
Assistant    Architect,    Chicago,    Milwaukee,    St.    Paul    &    Pacific    Railroad 

One  of  the  most  current  problems  facing  Committee  6  involves  some  good  news 
and  some  bad  news  about  our  vice  chairman,  C.  R.  Madeley.  The  bad  news  (as  far 
as  we  are  concerned)  is  that,  after  23  years  with  the  Southern  Pacific  Transportation 
Company,  Mr.  Madeley  resigned  and  became  civil  department  manager  of  a  consult- 
ing engineering  firm.  After  4  months,  Mr.  Nhideley  resigned  diat  position  and  is  now 


Remarks    by    Chairmen    of    Technical    Committees       615 

chief  engineer  of  a  building  systems  company.  Under  Association  rules,  Mr.  Madeley 
can  no  longer  serve  as  \'ice  chainnan.  The  good  news  is  that  Mr.  Madeley  will  remain 
on  Committee  6  as  an  Associate  Member. 

Your  Committee  6  is  well  into  its  tliird  year  of  carrying  out  major  revisions  to 
Chapter  6  of  the  Manual.  The  completion  of  the  new,  concise  specification  section 
2  years  ago  and  the  design  criteria  material  that  was  submitted  last  fall  has  already 
greatly  changed  the  character  of  Chapter  6. 

Much  of  the  activity  of  your  committee  is,  and  will  continue  to  be,  directly 
related  to  the  Manual.  First  of  all,  the  design  sections  of  the  Manual  are  being 
updated  to  reflect  current  innovations  in  the  building  industry  as  well  as  to  be 
responsive  to  new  techniques  involved  in  tlie  railroad  industry.  Second,  Subcommittee 
B  has  the  standing  assignment  to  review  information  reports  prepared  by  Committee 
6  over  the  past  few  years  to  determine  which  material  should  be  incorporated  in  the 
Manual  as  design  criteria.  And  third,  the  majority  of  our  existing  and  new  assign- 
ments will  in  part  or  totally  become  Manual  material  in  the  design  section.  The 
material  generated  within  these  assignments  will  place  great  emphasis  on  the  problems 
of  design  and  construction  of  buildings  and  facilities  which  are  unique  to  the  railroad 
industry. 

I  would  now  like  to  briefly  review  the  status  of  committee  assignments. 

Subcommittee  A — Recommendation  for  Stuchj  and  Research 

Four  new  subjects  were  suggested  last  fall,  and  all  four  were  approved  by  the 
Board  of  Direction.  Subcommittee  chairmen  and  members  have  been  assigned,  and 
work  will  progress  on  these  subjects  as  soon  as  the  existing  assignments  are  com- 
pleted. More  about  these  new  subjects  in  a  moment. 

Subcommittee  B — Revision  of  the  Manual:  W.  C.  Stumi,  Chairman 

The  subject  "Design  Criteria  for  Railway  Office  Buildings"  was  published  in 
Bulletin  630  and  received  committee  approval  for  inclusion  in  the  Manual.  The 
subcommittee  is  currently  pursuing  the  subject  "Passenger  Station  Design"  starting 
with  a  report  that  was  submitted  for  information  a  few  years  ago.  With  pending 
changes  to  the  railroad  passenger  systems,  this  could  become  a  very  timely  subject. 
Mr.  Stunn  has  directed  the  Manual  revision  for  the  past  three  years;  and,  needless 
to  say,  has  done  a  commendable  job. 

Subcommittee  1 — Piggyback  Terminals:  G.  J.  Chamraz,  Chairman 

Previous  activity  pursuant  to  this  subject  has  produced  \arious  reports  for 
infonnation  only. 

The  material  presently  being  prepared  by  this  subcommittee  will  be  specifics 
pertaining  to  the  design  and  construction  of  TOFC/COFC  facilities.  This  will 
include  such  specifics  as  ramp  design,  crane  runway  design,  development  of  areas 
for  side-loading  systems,  and  all  other  details  in  connection  with  the  design  and 
construction  of  such  facilities.  This  subject  was  pursued  in  a  committee  workshop 
at  our  January  meeting. 

Subcommittee  2 — Computer  Uses  for  Raihoaij  Building  Design:  J.   A.  Penner, 
Chainnan 

It  is  intended  that  this  assignment  will  remain  active  for  a  considerable  period 
of  time.  However,  the  subcommittee  will  not  prepare  a  fonnal  report  on  this  subject. 
The  function  of  the  subcommittee  will  be  to  present  reports  from  time  to  time  of 
actual  applications  where  computers  were  used  for  some  aspect  of  building  design. 


616       Remarks    by    Chairmen    of    Technical    Committees 

Mr.  Penner  advises  that  they  on  the  Penn  Central  have  been  successful  in  using  the 
computer  for  writing  specifications.  A  report  of  this  application  will  be  submitted 
soon. 

Suhcommittee  3 — Diesel  Shop  Design  Criteria:  A.  R.  Gualtieri,  Chairman 

Preparation  of  the  report  is  imderway,  and  it  is  intended  to  pursue  this  assign- 
ment in  a  workshop  at  our  June  met>ting.  The  report  in  its  final  form  will  be  pre- 
pared on  the  decimal  format  with  the  intention  that  it  will  be  included  in  the  Man- 
ual. This  report  will  include  recent  innovations  in  diesel  house  design  as  well  as 
portions  of  the  existing  diesel  house  design  section  presently  in  the  Manual. 

Subcommittee  4 — Spot  Car  Repair  Design  Criteria:  T.  H.  Seep,  Chairman 

A  preliminary  draft  was  prepared  by  the  subcommittee,  and  a  considerable 
amount  of  time  was  taken  up  in  a  workshop  at  the  January  meeting.  The  finished 
report,  which  is  also  intended  for  inclusion  in  the  Manual,  will  be  more  than  just 
a  general  report  on  this  type  of  facility.  It,  too,  will  deal  in  specifics  such  as  build- 
ing design,  structural  systems,  space  requirements,  clearances,  special  utilities,  and 
the  various  types  of  jacks,  hoists,  and  car  moving  equipment. 

The  four  new  subcommittees  and  chaimien  are  as  follows: 
Suhcommittee  5 — In-Floor  Conveyor  Systems:  R.  C.  Rankin,  Chairman 

It  is  intended  that  this  material  will  be  submitted  for  information  only. 

Subcommittee  6 — Computer  Room  Design:  R.  J.  Martens,  Chainnan 

It  is  our  intention  that  this  report  would  either  become  a  part  of  the  office 
building  design  section  of  the  Manual  or  be  submitted  as  a  separate  section. 

Subcommittee  7 — Pneumatic   Tube:   H.  R.  Helker,   Chairman 

It  is  intended  that  this  report  will  be  submitted  for  information  only. 

Subcommittee  8 — FortabJe  Prefabricated  Buildings:  P.  W.  Peterson,  Chairman 

It  is   our  intention   tliat  this   report  will   be  prepared  for  Manual  submission. 

Prior  to  presenting  the  special  feature,  I  would  like  to  make  a  few  requests. 
I  would  once  again  like  to  direct  a  question  to  you,  the  people  that  make  up  the 
railroad  industry  and  the  members  of  the  Association.  We  would  like  to  have  you 
keep  us  advised  as  to  what  subjects  pertaining  to  buildings  and  related  facilities 
are  of  the  greatest  interest  to  you  and  are  important  to  your  area  of  responsibility. 
If  you  have  such  subjects  in  mind,  please  advise  the  Executive  Manager  or  convey 
your  suggestions  directly  to  any  member  of  Committee  6.  We  sincerely  solicit  your 
assistance,  suggestions,  and  comments. 

My  second  comment  or  request  is  pertaining  to  committee  membership  and 
committee  participation.  Here  again,  I  would  like  to  turn  to  the  members  of  tiie 
Association  to  carry  our  message  back  to  your  railroad.  We  are  looking  for  increased 
membership  on  Committee  6,  and  increased  participation  in  tlie  activities  of  the 
committee  by  its  members. 

It  is  our  feeling  diat  our  committee  and  all  committees  of  AREA  are  today 
responsive  to  tlie  needs  of  our  industry.  We  are  more  than  a  group  of  subcommittee 
chainnen  writing  informative,  but  rarely  read,  reports.  The  format  has  changed,  and 
the  end  result  of  committee  action  is  not  only  informative  but  useful — useful  to  us 
and  useful  to  the  entire  industry.  Our  end  product  is  service  through  information. 
Without  full  participation  of  committee  members,  that  service  is  less  tlian  maximum. 


Remarks    by    Chairmen    of    Technical    Committees       617 

Committee  8 — Concrete  Structures  and  Foundations 

Remarks   by   Chairman    F.   A.    Kempe 
Regional    Engineer,    Burlington    Northern,    Inc. 

Your  committee  is  actively  progressing  revisions  to  the  Manual  and  conducting 
an  investigation  into  tlie  use  of  concrete  ties  on  open-deck  steel  bridges. 

Since  the  published  committee  report  in  Bulletin  631,  full-size  concrete  bridge 
ties  have  been  tested  in  tlie  AAR  Lab.  They  met  tlie  design  strength  and  showed 
exceptional  resistance  to  failure.  We  are  now  seeking  a  span  in  tiie  Chicago  area 
on  which  ties  can  be  placed  for  field  tests,  especially  to  establish  the  distribution 
of  wheel  load  between  adjacent  ties.  Your  help  is  requested.  The  physical  require- 
ments for  a  span  may  be  obtained  from  Jack  Williams  of  the  Rock  Island. 

In  the  past  we  have  held  three  committee  meetings  annually  to  progress  spec- 
ification preparation  and  review.  Due  to  the  recent  request  of  die  Board  of  Direc- 
tion, only  two  meetings  will  be  held  in  1971.  At  our  next  meeting  we  expect  to 
finalize  specifications  for  lightweight  aggregate  and  for  concrete  lining  of  tunnels. 
We  also  expect  to  receive  the  initial  draft  of  specifications  for  drilled-in  caissons. 

The  committee  is  also  studying  the  recommendation  of  AREA  Committee  30 
that  design  loading  for  concrete  structures  be  increased  from  the  current  E  72  to 
E  80.  This  matter,  too,  will  be  considered  at  our  next  meeting  in  order  to  allow  us 
to  reply  to  Committee  30. 

Last  year  the  Special  Feature  presented  by  Committee  8  was  titled  "Prestressed 
Concrete  Railroad  Bridges — A  Progress  Report."  It  was  brought  out  that  use  of 
concrete  spans  is  rapidly  increasing  in  both  number  of  spans  and  span  lengtli.  This 
year  we  will  present  a  special  feature  on  the  repair  of  concrete  structures  widi  epoxy 
compounds.  As  railroad  engineers,  we  are  aware  of  the  need  to  both  construct  and 
maintain  economically. 


Committee  9 — Highways 

Remarks   by   Chairman    R.    E.    Skinner 
Assistant   to    Chief   Engineer,    Illinois    Central    Railroad 

The  annual  report  of  Committee  9 — Highways,  is  published  in  Bulletin  630, 
pages  169  through  182. 

I  am  unhappy  to  report  that  Harold  Walbright,  one  of  our  more  active  members 
and  a  subcommittee  chairaian,  passed  away  on  May  19,  1970,  at  the  age  of  48. 
Harold's  last  position  was  as  division  engineer  on  the  Norfolk  &  Western  Railway  at 
Portsmoutii,  Ohio.  A  Memorial  is  printed  on  page  171  of  Bulletin  630. 

A  review  of  Committee  9's  ten  assignments  will  give  you  some  idea  of  the  broad 
scope  of  our  studies,  ranging  from  the  stabilization  of  grade  crossing  roadbeds  to  the 
use  of  railroad  air-rights  for  highways.  Most  of  our  work  involves  the  accumulation 
of  information  from  all  possible  sources  for  our  various  assignments. 

Another  important  function  of  our  committee  is  keeping  in  toucli  with  tlie 
activities  of  other  committees,  organizations  and  agencies  (mostly  non-railroad) 
involved  in  the  highway-railway  field.  Some  of  tliese  activities  are  reflected  in  our 
reports  on  such  assignments  as  No.  3 — Merits  of  Various  Types  of  Highway-Railway 
Grade  Crossing  Protection,  No.  4 — Merits  and  Econonucs  of  Marking  and  Signing 


618       Remarks    by    Chairmen    of    Technical    Committees 

Grade  Crossings,  and  No.  7 — Conduct  Study  with  the  View  Toward  Developing 
Alternate  Types  of  Automatic  Crossing  Protection.  We  feel  we  must  keep  infonned 
on  these  activities  not  only  for  our  reports  but  for  the  benefit  of  our  committee  mem- 
bers who  are  involved  in  these  problems  in  their  day-to-day  work. 

This  concludes  my  term  as  chairman.  The  new  vice  chairman  is  C.  A.  Christensen, 
assistant  director-public  works  planning,  Burlington  Northern,  Inc.,  St.  Paul,  Minn. 
The  new  chairman  is  K.  E.  Wyckofi^,  director-public  works  planning,  Burlington 
Nortliern,  Inc.,  St.  Paul.  Under  Ken,  the  work  of  Committee  9  will  be  in  very  capable 
hands.  Not  only  is  he  one  of  our  most  active  and  loyal  members,  he  pos.sesses  con- 
siderable knowledge  of  all  the  aspects  of  our  work  and  serves  on  other  related  com- 
mittees, such  as  the  AAR  General  Committee  on  Highway-Railway  Facilities. 


Committee   11 — Engineering  Records  and  Property 
Accounting 

Remarks    by    Chairman   J.    Bert   Byars 
Assistant   to    Chief   Engineer,    Denver   &   Rio    Grande   Western    Railroad 

The  members  of  Committee  11  welcome  the  opportunity  to  present  a  report  of 
their  work  during  the  year  of  1970. 

The  name  of  Committee  11  has  been  changed  to  "Engineering  Records  and 
Property  Accounting,"  which  we  feel  covers  tlie  many  phases  of  our  \\'ork  better  than 
the  old  title  of  "Engineering  and  Valuation  Records." 

During  1970,  Committee  11  had  seven  major  assignments  under  study.  The 
printed  reports  of  five  subcommittees  appear  in  Part  2  of  Bulletin  630,  November- 
December  1970,  on  pages  239  through  247. 

Our  committee  members  have  endeavored  to  continue  being  of  service  to  the 
railroad  industry  during  the  past  year  by  developing  information  that  will  facilitate 
management  in  the  most  economical  method  of  handling  engineering  records  and 
property  accounting.  A  progress  report  on  "Responsibility  Code  Reporting"  is  pre- 
sented in  our  report,  and  further  reporting  will  be  made  in  the  future.  This  mediod 
of  reporting  allows  the  engineering  and  maintenance  of  way  officers  better  control 
of  their  expenditures.  It  is  a  well  known  fact  that  adjustments  for  taxation,  deprecia- 
tion, personal  injuries,  etc.,  have  distorted  many  a  montlily  budget,  but  an  improper 
report  from  a  section  foreman  has  often  created  the  same  commotion. 

Our  special  committee  is  continuing  its  work  with  the  Interstate  Commerce  Com- 
mission on  revision  of  Valuation  Orders. 

We  would  again  like  to  solicit  any  suggestions  from  AREA  members  for  topics 
to  study  that  would  prove  beneficial  to  the  Association. 

At  the  adjournment  of  this  Convention  my  term  as  chairman  of  Committee  11 
will  be  concluded.  I  wish  to  thank  the  officers  of  the  AREA  for  the  fine  cooperation 
I  have  had,  and  want  to  express  my  appreciation  to  all  the  members  of  Committee  11 
for  their  support.  Anything  we  have  accomplished  during  my  tenure  is  due  to  their 
diligence,  fine  cooperation  and  interest  in  being  of  service  to  the  railroad  industry. 
I  have  never  worked  with  a  finer  group  of  meu 

The  new  chairman  of  Committee  11  will  be  tlie  present  vice  chairman,  C.  R. 
Dolan,  engineer  of  capital  expenditures,  Missouri  Pacific  Railroad.  The  new  vice 
chairman  will  be  R.  D.  Igou,  manager  capital  expenditures,  Chicago,  Rock  Island  & 
Pacific  Railroad. 


Remarks    by    Chairmen    of    Technical    Committees       619 

Committee   13 — Environmental   Engineering 

Remarks   by   Chairman   C.   F.   Muelder 
Utilities    Engineer,    Chicago    Region,    Burlington    Northern,    Inc. 

Your  committee  is  gaining  momentum  in  its  work  on  ecological  problems. 
We  have  46  members,  and  tliis  past  year  have  accepted  seven  new  members.  We 
have  had  one-day  meetings  with  one  exception.  One  two-day  meeting  was  held  so 
that  a  field  inspection  trip  could  be  made  to  a  new  railroad  waste  water  treatment 
plant  facility. 

We  had  six  pemianent  assignments  last  year,  and  tliis  year  an  additional  assign- 
ment on  Noise  Pollution  has  been  given  to  us. 

Subcommittee  1  on  Water  pollution  control  is  chaired  by  J.  L.  Goss;  Subcommit- 
tee 2  on  Air  Pollution,  A.  F.  Butcosk;  Subcommittee  3  on  Land  Pollution,  P.  P.  Duna- 
vant;  Subcommittee  4  on  Industrial  Hygiene,  R.  S.  Biyan  Jr.;  Subcommittee  5  on  Plant 
Utilities,  T.  L.  Hendrix;  Subcommittee  6  on  Corrosion  Control,  H.  W.  Azer.  Our 
new  Subcommittee  on  Noise  Pollution  will  be  chaired  by  R.  R.  Holmes.  C.  E. 
DeGeer  is  vice  chairman  of  our  committee  and  J.  J.  Dwyer  is  secretary. 

You  will  note  from  Bulletin  630  that  last  year  Subcommittee  1  presented  a 
complete  report  on  the  design  of  water  pollution  control  facilities.  Subcommittee  2 
presented  a  complete  report  on  incinerators  for  air  pollution  control.  Subcommittees 
3,  4,  and  6  have  given  us  progress  reports  on  tlieir  assignments. 

This  coming  year  our  Subcommittees  on  Water,  Air,  and  Noise  Pollution  Control 
have  assignments  of  study  relating  to  new  aspects  of  their  fields.  Subcommittees 
on  Land  Pollution,  Industrial  Hygiene,  Plant  Utilities,  and  Corrosion  Control  will 
complete  their  assignments.  In  addition,  the  completed  reports  as  published  in  the 
Bulletin  will  be  acted  upon  for  inclusion  in  the  Manual. 

Your  committee  solicits  suggestions  and  questions  relating  to  our  assignments. 
I  suggest  these  be  presented  to  me  in  a  letter  for  handling.  I  would  especially  be 
interested  in  any  particular  subject  within  the  scope  of  our  assignments  which  is 
felt  our  committee  should  investigate. 


Committee   14 — Yards  and  Terminals 

Remarks    by   Chairman    C.    E.    Stoecker 
Engineer   Planning    and    Design,    Louisville   &   Nashville   Railroad 

Committee  14  is  working  on  the  revision  of  Chapter  14  of  the  Manual  which 
will  include  changing  to  the  decimal  system  format. 

In  Bulletin  630  the  committee  published  reports  of  infonnation  on  "Methods 
of  Prevention  of  Roll-Out  At  Lower  End  of  Classification  Yard,"  and  "ACI  Applica- 
tion in  Yards  and  Terminals  and  Weighing  Systems."  It  also  published  a  report  on 
"Layout  and  Characteristics  of  Loading  Facilities  for  Automobiles  and  Trucks."  The 
information  on  automobiles  is  being  prepared  to  replace  Section  K,  page  14-3-18, 
of  the  Manual. 

For  the  year  1971  Committee  14  will  report  on  the  following: 

Snow  removal  appurtenances  in  yards  and  terminals. 
Development  of  belt  scale  specifications. 


620       Remarks    by    Chairmen    of    Technical    Committees 

Lengths  of  freight  cars  as  basis  for  track  capacity. 

Urban  mass  transportation. 

Temiinal  facihtias  for  container  handhng. 

Committee  14  will  hold  its  June  meeting  near  Newark,  N.  J.  At  that  time 
we  plan  to  visit  a  container  handling  facility. 

In  June  of  1970  Committee  14  visited  the  Argentine  Yard  of  the  Santa  Fe 
Railway  at  Kansas  City. 

This  is  my  last  official  act  as  chairman  of  Committee  14.  I  wish  to  take  this 
opportunity  to  thank  all  members  of  Committee  14  for  their  fine  spirit  of  cooperation 
and  assistance  during  my  tenure.  Gentlemen,  it  has  been  a  most  pleasant  experience. 

May  I  now  present  C.  H.  Chabot,  senior  engineer-contracts,  C&O  Ry.-B&O  RR., 
the  new  chainnan  for  Committee  14,  and  R.  F.  Beck,  chief  engineer,  EJ&E  Ry.,  the 
new  vice  chairman. 


Committee   15 — Steel  Structures 

Remarks   by   Chairman    M.    L.    Koehler 
Engineer   Structures,    Penn    Central   Transportation    Company 

The  annual  report  of  Committee  15 — Steel  Structures,  is  published  in  Bulletin 
631,  pages  429  and  430.  The  Manual  recommendations  of  Committee  15  as  published 
in  Bulletin  630,  pages  153  through  157,  cover  revisions  to  Part  1  and  the  addition 
of  new  Parts  9.3  and  9.5  of  the  Bibliography  and  Technical  Explanations  of  Various 
Requirements  in  AREA  Specifications  Relating  to  Steel  Structures. 

During  the  past  year,  a  task  group  of  six  members  of  the  Subcommittee  on 
Welded  Railway  Bridges  was  established  to  maintain  active  cooperation  between 
the  American  Welding  Society — Structural  Welding  Committee,  and  AREA  Steel 
Structures  Committee,  with  the  aim  to  promote  uniformity  of  specifications. 

The  plans  of  Committee  15  for  the  coming  year  include  a  complete  revision 
of  Part  6  covering  the  design,  fabrication  and  erection  of  movable  railway  bridges. 
A  commentary  will  be  prepared  for  Part  6  as  it  is  revised. 

The  scope  of  Committee  15  is  to  formulate  specific  and  detailed  rules  for  the 
design,  fabrication  and  erection  of  steel  railway  bridges  and  turntables  and  to  rec- 
ommend procedures  for  tlie  maintenance,  inspection,  and  rating  of  existing  metal 
railway  bridges. 

Committee  15  solicits  your  comments  or  suggestions  for  future  assignments, 
and  the  committee  would  appreciate  that  they  be  furnished,  in  writing,  after  tlie 
convention,  addressed  to  the  committee  chairman. 


Committee  20 — Contract  Forms 

Remarks   by    Chairman    E.   A.    Graham 
Chief   Engineer,    Colorado    &    Southern    Railway 

The  scope  of  Committee  20  is  to  draft  forms  of  agreements  involving  railroads 
with  railroads  or  railroads  with  outside  parties.  These  forms  are  presented  as  guides 
for  the  use  of  railroad  companies  in  drawing  up  their  own  fonns  of  agreements. 


Remarks    by    Chairmen    of    Technical    Committees       621 

During  the  past  year  Committee  20  has  been  engaged  in  progressing  for  adoption 
four  new  agreement  fonns  as  outHned  in  Bulletin  630,  page  167.  These  should  be 
completed  for  publication  with  our  1971  report.  In  addition  we  will  continue  to  review 
all  fonns  of  agreements  presently  in  the  Manual  for  any  revisions  that  may  be 
necessary. 

Two  meetings  of  the  joint  AREA-ARWA  liaison  committee  were  held  during 
the  past  year  and  these  meetings  will  continue  with  a  goal  to  develop  recommenda- 
tions for  better  handling  of  matters  between  the  railway  industry  and  utility  com- 
panies. The  meetings  to  date  have  brought  about  a  better  understanding  of  each 
other's  problems. 

Committee  20  will  welcome  suggestions  from  railroad  officers  on  future  assign- 
ments. These  suggestions  may  be  made  in  writing,  addressed  to  me. 


Committee  22 — Economics  of  Railway  Construction 
and  Maintenance 

Remarks    by   Chairman    R.    W.    Pember 
Assistant   Chief   Engineer,   Maintenance   of   Way,    Louisville   &   Nashville    Railroad 

The  Report  of  Committee  22 — Economics  of  Railway  Construction  and  Mainte- 
nance, appears  in  Bulletin  630,  Proceedings  Vol.  72,  November-December  1970, 
pages  183  to  201,  incl. 

Final  reports  were  presented  by  Subcommittees  2  and  3.  The  report  of  Subcom- 
mittee 2  deals  with  economics  of  various  types  of  highway-railway  grade  crossing 
installations,  including  full-depth  timbers,  planking,  shallow  blacktop,  full-depth  black- 
top (3  to  6  inches  below  tie  to  top  of  rail),  shallow  concrete,  full-depth  concrete, 
cast  steel  and  rubber.  That  of  Subcommittee  3  is  on  economics  of  headquarters  main- 
tenance of  way  gangs  versus  floating  gangs  in  view  of  recent  arbitration  awards. 

Assignment  5 — Potential  labor  economies  to  be  derived  through  the  use  of 
advanced  types  of  track  inspection  cars  in  formulating  maintenance  programs,  is  being 
discontinued  for  the  time  being. 

The  report  on  Assignment  1 — Analysis  of  operations  of  railways  that  have  sub- 
stantially reduced  the  cost  of  construction  and  maintenance  of  way  work,  is  a  progress 
report  describing  a  field  inspection  made  by  the  committee  on  June  23,  1970,  of  the 
Burlington  Northern,   Inc.'s  line  change  in  Montana  between  Stryker  and  Jennings. 


Committee  24 — Engineering   Education 

Remarks    by    Chairman    V.    J.    Roggeveen 
Associate    Professor    of    Transportation    Planning,    Stanford    University 

This  has  been  an  especially  important  year  for  your  committe(\  I  will  report 
to  yovi  briefly  about  the  comnuttee's  past,  about  where  it  is  today,  and  about  the 
plans  and  ideas  for  the  future. 

Where   We   have   Been 

Conunittee  24  has  been,  until  this  year,  the  Comnuttee  on  Cooperative  Rela- 
ti(ms  with  Universities.  According  to  old  issues  of  the  AREA  Proceedings,  the  com- 
mittee was  formed  in  1923.  It  held  its  first  meeting,  for  two  days,  at  the  University 


622       Remarks    by    Chairmen    of    Technical    Committees 

of  Michigan,  under  the  chairmanship  of  R.  N.  Ford,  of  the  Chicago,  Rock  Island  & 
Pacific.   Its   initial   report   to  the  Annual   Convention  of  AREA  was  in  March   1924. 
The  scope  of  its  assignment,  as  defined  by  the  Board  of  Direction  and  reported 
in  the  1924  and  1925  Proceedings,  was: 

"A  general  interest  upon  the  part  of  railroad  officers  in  assisting  tire 
university  to  develop  the  best  possible  methods  for  the  technical  courses; 
a  better  means  of  bringing  to  the  university  the  result  of  our  deliberations 
where  such  can  be  made  of  value  to  them;  a  better  means  of  bringing  to  the 
attention  of  the  railroads  the  benefits  of  a  technical  education,  tliereby 
acquainting  them  with  the  qualifications  of  graduates  of  these  courses  for 
initial  service  in  subordinate  positions,  and  at  the  same  time  providing  mate- 
rial from  which  men  may  be  drawn  for  higher  positions  as  they  demonstrate 
their  fitness;  a  means  of  stimulating  greater  interest  in  the  science  of  trans- 
portation among  engineering  students,  which  may  be  inclined  toward  this 
branch  of  industry;  a  means  whereby  the  facilities  of  the  university  may  be 
made  more  directly  available  for  the  research  work  of  the  Association,  by 
cooperative  effort  between  the  laboratories  and  the  committees  of  tlie  Asso- 
ciation; a  means  whereby  the  university  may  be  better  enabled  to  educate 
the  students  and  the  public  regarding  the  value  of  transportation  to  the 
Nation  as  a  whole;  a  means  of  stimulating  a  greater  interest  among  univer- 
sity officials  in  the  study  of  transportation  and  economics  and  impressing 
upon  them  the  importance  of  experienced  men  for  such  teaching." 

An  interesting  report  in  the  1925  Proceedings  was  that  on  one  large  eastern 
railroad,  with  38,000  employees,  about  VA  percent  had  college  training.  E.  T.  How- 
son,  of  Railway  Age,  chairman  of  the  Subcommittee  on  the  Questionnaire,  reported 
further: 

"It  is  common  knowledge  that  many  colleges  are  openly  discouraging 
men  from  entering  railway  service  today.  It  is  equally  generally  known  that 
many  industries  are  making  aggressive  campaigns  to  bring  collegemen  into 
their  employ,  sending  men  to  universities  to  look  over  the  graduates,  and  to 
interview  and  to  select  specific  men." 

The  committee  was  active  for  a  few  years,  but  the  Depression  brought  retrench- 
ment to  many  activities,  both  of  the  railways  and  of  AREA.  In  1930  the  committee 
submitted  an  annual  report  and  reported  to  the  March  convention.  The  1931,  1932, 
and  1933  Proceedings  only  list  the  committee  as  having  29  members,  with  no  added 
information.  It  is  omitted  entirely  in  the  1934  issue. 

The  winter  of  1940  brought  a  renewal  of  activity.  The  committee  was  re-created, 
with  17  members,  under  the  chairmanship  of  Mr.  Howson,  who  had  continued  to 
be  a  member  since  starting  with  the  original  1923  group.  The  1941  Proceedings 
included  a  statement  of  scope  and  purpose  and  listed  seven  assignments;  these  were 
generally  similar  to  the  original   1924  scope. 

Committee  24  has  been  continuous  since  1940.  The  number  of  members  rose 
to  26  in  1949,  took  a  sudden  jump  to  46  in  1950,  rose  somewhat  higher  in  the  early 
I960's,  and  is  46  now,  in  1971. 

Several  of  our  current  members  have  been  on  the  committee  for  over  20  years: 
W.   S.   Autrey    (1949),  J.   B.   Babcock    (emeritus)    (1941),   R.  P.   Davis   (emeritus) 


Remarks    by    Chairmen    of    Technical    Committees       623 

(1942),  W.  H.  Huffman   (1949),  A.  V.  Johnston  (1949),  B.  B.  Lewis   (emeritus) 
(1949),  W.  A.  Ohver  (1949),  and  R.  B.  Rice   (1949). 

Chairmen  since  the  1941  revival  have  been  E.  T.  Howson,  R.  E.  Dougherty, 
F.  R.  Layng,  S.  R.  Hursh,  C.  C.  Crove,  R.  J.  Stone,  W.  H.  Huffman,  W.  W.  Hay, 
J.  F.  Davison,  R.  H.  Beeder,  and  myself.  Mr.  Stone  and  hi,s  predecessors  are  no 
longer  with  us;  Mr.  Huffman  and  his  successors  are  all  still  active  committee 
members. 

Numerous  assignments  have  been  assiduously  worked  on  in  the  past  three 
decades,  and  the  results  of  some  of  them  are  well  known  to  you.  I  joined  the  com- 
mittee in  1958,  and  have  been  personally  aware  since  that  time  of  such  examples  as: 
the  annual  effort  to  inform  engineering  students  about  summer  employment  oppor- 
tunities, the  recruiting  brochure  (three  editions:  1955,  1959,  and  1964),  the  student 
recruiting  guide  for  use  by  railway  officials,  the  loan  collection  of  slides  about  rail- 
way engineering,  the  pictorial  exhibit  about  railway  engineering,  the  analysis  of  the 
need  for  engineering  technicians  in  the  railway  field,  the  development  of  tlie  student 
affiliate  program,  the  list  of  suggested  student  thesis  topics,  assistance  to  universities 
about  arranging  for  speakers  and  field  trips,  and  so  forth. 

Presentations  at  annual  conventions,  and  reports  in  the  Bulletins  and  Proceed- 
ings ever  since  the  1920's,  have  brought  to  the  attention  of  railway  engineers  tlie 
changing  curricula,  perspectives,  conditions,  and  similar  factors  at  college  and  uni- 
versities, and  informed  them  about  current  engineering  students. 

In  the  latter  1960's  many  of  tlie  assignments  lost  their  appeal.  Some  had  been 
essentially  completed.  Others  dragged  on,  in  some  cases  for  over  40  years,  with 
slow  progress,  but  without  a  feeling  of  significant  accomplishment.  Still  others  seemed 
outdated  in  these  rapidly  changing  times.  Several  were  no  longer  of  any  use  at  all. 
Almost  all  assignments  were  phrased  in  long  complex  language  out  of  an  earlier  era. 
The  subcommittee  chairmen  had  given  devoted  service  and  most  of  them  needed 
a  respite. 

In  the  meantime,  new  ideas  and  challenges  were  not  receiving  conmiittee  atten- 
tion. Even  the  name  no  longer  seemed  to  fit.  Railroads  do  not  and  probably  cannot 
cooperate  with  universities;  as  a  practical  matter  liaison  is  with  individual  professors 
who  have  an  especial  interest  in  railways.  In  recent  years  the  interests  of  college 
professors  have  all  too  often  not  included  railways,  and  this  has  been  reflected  in 
the  falling-off  of  professorial  memberships.  As  for  railway  engineering  officials,  atten- 
tion in  some  companies  has  been  diverted  to  more  pressing  matters  than  relations 
with  universities  or  their  faculty. 

In  this  setting  your  comnu'ttee  decided  upon  an  entirely  fresh  start. 

Where   We   Are    Now 

A  new  conunittee  name,  new  scope,  and  new  assignments  ha\e  been  developed 
during  the  18  months  just  passed;  and  all  except  the  scope  (which  awaits  coor- 
dination witli  the  statements  of  other  committees)  have  been  approved  by  the 
Board  of  Direction  and  are  now  in  effect. 

The  committee  is  now  called  "Engineering  Education." 

The  statement  of  scope  as  proposed  to  the  Board  is: 

1.  This  committee  serves  as  a  link  between  tlie  railway  engineering  j^rofession 
and  engineering  education. 


624       Remarks    by    Chairmen    of    Technical    Committees 

2.  Engineering  educators  arc  provided  with  opportunities  to  become  famiHar 
with  the  practices  and  advancements  in  railway  engineering  and  to  secure 
concepts  that  can  be  incorporated  into  academic  activities. 

3.  Railway  engineers  are  informed  about  developments  in  engineering  educa- 
tion and  given  an  opportunity  to  bring  their  ideas  to  the  attention  of  edu- 
cators interested  in  railway  engineering  and  research. 

4.  The  work  is  organized  into  general  assignments  dealing  with  the  education 
of  engineering  students,  recruiting  of  them  by  railway  managements,  and 
the  continuing  education  of  engineers  during  their  railway  careers. 

5.  The  committee  will  bring  to  the  attention  of  tlie  Association,  railway  man- 
agements, and  die  educational  community  new  knowledge  to  advance 
cooperative  programs  for  progress. 

The  new  assignments  are: 

A.  Recommendations  for  further  study  and  research. 

1.  Recruiting. 

2.  Summer  employment. 

3.  Student  internships. 

4.  Student  affiliates. 

5.  Continuing  education. 

6.  Speakers. 

7.  Project  case  studies. 

8.  Exchange  of  professional  staffs. 

9.  Research  resource  availability. 

Members  have  volunteered  to  serve  as  chairmen  of  all  the  subcommittees 
working  on  these  assignments;  all  but  two  are  new  to  subcommittee  chairmanships. 
They  are  listed  in  the  AREA  Handbook  of  Committee  Activity  for  1971. 

The  other  members  have  all  been  assigned  to  tlie  subcommittees. 

Further  details,  including  brief  explanations  of  the  assignments,  were  reported 
in  the  January-February  1971  AREA  Bulletin,  and  do  not  need  to  be  repeated  here. 

The   Future 

The  April  meeting  of  the  committee  brings  a  start  on  the  new  assignments. 
Ideas  will  be  developed,  and  actual  work  will  get  underway.  This  year  will  be  my 
last  as  chairman,  and  I  hope  we  can  generate  enough  starting  momentum  that  the 
next  chairman  will  be  able  to  report  substantial  progress  to  you. 

Committee  24  is  currently  below  its  full  quota  of  members,  and  is  somewhat 
unbalanced.  We  have  an  excellent  and  highly  interested  group  from  the  railroads, 
with  room  for  a  few  more.  The  professorial  membership  has  fallen  off  substantially. 
Those  who  are  members  are  almost  all  very  active,  but  additional  enthusiastic  ones 
are  needed.  It  is  to  be  hoped  that  the  "new  look"  of  the  committee,  combined  with 
some  new  enthusiasm  in  universities  for  the  study  of  transportation  and  for  attention 
to   professional   practice   rather   than   only   to   research,   will   aid  in  recruiting  them. 

We  welcome  ideas  or  comments  from  everyone;  this  has  never  been  more  true 
than  now.  In  1971,  we  are  starting  what  amounts  to  a  third  generation  of  the  com- 
mittee, following  the  1923-30  and  1940-70  eras.  We  hope  oiu-  reborn  activities 
will  be  as  useful  to  AREA,  to  the  railroads,  and  to  the  colleges  and  imiversities,  as 
.some  of  the  earlier  ones  were. 


Remarks    by    Chairmen    of    Technical    Committees       625 

Committee  25 — Waterways  and   Harbors 

Remarks   by    Chairman   J.    C.    Fenno 
Assistant   Division   Engineer,   Chicago,   Milwaukee,   St.   Paul   &   Pacific   Railroad 

The  report  of  Committee  25  is  pubUshed  in  Bulletin  No.  631,  January-February 
1971,  beginning  on  page  441.  A  progress  report  is  submitted  as  information  on 
assignment  2 — Current  Policies,  Practices  and  Developments  Dealing  with  Flood 
Control,  Water  Conservation,  Waterways  and  Water  Navigation  Projects.  The  report, 
prepared  by  L.  H.  McCurry,  offers  considerable  information  on  the  National  Water 
Commission,  established  by  Public  Law  90-515  on  September  26,  1968,  and  dis- 
cusses the  stand  of  the  AAR  concerning  management  of  water  and  land  resources 
as  related  to  subsidies  to  inland  navigation  and  the  evaluation  of  navigation  benefits. 

I  am  pleased  to  advise  the  membership  of  the  election  of  Dr.  Shu  T'ien  Li 
to  the  status  of  Member  Emeritus  on  Committee  25.  Dr.  Li,  retired  Professor  of 
Civil  Engineering  at  South  Dakota  School  of  Mines  &  Technology,  Rapid  City,  South 
Dakota,  has  faitlifully  served  the  AREA  and  Committee  25  for  many  years,  and 
it  is  hoped  that  he  will  continue  to  lend  his  experience  and  knowledge  for  many 
years  to  come. 

My  term  of  office  as  chairman  of  this  committee  will  terminate  at  the  end  of 
this  annual  convention.  It  would  now  be  appropriate,  I  think,  for  me  to  extend 
my  thanks  to  Earl  Hodgkins  and  his  staff  at  AREA  headquarters  for  their  many 
courtesies  and  always-available  assistance  to  me  during  the  past  tliree  years.  I  also 
wish  to  thank  those  subcommittee  chairmen  and  members  of  the  committee  whose 
diligent  efforts  and  hard  work  made  the  past  three  years  pass  so  swiftly.  1  am  sure 
that  the  same  cooperation,  courtesy  and  devotion  to  the  work  at  hand  will  extend 
through  the  in-coming  chairman's  term  of  office. 

The  new  chairman  of  Committee  25  is  L.  H.  McCurry,  assistant  engineer  of 
the  Santa  Fe,  Amarillo,  Tex.  The  new  vice  chairman  is  A.  C.  Parker,  assistant  cliief 
engineer  staff,  Seaboard  Coast  Line  Railroad. 

R.  V.  Gilbert,  engineer  public  works,  Burlington  Northern  Inc.,  continues  as 
secretary. 


Committee  28 — Clearances 

Remarks   by   Chairman    M.    E.    Vosseller 
Senior   Draftsman,    Central    Railroad   of   New   Jersey 

During  the  preceding  year  Committee  28 — Clearances  closed  out  its  Assignments 
4  and  6.  Subcommittee  4's  report  was  published  in  December  1968  and  sets  fortli 
restrictions  and  phrasing  of  instructions  for  handling  excessive  weight  and/or  dimen- 
sion shipments.  Subcommittee  6's  report  was  accepted  as  Manual  material  during 
1970.  It  is  entitled  "Instructions  Regarding  Infonnation  To  Be  Reported  For  An 
Excess  Dimension  Load  Or  Miscellaneous  Railroad  Equipment  ln\ol\  ing  Clearances, 
Weight  and  High  Center  Of  Gravity".  At  this  tiuie  I  want  to  thank  the  members  of 
Subconnnittees  4  and  6  and  their  respective  chairmen,  il.  P.  Huhleiu  and  his  suc- 
cessor, M.  E.  Dust,  both  of  the  L&N;  and  J.  E.  Beran  of  the  Burlington  Northern, 
for  their  efforts  in  seeing  these  two  assignments  through  to  completion. 


626       Remarks    by    Chairmen    of    Technical    Committees 

Several  of  our  subcoinniittees  have  arrived  at  a  point  where  the  cooperation  and 
assistance  of  certain  AAR  organizations  w  ill  he  solicited. 

One  of  our  newest  assignments,  "Inxestigate  the  practicability  of  using  disposable 
coded  placards  for  identifying  shipments  of  excessive  dimension  and/or  weight  that 
could  be  used  in  conjunction  with  the  Automatic  Car  Identification  System,"  has 
been  submitted  to  the  Mechanical  Division  of  the  AAR  and  all  of  Committee  28  for 
review  and  comments  or  suggestions.  Subcommittee  1  is  now  ready  to  have  a  field 
test  made  of  a  prototype  placard  for  evaluation  by  all  concerned.  However,  this  test 
nnist  be  made  under  the  auspices  of  the  AAR  Mechanical  Division's  Connnittee  on 
ACI,  and  attempts  are  being  made  to  seek  their  cooperation  in  arranging  for  the  test. 
Subcommittee  3  which  is  endeavoring  to  develop  new  methods  and  devices  to 
measure  clearance  obstructions  and  shipments  for  computer  data  and  Subcommittee  7 
which  is  investigating  the  feasibility  of  contracting  for  equipment  and  ser\'ices  that 
could  be  made  available  to  those  railroads  desiring  clearance  surveys,  are  considering 
going  outside  of  the  AREA  to  seek  the  cooperation  and  assistance  of  other  qualified 
organizations. 

Committee  28  will  continue  its  efforts  to  complete  our  current  assignments  and 
to  develop  new  recommendations  for  further  study  and  research.  Several  subjects  have 
been  brought  to  our  attention,  including  the  problem  encountered  with  tlie  move- 
ment of  cars  exceeding  the  AAR  Mechanical  Division  Plate  C  Equipment  Diagram 
For  Limited  Interchange  Service. 

I  welcome  any  comments  or  questions  tliat  you  might  have  concerning  this  report 
or  the  work  of  our  committee.  Anyone  having  any  suggestions  for  future  assignments 
relative  to  Committee  28's  area  of  responsibility  should  direct  them  to  Earl  Hodgkins, 
executive  manager  of  the  AREA,  or  to  myself. 


Committee  30 — Impact  and  Bridge  Stresses 

Remarks    by    Chairman    P.    L.    Montgomery 
Manager   Engineering    Systems,    Norfolk   &   Western    Railway 

This  report  is  my  last  as  chairman  of  Committee  30.  The  benefits  that  have 
been  gained  by  the  railroads  during  the  past  three  years  are  disappointing,  yet  we  can 
point  with  pride  to  some  accomplishments. 

Our  committee  is  progressing  its  study  leading  toward  tlie  establishment  of  a 
consistent  design  loading  for  all  structures  supporting  railway  loading.  A  preliminary 
draft  of  specifications  covering  railway  structures  is  now  being  circulated  for  com- 
ments. It  is  the  committee's  hope  that  each  affected  AREA  committee  can  accept  the 
final  draft  and  tliat  the  inconsistencies  which  now  exist  in  tlie  Manual  will  soon  be 
eliminated. 

Activity  by  the  Subcommittee  on  Electronic  Computers  remains  high.  During 
the  past  year,  a  new  publication  containing  moment  and  shear  tables  for  locomotives, 
heavy-duty  cars  and  regular  rolling  stock  was  issued.  A  new  program  for  the  analysis 
and  rating  of  railway  bridge  floor  systems  was  also  prepared  tliis  year.  This  program 
is  the  sixth  program  written  by  Dr.  E.  N.  Wilson  for  our  committee.  I  believe  rail- 
way bridge  engineers  will  agree  that  work  of  this  subcommittee  is  most  useful  in  the 
design  and  analysis  of  bridges. 


Remarks    by    Chairmen    of    Technical    Committees       627 

Work  in  the  areas  of  concrete,  steel  and  timber  has  been  practically  non-existent 
and  the  prospects  for  this  coming  year  are  not  good.  Unless  money  becomes  available 
for  research  by  either  the  AAR  Research  Center,  university  personnel  or  outside  par- 
ties, the  function  of  these  three  subcommittees  must  be  redefined. 

I  want  to  sincerely  thank  members  of  the  committee  for  their  help.  In  addition, 
I  want  to  commend  M.  Noyszewski  and  J.  A.  Erskine  to  the  Association  as  the  new 
chairman  and  vice  chairman,  respectively.  Finally,  I  would  like  to  recognize  our 
subcommittee  chairmen — M.  E.  Weller,  Steel;  E.  D.  Ripple,  Concrete;  L.  R.  Kubacki, 
Timber;  E.  R.  Andrlik,  Electronics  Computers;  and  D.  R.  Wright,  study  leading 
toward  die  establishment  of  a  consistent  design  loading. 

The  purpose  of  Committee  30  is  to  give  direction  on  structural  research.  We 
believe  the  talents  of  this  committee  are  not  being  best  used.  We  solicit  more  work. 


Committee  31 — Continuous  Welded  Rail 

Remarks    by   Chairman    B.    J.    Johnson 

Regional   Assistant    Chief   Engineer,    Chesapeake   &    Ohio    Railwoy— Baltimore 

&    Ohio    Railroad 

In  1970,  Committee  31  approxed  and  submitted  for  adoption  in  the  Manual, 
Specifications  For  Thermite  Welding — Rail  Joints.  This  report  is  a  result  of  several 
years'  study  and  preparation  by  Subcommittee  7  under  the  direction  of  K.  H.  Kan- 
nowski.  It  is  hoped  that  these  recommendations  on  thermite  welding  will  be  a 
practical  aid  in  this  most  essential  tool  in  the  field  of  continuous  welded  rail. 

In  1970,  the  Board  of  Direction  authorized  Committee  31  to  organize  a  new 
subcommittee,  the  purpose  of  which  is  to  prepare  a  CWR  Field  Handbook.  This 
group  will  be  known  as  Subcommittee  8  and  will  be  under  the  chairmanship  of 
V.  R.  Terrill.  The  committee  proposes  to  assemble  all  of  the  important  information 
which  would  be  of  value  to  persons  involved  in  the  field  work  of  continuous  welded 
rail.   The   booklet   will   be   directed   primarily   to   supervisors   of   track. 

Other  subcommittees  of  Committee  31  will  be  studying  such  subjects  as: 

Non-destructive  testing  of  welds; 

Heat  treatment  of  CWR; 

Control  of  temperature  while  laying  CWR; 

Anchorage  of  continuous  welded  rail; 

Increased  joint  restraint; 

Repairs  to  failed  welds; 

Layout  of  fixed  and  portable  welding  plants; 

In-track  welding. 

Six  members  of  Committee  31  will  join  Committee  4 — Rail,  in  fonniug  an 
ad  hoc  committee  for  the  study  of  rail  straightness  as  related  to  the  rail  welding 
process. 


628       R  emarks    by    Chairmen    of   Technical    Committees 


Committee  32 — Systems   Engineering 

Remarks    by    Chairman    H.    L.    Chamberlain 
Engineer— Bridge    Rating,    Penn    Central    Transportation    Company 

Before  proceeding  with  its  formal  report  your  committee  invites  the  attention 
of  the  membership  to  the  demonstration  which  has  been  arranged  as  part  of  our 
Special  Feature  for  this  convention.  We  have  labeled  this  "The  Computer  in  an 
Engineering  Environment"  and  we  invite  your  attendance  and  your  inquiry. 

The  committee  would  like  to  publicly  express  its  thanks  and  its  appreciation 
to  the  I.B.M.  Corporation  for  furnishing  and  installing  an  I.B.M.  1130  computer 
system  here  in  the  hotel  for  our  use;  to  the  Techplot  Company  for  lending  us  a 
Cal-Comp  plotter  for  inclusion  in  the  system;  and  to  the  Penn  Central  Transporta- 
tion Company  for  making  available  a  variety  of  illustrative  examples  which  are 
compatible  with  the  1130  system.  The  membership  is  urged  to  take  advantage  of 
what  your  committee  feels  is  a  unique  and  valuable  display. 

The  very  few  years  during  which  your  Committee  32  has  been  in  existence 
have  seen  remarkable  changes.  Only  five  years  ago,  during  tlie  time  the  committee 
was  in  the  process  of  formation,  the  accent  was  on  availability  of  computers.  This, 
perhaps  unfortunately,  led  to  a  general  impression  that  this  committee  is  primarily 
involved  with  computers.  This  is  not  tlie  case. 

The  computer  is  a  tool,  much  the  same  as  a  desk  calculator  or  a  slide  rule  is  a 
tool.  It  may  be  necessary,  even  mandatory,  that  a  computer  be  employed  to  manipu- 
late enormous  masses  of  data  efficiently  and  speedily,  but  it  must  be  emphasized 
that  the  computer  is  only  the  tool  by  means  of  which  we  are  able  to  glean  meaning 
out  of  the  data  available  to  us.  It  is  the  application  of  this  tool  that  is  our  primary 
concern.  You  will  hear  shortly  a  report  on  how  one  railroad  has  applied  the  disciplines 
of  systems  engineering  without  utilizing  the  computer. 

I  have  said  that  this  committee  has  witnessed  a  remarkable  change.  This  is 
true.  And  the  change  is  in  viewpoint.  Where  five  years  ago  this  committee  had  as 
its  ijrimary  concern  computer  availability,  today  we  are  concerned  with  the  applica- 
tions of  systems  engineering  concepts  through  the  power  of  tlie  computer  or  through 
whatever  tools  may  be  available.  And  this  is  what  systems  engineering  is  really  all 
about.  It  is,  very  basically,  the  application  of  a  concept  and  a  tool  to  the  solution 
of  engineering  problems. 

Recognizing  the  shift  in  emphasis  your  committee  has  involved  itself  over  the 
past  year  in  the  investigation  and  evaluation  of  applied  systems  engineering  on  vari- 
ous railroads  and  in  governmental  agencies  which  are  concerned  with  rail  transporta- 
tion. The  results  have  been  both  stimulating  and  valuable. 

During  the  ensuing  year  it  is  our  intention  to  continue  our  study  of  railroad 
engineering  problems  and  how  systems  concepts  may  be  used  to  assist  in  their 
solution. 


Remarks    by    Chairmen    of    Technical    Committees 


629 


Special   Committee  on   Concrete  Ties 

Remarks    by    Chairman    G.    H.    Way 
Research    Engineer   Roadway,    Chesapeake    &    Ohio    Railway-Baltimore    &    Ohio    Railroad 

During  1970-71  tlie  Special  Committee  on  Concrete  Ties  has  largely  formulated 
a  specification,  or  a  recommended  practice,  for  design,  test  and  use  of  concrete  rail- 
road ties.  Every  member  of  the  committee  has  contributed  both  individually  and 
collectively  to  this  effort.  If  the  only  thing  we  have  learned  is  how  much  we  don't 
know,  it  has  been  a  rewarding  experience.  When  we  started  this  project,  we  all 
anticipated  complexities,  urgency,  and  the  significance  of  the  task.  However,  I  don't 
believe  many  of  the  committee  members,  certainly  not  its  chaimian,  properly  esti- 
mated the  true  magnitude  of  this  assignment. 

We  have  tried,  however,  to  meet  three  essential  requirements: 

1.  Produce  a  performance  specification — tliat  is,  to  define  the  manner  in 
which  ties  should  react  to  loads  and  environment  ratiier  than  specify  the 
actual  design  of  ties. 

2.  Provide  a  rational  basis  for  those  performance  specifications — that  is,  field 
service  test  results  or  technical  analysis  rather  than  mere  judgement  or 
guesses  of  required  values. 

3.  Provide  a  specification  that  is  sufficiently  general  or  broad  in  its  require- 
ments that  it  permits  both  manufacturers  and  railroad  engineers  a  fairly 
wide  range  of  flexibility  in  designing  and  using  concrete  ties. 

The  format  of  a  specification  not  only  influences  the  relative  convenience  with 
which  it  can  be  used,  but  structures  the  way  those  who  prepare  it  tliink  about  and 
approach  their  problems.  Consequently,  I  think  it  worthwhile  to  go  over  the  fonnat 
of  tliis  specification.  This  will  tell  you  what  you  can  expect  to  find  in  the  spec- 
ification when  it  is  released  and  will  also  point  out  the  areas  which  tlie  committee 
considered  important  in  describing  cross  tie  performance: 

1.  FORWARD — The  forward  of  this  specification  explains  the  purpose  and 
scope  of  what  follows.  It  defines  terms  which  are  eitlier  generally  new  or 
that  are  particularly  significant  to  proper  interpretation.  The  relationship 
to  other  specifications,  such  as  American  Concrete  Institute  or  American 
Society  for  Testing  and  Materials,  is  explained.  Lastly,  tlie  forward 
describes  how  the  specification  can  be  used  by  both  manufacturers  and 
users. 

2.  GENERAL  CONSIDERATIONS— The  section  on  general  considerations 
attempts  to  relate  ellects  of  other  factors,  such  as  wheel  and  traffic  loads, 
rail  section,  ballast  section,  etc.,  to  tie  design  and  usage.  The  committee 
found  that  many  factors  such  as  these  were  repeatedly  influential  in  later 
sections  and  by  handling  them  once  at  the  beginning  avoided  repetition 
throughout  the  remainder  of  the  specification.  For  example,  the  value  of 
vertical  load  imposed  on  the  tie's  rail  seat  influences  not  only  tlie  required 
flexure  strength  of  the  ties  but  its  spacing  and  physical  dimensions,  mikI 
its  bearing  load  on  ballast  as  well. 

Uui.  eas 


630       Remark s    by    Chairmen    of    Technical    Committees 


3.  MATERIALS — It  was  in  an  cHort  to  rxcit  sonic  tonlrol  ()\cr  dniability 
and  weatherinji  characteristics  that  the  section  on  materials  was  inclnded. 
In  this  part,  the  specification  refers  to  ASTM  specifications  freqnently  and 
covers  snch  things  as: 

a )  cement 

b)  aggregates 

c )  concrete 

d)  reinforcing  steel 

e)  pads,   insnlation   and  fastening 

4.  TIE  SIZE  AND  MASS — The  section  dealing  with  physical  dimensions, 
weight,  and  confignration  actnally  specifies  only  the  limits  of  these  char- 
acteristics which  are  appropriate  to  usage  in  standard-gage  railway  track. 
The  section  also  addresses  itself  to  acceptable  dimensional  tolerances 
between  production  ties  and  their  design. 

5.  FLEXURE  STRENGTH— The  next  section,  dealing  with  flexure  strength, 
while  probably  the  most  straight-forward  in  the  specification,  represents 
at  the  same  time  the  very  essence  of  the  committee's  approach.  It  begins 
with  an  analysis  of  the  factors  involved  (tie  spacing,  wheel  loads,  impacts, 
tie-spacing  distribution  factor,  tie  lengtli,  etc.)  and  determines  the  appro- 
priate bending  moments.  The  specification  lists  strength  requirements  for 
both  monoblock  and  two-block  tie^s  and  relates  these  to  a  range  of  possible 
tie  spacings.  Positive  rail  seat,  and  both  negative  and  positive  tie-center 
strengths  are  provided. 

6.  LONGITUDINAL  AND  LATERAL  RESTRAINT— The  two  sections 
which  consider  longitudinal  and  lateral  rail  restraint,  of  course,  deal  with 
rail  fastenings.  This  is  not,  however,  unrelated  to  concrete  ties.  We 
learned  very  early  in  our  deliberations  tliat  the  entire  track  structure  is 
tied  together  in  the  way  it  responds  to  loading.  We  found  the  questions 
of  rail  restraint  to  be  good  examples  of  this  interdependency  of  track 
components.  In  addition,  the  problems  of  track  resistance  to  rail  over- 
turning and  longitudinal  movement  are  timely  and  pertinent  to  some  cur- 
rent operating  difficulties. 

As  in  the  sections  on  physical  dimensions  and  flexure  strength,  these 
sections  begin  by  considering  the  factors  influencing  the  requirements  and 
an  analysis  of  the  actual  loads  to  be  restrained  by  an  individual  fastener. 
Subsequently,  the  magnitudes  of  appropriate  restraint  factors  are  presented. 

7.  ELECTRICAL  PROPERTIES— The  electrical  properties  section,  while 
brief,  is  certainly  important.  It  will  provide  die  values  of  electrical  im- 
pedance and  resistance  which  concrete  ties  must  offer  to  insure  com- 
patibility with  signal  circuits.  We  received  consultation  and  advice  from 
the  Communication  and  Signal  Section  of  AAR  in  tliis  matter. 

8.  DESIGN  TESTS — This  section  is  devoted  to  a  description  of  laboratory 
procedures  which  are  to  be  used  to  test  a  tie  design's  compliance  witli 
the  requirements  set  in  the  previous  sections.  It  covers  static  tie  bending, 
static  rail  restraint,  pullout  of  cast  inserts,  and  fatigue  tests  of  ties  and 
fastenings.  It  is  anticipated  that  these  tests  will  be  performed  only  to 
cjualify  a  design  and  that  they  need  be  repeated  only  when  new  designs 
or  changes  in  design  are  offered. 


Remarks    by    Chairmen    of    Technical    Committees       631 

9.  QUALITY  CONTROL  TESTS— This  section  describes  the  much  fewer 
and  less  sophisticated  test  procedures  which  manufacturers  are  expected 
to  employ  to  assure  that  production  ties  continue  to  be  of  the  same 
general  quality  as  those  which  met  the  requirement  of  the  design  tests. 
It  describes  the  procedures  to  be  followed  in  selecting  production  ties  for 
test  and  for  subsequent  action  in  the  event  of  test  failure. 

10.  HANDLING  AND  SHIPPING— The  final  section  details  methods  for  han- 
dling and  shipping  ties  which  are  intended  to  make  sure  that  the  ties 
which  end  up  in  railway  track  can  reasonably  be  expected  to  be 
undamaged  and  able  to  perform  in  the  manner  expected. 

The  specification  includes  many  tables:  for  example,  tables  showing  flexure 
requirements  of  monoblock  ties  from  8  ft  to  9  ft  6  inches  in  length  and  of  the 
end  blocks  of  two-block  ties  for  the  same  range  of  tie  spacings. 

Using  tables  such  as  these,  designers  may  select  the  strength  they  wish  to  build 
into  ties,  or  railway  engineers  may  determine  the  spacings  with  which  to  use  existing 
products.  The  economics  of  using  smaller,  less  expensive  ties  can  be  compared  with 
that  of  stronger,  more-expensive  designs  used  at  wider  spacing.  For  example,  an 
engineer  offered  a  tie  capable  of  withstanding  180  inch-kips  positive  bending  at  the 
rail  seat  and  185  inch -kips  at  the  center  in  negative  bending,  can  judge  it  against 
another  design  offering  150  and  155  inch-kips,  respectively.  By  checking  tlie  table, 
he  can  see  that  he  will  ha\'e  to  use  the  second  tie  at  24-inch  spacing  while  the  first 
can  be  used  at  30-inch  spacing. 

The  specification  is  not  yet  complete.  The  entire  text  must  be  edited  and  several 
portions  need  answers  and  values  not  yet  detemiined.  I  mentioned  at  the  beginning 
that  ^^•e  have  learned  how  much  we  do  not  know.  Some  of  the  things  we  don't  know 
or  haven't  learned  will  have  to  be  missing  from  tliis  specification  when  it  is  published 
in  the  AREA  Bulletin  later  this  year  as  information.  I  hope  you  will  bear  with  us 
until  we  gain  more  knowledge. 


MEMOIRS 

Page 
H.   S.   Loeffler    635 

E.   G.   Gehrke    637 


633 


636 Memoir 

Mr.  Loflllci's  advancement  to  the  presidency  of  the  Association  was  attended 
l)>  tragic  circumstances.  At  the  convention  in  March  1950,  President  F.  S.  Schwinn 
was  to  have  been  succeeded  by  G.  L.  Sitton  who  was  unable  to  attend  the  conven- 
tion because  of  illness  (which  later  proved  to  be  terminal)  and  served  notice  that 
he  would  not  be  able  to  assume  the  presidency.  At  that  time  tlie  AREA  constitu- 
tion stipulated  that  in  the  event  of  a  vacancy  in  the  presidency,  the  senior  vice 
president  would  perform  his  duties.  Hence,  Mr.  LoefHer  was  faced  with  the  pros- 
pect of  a  two-year  term  as  president,  something  that  neither  he  nor  the  superior 
officers  of  his  railroad  had  bargained  for  when  he  was  placed  in  nomination  for 
president.  However,  by  expeditious  action  on  the  part  of  the  Board  of  Direction, 
ratified  by  the  membership,  the  constitution  was  quickly  amended  to  provide  that 
in  the  event  of  a  vacancy  in  the  office  of  tlie  president,  succession  on  the  part  of 
the  senior  vice  president  would  follow  automatically. 

Mr.  Loeffler's  qualifications  for  advancement  in  the  official  AREA  family  were 
established  during  his  long  membership  on  committees,  and  the  traits  of  character 
displayed  during  the  course  of  his  committee  work  were  manifest  throughout  his 
service  for  the  Association  as  a  whole.  At  no  time  during  his  entire  career  did  he 
indulge  in  anything  that  savored  of  the  sensational  or  spectacular.  Rather,  he  com- 
manded the  respect  of  his  fellow  workers  by  his  persistent  efforts  and  the  tenacity 
with  which  he  adhered  to  his  views  and  chosen  objectives. 

It  has  been  said  that  administrators,  as  a  rule,  do  not  rate  high  in  manual  skills. 
But  this  was  not  true  of  Mr.  Loeffler,  who  possessed  unusual  skill  and  taste  as  a 
cabinet  maker.  At  one  time  in  his  career  he  even  built  a  fine  home  for  his  family 
in  St.  Paul  almost  entirely  with  his  own  hands. 

Mr.  Loeffler  was  also  a  member  of  tlie  American  Society  of  Civil  Engineers 
(being  president  of  the  Northwestern  Section  in  1939),  St.  Paul  Engineers  Society, 
and  the  Methodist  Church.   His  fraternities  were  Tau  Beta  Pi  and  Theta  Tau. 


Cbtoarli  (Susttabe  <3t\)tkt 

1905=1970 

Edward  Gustave  Gehrke,  who  retired  on  May  31,  1970,  as  administrative  secre- 
tary, AREA,  and  secretary.  Engineering  Division,  AAR,  died  on  November  5,  1970, 
following  a  heart  attack  while  on  a  duck-hunting  trip  near  his  home  at  Lake  Villa, 
111.  Survivors  include  his  wife,  Evelyn;  one  son,  Edward  F.,  two  grandchildren, 
Gayle   and   Douglas;   and  his  94-year-old  mother,  Katherine. 


E.    G.    Gehrke 


Mr.  Gehrke  was  born  at  Maywood,  111.,  in  1905,  and  starting  at  the  age  of  15, 
spent  his  entire  career,  spanning  more  than  50  years,  as  a  joint  employee  of  the 
AREA  and  AAR.  During  these  years  he  served  in  the  administration  of  four  top 
executi\'e  staff  officers  of  the  AREA — E.  H.  Fritch,  W.  S.  Lacher,  N.  D.  Howard 
and  E.  W.  Hodgkins. 

Self-educated  beyond  his  high-school  work,  Mr.  Gehrke  had  a  fine  mind,  good 
looks,  a  pleasant  personality  and  high  character.  Versatile  and  competent,  he  was 
thoroughly  familiar  with  every  aspect  of  the  Association's  operations,  especially  its 
financial  affairs  and  convention  arrangements.  In  all  tliese  matters,  he  was  of  invalu- 
able assistance  to  the  AREA,  always  working  cooperatively  and  harmoniously  with 
otlier  members  of  the  headquarters  stafE 

Aside  from  his  official  duties,  Mr.  Gehrke  maintained  a  wide  and  friendly 
relationship  with  hundreds  of  AREA  members  over  tiie  years,  many  of  whom  would 
seek  him  out  for  assistance  and  advice  or  just  a  friendly  chat  whenever  they  visited 
Association  headcjuarters.  By  all  these  members  and  his  office  associates,  he  will  be 
greatly  missed. 

A  devout  Catholic,  Mr.  Gehrke  devoted  nmch  of  his  si^are  time  to  church  work, 
to  charity  work,  and  to  the  Boy  Scouts. 


637 


REPORT  OF  THE  EXECUTIVE  MANAGER 


639 


Report  of  the  Executive  Manager 

March   17,   1971 


To  THE  Members: 


The  71st  year  of  the  American  Railway  Engineering^  Association  was  a  success- 
ful one,  particularly  from  the  standpoints  of  technical  operations,  membership  and 
finances.  The  operational  year  began  on  March  18,  1970,  at  the  end  of  that  year's 
Comention,  and  ended  on  March  17,  1971,  at  the  end  of  the  1971  Con\ention  (the 
AREA  fiscal   year  coincides  with   the  calendar  year). 

During  the  1970  Association  year  the  technical  committees  maintained  a  high 
le\el  of  committee  activity  and  four  of  them  changed  their  names  to  more  accurately 
reflect  the  tlirust  of  their  activities  in  today's  technology.  These  are  Committee  7 — 
Timber  Structures  (formerly  Wood  Bridges  and  Trestles);  Committee  11 — Engineer- 
ing Records  and  Property  Accounting  ( formerly  Engineering  and  Valuation  Records ) ; 
Committee  16 — Economics  of  Plant,  Equipment  and  Operations  (formerly  Econom- 
ics of  Railway  Location  and  Operation);  and  Committee  24 — Engineering  Educa- 
tion (formerly  Cooperative  Relations  with  Universities).  In  addition,  the  name  of 
the  "General  Convention  Arrangements  Committee"  was  changed  to  "Convention 
Operating  Committee." 

Membership  statistics  show  a  gain  of  8  members  during  calendar  year  1970, 
thus  reversing  the  general  trend  of  the  past  eight  years  of  decreasing  membership 
when  considered  year  by  year.  Only  in  1967  did  the  Association  also  experience 
an  increase  in  membership  when  it  reached  an  all-time  high. 

In  spite  of  the  inflationary  forces  acting  on  virtually  all  facets  of  AREA  opera- 
tions and  actixities,  the  Association  finished  calendar  year  1970  in  the  black — by 
$4941 — even  though  a  deficit  of  about  $5660  had  been  anticipated.  This  was  accom- 
plished primarily  by  close  control  of  printing  costs  and  taking  the  greatest  possible 
advantage  of  technological  advances  in  printing  techniques.  Another  factor  was  the 
recovery  of  postage  for  mailing  AREA  publications  by  charging  the  purchasers 
thereof  for  mailing  and  handling  costs.  Details  regarding  Association  finances  are 
given  in  the  Treasurer's  Report. 
Major   Meetings    During    1970    Association    Year 

The  1970  Regional  Meeting  was  held  at  Toronto,  Ont.,  on  October  20.  The 
sixth  such  meeting  and  the  first  to  be  held  in  Canada,  it  attracted  219  members  and 
guests,  which  compares  fa\'orably  with  the  attendance  at  prior  Regional  Meetings. 
The  Toronto  Regional  Meeting  was  under  tlie  general  direction  of  AREA  Director 
C.  W.  Wagner,  Industrial  Engineering  Officer,  Canadian  National  Railways,  and  was 
planned  and  directed  by  R.  L.  Gray,  then  Regional  Engineer,  Canadian  National, 
Toronto,  now  Assistant  Chief  Engineer — Maintenance,  Montreal,  Que.  Mr.  CIray 
was  chairman  of  the  Local  Arrangements  Committee  made  up  of  Canadian  National 
and  Canadian  Pacific  personnel  in  the  vicinity  of  Toronto. 

The  AREA  sponsored  one  session  at  the  1970  National  Transportation  Engi- 
neering Meeting  of  the  American  Society  of  Civil  Engineers  held  at  Boston,  Mass., 
in  July  1970.  The  AREA-sponsored  program  included  talks  by  AREA  members 
and  others  on  various  aspects  of  rail  transportation.  The  program  was  planned  and 
directed  by  AREA  Director  C.  T.  Popma,  Chief  Engineering  Officer,  Penn  Central 
Transportation  Company. 

The  Seventieth  Annual  Convention  of  the  AREA  and  the  1971  Annual  Meet- 
ing of  the  AAR  Engineering  Division  were  held  on  March  15-17,  1971,  at  the 
Sherman   House,   Chicago.   Total   registration   was   97.5 — 546   railroad   members   and 

641 


642 Report    of    Executive    Manager 

COMMITTEES    OF    THE    BOARD    OF    DIRECTION 
1970-71 

Executive 

E.  Q.  Johnson  (Chairman),  A.  L.  Sams,  R.  M.  Rrown,  H.  E.  Wilson, 

H.  M.  Williamson 

Membership 
D.  V.  Sartore  {Chairman,}  C.  W.  Warner,  R.  F.  Bush,  A.  W.  Carlson, 

B.  J.   Worley 

Finance 
A.  L.  Sams  (Chairman),  H.  E.  Wilson,  D.  V.  Sartore,  A.  W.  Carlson, 

B.  J.  Worley 

Research 
R.  H.  Beeder  (Chairman),  A.  L.  Sams,  C.  T.  Popma,  E.  T.  Franzen, 

B.  J.  Worley 

Publications    (Special) 

(Manual    and    Publications) 

H.   M.Williamson  (Chairman),  J.   F.  Piper,   R.  F.   Bush,  J.  T.  Ward, 

E.  M.  Hastings,  Jr. 

Technical   Activity    (Special) 

(Assignments   and    Personnel) 

S.  A.  Cooper  (Chairman),  R.  M.  Brown,  J.  F.  Piper,  E.  T.  Franzen, 

W.  J.  Jones 

Regional    Meetings    (Special) 

C.  W.  Wagner  (Chairman),  H.  E.  Wilson,  S.  A.  Cooper,  J.  T.  Ward, 

E.  M.  Hastings,  Jr. 

Advertising    (Special) 
W.  J.  Jones  (Chairman),  H.  E.  Wilson,  R.  M.  Brown,  C.  T.  Popma, 

J.  T.  Ward 


guests  and  429  nonrailroad  members  and  guests.  While  lower  tlian  at  most  past 
conventions,  this  registration  figiue  was  considered  remarkably  good  in  view  of  the 
gloomy  economic  situation  on  tlie  railroads  and  the  impending  strike  which 
threatened  the  railroads  at  convention  time. 

Continuing  the  practice  began  last  year,  special  features  were  emphasized  and 
committee  reports  limited  to  brief  accounts  of  accomplishments  and  future  plans 
without  repetition  of  previously  published  material.  The  AAR  Engineering  Division 


Report   of    Executive    Manager 643 

also,  in  continuation  of  the  practice  began  last  year,  sponsored  a  session  given  over 
to  business  and  addresses  specifically  oriented  toward  the  AAR  and  the  Division. 
The  1971  meetings  were  presided  over  by  AREA  President  and  ED  Chairman  E.  Q. 
Johnson,  tlien  Chief  Engineer,  Norfolk  &  Western  Railway,  now  Assistant  General 
Manager  Maintenance,  Chesapeake  &  Ohio  Railway — Baltimore  &  Ohio  Railroad. 
The  address  at  the  Annual  Luncheon  was  given  by  J.  P.  Fishwick,  president, 
Norfolk   &   Western   Railway. 

MEMBERSHIP 

Membership  statistics,  established  during  1968  on  a  calendar  year  basis  for 
administration  and  comparison,  indicate  a  slight  upward  trend  and  show  a  gain 
of  8  as  compared  to  losses  of  73  last  year  and  15  in  1968. 

The  gain  shown  for  1970  is  due  in  part  to  the  efl^orts  of  the  officers,  directors, 
and  members  in  encouraging  a  continuation  of  membership  on  their  individual 
railroads.  New  members  gained  through  tlie  year  almost  offset  losses  by  attrition 
(deceased,  resigned  and  dropped  for  non-payment  of  membership  dues).  Applica- 
tions for  membership  received  as  a  result  of  efforts  made  at  the  Regional  Meeting 
in  Toronto,  Ont.,  and  the  initial  flow  of  applications  received  as  a  result  of  recent 
action  by  the  Board  Committee  on  Membership  account  for  die  small  but  significant 
gain  in  1970. 

As  a  direct  result  of  the  action  taken  by  the  Board  Committee  on  Membership, 
applications  are  being  received  almost  daily.  Letter  Ballot  308  was  issued  to  tlie 
Board  on  January  25,  containing  23  names.  Ballot  309  containing  14  names  was 
issued  on  February  16.  The  outlook,  so  far  as  membership  is  concerned,  looks  good 
for  1971. 

Efforts  should  not  be  confined  to  the  Board  Committee  on  Membership.  There 
are  still  many  railroad  employees  in  various  departments  of  all  roads  that  would 
benefit  through  AREA  membership.  It  is  vital  that  membership  be  maintained  on  a 
high  level  to  advance  technical  studies  to  the  fullest  and  benefit  the  greatest  pos- 
sible number  of  railroad  personnel  by  adding  to  their  knowledge,  experience  and 
talents  in  the  object  of  the  Association,  "the  advancement  of  knowledge  pertaining 
to  the  scientific  and  economic  location,  construction,  operation  and  maintenance  of 
railways,"  and  thereby  contribute  to  the  fullest  to  the  welfare  of  the  railroad  indus- 
try as  a  whole. 

As  one  member  of  the  Board  of  Direction  recently  pointed  out,  railway  engi- 
neering information  contained  in  reports  published  by  the  AREA  is  not  available 
from  any  other  source  and  all  railroads  benefit  materially  from  tlie  efforts  of  AREA 
technical  committees. 

Membership 

Membership  Years 

1969  1970 

Membership  as  of  January  1   3406  3333 

New  members  during  year 161  171 

Reinstatements  during  year 32  24 

Gain  or  loss  in  junior  members — 1  -f-7 

192  202 


,644 Report    of    Executive    Manager 

Membership  Years 
1969  1970 

Deceased  duiinji  year 44  34 

Rc'sijjnt'd  dminy  year   51  27 

Dropped  during  year   170  133 

265  194 

Net  CJain  or  Loss    —73  +8 


Membership  December  31   3333  3341 

Membership  Classification  by  Years 
For  each  of  the  membership  years  shown,  the  year  begins  on  February  1,  and 
ends  on  January  31  of  tlie  following  year,  except  1968,  1969  and  1970.  For  1968  the 
year  begins  on  February   1   and  ends  December  31.  For   1969  and  1970  the  year 
begins   January   1,   and  ends  December  31. 

1,963  1964  1965  1966 

Life   465'  449  457  446 

Member    2573  2540  2516  2528 

Associate    270  267  268  263 

Junior    90  76  66  65 


1967 

1968 

J  969 

1970 

434 

433 

437 

443 

2665 

2659 

2577 

2579 

265 

258 

264 

257 

57 

56 

55 

62 

Totals    3398     3332     3307     3302     3421     3406     3333     3341 

Student   Affiliates 

Not  included  in  the  foregoing  tabulations  are  tlie  Student  Affiliates  enrolled 
in  the  Association  on  college  campuses.  As  to  the  1970-1971  academic  year,  to 
December  31,  there  were  26  students  from  14  different  campuses  affiliated  with 
AREA,  compared  with  30  students  from  22  different  campuses  as  of  the  end  of 
the  academic  year  1969-1970. 

From  late  1960,  when  the  Student  Affiliate  Program  started,  to  February  20, 
1971,  the  Association  had  enrolled  a  total  of  290  students  on  66  different  college 
and  university  campuses  in  the  United  States  and  Canada. 

One    Past    President    and    One    Retired    Staff    Member   Die    in    1970    Association   Year 

From  March  1,  1970,  to  May  1,  1971,  notice  was  received  at  Association  Head- 
quarters of  the  death  of  45  members,  one  more  than  during  tlie  previous  Association 
year  and  20  fewer  than  two  years  ago. 

One  of  the  deceased  was  a  past .  president — H.  S.  Loeffler  (M  '29),  president 
1950-1951.  Mr.  Loeffler  died  on  June  1,  1970  at  the  age  of  80.  He  had  retired 
as  assistant  chief  engineer,  Great  Northern  Railway  (now  part  of  Burlington  North- 
em,  Inc.),  in  1959. 

Another  of  the  deceased  was  E.  G.  Gehrke,  retired  administrative  secretary  of 
the  AREA  and  retired  secretary  of  the  AAR  Engineering  Division.  Mr.  Gehrke  died 
on  November  5,  1970,  at  the  age  of  65.  He  had  been  a  joint  employee  of  the  AREA 
and  AAR  for  more  than  50  years  before  his  retirement  on  May  31,  1970. 

A  number  of  other  deceased  members  are  worthy  of  note,  either  for  the  promi- 
nent positions  they  had  attained  or  for  the  many  years  they  had  devoted  to  com- 
mittee service.  They  are: 

C.  M.  Angel  (M  '29),  retired  engineer  of  tests,  Chesapeake  &  Ohio  Railway, 
member  of  Committee  6 — Buildings,  1938  initil  his  retirement  in  1960,  and  Com- 
mittee   27 — Maintenance    of    Way    Work    Equipment,    1938-1948;    A.    B.    Chaney 


R  e  p  o  r  t    of    Executive    Manager 645 


(M  '25),  retired  engineer  maintenance  of  way,  Missouri  Pacific  Railroad,  member 
of  Committee  22 — Economics  of  Railway  Construction  and  Maintenance  (formerly 
Economics  of  Railway  Labor),  1940-1961,  and  Member  Emeritus  of  Committee  22, 
1963  until  the  time  of  his  death;  L.  J.  Deno  (M  '47),  member  of  former  Committee 
29 — Waterproofing,  1948-1954,  being  vice  chairman  the  last  two  years,  and  Com- 
mittee 1 — Roadway  and  Ballast,  1954  until  the  time  of  his  death,  being  vice  chair- 
man 1961-1964  and  chairman  1964-1967;  J.  E.  Fanning  (M  '22),  retired  assistant 
to  chief  engineer,  Illinois  Central  Railroad,  member  of  Committee  5 — Track,  1945- 
1948,  and  Committee  28 — Clearances,  1946-1959,  and  Member  Emeritus  of  Com- 
mittee 28,  1959  until  the  time  of  his  death;  D.  T.  Paries  (M  '55),  chief  engineer, 
Bessemer  &  Lake  Erie  Railroad,  member  of  Committee  4 — Rail,  1959  until  the 
time  of  his  death,  and  Committee  31,  1956-1962,  being  vice  chairman  in  1962; 
A,  R.  Harris  (M  '41),  retired  engineer  of  bridges,  Chicago  &  North  Western  Rail- 
way, member  of  Committee  15 — Steel  Structures  (formerly  Iron  and  Steel  Struc- 
tures), 1947-1966,  being  vice  chairman  1953-1955,  and  chairman  1956-1958,  Com- 
mittee 28 — Clearances,  1946-1962,  being  vice  chairman  1946-1948,  chairman 
1949-1952  and  Member  Emeritus  1962  until  the  time  of  his  death.  Committee  30 
— Impact  and  Bridge  Stresses,  1941-1965;  E.  K,  Lawrence  (M  '26),  retired  general 
scale  inspector,  Baltimore  &  Ohio  Railroad,  member  of  Committee  14 — Yards  and 
Terminals,  1926-1957;  F.  N.  Nye  (M  '33),  retired  director  of  transportation  and 
economic  research.  New  York  Central  System  (now  part  of  the  Penn  Central  Trans- 
portation Company),  member  of  Committee  16 — Economics  of  Plant,  Equipment 
and  Operations  (formerly  Economics  of  Railway  Location  and  Operations),  1938- 
1967,  being  vice  chairman  1942-1945,  chairman  1946-1948,  and  Member  Emeritus 
1967  until  the  time  of  his  death;  E.  E.  Oviatt  (M  '19),  retired  chief  engineer.  New 
York,  New  Haven  &  Hartford  Railroad  (now  part  of  the  Penn  Central  Transporta- 
tion  Company),   member   of   Committee  4 — Rail,   1933-1956. 

ACTIVITIES    OF   TECHNICAL   COMMITTEES 
Assignments 

In  1970  the  Association  had  22  standing  technical  committees  compared  with 
23  in  1969,  the  reduction  being  due  to  the  deactivation  of  Committee  18 — Electricity, 
on  January  1,  1970. 

During  1970  the  22  standing  committees  worked  on  153  assignments,  12  of 
which  were  new.  As  usual,  each  subcommittee  carried  out  its  own  studies  and 
investigations  independently,  or  with  the  cooperation  of  the  AAR  research  staff. 
In  addition,  the  Special  Committee  on  Concrete  Ties,  which  was  created  b\'  tlie 
Board  of  Direction  in  1969,  progressed  almost  to  completion  its  work  of  preparing 
a  perfonnance  specification  which  would  serve  as  guidance  to  the  railroad  industry, 
the  supply  industry  and  others  engaged  in  tlie  design,  manufacture,  selection,  testing 
and  purchasing  of  concrete  cross  ties. 

Many  of  the  subcommittees  held  their  own  meetings  before,  during  or  after 
the  scheduled  meetings  of  the  full  parent  committees.  At  the  full  connnittee  meet- 
ings, the  subcommittee  chairmen  reported  on  the  subconnnittee's  progress  on  their 
assignments  and  discussed  any  problems  with  the  work  with  other  members  of  the 
full  committee.  This  procedure  enables  the  wide  knowledge  and  experience  of  all 
the  members  of  AREA  committees,  from  a  large  number  of  railroads,  to  be  applied 
to  the  Studies  of  the  subcommittees.   What  an  outstanding  educational  experience 


646 Report    of    Executive    Manager 

AREA  committee  work  can  be  for  oin-  younger  members!  This  is  perhaps  one  of 
the  greatest  benefits  the  individual  railroads  and  the  raihoad  industry  as  a  whole 
derives  from  the  American  Railway  Engineering  Association — assistance  in  the 
technical  and  administrative  preparation  of  their  young  engineers  and  supervisors 
for  greater  responsibilities — to  tlie  extent  these  people  are  allowed  to  participate  in 
AREA  general  and  committee  activities. 

A  large  percentage  of  AREA  committee  work  is  directed  towards  the  prepara- 
tion of  progress  or  final  reports  for  information;  toward  revising  material  appearing 
in  tlie  AREA  Manual  for  Railway  Engineering  and  the  Portfolio  of  Trackwork 
Plans;  and  toward  carrying  out  special  projects  related  to  their  assignments. 

The  1970  statistics  show  that  our  22  standing  committees  produced  one  or 
more  information  reports  on  50  of  their  153  assignments  (not  including  Assign- 
ment A).  In  addition,  the  committees  submitted  10  reports  containing  Manual 
recommendations,  all  of  which,  for  the  fourth  time,  were  published  separate  from 
the  committee  reports — this  year  in  Part  1  of  the  November-December  Bulletin. 
Furthermore,  all  22  committees  presented  brief  "progress"  or  "status"  statements 
with   respect  to   assignments   on  which  they  made  no  formal  report. 

During  1971  the  committees  as  a  whole  will  work  on  156  assignments,  10  of 
which  are  new. 

Classification   of   Material 

The  work  of  AREA  committees  during  1970  was  so  diversified  and  extensive 
that  it  is  impossible  to  do  other  than  refer  to  it  in  general  terms  in  a  report  such 
as  this  one,  as  in  past  years.  However,  the  following  is  a  general  categorical  classifi- 
cation of  the  results  of  this  work,  as  published  in  the  technical  Bulletins  of  the 
Association. 

Recommendations  pertaining  to  the  development,  revision,  or  deletion  of  17 
different  specifications  and  recommended  practices  for  inclusion  of  the  AREA 
Manual  and  Portfolio;  43  reports  on  current  developments  in  engineering  practice 
and  design;  4  reports  on  current  developments  in  systems  engineering,  data  process- 
ing and  the  use  of  computers  to  solve  problems  in  railway  construction,  operation 
and  maintenance;  3  reports  dealing  with  economy  in  the  use  of  labor  and  the  re- 
cruiting and  training  of  employees;  1  report  on  new  and  improved  power  tools, 
machines,  equipment  and  material;  3  economic  and  analytical  studies;  3  reports 
on  relations  with  public  authorities;  5  reports  dealing  with  statistics;  and  2  bibli- 
ographies. 

Committee  work  affecting  the  AREA  Manual  and  the  Portfolio  of  Trackwork 
Plans  included  the  presentation  of  1  specification  for  adoption;  the  rewriting  or 
revision  of  5  specifications;  the  deletion  of  1  specification;  the  presentation  of  5 
recommended  practices  for  adoption  and  2  tentative  recommended  practices;  and 
the  revision  of  2  trackwork  plans. 

Discussion   Section 

During  the  1970  Association  year,  continuing  the  practice  adopted  by  the 
Board  of  Direction  in  1968,  subcommittee  reports,  papers  and  addresses  published 
in  the  technical  issues  of  the  Bulletin  were  advertised  as  open  for  discussion.  Also, 
the  Ground  Rules  for  the  Discussion  Section  were  reprinted  in  two  issues  of  the 
Bulletin. 


Report    of    Executive    Manager 647 

Personnel   of   Committees 

At  the  beginning  of  the  1970  Association  year  there  were  1196  members  as- 
signed to  1315  places  on  the  Association's  22  technical  committees.  This  compares 
with  1231  members  who  occupied  1380  places  on  the  23  standing  committees  at 
the   beginning   of  the   previous   year. 

AREA  committees  were  limited  to  a  maximum  membership  of  70  and  to  the 
number  of  members  from  each  railroad  depending  on  tlie  total  number  of  AREA 
members  from  a  specific  railroad. 

In  the  1970  Handbook  of  Committee  Activity  the  names  of  the  committee 
chainnen,  vice  chaimien,  secretaries  and  subcommittee  chainnen  were  again  shown 
in  boldface  type  at  the  head  of  each  committee  roster. 

The  number  of  members  assigned  to  committees  for  1971,  effective  widi  the 
close  of  the  1971  Annual  Convention,  will  be  less  than  a  year  ago.  Specifically, 
1163  members  have  been  assigned  to  1291  places  on  committees  for  1971. 

Committee   Meetings 

To  progress  their  work  on  assigmnents  die  22  AREA  technical  committees 
held  a  total  of  65  meetings  during  die  1970  Association  year,  compared  with  64 
meetings  the  previous  year.  As  is  usually  the  case,  the  majority  of  these  meetings 
were  held  in  Chicago  or  at  points  central  to  the  largest  number  of  committee  mem- 
bers. The  exceptions  were  scheduled  to  permit  inspections  of  facilities,  operations 
or  projects  which  could  be  seen  only  by  going  to  those  points. 

Of  the  65  meetings  held  during  the  1970  Association  year,  38  were  held  in 
Chicago  (including  the  15  held  during  the  1970  Convention);  3  were  held  in 
Madison,  Wis.,  two  each  were  held  in  Whitefish,  Mont.,  Ottawa,  Ont.,  and  New 
Orleans,  La.,  and  18  were  held  in  other  cities. 

The  number  of  meetings  held  during  the  year  by  each  committee  was  dictated 
by  the  scope  of  their  work  and  other  considerations.  Accordingly,  1  committee  held 
5  meetings;  4  committees  each  held  4  meetings;  10  committees  each  held  3  meet- 
ings; and  7  committees  each  held  2  meetings.  Combined  with  their  meetings,  25 
inspection  trips  were  made  by  AREA  committees  during  the  year  to  see  facilities, 
structures,   procedures,   projects   or  operations   directly  related  to  their  work. 

Committee   Name    Changes 

During  the  1970  Association  year,  with  the  approval  of  the  Board  of  Direction, 
Committees  7,  11,  15  and  24  changed  dieir  names.  The  new  name  for  Commit- 
tee 7  is  Timber  Structures  (formerly  Wood  Bridges  and  Trestles);  for  Committee 
11,  Engineering  Records  and  Property  Accounting  (formerly  Engineering  and 
Valuation  Records);  for  Committee  15,  Steel  Structures  (formerly  Iron  and  Steel 
Structures);  and  for  Committee  24,  Engineering  Education  (formerly  Cooperative 
Relations  with  Universities). 

ASSOCIATION    PUBLICATIONS 

In  1970  the  Board  of  Direction  put  into  effect  important  changes  in  the  pub- 
lishing schedules  of  the  AREA  Bulletin  and  the  AREA  \ews.  The  Bulletin  will 
henceforth  be  issued  five  times  a  year  instead  of  the  former  seven  issues  each  year, 
and  the  AREA  News  will  be  issued  on  a  quarterly  schedule — Winter,  Spring,  Sum- 
mer, and  Fall — instead  of  bi-monthly  as  heretofore. 


648 Report    of    Executive    Manager 

The  c'liaii^c  in  llic  Hiillclin  stlicdiilc  will  ncillu'r  icdiicc  iht'  contents  of  tliis 
publication  or  the  Annual  Proceedinj^s  nor  cliange  the  format  of  the  Bulletin  or 
its  contents.  The  reduction  in  the  number  of  issues  was  accomplished  by  combining 
the  November  and  December  issues  and  the  January  and  February  issues.  Thus  the 
Bulletins  in  Proceedings  \'olume  72  will  be  dated  September-October  1970, 
November-December  1970,  January-February  1971  and  June-July  1971.  In  addi- 
tion, the  Directory  Issue  of  the  Bulletin  each  year  will  be  dated  April-May  instead 
of  March.  This  change  will  result  in  the  Directory  being  more  up  to  date  when  it 
is  issued. 

The  Fall  issue  of  the  AREA  News  will  be  mailed  in  December  and  will  con- 
tain the  Skeleton  Program  of  the  following  years'  convention.  With  it  will  be  sent 
the  ballot  for  the  next  year's  election  of  officers  and  the  sleeping  room  reservation 
card  for  the  convention  hotel.  The  Winter  issue  of  the  News  will  be  mailed  in 
February  and  will  contain  the  Detail  Program  and  otlier  information  on  the  con- 
vention. The  Spring  and  Sununer  issues  will  be  mailed  on  a  flexible  schedule. 

The  changes  in  tliese  two  AREA  publications  were  made  necessary  by  the 
continued  increases  in  postal  rates  and  printing  costs,  and  by  tlie  stringent  rules 
and  regulations  of  the  Post  Office  Department  governing  second-class  matter,  the 
class  in  which  the  Bulletin  is  mailed. 

All  the  Manual  recommendations  submitted  by  committees  for  adoption  were 
again  published  separate  from  the  committees'  informational  reports — this  year  in 
Part    I   of    Bulletin    630,    November-December    1970. 

The  1970  Handbook  of  Committee  Activity  was  again  published  in  April,  with 
one  important  change:  removal  of  the  35  pages  of  "Information  and  Rules  for  the 
Guidance  of  Committees"  and  "Style  Standards  for  Committee  Reports"  that  had 
appeared  in  previous  editions  of  this  publication.  This  was  done  because  few  of 
these  rules  and  style  standards  were  of  interest  to  the  general  committee  member- 
ship or  chief  engineering  and  maintenance  officers.  The  few  that  were  of  general 
interest  were  printed  on  two  pages  near  the  front  of  tlie  handbook  under  the  head- 
ing "Information  About  Committee  Membership." 

In  the  future  the  rules  and  style  standards  will  be  revised  and  rewritten  as 
necessary  and  printed  in  a  separate  booklet  for  distribution  to  committee  chairmen, 
vice  chairmen,  secretaries,  and  subcommittee  chairmen  for  whom  they  are  really 
intended. 

In  1970  the  Board  of  Direction  changed  the  name  of  the  looseleaf  AREA 
Manual  from  "Manual  of  Recommended  Practice  for  Railway  Engineering"  to 
"Manual  for  Railway  Engineering,"  and  all  the  Manual  pages  bearing  tlie  name  of 
the  Manual  were  revised  accordingly  and  issued  in  the  1970  Manual  Supplement. 
The  new  name  actually  reverts  to  the  title  of  the  Manual  used  in  1936  when  it  was 
first  issued  in  its  present  looseleaf  form. 

One  reason  for  the  name  change  was  to  remove  the  connotation  that  tlie 
Manual  contains  or  should  contain  definitixe  qualitative  or  detailed  maintenance 
standards  criteria  or  tolerances  to  which  railway  roadway,  track  and  structures  should 
be  maintained.  Another  reason  was  to  emphasize  the  engineering  nature  of  the  AREA 
Manual  to  all  the  many  and  varied  owners  and  users  of  it. 

In  toto,  the  1970  Supplement  contained  534  pages  (267  sheets).  Continuing 
the  practice  begim  last  year,  member  holders  of  tlie  Manual  were  charged  a  price 
for  the  1970  Manual  Supplement  compatible  with  the  actual  cost  to  print  it  instead 
of  the  flat  $1.00  annual  Supplement  fee,  regardless  of  the  size  of  the  Supplement, 


Rep  o  r  t    of    Executive    Manager  649 

which  was  formerly  in  cllect.  The  price  for  the  1970  Supplement  was  estabhshed 
at  $3.00  for  a  member's  personal  copy,  4.75  for  railroads  and  $6.50  for  non- 
members. 

However,  to  i^ermit  conunittee  members  who  have  purchased  separate  copies 
of  their  committee's  Ahmual  Chapter  to  keep  tliem  up  to  date,  copies  of  the  1970 
Supplement  sheets  pertaining  to  their  chapters  again  were  mailed  to  all  committee 
members  without  charge. 

There  was  no  Supplement  to  the  AREA  Portfolio  of  Trackwork  Plans  in  1970 

Again  in  1970,  Proceedings  Binders  automatically  were  furnished  without 
charge  to  all  members  who  had  standing  orders  for  them  on  file  at  Association 
Headquarters.  This  tsvo-post,  hard-cover,  book-type  binder  is  designed  to  house 
aU  tile  Bulletins  in  tlie  publication  year,  which  starts  with  die  September-October 
issue  and  ends  witli  the  June-July  issue,  with  the  exception  of  the  blue-covered 
Directory  issue  (henceforth  to  be  dated  April-May)  which  is  not  punched  for 
binding,  since  the  directory  of  members  never  has  been  published  in  the  Annual 
Proceedings. 

The  June-July  1970  Bulletin  was  again  published  in  the  new  format  made 
possible  by  the  adoption  in  November  1968  of  an  amendment  to  die  AREA  Consti- 
tution removing  the  requirement  for  "Reading  of  the  minutes  of  the  last  meeting" 
at  Annual  Conventions.  As  in  1969,  the  1970  issue  contained  only  material  pre- 
sented at  the  March  1970  Convention  having  technical  and  historic  interest:  the 
president's  address,  reports  of  tlie  executive  manager  and  treasurer,  special  features, 
panel  discussions  and  committee  reports  not  previously  published  in  die  committee 
report  Bulletins.  It  also  included  the  addresses  and  special  features  presented  during 
the  session  sponsored  for  die  first  time  by  die  AAR  Engineering  Division. 

LOOKING   AHEAD 

Here  are  the  presently  scheduled  dates  and  locations  for  future  Conventions 
of  the  AREA,  all  at  Chicago: 

1972 — March  7-9,  Sheniian  House 

1973— March  12-14,  Palmer  House 

1974— March  18-20,  Palmer  House 

1975— March  24-26,  Palmer  House 

1976— March  22-24,  Palmer  House 

In  conjunction  with  the  1972  Convention,  which  will  start  on  Tuesday,  March 
7,  the  Railway  Engineering-Maintenance  Suppliers  Association  will  sponsor  an  exhibit 
at  the  International  Amphitheatre,  starting  on  Monday,  March  6.  Thereafter,  REMSA 
plans  to  sponsor  an  exhibit  in  conjunction  with  an  AREA  Convention  every  fifth 
year. 

The  next  Regional  Meeting  will  be  held  on  October  21,  1971,  at  die  Sheraton- 
Jefferson  Hotel,  St.  Louis,  Mo.  Arrangements  and  planning  for  the  meeting  are 
under  the  direction  of  AREA  Director  E.  T.  Franzen,  Chief  Engineer,  Missouri 
Pacific  Railroad,  St.  Louis. 

The  officers  and  directors  of  AREA  look  to  all  classes  of  membership  to  help 
solve  the  problems  facing  the  Association  today  and  tomorrow.  The  technical  and 
other  activities  need  active  support,  and  there  are  many  people  qualified  for  AREA 
membership  who  would  benefit  therefrom,  and  whose  activity  would  benefit  tlic 
railroad  industry  and  the  profession  of  railway  engineering.  All  members  are  urged 
to  promote  their  Association  to  their  associates  while  at  the  same  time  participating 


650 Report    of    Executive    Manager 

themselves  in  the  wide  range  of  AREA  activity  in  the  engineering,  design,  construc- 
tion and  maintenance  of  the  fixed  plant  of  railroads. 


Respectfully  submitted. 


Earl  W.  Hodgkins, 
Executive  Manager 
and  Secretary. 


Bcceageb  jUlembcrsi 

C.  M.  Angel  (M  '29) 

Retired    Engineer    of    Tests,    Chesapeake   &    Ohio   Railway,    Huntington,   W.    Va. 

J.  H.  Babbitt  (M  '27*,  L  '69) 

Retired   Division   Engineer,    Baltimore   &   Ohio   Railroad,    Indianapolis,    Ind. 

J.  Bernstein  (M  '28) 
Retired   Division,    New    York    Board   of    Transportation,   Woodstock,   N.   Y. 

D.  L.  Bloem  (A  '57,  M  '67) 
Director   of   Engineering,   National   Sand   and    Gravel   Association,   Silver   Springs,   Md. 

F.  B.  Calhoun  (M  '47) 
Assistant   to   Chief   Engineer,   Southern   Pacific   Transportation   Company,  Texas  &  Louisiana  Lines, 

Houston,  Texas 

R.  E.  Case  (M  '63) 
Assistant    Structural    Engineer,    Union    Pacific    Railroad,    Omaha,    Nebr. 

A.  B.   Chaney   (M   '25) 
Retired   Engineer   Maintenance   of   Way,    Missouri   Pacific   Railroad,   Little   Rock,   Ark. 

A.  W.  Charvat  (M  '62) 
Engineer    of    Buildings,    Chicago,    Rock    Island    &    Pacific    Railroad,    Chicago,    111. 

C.  G.  Conley  (A  '32) 
Retired    President,   The   Mount   Vernon    Bridge   Company,   Mt.   Vernon,   Ohio 

J.  J.  Connors   (M  '69) 

Superintendent   Maintenance   of   Way   Shop,    Penn   Central   Transportation    Company,   Jackson,   Mich. 

L.  J.  Deno  (M  '47) 

Maintenance    Engineer,    Chicago   &   North   Western    Railway,    Chicago,    111. 

W.  E.  DwY  (M  '64) 
Area   Engineer,    Baltimore   &   Ohio   Chicago  Terminal   Railroad,    Chicago,    111. 

J.  E.  Fanning  (M  '22)* 
Retired   Assistant   to    Chief   Engineer,    Illinois   Central    Railroad,    Memphis,   Tenn. 

D.  T.  Faries  (M  '55) 
Chief   Engineer,   Bessemer  &   Lake  Erie  Railroad,   Greenville,   Pa. 


Report    of    Executive    Manager 651 

G.  L.  Field  (M  '48) 
Production    and    Programming    Officer,    Canadian    National    Railways,    Montreal,    Que.,    Can. 

W.  T.  Friedline   (M  '70) 
General    Foreman    Maintenance   of   Way,    U.    S.    Steel    Corp.,    Blairsville,    Pa. 

A.  R.  Harris  (M  '41) 

Retired   Engineer   of    Bridges,   Chicago  &   North   Western   Railway,   St.    Petersburg,   Fla. 

G.  p.  Hayes   (M  '55) 

Retired    Assistant    Chief    Engineer,    Construction,    Richmond,    Fredericksburg   &    Potomac 

Railroad,    Arlington,    Va. 

R.  B.  Hayslip  (M  '63) 

Division    Engineer,    Chesapeake    &    Ohio    Railway,    Detroit,    Mich. 

L.  J.  Hughes  (M  '12) 

Retired   Principal   Assistant   Engineer,    Chicago,   Rock  Island   &   Pacific   Railroad,   Evanston,   111. 

D.  HULTGREN    (A    '33) 

Evanston,    111. 

S.  C.  Johnson  (A  '26) 

Retired    Executive    Secretary,    National    Railway   Appliances   Association;    Retired    Vice    President, 
Dearborn    Chemical    Company,    Ft.    Lauderdale,   Fla. 

J.  T.  Kelly  (M  '68) 

Supervisor    Contract    Administration,    Penn    Central    Transportation    Company,    Philadelphia,    Pa. 

R.  L.  Knight  (M  '57) 

Retired    Chief    Draftsman,     Pennsylvania    Railroad,     Baltimore,    Md. 

E.  K.  Lawrence  (M  '26) 

Retired    General    Scale    Inspector,    Baltimore    &    Ohio    Railroad,    Cantonville,    Md. 

R.  A.  Leach  (M  '29) 

Retired    Inspecting    Engineer,    Chief   Engineer's    Branch,    Commissioner   of    Railways  Office, 

Brisbane,    Queensland,    Australia 

E.  T.  Lederman  (M  '58) 
Sun    City   Center,    Fla. 

H.    S.   LOEFFLER    (M    '29) 
Retired    Assistant    Chief    Engineer,    Great    Northern    Railway,    Salt    Lake    City,    Utah 

P.  F.  Nichols  (M  '36) 

Retired    Assistant    Engineer,    Erie    Lackawanna    Railway,    Del    Ray    Beach,    Fla. 

R.  E.  NcTTiNOHAM   (M  '42,  L  '67) 
Retired    Division    Engineer,    Louisville    &    Nashville    Railroad,    Ely,    Minn. 

F.  N.  Nye   (M  '33,  L  '68) 

Retired    Director    of    Transportation    and    Economic    Research,    New    York    Central    System, 

Tuckahoe,   N.   Y. 

E.  E.  OviATT  (M  '19) 

Retired    Consulting    Engineer,    New    York,    New    Haven   &   Hartford    Railmad.    Ncedham,    Conn. 

VV.  M.  Post  (M  '19) 
Retired   Signal    Engineer,    Penn.sylvania    Railroad,   Wayne,    Pa. 


652 Report    of    Executive    Manager 

A.  G.  Rankin  (M  '42,  L  '69) 

Rilircd    Assistant    District    Engineer,    Texas   &    Pacific   Railway,    Dallas,   Texas 

V.  A.  M.  Robertson  (M  '29) 

Sir    William    Halcrow    &    I'artners,    Consulting    Engineers,    London,    England 

A.  J.  Robinson  (M  '24) 

Retired    Engineer    Timber    Preservation,    Great    Northern    Railway,    Spokane,    Wash. 

H.  H.  Schmidt  (M  '63) 

Structural    Engineer,    Union    Pacific    Railroad,    Omaha,    Nebr. 

W.  G.  Stxjbblefield   (M  '52) 

Principal    Assistant    Engineer,    Gulf,    JNIobile    &    Ohio    Railroad,    Mobile,    Ala. 

P.  H.  Swales  (M  '58) 

T.    K.    Dyer,    Inc.,    Lexington,    Mass. 

Vance  Sykes   (M  '18) 

Retired    Division    Engineer,    Seaboard    Air    Line    Railroad,    Hamlet,    S.    C. 

M.  D.  Thompson  (M  '22>) 

Retired    Special    Engineer,    Illinois    Central    Railroad,    Covington,    La. 

J.  R.  Traphoner  (M  '35) 

Retired    Division    Engineer,    Seaboard    Air    Line    Railroad,    Tampa,    Fla. 

H.  W.  Walbright  (M  '60) 

Division    Engineer,    Norfolk    &   Western    Railway,    Portsmouth,    Ohio 

Thomas  Walker  (M  '20) 
Retired    Roadmaster,    Louisville    &    Nashville    Railroad,    Ashville,    N.    C. 

J.  M.  Wolfe  (M  '48) 

Chief    Engineer,    Florida   East    Coast    Railroad,    St.    Augustine,    Fla. 


«iVS    .if 


REPORT  OF  THE  TREASURER 


653 


Report  of  the  Treasurer 

December  31,  1970 

To    THE    Nf EMBERS: 

As  your  treasurer,  and  viewing  the  Association  from  a  financial  viewpoint,  I 
am  happy  to  report  that  during  1970  the  Budget  was  balanced  and  we  finished 
the  year  in  the  black  in  spite  of  the  fact  that  we  began  the  year  with  a  negative 
bank  balance  of  about  $4,000. 

At  the  beginning  of  the  year  it  was  anticipated  that  1970  receipts  would  hold 
their  own  with  only  slight  losses,  but  increasing  costs  would  inflate  disbursements. 
It  was  expected  that  disbursements  would  exceed  receipts  by  $5,660 — almost  the 
opposite  was   achieved,  receipts  exceeded  disbursements  by  $4,941. 

I  will  not  attempt  to  review  all  items  of  receipts  and  disbursements  here.  These 
statistics  are  individually  shown  in  the  following  Financial  Statement  and  General 
Balance  Sheet.  I  will,  however,  comment  on  some  of  the  more  significant  items. 

The  items  of  Membership,  Track  Plans,  Miscellaneous,  Interest,  Convention 
and  Manual  were  about  at  the  expected  level  of  receipts.  Student  Affiliate  fees  and 
Advertising  receipts  were  slightly  under  expectation.  The  fact  that  Manual  Receipts 
for  1970  were  $3,275  over  expectation,  does,  I  believe,  deserve  some  individual 
attention.  Manual  receipts  were  only  slightly  below  the  all-time  high  reached  in 
1968  when  120  Manuals  were  sold  to  one  purchaser.  Thus,  revenue  on  normal 
sales  exceeded  the  previous  high.  This  would  appear  to  indicate  the  high  regard 
in  which  this  important  Association  publication  is  held  by  the  entire  engineering 
profession,  not  only  in  this  country,  but  abroad,  as  well. 

It  is  also  significant  to  note  that  receipts  from  the  sale  of  other  publications 
was   about   $2,675  above  estimation. 

On  the  disbursement  side,  disbursements  for  1970  were  estimated  at  $113,660, 
but  were  $5,355  lower  than  estimated,  with  minor  over-vmder  expenditure  in  most 
items  contained  in  the  Budget.  The  major  under  expenditure  was  $2,229  in  printing, 
due  primarily  to  action  taken  by  the  Board  to  consolidate  some  issues  of  the  Bulletin 
and  to  publish  the  AREA  News  four  times  a  year  instead  of  sLx. 

It  should  be  noted  that  the  volume  of  publication  sales  and  receipts  has  more 
than  doubled  in  the  past  eight  years  and  continues  to  increase.  To  cope  with  tlie 
demands  of  industry  for  our  mail-order  operation  requires  an  increasing  amount  of 
correspondonce,  records  and  bookkeeping.  This  results,  of  course,  in  a  significant 
increase  in  the  amount  of  staff  time  expended  and  materials  used. 

In  all,  1970  was  a  record  year  for  total  receipts  and  we  have  been  successful 
in  holding  disbursements  at  a  level  significantly  below  the  budget  level.  The  1970 
calendar  year  was  successful  financially,  but  we  will  be  hard  pressed  to  achieve 
similar  results  in  1971.  Inflation  is  increasing  virtually  all  items  of  AREA  expendi- 
tures. Thus,  to  come  anywhere  near  balancing  receipts  and  expenditures  will  require 
concerted  efi^orts  on  the  part  of  all  officers  and  members  of  the  Association  to  in- 
crease AREA  Membership,  and  to  promote  the  sale  of  AREA  publications  and  the 
Bulletin  as  an  important  ad\ertising  medium. 


Respectfully  submitted. 


655 


A.  B.  Hu.LMAN,  Jr. 

Treasurer. 


656 


Report    of    Treasurer 


COMPARISON    OF   RECEIPTS   AND   DISBURSEMENTS   FOR   THE   LAST   20   YEARS 


195L--- %  09, 045. 00 

1952..-. _  77,514.00 

1953 7:^,0:53.00 

1954 85,748.99 

1955 80,177.21 

1956 79,5:^1.11 

1957 85,429.  :51 

1958 81,454.50 

1959 80,407.10 

1960 81,1:58.79 

1961 8:5,401.7:5 

1962 70,097.28 

1963 73,053.48 

1964 74,8:54.81 

1905 81,:5:50.73 

1960 84,590.91 

1967 78,724.17 

1968 97 , 639 . 94 

1 909 1 09 , 893 . 1 0 

1970 113,245.85 


Dish  II 

%  02 

7(i 

82 

(;s 
73 

70 

89 

77 

80 

8:5 

73 

87 

00 

78 

73 

80 

101 

111 

112 

108 


scnienls 

:509.()0 

9(;4.00 

007.00 

003.03 

923.18 

330 . 1 7 

8:50.57 

:548.92 

297 . 48 

978.29 

410.20 

344.12 

150.99 

118.00 

8i)5.9() 

454.00 

087.51 

054.20 

741.02 

:m5.:33 


Net  Gain 
?  0,076.00 
550.00 
i),  0:54. 79* 
17,745.90* 
0,254.03 
9,014.04 
4,401.20* 
4,105.04 
109.08 
2,8:59.50 
10,051.53 
11,240.84* 
7,490.49 
3,283.85* 
7,440.83 
4,1:50.91 
22,:503.:54* 
13,414.20* 
2,848.40* 
4,940.52 


♦Deficit. 


financial  statement  for  calendar  year  ending  december  31,  1970 

Receipts 
Balance  on  Hand  January  1,  1970 $117,090.70 

Membership  Account 

Entrance  Fees $  1 ,  755 .  00 

Dues 57,485.50 

$  59,240.50 

Sale  of  Publications 

Proceedings $  4,247.35 

Bulletins 3,552.35 

Manuals 18,274.82 

Track  Plans 3 ,  802 .  20 

Specifications 1, 874 .  03 

$  31,750.75 

Professors  E.xpenses $  5,437.92 

Advertising  in  Publications 3,149.90 

Convention 0, 004 .  00 

I nterest  on  Investments 5, 954 .  20 

Interest  on  Special  Account 9.07 

Miscellaneous  and  Student  Affiliate  Fees 1 ,  098 .  85 

Total $113,245.85 


Report    of   Treasurer 657 

Disbursements 

Salaries $:W,<)54.()8 

Bulletins-  . ... 27 ,  43:i .  83 

Stationery  and  Printing '.],  542 .  54 

Rent-___' 1,14().(){) 

Postage 4 ,  234 . 5! ) 

Supplies 874 .  52 

Audit 350.00 

Pensions 5 ,  548 .  59 

Social  Security  and  Unemployment  Tax '.i,  774 .  42 

Manual 1 1 13,48().48 

Refunds 110.26 

Committee  and  Officers  Expenses 1 ,072.27 

Xewslet  ter ] ,  344 .  58 

Studezit  Affiliates 44.00 

Miscellaneous  and  Telephone  Expense 905 .  32 

Track  Plans (i.OO 

Ext  raordinary  and  Professors  Expense 5 ,  760 .  78 

Convention 4, 722 .  47 

Total $108,305 .33 

Excess  of  Receipts  over  Disbursements $     4, 940 . 52 

Balance  on  Hand  December  31,  1970 $122,631.22 


STATEMENT    OF   ASSETS 

To  the  Members: 

Balance  on  Hand  January  1,  1970 $117,690.70 

Receipts  during  1970 $113,245.85 

Paid  out  on  Audited  Vouchers 108,305.33 

Excess  of  Receipts  over  Disbursements 4,940.52 

Balance  on  Hand  Decern! icr  31.  1970 $122,631.22 

Consisting  of: 

Bonds  at  Cost $121,715.01 

Cash  in  Northern  Trust  Co 671. 25 

Special  Deposit  in  Northern  Trust  Co 2 1 9 .  96 

Petty  Cash 25.00 

$122,631.22 


I  have  made  an  examination  of  the  accounts  of  the  American  Railway  Engineering 
Association  for  the  year  ending  December  31,  1970,  and  have  found  them  to  be  in 
accordance  with  the  foregoing  statement. 

C.  A.  BicK, 
A  iiililor. 


658  Report   of   Treasurer 


general  balance  sheet — 1970 
Assets: 

Cash  ill  Xortlicrii  'riiist|('()ini)aiiy     $         ()71  .25 

Casli  ill  Special  Account 210.2!) 

Iiitcrcsl  on  Special  Account <)  67 

Petty  Cash         25. (K) 

Due  from  Members 20. 00 

Due  from  .Vdvertising 520.00 

Prepaid  Postage (io . 00 

Furniture  a lui  P'ixtures 1 ,000 . 00 

Inventories: 

I'uhlications  on  Hand 500.00 

Track  Plans  and  Loose  Plans :i,5()5.27 

Manuals 2,587.52 

Binders 1,074. 46 

Chapters,  Specifications,  etc ;5,958.80 

Investments  at  Cost 121  ,715.01 

Interest  Accrued  on  Investments 1,131. 95 

Total  Assets $137,072 . 22 

Liabilities: 

Members  dues  paid  in  advance $        528 .  00 

Surplus 136,544.22 

Total $137,072.22 


CONSTITUTION 


659 


American  Railway  Engineering 
Association 

CONSTITUTION 

Revised  to  November  14,  1968 


Article  I 
Name,  Object  and  Location 

1.  Name 

The  name  of  this  Association  shall  be  the  AMERICAN  RAILWAY  ENGINEERING 
ASSOCIATION. 

2.  Object 

The  object  of  the  Association  shall  be  the  advancement  of  knowledge  pertaining 
to  the  scientific  and  economic  location,  construction,  operation  and  maintenance  of 
railways. 

3.  Means  to  be  Used 

The  means  to  be  used  for  this  purpose  shall  be: 

(a)  The  investigation  of  matters  pertaining  to  the  object  of  the  Association  through 
Study  and  Research  Committees. 

(b)  Meeting  for  the  presentation  and  discussion  of  papers,  and  for  action  on  the 
recommendations  of  committees. 

(c)  The  publication  of  papers,  reports  and  discussions. 

4.  Conclusions 

The  conclusions  adopted  by  the  Association  shall  be  recommendatory. 

5.  Location 

The  office  of  the  Association  shall  be  located  in  Chicago,  111. 

Article  II 

Membership 

1.  Classes 

The  membership  of  this  Association  shall  be  divided  into  five  classes:  Members, 
Life  Members,  Honorary  Members.  Associates  and  Junior  Members. 

2.  Qualifications 

A.  General 

(a)  An  applicant  to  be  eligible  for  membership  in  any  class  other  than  that  of 
Junior  Member  shall  be  not  less  than  25  years  of  age. 

661 

Bui.  633 


662  Constitution 


(b)  To  be  eligible  for  membership  in  any  class,  or  for  retention  of  membership  as  a 
Member,  an  Associate  or  a  Junior  Member,  a  person  shall  not  be  engaged  directly  or 
primarily  in  the  sale  to  the  railways  of  appliances,  supplies,  patents  or  patented  services. 

(c)  The  right  to  membership  shall  not  be  terminated  by  retirement  from  active 
service. 

(d)  In  determining  the  eligibility  for  membership  in  any  class,  graduation  in  engineer- 
ing from  a  school  of  recognized  standing  shall  be  considered  as  equivalent  to  three  years 
of  active  practice,  and  satisfactory  completion  of  each  year  of  work  in  such  school, 
without  graduation,  shall  be  considered  as  equivalent  to  one-half  year  of  active  practice. 

(e)  In  determining  the  eligibility  for  Member  under  Section  B  (a)  of  this  Article, 
each  year  of  practical  experience  in  engineering,  or  in  science  related  thereof,  prior  to 
employment  on  a  railway,  if  such  experience  were  of  the  same  specialized  character  as 
the  current  work  of  the  applicant,  shall  be  considered  as  equivalent  to  one  year  of 
railway  service. 

B.  Member 

A  Member  shall  be: 

(a)  A  railway  engineer  or  officer  who  has  had  not  less  than  five  years'  experience 
in  the  location,  construction,  operation  or  maintenance  of  railways  and  who  is  employed 
by  a  common-carrier  railway  corporation,  by  an  approved  association  of  railroads  or 
railway  engineers  or  officers,  or  by  a  non-common-carrier  railway  if  his  primary  duties 
consist  entirely  or  primarily  of  the  location,  construction,  operation  or  maintenance  of 
a  railway  plant  and  facilities. 

(b)  A  dean,  professor,  assistant  professor,  or  equivalent  in  engineering  in  a  university 
or  college  of  recognized  standing,  or  an  instructor  or  equivalent  in  such  university  or 
college,  who,  with  an  engineering  degree,  has  had  at  least  two  years'  experience  in 
teaching  engineering. 

(c)  An  engineer  or  member  of  a  public  board,  commission  or  other  official  agency 
who,  in  the  discharge  of  his  regular  duties,  deals  with  railway  problems. 

(d)  An  editor  of  a  trade  or  technical  magazine  who,  in  the  discharge  of  his  regular 
duties,  deals  with  railway  problems,  and  who  has  had  the  equivalent  of  five  years' 
engineering  or  railway  experience. 

(e)  A  consulting  engineer  or  contractor,  or  an  engineer  in  their  employ,  engaged  in 
the  engineering,  construction  and  maintenance  of  railroad-related  facilities  or  an  engineer 
employed  by  a  technical  service  or  research  and  development  organization  who  has  had 
the  equivalent  of  five  years'  engineering  experience. 

(f)  An  officer  or  engineer  of  an  engineering  or  scientific  society  or  association 
whose  aims  and  objectives  are  compatible  with  the  aims  and  objectives  of  this 
association. 

C.  Life  Member 

A  Life  Member  shall  be  a  Past  President  of  the  Association  who  has  been  retired 
under  a  recognized  retirement  plan,  or  a  Member  or  an  Associate  who  has  paid  dues 
for  35  years  or  who  has  been  retired  under  a  recognized  retirement  plan  and  has  paid 
dues  for  not  less  than  25  years. 

D.  Honorary  Member 

(a)  An  Honorary  Member  shall  be  a  person  of  acknowledged  eminence  in  railways 
engineering  or  management. 

(b)  The  number  of  Honorary  Members  shall  be  limited  to  ten. 


Constitution  663 


E.  Associate 

An  Associate  shall  be: 

(a)  A  member  of  a  railway  supply  company  or  association  who  meets  the  qualifica- 
tions of  Section  2,  Paragraph  A  (a)  and  (b). 

(b)  A  person  qualified  by  training  and  experience  to  cooperate  with  Members  in  the 
object  of  this  Association,  but  who  is  not  qualified  to  become  a  Member, 

F.  Junior  Member 

(a)  A  Junior  Member  shall  be  not  less  than  21  years  of  age,  shall  have  had  not 
less  than  three  years'  experience  in  the  location,  construction,  operation  or  maintenance 
of  railways,  and  shall  be  an  employee  of  a  railway  corporation,  or  one  of  the  organiza- 
tions or  institutions  listed  under  Section  B  of  this  Article,  or  a  railway  supply  company 
if  he  qualifies  under  Section  2,  Paragraph  A  (b)   of  this  Article. 

(b)  His  membership  in  this  classification  in  the  Association  shall  terminate  at  the 
end  of  the  calendar  year  in  which  he  becomes  30  years  of  age. 

(c)  He  may  make  application  for  membership  other  than  as  a  Junior  Member  at 
any  time  when  he  becomes  eligible  to  do  so. 

3.  Transfers 

The  Board  of  Direction  shall  transfer  from  one  class  of  membership  to  another, 
or  may  remove  from  membership,  any  person  whose  qualifications  so  change  as  to 
warrant  such  action. 

4.  Rights 

(a)  Members,  and  Life  Members  who  were  formerly  Members,  shall  have  all  the 
rights  and  privileges  of  the  Association.  Life  Members  who  were  formerly  Associates 
shall  continue  to  have  all  the  rights  and  privileges  of  Associates. 

(b)  Honorary  Members  shall  have  all  the  rights  and  privileges  of  the  Association 
except  those  of  holding  elective  office,  provided,  however,  that  Members  or  Life  Members 
who  are  elected  Honorary  Members  shall  retain  all  the  rights  and  privileges  of  the 
Association. 

(c)  Associates  and  Junior  Members  shall  have  all  the  rights  and  privileges  of  the 
Association  except  those  of  voting  and  holding  elective  office. 


Article  IH 
Admission,  Resignation,  Expulsion  and  Reinstatement 
L  Charter  Membership 

The  Charter  Membership  of  this  Association  consists  of  all  persons  elected  to  mem- 
bership before  March   15,  1900. 

2.  Application  for  Membership 

(a)  A  person  desirous  of  membership  in  this  Association  shall  make  application 
upon  the  form  provided  by  the  Board  of  Direction.  In  the  event  that  Junior  Membership 
is  desired,  the  applicant  shall  so  state. 

(b)  The  applicant  shall  give  the  names  of  at  least  three  Members  of  this  Asso- 
ciation to  whom  personally  known.  Each  of  these  Members  shall  be  requested  by  the 
Executive  Manager  of  the  Association  to  certify  to  a  personal  knowledge  of  the  applicant 
with  an  opinion  of  the  applicant's  qualifications  for  membership. 


664  Constitution 


(c)  If  an  applicant  is  not  personally  known  to  as  many  as  three  Members  of  this 
Association,  the  names  of  well-known  persons  engaged  in  railway  or  allied  professional 
work  to  whom  he  is  personally  known  shall  be  substituted,  as  necessary,  to  provide  a 
total  of  at  least  three  references.  Each  of  these  persons  shall  be  requested  by  the  Executive 
Manager  of  the  Association  to  certify  to  a  personal  knowledge  of  the  applicant,  with  an 
opinion  of  the  applicant's  qualifications  for  membership. 

(d)  No  further  action  shall  be  taken  upon  the  application  until  replies  have  been 
received  from  at  least  three  of  the  persons  named  by  the  applicant  as  references. 

3.  Election  to  Membership 

(a)  Upon  completion  of  the  application  in  accordance  with  Section  2  of  this  Article 
the  Board  of  Direction  through  its  Membership  Committee  shall  consider  the  application 
and  make  such  investigation  as  it  may  consider  desirable  or  necessary. 

(b)  Upon  completion  of  such  consideration  and  investigation,  each  member  of  the 
Board  of  Direction  shall  be  supplied  with  the  required  information,  together  with  the 
recommendation  of  the  Membership  Committee  as  to  the  class  of  membership,  if  any, 
to  which  the  applicant  is  eligible,  and  the  admission  of  the  applicant  shall  be  canvassed  bv 
ballot  among  the  members  of  the  Board  of  Direction. 

(c)  In  the  event  that  an  application  has  been  made  under  the  provisions  of  Section 
2,  Paragraphs  (a)  and  (b)  of  this  Article,  a  two-thirds  affirmative  vote  of  the  entire 
Board  of  Direction  shall  be  required  for  election. 

(d)  In  the  event  that  an  application  has  been  made  under  the  provision  of  Section 
2,  Paragraphs  (a)  and  (c)  of  the  Article,  a  unanimous  affirmative  vote  of  the  entire 
Board  of  Direction  shall  be  required  for  election. 

4.  Subscription  to  the  Constitution 

An  applicant  for  any  class  of  membership  in  this  Association  shall  declare  his  wilHng- 
ness  to  abide  by  the  Constitution  of  the  Association  in  his  application  for  membership. 

5.  Honorary  Member 

A  proposal  for  Honorary  Membership  shall  be  endorsed  by  ten  or  more  Members 
of  the  Association  and  a  copy  furnished  each  member  of  the  Board  of  Direction.  The 
nominee  shall  be  declared  an  Honorary  Member  upon  receiving  a  unanimous  vote  of  the 
entire  Board  of  Direction. 

6.  Resignation 

The  Board  of  Direction  shall  accept  the  resignation,  tendered  in  writing,  of  any 
person  holding  membership  in  the  Association  whose  obligations  to  the  Association  have 
been  fulfilled. 

7.  Expulsion 

Charges  of  misconduct  on  the  part  of  anyone  holding  membership  in  this  Association, 
if  in  writing  and  signed  by  ten  or  more  Members,  may  be  submitted  to  the  Board  of 
Direction  for  examination  and  action.  If,  in  the  opinion  of  the  Board  action  is  war- 
ranted, the  person  complained  of  shall  be  served  with  a  copy  of  such  charges  and  shall 
be  given  an  opportunity  to  answer  them  to  the  Board  of  Direction.  After  such  oppor- 
tunity has  been  given,  the  Board  of  Direction  shall  take  final  action.  A  two-thirds 
affirmative  vote  of  the  entire  Board  of  Direction  shall  be  required  for  expulsion. 


Constitution  665 


8.   Reinstatement 

(a)  A  person  having  been  a  Member,  an  Associate  or  a  Junior  Member  of  this 
Association  and  having  resigned  such  membership  while  in  good  standing  may  be 
reinstated  by  a  two-thirds  affirmative  vote  of  the  entire  Board  of  Direction. 

(b)  A  person  having  been  a  Member,  an  Associate  or  a  Junior  Member  of  this 
Association  and  having  forfeited  membership  under  llie  provisions  of  Article  IV,  Section 
3,  may,  upon  such  conditions  as  may  be  fixed  by  the  Board,  be  reinstated  by  a  two-thirds 
affirmative  vote  of  the  entire  Board  of  Direction. 


Article  IV 

Dues 

1.  Entrance  Fee 

(a)  An  entrance  fee  of  .SIO  shall  be  payable  to  the  Association  with  each  application 
for  membership  other  than  Junior  Membership.  This  sum  shall  be  returned  to  an  applicant 
not  elected. 

(b)  An  entrance  fee  of  $5  shall  be  payable  to  the  Association  with  each  application 
for  Junior  Member,  which  sum  shall  be  returned  to  an  applicant  not  elected.  When  a 
Junior  Member  transfers  to  the  Member  or  Associate  Member  class  the  previously  paid 
$5  entrance  fee  shall  be  credited  towards  the  entrance  fee  for  the  class  to  which  trans- 
ferring. However,  the  Junior  Member  entrance  fee  shall  not  be  returnable  should  the 
individual  resign  from  the  Association  or  allow  his  membership  to  lapse.  Neither  shall 
it  be  applicable  to  the  dues  for  any  year. 

2.  Annual  Dues 

(a)  The  annual  dues   for  each   Member  and  each  Associate  shall  be  $20. 

(b)  The  annual  dues  for  each  Junior  Member  shall  be  $7.50. 

(c)  Life  Members  and  Honorary  Members  shall  be  exempt  from  the  payment  ol 
dues.  Life  Members  desiring  to  continue  to  receive  tlic  Bulletins  and  Proceedings  of  the 
Association  may  do  so  by  paying  a  subscription  fee  prescribed  by  the  Board  of  Direction 

3.  Arrears 

A  person  whose  dues  are  not  paid  before  April  1  of  the  current  year  shall  be  notified 
by  the  Executive  Manager.  If  the  dues  are  still  unpaid  on  July  1,  further  notice  shall  be 
given,  informing  the  person  that  he  is  not  in  good  standing  in  the  Association.  If  the  dues 
remain  unpaid  by  October  1,  the  person  shall  be  notified  that  he  will  no  longer  receive 
the  publications  of  the  Association.  If  the  dues  are  not  jwid  by  December  .^1,  the  person 
shall  forfeit  membership  without  further  action  or  notice,  except  as  provided  for  in 
Section  4  of  this  Article. 

4.  Remission  of  Dues 

The  Board  of  Direction  may  extend  the  time  of  payment  of  dues,  and  may  remit 
the  dues  of  any  Member,  Associate  or  Junior  Member  who.  for  good  reason,  is  unable 
to  pay  them. 

Article  V 
Officers 
I.  Officers 

(a)  The  officers  of  the  Association  shall  be  a  President,  two  Vice  Presidents, 
twelve  Directors,  an   Executive  Manager  and  a  Treasurer. 


666  Constitution 


(b)  The  President,  the  Vice  Presidents,  the  Directors  and  the  two  Past  Presidents 
on  the  Board  of  Direction  shall  be  Members  and  shall  act  as  the  trustees  and  have  the 
custody  of  all  property  belonging  to  the  Association. 

(c)  The  Executive  Manager  and  the  Treasurer  shall  be  appointed  by  the  Board  of 
Direction. 

2.  Term  of  Office 

The  term  of  oMce  of  the  President  shall  be  one  year,  of  the  Vice  Presidents  two 
years  and  of  the  Directors  three  years.  The  term  of  each  shall  begin  at  the  close  of 
the  annual  convention  at  which  elected  and  continue  until  a  successor  is  qualified. 
All  other  officers  and  employees  shall  hold  office  or  position  at  the  pleasure  of  the  Board 
of  Direction. 

3.  Officers  Elected  Annually 

(a)  There  shall  be  elected  at  each  annual  convention  a  President,  one  Vice  President 
and  four  Directors. 

(b)  The  candidates  for  President  and  for  Vice  President  shall  be  selected  from 
the  members  or  past  members  of  the  Board  of  Direction. 

4.  Conditions  of  Re-election  of  Officers 

A  President  shall  be  ineligible  for  re-election,  except  as  provided  for  in  Section  S  (e) 
of  this  Article.  Vice  Presidents  and  Directors  shall  be  ineligible  for  re-election  to  the  same 
office,  except  as  provided  for  in  Section  5  (e)  of  this  Article,  until,  at  least  one  full 
term  has  elapsed  after  the  end  of  their  respective  terms. 

5.  Vacancies  in  Offices 

(a)  If  a  vacancy  should  occur  in  the  office  of  President,  as  set  forth  in  Section  6 
of  this  Article,  the  senior  Vice  President  shall  immediately  and  automatically  become 
President  for  the  unexpired  term. 

(b)  If  a  vacancy  should  occur  in  the  office  of  the  senior  Vice  President,  due  to 
advancement  under  Section  5  (a)  of  this  Article,  or  for  reasons  set  forth  in  Section  6 
of  this  Article,  the  junior  Vice  President  shall  automatically  become  senior  Vice  President 
for  the  unexpired  term. 

(c)  If  a  vacancy  should  occur  in  the  office  of  the  junior  Vice  President,  due  to 
advancement  under  Section  S  (b)  of  this  Article,  or  for  reasons  set  forth  in  Section  6 
of  this  Article,  the  Board  of  Direction  shall  by  the  affirmative  vote  of  two-thirds  of  its 
entire  membership,  select  a  junior  Vice  President  from  the  members  or  past  members 
of  the  Board  of  Direction 

(d)  A  vacancy  in  the  office  of  Director,  due  to  advancement  of  a  Director  to  junior 
Vice  President  under  Section  5  (c)  of  this  Article,  or  for  reasons  set  forth  in  Section  6 
of  this  Article,  shall  be  filled  by  the  Board  of  Direction  by  the  affirmative  vote  of 
two-thirds  of  its  entire  membership. 

(e)  An  incumbent  in  any  office  for  an  unexpired  term  shall  be  eligible  for  re-election 
to  the  office  held;  provided,  however,  that  anyone  selected  to  fill  a  vacancy  as  Director 
shall  be  eligible  for  election  to  that  office,  excepting  that  such  appointee  filling  out  an 
unexpired  term  of  two  years  or  more  shall  be  considered  as  coming  within  the  provisions 
of  Section  4  of  this  Article. 


Constitution  667 


6.  Vacation  of  Office 

(a)  In  the  event  of  the  death  of  an  elected  officer,  or  his  resignation  from  office, 
or  if  he  should  cease  to  be  a  Member  of  the  Association  as  provided  in  Section  2  (B), 
Article  II;  Section  6  or  7,  Article  III;  or  Section  3,  Article  IV,  the  office  shall  be  con- 
sidered as  vacated. 

(b)  In  the  event  of  the  disability  of  an  officer  or  neglect  in  the  performance  of  duty 
by  an  officer,  the  Board  of  Direction,  by  the  affirmative  vote  of  two-thirds  of  its  entire 
membership  shall  have  the  power  to  declare  the  office  vacant. 


Article  VI 
Nomination  and  Election  of  Officers 

1.  Nominating  Committee 

(a)  There  shall  be  a  Nominating  Committee  composed  of  the  five  latest  living  Past 
Presidents  of  the  Association,  who  are  Members,  and  five  Members  who  are  not 
officers. 

(b)  The  five  Members  who  are  not  Past  Presidents  shall  be  elected  annually  for  a 
term  of  one  year,  when  the  officers  of  the  Association  are  elected. 

(c)  The  senior  Past  President  who  is  a  member  of  the  committee  shall  be  the 
chairman  of  the  committee.  In  the  absence  of  the  senior  Past  President  from  a  meeting 
of   the   committee   the   Past   President   next   in   seniority   present   shall   act  as   chairman. 

(d)  If  one  or  more  Past  Presidents  are  unable  to  act  as  members  of  the  committee 
through  disability,  the  President  shall  have  the  authority  to  appoint  an  equivalent  num- 
ber of  eligible  next  senior  Past  Presidents  to  the  committee  as  ordinary  members. 

(e)  If  one  or  more  elected  members  of  the  committee  are  unable  to  act,  through 
death  or  disability,  the  President  shall  have  the  authority  to  appoint  as  replacements  an 
equivalent  number  of  the  senior  unsuccessful  candidates  for  election  to  the  committee. 

2.  Method  of  Nominating 

(a)  At  least  three  months  prior  to  the  annual  convention,  the  Chairman  shall  call 
a  meeting  of  the  committee  at  a  convenient  place,  at  which  nominees  for  the  several 
elective  offices  shall  be  selected  as  follows: 

Number  of  Candi- 
Number  of  Candi-  dales  to  be 

dates  to  be  named  elected  at  the 

by  the  Nominating        Annual  Election 
Office  to  be  Filled  Committee  of  Officers 

President    1  1 

Vice    President    1  1 

Directors    8  4 

Nominating  Committee    10  S 

(b)  The  nominations  for  Director  shall  maintain  the  territorial  balance  prescribed 
in  Article  VII,  Section  1,  Paragraph  (b),  to  the  maximum  extent  practicable.  In  this 
connection,  the  nominations  for  Director  shall  be  predicated,  insofar  as  practicable,  on 
the  following  three-year  repeating  pattern  of  Director  po.sitions  to  ensure  adequate 
territorial  distribution: 


668  Constitution 


First  Year  Second  Year  Third  Year 

East— 2  East— 1  East— 1 

South— 1  West— 2  South— 1 

West— 1  Canada— 1  West— 2 

Nominations  in  any  one  year  shall  be  double  the  number  of  positions  available  for 
each  district  that  year,  with  the  nominations  listed  separately  by  districts. 

(c)  The  elected  members  of  the  Nominating  Committee  each  year  shall  include 
one  from  each  district  represented  on  the  Board  of  Direction  and  one  at-large  member. 
Nominations  in  any  year  shall  be  double  the  number  of  positions  available  for  each 
district,  with  the  nominations  listed  separately   by  districts. 

(d)  The  Chairman  of  the  Nominating  Committee  shall  send  the  names  of  the 
nominees  to  the  President  and  Executive  Manager  within  IS  days  after  the  meeting 
of  the  Nominating  Committee,  and  the  Executive  Manager  shall  report  the  names  of 
these  nominees  to  the  members  of  the  Association  not  less  than  60  days  prior  to  the 
.innual  convention. 

(e)  At  any  time  prior  to  30  days  before  the  annual  convention,  any  ten  or  more 
Members  may  send  to  the  Executive  Manager  additional  nominations  for  any  elective 
office  for  the  ensuing  year,  signed  by  such  Members. 

(f)  If  any  person  nominated  shall  be  found  by  the  Board  of  Direction  to  be 
ineligible  loi  the  office  for  which  nominatciJ.  oi  should  a  nominee  decline  such  nomination, 
his  name  shall  be  withdrawn.  The  Board  of  Direction  may  fill  any  vacancies  that  may 
occur  in  the  list  of  nominees  up  to  the  time  the  ballots  are  sent  out. 

3.  Ballots  Issued 

Not  less  than  thirty  days  prior  to  each  annual  convention,  the  Executive  Manager 
shall  issue  a  ballot  to  each  voting  Member  of  record  who  has  paid  his  dues  to  or  beyond 
December  31  of  the  previous  year,  listing  by  districts  the  several  candidates  to  be  voted 
upon.  When  there  is  more  than  one  candidate  for  any  office,  the  names  shall  be 
arranged  on  the  ballot  in  the  order  within  each  district  that  shall  be  determined  by  lot 
by  the  Nominating  Committee.  The  ballot  shall  be  accompanied  by  a  statement  giving 
for  each  candidate  his  record  of  membership  and  activities  in  the  Association. 

4.  Substitution  of  Names 

Members  may  remove  names  from  the  printed  ballot  list  and  may  substitute  the  name 
or  names  of  any  other  person  or  persons  eligible  for  any  office,  but  the  number  of  names 
voted  for  each  office  on  the  ballot  must  not  exceed  the  number  to  be  elected  at  that 
time  to  such  office. 

5.  Ballots 

(a)  Ballots  shall  be  placed  in  an  envelope,  sealed  and  endorsed  with  the  name  of 
the  voter,  and  mailed  to  or  deposited  with  the  Executive  Manager  at  any  time  previous 
to  the  closure  of  the  polls. 

(b)  A  voter  may  have  the  privilege  of  withdrawing  his  ballot,  for  the  purposes 
of  casting  another,  or  otherwise,  at  any  time  up  to  ten  working  days  prior  to  the 
closure  of  the  polls.  After  that  date,  no  ballot  shall  be  subject  to  withdrawal  or 
revision. 

(c)  Ballots  received  in  unendorsed  envelopes,  or  from  persons  not  qualified  to  vote, 
shall  not  be  counted. 


Constitution  669 


(d)  The  ballots  and  envelopes  shall  be  preserved  for  not  less  than  ten  days  after 
the  vote  is  canvassed. 

6.  Closure  of  Polls 

The  polls  shall  be  closed  at  12  o'clock  noon  on  the  first  day  of  normal  2J/2-day 
annual  conventions,  and  at  4  pm  on  the  day  prior  to  the  first  day  of  annual  conven- 
tions which  are  less  than  2J^  days  in  length.  In  both  instances,  the  ballots  shall  be 
counted  by  tellers  appointed  by  the  presiding  officer. 

7.  Election 

(a)  The  persons  who  shall  receive  the  highest  number  of  votes  for  the  offices  for 
which  they  are  candidates  shall  be  declared  elected. 

(b)  In  case  of  a  tie  between  two  or  more  candidates  for  the  same  office,  the 
Members  present  at  the  annual  convention  shall  elect  the  officer  by  ballot  from  the 
candidates  so  tied. 

(c)  The  presiding  officer  shall  announce  at  the  convention  the  names  of  the  officers 
elected  in  accordance  with   this  Article. 


Article  VII 
Management 

1.  Board  of  Direction 

(a)  The  Board  of  Direction  shall  be  the  governing  body  of  the  Association  and 
shall  manage  the  affairs  of  the  Association  in  accordance  with  the  Constitution  of 
the  Association,  and  shall  have  full  power  to  control  and  regulate  all  matters  not  other- 
wise provided  for  in  the  Constitution.  It  shall  be  composed  of  seventeen  Members  of 
the  Association,  and  shall  include  the  President  and  two  Vice  Presidents  of  the  Asso- 
ciation, the  two  living  junior  Past  Presidents,  and  twelve  elected  Directors.  The  nomina- 
tion and  election  of  the  Officers  and  Directors  shall  be  in  accordance  with  the  procedures 
set  forth  in  Article  VI  herein. 

(b)  Furthermore,  the  membership  shall,  insofar  as  possible,  include  proportional 
representation  from  the  territorial  divisions  contained  in  the  "List  of  Principal  Railroads 
Showing  Allocation  to  Geographical  Groups"  (published  in  the  current  issue  of  The 
Official  Railway  Equipment  Register). 

Accordingly,  the  twelve  Directors  shall  be  elected  in  accordance  with  Article  VI, 
Section  2,  to  fit,  insofar  as  possible,  the  following  general  plan  for  territorial 
representation: 

Four  from  the  Eastern  District,  including  the  Allegheny  and  Pocahontas  Districts; 
two  from  the  Southern  District;  five  from  the  Western  District,  including  the  North- 
western, Central  Western  and  Southwestern  Districts;  and  one  from  Canada. 

(c)  The  President  and  two  Vice  Presidents  of  the  Association  and  the  two  Past 
Presidents  on  the  Board  of  Direction  shall  be  at-large  members  of  the  Board. 

(d)  Vacancies  occurring  in  Director  positions  prior  to  normal  expiration  of  term 
of  office  shall  be  filled  by  the  Board,  insofar  as  possible,  from  the  district  represented 
by  the  previous  incumbent. 

(e)  The  Board  of  Direction  shall  meet  within  thirty  days  after  each  annual  con- 
vention, and  at  such  other  times  as  the  President  may  direct.  Special  meetings  shall  be 
called  on  request,  in  writing,  of  five  members  of  the  Board  of  Direction. 

(f)  Seven  members  of  the  Board  of  Direction  shall  constitute  a  quorum. 


670  Constitution 


2.  Executive  Committee 

(a)  An  Executive  Committee  of  the  Board  of  Direction  shall  be  constituted 
annually  and  shall  consist  of  the  President  and  two  Vice  Presidents  of  the  Association 
and  the  two  Past  Presidents  on  the  Board  of  Direction.  The  Executive  Committee  shall 
be  subject  to  confirmation  of  the  Board  of  Direction  each  year  at  the  first  meeting  of 
the  Board  following  the  Convention.  The  President  of  the  Association  shall  be  the 
chairman  of  the  Executive  Committee. 

(b)  The  Executive  Committee  shall  possess  and  may  exercise  during  intervals 
between  meetings  of  the  Board,  all  of  the  powers  of  the  Board  on  matters  which  in  the 
judgment  of  a  majority  of  the  Executive  Committee  cannot  properly  be  delayed  until 
the  next  meeting  of  the  Board.  Actions  of  the  Executive  Committee  shall  be  authorized 
by  a  concurring  majority  of  its  full  membership  and  shall  be  reported  to  the  Board  of 
Direction  at  its  next  meeting. 

(c)  The  Executive  Committee  may  be  dissolved  at  any  time  by  action  of  a  majority 
of  the  full  membership  of  the  Board  of  Direction.  Following  such  dissolution,  the  Execu- 
tive Committee  may  be  re-created  with  personnel  different  than  prescribed  in  Paragraph 
(a)  herein  at  any  time  prior  to  the  Annual  Convention  by  action  of  a  majority  of  the 
full  membership  of  the  Board.  However,  if  the  Executive  Committee  is  not  re-created 
prior  to  the  next  Annual  Convention  it  automatically  shall  come  under  the  provision 
of  Paragraph  (a)   herein  unless  the  Board  of  Direction  decrees  otherwise. 

3.  President 

The  President  shall  have  general  supervision  of  the  affairs  of  the  Association,  shall 
preside  at  meetings  of  the  Association,  the  Board  of  Direction  and  the  Executive  Com- 
mittee of  the  Board  of  Direction,  and,  by  virtue  of  his  office,  shall  be  a  member  of  all 
committees,  except  the  Nominating  Committee. 

4.  Vice  Presidents 

The  Vice  Presidents,  in  order  of  seniority,  shall  preside  at  meetings  in  the  absence 
of  the  President. 

5.  Treasurer 

The  Treasurer  shall  pay  all  bills  of  the  Association  when  properly  certified  by  the 
Executive  Manager  and  approved  by  the  Finance  Committee.  He  shall  make  an  annual 
report  as  to  the  financial  condition  of  the  Association  and  such  other  reports  as  may  be 
called  for  by  the  Board  of  Direction. 

6.  Executive  Manager 

The  Executive  Manager  shall  be  appointed  by  the  Board  of  Direction  to  manage 
the  affairs  of  the  Association  under  the  direction  of  the  President  and  the  Board  of 
Direction.  He  shall  be  the  Executive  Officer  and  the  Secretary  of  the  Association,  and 
shall  serve  as  secretary  of  the  Board  of  Direction  and  of  the  Executive  Committee  of 
the  Board  of  Direction. 

The  Executive  Manager  shall  attend  the  meetings  of  the  Association  and  of  the 
Board  of  Direction  and  the  Executive  Committee  of  the  Board  of  Direction,  prepare 
the  business  therefor,  and  record  the  proceedings  thereof.  Furthermore,  he  shall  see  that 
all  money  due  the  Association  is  collected,  is  credited  to  the  proper  accounts,  and  is 
deposited  in  the  designated  depository  of  the  Association,  with  receipt  to  the  Treasurer 
therefor.  He  shall  personally  certify  to  the  accuracy  of  all  bills  and  vouchers  on  which 
money  is  to  be  paid.  In  addition,  he  shall  invest  all  funds  of  the  Association  not  needed 
for  current  disbursements,  as  shall  be  recommended  by  the  Finance  Committee  of  the 


Constitution  671 


Board  of  Direction  and  approved  by  the  Board  of  Direction,  with  notification  to  the 
Treasurer  of  such  investments. 

The  Executive  Manager  shall  be  responsible  for  the  handling  of  the  correspondence 
of  the  Association,  shall  make  an  annual  report  to  the  Association,  shall  have  direct 
charge  of  the  property  and  quarters  of  the  Association,  shall  direct  the  work  of  the 
secretaries,  assistant  secretaries  and  other  employees  of  the  Association,  and  shall  perform 
such  other  duties  as  the  Board  of  Direction  may  prescribe. 

7.  Auditing  of  Accounts 

The  financial  accounts  of  the  Association  shall  be  audited  annually  by  an  accountant 
or  accountants  approved  by  and  under  the  direction  of  the  Finance  Committee. 

8.  Administrative  Committees 

At  the  first  meeting  of  the  Board  of  Direction  after  the  annual  convention,  the 
following  Administrative  Committees,  each  consisting  of  not  less  than  three  members, 
shall  be  appointed  by  the  President.  The  personnel  of  these  committees  shall  be  subject 
to  approval  by  the  Board  of  Direction 

Assignments 

Finance 

Manual 

Membership 

Personnel 

Publications 

Research 

Other  special  Administrative  Committees  may  be  appointed  by  the  President  at 
any  time,  and  reappointed  annually,  if  necessary,  their  personnel  being  subject  to 
approval  by   the  Board  of  Direction, 

Membership  on  Administrative  Committees  shall  be  restricted  to  members  of  the 
Board  of  Direction,  except  that  one  or  two  members  of  the  Administrative  Committee 
on  Research  may  be  past  members  of  the  Board  of  Direction. 

9.  Study  and  Research  Committees 

The  Board  of  Direction  may  establish  continuing  or  special  Study  and  Research 
Committees  to  investigate,  consider,  and  report  upon  subjects  appropriate  to  the  object 
of  the  Association,  as  set  forth  in  Art.  I. 

10.  Duties  of  Administrative  Committees 

(a)  Assignments 

The  Assignments  Committee  shall  review  and  pass  upon  the  recommendations  of 
Association  Study  and  Research  Committees  for  subjects  to  be  investigated,  considered 
and  reported  on  by  these  committees  during  the  ensuing  Association  year,  and  shall 
report  thereon  to  the  Board  of  Direction  for  its  approval.  The  Assignments  Committee 
shall  have  authority  to  assign  additional  subjects  or  change  the  scope  of  any  existing 
subjects  at  any  time  during  the  year,  reporting  its  action  thereon  to  the  Board  at  its 
next  regular  meeting. 

(b)  Finance 

The  Finance  Committee  shall  have  immediate  supervision  of  the  accounts  and 
financial  affairs  of  the  Association;  shall  approve  all  bills  before  payment,  and  shall 
make  recommendations  to  the  Board  of  Direction  as  to  the  investment  of  funds  and 
other   financial    matters.   The   Finance   Committee   shall    not   have   the   power   to   incur 


672  Constitution 


debts  or  other  obligations  binding  the  Association,  nor  authorize  the  payment  of  money 
other  than  the  amounts  necessary  to  meet  ordinary  current  expenses  of  the  Association, 
except  by  authority  of  the  Board  of  Direction. 

(c)  Manual 

The  Manual  Committee,  with  the  assistance  of  the  Publications  Committee,  shall 
liave   general  supervision   over   the   Manual. 

(d)  Membership 

The  Membership  Committee  shall  investigate  applicants  for  membership  and  shall 
make  recommendations  to  the  Board  of  Direction  with  reference  thereto. 

(e)  Personnel 

The  Personnel  Committee  shall  review  and  pass  upon  applications  of  members 
for  appointment  to  Study  and  Research  Committees,  and  shall  also  appoint  the  chair- 
man and  vice  chairman  of  such  committees  and  make  a  report  thereon  to  the  Board 
(if  Direction  for  its  approval.  Should  an  unexpected  vacancy  in  chairmanship  or  vice 
chairmanship  of  any  such  committee  occur,  the  Personnel  Committee  shall  have  author- 
ity to  fill  such  vacancy  immediately,  reporting  its  action  thereon  to  the  Board  at  its 
next  regular  meeting. 

(f)  Publications 

The  Publications  Committee  shall  have  general  supervision  over  the  publications 
of  the  Association.  The  Publications  Committee  shall  not  have  the  power  to  incur 
debts  or  other  obligations  binding  the  Association,  nor  authorize  the  payment  of  money 
except   by   authority   of   the   Board   of   Direction. 

(g)  Research 

The  Research  Committee  shall  encourage  and  coordinate  the  research  activities  of 
I  lie  Association,  in  the  course  of  accomplishment  of  which  it  shall  review  and  pass 
upon  the  recommendations  of  Study  and  Research  Committees  for  research  projects  and 
--hall  report  thereon  to  the  Board  of  Direction,  recommending  for  approval  specific 
projects  initiated  by  these  committees  or  by  the  Research  Committee  and  recommending 
.illotments  of  funds  for  these  projects  in  the  research  budget  of  the  Association  of 
American  Railroads  or  from  other  sources  compatible  therewith;  shall  collaborate  closely 
with  the  research  staff  of  the  Association  of  American  Railroads;  and  when  called  upon 
l)y  the  Vice  President — Research  or  the  Vice  President — Operations  and  Maintenance 
of  that  association,  members  of  the  Research  Committee  shall  engage  in  the  activities 
of  advisory  committees  or  groups  of  that  organization  and  shall  report  from  time  to 
time  to   the  Board  of  Direction  on  those  activities. 

11.  Special  Committees 

The  Board  of  Direction  may  appoint  special  committees  to  examine  into  and  report 
upon  any  subject  connected  with  the  objects  of  this  Association. 

12.  Discussion  by  Non-Members 

The  Board  of  Direction  may  invite  discussions  of  reports  from  persons  not  members 
of  the  Association. 

13.  Sanction  of  Act  of  Board  of  Direction 

An  act  of  the  Board  of  Direction  which  shall  have  received  the  expressed  or  implied 
sanction  of  the  membership  at  the  next  annual  convention  of  the  Association  shall  be 
deemed  to  be  the  act  of  the  Association. 


Constitution  673 


Article  VIII 

Meetings 
i.  Annual  Convention 

(a)  The  Annual  Convention  of  the  Association  shall  be  held  in  the  City  of  Chicago, 
111.,  or  in  such  other  city  as  may  be  determined  by  the  affirmative  vote  of  two-thirds 
of  the  entire  membership  of  the  Board  of  Direction.  The  convention  in  any  year  shall 
be  held  on  dates  determined  by  the  affirmative  vote  of  two-thirds  of  the  entire  mem- 
bership of  the  Board  of  Direction. 

(b)  The  Executive  Manager  shall  notify  all  members  of  the  Association  of  the  time 
and  place  of  the  annual  convention  at  least  30  days  in  advance  thereof. 

(c)  The  order  of  business  at  the  annual  convention  of  the  Association  shall  be: 
Address  of  the  President 

Reports  of  the  Executive  Manager  and  the  Treasurer 

Reports  of  committees 

Unfinished   business 

New  business 

Installation  of  officers 

Adjournment 

(d)  This  order  of  business  may  be  changed  by  a  majority  vote  of  Members  present. 

(e)  The  proceedings  shall  be  governed  by  "Robert's  Rules  of  Order"  except  as 
otherwise  herein  provided. 

(f)  Discussions  shall  be  limited  to  Members  and  to  those  others  invited  by  the 
presidmg  oOicer  to  speak. 

2.  Special  Meetings 

Special  meetings  of  the  Associations  may  be  called  by  the  Board  of  Directions  on  its 
own  initiative,  and  may  be  so  called  by  the  Board  of  Direction  upon  written  request 
of  100  Members.  The  request  shall  state  the  purpose  of  such  meeting. 

The  call  for  such  special  meeting  shall  be  issued  not  less  than  ten  days  in  advance 
of  the  proposed  date  of  such  meeting  and  shall  state  the  purpose  and  place  of  the 
meeting.  Ao  other  business  shall  be  taken  up  at  such  meeting, 

3.  Quorum 

Twenty-five  Members  shall  constitute  a  quorum  at  all  meetings  of  the  Association. 

Article  IX 
Amendment 
1.   Amendment 

Amendment  of  this  Constitution  may  be  proposed  by  written  petition  signed  by 
not  less  than  ten  Members  of  the  Association,  and  shall  be  acted  upon  in  the  following 
manner: 

The  proposed  amendment  shall  be  presented  to  the  Executive  Manager  who  shall 
send  a  copy  to  each  member  of  the  Board  of  Direction  as  soon  as  received.  If  a  majority 
of  the  entire  Board  of  Direction  so  votes,  the  matter  shall  be  submitted  to  the  voting 
members  of  the  Association  by  letter  ballot 

Amendment  to  the  Constitution  also  may  be  proposed  by  majority  affirmative  vote 
of  the  entire  Board  of  Direction,  and  the  proposed  amendment  tlien  submitted  to  the 
voting  members  of  the  Association  by  letter  ballot. 


674  Constitution 


Sixty  days  after  the  date  of  issue  of  the  letter  ballot,  the  Board  of  Direction  shall 
canvass  the  ballots  which  have  been  received,  and  if  two-thirds  of  such  ballots  are  in 
the  affirmative  the  amendment  shall  be  declared  adopted  and  shall  become  effective 
immediately.  The  result  of  the  letter  ballot  shall  be  announced  to  members  of  the 
Association. 


ADVANCE  COMMITTEE  REPORT 


675 


Advance   Report  of  Committee  3 — Ties   and   Wood   Preservation 
Report   on   Assignment   5 

Service  Records 

J.  T.  Slocomb  (chairman,  subcommittee),  W.  F.  Arksey,  A.  B.  Baker,  K.  C. 
Edscorn,  F.  J.  FuixjE,  R.  P.  Hughes,  H.  C.  Martin,  G.  H.  Way,  J.  L. 
Williams. 

Tie   Renewals  and   Costs 

Statistics  providing  information  on  cross  tie  renewals  and  average  cross  tie  costs 
for  the  year  1970  as  compiled  by  the  Economics  and  Finance  Department,  Asso- 
ciation of  American  Railroads,  are  presented  on  following  pages  in  Tables  A  and  B. 
Table  C  shows  the  number  of  concrete  ties  laid  in  replacement  and  in  new  con- 
struction. Table  D  shows  typical  prices  paid  for  wood  ties  in  the  East,  South  and 
West. 

The  1970  statistics  on  new  tie  renewals  by  Class  I  U.  S.  Railroads  compared 
with  1969  are  as  follows: 

Total  New  Renewals 

Year  Tie  Renewals         Per  Mile 

1969     17,191,221*  57 

1970     17,852,841"*'  60 

"  Includes   93,866   concrete  ties,   excludes  358,592   secondhand  ties. 
**  Includes   48,340   concrete  ties,   e.\cludes   323,187   secondhand  ties. 

By  geographical  regions,  the  Southern  Roads  inserted  in  replacement  103  new 
ties  per  mile,  Eastern  Roads  51  ties  per  mile  and  the  Western  Roads  52  ties  per 
mile. 

Indicated  wood  tie  life  detemiined  by  dividing  the  total  number  of  ties  in 
track  (1967  figures)  by  the  number  of  new  ties  inserted  this  one  year  is  as  follows: 
Southern  Roads  30  years.  Eastern  Roads  60  years.  Western  Roads  58  years.  These 
figures  indicate  that  railroads  in  the  South  are  replacing  ties  at  a  rate  close  to 
actual  tie  life.  Railroads  in  the  East  and  in  the  West  are  still  living  on  tlie  e.xtra 
high  insertions  of  the  early  1940*s.  Cyclical  high  installations  of  over  150  ties  per 
mile  in  the  period  1940-1950  indicate  increasingly  high  requirements  in  the  decade 
of  the  70's. 

The  a\erage  cost  of  all  sizes  (grades)  and  species  of  new  wooden  ties,  pro- 
tected (or  not)  widi  various  types  of  anti-splitting  devices  and  subject  to  various 
preser\ati\e  treabiients  as  charged  out  by  storekeepers  was  $4.99  in  1969  and  $5.33 
in  1970. 

Based  on  figures  submitted  by  ten  selected  railroads,  a  typical  grade  5  main  line 
treated  oak  cross  tie  was  priced  at  $5.2.5-$6.00  in  the  South,  $5.80-$7.45  in  the 
East  and  $5.25  in  the  West.  The  range  of  prices  within  a  region  is  often  due  to 
various  upgrading  practices;  anti-splitting  devices,  types  of  preservatixes  and  reten- 
tions, number  of  handlings,  duration  of  seasoning  period,  boring,  adzing,  incising, 
etc. 

The  number  of  concrete  ties  used  in  replacement  declined  in  1970  compared 
with  1969 — from  93,866  to  48,340.  Concrete  ties  \ised  in  new  construction  increa.sed 
slightly  from  48,116  to  58,946. 

677 




— 

— 

— 

— 

- 

o 

O 

d   ao  Z 

rrf    C» 

a>  r-. 

ON 

IJN 

vO  00 

NO 

NO 

ON 

o 

ON    ^    -H 

3 

O   H 

ts 

r~  vO 

<N  n 

r^ 

sj-  r^  -J  00 

-3- 

(N 

in 

CD 

o 

00  a\  en 

o    u 

'  u 

n  ^ 

-I 

O  rj 

tvi  <N 

O 

<f 

en 

vT 

<r 

lA  <•  O 

il. 

1    t 

"■ 

cs 

-^ 

rl 

o    u 

.-1     o 

u    > 

a 

in  <T 

p~  o 

>o 

•» 

o  o 

o 

o 

r^  NO  en 

d 

o 

(N  a^ 

f^   CT\ 

o 

en  ..^ 

X     NO 

O 

<T 

<r 

NO 

en 

ON  nO  -J 

<T 

IN  <r 

r-l 

en  CN 

CN4 

m 

CN  -< 

C     0 

0    c 

t 

o 

c   E 

U     Ci 

a: 

a 

u 

S    rs 

o  -3 

o 

^    'H 

1-.  -< 

o 

<N  r^ 

>J 

M 

r-  00 

CJN 

O 

nO 

nO 

E    <1 

1,  .-1 

r^  r^ 

in  o 

-cr 

r^ 

X  in 

-3- 

c^ 

-T  en 

3   w 

c  e 

CN 

5- 

Z 

4J    ^ 

c 

d 

>3-  *£> 

00  r^ 

■s> 

-3-  O 

CN   O 

X 

sj 

X 

o 

O  -1  ON 

O    2 

-3-  in 

r^  in 

<T 

ON 

<N  00 

X  r* 

NO 

NO 

ON 

o> 

in  CNJ  o 

c 

o 

n   a 

!3^ 

ti    c 

•M 

C-J  O 

O 

O  es 

CNJ     ^ 

X 

o 

^'  J  d 

O     CJ 

O    JJ 

cu   u 

i-t 

^ 

-3-  CN 

in  r-v 

~ 

^ 

r^  CO 

ON  cn 

^ 

o 

~ 

in 

o 

c 

~ 

O  in  <T 

O 

en 

-T  00 

in  X 

o 

X 

C7N 

<t      NO     -4 

0     0 

o  in 

<r  o 

o 

o- 

o  in 

X 

X 

r^ 

O   en  en 

ft.   = 

CO  c-g 

NO  cn 

(^ 

en 

in  en  <r 

i-»   "O 

M    3 
O     3 

m  a: 

o  m 

^ 

ON 

in  (^ 

in  X 

^ 

CNJ 

o 

<r 

r^ 

m 

ON 

en  cn  in 

u   o 

.-J  en 

m  X 

<T 

O  en 

NO 

ON 

~3-  NO  X 

u>  ^ 

<T  r^ 

o 

X 

o 

o 

t-4 

-3  ^-' 

o 

in  o 

r^ 

X 

<f  1^ 

O   O 

o 

r^  NO  »c 

o 

r^ 

o  >o 

r^ 

r^  X 

v3   en 

r^ 

sT 

en 

X  in  CN 

i->     CO 

o 

r^  ^ 

<3- 

CNJ  o 

r^ 

NO 

CN  O   NO 

n    aj 

H 

3  ^ 

-D   ^ 

<t 

^    X 

X 

C3N  ^   vO 

a-  -H 

nT 

w    E 

o 

O   CN 

o  <r 

O 

o 

in  X 

CN   O 

~ 

o 

o 

NO 

o 

X 

o 

CN  <r  X 

in  -a- 

o  c^ 

O 

'n  C3N 

X  o 

<r 

o 

o 

X 

in  ON  i.n 

ON    o 

o 

ON 

ON  r^ 

X  o 

o 

o 

o 

ON 

rt  O  -1 

vO 

o  - 

en 

<n 

<-) 

o 

^-^ 

a 

^  -a 

o 

r-i  ^ 

^   vD 

o 

NO      O 

"o" 

X 

f^ 

NO  o  in 

•o    o 

-1    ON 

M   O 

<f 

in  <r 

CN 

r^ 

CN 

(J     u 

M    ^ 

t^  f^ 

<r 

NO    o 

o 

NO 

<r 

<f 

in  <r  ON 

C   -1 

r^  in 

r^  CN 

-T 

NO  r^ 

NO     X 

NO 

X 

o  ^  c^ 

a    d 

ij     0 

<■    CN 

^  o 

—1  en 

X 

o 

rf  r~  -a- 

o   u 

vD   CJ 

-d-  cs 

NO    ON 

-<   -3- 

<r 

cn 

r^ 

X   ON  00 

c 

H    o 

4-t 

■H      Ot' 

O   CN 

nD 

-4    <• 

CN 

in        -3- 

!0      C 

1      >^ 

Ji    u 

O   J3 

o 

O   cvi 

O   vD 

en 

o  o 

<r 

X 

<r 

O 

m  -3-  vD 

n   & 

r-j   o 

o 

-J  <f 

X 

o 

r^ 

<r  w  en 

m    01    0 

CN  <• 

i-H  r^ 

o- 

CN  O 

<r  -1 

r^ 

o 

<r 

X  m  in 

H    1^ 

4J 

-J 

a\ 

IN 

^ 

00 

'"' 

in 

rt        rt 

M    vO 

CN 

1J> 

CO 

en 

X 

X 

^ 

^ 

X 

X   X        ' 

f^   O 

1    c^ 

1    X 

r^    1 

X 

<t 

CJN    r^      i    ; 

<r 

CTN 

-3- 

o 

X 

-3-  ON        1 

o    c 

•rJ 

ON            1 

c 

4J     o 

rt 

oc 

-^1 

CO 

CM    O 

in  <t- 

cc 

r^  ^ 

o 

o 

o 

-3- 

w   o. 

o>  in 

en  X 

a> 

NO 

NO     CM 

r^ 

CJN 

r^ 

r^ 

-3- 

ON 

CN  -3-  <3N 

0    o 

l-l   1-1 

w 

^ 

0 

<n-  ■" 

in  <r 

vD 

in 

■<r  nd 

<r  in 

<r 

nD 

NO 

in 

in 

in 

NO  <r  -a- 

c 

a 

CJ 

-u 

T)  -o 

00  en 

oo  m 

r^ 

<r  o 

X 

o 

X 

-O 

ON 

ON  -3-  en 

0  ■'^ 

r.  o 

X 

en 

r^  r~  o 

0    d 

r^  CJ> 

en  ^o 

CO 

O 

<f  CM 

<r  -1 

ON 

O 

ON 

CN  r*s  CNJ 

z 

XI 

E 

in  o 

r-^ 

ON 

en  <r 

r^ 

<r 

r^ 

r^ 

t^  -1  o- 

3 

r^  r^ 

X 

X 

r^ 

O 

X  ^ 

E: 

<t 

^t 

^ 

^ 

C 

c 

cn 

^ 

c 

3 

c 

C 

■o 

>. 

d 

ij 

o 

o 

C 

o 

-0 

c 

OS 

c 

u 

■S  ^ 

n; 

•r4 

o 

o 

o 

1 

■3 

d  ■"■ 

H 

c: 

c 

0 

^ 

d 

n 

>H 

o 

O    0 

W 

u    g 

o 

c 

O 

g 

o 

•a 

M 

u    d 

H 

i« 

-r-l     JJ 

<u 

,'r;  3 

C 

■o 

o 

la 

d 

M     G 

o 

O 

^    cn 

J! 

(U 

c  o 

-a 

OJ 

■a 

c 

M 

c 

O    0 

CD 

c 

■r4    14_| 

o 

3 

0) 

c 

3    E    >N 

i-i 

OS 

0 

►4 

ea    ° 

E   ■^ 

d 

a 

o 

d 

u    a 

H 

i^    u 

2 

u 

(d 

M 

H 

o 

3 

^     O   -1 

CO 

to 

c 

< 

i<) 

N^ 

H 

a 

C   H  -H 

H 

>  -^ 

lO 

■^ 

N<J 

o 

^ 

3         d 

Q 

O 

U     0 

U    lO 

n3 

c: 

<D 

•-> 

u    m  > 

^ 

o 

O 

rO   -l 

•-4      O 

O 

O 

d 

H   -H 

V^ 

E    Vj 

g 

c: 

<D    C. 

eJ 

O    £ 

OS 

c  < 

•rJ       O 

O 

0 

■O       V4 

u    d 

d 

d 

o 

o 

c 

T)     C     CJ^ 

u 

0 

4-)     Mj 

CD     4J 

4-j    y] 

H 

n   c 

.-1     C 

c   c: 

c   o 

u 

^ 

00 

d  ^  ^ 

^ 

M    c 

n   nj 

CD 

o 

CD    (U 

o  X 

^ 

<: 

<  < 

fa  « 

tq 

« 

u  u 

ID   O 

u 

u 

o 

o 

o 

M 

M 

O   H   ,4 

^^^ 

w 

'f^   <t 

oj  vt 

^1    --t 

~t 

-3 

O   .-. 

c5 

CO  c-1  O   (^ 

<t 

en  ON 

ON 

NO 

NO     CN] 

<f' 

1-; 

'^, 

NO 

.-1  in 

1- 

o 

6 

O   1  - 

''I 

r--i    rA 

ON  O- 

CN| 

<-i  (-i  in  X 

in 

ejN  <r 

r* 

,^ 

On    in 

^ 

.J 

X 

o 

-3  1^ 

-t 

ON 

o 

1-.  Jl 

t^ 

*"" 

■^ 

"* 

CN] 

»-l 

'^ 

O    CO 

J3   O 

o 

^j  ^1  ^  ^ 

^ 

X     CNl 

^ 

^ 

CN    X 

CJN 

^ 

<r 

<r 

r~« 

X 

^ 

^ 

<r  NO 

in 

m  m 

r-^ 

vO  -1   irN   ^D 

<r 

o 

en  <f 

ON 

NO 

en  o 

-3 

-3 

<»■   -1 

o  -n 

nD     3? 

I^ 

X 

o^  <r 

r~  00 

O 

ON  :-,  ON  c-1 

ON    O 

o 

CNien 

-3 

-1  o 

. 

-t  ■£> 

ON   rn 

X  rn   c-l   ir, 

■<r 

^'^ 

2 

O    -T 

^I 

o 

o 

>3- 

■n  O 

O 

O    -3 

O 

C^CN 

~ 

J3  O-    O   CN 

ON 

en   X 

ON 

— < 

r^  CN 

nD 

X 

X 

-3  in 

CN 

^ 

en  X 

n3 

r^  ^^ 

—*    CM 

m 

X  CN  o  r^ 

-1- 

O    X 

nD 

o 

<f  in 

^t 

n 

ON 

^ 

nO    CNl 

O 

-D 

CN   -3 

en 

^    CN 

■ri  ^-t 

O 

(>J  ^    ^    -^ 

^ 

r^  ^ 

^ 

Ln 

m  -.t 

^ 

en 

^ 

-T 

r^   en 

rn 

en  -3 

m 

^  ^ 

— 1   ^ 

~ 

X  -J  <t  <r 

~ 

O   CN    • 

^ 

r^ 

in  cNj 

nO 

■<r 

o" 

~ 

NO      O 

in 

X 

[^ 

nd  in 

r^ 

ON    VO 

<r  CN] 

^-1   r^ 

f^ 

-T 

O 

o  o 

O    ON 

O  <f 

O    in 

rN 

vo  <r  o  0-1 

in 

r-^  r^ 

m 

r^ 

CN    ^ 

in 

<r 

O 

X 

r^  f^ 

<r 

en 

■^ 

<r  en 

<r 

O   CN 

U-,  <r 

C-N 

-3-  vD   -^  <f 

"^ 

X   o 

r^ 

- 

m   nD 

O 

m 

<r 

r^ 

in  NO 

X 

C-] 

r^  X 

r^ 

00     00 

-<  <r 

O 

r^  ^  ON  in 

~ 

ON  O 

NO 

^ 

CN    X 

X 

j^ 

__, 

X 

NO      O 

NO 

r-t 

ON 

ON   CN 

X 

fo  f^ 

r^  .— t 

vT 

NO  en 

X 

CN    -3- 

o 

ON 

o 

o 

O  r-l 

ON 

■<f 

en  r^ 

NO 

00   [^ 

O 

X    m    CM    CNl 

•-< 

r^ 

o 

X  in 

o 

NO 

NO 

NO     NO 

in 

^  f^ 

M  <r 

CO 

^   ^    I^    un 

in 

0\  CN] 

X 

p^ 

O    r^ 

en 

CN 

-d- 

p^ 

CN   en 

o 

-3 

C3N 

<f     ON 

r^ 

vO   O 

m  n 

<r 

<r  CN    C^   CN 

ON 

X 

<• 

-3- 

n3   CN 

X 

as  so 

NO  o  ro  u-i 

m 

X  in 

o 

X 

X  in 

NO 

O 

I^ 

1^ 

^  o- 

<f 

1^ 

1-* 

ON  r^ 

i-t 

ncN 

n 

-3-  c-1         CN 
CNl  u^ 

o 

<n  1^ 

o 

ON 

NO  CN 

X 

<f 

'"' 

en 

ON  en 

1-1      NO 

]-^ 

-■ 

in  X 

ON    NO 

r^ 

NO 

en 

ON     C-J 

CN    O 

~ 

-1    O     ON    ON 

<r 

en  CN 

r^ 

r^ 

^  en 

o 

"in 

NO 

<r 

X   u-i 

o- 

CN 

To" 

en   en 

CN 

o  ^ 

-1  ^  o  in 

CN]    o 

in  o 

<T 

-3- 

<r 

NO  r^ 

X 

zz 

o  ^ 

o 

^  o  r-  o 

r-^ 

en  CN] 

" 

o 

en 

O 

O 

en 

en 

;^^ 

X 

X 

O 

I— 1    r-l 

o 

o  x> 

u-1  en 

o 

m  en  ON  <!■ 

o" 

o  -t 

CN] 

X 

ON  <r 

X 

"on" 

o 

"no" 

^   en 

ON 

in" 

o 

[^     ON 

X 

tn  r^ 

LTi  r^ 

o  r^  r^  O 

o 

<r 

n3   r^ 

r^ 

X   ^ 

r~~ 

CO   00 

r~i 

r-^  ^  in  r^ 

.—I 

C7N  in 

o 

NO 

r^  r^ 

r-^ 

X 

(3N 

in 

m,  <t 

en 

o 

ON 

O       CN] 

X 

r^  vo 

ON  in 

ON 

X    ON     ON     U^ 

o 

NO  in 

X 

NO 

<r  no 

X 

f^ 

^ 

r^ 

~3   C7N 

en 

CN 

<f 

o  .- 

in 

O    ON 

<■ 

ON    W     NO     X 

O    nD 

o 

X 

<r  -3 

<f 

X 

en  NO 

00   -< 

en  in  C3N   r^ 

CN 

<r  CN 

NO 

NO 

r^  <f 

en 

<f 

en 

-3 

NO     O 

en 

^ 

m 

en  in 

o 

-.  n 

CN 

NO  r--         ^ 

NO 

^   en 

CN 

CN 

NO    IN 

'-^ 

en 

^ 

^ 

o  o 

JQ 

CN 

o  in 
<r  CN 

-3 

O   00 

>n  ^o 

X 

NO  c-i  «  -d- 

<f 

1^  in 

^ 

-3- 

-J     ON 

^ 

"7 

~ 

NO 

O   <!■ 

CTi 

~ 

ON 

^ 

vO  O 

<r 

X  <r  in  X 

<r 

en  r^ 

en 

r^ 

>t 

NO 

in  X 

o  o 

•-J   r^ 

-.t  o  r-i  in 

CN] 

<r  ^ 

NO 

X 

--*  r^ 

<r 

'-^ 

-3- 

-3 

"  o- 

1^ 

^ 

ON    ^ 

ON 

^ 

X   ON 

CN 

^ 

o 

CNl 

.ON 

CO 

CN    X 

ON 

X 

in  X  CN  X 

o 

ON 

ON 

CN 

ON 

ON 

<J- 

CN 

in 

O  r^  -cr   ro 

NO      O      l~-      O 

3 

^ 

<f    1 

s 

s 

^      ' 

ON 

r^ 

<T 

-<   CN 

r-1  NO  -a-  ^ 

<f 

r^  O- 

NO 

■3- 

^ 

<f 

^   en 

sO   CN 

I--  O 

r^ 

o  NO  m.  ON 

ON 

<r  o 

r^ 

X 

r^  O 

en 

~3- 

X 

ON 

in  CJN 

^ 

CNl 

CTN 

CN    X 

CN 

-t  m 

-t  in 

o 

nO  m.  in  NO 
Ml 

in 

P^     NO 

in 

in 

in  -o 

NO 

_M 

in 

in 

<r  <t 

-3 

-3 

<r 

«( 

in 

rj  r^ 

CNl     ,-1 

o 

r^  O  NO  X 

in 

in  ON 

ON 

X 

r~  X 

r^ 

ON 

CN 

in 

en  r^ 

X 

1^ 

o 

ON    X 

X 

«    ON 

o 

<f    r-l 

en 

X 

NO 

m 

_(    ON 

1^    NO 

in 

<f  rH  En  3 

<!• 

ON  <r 

-•t 

CN  en 

C?N 

O 

o 

X 

ON     ON 

X 

<r  X 

r^ 

c^i  r^ 

m  vO 

CN 

in  X  o  o 

en 

X      T~t 

m 

o 

en  Cjn 

On 

X 

NO 

NO 

<f  in 

-3 

X 

m  in 

r^ 

~i  o 

r-H    CN 

ON 

ON    ,D 

X 

-3- 

en 

en  o 

fN]       f-t 

yj 

CN 

NO 

r-N.  r^ 

NO 

•^T 

o 

o 

2 

c 

0 

p^ 

n 

•r-l 

iJ 

■3 

J 

0 

CU 

u 

X 

•H 

CJ     Zl 

C 

o 

O 

CJ 

tl 

U     'H 

■^ 

H 

JJ 

0     >< 

ij 

b^ 

X  w 

SIj 

X 

o8 

O 

o 

•^ 

u 

■u 

=J 

•JS 

> 

!3 

c 

Q 

c        c3   a 

3 

Q 

■  •    3 

X 

X 

U 

I.            01   J! 

£  -o 

H 

c 

tx.  c 

o 

C 

O  w 

c 

C 

1-1 

C 

o 

41           M     to 

-     c 

c 

U 

en 

o 

m 

!5 

u 

d 

c 

iJ                  J 

■a  n 

H-t 

O     CI 

tj 

u 

1^  t. 

y; 

(J 

M        e* 

o 

o: 

jj 

X 

X 

u 

X 

n 

O    --     C    n3 

U      >N 

H 

a) 

O    l- 

'J    c 

1^ 

u 

!1 

-3     U 

rs 

b.   u 

(U 

o 

•3 

-1     o 

3 

HH 

"    ii  -3  X 

It 

M 

ki 

rl 

0 

.rt  (J 

0 

N^ 

o 

0 

5   c 

O 

v8     4J      rj      W 

'  3C 

Q 

o 

0    3 

O 

W 

w 

^ 

1-4 

tn 

tn 

-■  o 

x: 

c    in   u 

-T3 

o    n 

■3    C 

■ji  (J 

U 

C3 

^   o  Qi:    = 

C     C 

k: 

-H  z; 

^ 

n 

:1 

j^ 

n 

V4      U 

w 

ZC 

-J   O     1    ^ 

c 

O     U 

•t 

O! 

E 

to 

•3 

0 

> 

c 

«     iJ 

r- 

0   c 

C 

C          (^    w 

E    11 

:1 

oc 

-  c 

"o 

c 

0   X 

«,  c 

m   o 

o 

u-     C     C     4-f 

-D 

G 

^ 

c 

V. 

u 

C« 

•H 

eo 

X    u 

O 

C     -H 

w   C 

c 

1-     C    C    u 

n 

(-1 

c  c 

O 

0 

e; 

3 

u 

> 

13     = 

H 

O    rj 

—   o 

0 

o    o    o   ■-< 

OJ 

OJ 

O 

o 

r3 

U     O 

J   Z 

:s  ci4  a.  a. 

a: 

fle:   s 

O 

< 

o  tj 

u 

U, 

u 

C 

o  >-< 

^ 

R". 

w 

tn  tn 

en 

s? 


.  ^, 

1,     n    C.    (^    sO 

tn 

r^  m  in  <f 

NO  -J  o.  aj  o 

n  -J  r-i  -.J   ^1 

.[    -• 

■j    in  ON  IT.  <» 

in 

m  ro  ON  <t 

in  ON  <r  <r  On 

JO  O  ON  ri  o 

:^.   J 

<('      '  ^'  C-I  -I 

c-j  J     '  -.' 

J.     '  J,     '    ' 

tN  CS       '  ^ 

»! 

,r,     S 

o 

<t  nd  CO  r^  \0 

~^ 

<r  o  ts  o 

00  vj  rNl         00 

CM  O   O    --   ON 

7! 

<t  in  r~  in  -* 

ON 

ts  00  00  r^ 

t*N   nO   nO     I    On 

-1  ON  in  rg  o 

o^ 

GJ 

C 

^ 

01 

rj 

<t  so  p^  r^  C7N 

00  O  ON  -3- 

00  nd  en  .— *  00 

o  <f  X  pg  tn 

CI 

jJ 

o 

ON  00  oo  in  w 

00 

NO  t-i  t~.  .-t 

00  no  r^  o  in 

Cn)  CM  r^  X  O 

u 

C 

2 

CO        r-i  cNi  eg 

o^   J  J 

n  CM 

» 

rl   M  r-  (X3  -1 

in 

r~.  o  00  <f 

<r  CO  <r       in 

-n  X  (*N  NO  in 

g 

aj 

-o 

<f   in  ON  ^  <Ni 

<r 

00  <r  --  in 

X   CS    t-l      1     ON 

-JI  in  in  -J  o 

'^ 

^ 

"• 

-t         —  (>J  -■ 

<T    —1           —1 

en         ^ 

m  CM        -1 

o  ON  <r  00 

r^  ON  CN4  r-  ts 

r^  _(  o  o  in 

c 

to 

XI 

vO    CN    00    On    CN 

F-. 

tNi  o  in  IN 

nD  en  o   tN|   .D 

cr  ON  »  in  o 

<r            -1 

c 

'-' 

vO 

<N    00    <]•    <-1   CN 

^ 

in  NO  o-  in 

in  nD  m  o  X 

<!■  X  r~  ON 

u 

ON  <r  -1  fn  IN 

tn 

coo<rtNOinoo-itn 

in  lA  ON  -J 

Ol 

-' 

-1              ^  CNi              rj  w 

rg  -1        -1 

^^^ 

^ 

<u 

u 

U     60 

m  ^  rH  r--  <r 

r^<rOootNj<rOi.ncN 

~N  X  X  rg  nO 

(d 

to    to 

CN    »  r^  ^   r^ 

ONmtNOtNr~r~-r-m 

CN  tn  in  nD 

s;    1-1 

INCNl-ltNNO-l^           -1 

>>    0) 

" 

-o 

> 

in   to 

o 

a 

o 

in  <f  r^  v£5  NO 

CO 

O    O    rf    ON  Lo   O   O          -1 

nO  in  r~  nO  en 

to 

cs   ON  r^  !JN  O 

m  -H  X  nd  o  <f  <!■    1   no 

^  en  ON  nO  ^ 

^ 

tr. 

<(■       (M  <r  en 

in  tn  cs  cni  r-)  r-\        — i 

s 

c 
to 

</> 

^ 

-1   <f  r^  O  O 

~ 

CTNin<i--iNONO<r^oo 

O  in  nO  X  tn 

c 

E 

00  <r  NO  CO  t^ 

NOOCTN^ONtNtn           00 

X  nO  CNJ  o 

vO 

IN)  -1  t>j  n  -3- 

<^        <N  X  -n  m 

<r  en  -J  rf 

"4H 

^ 

O 

'-' 

<n- 

CO 

r^   en  <r  !^  CTN 

oo" 

ON-itNin,NDinON        00 

NO  X  tn  X  r-- 

o 

^ 

NO 

-.-a-rNj_,|Cs<rcNi     ivj- 

X  en  X  o 

g 

NO           IN   ITn]   tNJ 

<f  <r       CNj 

nj 

0) 

^ 

t~,  cs  -1  -D  m 

-cr 

00  r^  r-  CO  00  o  ON  nO  oo 

<N  o  r-  ON  in 

m 

S 

in  tn  in  o  NO 
nD          tN4  ^   -3- 

-J         NO  r-~  ON  r^  tn  cN   oo 

X  -1   IN  X 

,_( 

—J 

■CO- 

3 

^ 

ON  NO  <r  -H  o 

00 

CO  in   nD  00  cnJ  o  00  00  <f 

O  ^  Ln  X 

c 

cNj  NO  =0  in  <f 

^        cnNo!oooNO<rr^ 

in  <f  in  tn    i 

ON 

NO        CNi  tn  <f 

CN                  -1 

^ 

^ 

^      yj 

v^    nO    nO  CN    nO 

in 

o  c^  00  m 

ON     r^     NO     <f      NO 

r^  O  On  X  ^ 

to    to 

<r  rt  in  1^  in 

r^  en  CN  <r 

NO  CNj  <r  ~<  e-j 

X  NO  CNi  en 

^ 

>N    CJ 

> 

to 

in    to 

1 

3 

4-1 

1 

o 

^  r-~  oj  tn  <r  1  oo 

r^x-^^iinCTNO        00 

NO   nD  r^  r^  tn 

C 

TO 

r-~  -1  in  o  <r  itN 

On  i.n  <T  .-n 

-1 

.<-^ 

to 

JJ^ 

<f  no  <r  <r  NO  <r 

ONtrtntniaNO<r        t^ 

X  no  in  in  ^ 

c 
s 

CJ^ 

sD  CN   in   r^  nD  ;tN 
CM 

tNNOcN<r|f^inin    I--! 

ON  no  eg  CNJ 

O 

00 

,-(  no  r^  m  nd 

en 

cnoNinNOr^xoN        r^ 

in  NO  r^  in  - 

o 

-cr  tn        <i-!r-j        no    1   (N 

O  r^  r-^  vr 

0^ 

r-J 

cu 

CJ 

■rH 

14-1 

E 

r^ 

nO   r^  <!■  ON  r^ 

m 

?3  "^  2  S  ?1  2  S  "  2 

o  r~  in  NO  CNJ 
nD  in  CNi  <r 

° 

CJ 

s 

-' 

-1                                               ^^Nl 

ex 

XI 

vO 

NO  in  CNJ  to  r^ 

ON 

incNtnooVir-^O^O 

X  r-^  ^^  r^ 

E 

^ 

in        ^rtN;ND^tN]NO<r 

r-~  -0-  m  en    1 

d 

S 

•^ 

i 

o 

s 

c 

c 

M  -o          c 

i 

>, 

--4      C              -H      C 
O     to           JO 

J- 

t>C 

OJ    w 

•H  -o           CJ    c 

c 

c   u 

^      -H                   V4        O 

3                          Q) 

■H      O 

^    S            0     1-1 

to 

0                       ■-! 

d.  '^ 

'^    m        m  '"' 

to          u 

0  w 

3          0 

c  -H   c       .■a 

w         o  -> 

OS 

■•    la            O     0 

U     0    0     o 

-u    n3 

H 

-H     iJ      O 

-J   Z    u  X 

CD    c   tn  -a    o 

id     to     M     C 

T) 

G 

-       j:  tn  ^ 

1) 

t«           CO 

U    -H   T)     CJ    -o 

==  -Si  '^   . 

c 

M 

c       o  0  to 

c 

u    c   3    E    >. 

to 

Pi 

O               0  ^ 

U     O     E    !« 

to    -^    S     G    -1 

CJ     to            H     (U 

H 

OJ          ■^    U 

'io 

W   M          HO 

■-<    3  Ji    CJ  '-I 

c           <  la 

S 

(in  g    <u    a 

.<3           H 

-1    to    C  H  •-< 

CO   ^j   a> 

1^     cO               l^ 

O  ^     3           to 

O 

U    O    ^1   1^    n 

i^a 

c:              to 

-)     O    ^V4     »)    > 

^0           01 

10   -1   -^    (U 

0     O     H    iJ    tJ 

to  H  -H 

Z 

~  u   e  u  e 

c 

■H   to   to   a 

'J          o  .c 

c< 

C    <    ■'^     O     01 

•O     u     ti     to 

to    to    3    O     0 

c       -a   c   oc 

UJ 

0           iJ     60   en 

to    iJ    iJ    tn 

o    u    to    1-,    iJ 

•rf     OJ     C    -H    -rt 

D 

H 

U     C    ^     C     (/i 

c    c:    c   o 

6t  -H     to    -J    £ 

c/3 

^     C     lO     ^     CU 
5    <    pq    CO    CQ 

^    j;     CJ     <U     OJ 

< 

p= 

U   O   O   CJ 

O  CJ   Q   Q   Q 

W   U    CJ    M    iJ 



U 

<r  rg  --T  rj  o 
r^  CM  <r  -<  o 

ON   <T 

ON 
-J- 

^  O   m,  in  oo 
en  r^  CM  ON  in 

X  o  <r  CO  in 
<r  X  X  CM  in 

ir,   [^    X  -T 

O  ON  -1   r^ 

f^ 

^  ^  ^  ^ 

-,    ^            ^    C-l 

~N  -J 

CO  CO  m  ^  en 

CM    CO   -,    ^    <M 

e"          en  rj 

in  u-1  m  r^  u-i 

O   <?■   vO  CM   ON 
00   CM    O    1^  ^ 

m  00 

O    00 

ON 

nO 

n-i  r^  CM  NO  CO 
O  <!•  in  <r   en 

X  r-~  <r  in  CM 

OS  -3-   NO  CM   O 

-J          en  X 

n3 

^  ^,  c-,^ 

CM   ^   ^^   ^ 

in  en  <r  -1  en 

-J  -3-  -1  en  en 

en          en  <f 

[^  u^  -^r  o  -3- 
r-  o  a^  00  o 

<j  <^  00  o  ^ 

00    CN    O    00    ^ 

7^^ 

<f 

NO    o    <f    CM    CO 

M  X  ^  in  in 

in   en  CM  -3- 
O   -<   e'l   o 

O 

OJ  -.  -.  ^ 

CM 

CO    ^ 

in  <r  nj  CM  en 

CM    <r   CM   CM    CM 

N*          en   en 

<r  00  b  vD  ^ 

r^  in         <t  <r 

in  .-1     1    a^  <?■ 

(N    00 

O      NO 

00  ON  r^  f^  o 

en  in  CJN  in  o 

en  in  o  X  so 

<f  CM  ^  ON  <r 

n3   X  so   NO 
r^  r^  en  o 

O 

^       r-t  ^  -1 

_  ^ 

^  ^ 

CM  en^  ^  ,^ 

CM   -3   c^    ^   CM 

CM  CM   en  en 

1.83 

2.14 

.70 

1.62 

a 

O  r^         vo  ON 
O    CM      1     ^    00 

<t  in 

00 

o  in  nO  in  ^ 
ON  ON  rn  m  o 

en  <r  r^  ON  en 

-3-    13|0  so 
<r        CM  r^ 

CM 

-I  en  oj  ^  ^ 

^   eo_<  ^  CM 

CM        cn^ 

2.10 

1  .94 

1.56 

n  O  r^  00  ON 
<r  CM  o  ON  o 

-1  o 

S 

r-  OS  o  O   X 

NO   -3-    ON    -<    nD 

O   IN   ^  CM   en 

X  O   NO  nD   en 

CM     MM   «J 

<f          X  en 

cm' 

.-,    CO   -^    ^    -1 

rs,    IN   -^    -I    CM 

CM        rs,  ^ 

O   r-1  r-l  c^  CM 
CS  cs  cs  ts  -1 

<f  ^  in  O  r- 

O    CO    so    CM    ON 

O  <f 
r^  00 

NO     CNJ 

s 

O   CN    CM    NO   CN 

in  NO  in  c-N  so 

— I   sO  X  r^  NO 
so  r^  <!•  CO  _< 
en  nD   CM   en   eo 

e^i   NO   NO  CM 

CM  nd  r^  X 

en  -J  <r  -3- 

O   »  vO  o  o 
CM  c-i  <r  -1 

CN  EN  ON  n  in 
nO  -J  in  NO  <f 

CO  r^ 

00   tn 

s 

-1   CM    00    ON   ^ 

o  en  <f  c^  NO 

CT\  NO   00    CM    r^ 

<f  <f  r^  X  X 
in  en  en  o  ON 
en  X  CM  in  en 

^       r~l      <T      ^ 

<t           CM    ^ 

<f        in  X 

3 

ON  CM  in  ^o  ^ 

-1  .1  in  00  o 

r-  00  CO  in  -T 
csi  c^  -^  <r  o 

in  <r 

<r  en  r^  O  i-i 
in  IM    O    O   CM 

ON  1^  00  <r  o 

<r  c^  ON  r~  -1 

-3-   X  IM   en   en 

en  <f  en  C7S 
IM   c-1   O  en 

<r         in  in 

o 

<3 

-1  O  -I  cs]  in 
o  (-1  in  00  -< 

NO  o    1   o  in 

in  r^ 

ON 

NO     O     b      ON     NO 

m  NO  in  -3-  r^ 

O   en  r^  r^  .— 1 
m   CM   X   ON  o 

^    CM   X   OJ 
CM  -3  -3  in 

m  CO  CO  » 

vo  00    1    m  CO 

CO    CnJ 

r^  NO 

o 

<r  -1  <r  00  ON 
CM  XJ  o  in  o 
en  nd  <r  <J-  nJ 

CM    C3N  CM   OT  X 
en    in  CM  CM   CM 

so    t3|in   en 
■3-        r^  o 
CM         -3-  en 

so 
en 

(^  00  0|o>   a 

-1  -*   -J  O  r^ 
^  r*  in  o  ON 

CM    -^   — I   -I  CS 

rN    CO 

<r  ON 

NO 

CM  M  r^  <r  in 
in  nO  ON  CO  o 

CM    in   CM    -1   <t 

CM  CTN  in  -4  in 

<r  d|o  X 

en          X  CM 

ON 

<]■  in  ^  ov  in 
<J-  in  vO  <J-  CM 

<j-  NO  CM  <t  in 

O  in 

^ 

CM  r^  -1  en  00 
O  -1  O  NO  o 

in  o  ON  CM  en 
r^  CM   in  r^  p^ 

X    O    ON   NO 

ON  ^  r-  00  o 

O-    O    ON    (-1   -1 

00  m  CM  m  <r 

NO  in 

s 

in  ON  o  r^  CM 
in  o  -3-  ■<?  o 

O  -<  CM  en  so 
NO  <r  in  o  X 

<f          -JO 
O     1    O  <f 

o 

rsl  — <  o  o  ^ 
ts  vo  -o  in  !-i 

c^  r^  CM  <f  00 
Ln  c-1        cNj  in 

o  <r 

<f 

CO  r^  ON  -a-  in 

X  in  no  X  r^ 

r^  <J-   n  in 

-J               o     ON 

m 
cr- 

5SSSS 

ON  <r        ON  1^ 

sf   --0      1     CM    NO 

nD    <f 

r*.  w  CJN  00  ^ 

<f  <!•  r^  en  o 
r^  en  NO  so  r^ 

OS  in  <r  m 

r^  X  o  ON 

X 

CM  •*  CM  o    ni 

r-l    00             tn    CM 

(-1  n    1   tn  in 

ON  in 
I--  -a- 

~I 

ON  -cf  m  so  -1 

o  r^  NO  ^  ON 
r^  O  i-n  NO  NO 

o    dlON  in 
r^         ON  m 

r^ 

00    X     r3|cr>     o 

in  in        O- 

in  nd  C3N  o  00 
<r  n  CM  n  in 

S  S 

-d- 

CM    O    ON    NO   O 

in  <r  -H  o  NO 

O    d|sO   en 

r^        X  <r 

s 

Long  Island 
Maine  Central 
Missouri -Illinois 
Monon 
Monongahela 

o 

c 

i-i 

J-     -H 

0    k- 

.=  w 

c        no 

S   <^ 
j<:  0)  OS   3   to 

_.   U     1     J5     C 

O             OJ     W    •-! 
i-i     C     C    i-i  TJ 
u    c    C    u    rs 

0     O     OJ    -H     0) 

z  0.  CL,  a,  OS 

0 

o 

'^ 

-  -0 
Si    c 
-     ca 
-a  ^ 
o   ^. 

s 

•a 
c   c 

0     I- 

E    u 

«   3 

o 

c 

w 

0 
H 

H 
U 

M 

o: 

H 

as 
§ 

CO 

X 

H 

.ol 

c        c 

o        o 
j:       -I 

u    r)    u           u 
3    -H    O            W 
0    OC               ri 
M    u    3          o 

o  0)       o 

o          -  -a   « 

u  w  -rf  rj   m 

O    O    4J    CJ   w 

B!   -1     C    ■«     f3 
E     n     C    .=    T3 
ri     u    -r^      u    -M 
.O    u     O     C     ^ 
ej     C     C    -I     O 

<  a   O   tj  (n. 

d 

•H 

0               o 
fc           — 

1^    -M             'p> 

u        CO   d 
a  Ji   u  z 

JJ     41     C    .^ 
3   ^     O 

0  -H  u  c; 

W   J3          ^ 

n)    eij  S  'rt  -H 

•-1  •-<     ,  o    > 

0     O   -1  .-1     3 
CJ     O     3    r-<     0 
U    (J    U    H    ^ 

o 

n   c 

C     C    J 

u   n 
a;  --I  4J 

■£  <   d 

3            O 

o  i3  u 
en 

j<:   d   ti   M 
-H   c  flj   a 
o    c:    o  £ 
>"    d  XI   JJ 
u    >    d    3 
0    d    o    o 

u 

a 

3 
0 

en 

d 

0 
H 

J 

d  ^ 

U     1 
ZI    i-l 
i-t    c 

0   o 
o  ^ 

c   - 

o 

o 

04 

;4    00 
> 

r^  U5  On  X  en 
r-i  ^  o  en  r- 

CO   ON  ^    r^  CM 
CM    On   -^    NO    C^J 

X  On    O    X   On 

-1  r-.  CM  -J  <r 

r^    r.  ON  NO  en 

en    p»  _i   O  -^r 

in  ON  .-.  X  ON 
nO  X  ON  en  ON 

ON 

W   O    nO 

r,  .H  -  -1  - 

t-H             t-H    >-4    f-* 

enc-l 

C^(           CM   CM    rH 

_l   CM   -1   -1    -1 

-^ 

-* 

o 

o  O  o  m  CM 

-J   CM    On  <r    CM 

cn  -1  -1  CO  o 
O  r^  <r  r--  m 

X  X  nO  in  in 

en   r^  O  -^  CJN 
CM   r^  c^)  ^  rj 

I-l    -T   sf  -T   e-1 

in     ON    CNl     o     ON 

r- 

ON 

-T     ON 
If,     OV     — 

Oi     r^              -.     CV, 

n-i            _|    c-j    rf 

CM           CM   cn 

CM         CM  ^r*^ 

.-.  en  CM  -<  -. 

- 

-1 

vO 

<r  a>  in  m  r^ 

CN    .-<    On  O    ON 

t^  O   0^  in  CM 
-.   NO  O   en  in 

dlON  C7N  <r  ON 
in  o  p^  en 

in        X  -1  NO 

X           -.    CM    CM 

in   IN   C-l    vT    o 

X  r.  m  -.T  .<r 

O 

O      ON     CNJ 

en  -<  o 

-4    CM   CM 

CN    -1           CN    -^ 

_     -1  ^  ^ 

-1        CM  c-g 

-1               CM     CM     r-l 

^   CM   CM   -J    IM 

«-l 

00 

in  cvj  o  ON  CM 
^  -<  On  <r  00 

nO    in   O    On    P^ 
00   O  O   -1    ON 

dl-H  en  <r  X 
o  <r  en  X 

en        rt  ^  in 

O          -1   X  -1 

ON  vO   O  CM   CM 
NO   r-  X   NO  CM 

r** 

X 

o  -3-  m 
r-.  o  r-- 

rj  -H        _  -1 

-.  -1  ^ 

CM         en^ 

<r           CM   CM   -( 

.Hin-^^CM 

'^ 

'^ 

<r  -a-  On  -1  r- 
CO  o  tn  vD  c-1 

nO  ri  in  X  nD 
X  CM  r^  en  o 

dlio  vO  f-<  in 
en  ,-H  CM  NO 

-T           O    -1   CM 

ON        .-H  ui  in 

O  ON  r-»  CM  X 
-J  NO  in  in  r^ 

■a 

-3- 

X 

o  O  X 
CN  o  in 

-4  CM  en 

.-.^^    - 

-  -         --  -< 

^        m-. 

.-H           CM    CM   -< 

WCM.-1-.- 

-- 

-^ 

cNj  NO  -.  <r  ON 

O   CM    r^   nD    M 
in  en  -t  <f  CM 

dJNO  r^  nD  r^ 
in  o  <r  en 

O         r-  -.T  -1 
X        en  >o  CTN 

o  <r  <■  X  CM 

X    en  <f   CM    NO 

•<r 

NO 

ON  NO  r~ 
IN    ON   X 

CM          <r  CM 

-        ra  ^  ^ 

-^ 

^ 

o 

O     l-i 

w     d 

12    .^ 
C     E 

o   o 

u   a 

0    •-( 
o    E 

a   u 
ij   11 
n   c 
oc 
o   w 

oil  a 
ai  3 

<    o 
d 

u 

O 
U     OC 

d    d 
a    ij 
>,  o 

> 

c-j  o  r^  o-  in 
OO  lO  o  o  .-< 

CN    -1    -1    CM    CNI 

-co- 

^  <r  NO  o  CM 
f^  nJ  O   en  nO 

<r  in  X  r~  r^ 

c-j  X  CM  en  CM 

(N        <f  en 

CM  -3-  in  in  m 
O    en  in  o  r^ 
en  ^  CM  <r  -1 

X  en  o  ON  nO 
^  X  r^  ON  CM 
ri  en  CN|  ,-1  <r 

s 

o 

lO  o  ^ 
-.  ri  tn 

o 

<r  in  r^  m  00 
<r  ON  in  <i  o 

t-~  X  in  en  r^ 

-H   ^   CM   <r    CM 

CM  o  en  >o  <r 
in        m  <r 

ON  -3-  X  in  <r 

<r   en  X  _.  NO 

r^  <t  in  en  o 
CM  r>-  CJN  X  r^ 
(N  in  en  -4  <r 

NO 

o 

cox 

X  C    X 

$308 
168 
150 
310 
268 

O   CM   NO   O-    vD 
ON  O   O    ^    ON 

d|x  en  <r  o 

en         <!■   e^ 

r^         r^   en  <r 

<r     1   NO  -^  vD 

<r  IN   r^  --1  c^ 
CM  en  en  CM  in 

NO 

X 

»  en  -I 

•3-  O  -3- 
--I  en  en 

X 

$335 
138 
142 
213 
224 

ON  tn  o  ON  ts 
O  m  ON  vo  CM 

d|r-j  X  -1  en 
.-(  in  en  no 

in        -cf  in  NO 
1^    1   en  CM  en 
o-       CM  <r  .-1 

NO  r-  o  in  NO 
IN  NO   en  CM  -J- 
CM   -sj-   CM   CM  <■ 

IN 

-3- 

NO 

CM 

C7N  ^   en 
r^  no  r* 

CM  <T 

r^  CO  r^  O  ^ 

m  rn  o  00  vT 

ON  ^  O  <f   o 
m  NO  <r  r^  en 

dl-J-  CM  in  o 
r^  CM  o  .-1 

-1          -1-  CM 

<)■        r-  -3-  o 

o  NO  X  Ln  nd 
ON  en  NO  ctn  <r 

^  en  --1  .-<  m 

r^ 

O 

in  r^  ON 

^  en  ^ 

•SI 

$188 
161 
181 
170 
133 

en  <f  -1  X  en 
X  NO  en  in  <r 

.-<     r-.     CNJ     ,-1     ^ 

d|<t  o  -er  -a- 

'r^  n-i  NO  X 
IN           in   CM 

<f       o  NO  en 

r-l             CN    CN    CM 

in  X  IN  o  X 
X  <r  NO  NO  CM 

<r 

r-4 

CM  o  en 
.-^  CM  -3- 

a   u 
3   u 

dj 

d    T3 
01     OJ 
U     d 

o   ca 

•  r^       4J 
U        C 

si 

S    o 

tU    r-l 

d  -H 
E 

0     V. 

u    & 

1 

z 

<u 
u    to 

■  d    d 

>>    0) 

> 

in    d 

o  m  rvi  tM  CM 

r~  n  m  <f  in 

O  .-1  ^  r^  NO 

o-  en  en  -J-  tn 

in  r^  NO  CM  r^ 
in         O  r^ 

X   <r  <JN  CM  en 

nO    CM   nO    X    >7 

ON     X     -1     ON     ON 

.-t  X  NO  en  in 

o 

-3- 

2:9  "^ 

lO  nO   |~. 

o 

r^  r^  r^  <t  NO 
r^  m  CM  <t-  nd 

CJ    CM    tvi    O    ON 

en  IN  <r  X  r^ 

in  c^j   X   ON  r^ 

X              X>    ON 

<r  <r  ON  r-  ON 

NO    CM  nO   CM    en 

in  o  ^  ON  r-- 
<r  CM  r^  CM  m 

S 

O 

-r  n  tn 

as 

CM  nD    CO  i-J   ON 

r-~  n  CM  nd  in 

NO  o  CM  ON  in 

en  CM  en  en  <r 

d|-i  en  X  <f 
'in         xr^ 

en          XXX 

in  ^  O  -1  CM 
in  X  X  <r  r^ 

'^ 

[^ 

X  in  o 

en  nd  no 

VO 

in  <t  r^  in  -3- 
oo  n  CM  -.t  in 

NO   en  o  -I-  X 
CM   en  en   en  CN 

d|vl-  en  r^  ON 
lO   rf  o   X 

NO          NO  NO   in 
-.      1    nD   X   en 

O   in   r^  NO  NO 

in  -4  in  <r  NO 

" 

NO 

(N    O    -J 
CN    nO    X 

ON  CM   —1    M    CO 

in  en  <)•  rH  en 

r^   X  CN   O   CN 

in  en  IN  <!•  en 

dl-t  in  en  --1 
<r       o  in 

in     1    NO  r^  <f 

-1  CM  o   en  en 
<f  X  in  <r  in 

-3- 

X 

<r  ON  in 
en  in  o 

lO 
ON 

in  CO  ON  ^  -1 
in  en  en  <r  <f 

X  f-^  <r  CM  X 
<f  <f  -T  <f  en 

d|!^J  o4  CM  en 
X        <r  r^ 

c^l        in  o  X 

en  r-i  nd  r^  X 
in  -a-  -J-  en  <r 

O 

ON 

X  X  -3- 
en  in  X 

13 

d 
o 

d 
O 

o 

H 

CJ 

H 
02 
H 

H 
Q 

Z 

a; 

1 

Atchison,  Topeka  &  Santa  Fe 
Burlington  Northern  d^ 
Chicago  &  North  Western  b 
Chicago,  Milwaukee,  St.  Paul  &  Pac. 
Chicago,  Rock  Island  &  Pacific 

Colorado  &  Southern 
Denver  &  Rio  Grande  Western 
Duluth,  Missabe&Iron  Range 
Duluth,  Winnipeg  &  Pacific 
Fort  Worth  &  Denver 

Green  Bay  &  Western 
Kansas  City  Southern 
Lake  Superior  &  Ishpeming 
Missouri -Kansas -Texas 
Missouri  Pacific 

Northwestern  Pacific 
Oregon  Electric  e 
St.  Louis-San  Francisco 
St.  Louis  Southwestern 
Soo  Line 

Southern  Pacific 
Texas  &  Pacific  i_ 
Toledo,  Peoria  &  Western 
Union  Pacific 
Western  Pacific 

o 

d 
u 

OJ 

3 
d 

OJ 

H 

« 

X 

■o 

CD 

•H 
d 

d 

ij 

0 
H 

1 

o 

d  -I   d 

O    !«   -4 
•H    -H    X 

d    d    1-1 
Z  ft-    o 
z 
d    d 
d    d    0 

-0-0^4 

d    d    d 

C      d     4J 

d    d    d 
o  cj  o 

j£   a   a  »-• 


D    o   -H  w 


J3     to   J=    c 


U     QJ    TJ    13 


O    ^1  ^ 


OJ    o    ;j    n]  C_J 


j:    c   v<    o   o 


^    i-i  <u    ^ 


— '       -u  cy 


X 

c 

i5 

>« 

o 

rj 

3 

5 

r^ 

M 

o 

d 

■o 

C 

c 

0 

O 

o 

O 

C 

o 

E 

13 

c 

m 

c 

3 

Z} 

C 

n! 

2 

CL, 

■u 

cc 

3 

o 

■H 

--^ 

ta 

c 

^ 

o 

0 

z 

T3 

X 

c 

=: 

o 

o 

o 

01) 

> 

■o 

•rH 

■r^ 

03 

i-l 

jj 

IJ 

3 

^ 

nJ 

■H 

QJ 

•-^ 

j: 

01 

60 

u 

o 

u 

u 

1-1 

2 

o< 

o. 

U-( 

0) 

.Q 

O     3 


r3    :tJ    O    ^ 


•  ra 

:3 

u 

u 

00  e 

-o   a 

D. 

a   o 

a 

B 

« 

S    0 
B   S 

>. 

O     M 

Xi 

o 

EX    (U 

tl     OJ 

i  -a 

TJ 

•a 

j: 

U     3 

3 

01 

u 

u  ^ 

E 

XJ 

0 

o 

O 

ca 

r^ 

o   c 

o 

\j     0 

z:  M 

'"' 

u. 

w 

-■ 

'^Ijal 

u| 

•31 

a.'—  — '  -H  1-1  < 


A  d  V  1 


C  o  m  m  i  t  t  (M^  Report 


OTHER  TH,\M  WOODEN  CROSS  fU'.S   LAID  IK  1970  AJ.T)  Ni;:mER  OF  OTHER  THAN  WOODEN 
CROSS  TIES  IN  ^LM^n'.•\INED  TR^.CK  OCCUPIED  BY  CROSS  TIES  AS  OF  DECEMBER  31,  1970 


District  and  Road 

Other  than 
wooden  cross 
ties  laid  in 
replacement 

Other  than 
wooden  cross 
ties  laid  in 

additional 
tracks,  new 
lines  and  ex- 
tensions 

Number  of 
other  than 
wooden  cross 
ties  in  main- 
tained track 
occupied  by 
cross  ties 
(12/31/70) 

Number 

Average 
Cost 

Number 

Average 
Cost 

EASTERN  DISTRICT: 
Baltimore  &  Ohio 
Central  RR  of  New  Jersey 
Central  Vermont 
Chicago  6e  Illinois  Midland 
Delaware  &  Hudson 
Pittsburgh  &  Lake  Erie 

155 

12.08 

- 

- 

13  770 

840 

120 

36 

61  773 
155 

Total  Eastern  District 

155 

12.08 

- 

- 

76  694 

SOUTHERN  DISTRICT: 
Florida  East  Coast 
Louisville  &  Nashville 
Norfolk  Southern 
Seaboard  Coast  Line 

7  550 
20 

$13.92 
8.87 

47  940 

$11.59 

269  854 

3  321 

68  579 

241  814 

Total  Southern  District 

7  570 

13.91 

47  940 

11.59 

583  568 

WESTERN  DISTRICT: 
Burlington  Northern 
Duluth,  Missabe  &  Iron  Range 
Kansas  City  Southern 
(Incl.  La.  &  Ark.) 
St.  Louis-San  Francisco 
Western  Pacific 

40  615 

11.94 

11  OOo 

12.74 

303 
530 

119  437 

74  480 

723 

Total  Western  District 

40  615 

11.94 

11  006 

12.74 

195  47  3 

Total  United  States 

48  340 

12.24 

58  946 

11.81 

855  735 

Association  of  American  Railroads 
Economics  and  Finance  Department 
Washington,  D.  C.   20036 


July  9,  1971 


Ties    and    Wood    Preservation 


687 


Ti'blc   D 

TYi'iCAL  cro?s  Ti:;  vr-v.^s 

10  SolccLcd  Class  I  Railroads 


DL.>v;:ricL  /description 
of  cross  tie 

January  1 , 
196« 

January  1, 
196'! 

January  1, 
1970 

Ja.u.uy  1, 
1971 

7".'c9".'<8'6"  oak  treated 
Grade  3  (M.O.  latest 

A.R.E..A..  Spec.) 
#.';S5  trt'aL.ed  (latest  A.R.K.A. 

spec.) 

$5.33 
6.50 
6.50 

$5.33 
6.50 
6.35 

$5.83 
6.90 
6.90 

S5.83 

7.45 

7.43 
1 

SO'aXfl: 

6"xS",  7"xS"  and  7"x9"  by 
8 '6"  treated  oak  &  miiced 
hardi.X'cd 
7":<9"vS'6"  treated 
7":<9"v3 '6"  oak,  creo.sotcd 

4. OS 
4.94 
5.50 

3.62 
5.09 
5.60 

4.63 
5.13 
6.50 

5.22 
5  .29 
6.00 

5.24 
5.63 

6.99 
5.12 

1 

OT.fiT: 

7";<9'^-<8'6"  red  oak 
DF  No.  1  &  better 
7":<S";<S'  Doug,  fir  rou^h  - 

No.  1  &  better 
7"x8"x9'  hard'.ood  treated 

*2.60 

4.00 

4.39 
4.45 

4.77 
5.03 

5.00 
4.67 

5.07 
5.63 

6.01 
5.09 

*  Price  for  untreated  tie. 


Association  of  Anjcrican  Railroads 
Economics  and  Fina-.ice  Department 
April  6,  1971 


Index  of  Proceedings,   Vol.   72,    1971 


—  A  — 

American  Society  for  Testing  and  Materials, 
specifications  and  designations,  concrete 
structures   and   foundations,    136 

Annual   meeting,   luncheon   address,   487 

— opening    session    features,    470 

— president's   address,  473 

— program,   46.5 

Arbitration  award,  maintenance  of  way,  eco- 
nomic effect  on  maintenance  of  way 
gangs,   201 

Australian  Iron  and  Steel  Co.,  investigation  of 
rails  made   b\',   310 

Automatic  Car  Identification,  applications  in 
vards  and  terminals  and  weighing  sys- 
tems,  230 

. — economic  studies,   73 

Automobiles,  loading  and  un'oading  facilities 
for,  tentative  Manual  recommendations, 
232 


—  B  — 

Bibliographies,   Contract  Forms,    168 
— Engineering    Records    and    Property   Account- 
ing,  241 
Birkemeier,     G.     R.,    panel    discussion,     "Glued 
Laminated   Timber — A    Reliable   Engineer- 
ing Material,"  .529 
Bohannan,  Billy,  panel  discussion,   "Glued  Lam- 
inated    Timber — A     Reliable     Engineering 
Material,"   529 
Bridges,    concrete,    plain    and    reinforced,    spec- 
ification revisions,   136 
Bridges,    continuous    welded    rail    on,    practices, 

address  by  R.   I.   Simkins,   582 
— principles,    address    by    D.    V.    Messman,    572 
— problems,   address  by  L.   F.   Currier,   .580 
Buildings,    committee    report,    419;    remarks    by 

committee   chairman,   614 
— railway  office,  design  criteria,   120 
Burlington  Northern,    Inc.,   Libbev   line   change, 
184 


—  C  — 

Charvat,  A.  W.,  memoir,  420 

Chicago  &  North  Western  Railway,  tie  test  near 
Des   Plaines,    III.,   293 

Clearances,  committee  report,  4.39;  remarks  by 
committee   chairman,   62.5 

College  students,  summer  employinent  in  rail- 
way service,  4.52 

Collisions,  involving  dangerous  articles,  address 
by  E.   R.   Schlaf,  482 

Computer  assignments  of  all  AREA  committees, 
documentation   of,   4.37 

Computers,  electronic,  programs  for  analysis 
and  rating  of  bridges,   4.32 

Concrete   bridges    ( see   Bridges,   concrete ) 

Concrete  members  ( see  Structures,  concrete 
members) 

Concrete  Structures  and  Foundation.s,  commit- 
tee report,  425;  remarks  by  committee 
chairman,   617 

Concrete   ties    (see   Ties,   concrete) 

Concrete   Trestles    (.see   Trestles,   concrete) 

Constitution,   659 

Containers,  handling  areas,  design  of  pave- 
ments  for,   536 


Continuous  Welded  Rail,  committee  report, 
415;  remarks  by  committee  chairman,  627 

— failures,   417 

— guide  for  using  thermite  process,    157 

— on   bridges,    572,    580,    582 

— statistics,   418 

Contract  Forms,  committee  report,  167;  remarks 
by  committee  chainnan,  620 

— bibliography,   168 

Corrosion,   control   of,   226 

Crossings,  highway— railway  grade,  developing 
alternate  types  of  automatic  protection, 
178 

. — development  of  a  protection  program,  ad- 
dress by  H.   L.   Michael,  493 

— economics  of  various  types,   198 

— merits  and  economics  of  marking  and  sign- 
ing,   177 

— merits  and  economics  of  prefabricated  tyiJes, 
172 

— merits   of  various   types  of  protection,    173 

— roadbed    stabilization   for,    171 

— types   of   rumble   strips   for   approaches,    180 

Culverts,   height   of   cover  tables,    107 

Currier,  L.  F.,  address,  "Problems  of  Continu- 
ous  Welded   Rail  on  Bridges,"   580 

Curves,  reverse,  minimum  tangent  distance 
between,  414 


—  D  — 

Data   processing,    applications,   244 

— code   reporting,   243,   244 

— work  equipment,  address  by  E.  H.  Fisher, 
.584 

Deno,  L.  J.,  memoir,   612 

Depreciation,  current  developments  in  connec- 
tion with  regulator\'  bodies  and  courts, 
245 

Derailments,  involving  dangerous  articles,  ad- 
dress  by   E.   R.    Schlaf,    482 

Discussion   section,   ground   rules,   72,   2.54,   608 


E 


Economics  of  Railway  Construction  and  Main- 
tenance, committee  report,  18.3;  remarks 
by   committee   chairman,    621 

Economics  of  Railway  Location  and  Operation, 
committee  reports,   1,  73,  95,    16.5 

Election  of  officers,  nominating  committee,   469 

— successful    candidates,    470 

— tellers    committee,    469 

Engineering  Education,  committee  report,  449; 
remarks     by     committee     chairman,     621 

Engineering  Records  and  Property  Accounting, 
committee  report,  239;  remarks  by  com- 
mittee   chairman,    618 

— bibliography,    241 

Environmental  Engineering,  committee  report, 
20.3;   remarks  by  committee  chairman,  619 

Epoxy  compoimds,  use  in  repair  of  concrete 
structures,    address    by   J.    A.    Heinen,    599 

Europe,    railroads    in,    79 

Executive    manager,    remarks,    473;    report,    639 


—  F  — 

Faries,   D.   T.,   memoir,   307 

Fisher,    E.    H.,    address,    "Data    Processing    for 
^Vork    E<|uipnient,"   .584 


689 


690 


Index 


Fishwick,   J.    P.,   annual    luncheon    address,   487 
Frogs,  permissible  variations,  iilan  revised,  162 


—  G  — 

(lanns,  maintenance  of  way,  as  affected  by 
arbitration   award,    201 

Gehrke,    E.   G.,   memoir,    637 

Glickstein,  D.  L.,  i>anel  discussion,  "Practical 
Applications  of  Systems  Engineering  on 
the    Railroads,"    562 

Great  Northern  Railway  (see  Burlington  North- 
em,   Inc. ) 

Guard   rails,   plan   revised,    162 


—  H  — 

Jfeinen,  J.  A.,  address,  "Repair  of  Goncrete 
Structures  with  Epoxy  Compounds,"  599 

Henry,  R.  J.,  address,  "Some  Aspects  of  Serv- 
ice Developments  in  Rail-Head  Metal," 
586 

High  speed  rail  transportation,  special  report 
on  by  W.   B.   O'Sullivan,   9 

— basic    mechanical    considerations,    1 

Highway-railway  grade  crossings  (see  Cross- 
ings, highway-railway  grade) 

Highways,  committee  report,  169;  remarks  by 
committee   chairman,   617 

Hillman,   A.   B.,  report  of  treasurer,   653 

Hodgkins,  E.  W.,  executive  manager,  remarks 
and    report,    475,    639 

Hygiene,    industrial,    retention   type   toilets,   225 


—  I  — 

Impact  and  Bridge  Stresses,  committee  report, 
431;  remarks  by  committee  chairman,  626 

Industrial   hygiene    (see    Hygiene,    industrial) 

Interstate  Commerce  Commission,  valuation  or- 
ders  and   reports,   245 

— Accounting  classifications,  revisions  and  in- 
teri>retations,  246 

— Bureau  of  Accounts,  depreciation  orders,  245 


-J- 

Johnson,   E.   0-,  president's  address,  473 

—  K  — 

Koci,  L.  F.,  address,  "Wheel  and  Rail  Loadings 
from    Diesel    Locomotives,"    500 

—  L  — 

Laird,  N.  A.,  memoir,  426 

Libbey    Dam,     construction     of    on     Burlington 

Northern,   Inc.,   184 
Line     change,     on     Burlington     Northern     near 

Libbey,    Mont.,    184 
Loeffler,   H.    S.,   memoir,    609 
Lubrication,    switch   plates,   405 

—  M  — 

Maintenance  of  way  gangs  (see  Gangs,  main- 
tenance of  way) 

Maintenance  of  Way  Work  Equipment,  com- 
nuttoe    report,    249 


— data  processing  for,  address  by  E.  II.  Fisher, 
584 

— existing,  improvements  to  be  made  to,  250 

Marine  organisms,   301 

McCurry,  L.  H.,  report  on  National  Water 
Commission,   442 

Messman,  D.  V.,  address,  "Principles  of  Con- 
tinuous  Welded   Rail  on   Bridges,"  572 

Michael,  H.  L.,  address,  "Development  of  a 
Highway-Railway  Grade  Crossing  Protec- 
tion  Program,"  493 

Muelder,  C.  F.,  address,  "A  Railroad  State- 
ment  for  Pollution  Abatement,"  568 


—  N  — 

National     \\'ater     Commission,     report     on     by 
L.    II.    McCurry,    442 


—  o  — 

O'Byrn,    Dan,    panel    discussion,    "Glued    Lami- 
nated   Timber — A    Reliable    Engineering 
Material,"    529 
Office  buildings,   railway,  design  criteria,   120 
O'Sullivan,    W.    B.,    "Special    Report    on    High- 
Speed  Rail  Transportation,"   9 


—  P  — 

Pavements,  design  of  for  container  handling 
areas,   536 

Peckover,  F.  L.,  report  on  "Design  of  Pave- 
ments for  Container  Handling  Areas,"  536 

Pipelines,  conveying  flammable  substances, 
specification    revisions,     109 

— conveying  non-flammable  substances,  speci- 
fication  revisions,    115 

Pollution  abatement,  a  railroad  statement  for, 
address   by  C.   F.   Muelder,   .568 

Pollution  control,  air,  tentative  Manual  recom- 
mendations,   217 

— water,  tentative  Manual  recommendations, 
204 

Preservatives,    wood    (see   Wood   preservation) 

President's   address,   annual   meeting,   473 


—  R  — 

Rail,  committee  report,  305;  remarks  by  com- 
mittee  chainiian,    613 

— continuous  welded  ( see  Continuous  welded 
rail) 

— end  batter,  building  up  by  use  of  semi- 
automatic wire  feed  weld,   392 

— failure  statistics,   372 

— loadings  from  diesel  locomotives,  address  by 
L.   F.   Koci,   500 

— made  by  Australian  Iron  and  Steel  Co.,  in- 
vestigation  of,    310 

— made  from  vacuum  degassed  steel,  investi- 
gation of,   335 

— obtaining    lengths    longer   than    39   ft,    309 

—  119-lb  CF&I  section  adopted  as  AREA  sec- 
tion,   160 

— rolled  and  shipped  bv  weight  and  sections 
in    1969,    400 

— service  developments  in  head  metal,  address 
by  R.  J.   Henry,  586 

Rail    mills,    visits   to   by   Rail   Committee,   309 

Rail  thermometer,  plan  and  specifications 
adopted,    161 

Rail  transportation,  high  speed  (see  High  speed 
rail  transportation ) 

Railroads,   in  Europe,  79 


Index 


691 


Rapid   transit  systems,   comparison  of  21   types, 

95 
Reed,  J.  H.,  address,   "Safety  in  the  70's,"  477 
Regional    Meeting,    Toronto,    address    by    J.    H. 

Spicer,    454 
Responsibilit>'  reixjrting,   243,   244 
Rhude,    M.    j.,   panel   discussion,    '"Glued   Lami- 
nated    Timber — A     Reliable     Engineering 

Material,"   529 
Roadbed,     tentative     Manual     recommendations, 

256 
Roadway    and    Ballast,    committee    report,    107, 

255;   remarks  by  committee  chairman,   611 
Roberts,    W.    E.,    memoir,   416 
Roggeveen,   V.   J.,   report,   "Railroads  in  Europe 

— an   American's   Views,"   79 


—  s  — 

Safety  in  the  70's,   address  by  J.  H.   Reed,  477 

Schlaf,  E.  R.,  address,  "Collisions  and  Derail- 
ments  Involving   Dangerous   Articles,"   482 

Simkins,  R.  I.,  address,  "Practices  pertaining 
to  Continuous  Welded  Rail  on  Bridges," 
582 

Siiepka,  R.  B.,  panel  discussion,  "Practical  Aii- 
plications  of  Systems  Engineering  on  the 
Railroads,"  566 

Spicer,  J.  H.,  address,  "Planning  and  Control," 
presented  at  Toronto  Regional  Meeting, 
454 

Steel  Structures,  committee  report,  153,  429; 
remarks   by   committee   chairman,   620 

Structures,  concrete,  repair  of  with  epoxy  com- 
pounds,  address  by  J.   A.   Heinen,   599 

— concrete  members,  i^lain  and  reinforced, 
specification   revisions,    139 

— establishment  of  consistent  design  loading, 
433 

Structures,   steel,  specification  revisions,   153 

- — bibliograjihy  and  technical  explanation  of 
various   specification   requirements,    153 

Structures,  timber,  repeated  loading  of  full- 
size   stringers,   422 

Systems  Engineering,  committee  report,  435; 
remarks  by   committee  chairinan,   628 

— on  a  small  railroad,  address  by  R.  B.  Siiepka, 
566 

— track  charts,  address  bv  D.  L.  Glickstein, 
562 

Switch   plates,   lubrication   of,   405 


Ties,   wood 

— annual   renewal  statistics,   301,   677 

— joint   RTA-AAR  service  test  on  C&NW,   293 

— service  test  on  Baltimore  &  Ohio  Railroad, 
302 

Timber,  glued  laminated,  panel  discussion  on, 
529 

Timber  Structures  (see  also  Structures,  timber), 
committee    report,    421 

Track,   committee  rejiort,  401 

Tracks,  main,  upgrading  of  to  support  very 
high   speeds,    1 

Trackwork,    special,    specification   revisions,    162 

Treasurer,   report,   653 

Trestles,  concrete,  reinforced,  specifications  de- 
leted,   136 

Trucks,  loading  and  unloading  facilities  for, 
tentative   Manual   recommendations,   232 


—  u— 

University  students    (see  College  students) 


—  V  — 

Valuation,    current    developments    in    connection 

with    regulatory   bodies   and    courts,   245 
— ICC   orders   and   reports,   246 


—  w  — 

VValbright,   H.    W.,   memoir,    171 

Waterways  and  Harbors,  committee  report,  441; 
remarks    by    committee    chairman,    625 

Welding,  rail  end  batter  build-up  by  semi- 
automatic  wire   feed,   392 

— rail   joints,  thennite  process,    157 

Williamson,  T.  C,  panel  discussion,  "Glued 
Laminated  Timber — A  Reliable  Engineer- 
ing  Material,"   529 

Wong,  W.  W.,  report  on  "Design  of  Pave- 
ments for  Container  Handling  Areas,"  536 

Wood,   W.   A.,   memoir,   228 

Wood   preservation,    survey   of   practices,   294 

Work  equipment  ( see  Maintenance  of  Way 
Work  Equipment) 


—  T  — 

Terrell,  E.  G.,  memoir,  240 
Thermite   welding,    rail    joints,    157 
Thermometer,    rail    (see    Rail    thermometer) 
Thoman,    R.    S.,    address,    "Ontario    Program    of 

Regional     Development,"     presented     at 

Toronto   Regional   Meeting,   458 
Ties  and   Wood  Preservation,   committee  report, 

291;   remarks  by  committee  chairman,  613 
Ties,    concrete,    special    committee    on,    remarks 

by   chairman,   629 


—  Y  — 

Yards,  applications  in  of  Automatic  Car  Identi- 
fication,   230 

— classification,  methods  of  preventing  roll- 
(mts,   229 

— layout  and  characteristics  of  loading  and 
unloading  facilities  for  automobiles  and 
trucks,  tentative  Manual  recommendations, 
232 

Yards  and  Terminals,  committee  report,  227; 
remarks  by  committee   chairman,   619 


DIRECTORY 

CONSULTING    ENGINEERS 


FRANK   R.  WOOLFORD 

Engineering   Consultant — Railroads 

24  Josepha   Ave. 

San   Francisco,  Ca.  94132 

(415)  587-1569 

246   Seadrift   Rd. 

Stinson  Beach,  Ca.  94970 

(415)  868-1555 


\MkM  Westenhoff  &  Novick,  Inc. 
■^   Consulting   Engineers 

Railroads 

Bridges — Foundations 

Waterfront    Structures — Urban     Transportation 

Planning,    Feasibility,    Design,    Inspection 

222   W.  Adams  St.,  Chicago,   III.   60606 
New   York   .   Washington    .   Sao   Paulo 


RALPH  WHITEHEAD 
&  ASSOCIATES 

Consulting   Engineers 

Bridges,   Buildings,  Highways, 

Railroads,  Airports 

1945   RANDOLPH   ROAD 

CHARLOTTE,  NORTH   CAROLINA  28207 


Pittsburgh  Testing 

Laboratory 

W.  T.  McHugh 

Assistant  to  the 

President 

850  Poplar 

Street 

Pittsburgh,  Pa. 

15220 

HAZELET  &  ERDAL 

Consulting   Engineers 

Design         Investigations         Reports 
Fixed    and    Movable    Bridges 

150  So.  Wackor  Dr.,  Chicago,  III.  60606 
Louisville        Cincinnati        Washington 


carrier  et  trottier 

ingenleu 

consells 


I         ingenieurs 


990,   avenue   Holland, 
Quebec  6 

telephone  681-0018 

Centre  d'achat, 
Rond-Point,  L^vis 
telephone  837-3792 


R.  Robert  Carrier,  b.sc.a.,  inj;. 
r^s.  681-1680 


694 


4uB  ■■ 


'i^.:»i!'-!,"^Hi  -?'ii?;i 


im 


ECONOMICAL  TRACK  DRAINAGE 

.1. [Q^V^ Ballast  Cleaning 


One  of  the  SPENO  Ballast  Cleaninj  machines. 


The  transformation  in 
drainage  conditions  shown 
in  these  photos  was 
accomplished  with  a 
SPENO  Ballast  Cleaning 
Machine . . .  Time  Tested 
—  and  Proved  — Year 
^fter  Year  on  the  railroads 
of  the  Nation. 

For  just  a  few  pennies 
per  track  foot  you  can 
have  good  track  drainage 
that  saves  maintenance 
dollars. 


Write  or  telephone  for  a  Ballast 
Cleaning  program  for  your  railroad. 


^vs; 


RRI 

ss-1 


FRANK  SPENO  RAILROAD  BALLAST  CLEANING  co.,  inc. 


Clark  St.,  Eait  Syracuse,   N.Y. 
Ph.  31 S  437  2547 


306  N.  Cayuga  St.,  Ilhoca,   N.Y. 
Ph.  607  272  3313 


Canadian  Sales  Representative:  lEC-HOLDEN  LTD.,  614  St.  James 
St.  W.,   Montival  3,  Quebec,  Canada     Phone:  514  849-8U1 


I^r